Method and device for online determining station service power consumption rate target value during peak regulation of coal-fired unit

By determining the target value of the plant power consumption rate during peak shaving of coal-fired units online, using data analysis and optimization and adjustment, the increase in power consumption and safety problems of coal-fired units during peak shaving of coal-fired units are solved, and operating efficiency and safety are improved. Reduced costs.

CN118983783APending Publication Date: 2024-11-19NORTH CHINA ELECTRICAL POWER RES INST +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411057330.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-02
Publication Date
2024-11-19

AI Technical Summary

Technical Problem

The operating efficiency of coal-fired units decreases during peak shaving, the coal consumption for power supply increases, and the power consumption rate of the plant increases, which affects the safety and economy of the unit, and is difficult to effectively reduce coal consumption and improve flexibility.

Method used

By determining the target value of the plant power consumption rate during peak shaving of coal-fired units online, using real-time and historical data for cluster analysis and abnormal warning, optimizing the power consumption of each auxiliary machine, adjusting load and environmental factors to determine the optimal target value, Perform energy efficiency optimization and adjustment.

Benefits of technology

The optimal power consumption target value determination of coal-fired units during low-load operation is achieved, and the energy-saving potential is deeply analyzed, which improves the unit's operating efficiency and safety, and reduces operating costs.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118983783A_ABST
    Figure CN118983783A_ABST
Patent Text Reader

Abstract

The invention provides a method and a device for online determining a station service power consumption rate target value during peak regulation of a coal-fired unit, and relates to the field of energy efficiency improvement, and the method comprises the following steps: determining normal operation data according to obtained real-time operation data and historical operation data; determining an optimal target value of the station service power consumption rate according to the normal operation data; and performing energy efficiency optimization adjustment according to the optimal target value of the station service power consumption rate and the real-time operation data. According to the method, the optimal target value which the station service power consumption rate should reach during peak-shaving low-load operation of the coal-fired unit can be determined online, and the operation energy efficiency of the coal-fired unit is improved based on the optimal target value.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of energy efficiency improvement, and specifically to a method and device for online determining a target value of a plant power consumption rate during peak load regulation of a coal-fired unit. Background Art

[0002] With the large-scale access of new energy to the power grid, coal-fired power generation units that were originally used for single power generation have taken on new tasks: to smooth out the load fluctuations caused by the power grid's absorption of new energy and to ensure the safe and stable operation of the power grid. At present, with the rapid development of electricity, peak load regulation has become the norm. On the one hand, during peak load regulation, the operation of the units deviates from the design value, the efficiency of the units decreases, the coal consumption for power supply increases significantly, and the operating efficiency of the units decreases. On the other hand, during peak load regulation, the units are in a low-load operation state for a long time, and the safety of several units is also affected. Under this circumstance, if power plants want to survive, they must improve their profitability, reduce costs and increase efficiency.

[0003] The power supply coal consumption value is an important criterion for measuring the energy efficiency of the unit, and the plant power consumption rate is one of the most important factors that determine the size of the power supply coal consumption. The plant power consumption rate refers to the percentage of the plant variable power consumption to the power generation per unit time. It is an important indicator of the operation of the power plant and an important basis for measuring the operation level of the power plant. Reducing the plant power consumption rate is one of the key tasks of energy conservation and consumption reduction in power plants. During peak load regulation, on the one hand, the plant power consumption rate increases, causing the unit energy efficiency to decrease, but "whether the increase in the plant power consumption rate is within a reasonable range", "whether the unit still has energy-saving potential", and "where is the key point of energy saving" are still issues that power generation companies need to study in depth and solve; on the other hand, during peak load regulation, how to improve the flexibility and rapid response load capacity of coal-fired units and ensure the safe and stable operation of units is another issue that power generation companies are most concerned about.

[0004] This section is intended to provide a background or context to the embodiments of the invention recited in the claims. No admission is made that the description herein is prior art by inclusion in this section. Summary of the invention

[0005] In response to the problems in the prior art, the present application provides a method and device for online determining the target value of the plant power consumption rate during peak-shaving of a coal-fired unit, which can realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak-shaving, and based on this, improve the operating energy efficiency of the coal-fired unit.

[0006] In order to solve the above technical problems, this application provides the following technical solutions:

[0007] In a first aspect, the present application provides a method for online determining a target value of a plant power consumption rate during peak load regulation of a coal-fired unit, comprising:

[0008] Determine normal operation data based on the acquired real-time operation data and historical operation data;

[0009] Determine the optimal target value of the plant power consumption rate according to the normal operation data;

[0010] Energy efficiency optimization and adjustment are performed according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0011] Furthermore, determining the normal operation data according to the acquired real-time operation data and historical operation data includes:

[0012] Performing cluster analysis on the real-time operation data and the historical operation data to determine normal operation data and abnormal operation data;

[0013] A data abnormality warning is issued for the abnormal operation data.

[0014] Further, determining the optimal target value of the plant power consumption rate according to the normal operation data includes:

[0015] Determine the optimal target value of power consumption rate of coal mill, primary fan, forced draft fan, induced draft fan, air-cooling fan, circulating water pump and auxiliary equipment respectively;

[0016] The optimal target value of plant power consumption rate is calculated based on the optimal target value of plant power consumption rate of the coal mill, the optimal target value of the primary fan, the optimal target value of the blower, the optimal target value of the induced draft fan, the optimal target value of the air-cooling fan, the optimal target value of the circulating water pump, and the optimal target value of the auxiliary equipment.

[0017] Further, the respectively determining of the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment includes:

[0018] Determine the optimal target value of the power consumption rate of the coal mill plant according to the inherent value of the power consumption rate of the coal mill plant under the current load and the increase in the power consumption rate of the pulverizing system caused by the change in coal type;

[0019] Determine the optimal target value of the primary fan power consumption rate according to the inherent value of the primary fan power consumption rate under the current load and the increase in the primary fan power consumption rate caused by the change in ambient temperature;

[0020] Determine the optimal target value of the fan power consumption rate according to the inherent value of the fan power consumption rate under the current load and the increase in the fan power consumption rate caused by the change in ambient temperature;

[0021] Determine the optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type;

[0022] Determine the optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase in the air cooling fan power consumption rate caused by the change in ambient temperature;

[0023] Determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase in the circulating water pump power consumption rate caused by the change in the inlet water temperature;

[0024] The auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test are fitted to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate.

[0025] Furthermore, the energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data includes:

[0026] If the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate, it is determined that there is no energy saving potential;

[0027] If the measured point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate, it is judged to have energy-saving potential; wherein, the measured point value includes the current coal mill plant power consumption rate, the current primary fan plant power consumption rate, the current blower plant power consumption rate, the current induced draft fan plant power consumption rate, the current air-cooling fan plant power consumption rate, the current circulating water pump plant power consumption rate and the current auxiliary equipment plant power consumption rate.

