Sludge landfill waste gas comprehensive treatment device and method
Through the combination of the spiral twisted dragon filter mesh and the rotary filter structure, the complex structure and low filtration efficiency of the waste gas treatment device in the sludge landfill are solved, and efficient waste gas filtration and environmentally friendly treatment are achieved, reducing maintenance costs.
Patent Information
- Application Number
- CN202411419505.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-11
- Publication Date
- 2024-11-22
AI Technical Summary
The existing sludge landfill waste gas treatment device has a complex structure, low filtration efficiency, large equipment space and high maintenance costs.
A comprehensive treatment device for waste gas in sludge landfills including a spiral slime slid dragon filter and a rotary filter structure is designed. Through rotary filtration and multi-stage spraying, the dynamic physical filtration and uniform spraying of waste gas are realized, combined with magnetic sealing. The plug structure and modular design improve processing efficiency and system stability and reliability.
It significantly improves the efficiency of exhaust gas filtration, reduces equipment complexity and space occupation, reduces maintenance costs, and ensures long-term efficient operation and environmental protection effects.
Smart Images

Figure HDA0005080367640000011 
Figure HDA0005080367640000012 
Figure HDA0005080367640000021
Abstract
Description
Technical Field
[0001] The present invention relates to the field of waste gas treatment, and in particular to a comprehensive waste gas treatment device and method for a sludge landfill. Background Art
[0002] Landfill waste gas treatment. In the production of landfills, a large amount of harmful gases will be produced. These harmful gases cause serious pollution to the surrounding environment. Therefore, it is necessary to treat these waste gases. The existing methods for treating waste gases include activated carbon adsorption, plasma purifiers and spraying. The water spray + adsorption method produces spraying waste gas. During the spraying process, liquid paint forms atomized dust particles and volatile triphenyls and other organic hazards under the action of air pressure. The concentration is high and the particle size is small. Most of them are below 10μm. If not pre-treated, it will quickly block the activated carbon micropores and make the activated carbon ineffective. After the spray paint waste gas is cleaned by the water curtain cabinet, it has a good cleaning and degradation effect on the paint mist. The waste gas enters the water spray waste gas treatment tower, and after further cleaning and treatment by the wet cyclone plate waste gas tower, it enters the activated carbon adsorption tower through the pressurized induced draft fan. The organic gas is adsorbed by the activated carbon in the bed. Activated carbon is suitable for large-flow and low-concentration organic waste gas. Activated carbon uses granular activated carbon with a specific surface area (adsorption area) of up to 500-1500m 2 / g has a large specific surface area, so it has a high surface activated carbon and adsorption capacity. The low-concentration organic gas discharged is adsorbed on its active surface and the purified gas is discharged from the external exhaust pipe at high altitude to meet the standards. When the existing water spray is used to treat the waste gas, generally only one or two nozzles are used to spray water mist from above, and the waste gas is not filtered, which is easy to cause imperfect waste gas treatment. In addition, the spray head spraying from above will inevitably have a dead angle of spraying, resulting in the inability to effectively treat the waste gas. For this reason, we proposed a comprehensive waste gas treatment device for sludge landfills. Summary of the invention
[0003] 1. Technical issues to be solved
[0004] In view of the deficiencies in the prior art, the present invention provides a comprehensive waste gas treatment device and method for sludge landfills, which solves the problems of complex structure, low filtration efficiency, large equipment space occupation and high maintenance cost of the waste gas treatment device in the prior art.
[0005] (II) Technical solution
[0006] To achieve the above-mentioned objectives, the present invention provides the following technical solutions: a comprehensive waste gas treatment device for a sludge landfill, comprising an outer shell, an air inlet hole starting from the bottom of the outer shell, a removable top cover is arranged on the top of the outer shell, a funnel-shaped top cover is arranged on the top of the removable top cover, an air outlet connecting pipe is arranged on the funnel-shaped top cover, an inner tank is fixedly installed inside the outer shell, an external pipeline of the inner tank is used to discharge spray water, a rotatable rotating structure is arranged on the inner side of the inner tank, a spiral auger filter is arranged on the outer side of the rotating structure, a liquid inlet pipe is connected to the top of the rotating structure, and a spray nozzle is arranged on the outer side of the rotating structure at a position corresponding to the position between the two auger filter blades.
[0007] Preferably, the pore size of the upper end of the auger filter is smaller than the pore size of the lower end of the filter.
[0008] Preferably, the rotating structure includes a rotating shaft, fan blades and a fixed structure, wherein the fixed structure is used to fix the rotating shaft, the interior of the rotating shaft is a hollow structure, and the bottom of the rotating shaft is connected to the fan blades.
