SMW construction method pile profile steel positioning device, positioning assembly and positioning method

By designing the SMW pile steel positioning device composed of prefabricated steel pipes, the stable positioning is achieved by using bolt connections, which solves the problem of insertion error of steel in SMW pile construction, and achieves accurate construction and cost-effectiveness improvement.

CN118997155APending Publication Date: 2024-11-22CCCC RUITONG CONSTR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411392608.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the construction of SMW piles, the steel is easily affected by various factors when inserted, and the lack of precise positioning tools leads to the error exceeding the control range, resulting in serious consequences.

Method used

Design a SMW pile steel positioning device including two positioning frames and multiple positioning steel pipes. It is a positioning device that is light and easy to assemble through a rectangular structure composed of prefabricated steel pipes. It uses bolt connections to achieve stable positioning, reduce errors and improve construction accuracy. .

Benefits of technology

The precise positioning of steel profiles is achieved, construction errors and human resources waste are reduced, construction costs are reduced, and working speed and appearance quality are improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997155A_ABST
    Figure CN118997155A_ABST
Patent Text Reader

Abstract

The invention relates to an SMW construction method pile profile steel positioning device, positioning assembly and positioning method.The SMW construction method pile profile steel positioning device comprises two positioning frames and a plurality of positioning steel pipes, and each positioning frame comprises two first connecting steel pipes and two second connecting steel pipes; the two first connecting steel pipes and the two second connecting steel pipes are connected with each other to form a positioning frame of a rectangular structure; the two positioning frames are horizontally arranged and are arranged at intervals up and down, the projection of the in-frame area of the upper positioning frame right below coincides with the in-frame area of the lower positioning frame, the second connecting steel pipe of the upper positioning frame is fixedly connected with the second connecting steel pipe of the lower positioning frame through a plurality of positioning steel pipes, and the positioning steel pipes are vertically arranged. The positioning device composed of the prefabricated steel pipes is adopted for positioning the profile steel, the profile steel can be light and easy to assemble and disassemble, the effect of reducing errors and precise construction is achieved, meanwhile, redundant construction cost is not increased, and waste of human resources is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field related to building construction, and in particular to a SMW method pile steel positioning device, a positioning component and a positioning method. Background Art

[0002] In engineering operations, refined management becomes more and more important, and the requirements for errors are becoming increasingly stringent. Sometimes errors may exceed the control range due to some operational errors or lack of precise tools, which will lead to serious consequences.

[0003] In the construction of SMW piles, the insertion of steel sections is the key point of the entire process. If the steel sections are directly inserted according to the points without taking any control measures after measuring the defense line, errors may occur due to various factors. In order to reduce the errors, according to the on-site conditions, making a simple and lightweight positioning device is a technical focus that needs to be faced. Summary of the invention

[0004] In order to solve one or more technical problems existing in the prior art, the present invention provides a SMW method pile steel positioning device, a positioning assembly and a positioning method.

[0005] The technical solution of the present invention to solve the above technical problems is as follows: a SMW method pile steel positioning device, comprising two positioning frames and a plurality of positioning steel pipes, wherein the positioning frame comprises two first connecting steel pipes and two second connecting steel pipes, and the two first connecting steel pipes and the two second connecting steel pipes are connected to each other to form a rectangular positioning frame;

[0006] Both positioning frames are set horizontally and arranged with intervals up and down. The projection of the area inside the upper positioning frame directly below coincides with the area inside the lower positioning frame. The second connecting steel pipe of the upper positioning frame and the second connecting steel pipe of the lower positioning frame are connected and fixed by multiple positioning steel pipes, and the multiple positioning steel pipes are arranged vertically.

[0007] The beneficial effects of the present invention are as follows: the present invention adopts a positioning device composed of prefabricated steel pipes to position the steel section, which can be light and easy to assemble and disassemble, thereby achieving the effect of reducing errors and precise construction without increasing unnecessary construction costs and reducing the waste of human resources.

[0008] Based on the above technical solution, the present invention can also be improved as follows.