[0028] In a second aspect, the present application provides a device for online determining a target value of a plant power consumption rate during peak load regulation of a coal-fired unit, comprising:

[0029] A normal data determination unit, used to determine normal operation data according to the acquired real-time operation data and historical operation data;

[0030] An optimal target determination unit, used to determine an optimal target value of the plant power consumption rate according to the normal operation data;

[0031] The optimal target unit is used to optimize and adjust the energy efficiency according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0032] Furthermore, the normal data determination unit includes:

[0033] A cluster analysis module, used to perform cluster analysis on the real-time operation data and the historical operation data to determine normal operation data and abnormal operation data;

[0034] The abnormality warning module is used to issue a data abnormality warning for the abnormal operation data.

[0035] Furthermore, the optimal target determination unit includes:

[0036] The sub-project target determination module is used to respectively determine the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment;

[0037] The optimal target determination module is used to calculate the optimal target value of the power consumption rate of the plant according to the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment.

[0038] Furthermore, the sub-project goal determination module includes:

[0039] A coal pulverizing target determination module is used to determine the optimal target value of the coal pulverizing plant power consumption rate according to the inherent value of the coal pulverizing plant power consumption rate under the current load and the increase in the power consumption rate of the pulverizing system caused by the change in coal type;

[0040] A fan target determination module is used to determine the optimal target value of the primary fan power consumption rate according to the inherent value of the primary fan power consumption rate under the current load and the increase in the primary fan power consumption rate caused by the change in ambient temperature;

[0041] The air supply target determination module is used to determine the optimal target value of the air supply fan power consumption rate according to the inherent value of the air supply fan power consumption rate under the current load and the increase value of the air supply fan power consumption rate caused by the change of ambient temperature;

[0042] An induced draft target determination module is used to determine the optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type;

[0043] An air cooling target determination module is used to determine the optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase in the air cooling fan power consumption rate caused by the change in ambient temperature;

[0044] A water pump target determination module is used to determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase in the circulating water pump power consumption rate caused by the change in the inlet water temperature;

[0045] The auxiliary target determination module is used to fit the auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate.

[0046] Furthermore, the optimal target unit includes:

[0047] A no potential judgment module, used to judge that there is no energy saving potential if the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate;

[0048] A potential judgment module is used to judge that there is energy-saving potential if the measurement point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate; wherein the measurement point value includes the current plant power consumption rate of the coal mill, the current plant power consumption rate of the primary fan, the current plant power consumption rate of the blower, the current plant power consumption rate of the induced draft fan, the current plant power consumption rate of the air-cooling fan, the current plant power consumption rate of the circulating water pump and the current plant power consumption rate of the auxiliary equipment.

[0049] In a third aspect, the present application provides an electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the program, the method for online determining a target value of a plant power consumption rate during peak load regulation of the coal-fired unit is implemented.

[0050] In a fourth aspect, the present application provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of a method for online determining a target value of a plant power consumption rate during peak load regulation of the coal-fired unit.

[0051] In a fifth aspect, the present application provides a computer program product, including a computer program / instruction, which, when executed by a processor, implements the steps of a method for online determining a target value of a plant power consumption rate during peak load regulation of the coal-fired unit.

[0052] In response to the problems in the prior art, the method and device for online determining the target value of the plant power consumption rate during peak-shaving of coal-fired units provided in the present application can realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak-shaving, and then deeply analyze the reasons for the plant power consumption rate and indicate the specific work of energy-saving upgrading and optimization and transformation of the unit, further tapping the energy-saving potential of the unit, which is of great significance for reducing operating costs and improving the operating safety of the unit. BRIEF DESCRIPTION OF THE DRAWINGS

[0053] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0054] Figure 1 This is a flow chart of a method for online determining a target value of a plant power consumption rate during peak load regulation of a coal-fired unit in an embodiment of the present application;

[0055] Figure 2 A flowchart for determining normal operation data in an embodiment of the present application;

[0056] Figure 3 This is one of the flow charts for determining the optimal target value of the plant power consumption rate in the embodiment of the present application;

[0057] Figure 4 This is the second flow chart for determining the optimal target value of the plant power consumption rate in the embodiment of the present application;

[0058] Figure 5 A flow chart of energy efficiency optimization adjustment in an embodiment of the present application;

[0059] Figure 6 This is a structural diagram of a device for online determining a target value of a plant power consumption rate during peak load regulation of a coal-fired unit in an embodiment of the present application;

[0060] Figure 7 This is a structural diagram of a normal data determination unit in an embodiment of the present application;

[0061] Figure 8 This is a structural diagram of the optimal target determination unit in an embodiment of the present application;

[0062] Fig. 9 This is a structural diagram of the sub-project target determination module in the embodiment of the present application;

[0063] Fig.10 This is a structural diagram of the best target unit in the embodiment of the present application;

[0064] Fig.11 A schematic diagram of the structure of an electronic device in an embodiment of the present application;

[0065] Fig.12 This is a general flow chart for online determination of the target value of the plant power consumption rate and realization of energy efficiency improvement during peak load regulation of the coal-fired unit in the embodiment of the present application. DETAILED DESCRIPTION

[0066] To make the purpose, technical solution and advantages of the embodiments of the present invention more clear, the embodiments of the present invention are further described in detail below in conjunction with the accompanying drawings. Here, the exemplary embodiments of the present invention and their descriptions are used to explain the present invention, but are not intended to limit the present invention.

[0067] The information collected in the technical solution of this application is information and data authorized by the user or fully authorized by all parties, and the collection, storage, use, processing, transmission, provision, disclosure and application of relevant data comply with the relevant laws, regulations and standards of relevant countries and regions, take necessary confidentiality measures, do not violate public order and good morals, and provide corresponding operation entrances for users to choose to authorize or refuse.

[0068] Provide users with corresponding operation entrances for them to choose to agree or reject the automated decision-making results; if the user chooses to reject, the expert decision-making process will be entered.

[0069] In one embodiment, see Figure 1 In order to achieve online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is running at low load during peak load regulation, and based on this, improve the operating energy efficiency of the coal-fired unit, the present application provides a method for online determination of the plant power consumption rate target value during peak load regulation of the coal-fired unit, comprising:

[0070] S101: Determine normal operation data according to the acquired real-time operation data and historical operation data;

[0071] S102: Determine the optimal target value of the plant power consumption rate according to the normal operation data; specifically, see Figure 2 The method of determining normal operation data based on the acquired real-time operation data and historical operation data includes: performing cluster analysis on the real-time operation data and historical operation data to determine normal operation data and abnormal operation data (S201); and performing data abnormality warning on the abnormal operation data (S202).

[0072] S103: Perform energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0073] It can be understood that the method provided in this application can online determine the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak load regulation, and then deeply analyze the reasons for the plant power consumption rate to provide specific methods for energy-saving upgrades and optimization and transformation of the unit, further tap the energy-saving potential of the unit, and is of great significance to improving the operating efficiency and safety of the unit.

