Heat recovery system and heat recovery process for gas-based shaft furnace direct reduction iron system
By designing a waste heat recovery system in a gas-based vertical furnace direct reduction iron system, countercurrent heat exchange and optimize CO2 removal, the problems of high energy consumption and large pollution in traditional iron smelting processes are solved, and high efficiency energy conservation and carbon emission reduction are achieved.
Patent Information
- Application Number
- CN202411081035.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-07
- Publication Date
- 2024-11-22
AI Technical Summary
The traditional blast furnace iron smelting process consumes high energy and is polluted greatly, and the waste heat recovery of the furnace top gas in the gas-based vertical furnace direct reduction iron system is not thorough, resulting in large fuel gas consumption of the heating furnace, high water replenishment of external boiler and external steam pipeline network. .
A system including waste heat recovery system and process is designed. The high-temperature process gas on the furnace roof is exchanged in countercurrent heat. After the heat is recovered, it is purified, compressed, CO2 removal and humidification to form a preheated process gas. It is then sent back to the gas-based vertical furnace to form a self-circulation and optimize heat utilization.
The fuel gas consumption of heating furnace, external boiler water replenishment and external steam pipeline network cost have been significantly reduced, the heat recovery efficiency has been improved, and the carbon emission reduction effect has been achieved.
Smart Images

Figure HDA0004984254070000011 
Figure HDA0004984254070000021
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of gas-based shaft furnace direct iron reduction, and relates to a heat recovery system and a heat recovery process for a gas-based shaft furnace direct iron reduction system. Background Art
[0002] With the rapid development of the steel industry, the traditional long-process coking-sintering-blast furnace-converter-casting ironmaking process has high energy consumption and pollution, revealing the problems of resource scarcity and environmental damage. The unit emission of iron smelting by the traditional blast furnace method is about 1.6tCO2 / t iron, while the unit carbon emission of the gas-based reduction process is about 0.12tCO2 / t iron when pure hydrogen is used as the reducing gas, about 0.34tCO2 / t iron when natural gas is used as the reducing gas, and about 0.4tCO2 / t iron when coke oven gas is used as the reducing gas. The short-process steelmaking led by the gas-based direct reduction iron process replaces the long-process steelmaking process led by the traditional blast furnace ironmaking process, with obvious emission reduction advantages, and has been adopted by large domestic steel companies. In the gas-based direct reduction process, the waste heat recovery technology of the furnace top gas has a great impact on the energy-saving effect of the entire process. Due to the large amount of furnace top gas, high temperature and high dust content, the waste heat is often used to produce by-product steam and sent to the boundary area for other users. However, there is also the situation of incomplete recovery. At the same time, the process gas before entering the vertical furnace needs to be heated by a heating furnace, which will consume a lot of gas.
[0003] Therefore, how to design a more suitable heat recovery system for the gas-based vertical furnace direct reduced iron system to make full use of the waste heat of the furnace top gas economically and effectively is the key to the green development of gas-based reduced iron, and it is also one of the focuses of attention of many front-line researchers in the industry. Summary of the invention
[0004] In view of this, the technical problem to be solved by the present invention is to provide a heat recovery system and a heat recovery process for a gas-based vertical furnace direct iron reduction system. The heat recovery system provided by the present invention has the advantages of simple process, convenient operation, and high heat recovery efficiency. In addition, for the gas-based direct iron reduction system, the amount of fuel gas used in the heating furnace, the amount of water to make up the external boiler, and the cost of the external steam pipeline network can be reduced through the optimization of the heat balance in the system.
[0005] The present invention provides a heat recovery system for a gas-based vertical furnace direct iron reduction system, comprising:
[0006] Gas-based vertical furnace;
[0007] A waste heat recovery system connected to a high temperature process gas outlet at the top of the vertical furnace at the top of the gas-based vertical furnace;
[0008] A purification and cooling device connected to the outlet of the low-temperature process gas after heat recovery of the waste heat recovery system;
[0009] A process gas compression device connected to the purification and cooling device;
[0010] a CO2 removal device connected to the process gas compression device;
[0011] a process gas humidification device connected to the CO2 removal device;
[0012] The outlet of the process gas humidification device is connected to the waste heat recovery system;
[0013] A process gas heating device connected to the preheated process gas outlet of the waste heat recovery system;
[0014] The heated process gas outlet of the process gas heating device is connected to the gas-based vertical furnace.
[0015] Preferably, the high-temperature process gas outlet at the top of the vertical furnace is connected to the heat medium inlet of the waste heat recovery system;
[0016] The waste heat recovery system is also provided with a steam outlet and a water supply inlet;
[0017] The steam outlet is connected to the heat source inlet of the CO2 removal device, and the water supplement inlet is connected to the condensate outlet of the CO2 removal device;
[0018] The dust-removed process gas outlet of the purification and cooling device is connected to the process gas compression device.
[0019] Preferably, the compressed process gas outlet of the process gas compression device is connected to the CO2 removal device;
[0020] The CO2 removal device includes an amine CO2 removal device;
[0021] The outlet of the process gas after CO2 removal of the CO2 removal device is connected to the process gas humidification device through a first pipeline;
[0022] The first pipeline is also provided with a supplementary process gas inlet pipeline.
[0023] Preferably, the humidified process gas outlet of the process gas humidifying device is connected to the cold medium inlet of the waste heat recovery system;
[0024] The preheated process gas of the waste heat recovery system is connected to the inlet of the process gas heating device via the cold medium outlet;
[0025] The heated process gas outlet of the process gas heating device is connected to the process gas circulation inlet of the gas-based vertical furnace;
[0026] The process gas circulation air inlet of the gas-based vertical furnace is arranged in the middle of the gas-based vertical furnace.