[0009] Further, one side wall of the first connecting steel pipe is a plug-in side wall, and two first plug-in holes arranged at intervals are formed on the plug-in side wall;

[0010] The two first connecting steel pipes are arranged in parallel and at intervals, and the first plug holes on the two first connecting steel pipes are arranged relatively to each other in a one-to-one manner. The two ends of the second connecting steel pipe are respectively plugged and fixed in a group of first plug holes arranged relatively, and the second connecting steel pipe is arranged perpendicular to the first connecting steel pipe.

[0011] The beneficial effect of adopting the above further solution is that by providing the first plug hole, the stable connection and fixation between the first connecting steel pipe and the second connecting steel pipe is facilitated.

[0012] Furthermore, the other side wall of the first connecting steel pipe is a connecting side wall, the plug-in side wall and the connecting side wall are adjacent and vertically arranged, and one end of the second connecting steel pipe inserted into the first plug-in hole is fixed to the connecting side wall by bolts.

[0013] The beneficial effect of adopting the above further solution is: the second connecting steel pipe and the first connecting steel pipe are connected by bolts, so that the disassembly and assembly between the first connecting steel pipe and the second connecting steel pipe are convenient.

[0014] Furthermore, the two first plugging holes on the first connecting steel pipe are respectively arranged close to the two ends of the first connecting steel pipe, the distance between one first plugging hole and one end of the first connecting steel pipe is a, and the distance between the other first plugging hole and the other end of the first connecting steel pipe is b, a=b.

[0015] The beneficial effect of adopting the above further solution is that the two first plug holes are symmetrically arranged, the structure is stable, and stable support for the steel section can be achieved.

[0016] Furthermore, a group of first channel steel connecting holes is opened on the connecting side wall between one end of the first connecting steel pipe and the adjacent first plug-in hole, and a group of second channel steel connecting holes is opened on the connecting side wall between the other end of the first connecting steel pipe and the adjacent first plug-in hole; the distance between a group of first channel steel connecting holes and one end of the first connecting steel pipe is c, and the distance between a group of second channel steel connecting holes and the other end of the first connecting steel pipe is d, c=d.

[0017] The beneficial effect of adopting the above further solution is: using two groups of channel steel connection holes with equal distances to the ends facilitates the cyclic and equidistant installation of the steel sections.

[0018] Furthermore, a second plugging hole is opened on the lower side wall of the two second connecting steel pipes of the upper positioning frame, and a third plugging hole is opened on the upper side wall of the two second connecting steel pipes of the lower positioning frame. The second plugging holes and the third plugging holes on the two second connecting steel pipes arranged opposite to each other are arranged one by one, and the upper and lower ends of the positioning steel pipe are respectively plugged and fixed in a group of second plugging holes and third plugging holes arranged opposite to each other.

[0019] The beneficial effect of adopting the above further solution is that by providing the second plug hole and the third plug hole, the stable connection and fixation between the positioning steel pipe and the second connecting steel pipe is facilitated.

[0020] Furthermore, one end of the positioning steel pipe inserted into the second plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe by bolts, and one end of the positioning steel pipe inserted into the third plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe by bolts.

[0021] The beneficial effect of adopting the above further solution is: bolts are used to connect the positioning steel pipe and the second connecting steel pipe, which facilitates the disassembly and assembly between the positioning steel pipe and the second connecting steel pipe.

[0022] Furthermore, the first connecting steel pipe, the second connecting steel pipe and the positioning steel pipe are all square steel pipes, the width of the first connecting steel pipe is greater than the width of the second connecting steel pipe, and the width of the second connecting steel pipe is greater than the width of the positioning steel pipe.

[0023] The beneficial effect of adopting the above further solution is: using square steel pipes of different widths, the structure has high strength and is easy to assemble.

[0024] A positioning assembly comprises two of the above-mentioned SMW method pile steel positioning devices, and also comprises a connecting channel steel. The two SMW method pile steel positioning devices are arranged side by side, and the two first connecting steel pipes of the lower positioning frame of one SMW method pile steel positioning device correspond to the two first connecting steel pipes of the lower positioning frame of the other SMW method pile steel positioning device one by one and are arranged coaxially. The two coaxially arranged first connecting steel pipes are connected and fixed by the connecting channel steel, and the two ends of the connecting channel steel are respectively connected and fixed to the two coaxially arranged first connecting steel pipes by bolts.