[0074] Specifically, it solves three technical problems during peak load regulation of coal-fired units: "whether the increase in plant power consumption is within a reasonable range", "whether the units still have energy-saving potential", and "where are the key points of energy saving", thereby improving the flexibility of coal-fired units and their ability to quickly respond to loads, and ensuring the safe and stable operation of the power grid.

[0075] The method provided in this application is implemented through the following steps:

[0076] 1. Retrieve real-time data: retrieve real-time operation data of coal-fired power plant units;

[0077] 2. Retrieve historical data: retrieve historical data of coal-fired power plant units under the load for at least 1 hour;

[0078] 3. Abnormal data judgment: put the real-time running data in the historical data, and use the density-based cluster analysis method (BSCAN algorithm) to judge whether the real-time data is abnormal data. If the data is abnormal data, stop the calculation and display "Data abnormality alarm!". If the data is normal, proceed to the next step;

[0079] 4. The optimal target value of the plant power consumption rate is determined, and energy efficiency tuning operations are performed based on the optimal target value of the plant power consumption rate.

[0080] Among them, the plant power consumption rate at least includes the plant power consumption rate of the following auxiliary equipment: coal mill plant power consumption rate, primary fan plant power consumption rate, blower plant power consumption rate, induced draft fan plant power consumption rate, air-cooling fan plant power consumption rate, desulfurization system plant power consumption rate, ash removal plant power consumption rate, circulating water pump plant power consumption rate, condensate pump plant power consumption rate and vacuum pump plant power consumption rate, etc.

[0081] In order to better illustrate the method mentioned in this application, the following embodiments are provided:

[0082] Taking a 1000MW supercritical wet-cooled coal-fired unit as an example, during peak load regulation, the unit load rate drops to 35%, and the plant power consumption rate is 8.21%.

[0083] 1. Retrieve real-time data: retrieve real-time operation data of coal-fired power plant units;

[0084] 2. Retrieve historical data: retrieve the historical data of the coal-fired power plant units under the load within 1 hour;

[0085] 3. Abnormal data judgment: put the real-time operation data in the historical data, and use the density-based cluster analysis method (BSCAN algorithm) to determine whether the real-time data is abnormal data. If the data is normal, proceed to the next step;

[0086] 4. The method for determining the optimal target value of the plant power consumption rate is as follows:

[0087] According to formulas (1)-(7), the optimal target value of the auxiliary power consumption rate is obtained. According to formula (8), the optimal target value of the auxiliary power consumption rate is 6.79%.

[0088] 5. Compare the power consumption rate of each auxiliary machine with the optimal target value, and analyze the energy saving potential and energy efficiency improvement work.

[0089] 1) Power consumption rate of coal mill plant

[0090] The current coal mill power consumption rate is greater than the optimal target value of the coal mill power consumption rate. It is judged that there is energy saving potential and further operations are required, as follows:

[0091] Inspection of the coal mill revealed vibrations, so maintenance work was carried out;

[0092] Check that the air and powder pipes of the coal mill are not blocked or leaking;

[0093] 2) Primary fan power consumption rate

[0094] If the power consumption rate of the primary fan plant is less than or equal to the optimal target value of the power consumption rate of the primary fan plant, it is judged that there is no energy saving potential;

[0095] 3) Power consumption rate of fan plant

[0096] If the power consumption rate of the fan plant is less than or equal to the optimal target value of the power consumption rate of the fan plant, it is judged that there is no energy saving potential;

[0097] 4) Electricity consumption rate of induced draft fan

[0098] If the power consumption rate of the induced draft fan is greater than the optimal target value of the power consumption rate of the induced draft fan, it is judged that there is energy saving potential, and further operations are as follows:

[0099] Check if there is blockage in the induced draft fan duct, and start clearing it;

[0100] Check that there is no vibration in the induced draft fan;

[0101] 5) This unit is wet cooling, check the power consumption rate of the circulating water pump:

[0102] The circulating water pump power consumption rate is greater than the optimal target value of the circulating water pump power consumption rate. It is judged that there is energy saving potential. Check that the water temperature of the water tower is low. Adjust the number of wind shields to keep the water temperature within a reasonable range.

[0103] 6) Power consumption rate of other auxiliary equipment

[0104] The power consumption rate of the air preheater plant is greater than the optimal target value of the power consumption rate of the air preheater plant. It is judged that there is energy saving potential, and the air preheater is further checked:

[0105] There is no blockage or leakage;

[0106] There is low-temperature corrosion, which can be improved by optimizing and adjusting the air inlet temperature;

[0107] Air leakage is within a reasonable range;

[0108] As the power plant is not in a condition to upgrade, it has not been upgraded. Through the above work, the power consumption rate of the plant has dropped to 7.32%.

[0109] From the above description, it can be seen that the method for online determining the target value of the plant power consumption rate during peak-shaving of coal-fired units provided in this application can realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak-shaving, and then deeply analyze the reasons for the plant power consumption rate and indicate the specific work of energy-saving upgrading and optimization and transformation of the unit, further tapping the energy-saving potential of the unit, which is of great significance for reducing operating costs and improving the operating safety of the unit.

[0110] In one embodiment, see Figure 3 , the determining of the optimal target value of the plant power consumption rate according to the normal operation data includes:

[0111] S301: respectively determining the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment;

[0112] S302: Calculate the optimal target value of the power consumption rate of the plant according to the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment.

[0113] Specifically, see Figure 4 The respectively determining the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment includes:

[0114] S401: determining the optimal target value of the coal mill power consumption rate according to the inherent value of the coal mill power consumption rate under the current load and the increase in the power consumption rate of the pulverizing system caused by the change in coal type;

[0115] S402: determining an optimal target value of the primary fan power consumption rate according to an inherent value of the primary fan power consumption rate under the current load and an increase in the primary fan power consumption rate caused by a change in ambient temperature;

[0116] S403: determining an optimal target value of the fan power consumption rate according to the inherent value of the fan power consumption rate under the current load and the increase in the fan power consumption rate caused by the change in ambient temperature;

[0117] S404: determining an optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type;

[0118] S405: determining an optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase in the air cooling fan power consumption rate caused by the change in ambient temperature;

[0119] S406: Determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase in the circulating water pump power consumption rate caused by the change in the inlet water temperature;

[0120] S407: Fit the auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate. The auxiliary equipment power consumption rate refers to the description in 7) below, which refers to "other auxiliary equipment power consumption rates".

[0121] It can be understood that the calculation method of the optimal target value of the power consumption rate of each plant is as follows.

[0122] 1) Optimal target value of coal mill power consumption rate:

[0123] L ΔB =L ΔB,pt +ΔL ΔB (1)

[0124] in:

[0125] L ΔB,pt ——The inherent value of the power consumption rate of the coal mill under the current load is obtained by fitting the power consumption rate values ​​of the coal mill under at least three loads of the acceptance test before the unit is put into production into a curve, obtaining the formula of the curve, and calculating it online to the value under the current load through the formula, %;

[0126] ΔL ΔB ——The increase in power consumption of the pulverizing system caused by the change in coal type is calculated according to the industry standard DL / T1928-2018, %.