[0027] Preferably, the waste heat recovery system comprises:
[0028] Heat exchange boiler;
[0029] A boiler drum connected to the heat exchange boiler and arranged above the heat exchange boiler;
[0030] a process gas preheater connected to the boiler drum;
[0031] The high-temperature process gas outlet at the top of the vertical furnace is connected to the heat medium inlet of the heat exchange boiler; the heat medium passes through the tube side of the heat exchange boiler;
[0032] The heat medium inlet is arranged at the top of the heat exchange boiler, and the heat medium outlet is arranged at the bottom of the heat exchange boiler;
[0033] The heat medium outlet of the heat exchange boiler is connected to the low-temperature process gas inlet of the purification and cooling device.
[0034] Preferably, the liquid phase outlet of the boiler drum is connected to the cold medium inlet of the heat exchange boiler;
[0035] The gas-liquid mixed phase inlet of the boiler drum is connected to the cold medium outlet of the heat exchange boiler;
[0036] The cold medium inlet of the heat exchange boiler is arranged at the lower part of the heat exchange boiler, and the cold medium outlet is arranged at the upper part of the heat exchange boiler;
[0037] The gas phase outlet of the boiler drum is connected to the heat medium inlet of the process gas preheater;
[0038] The heat medium outlet of the process gas preheater is connected to the boiler drum via a condensation pipeline;
[0039] The condensation pipeline is provided with a U-shaped bend.
[0040] Preferably, the hot medium of the process gas preheater flows through the tube layer, and the cold medium flows through the shell layer;
[0041] The cold medium inlet of the process gas preheater is connected to the humidified process gas outlet of the process gas humidifying device;
[0042] The cold medium outlet of the process gas preheater is connected to the inlet of the process gas heating device;
[0043] The gas phase outlet of the boiler drum is also connected to the heat source inlet of the CO2 removal device through a steam outlet;
[0044] The liquid phase inlet of the boiler drum is connected to the condensate outlet of the CO2 removal device through a water supply inlet;
[0045] The amount of gas from the boiler drum to the CO2 removal device is regulated by one or more of a first pressure regulating device arranged between the gas phase outlet of the boiler drum and the heat source inlet of the CO2 removal device, a second pressure regulating device arranged between the cold medium inlet and the cold medium outlet of the process gas preheater, and a third pressure regulating device arranged between the liquid phase inlet of the boiler drum and the condensate outlet of the CO2 removal device.
[0046] The present invention provides a heat recovery process for a gas-based shaft furnace direct iron reduction system, comprising the following steps:
[0047] 1) After the top process gas of the gas-based vertical furnace in the direct reduction iron process is discharged, it is firstly recovered through the waste heat recovery system to obtain low-temperature process gas after heat recovery, and then purified and dusted to obtain dust-removed process gas;
[0048] 2) The dust-removed process gas obtained in the above step is compressed and CO2 is removed to obtain a process gas after CO2 is removed, and then humidified to obtain a humidified process gas, and then the humidified process gas is returned to the waste heat recovery system for heating to obtain a preheated process gas;
[0049] 3) The preheated process gas obtained in the above step is heated and then returned to the gas-based vertical furnace.
[0050] Preferably, the reducing gas in the direct iron reduction process includes one or more of hydrogen, natural gas and coke oven gas;
[0051] The furnace top process gas, measured by molar content, includes: H2: 10% to 80%, CO: 5% to 20%, CO2: 0% to 10%, CH4: 10% to 15%, N2: 5% to 10% and H2O: 15% to 25%, and the above contents meet 100%;
[0052] The temperature of the furnace top process gas is 400-600°C;
[0053] The pressure of the furnace top process gas is 0.4-1.2MPaG;
[0054] The gas volume of the furnace top process gas is 150000~350000Nm 3 / h;
[0055] The temperature of the preheated process gas is 140-180°C;
[0056] The heat generated by the waste heat recovery also enters the CO2 removal process;
[0057] Before the humidification, the step of supplementing process gas for conditioning is also included.
[0058] Preferably, the temperature of the low-temperature process gas is 180-220°C;
[0059] The pressure of the compressed process gas is 0.5-1.2 MPaG;
[0060] The waste heat recovery process comprises the following steps:
[0061] (1) The process gas from the furnace top is sent to the heat exchange boiler of the waste heat recovery system. After countercurrent heat exchange with water in the drum of the heat exchange boiler, the water in the heat exchange boiler is heated to form a gas-liquid mixture and returned to the drum. After separation, steam and liquid are obtained;
[0062] (2) using the steam in the drum obtained in the above step as a heat source to perform countercurrent heat exchange with the humidified process gas, and obtaining preheated process gas after the humidified process gas absorbs heat;
[0063] After the countercurrent heat exchange, the condensate formed by the condensation of the steam returns to the steam drum;
[0064] The step 2) further includes using a portion of the steam in the drum as a heat source to perform countercurrent heat exchange with the humidified process gas, and sending another portion of the steam into the CO2 removal process as a heating source for solvent regeneration;
[0065] The condensate produced during the CO2 removal process is returned to the steam drum as supplementary boiler water;
[0066] The ratio of the one part to the other part of the steam is controlled by one or more of the parameters of the humidified process gas before and after countercurrent heat exchange, the parameters of the other part of the steam, and the parameters of the supplementary boiler water;
[0067] The parameters include one or more of temperature, pressure and flow rate.