[0009] Preferably, the fixed structure includes an annular connecting block and a transverse axis, an annular groove is provided at the top of the rotating shaft, the lower end of the annular connecting block is rotatably connected to the annular groove, a plurality of groups of transverse axes are equidistantly installed on the outer wall surface of the annular connecting block, and the ends of the transverse axes are fixedly connected to the inner wall of the outer shell.
[0010] Preferably, an opening is provided on one side wall surface inside the inner liner, and an inner liner filter is embedded in the opening.
[0011] Preferably, a plurality of mounting grooves are equidistantly provided on the side of the auger filter corresponding to the inner wall of the inner tank, a magnet is fixedly installed inside the mounting groove, a plurality of openings are provided on the inner wall of the inner tank, a magnetic sealing structure is provided inside the opening, and the plurality of openings and the magnetic sealing structure are arranged in a spiral shape, and magnet is used to exclude the magnetic sealing structure.
[0012] Preferably, the magnetic sealing structure includes a circular tube, a sealing assembly and magnet three, one end of the circular tube seal extends to the interior of the inner liner, and one end of the circular tube extending to the interior of the inner liner is provided with multiple groups of discharge holes equidistantly arranged, the sealing structure is arranged inside the circular tube, and magnet three is embedded at the end of the circular tube.
[0013] Preferably, the blocking structure includes magnet two, a ring and an L-shaped connecting block, the ring is sleeved on the outside of magnet two, and the ring is slidably fitted with the inner wall of the circular tube, an inner wall groove is opened on the inner wall of the circular tube, an L-shaped connecting block is fixedly installed on the outside of the ring, the L-shaped connecting block is slidably engaged with the inner wall groove, the side of magnet two corresponding to magnet three is the same pole, the side of magnet two facing away from magnet three and the side of magnet one facing away from the auger filter are the same pole, and the repulsive force of magnet one on magnet two is greater than the repulsive force of magnet three on magnet two, and when not repelled by magnet one, magnet two is located at the end of the discharge hole close to the inner side of the inner tank.
[0014] The present invention also proposes a comprehensive treatment method for waste gas from a sludge landfill, comprising the following steps:
[0015] S1: Waste gas enters the treatment system: The waste gas generated by the sludge landfill is introduced into the shell through the air inlet. When the waste gas enters the shell, it is guided by the internal rotating structure to ensure that it is evenly distributed in the entire filtration system. The rotating structure design can not only achieve uniform guidance and diffusion of waste gas, but also effectively reduce the local concentration peak, ensuring the overall stability and uniformity of the filtration process.
[0016] S2: Rotary filtration start: After the exhaust gas enters the housing, the internal air flow will drive the fan blades to rotate, thereby driving the rotating shaft and the spiral auger filter to achieve synchronous rotation, thereby completing the dynamic physical filtration of the exhaust gas. The spiral design of the auger filter combines centrifugal force with multi-layer filtration to remove suspended particles of different particle sizes layer by layer. This filtration method significantly improves the processing efficiency of the system, ensuring that even tiny particles can be effectively captured.
[0017] S3: Spray water introduction: Spray water is introduced into the rotating structure through the liquid inlet pipe, and the spray water is sprayed out through multiple spray nozzles to form a uniform fine mist spray water flow. The spray nozzle rotates synchronously with the rotating structure to ensure that the exhaust gas is evenly covered throughout the filtration process. The application of fine mist spray water flow can not only efficiently capture fine particles and soluble pollutants in the exhaust gas, but also properly flush the filter, reduce the risk of filter clogging, and maintain long-term high-efficiency filtration.
[0018] S4: Multi-stage filtration treatment: The auger filter is designed with different apertures at the top and bottom. The aperture of the upper filter is smaller and gradually increases to the lower end. This multi-stage aperture design ensures that large particles of pollutants are effectively trapped during primary filtration, while small particles are further filtered in subsequent levels. This multi-stage step-by-step filtration method not only improves the overall processing accuracy, but also reduces the risk of large particles clogging the pores, ensuring the long-term stability and reliable operation of the system.
[0019] S5: Spray liquid collection and discharge: The spray liquid is collected in the inner tank, and most of the water enters the inner tank through the inner tank filter and is discharged through the external pipe. This design can prevent the spray liquid from accumulating at the bottom of the shell, keep the inside of the treatment system dry, reduce the risk of corrosion of equipment components, and ensure that the spray liquid can be reprocessed in time to meet environmental protection requirements. The optimization of the spray water collection and discharge mechanism is of great significance to the long-term stability of the equipment and energy conservation and environmental protection.