[0127] 2) Optimal target value of primary fan power consumption rate:

[0128] L PF =L PF,pt +ΔL PF (2)

[0129] in:

[0130] L PF,pt ——The inherent value of the primary fan power consumption rate under the current load, which is obtained by fitting the primary fan power consumption rate values ​​under at least three loads of the unit pre-commissioning acceptance test into a curve, obtaining the formula of the curve, and calculating the value under the current load online through the formula, %;

[0131] ΔL PF ——The increase in primary fan power consumption rate caused by changes in ambient temperature is calculated according to the industry standard DL / T1928-2018, %.

[0132] 3) Optimal target value of power consumption rate of fan plant:

[0133] L SF =L SF,pt +ΔL SF (3)

[0134] in:

[0135] L SF,pt ——The inherent value of the power consumption rate of the fan under the current load is obtained by fitting the power consumption rate values ​​of the fan under at least three loads of the acceptance test before the unit is put into production into a curve, obtaining the formula of the curve, and calculating it online to the value under the current load through the formula, %;

[0136] ΔL SF ——The increase in power consumption of the blower caused by changes in ambient temperature is calculated according to the industry standard DL / T1928-2018, %.

[0137] 4) Optimal target value of power consumption rate of induced draft fan:

[0138] L IDF =L IDF,pt +ΔL IDF (4)

[0139] in:

[0140] L IDF,pt ——The inherent value of the power consumption rate of the induced draft fan under the current load, which is obtained by fitting the power consumption rate values ​​of the induced draft fan under at least three loads of the acceptance test before the unit is put into production into a curve, obtaining the formula of the curve, and calculating it online to the value under the current load through the formula, %;

[0141] ΔL IDF ——The increase in power consumption of the blower caused by the change in coal type is calculated according to the industry standard DL / T1928-2018, %.

[0142] 5) Optimal target value for air-cooling fan power consumption rate:

[0143] LACC =L ACC,pt +ΔL ACC (5)

[0144] in:

[0145] L ACC,pt ——The inherent value of the air-cooling fan power consumption rate under the current load is obtained by fitting the air-cooling fan power consumption rate values ​​under at least three loads of the unit acceptance test before commissioning into a curve, obtaining the formula of the curve, and calculating the value under the current load online through the formula, %;

[0146] ΔL ACC ——The increase in power consumption of air-cooling fans caused by changes in ambient temperature is calculated according to the industry standard DL / T1928-2018, %.

[0147] 6) Optimal target value of circulating water pump power consumption rate:

[0148] L cw =L cw,pt +ΔL cw (6)

[0149] in:

[0150] L cw,pt ——The inherent value of the circulating water pump power consumption rate under the current load, which is obtained by fitting the circulating water pump power consumption rate values ​​under at least three loads of the unit acceptance test before commissioning into a curve, obtaining the formula of the curve, and calculating the value under the current load online through the formula, %;

[0151] ΔL cw ——The increase in power consumption of the circulating water pump caused by the change in inlet water temperature is calculated according to the industry standard DL / T1928-2018, %.

[0152] 7) Optimal target value of power consumption rate for other auxiliary equipment:

[0153] L 其他 =L 其他,pt (7)

[0154] in:

[0155] in:

[0156] L cw,pt ——The inherent value of the power consumption rate of some other auxiliary equipment under the current load, which is obtained by fitting the power consumption rate values ​​of the equipment under at least three loads of the acceptance test before the unit is put into production into a curve, obtaining the formula of the curve, and calculating it online to the value under the current load through the formula, %;

[0157] 8) The formula for calculating the optimal target value of the plant power consumption rate is as follows:

[0158] L cy =L cy,pt +ΔL cy

[0159] =L ΔB +L PF +L SF +L IDF +L ACC +L cw

[0160] =L ΔB,pt +ΔL ΔB +L PF,pt +ΔL PF +L SF,pt +ΔL SF +L IDF,pt +ΔL IDF +L ACC,pt +ΔL ACC +L cw,pt +ΔL cw +L 其他,pt (8)

[0162] From the above description, it can be seen that the method for online determining the target power consumption rate of the coal-fired unit during peak load regulation provided in the present application can respectively determine the optimal target power consumption rate of the coal mill, the optimal target power consumption rate of the primary fan, the optimal target power consumption rate of the blower, the optimal target power consumption rate of the induced draft fan, the optimal target power consumption rate of the air-cooling fan, the optimal target power consumption rate of the circulating water pump, and the optimal target power consumption rate of the auxiliary equipment.

[0163] In one embodiment, see Figure 5 , the energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data includes:

[0164] S501: If the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate, it is determined that there is no energy saving potential;

[0165] The so-called "corresponding" means: the current "primary fan" power consumption rate should be compared with the optimal target value of the "primary fan" power consumption rate; the current "supply fan" power consumption rate should be compared with the optimal target value of the "supply fan" power consumption rate; and so on;

[0166] S502: If the measurement point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate, it is determined to have energy-saving potential; wherein the measurement point value includes the current coal mill plant power consumption rate, the current primary fan plant power consumption rate, the current blower plant power consumption rate, the current induced draft fan plant power consumption rate, the current air-cooling fan plant power consumption rate, the current circulating water pump plant power consumption rate and the current auxiliary equipment plant power consumption rate.

[0167] It is understandable that in this step, it is necessary to first perform a measurement point inspection, and then perform energy efficiency tuning based on the measurement point inspection results.

[0168] 1. Check the measuring points:

[0169] Check whether the relevant measuring points of each auxiliary machine are accurate, and compare the dial data with the design data:

[0170] if If the test point is qualified, the next step can be carried out directly;

[0171] if If the measuring point is inaccurate, it is judged that the measuring point needs to be repaired.

[0172] Correction.

[0173] Among them, the measurement point values ​​include the current coal mill power consumption rate, the current primary fan power consumption rate, the current blower power consumption rate, the current induced draft fan power consumption rate, the current air cooling fan power consumption rate, the current circulating water pump power consumption rate and the current auxiliary equipment power consumption rate. In other words, for each type of power consumption rate, the above judgment process is executed one by one, see Fig.12 shown.

[0174] 2. Compare the power consumption rate of each auxiliary machine with the optimal target value, and analyze the energy saving potential and energy efficiency improvement work.

[0175] 1) Power consumption rate of coal mill plant

[0176] If the current coal mill power consumption rate is ≤ the optimal target value of the coal mill power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0177] If the current coal mill power consumption rate is greater than the optimal target value of the coal mill power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0178] a. Check whether the coal mill is vibrating:

[0179] If yes, check whether there is friction or jam; if no, proceed to the next step;

[0180] b. Check the pressure of the coal mill air and powder pipelines. If the pressure is greater than the regulations, it is considered that the pipeline is blocked and needs to be unblocked; if the pressure is less than the regulations, it is considered that the pipeline is leaking and needs to be repaired:

[0181] If it does not exist, proceed directly to the next step;

[0182] c. Operation optimization and equipment upgrade

[0183] When there is no vibration in the coal mill and no blockage or leakage in the air and powder pipes, it is necessary to optimize the operation mode of the pulverizing system, and to improve the fineness of the coal powder and the uniformity of the air and powder by adjusting the parameters such as the air-coal ratio, wind speed and coal mill load, so as to reduce the power consumption rate of the coal mill. If necessary, equipment upgrades can be carried out, such as introducing dynamic separators and frequency conversion of coal mills.