[0025] The beneficial effects of the present invention are as follows: the positioning assembly of the present invention is simple to process and easy to operate, all components are connected by bolts, and installation and disassembly are simple and fast. It can not only solve the positioning requirements of SMW pile steel and improve the appearance quality, but also minimize the impact on the working speed, and can be put into use once and used in a cycle, and has strong application ability.

[0026] A positioning method is implemented by using the above positioning assembly, comprising the following steps: directly inserting a first steel section through GPS positioning, assembling an SMW construction method pile steel positioning device on the first steel section, so that the first steel section is located in the upper and lower frame areas of an SMW construction method pile steel positioning device;

[0027] After assembling one SMW method pile steel positioning device, connect the connecting channel steel to the one SMW method pile steel positioning device, assemble another SMW method pile steel positioning device at the other end of the connecting channel steel, and after the other SMW method pile steel positioning device is assembled, insert the second steel into the upper and lower frame areas of the other SMW method pile steel positioning device;

[0028] After the second steel section is inserted, remove the SMW pile steel positioning device on the first steel section and move it to the position where the third steel section is to be inserted. Then connect it to the SMW pile steel positioning device on the second steel section through the connecting channel steel, and repeat the process until all the steel sections are installed.

[0029] The beneficial effects of the present invention are as follows: the positioning method of the present invention can effectively control the spacing between the steel sections, and at the same time, the interaction between the upper and lower positioning frames of the positioning device can well ensure the vertical insertion of the steel sections, so that the vertical deviation angle can be well controlled. The two positioning devices circulate and turn around, so that all the steel sections can achieve a good positioning effect. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 It is a schematic diagram of the main structure of the positioning assembly of the present invention;

[0031] Figure 2 for Figure 1 A schematic diagram of the enlarged structure of the middle part A;

[0032] Figure 3 It is a side view structural schematic diagram of the positioning assembly of the present invention;

[0033] Figure 4 It is a schematic diagram of the top view of the positioning assembly of the present invention;

[0034] Figure 5 for Figure 4 Schematic diagram of the enlarged structure of part B in the middle.

[0035] In the accompanying drawings, the components represented by the reference numerals are listed as follows:

[0036] 1. The first connecting steel pipe; 2. The second connecting steel pipe; 3. The positioning steel pipe; 4. Bolts; 5. Connecting channel steel; 6. The first steel section; 7. The second steel section. DETAILED DESCRIPTION

[0037] The principles and features of the present invention are described below in conjunction with the accompanying drawings. The examples given are only used to explain the present invention and are not used to limit the scope of the present invention.

[0038] like Figure 1 to Figure 5As shown, a SMW pile steel positioning device of the present embodiment includes two positioning frames and multiple positioning steel pipes 3, wherein the positioning frame includes two first connecting steel pipes 1 and two second connecting steel pipes 2, and the two first connecting steel pipes 1 and the two second connecting steel pipes 2 are interconnected to form a positioning frame of a rectangular structure; the two positioning frames are both horizontally arranged and spaced apart from each other, and the projection of the inner area of ​​the upper positioning frame at the bottom coincides with the inner area of ​​the lower positioning frame, and the second connecting steel pipe 2 of the upper positioning frame is connected and fixed with the second connecting steel pipe 2 of the lower positioning frame by multiple positioning steel pipes 3, and the multiple positioning steel pipes 3 are all vertically arranged.

[0039] like Figure 1 to Figure 5 As shown, one side wall of the first connecting steel pipe 1 of this embodiment is a plug-in side wall, and two first plug-in holes arranged at intervals are opened on the plug-in side wall; the two first connecting steel pipes 1 are arranged in parallel and at intervals, and the first plug-in holes on the two first connecting steel pipes 1 are arranged relatively in a one-to-one correspondence, and the two ends of the second connecting steel pipe 2 are respectively plugged and fixed in a group of first plug-in holes arranged relatively, and the second connecting steel pipe 2 is arranged perpendicular to the first connecting steel pipe 1. By providing the first plug-in holes, the stable connection and fixation between the first connecting steel pipe and the second connecting steel pipe is facilitated.