[0020] S6: Operation of magnetic plugging structure: The inner wall of the inner tank is equipped with a magnetic plugging structure, which automatically opens and closes the plugging structure through the attraction and repulsion between magnets, ensuring that unpurified waste gas will not escape into the drainage system during the spray liquid discharge process. This design can effectively control the flow direction of the spray liquid, improve the closure of waste gas treatment and the overall purification efficiency of the system, and reduce the negative impact of untreated waste gas emissions on the environment.
[0021] S7: Exhaust gas discharge: The exhaust gas after spraying and multi-stage filtration is discharged through the exhaust connection pipe at the top. At this time, the particulate matter and harmful components in the exhaust gas have been basically removed, meeting the relevant environmental emission standards. The exhaust connection pipe can be connected to other subsequent treatment equipment or high-altitude emission pipelines to ensure further compliance with emission standards. In addition, the outlet can be equipped with online monitoring equipment to monitor the concentration of pollutants in the exhaust gas in real time to ensure the safety and compliance of exhaust gas emissions.
[0022] S8: Equipment maintenance and cleaning: In order to ensure that the treatment system is always in optimal operating condition, regular maintenance is required, including removing the removable top cover to clean the rotating structure, auger filter and liner to remove accumulated impurities and residues. Regularly check and maintain the magnetic sealing structure and spray system to ensure their normal operation, effective discharge of the spray liquid and the sealing of the treatment system. The equipment maintenance process includes cleaning and replacement of the filter, inspection and cleaning of the spray nozzle, to ensure the coordinated operation of the various components of the system, thereby reducing the failure rate and improving the service life and overall operating efficiency of the treatment system.
[0023] S9: Operation monitoring and optimization: During the operation of the treatment system, sensors are used to monitor key components in real time, including the rotation speed of the rotating shaft, filter resistance, spray water flow rate, and exhaust gas flow rate. Through data collection and analysis, potential problems can be discovered in time and necessary adjustments can be made to optimize the performance of the treatment system. Through intelligent operation monitoring, it is ensured that the treatment system can maintain efficient operation under various working conditions, minimize energy consumption and maintenance costs, and improve the exhaust gas purification effect.
[0024] S10: Abnormal handling and emergency measures: When abnormal conditions such as filter blockage, insufficient spray water flow or poor exhaust gas treatment effect occur during operation, the system can automatically trigger an alarm to notify the operator to take necessary emergency measures. In addition, the treatment system is equipped with a backup spray system and filter cleaning function to ensure that basic exhaust gas treatment operations can be maintained when the main system fails, avoiding environmental pollution caused by equipment downtime, and ensuring the reliability and safety of the treatment system.
[0025] (III) Beneficial effects
[0026] Compared with the prior art, the present invention provides a comprehensive treatment device and method for waste gas from sludge landfill, which has the following features:
[0027] Beneficial effects:
[0028] 1. Spiral auger filter design: A spiral auger filter is used, and the aperture of the upper filter is smaller than that of the lower filter, forming a multi-layer filtering effect. The structure is simpler and more compact than the multi-layer parallel filter in the prior art, which effectively improves the filtration efficiency of the exhaust gas and reduces the complexity and space occupied by the equipment.
[0029] 2. Rotary filtration and uniform spraying: When the exhaust gas enters the shell, the air flow drives the fan blades to rotate, thereby driving the rotating shaft and the auger filter to rotate synchronously, realizing a dynamic treatment process of rotating filtration and rotating spraying at the same time. Through rotary filtration, the blockage problem caused by the traditional filter being immobile for a long time is solved, and the service life of the filter is extended. At the same time, the spray nozzle rotates with the rotating structure, effectively avoiding the spray blind area, achieving uniform coverage of the spray water, and significantly improving the coating efficiency of particulate matter in the exhaust gas and the overall purification effect.
[0030] 3. Inner tank design and spray water collection: There is an opening on one side of the inner tank wall. The spray water enters the inner tank through the inner tank filter and is discharged through the external pipe, avoiding the problem of spray water accumulation at the bottom of the shell and ensuring the continuity and stability of equipment operation. The discharge path of the spray water has been optimized to reduce the escape of exhaust gas and improve purification efficiency.
[0031] 4. Innovative application of magnetic plugging structure: By setting up multiple sets of magnetic plugging structures on the inner wall of the inner tank, and using the attraction and repulsion of the magnet to achieve automatic control of the plugging, it is ensured that the spray liquid isolates the untreated exhaust gas when it is discharged, effectively reducing the escape of exhaust gas. This design increases the automation of the system, reduces the need for manual operation, and improves the reliability of operation.
[0032] 5. Multi-stage spraying and drainage control: The multi-stage spraying system ensures that the exhaust gas is fully purified during the entire process of passing through the device, reduces the possibility of exhaust gas escape, and improves environmental friendliness. The design of the spray liquid discharge path can reduce the retention and waste of liquid compared to traditional methods, further improving the exhaust gas treatment effect.