[0184] 2) Primary fan power consumption rate

[0185] If the current primary fan power consumption rate is ≤ the optimal target value of the primary fan power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0186] If the current primary fan power consumption rate is greater than the optimal target value of the primary fan power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0187] a. Check whether the primary fan pipeline is blocked or leaking:

[0188] If the pressure of the primary fan pipe is greater than the regulations, it is judged that the pipe is blocked and needs to be unblocked; if the pressure is less than the regulations, it is judged that the pipe is leaking and needs to be repaired; if not, proceed to the next step;

[0189] b. Check the air volume of the primary fan

[0190] Calculate the design value of primary air volume: The system automatically retrieves the design value of primary air volume under at least three loads, uses the linear regression method to obtain the formula for the change of the design value of primary air volume with load, and uses the formula to calculate the value under the current load online;

[0191] If the primary air volume is ≤ the design value, proceed directly to the next step;

[0192] If the primary air volume is greater than the design value, the unit combustion optimization adjustment work should be carried out to reduce the primary air volume as much as possible. It is judged as "working up to standard" if after multiple adjustments, It is judged as

[0193] "It is necessary to carry out equipment upgrades and modifications" to change the primary fan from fixed frequency to variable frequency.

[0194] 3) Power consumption rate of fan plant

[0195] If the current power consumption rate of the fan plant is ≤ the optimal target value of the power consumption rate of the fan plant, it is judged that there is no energy saving potential and no further operation is required;

[0196] If the current fan power consumption rate is greater than the optimal target value of the fan power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0197] a. Check whether there is blockage or leakage in the fan pipeline:

[0198] If the pressure of the fan pipe is greater than the regulations, it is judged that the pipe is blocked and needs to be unblocked; if the pressure is less than the regulations, it is judged that the pipe is leaking and needs to be repaired; if not, proceed to the next step;

[0199] b. Check the air volume of the blower

[0200] Calculate the secondary air volume design value: The system automatically retrieves the secondary air volume design value under at least three loads, uses the linear regression method to obtain the formula for the change of the secondary air volume design value with the load, and uses the formula to calculate the value under the current load online;

[0201] If the secondary air volume is ≤ the design value, proceed directly to the next step;

[0202] If the secondary air volume is greater than the design value, the unit combustion optimization adjustment work should be carried out to reduce the primary air volume as much as possible. It is judged as "working up to standard" if after multiple adjustments, It is judged as

[0203] "It is necessary to carry out equipment upgrade and transformation" to change the fan from fixed frequency to variable frequency;

[0204] 4) Electricity consumption rate of induced draft fan

[0205] If the current induced draft fan power consumption rate is ≤ the optimal target value of the induced draft fan power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0206] If the current induced draft fan power consumption rate is greater than the optimal target value of the induced draft fan power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0207] a. Check whether there is blockage or leakage in the induced draft fan pipeline:

[0208] If the pressure of the induced draft fan pipe is greater than the regulations, it is judged that the pipe is blocked and needs to be unblocked; if the pressure is less than the regulations, it is judged that the pipe is leaking and needs to be repaired; if not, proceed to the next step;

[0209] b. Check whether the induced draft fan is vibrating:

[0210] If it does not exist, proceed directly to the next step; if it does exist, it needs to be repaired;

[0211] c. Operation optimization and equipment upgrade

[0212] When the induced draft fan does not vibrate and the induced draft fan duct does not have blockage or leakage, combustion optimization adjustment work needs to be carried out to reduce the flue gas volume by adjusting the reasonable air distribution method. It is judged as "working up to standard" if after multiple adjustments, It is judged as "needing to carry out equipment upgrading and renovation", such as frequency conversion modification of the induced draft fan.

[0213] 5) Power consumption rate of air cooling fan

[0214] If the current air-cooling fan power consumption rate is ≤ the optimal target value of the air-cooling fan power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0215] If the current air-cooling fan power consumption rate is greater than the optimal target value of the air-cooling fan power consumption rate, it is judged that there is energy saving potential and further operations are required as follows:

[0216] a. Check whether there is blockage or leakage in the air cooling fan pipeline:

[0217] If the air-cooling fan pipe pressure is greater than the regulations, it is judged that the pipe is blocked and needs to be unblocked; if the pressure is less than the regulations, it is judged that the pipe is leaking and needs to be repaired; if not, proceed to the next step;

[0218] c. Operation optimization

[0219] If there is no blockage or leakage in the air-cooling fan duct, the power consumption rate can be reduced by carrying out operation optimization and adjustment.

[0220] 6) Power consumption rate of circulating water pump

[0221] If the current circulating water pump power consumption rate is ≤ the optimal target value of the circulating water pump power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0222] If the current circulating water pump power consumption rate is greater than the optimal target value of the circulating water pump power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0223] Check whether the water tower water temperature is within a reasonable range:

[0224] If |water temperature - design value| is less than 5℃, it is judged as "reasonable", and the open and closed water operation modes should be optimized;

[0225] If |water temperature - design value|≥5℃ is judged as "unreasonable", the number of wind shields needs to be adjusted to keep the water temperature within a reasonable range. If necessary, equipment upgrades can be carried out to change the circulating water pump from fixed frequency to variable frequency; 7) Power consumption rate of other auxiliary equipment

[0226] If the current auxiliary equipment power consumption rate is ≤ the optimal target value of the auxiliary equipment power consumption rate, it is judged that there is no energy saving potential and no further operation is required;

[0227] If the current auxiliary equipment power consumption rate is greater than the optimal target value of the auxiliary equipment power consumption rate, it is judged that there is energy saving potential and further operations are required, as follows:

[0228] a. Check the nitrogen oxide content in the flue gas:

[0229] If the nitrogen oxide content is ≤ the design value, no optimization is required;

[0230] If the nitrogen oxide content is greater than the design value, precise ammonia injection modification work needs to be carried out.

[0231] b. Check the air preheater

[0232] Is there any blockage, leakage, etc.?

[0233] If the pressure of each pipe of the air preheater is greater than the regulations, it is judged that the pipeline is blocked and it is necessary to carry out pipeline dredging work; if the pressure is less than the regulations, it is judged that there is a leak in the pipeline and it is necessary to carry out repair work; if there is no leakage, proceed directly to the next step;

[0234] Is there low temperature corrosion?

[0235] If it exists, optimization and adjustment work needs to be carried out to prevent low-temperature corrosion by adjusting the inlet air temperature; if it does not exist, proceed directly to the next step;

[0236] Is the air leakage within a reasonable range?