[0068] The present invention provides a heat recovery system for a gas-based vertical furnace direct iron reduction system, comprising: a gas-based vertical furnace; a waste heat recovery system connected to the high-temperature process gas outlet at the top of the vertical furnace at the top of the gas-based vertical furnace; a purification and cooling device connected to the low-temperature process gas outlet after heat recovery of the waste heat recovery system; a process gas compression device connected to the purification and cooling device; a CO2 removal device connected to the process gas compression device; a process gas humidification device connected to the CO2 removal device; the outlet of the process gas humidification device is connected to the waste heat recovery system; a process gas heating device connected to the preheated process gas outlet of the waste heat recovery system; the heated process gas outlet of the process gas heating device is connected to the gas-based vertical furnace. Compared with the prior art, the present invention designs a heat recovery system for a gas-based vertical furnace direct iron reduction system with a specific structure, which is a new type of waste heat recovery process system with high efficiency and energy saving. In the present invention, the high-temperature gas from the top of the vertical furnace first enters the top gas heat exchanger through a pipeline lined with refractory bricks. The heat exchanger is installed vertically, and the top gas goes through the tube side, enters from the upper head, and flows out from the lower head; the shell side goes through boiler water or recovered steam condensate from the drum of the top gas heat exchanger. The boiler water enters the shell side from the lower part of the top gas heat exchanger in one or more streams. The shell side fluid contacts and exchanges heat with the top gas in the tube side in countercurrent. The boiler water absorbs heat and then vaporizes. One or more streams of the vapor-liquid two-phase are sent to the drum of the top gas heat exchanger through a pipeline. The drum adopts a horizontal container. A part of the steam generated by the drum is consumed by heating the process gas to recover the waste heat, and a part is used for the gas-based direct reduction decarbonization system. In this waste heat recovery system, the process gas heater, the top gas heat exchanger and the drum form a self-circulation. The waste heat recovery system replenishment water continuously enters the bottom of the drum for replenishment. The amount of heat recovered by the process gas is determined by the amount of steam used by the decarbonization unit. For the gas-based vertical furnace process, the heat generated inside the system is fully utilized first, and the heat utilization efficiency is high.
[0069] The waste heat recovery system and recovery process provided by the present invention have the advantages of simple process, convenient operation and high heat recovery efficiency. For the gas-based direct iron reduction system, after optimizing the heat balance within the system, the consumption of heating furnace fuel gas, the external boiler water replenishment amount and the cost of the external steam transmission pipeline network can be reduced.
[0070] The research results show that the waste heat recovery process system provided by the present invention can recover about 241.5MJ of heat per ton of reduced iron when natural gas is used as the reducing gas, and the heating furnace can save at least 6.7Nm 3 When natural gas is used as reducing gas, the unit carbon emission reduction is 0.013tCO2 / t iron; when coke oven gas is used as reducing gas, about 351MJ of heat can be recovered per ton of reduced iron, and the heating furnace can save at least 9.8Nm 3When pure hydrogen is used as reducing gas, about 32.05MJ of heat can be recovered per ton of reduced iron, and the heating furnace can save at least 0.9Nm2 per ton of iron produced. 3 of natural gas, with unit carbon emission reduction of 0.002tCO2 / t iron, and obvious economic, environmental and energy-saving benefits. BRIEF DESCRIPTION OF THE DRAWINGS
[0071] Figure 1 A schematic diagram of the process structure of a heat recovery system for a gas-based shaft furnace direct iron reduction system provided by the present invention;
[0072] Figure 2 A schematic diagram of the process structure of a waste heat recovery system in a heat recovery system for a gas-based vertical furnace direct iron reduction system provided by the present invention. DETAILED DESCRIPTION
[0073] In order to further understand the present invention, preferred embodiments of the present invention are described below in conjunction with examples, but it should be understood that these descriptions are only for further illustrating the features and advantages of the present invention rather than limiting the patent claims of the present invention.
[0074] All raw materials of the present invention have no particular limitation on their sources, and can be purchased from the market or prepared according to conventional methods known to those skilled in the art.
[0075] There is no particular limitation on the purity of all raw materials in the present invention. The present invention preferably uses industrial pure materials or materials with conventional purity in the field of gas-based shaft furnace direct reduced iron.
[0076] All noun expressions and abbreviations in the present invention are conventional noun expressions and abbreviations in the field. Each noun expression and abbreviation is clear and unambiguous in its relevant application field. Those skilled in the art can clearly, accurately and uniquely understand them based on the noun expressions and abbreviations.
[0077] The present invention provides a heat recovery system for a gas-based vertical furnace direct iron reduction system, comprising:
[0078] Gas-based vertical furnace;
[0079] A waste heat recovery system connected to a high temperature process gas outlet at the top of the vertical furnace at the top of the gas-based vertical furnace;
[0080] A purification and cooling device connected to the outlet of the low-temperature process gas after heat recovery of the waste heat recovery system;
[0081] A process gas compression device connected to the purification and cooling device;
[0082] a CO2 removal device connected to the process gas compression device;
[0083] a process gas humidification device connected to the CO2 removal device;
[0084] The outlet of the process gas humidification device is connected to the waste heat recovery system;
[0085] A process gas heating device connected to the preheated process gas outlet of the waste heat recovery system;
[0086] The heated process gas outlet of the process gas heating device is connected to the gas-based vertical furnace.
[0087] In the present invention, the high-temperature process gas outlet at the top of the vertical furnace is preferably connected to the heat medium inlet of the waste heat recovery system.
[0088] In the present invention, the waste heat recovery system is preferably further provided with a steam outlet and a water supplement inlet.
[0089] In the present invention, the steam outlet is preferably connected to the heat source inlet of the CO2 removal device, and the water supplement inlet is preferably connected to the condensate outlet of the CO2 removal device.
[0090] In the present invention, the dust-removed process gas outlet of the purification and cooling device is preferably connected to the process gas compression device.
[0091] In the present invention, the compressed process gas outlet of the process gas compression device is preferably connected to the CO2 removal device.
[0092] In the present invention, the CO2 removal device preferably includes an amine CO2 removal device.
[0093] In the present invention, the outlet of the process gas after CO2 removal of the CO2 removal device is preferably connected to the process gas humidification device through a first pipeline.
[0094] In the present invention, the first pipeline is preferably also provided with a supplementary process gas inlet pipeline.