[0040] like Figure 1 to Figure 5 As shown, the other side wall of the first connecting steel pipe 1 of this embodiment is a connecting side wall, the plug-in side wall and the connecting side wall are adjacent and vertically arranged, and the end of the second connecting steel pipe 2 inserted into the first plug hole is connected and fixed to the connecting side wall by bolts 4. The second connecting steel pipe and the first connecting steel pipe are connected by bolts, which facilitates the disassembly and assembly between the first connecting steel pipe and the second connecting steel pipe.

[0041] Specifically, a connecting hole is opened on the connecting side wall corresponding to each first plug-in hole, and one end of the second connecting steel pipe 2 inserted into the first plug-in hole is provided with a threaded hole corresponding to the connecting hole on the connecting side wall. The second connecting steel pipe 2 and the first connecting steel pipe 1 are connected and fixed by screwing bolts 4 into the correspondingly arranged connecting holes and threaded holes.

[0042] Optionally, first plugging holes are provided on two opposite plugging side walls of the first connecting steel pipe 1, that is, the first plugging holes are arranged through the two plugging side walls of the first connecting steel pipe 1. The end of the second connecting steel pipe 2 can be arranged through the first connecting steel pipe 1.

[0043] like Figure 2 and Figure 5As shown, the two first plug holes on the first connecting steel pipe 1 of this embodiment are respectively arranged near the two ends of the first connecting steel pipe 1, and the distance between one first plug hole and one end of the first connecting steel pipe 1 is a, and the distance between the other first plug hole and the other end of the first connecting steel pipe 1 is b, a = b. The two first plug holes are symmetrically arranged, the structure is stable, and stable support for the steel section can be achieved.

[0044] like Figure 1 to Figure 5 As shown, a group of first channel steel connection holes is provided on the connecting side wall between one end of the first connecting steel pipe 1 and the adjacent first plug-in hole, and a group of second channel steel connection holes is provided on the connecting side wall between the other end of the first connecting steel pipe 1 and the adjacent first plug-in hole; the distance between a group of first channel steel connection holes and one end of the first connecting steel pipe 1 is c, and the distance between a group of second channel steel connection holes and the other end of the first connecting steel pipe 1 is d, c=d. Two groups of channel steel connection holes with equal distances to the ends are used to facilitate the cyclic equidistant installation of the steel. Specifically, the center point of a group of first channel steel connection holes (for example, a group of first channel steel connection holes includes two first channel steel connection holes, and the midpoint between the two first channel steel connection holes) is at a distance c from one end of the first connecting steel pipe, and the center point of a group of second channel steel connection holes (for example, a group of second channel steel connection holes includes two second channel steel connection holes, and the midpoint between the two second channel steel connection holes) is at a distance d from the other end of the first connecting steel pipe.

[0045] like Figure 1 to Figure 3 As shown, the lower side walls of the two second connecting steel pipes 2 of the upper positioning frame of this embodiment are provided with second plug holes, and the upper side walls of the two second connecting steel pipes 2 of the lower positioning frame are provided with third plug holes. The second plug holes and the third plug holes on the two second connecting steel pipes 2 arranged opposite to each other are arranged one by one, and the upper and lower ends of the positioning steel pipe 3 are respectively plugged and fixed in a group of second plug holes and third plug holes arranged opposite to each other. By setting the second plug hole and the third plug hole, the stable connection and fixation between the positioning steel pipe and the second connecting steel pipe is facilitated.

[0046] Specifically, second plug holes can be provided on the upper and lower side walls of the two second connecting steel pipes 2 of the upper positioning frame, that is, the second plug holes penetrate the upper and lower side walls of the second connecting steel pipe 2. Third plug holes can be provided on the upper and lower side walls of the two second connecting steel pipes 2 of the lower positioning frame, that is, the third plug holes penetrate the upper and lower side walls of the second connecting steel pipe 2. The upper and lower ends of the positioning steel pipe can penetrate the second connecting steel pipe 2 of the upper positioning frame and the second connecting steel pipe 2 of the lower positioning frame, respectively.