[0237] if It is considered reasonable if If it is judged as "unreasonable", it needs to be repaired; if it is reasonable, it will proceed directly to the next step;

[0238] c. Desulfurization system

[0239] For wet flue gas desulfurization, the operation mode of the slurry circulation system can be optimized.

[0240] d. Condensate pump system.

[0241] Check whether the condensate pipe is blocked. If the pipe pressure is greater than the regulations, it is judged that the pipe is blocked and needs to be unblocked. If the pressure is less than the regulations, it is judged that the pipe is leaking and needs to be repaired. If not, avoid using regulating valves to adjust the flow. If necessary, upgrade the equipment and change the condensate pump from fixed frequency to variable frequency speed regulation or perform permanent magnet speed regulation.

[0242] From the above description, it can be seen that the method provided in this application for online determining the target value of the plant power consumption rate during peak load regulation of coal-fired units can optimize and adjust the energy efficiency according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0243] Based on the same inventive concept, the embodiment of the present application also provides a device for online determining the target value of the plant power rate when the coal-fired unit is peak-shaving, which can be used to implement the method described in the above embodiment, as described in the following embodiment. Since the principle of solving the problem by the device for online determining the target value of the plant power rate when the coal-fired unit is peak-shaving is similar to the method for online determining the target value of the plant power rate when the coal-fired unit is peak-shaving, the implementation of the device for online determining the target value of the plant power rate when the coal-fired unit is peak-shaving can refer to the implementation of the method based on software performance benchmark determination, and the repetitions will not be repeated. As used below, the term "unit" or "module" can be a combination of software and / or hardware that implements predetermined functions. Although the system described in the following embodiments is preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceived.

[0244] In one embodiment, see Figure 6 In order to realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak load regulation, and based on this, improve the operating energy efficiency of the coal-fired unit, the present application provides a device for online determination of the target value of the plant power consumption rate when the coal-fired unit is operating at peak load regulation, including: a normal data determination unit 601, an optimal target determination unit 602 and an optimal target unit 603.

[0245] A normal data determination unit 601 is used to determine normal operation data according to the acquired real-time operation data and historical operation data;

[0246] An optimal target determination unit 602, configured to determine an optimal target value of the plant power consumption rate according to the normal operation data;

[0247] The optimal target unit 603 is used to optimize and adjust the energy efficiency according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0248] In one embodiment, see Figure 7 The normal data determination unit 601 includes: a cluster analysis module 701 and an abnormal warning module 702.

[0249] The cluster analysis module 701 is used to perform cluster analysis on the real-time operation data and the historical operation data to determine normal operation data and abnormal operation data;

[0250] The abnormality warning module 702 is used to issue a data abnormality warning for the abnormal operation data.

[0251] In one embodiment, see Figure 8 The optimal target determination unit 602 includes: a sub-project target determination module 801 and an optimal target determination module 802.

[0252] The sub-project target determination module 801 is used to respectively determine the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment;

[0253] The optimal target determination module 802 is used to calculate the optimal target value of the power consumption rate of the plant according to the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment.

[0254] In one embodiment, see Fig. 9 The sub-project target determination module 802 includes: a coal grinding target determination module 901, a fan target determination module 902, an air supply target determination module 903, an induced draft target determination module 904, an air cooling target determination module 905, a water pump target determination module 906 and an auxiliary target determination module 907.

[0255] The coal pulverizing target determination module 901 is used to determine the optimal target value of the coal pulverizing plant power consumption rate according to the inherent value of the coal pulverizing plant power consumption rate under the current load and the increase in the power consumption rate of the pulverizing system caused by the change of coal type;

[0256] The fan target determination module 902 is used to determine the optimal target value of the primary fan power consumption rate according to the inherent value of the primary fan power consumption rate under the current load and the increase value of the primary fan power consumption rate caused by the change of ambient temperature;

[0257] The air supply target determination module 903 is used to determine the optimal target value of the air supply fan power consumption rate according to the inherent value of the air supply fan power consumption rate under the current load and the increase value of the air supply fan power consumption rate caused by the change of ambient temperature;

[0258] The induced draft target determination module 904 is used to determine the optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type;

[0259] The air cooling target determination module 905 is used to determine the optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase value of the air cooling fan power consumption rate caused by the ambient temperature change;

[0260] The water pump target determination module 906 is used to determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase value of the circulating water pump power consumption rate caused by the change of the inlet water temperature;

[0261] The auxiliary target determination module 907 is used to fit the auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate.

[0262] In one embodiment, see Fig.10 The optimal target unit 603 includes: a non-latent judgment module 1001 and a latent judgment module 1002.

[0263] A no potential judgment module 1001 is used to judge that there is no energy saving potential if the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate;

[0264] The potential judgment module 1002 is used to judge that there is energy-saving potential if the measurement point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate; wherein the measurement point value includes the current plant power consumption rate of the coal mill, the current plant power consumption rate of the primary fan, the current plant power consumption rate of the blower, the current plant power consumption rate of the induced draft fan, the current plant power consumption rate of the air-cooling fan, the current plant power consumption rate of the circulating water pump and the current plant power consumption rate of the auxiliary equipment.

[0265] From the hardware level, in order to achieve online determination of the optimal target value that the plant power rate should reach when the coal-fired unit is running at low load during peak load regulation, and based on this, improve the operating energy efficiency of the coal-fired unit, the present application provides an embodiment of an electronic device for implementing all or part of the content of the method for online determination of the plant power rate target value during peak load regulation of the coal-fired unit, and the electronic device specifically includes the following content:

[0266] Processor, memory, communication interface and bus; wherein the processor, memory and communication interface communicate with each other through the bus; the communication interface is used to realize the information transmission between the device for online determining the target value of the plant power rate during peak shaving of the coal-fired unit and related equipment such as the core business system, user terminal and related database; the logic controller can be a desktop computer, a tablet computer and a mobile terminal, etc., but the present embodiment is not limited thereto. In the present embodiment, the logic controller can be implemented with reference to the embodiment of the method for online determining the target value of the plant power rate during peak shaving of the coal-fired unit in the embodiment, and the embodiment of the device for online determining the target value of the plant power rate during peak shaving of the coal-fired unit, and the contents thereof are incorporated herein, and the repeated parts are not repeated.

[0267] It is understandable that the user terminal may include a smart phone, a tablet electronic device, a network set-top box, a portable computer, a desktop computer, a personal digital assistant (PDA), a vehicle-mounted device, a smart wearable device, etc. Among them, the smart wearable device may include smart glasses, a smart watch, a smart bracelet, etc.

[0268] In practical applications, part of the method for determining the target value of the plant power consumption rate online during peak load regulation of coal-fired units can be executed on the electronic device side as described above, or all operations can be completed in the client device. The selection can be made based on the processing capacity of the client device and the limitations of the user's usage scenario. This application does not limit this. If all operations are completed in the client device, the client device may also include a processor.