[0095] In the present invention, the humidified process gas outlet of the process gas humidification device is preferably connected to the cold medium inlet of the waste heat recovery system.
[0096] In the present invention, the preheated process gas of the waste heat recovery system is preferably connected to the inlet of the process gas heating device via the cold medium outlet.
[0097] In the present invention, the heated process gas outlet of the process gas heating device is preferably connected to the process gas circulation inlet of the gas-based vertical furnace;
[0098] In the present invention, the process gas circulation inlet of the gas-based vertical furnace is preferably arranged in the middle of the gas-based vertical furnace.
[0099] In the present invention, the waste heat recovery system preferably comprises:
[0100] Heat exchange boiler;
[0101] A boiler drum connected to the heat exchange boiler and arranged above the heat exchange boiler;
[0102] A process gas preheater is connected to the boiler drum.
[0103] In the present invention, the high-temperature process gas outlet at the top of the vertical furnace is preferably connected to the heat medium inlet of the heat exchange boiler; and the heat medium passes through the tube side of the heat exchange boiler.
[0104] In the present invention, the heat medium inlet is preferably arranged at the top of the heat exchange boiler, and the heat medium outlet is arranged at the bottom of the heat exchange boiler.
[0105] In the present invention, the heat medium outlet of the heat exchange boiler is preferably connected to the low-temperature process gas inlet of the purification and cooling device.
[0106] In the present invention, the liquid phase outlet of the boiler drum is preferably connected to the cold medium inlet of the heat exchange boiler.
[0107] In the present invention, the gas-liquid mixed phase inlet of the boiler drum is preferably connected to the cold medium outlet of the heat exchange boiler.
[0108] In the present invention, the cold medium inlet of the heat exchange boiler is preferably arranged at the lower part of the heat exchange boiler, and the cold medium outlet is preferably arranged at the upper part of the heat exchange boiler.
[0109] In the present invention, the gas phase outlet of the boiler drum is connected to the heat medium inlet of the process gas preheater.
[0110] In the present invention, the heat medium outlet of the process gas preheater is preferably connected to the boiler drum via a condensation pipeline.
[0111] In the present invention, a U-shaped bend is preferably provided on the condensation pipeline.
[0112] In the present invention, the hot medium of the process gas preheater preferably flows through the tube layer, and the cold medium preferably flows through the shell layer.
[0113] In the present invention, the cold medium inlet of the process gas preheater is preferably connected to the humidified process gas outlet of the process gas humidifying device.
[0114] In the present invention, the cold medium outlet of the process gas preheater is preferably connected to the inlet of the process gas heating device.
[0115] In the present invention, the gas phase outlet of the boiler drum is preferably also connected to the heat source inlet of the CO2 removal device through a steam outlet.
[0116] In the present invention, the liquid phase inlet of the boiler drum is preferably connected to the condensate outlet of the CO2 removal device through a make-up water inlet.
[0117] In the present invention, the amount of gas from the boiler drum to the CO2 removal device is preferably regulated by one or more of a first pressure regulating device arranged between the gas phase outlet of the boiler drum and the heat source inlet of the CO2 removal device, a second pressure regulating device arranged between the cold medium inlet and the cold medium outlet of the process gas preheater, and a third pressure regulating device arranged between the liquid phase inlet of the boiler drum and the condensate outlet of the CO2 removal device.
[0118] The present invention provides a heat recovery process for a gas-based shaft furnace direct iron reduction system, comprising the following steps:
[0119] 1) After the top process gas of the gas-based vertical furnace in the direct reduction iron process is discharged, it is firstly recovered through the waste heat recovery system to obtain low-temperature process gas after heat recovery, and then purified and dusted to obtain dust-removed process gas;
[0120] 2) The dust-removed process gas obtained in the above step is compressed and CO2 is removed to obtain a process gas after CO2 is removed, and then humidified to obtain a humidified process gas, and then the humidified process gas is returned to the waste heat recovery system for heating to obtain a preheated process gas;
[0121] 3) The preheated process gas obtained in the above step is heated and then returned to the gas-based vertical furnace.
[0122] The present invention firstly guides the top process gas of the gas-based vertical furnace in the direct reduction iron process, recovers the waste heat through a waste heat recovery system to obtain low-temperature process gas after heat recovery, and then purifies and dedusts to obtain dust-removed process gas.
[0123] In the present invention, the reducing gas in the direct iron reduction process preferably includes one or more of hydrogen, natural gas and coke oven gas, and more preferably includes hydrogen, natural gas or coke oven gas.
[0124] In the present invention, the furnace top process gas, measured by molar content, preferably includes: H2: 10% ~ 80%, CO: 5% ~ 20%, CO2: 0% ~ 10%, CH4: 10% ~ 15%, N2: 5% ~ 10% and H2O: 15% ~ 25%, and the above contents meet 100%, and more preferably are: H2: 25% ~ 65%, CO: 8% ~ 17%, CO2: 2% ~ 8%, CH4: 11% ~ 14%, N2: 6% ~ 9% and H2O: 17% ~ 23%, and more preferably are: H2: 40% ~ 50%, CO: 11% ~ 14%, CO2: 4% ~ 6%, CH4: 12% ~ 13%, N2: 7% ~ 8% and H2O: 19% ~ 21%.
[0125] In the present invention, the temperature of the furnace top process gas is preferably 400-600°C, more preferably 440-560°C, and more preferably 480-520°C.
[0126] In the present invention, the pressure of the furnace top process gas is preferably 0.4-1.2 MPaG, more preferably 0.55-1.05 MPaG, and more preferably 0.7-0.9 MPaG.
[0127] In the present invention, the gas volume of the furnace top process gas is preferably 150000~350000Nm 3 / h, more preferably 190000 to 310000 Nm 3 / h, more preferably 230000-270000Nm 3 / h.