[0033] 6. Overall modular design and easy maintainability: The device adopts a modular design. Each component can be easily disassembled and replaced. The removable cover on the top of the shell facilitates internal cleaning and maintenance. The removable rotating parts allow operators to easily inspect the equipment, reducing the maintenance difficulty and operating cost of the equipment and improving the applicability and reliability of the equipment.
[0034] 7. Dynamic spray liquid discharge and reduction of exhaust gas escape: The magnetic sealing structure set on the inner wall of the inner tank is combined with the auger filter. The spray liquid is scraped off and guided for discharge during the rotation process. At the same time, the opening is automatically opened when needed to ensure the smooth discharge of the spray liquid, effectively reducing the retention of the spray liquid and the escape of exhaust gas, and improving the purification effect and reliability of the system. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 It is a schematic diagram of the structure of the present invention;
[0036] Figure 2 It is a top view schematic diagram of the structure of the present invention;
[0037] Figure 3 for Figure 2 AA cross-sectional view in FIG.
[0038] Figure 4 for Figure 3 A local enlarged schematic diagram of point B in FIG.
[0039] Figure 5 It is a schematic cross-sectional view of the end of the auger filter in the second embodiment;
[0040] Figure 6 This is a schematic diagram of the drainage structure in the second embodiment;
[0041] Figure 7 for Figure 6 A local enlarged schematic diagram of point C in the figure.
[0042] Figure 8 The figure is a flow chart of the steps of the method of the present invention.
[0043] In the figure: 1. outer shell; 2. air inlet; 3. removable top cover; 4. liquid inlet pipe; 5. air outlet connecting pipe; 6. funnel-shaped top cover; 7. opening; 8. liner; 9. rotating shaft; 10. auger filter; 11. liner filter; 12. fan blades; 13. spray nozzle; 14. annular groove; 15. annular connecting block; 16. horizontal axis; 17. mounting groove; 18. magnet one; 19. circular tube; 20. magnet two; 21. collar; 22. inner wall groove; 23. L-shaped connecting block; 24. discharge hole; 25. magnet three. DETAILED DESCRIPTION
[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0045] Example 1: Please refer to Figure 1-4 , Figure 8 A comprehensive waste gas treatment device for a sludge landfill comprises a shell 1, an air inlet 2 is provided at the bottom of the shell 1, a removable top cover 3 is provided at the top of the shell 1, a funnel-shaped top cover plate 6 is provided at the top of the removable top cover 3, an air outlet connecting pipe 5 is provided on the funnel-shaped top cover plate 6, an inner liner 8 is fixedly installed inside the shell 1, an external pipeline of the inner liner 8 is used to remove spray water, a rotatable rotating structure is provided on the inner side of the inner liner 8, a spiral auger filter 10 is provided on the outer side of the rotating structure, a liquid inlet pipe 4 is connected to the top of the rotating structure, and two auger filters 10 are provided on the outer side of the rotating structure. A spray nozzle 13 is provided between the sheets. When the waste gas is treated, spray water is injected from the inside of the liquid inlet pipe 4, and the spray water enters the inside of the rotating structure, and then a fine mist of liquid is sprayed out through the spray nozzle 13. Then the waste gas to be treated enters the inside of the outer shell 1 through the air inlet 2, and then the rotating structure rotates, and then the waste gas gradually passes through the auger filter 10 for physical filtration, and when the rotating structure rotates, the spray nozzle 13 can realize rotary spraying, and can realize uniform spraying of the waste gas, and realize coating of the particulate matter in the waste gas, and then the treated waste gas is discharged through the air outlet connecting pipe 5.
[0046] Furthermore, the pore size of the upper filter of the auger filter 10 is smaller than the pore size of the lower filter. Since the auger filter 10 is spiral, several layers of auger filters 10 are equivalent to several layers of filters for filtering exhaust gas. Therefore, the structure is simpler than the existing structure that uses multiple layers of filters.
[0047] Furthermore, the rotating structure includes a rotating shaft 9, fan blades 12 and a fixed structure. The fixed structure is used to fix the rotating shaft 9. The interior of the rotating shaft 9 is a hollow structure, and the bottom of the rotating shaft 9 is connected to the fan blades 12. When the exhaust gas enters the interior of the outer shell 1, the air flow will drive the fan blades 12 to rotate, thereby driving the rotating shaft 9 to rotate, thereby realizing subsequent rotating filtration and rotating spraying at the same time, which can achieve the effect of uniform spraying. The benefit of rotating to filter the exhaust gas is that it can solve the problem of the filter not moving for a long time, resulting in a constant filter position and filter clogging.