[0269] The client device may have a communication module (i.e., a communication unit) that can communicate with a remote server to achieve data transmission with the server. The server may include a server on the task scheduling center side, and other implementation scenarios may also include a server on an intermediate platform, such as a server on a third-party server platform that has a communication link with the task scheduling center server. The server may include a single computer device, or a server cluster consisting of multiple servers, or a server structure of a distributed device.

[0270] Fig.11 FIG. 9 is a schematic block diagram of the system structure of the electronic device 9600 according to an embodiment of the present application. Fig.11 As shown, the electronic device 9600 may include a central processor 9100 and a memory 9140; the memory 9140 is coupled to the central processor 9100. It is worth noting that Fig.11 is exemplary; other types of structures may also be used to supplement or replace this structure to implement telecommunication functions or other functions.

[0271] In one embodiment, the method function of online determining the target value of the plant power consumption rate during peak load regulation of coal-fired units can be integrated into the central processor 9100. The central processor 9100 can be configured to perform the following control:

[0272] S101: Determine normal operation data according to the acquired real-time operation data and historical operation data;

[0273] S102: determining an optimal target value of the plant power consumption rate according to the normal operation data;

[0274] S103: Perform energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0275] From the above description, it can be seen that the method for online determining the target value of the plant power consumption rate during peak-shaving of coal-fired units provided in this application can realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak-shaving, and then deeply analyze the reasons for the plant power consumption rate and indicate the specific work of energy-saving upgrading and optimization and transformation of the unit, further tapping the energy-saving potential of the unit, which is of great significance for reducing operating costs and improving the operating safety of the unit.

[0276] In another embodiment, the device for determining the target value of the plant power rate online when the coal-fired unit is peak-shaving can be configured separately from the central processor 9100. For example, the data composite transmission device for determining the target value of the plant power rate online when the coal-fired unit is peak-shaving can be configured as a chip connected to the central processor 9100, and the function of the method for determining the target value of the plant power rate online when the coal-fired unit is peak-shaving is realized through the control of the central processor.

[0277] like Fig.11 As shown, the electronic device 9600 may also include: a communication module 9110, an input unit 9120, an audio processor 9130, a display 9160, and a power supply 9170. It is worth noting that the electronic device 9600 does not necessarily have to include Fig.11 In addition, the electronic device 9600 may also include Fig.11 For components not shown, reference may be made to the prior art.

[0278] like Fig.11 As shown, the central processing unit 9100 is sometimes also referred to as a controller or an operation control, and may include a microprocessor or other processor device and / or logic device, which receives input and controls the operation of various components of the electronic device 9600.

[0279] The memory 9140 may be, for example, one or more of a cache, a flash memory, a hard drive, a removable medium, a volatile memory, a non-volatile memory or other suitable devices. The above-mentioned information related to the failure may be stored, and a program for executing the relevant information may also be stored. The CPU 9100 may execute the program stored in the memory 9140 to implement information storage or processing, etc.

[0280] The input unit 9120 provides input to the central processing unit 9100. The input unit 9120 is, for example, a key or a touch input device. The power supply 9170 is used to provide power to the electronic device 9600. The display 9160 is used to display display objects such as images and texts. The display may be, for example, an LCD display, but is not limited thereto.

[0281] The memory 9140 may be a solid-state memory, such as a read-only memory (ROM), a random access memory (RAM), a SIM card, etc. It may also be a memory that saves information even when the power is off, can be selectively erased, and is provided with more data, examples of which are sometimes referred to as EPROMs, etc. The memory 9140 may also be some other type of device. The memory 9140 includes a buffer memory 9141 (sometimes referred to as a buffer). The memory 9140 may include an application / function storage unit 9142, which is used to store application programs and function programs or processes for executing the operation of the electronic device 9600 through the central processor 9100.

[0282] The memory 9140 may also include a data storage unit 9143 for storing data, such as contacts, digital data, pictures, sounds, and / or any other data used by the electronic device. The driver storage unit 9144 of the memory 9140 may include various drivers for communication functions of the electronic device and / or for executing other functions of the electronic device (such as messaging applications, address book applications, etc.).

[0283] The communication module 9110 is a transmitter / receiver 9110 that sends and receives signals via an antenna 9111. The communication module (transmitter / receiver) 9110 is coupled to the central processor 9100 to provide input signals and receive output signals, which may be the same as the case of a conventional mobile communication terminal.

[0284] Based on different communication technologies, multiple communication modules 9110 may be provided in the same electronic device, such as a cellular network module, a Bluetooth module and / or a wireless LAN module. The communication module (transmitter / receiver) 9110 is also coupled to a speaker 9131 and a microphone 9132 via an audio processor 9130 to provide an audio output via the speaker 9131 and receive an audio input from the microphone 9132, thereby realizing a common telecommunication function. The audio processor 9130 may include any suitable buffer, decoder, amplifier, etc. In addition, the audio processor 9130 is also coupled to the central processor 9100, so that recording can be performed on the local machine through the microphone 9132, and the sound stored on the local machine can be played through the speaker 9131.

[0285] The embodiment of the present application also provides a computer-readable storage medium capable of implementing all the steps of the method for online determining the target value of the plant power consumption rate when the coal-fired unit is peak-shaving when the execution subject is a server or a client in the above embodiment. The computer-readable storage medium stores a computer program. When the computer program is executed by a processor, all the steps of the method for online determining the target value of the plant power consumption rate when the coal-fired unit is peak-shaving when the execution subject is a server or a client in the above embodiment are implemented. For example, when the processor executes the computer program, the following steps are implemented:

[0286] S101: Determine normal operation data according to the acquired real-time operation data and historical operation data;

[0287] S102: determining an optimal target value of the plant power consumption rate according to the normal operation data;

[0288] S103: Perform energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data.

[0289] From the above description, it can be seen that the method for online determining the target value of the plant power consumption rate during peak-shaving of coal-fired units provided in this application can realize online determination of the optimal target value that the plant power consumption rate should reach when the coal-fired unit is operating at low load for peak-shaving, and then deeply analyze the reasons for the plant power consumption rate and indicate the specific work of energy-saving upgrading and optimization and transformation of the unit, further tapping the energy-saving potential of the unit, which is of great significance for reducing operating costs and improving the operating safety of the unit.

[0290] It will be appreciated by those skilled in the art that embodiments of the present invention may be provided as methods, devices, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0291] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (apparatus), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to generate a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0292] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0293] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0294] The present invention uses specific embodiments to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea. At the same time, for those skilled in the art, according to the idea of ​​the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A method for determining the target value of the plant power consumption rate online during peak load regulation of a coal-fired unit, characterized in that: include: Determine normal operation data based on the acquired real-time operation data and historical operation data; Determine the optimal target value of the plant power consumption rate according to the normal operation data; Energy efficiency optimization and adjustment are performed according to the optimal target value of the plant power consumption rate and the real-time operation data.

2. The method for online determining the target value of the plant power consumption rate during peak load regulation of a coal-fired unit according to claim 1, characterized in that: Determining the normal operation data according to the acquired real-time operation data and historical operation data includes: Performing cluster analysis on the real-time operation data and the historical operation data to determine normal operation data and abnormal operation data; A data abnormality warning is issued for the abnormal operation data.