[0128] In the present invention, the temperature of the preheated process gas is preferably less than or equal to 180°C (waste heat ~ 180°C), more preferably 140-180°C, or 140-170°C, or 140-160°C.
[0129] In the present invention, the temperature rise of the preheated process gas is 60-100°C. The temperature rise here can be adjusted according to the amount of steam used for decarburization, that is, the lower the steam used for decarburization, the more heat recovered here, and vice versa.
[0130] In the present invention, the heat generated by the waste heat recovery is preferably also fed into the CO2 removal process.
[0131] The present invention further compresses the dust-removed process gas obtained in the above steps and removes CO2 to obtain a process gas after CO2 removal, and then humidifies it to obtain a humidified process gas, and then returns the humidified process gas to the waste heat recovery system for heating to obtain a preheated process gas.
[0132] In the present invention, before the humidification, it is preferred to further include a step of supplementing the process gas for conditioning.
[0133] In the present invention, the supplementary process gas preferably includes one or more of natural gas, coke oven gas and hydrogen.
[0134] In the present invention, the composition of the supplementary process gas is preferably as follows: CH4: 25% to 95%, H2: 0 to 100%, CO: 2% to 8%, CO2: 2% to 4%, N2: 4% to 8%, O2: 0 to 1%. Among them, CH4 is either 35% to 85%, or 45% to 75%, or 55% to 65%. H2 is either 1% to 90%, or 10% to 70%, or 30% to 50%. CO is either 3% to 9%, or 4% to 8%, or 5% to 7%. CO2 is either 2.2% to 3.7%, or 2.5% to 3.5%, or 2.7% to 3.3%. N2 is either 4.5% to 7.5%, or 5% to 7%, or 5.5% to 6.5%. O2 is either 0.1% to 0.8%, or 0.3% to 0.6%.
[0135] In the present invention, the temperature of the low-temperature process gas is preferably 180-220°C, more preferably 185-215°C, more preferably 190-210°C, and more preferably 195-205°C.
[0136] In the present invention, the pressure of the compressed process gas is preferably 0.5 to 1.2 MPaG, more preferably 0.6 to 1.1 MPaG, more preferably 0.7 to 1.0 MPaG, and more preferably 0.8 to 0.9 MPaG.
[0137] In the present invention, the waste heat recovery process preferably includes the following steps:
[0138] (1) The process gas from the furnace top is sent to the heat exchange boiler of the waste heat recovery system. After countercurrent heat exchange with water in the drum of the heat exchange boiler, the water in the heat exchange boiler is heated to form a gas-liquid mixture and returned to the drum. After separation, steam and liquid are obtained;
[0139] (2) The steam in the drum obtained in the above step is used as a heat source to perform countercurrent heat exchange with the humidified process gas, and the humidified process gas absorbs heat to obtain preheated process gas.
[0140] After the countercurrent heat exchange in step 2), the condensate formed by the condensation of steam is returned to the steam drum.
[0141] In the present invention, the step 2) preferably also includes using a portion of the steam in the drum as a heat source for countercurrent heat exchange with the humidified process gas, and sending another portion of the steam into the CO2 removal process as a heating source for solvent regeneration.
[0142] In the present invention, the condensate generated during the CO2 removal process is preferably returned to the steam drum as supplementary boiler water.
[0143] In the present invention, the ratio of the one part to the other part of steam is preferably controlled in a chain manner by one or more of the parameters of the humidified process gas before and after countercurrent heat exchange, the parameters of the other part of steam, and the parameters of the supplementary boiler water.
[0144] In the present invention, the parameters preferably include one or more of temperature, pressure and flow rate.
[0145] In the present invention, the preheated process gas obtained in the above steps is finally heated and then returned to the gas-based vertical furnace.
[0146] The present invention is a complete and detailed overall technical solution, which can better improve the operation effect of the heat recovery system and process of the gas-based shaft furnace direct iron reduction system, and further improve the recovery and utilization of heat. The heat recovery system and heat recovery process for the gas-based shaft furnace direct iron reduction system can specifically include the following contents:
[0147] See also Figure 1 , Figure 1 The process structure schematic diagram of the heat recovery system for the gas-based vertical furnace direct reduction iron system provided by the present invention. Among them, ① gas-based vertical furnace ② high-temperature process gas at the top of the vertical furnace ③ waste heat recovery system ④ low-temperature process gas after heat recovery ⑤ purification and cooling system ⑥ process gas after normal temperature dust removal ⑦ process gas compressor ⑧ compressed process gas ⑨ amine method CO2 removal system ⑩ process gas after CO2 removal Preheated process gas Process gas heating furnace High temperature process gas Byproduct steam Boiler water replenishment Process gas humidification system, Humidified process gas.
[0148] Process flow:
[0149] The high-temperature process gas from the top of the vertical furnace① first enters the waste heat recovery system, and the process gas after humidification In the waste heat recovery system, the waste heat reaches 150℃, the high temperature furnace top gas② is at 400~600℃, and part of the steam generated in the waste heat recovery Used as a heating source for the solvent regeneration of the CO2 removal system ⑨, and the condensate produced Return to the waste heat recovery system for water replenishment; the high-temperature furnace top gas is reduced to 180-220℃ after waste heat recovery and enters the purification and cooling unit⑤, where a large amount of dust is removed. The purified and cooled process gas enters the process gas compressor⑦, and the pressure is increased to 0.5-1.2MPaG; the pressurized process gas enters the CO2 removal system⑨ to remove the excess CO2 generated in the vertical furnace. The decarbonized process gas⑩ is tempered by supplementing the process gas and then enters the process gas humidification system The humidified process gas enters the waste heat recovery system ③ to recover heat. After preheating, the process gas temperature reaches 150℃ and enters the process gas heating furnace After further heating, it enters the vertical furnace body to form a process gas loop.