[0048] Furthermore, the fixed structure includes an annular connecting block 15 and a transverse axis 16. An annular groove 14 is provided at the top of the rotating shaft 9. The lower end of the annular connecting block 15 is rotatably connected to the annular groove 14. Multiple groups of transverse axes 16 are equidistantly installed on the outer wall surface of the annular connecting block 15. The ends of the transverse axes 16 are fixedly connected to the inner wall of the outer shell 1.
[0049] Furthermore, an opening 7 is provided on one side wall of the inner tank 8, and an inner tank filter 11 is embedded in the opening 7. When spraying, most of the water will flow into the inner tank 8 along the inner tank filter 11, and finally be discharged through the external pipe of the inner tank 8. Such a setting of the device can effectively prevent a large amount of spray water from accumulating at the bottom of the outer shell 1, causing untimely removal.
[0050] The steps of the comprehensive treatment method for waste gas from sludge landfill using this embodiment are as follows:
[0051] S1: Waste gas enters the treatment system: The waste gas generated by the sludge landfill is introduced into the shell 1 through the air inlet 2. When the waste gas enters the shell, it is guided by the internal rotating structure 9 to ensure that it is evenly distributed in the entire filtration system. The rotating structure design can not only achieve uniform guidance and diffusion of the waste gas, but also effectively reduce the local concentration peak, ensuring the overall stability and uniformity of the filtration process.
[0052] S2: Rotary filtration start: After the exhaust gas enters the housing, the internal air flow will drive the fan blades 12 to rotate, thereby driving the rotating shaft 9 and the spiral auger filter 10 to achieve synchronous rotation, thereby completing the dynamic physical filtration of the exhaust gas. The spiral design of the auger filter combines centrifugal force with multi-layer filtration, so that suspended particles of different particle sizes are removed layer by layer. This filtration method significantly improves the processing efficiency of the system, ensuring that even tiny particles can be effectively captured.
[0053] S3: Spray water introduction: Spray water is introduced into the rotating structure through the liquid inlet pipe 4, and the spray water is sprayed out through multiple spray nozzles 13 to form a uniform fine mist spray water flow. The spray nozzle rotates synchronously with the rotating structure to ensure that the exhaust gas is evenly covered throughout the filtration process. The application of fine mist spray water flow can not only efficiently capture fine particles and soluble pollutants in the exhaust gas, but also properly rinse the filter screen, reduce the risk of filter screen clogging, and maintain long-term high-efficiency filtration.
[0054] S4: Multi-stage filtration treatment: The auger filter is designed with different apertures at the top and bottom. The aperture of the upper filter is smaller and gradually increases to the lower end. This multi-stage aperture design ensures that large particles of pollutants are effectively trapped during primary filtration, while small particles are further filtered in subsequent levels. This multi-stage step-by-step filtration method not only improves the overall processing accuracy, but also reduces the risk of large particles clogging the pores, ensuring the long-term stability and reliable operation of the system.
[0055] S5: Spray liquid collection and discharge: The spray liquid is collected in the inner tank 8, and most of the water enters the inner tank through the inner tank filter 11 and is discharged through the external pipe. This design can prevent the spray liquid from accumulating at the bottom of the shell, keep the inside of the treatment system dry, reduce the risk of corrosion of equipment components, and ensure that the spray liquid can be reprocessed in time to meet environmental protection requirements. The optimization of the spray water collection and discharge mechanism is of great significance to the long-term operation stability of the equipment and energy conservation and environmental protection.
[0056] S6: Magnetic plugging structure 19 Operation: A magnetic plugging structure is provided on the inner wall of the inner tank, and the plugging structure is automatically opened and closed through the attraction and repulsion between magnets 18, 20, and 25, ensuring that the unpurified waste gas will not escape into the drainage system during the spray liquid discharge process. This design can effectively control the flow direction of the spray liquid, improve the sealing of the waste gas treatment and the overall purification efficiency of the system, and reduce the negative impact of untreated waste gas emissions on the environment.
[0057] S7: Exhaust gas discharge: The exhaust gas after spraying and multi-stage filtration is discharged through the exhaust connection pipe 5 at the top. At this time, the particulate matter and harmful components in the exhaust gas have been basically removed, meeting the relevant environmental emission standards. The exhaust connection pipe can be connected to other subsequent processing equipment or high-altitude emission pipelines to ensure further compliance with emission standards. In addition, the exhaust port 5 can be equipped with online monitoring equipment to monitor the concentration of pollutants in the exhaust gas in real time to ensure the safety and compliance of exhaust gas emissions.