3. The method for determining the target value of the plant power consumption rate online during peak load regulation of a coal-fired unit according to claim 2, characterized in that: Determining the optimal target value of the plant power consumption rate according to the normal operation data includes: Determine the optimal target value of power consumption rate of coal mill, primary fan, forced draft fan, induced draft fan, air-cooling fan, circulating water pump and auxiliary equipment respectively; The optimal target value of plant power consumption rate is calculated based on the optimal target value of plant power consumption rate of the coal mill, the optimal target value of the primary fan, the optimal target value of the blower, the optimal target value of the induced draft fan, the optimal target value of the air-cooling fan, the optimal target value of the circulating water pump, and the optimal target value of the auxiliary equipment.

4. The method for determining the target value of the plant power consumption rate online during peak load regulation of a coal-fired unit according to claim 3, characterized in that: The respectively determining the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment includes: Determine the optimal target value of the power consumption rate of the coal mill plant according to the inherent value of the power consumption rate of the coal mill plant under the current load and the increase in the power consumption rate of the pulverizing system caused by the change in coal type; Determine the optimal target value of the primary fan power consumption rate according to the inherent value of the primary fan power consumption rate under the current load and the increase in the primary fan power consumption rate caused by the change in ambient temperature; Determine the optimal target value of the fan power consumption rate according to the inherent value of the fan power consumption rate under the current load and the increase in the fan power consumption rate caused by the change in ambient temperature; Determine the optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type; Determine the optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase in the air cooling fan power consumption rate caused by the change in ambient temperature; Determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase in the circulating water pump power consumption rate caused by the change in the inlet water temperature; The auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test are fitted to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate.

5. The method for online determining the target value of the plant power consumption rate during peak load regulation of a coal-fired unit according to claim 1, characterized in that: The energy efficiency optimization adjustment according to the optimal target value of the plant power consumption rate and the real-time operation data includes: If the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate, it is determined that there is no energy saving potential; If the measured point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate, it is judged to have energy-saving potential; wherein, the measured point value includes the current coal mill plant power consumption rate, the current primary fan plant power consumption rate, the current blower plant power consumption rate, the current induced draft fan plant power consumption rate, the current air-cooling fan plant power consumption rate, the current circulating water pump plant power consumption rate and the current auxiliary equipment plant power consumption rate.

6. A device for determining the target value of the power consumption rate of a coal-fired unit online during peak load regulation, characterized in that: include: A normal data determination unit, used to determine normal operation data according to the acquired real-time operation data and historical operation data; An optimal target determination unit, used to determine an optimal target value of the plant power consumption rate according to the normal operation data; The optimal target unit is used to optimize and adjust the energy efficiency according to the optimal target value of the plant power consumption rate and the real-time operation data.

7. The device for determining the target value of the power consumption rate of a coal-fired unit online during peak load regulation according to claim 6, characterized in that: The normal data determining unit comprises: A cluster analysis module, used to perform cluster analysis on the real-time operation data and the historical operation data to determine normal operation data and abnormal operation data; The abnormality warning module is used to issue a data abnormality warning for the abnormal operation data.

8. The device for determining the target value of the power consumption rate of a coal-fired unit online during peak load regulation according to claim 7, characterized in that: The optimal target determination unit comprises: The sub-project target determination module is used to respectively determine the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment; The optimal target determination module is used to calculate the optimal target value of the power consumption rate of the plant according to the optimal target value of the power consumption rate of the coal mill, the optimal target value of the power consumption rate of the primary fan, the optimal target value of the power consumption rate of the blower, the optimal target value of the power consumption rate of the induced draft fan, the optimal target value of the power consumption rate of the air-cooling fan, the optimal target value of the power consumption rate of the circulating water pump, and the optimal target value of the power consumption rate of the auxiliary equipment.

9. The device for online determining the target value of the power consumption rate of a coal-fired unit during peak load regulation according to claim 8, characterized in that: The sub-project goal determination module includes: A coal pulverizing target determination module is used to determine the optimal target value of the coal pulverizing plant power consumption rate according to the inherent value of the coal pulverizing plant power consumption rate under the current load and the increase in the power consumption rate of the pulverizing system caused by the change in coal type; A fan target determination module is used to determine the optimal target value of the primary fan power consumption rate according to the inherent value of the primary fan power consumption rate under the current load and the increase in the primary fan power consumption rate caused by the change in ambient temperature; The air supply target determination module is used to determine the optimal target value of the air supply fan power consumption rate according to the inherent value of the air supply fan power consumption rate under the current load and the increase value of the air supply fan power consumption rate caused by the change of ambient temperature; An induced draft target determination module is used to determine the optimal target value of the induced draft fan power consumption rate according to the inherent value of the induced draft fan power consumption rate under the current load and the increase in the power consumption rate of the blower caused by the change in coal type; An air cooling target determination module is used to determine the optimal target value of the air cooling fan power consumption rate according to the inherent value of the air cooling fan power consumption rate under the current load and the increase in the air cooling fan power consumption rate caused by the change in ambient temperature; A water pump target determination module is used to determine the optimal target value of the circulating water pump power consumption rate according to the inherent value of the circulating water pump power consumption rate under the current load and the increase in the circulating water pump power consumption rate caused by the change in the inlet water temperature; The auxiliary target determination module is used to fit the auxiliary equipment power consumption rate values ​​under multiple loads of the pre-production acceptance test to obtain the inherent value of the auxiliary equipment power consumption rate under the current load as the optimal target value of the auxiliary equipment power consumption rate.

10. The device for online determining the target value of the power consumption rate of a coal-fired unit during peak load regulation according to claim 6, characterized in that: The optimal target unit includes: A no potential judgment module, used to judge that there is no energy saving potential if the measurement point value in the real-time operation data is not greater than the corresponding optimal target value of the plant power consumption rate; A potential judgment module is used to judge that there is energy-saving potential if the measurement point value in the real-time operation data is greater than the corresponding optimal target value of the plant power consumption rate; wherein the measurement point value includes the current plant power consumption rate of the coal mill, the current plant power consumption rate of the primary fan, the current plant power consumption rate of the blower, the current plant power consumption rate of the induced draft fan, the current plant power consumption rate of the air-cooling fan, the current plant power consumption rate of the circulating water pump and the current plant power consumption rate of the auxiliary equipment.

11. An electronic device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the program, the steps of the method for online determining the target value of the plant power consumption rate during peak load regulation of a coal-fired unit as described in any one of claims 1 to 5 are implemented.

12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the computer program is executed by a processor, the steps of the method for online determining the target value of the plant power consumption rate during peak load regulation of a coal-fired unit as described in any one of claims 1 to 5 are implemented.

13. A computer program product comprising a computer program / instructions, characterized in that When the computer program / instruction is executed by a processor, the steps of the method for online determining the target value of the plant power consumption rate during peak load regulation of a coal-fired unit as described in any one of claims 1 to 5 are implemented.