[0150] See also Figure 2 , Figure 2 The process structure schematic diagram of the waste heat recovery system in the heat recovery system of the gas-based vertical furnace direct reduction iron system provided by the present invention. Among them, ② is the high-temperature process gas from the furnace top gas, ⑩ is the cold process gas, Refill boiler water, Vertical boiler, Boiler drum, Process gas preheater, Adjustment device 1, Adjustment device 2, Adjustment device 3.
[0151] Process flow:
[0152] High-temperature process gas from the top gas② first enters the vertical boiler Tube pass, air inlet at the top, air outlet at the bottom; boiler drum Arranged at the top, saturated liquid water enters the shell side of the boiler bottom through vertical pipes by gravity, and enters in one or more streams. The shell side liquid and the tube side high-temperature gas exchange heat in countercurrent. The shell side saturated water absorbs heat and partially vaporizes. Under the driving force of pressure difference, the gas and liquid phases enter the steam drum upward, and enter in one or more streams. The gas and liquid phases enter the steam drum for gas-liquid separation, and the separated liquid phase flows to the boiler by gravity. A part of the gas phase separated from the drum enters the process gas preheater The tube side, the cold process gas ⑩ goes through the shell side, the process gas and steam are in the process gas preheater Internal countercurrent heat exchange, the steam is condensed and flows back to the drum under the action of gravity. The condensate pipeline is set with a U-bend to prevent gas from flowing through; part of the steam passes through the pressure regulating device The steam volume sent to the gas-based vertical furnace CO2 removal system is controlled by the regulating device. Common regulation is achieved; boiler replenishment is achieved through pipelines Continuously add into the steam drum.
[0153] Specifically, in the heat recovery process for the gas-based shaft furnace direct iron reduction system, in the gas-based shaft furnace direct iron reduction process, the reducing gas is one or a combination of hydrogen, natural gas, and coke oven gas.
[0154] Specifically, the composition range (mol) of the top gas of the gas-based vertical furnace (i.e., the high-temperature process gas at the top of the furnace) is: H2: 10-80%, CO: 5-20%, CO2: 0-10%, CH4: 10-15%, N2: 5-10%, H2O: 15-25%.
[0155] Specifically, the temperature of the top gas of the gas-based vertical furnace is 400-600° C., and the pressure is 0.4 MPaG-1.2 MPaG.
[0156] Specifically, the gas volume of the top gas of the gas-based vertical furnace is 150,000 to 350,000 Nm 3 / h.
[0157] The present invention provides a heat recovery system and a heat recovery process for a gas-based shaft furnace direct iron reduction system. The heat recovery system for a gas-based shaft furnace direct iron reduction system with a specific structure designed by the present invention is a new type of waste heat recovery process system with high efficiency and energy saving. In the present invention, the high-temperature gas from the top of the vertical furnace first enters the top gas heat exchanger through a pipeline lined with refractory bricks. The heat exchanger is installed vertically, and the top gas goes through the tube side, enters from the upper head, and flows out from the lower head; the shell side goes through boiler water or recovered steam condensate from the drum of the top gas heat exchanger. The boiler water enters the shell side from the lower part of the top gas heat exchanger in one or more streams. The shell side fluid contacts and exchanges heat with the top gas in the tube side in countercurrent. The boiler water absorbs heat and then vaporizes. One or more streams of the vapor-liquid two-phase are sent to the drum of the top gas heat exchanger through a pipeline. The drum adopts a horizontal container. A part of the steam generated by the drum is consumed by heating the process gas to recover the waste heat, and a part is used for the gas-based direct reduction decarbonization system. In this waste heat recovery system, the process gas heater, the top gas heat exchanger and the drum form a self-circulation. The waste heat recovery system replenishment water continuously enters the bottom of the drum for replenishment. The amount of heat recovered by the process gas is determined by the amount of steam used by the decarbonization unit. For the gas-based vertical furnace process, the heat generated inside the system is fully utilized first, and the heat utilization efficiency is high.
[0158] The waste heat recovery system and recovery process provided by the present invention have the advantages of simple process, convenient operation and high heat recovery efficiency. For the gas-based direct iron reduction system, after optimizing the heat balance within the system, the consumption of heating furnace fuel gas, the external boiler water replenishment amount and the cost of the external steam transmission pipeline network can be reduced.
[0159] The research results show that the waste heat recovery process system provided by the present invention can recover about 241.5MJ of heat per ton of reduced iron when natural gas is used as the reducing gas, and the heating furnace can save at least 6.7Nm 3 When natural gas is used as reducing gas, the unit carbon emission reduction is 0.013tCO2 / t iron; when coke oven gas is used as reducing gas, about 351MJ of heat can be recovered per ton of reduced iron, and the heating furnace can save at least 9.8Nm 3 When pure hydrogen is used as reducing gas, about 32.05MJ of heat can be recovered per ton of reduced iron, and the heating furnace can save at least 0.9Nm2 per ton of iron produced. 3 of natural gas, with unit carbon emission reduction of 0.002tCO2 / t iron, and obvious economic, environmental and energy-saving benefits.
[0160] In order to further illustrate the present invention, a heat recovery system and a heat recovery process for a gas-based vertical furnace direct reduced iron system provided by the present invention are described in detail in combination with embodiments below. However, it should be understood that these embodiments are implemented on the premise of the technical solution of the present invention, and detailed implementation methods and specific operation processes are given only to further illustrate the features and advantages of the present invention, rather than to limit the claims of the present invention, and the protection scope of the present invention is not limited to the following embodiments.
[0161] Example 1
[0162] Heat recovery systems such as Figure 1 and Figure 2 shown.