[0058] S8: Equipment maintenance and cleaning: In order to ensure that the treatment system is always in the best operating condition, regular maintenance is required, including disassembly of the removable top cover 3 to clean the rotating structure, auger filter and liner to remove accumulated impurities and residues. Regularly check and maintain the magnetic sealing structure and spray system 13 to ensure their normal operation, effective discharge of the spray liquid and the sealing of the treatment system. The equipment maintenance process includes cleaning and replacement of the filter, inspection and cleaning of the spray nozzle, to ensure the coordinated operation of the various components of the system, thereby reducing the failure rate and improving the service life and overall operating efficiency of the treatment system.
[0059] S9: Operation monitoring and optimization: During the operation of the treatment system, sensors are used to monitor key components in real time, including the rotation speed of the rotating shaft 9, the filter resistance, the spray water flow rate, and the exhaust gas flow rate. Through data collection and analysis, potential problems can be discovered in time and necessary adjustments can be made to optimize the performance of the treatment system. Through intelligent operation monitoring, it is ensured that the treatment system can maintain efficient operation under various working conditions, minimize energy consumption and maintenance costs, and improve the exhaust gas purification effect.
[0060] S10: Abnormal handling and emergency measures: When abnormal conditions such as filter blockage, insufficient spray water flow or poor exhaust gas treatment effect occur during operation, the system can automatically trigger an alarm to notify the operator to take necessary emergency measures. In addition, the treatment system is equipped with a backup spray system and filter cleaning function to ensure that basic exhaust gas treatment operations can be maintained when the main system fails, avoiding environmental pollution caused by equipment downtime, and ensuring the reliability and safety of the treatment system.
[0061] Embodiment 2, based on embodiment 1, since the spray liquid is directly allowed to enter the inner tank 8 through the inner tank filter 11, the exhaust gas that has not been completely treated will also enter the inner tank 8, and will eventually be discharged along with the spray liquid, causing the exhaust gas to escape, so a magnetic blocking structure is added.
[0062] Furthermore, a plurality of mounting grooves 17 are equidistantly provided on the side of the auger filter 10 corresponding to one side of the inner wall of the liner 8, a magnet 18 is fixedly installed inside the mounting groove 17, a plurality of openings are arranged on the inner wall of the liner 8, a magnetic sealing structure is arranged inside the opening, and the plurality of openings and the magnetic sealing structure are arranged in a spiral shape, and the magnet 18 is used to exclude the magnetic sealing structure. When excluding, the opening is opened, and at this time, when the spray liquid attached to the outer shell 1 and the inner wall of the liner 8 flows down, it will flow into the interior of the liner 8 along the opened opening and finally be discharged. Since most of the spray liquid will adhere to the inner wall and will be scraped off when the auger filter 10 rotates and flow along the edge of the auger filter 10, the liquid can enter when the opening is opened. Compared with the method of using the auger filter 10, this scheme can reduce the escape of exhaust gas while not reducing the discharge of the spray liquid.
[0063] Furthermore, the magnetic sealing structure includes a circular tube 19, a sealing assembly and a magnet three 25. One sealed end of the circular tube 19 extends to the interior of the inner liner 8. One end of the circular tube 19 extending to the interior of the inner liner 8 is provided with multiple groups of discharge holes 24 at equal intervals. The sealing structure is arranged inside the circular tube 19, and a magnet three 25 is embedded at the end of the circular tube 19.
[0064] Furthermore, the blocking structure includes a magnet 20, a collar 21 and an L-shaped connecting block 23. The collar 21 is sleeved on the outside of the magnet 20, and the collar 21 is slidably fitted with the inner wall of the circular tube 19. An inner wall groove 22 is provided on the inner wall of the circular tube 19. An L-shaped connecting block 23 is fixedly installed on the outside of the collar 21. The L-shaped connecting block 23 is slidably connected with the inner wall groove 22. The side of the magnet 20 corresponding to the magnet 3 25 is the same pole, and the side of the magnet 20 away from the magnet 3 25 is opposite to the side of the magnet 18 away from the auger filter. One side of the net 10 is of the same pole, and the repulsive force of magnet one 18 on magnet two 20 is greater than the repulsive force of magnet three 25 on magnet two 20. When not repelled by magnet one 18, magnet two 20 is located at one end of the discharge hole 24 close to the inner side of the inner tank 8. When the auger filter 10 rotates, magnet one 18 repels magnet two 20, and magnet two 20 moves to one side of magnet three 25. At this time, the discharge hole 24 is opened, and after the spray liquid enters the circular tube 19, it flows into the inner side of the inner tank 8 along the discharge hole 24.
[0065] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A comprehensive waste gas treatment device for a sludge landfill, comprising a housing (1), characterized in that: An air inlet (2) is provided at the bottom of the shell (1); a detachable top cover (3) is provided at the top of the shell (1); a funnel-shaped top cover plate (6) is provided at the top of the detachable top cover (3); an air outlet connecting pipe (5) is provided on the funnel-shaped top cover plate (6); an inner liner (8) is fixedly installed inside the shell (1); an external pipeline of the inner liner (8) is used to discharge spray water; a rotatable rotating structure is provided on the inner side of the inner liner (8); a spiral auger filter (10) is provided on the outer side of the rotating structure; a liquid inlet pipe (4) is connected to the top of the rotating structure; a spray nozzle (13) is provided on the outer side of the rotating structure at a position corresponding to between two blades of the auger filter (10).
2. A comprehensive waste gas treatment device for sludge landfill according to claim 1, characterized in that: The pore size of the upper filter screen of the auger filter (10) is smaller than the pore size of the lower filter screen.
3. A comprehensive waste gas treatment device for sludge landfill according to claim 1, characterized in that: The rotating structure comprises a rotating shaft (9), a fan blade (12) and a fixed structure, wherein the fixed structure is used to fix the rotating shaft (9), the interior of the rotating shaft (9) is a hollow structure, and the bottom of the rotating shaft (9) is connected to the fan blade (12).
4. A comprehensive waste gas treatment device for sludge landfill according to claim 3, characterized in that: The fixed structure comprises an annular connecting block (15) and a transverse axis (16); an annular groove (14) is provided on the top of the rotating shaft (9); the lower end of the annular connecting block (15) is rotatably connected to the annular groove (14); a plurality of groups of transverse axes (16) are equidistantly mounted on the outer wall surface of the annular connecting block (15); and the ends of the transverse axes (16) are fixedly connected to the inner wall of the outer shell (1).
5. The comprehensive treatment device for waste gas from a sludge landfill according to claim 1 is characterized by: An opening (7) is provided on a side wall surface inside the inner container (8), and an inner container filter screen (11) is embedded inside the opening (7).
6. The comprehensive treatment device for waste gas from a sludge landfill according to claim 1 is characterized by: A plurality of mounting grooves (17) are equidistantly arranged on the side of the auger filter (10) corresponding to the inner wall of the inner tank (8), a magnet (18) is fixedly installed inside the mounting groove (17), a plurality of openings are arranged on the inner wall of the inner tank (8), a magnetic sealing structure is arranged inside the opening, and the plurality of openings and the magnetic sealing structure are arranged in a spiral shape, and the magnet (18) is used to exclude the magnetic sealing structure.
7. A comprehensive waste gas treatment device for sludge landfill according to claim 6, characterized in that: The magnetic blocking structure comprises a circular tube (19), a blocking component and a third magnet (25); one end of the circular tube (19) blocked extends into the interior of the inner liner (8); one end of the circular tube (19) extending into the interior of the inner liner (8) is provided with a plurality of groups of discharge holes (24) at equal intervals; the blocking structure is arranged inside the circular tube (19); and the end of the circular tube (19) is inlaid with a third magnet (25).
8. The comprehensive waste gas treatment device for sludge landfill according to claim 7 is characterized by: The blocking structure comprises a second magnet (20), a collar (21) and an L-shaped connecting block (23); the collar (21) is sleeved on the outer side of the second magnet (20), and the collar (21) is slidably fitted with the inner wall of the circular tube (19); an inner wall groove (22) is provided on the inner wall of the circular tube (19); an L-shaped connecting block (23) is fixedly installed on the outer side of the collar (21), and the L-shaped connecting block (23) is slidably engaged with the inner wall groove (22); the side of the second magnet (20) corresponding to the third magnet (25) is the same pole; the side of the second magnet (20) facing away from the third magnet (25) and the side of the first magnet (18) facing away from the auger filter (10) are the same pole; and the repulsive force of the first magnet (18) on the second magnet (20) is greater than the repulsive force of the third magnet (25) on the second magnet (20).