[0163] A gas-based vertical furnace steel plant uses natural gas as reducing gas. The high-temperature process gas from the furnace top, ~500°C, enters the tube side of the furnace top gas heat exchanger from top to bottom, and the process gas coming out of the tube side enters the subsequent purification and cooling system; the shell side of the furnace top gas heat exchanger uses boiler water or condensate, which enters from the bottom in two or more streams. After gasification, the steam-liquid two-phase is divided into two or more streams and enters the steam drum from the top. Part of the gas phase in the steam drum enters the process gas preheater to preheat the process gas to about 150°C. Part of the steam is reduced in pressure to 0.5MPa through the regulating device and then enters the CO2 removal system for use as a regenerative heat source. The steam condensate returns to the system through the pipeline.
[0164] Specific implementation parameters:
[0165] 1) Composition of high temperature gas at the top of the furnace (mol): H2: 35%, CO: 15%, CO2: 8%, CH4: 13%, N2: 5%, H2O: 24%;
[0166] Operating temperature: 500℃, operating pressure 0.7MpaG, gas volume: 300000Nm 3 / h;
[0167] 2) The drum control pressure is 1.0MPa;
[0168] 3) Process gas parameters: H2: 44%, CO: 10%, CO2: 2%, CH4: 24%, N2: 15%, H2O: 5%, temperature 40°C, pressure 0.7MPaG, gas volume 250000Nm 3 / h;
[0169] 4) The process gas is preheated from 80℃ to 150℃ and sent to the CO2 removal system with 45t / h low-pressure steam.
[0170] The statistical calculation of the operation results shows that 241MJ of heat can be recovered per ton of reduced iron, saving at least 6.75 million Nm per year. 3 of natural gas, can reduce CO2 emissions by 13,250t per year, with obvious economic and environmental benefits.
[0171] Example 2
[0172] A gas-based vertical furnace steel plant uses coke oven gas as reducing gas. The high-temperature process gas from the furnace top, ~450°C, enters the tube side of the furnace top gas heat exchanger from top to bottom, and the process gas coming out of the tube side enters the subsequent purification and cooling system; the shell side of the furnace top gas heat exchanger uses boiler water or condensate water, which enters from the lower part in two or more streams, and after gasification, the vapor-liquid two-phase enters the steam drum from the upper part in two or more streams, and part of the gas phase in the steam drum enters the process gas preheater to preheat the process gas to about 170°C. Part of the steam is reduced in pressure to 0.5MPa through the regulating device and then enters the CO2 removal system for use as a regenerative heat source, and the steam condensate returns to the system through the pipeline.
[0173] Specific implementation parameters:
[0174] 1) Composition of high temperature gas at the top of the furnace (mol): H2: 40%, CO: 5%, CO2: 5.2%, CH4: 11.877%, N2: 14.8%, H2O: 23.14%;
[0175] Operating temperature: 446℃, operating pressure 0.7MpaG, gas volume: 170000Nm 3 / h;
[0176] 2) The drum control pressure is 1.5MPa;
[0177] 3) Process gas parameters: H2: 49.34%, CO: 5.65%, CO2: 2.41%, CH4: 31.34%, N2: 16.95%, H2O: 5%, C2H6: 0.11%;
[0178] Temperature 80℃, pressure 1.0MPaG, gas volume 150000Nm 3 / h;
[0179] The process gas is preheated from 80℃ to 160℃ and sent to the CO2 removal system with 15.2t / h of low-pressure steam.
[0180] The statistical calculation of the operation results shows that 351MJ of heat can be recovered per ton of reduced iron, saving at least 4.91 million Nm per year. 3 of natural gas, can reduce CO2 emissions by 9,639t per year, with obvious economic and environmental benefits.
[0181] The above is a detailed introduction to a heat recovery system and a heat recovery process for a gas-based vertical furnace direct reduction iron system provided by the present invention. The principle and implementation method of the present invention are described in detail using specific examples. The description of the above embodiments is only used to help understand the method and its core idea of the present invention, including the best mode, and also enables any technician in the field to practice the present invention, including manufacturing and using any device or system, and implementing any combined method. It should be pointed out that for ordinary technicians in this technical field, without departing from the principle of the present invention, the present invention can also be improved and modified in a number of ways, and these improvements and modifications also fall within the scope of protection of the claims of the present invention. The scope of patent protection of the present invention is defined by the claims and may include other embodiments that can be thought of by those skilled in the art. If these other embodiments have structural elements that are not different from the text of the claims, or if they include equivalent structural elements that are not substantially different from the text of the claims, then these other embodiments should also be included in the scope of the claims.
Claims
1. A heat recovery system for a gas-based shaft furnace direct iron reduction system, It is characterized in that include: Gas-based vertical furnace; A waste heat recovery system connected to a high temperature process gas outlet at the top of the vertical furnace at the top of the gas-based vertical furnace; A purification and cooling device connected to the outlet of the low-temperature process gas after heat recovery of the waste heat recovery system; A process gas compression device connected to the purification and cooling device; The CO connected to the process gas compression device 2 Removal device; With the CO 2 A process gas humidification device connected to the removal device; The outlet of the process gas humidification device is connected to the waste heat recovery system; A process gas heating device connected to the preheated process gas outlet of the waste heat recovery system; The heated process gas outlet of the process gas heating device is connected to the gas-based vertical furnace.
2. The process system according to claim 1, It is characterized in that The high-temperature process gas outlet at the top of the vertical furnace is connected to the heat medium inlet of the waste heat recovery system; The waste heat recovery system is also provided with a steam outlet and a water supply inlet; The steam outlet and the CO 2 The heat source inlet of the removal device is connected, and the water supply inlet is connected to the CO 2 The condensate outlet of the removal device is connected; The dust-removed process gas outlet of the purification and cooling device is connected to the process gas compression device.
3. The process system according to claim 1, It is characterized in that The compressed process gas outlet of the process gas compression device is connected to the CO 2 The removal device is connected; The CO 2 The removal device includes amine CO 2 Removal device; The CO 2 CO removal by removal unit 2 The process gas outlet is connected to the process gas humidification device through a first pipeline; The first pipeline is also provided with a supplementary process gas inlet pipeline.
4. The process system according to claim 1, It is characterized in that The humidified process gas outlet of the process gas humidifying device is connected to the cold medium inlet of the waste heat recovery system; The preheated process gas of the waste heat recovery system is connected to the inlet of the process gas heating device via the cold medium outlet; The heated process gas outlet of the process gas heating device is connected to the process gas circulation inlet of the gas-based vertical furnace; The process gas circulation air inlet of the gas-based vertical furnace is arranged in the middle of the gas-based vertical furnace.
5. The process system according to claim 2, It is characterized in that The waste heat recovery system comprises: Heat exchange boiler; A boiler drum connected to the heat exchange boiler and arranged above the heat exchange boiler; a process gas preheater connected to the boiler drum; The high-temperature process gas outlet at the top of the vertical furnace is connected to the heat medium inlet of the heat exchange boiler; the heat medium passes through the tube side of the heat exchange boiler; The heat medium inlet is arranged at the top of the heat exchange boiler, and the heat medium outlet is arranged at the bottom of the heat exchange boiler; The heat medium outlet of the heat exchange boiler is connected to the low-temperature process gas inlet of the purification and cooling device.
6. The process system according to claim 5, It is characterized in that The liquid phase outlet of the boiler drum is connected to the cold medium inlet of the heat exchange boiler; The gas-liquid mixed phase inlet of the boiler drum is connected to the cold medium outlet of the heat exchange boiler; The cold medium inlet of the heat exchange boiler is arranged at the lower part of the heat exchange boiler, and the cold medium outlet is arranged at the upper part of the heat exchange boiler; The gas phase outlet of the boiler drum is connected to the heat medium inlet of the process gas preheater; The heat medium outlet of the process gas preheater is connected to the boiler drum via a condensation pipeline; The condensation pipeline is provided with a U-shaped bend.
7. The process system according to claim 5, It is characterized in that The hot medium of the process gas preheater flows through the tube path, and the cold medium flows through the shell layer; The cold medium inlet of the process gas preheater is connected to the humidified process gas outlet of the process gas humidifying device; The cold medium outlet of the process gas preheater is connected to the inlet of the process gas heating device; The gas phase outlet of the boiler drum is also connected to the CO 2 connected to the heat source inlet of the removal device; The liquid phase inlet of the boiler drum is connected to the CO 2 The condensate outlet of the removal device is connected; The boiler drum is vented to CO 2 The gas volume of the removal device is connected to the gas phase outlet of the boiler drum through the 2 The first pressure regulating device is arranged between the heat source inlet of the removal device, the second pressure regulating device is arranged between the cold medium inlet and the cold medium outlet of the process gas preheater, and the liquid phase inlet and the CO 2 One or more of the third pressure regulating devices between the condensate outlets of the removal devices are regulated.
8. A heat recovery process for a gas-based shaft furnace direct iron reduction system, It is characterized in that The following steps are involved: 1) After the top process gas of the gas-based vertical furnace in the direct reduction iron process is discharged, it is firstly recovered through the waste heat recovery system to obtain low-temperature process gas after heat recovery, and then purified and dusted to obtain dust-removed process gas; 2) The dust-free process gas obtained in the above steps is compressed and CO 2 After removal, CO is removed 2 The humidified process gas is then humidified to obtain humidified process gas, and then the humidified process gas is returned to the waste heat recovery system for heating to obtain preheated process gas; 3) The preheated process gas obtained in the above step is heated and then returned to the gas-based vertical furnace.
9. The heat recovery process according to claim 8, It is characterized in that The reducing gas in the direct iron reduction process includes one or more of hydrogen, natural gas and coke oven gas; The furnace top process gas, measured by mole content, includes: H 2 : 10% to 80%, CO: 5% to 20%, CO 2 :0%~10%, CH 4 :10%~15%,N 2 :5%~10% and H 2 O: 15% to 25%, the above content meets 100%; The temperature of the furnace top process gas is 400-600°C; The pressure of the furnace top process gas is 0.4-1.2MPaG; The gas volume of the furnace top process gas is 150000~350000Nm 3 / h; The temperature of the preheated process gas is 140-180°C; The waste heat recovery generates heat that also enters the CO 2 During the removal process; Before the humidification, the step of supplementing process gas for conditioning is also included.
10. The heat recovery process according to claim 8, It is characterized in that The temperature of the low-temperature process gas is 180-220°C; The pressure of the compressed process gas is 0.5-1.2 MPaG; The waste heat recovery process comprises the following steps: (1) The process gas from the furnace top is sent to the heat exchange boiler of the waste heat recovery system. After countercurrent heat exchange with water in the drum of the heat exchange boiler, the water in the heat exchange boiler is heated to form a gas-liquid mixture and returned to the drum. After separation, steam and liquid are obtained; (2) using the steam in the drum obtained in the above step as a heat source to perform countercurrent heat exchange with the humidified process gas, and obtaining preheated process gas after the humidified process gas absorbs heat; After the countercurrent heat exchange, the condensate formed by the condensation of the steam returns to the steam drum; The step 2) further includes using part of the steam in the drum as a heat source to perform countercurrent heat exchange with the humidified process gas, and sending the other part of the steam into the CO 2 During the removal process, it serves as a heating source for solvent regeneration; The CO 2 The condensate produced during the removal process is returned to the steam drum as make-up boiler water; The ratio of the one part to the other part of the steam is controlled by one or more of the parameters of the humidified process gas before and after countercurrent heat exchange, the parameters of the other part of the steam, and the parameters of the supplementary boiler water; The parameters include one or more of temperature, pressure and flow rate.
Citation Information
Cited By
Low-carbon metallurgical waste heat recovery system
CN120799984A