9. A comprehensive treatment method for waste gas from a sludge landfill, characterized in that: The method comprises the following steps: S1: Waste gas enters the treatment system: The waste gas generated by the sludge landfill is introduced into the housing (1) through the air inlet (2). When the waste gas enters the housing, it is guided by the internal rotating structure (9) to ensure that it is evenly distributed in the entire filtration system. The rotating structure design can not only achieve uniform guidance and diffusion of the waste gas, but also effectively reduce the local concentration peak, ensuring the overall stability and uniformity of the filtration process. S2: Rotary filtration start: After the exhaust gas enters the housing, the internal air flow will drive the fan blades (12) to rotate, thereby driving the rotating shaft (9) and the spiral auger filter (10) to achieve synchronous rotation, thereby completing the dynamic physical filtration of the exhaust gas. The spiral design of the auger filter combines centrifugal force with multi-layer filtration, so that suspended particles of different particle sizes are removed layer by layer. This filtration method significantly improves the processing efficiency of the system, ensuring that even tiny particles can be effectively captured. S3: Spray water introduction: Spray water is introduced into the rotating structure through the liquid inlet pipe (4), and the spray water is sprayed out through multiple spray nozzles (13) to form a uniform fine mist spray water flow. The spray nozzle rotates synchronously with the rotating structure to ensure that the exhaust gas is evenly covered throughout the filtration process. The application of fine mist spray water flow can not only efficiently capture fine particles and soluble pollutants in the exhaust gas, but also properly rinse the filter screen, reduce the risk of filter screen clogging, and maintain long-term high-efficiency filtration. S4: Multi-stage filtration treatment: The auger filter is designed with different apertures at the top and bottom. The aperture of the upper filter is smaller and gradually increases to the lower end. This multi-stage aperture design ensures that large particles of pollutants are effectively trapped during primary filtration, while small particles are further filtered in subsequent levels. This multi-stage step-by-step filtration method not only improves the overall processing accuracy, but also reduces the risk of large particles clogging the pores, ensuring the long-term stability and reliable operation of the system. S5: Spray liquid collection and discharge: The spray liquid is collected in the inner tank (8), and most of the water enters the inner tank through the inner tank filter (11) and is discharged through the external pipe. This design can prevent the spray liquid from accumulating at the bottom of the shell, keep the inside of the treatment system dry, reduce the risk of corrosion of equipment components, and ensure that the spray liquid can be reprocessed in time to meet environmental protection requirements. The optimization of the spray water collection and discharge mechanism is of great significance to the long-term operation stability of the equipment and energy conservation and environmental protection. S6: Operation of magnetic plugging structure (19): A magnetic plugging structure is provided on the inner wall of the inner tank, and the plugging structure is automatically opened and closed through the attraction and repulsion between the magnets (18, 20, 25), ensuring that the unpurified waste gas will not escape into the drainage system during the spray liquid discharge process. This design can effectively control the flow direction of the spray liquid, improve the sealing performance of the waste gas treatment and the overall purification efficiency of the system, and reduce the negative impact of untreated waste gas discharge on the environment. S7: Exhaust gas discharge: The exhaust gas after spraying and multi-stage filtration is discharged through the exhaust connection pipe (5) at the top. At this time, the particulate matter and harmful components in the exhaust gas have been basically removed, meeting the relevant environmental emission standards. The exhaust connection pipe can be connected to other subsequent treatment equipment or high-altitude emission pipelines to ensure further compliance with emission standards. In addition, the exhaust port (5) can be equipped with online monitoring equipment to monitor the concentration of pollutants in the exhaust gas in real time to ensure the safety and compliance of exhaust gas emissions. S8: Equipment maintenance and cleaning: In order to ensure that the treatment system is always in optimal operating condition, regular maintenance is required, including removing the removable top cover (3) to clean the rotating structure, auger filter and liner to remove accumulated impurities and residues. Regularly check and maintain the magnetic sealing structure and spray system (13) to ensure their normal operation, effective discharge of the spray liquid and the sealing of the treatment system. The equipment maintenance process includes cleaning and replacing the filter, checking and cleaning the spray nozzle, ensuring the coordinated operation of the various components of the system, thereby reducing the failure rate and improving the service life and overall operating efficiency of the treatment system. S9: Operation monitoring and optimization: During the operation of the treatment system, sensors are used to monitor key components in real time, including the rotation speed of the rotating shaft (9), filter resistance, spray water flow rate and exhaust gas flow rate. Through data collection and analysis, potential problems can be discovered in time and necessary adjustments can be made to optimize the performance of the treatment system. Through intelligent operation monitoring, it is ensured that the treatment system can maintain efficient operation under various working conditions, minimize energy consumption and maintenance costs, and improve the exhaust gas purification effect. S10: Abnormal handling and emergency measures: When abnormal conditions such as filter blockage, insufficient spray water flow or poor exhaust gas treatment effect occur during operation, the system can automatically trigger an alarm to notify the operator to take necessary emergency measures. In addition, the treatment system is equipped with a backup spray system and filter cleaning function to ensure that basic exhaust gas treatment operations can be maintained when the main system fails, avoiding environmental pollution caused by equipment downtime, and ensuring the reliability and safety of the treatment system.
Citation Information
Patent Citations
Building construction ground dust collecting and falling device
CN115591346A
A secondary collection device for palletizing dust
CN215137980U
Material processing and feeding structure
CN215506633U
Filter for industrial waste gas and wastewater treatment
CN219272299U
Exhaust gas purification device and purification method
JP2013167160A
Cited By
Grading type impurity removal device for lubricating oil processing
CN119345786A
Covering type indoor construction dust falling device
CN120900352A
A covering type indoor construction dust falling device
CN120900352B