[0047] like Figure 1 to Figure 5As shown, in this embodiment, one end of the positioning steel pipe 3 inserted into the second plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe 2 by a bolt 4, and one end of the positioning steel pipe 3 inserted into the third plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe 2 by a bolt 4. Bolts are used to connect the positioning steel pipe and the second connecting steel pipe, which facilitates the disassembly and assembly between the positioning steel pipe and the second connecting steel pipe.

[0048] like Figure 3 to Figure 5 As shown, the second plug hole is one and is opened in the middle position of the second connecting steel pipe 2 of the upper positioning frame, and the third plug hole is one and is opened in the middle position of the second connecting steel pipe 2 of the lower positioning frame.

[0049] like Figure 1 to Figure 5 As shown, the first connecting steel pipe 1, the second connecting steel pipe 2 and the positioning steel pipe 3 of this embodiment are all square steel pipes, the width of the first connecting steel pipe 1 is greater than the width of the second connecting steel pipe 2, and the width of the second connecting steel pipe 2 is greater than the width of the positioning steel pipe 3. The use of square steel pipes of different widths has high structural strength and is easy to assemble.

[0050] Specifically, the first connecting steel pipe 1 adopts a square steel pipe with a size of 660 mm long × 100 mm wide × 100 mm high × 10 mm (length × width × height × thickness); the second connecting steel pipe 2 adopts a square steel pipe with a size of 700 mm long × 80 mm wide × 80 mm high × 8 mm (length × width × height × thickness); the positioning steel pipe 3 adopts a square steel pipe with a size of 500 mm long × 64 mm wide × 64 mm high × 8 mm (length × width × height × thickness); and the bolts can be ordinary M16 bolts.

[0051] When assembling the positioning device of this embodiment, first a first connecting steel pipe and a second connecting steel pipe are plugged and fixed to form an L-shaped device, and then another L-shaped device is assembled in the same way, and the two L-shaped devices are inserted into each other's remaining first plug holes to be fixed to form a rectangular device, and then repeated once to obtain a positioning frame. Then two positioning steel pipes are inserted into the second plug hole of the upper positioning frame and the third plug hole of the lower positioning frame to connect and fix them to form a three-dimensional device.

[0052] This embodiment uses a positioning device composed of prefabricated steel pipes to position the steel section, which can be light and easy to assemble and disassemble, thereby reducing errors and achieving precise construction effects without increasing unnecessary construction costs and reducing waste of human resources.

[0053] like Figure 1 to Figure 5As shown, a positioning assembly of the present embodiment includes two of the above-mentioned SMW method pile steel positioning devices, and also includes a connecting channel steel 5. The two SMW method pile steel positioning devices are arranged side by side, and the two first connecting steel pipes 1 of the lower positioning frame of one SMW method pile steel positioning device correspond to the two first connecting steel pipes 1 of the lower positioning frame of another SMW method pile steel positioning device one by one and are coaxially arranged. The two coaxially arranged first connecting steel pipes 1 are connected and fixed by the connecting channel steel 5, and the two ends of the connecting channel steel 5 are respectively connected and fixed to the two coaxially arranged first connecting steel pipes 1 by bolts 4. The connecting channel steel is a connecting piece connecting the two devices, and is also a key component for controlling the insertion position of the steel. The central axis of the connecting channel steel is parallel to the central axis of the connected first connecting steel pipe.

[0054] The positioning assembly of this embodiment is simple to process and easy to operate. All components are connected by bolts, and installation and disassembly are simple and fast. It can not only meet the positioning requirements of SMW pile steel and improve the appearance quality, but also minimize the impact on the working speed. It can be put into use once and used in a cycle, and has strong application ability.

[0055] This embodiment also provides a positioning method, which is implemented by using the above-mentioned positioning assembly, including the following steps: directly inserting a first steel section 6 through GPS positioning, assembling an SMW construction method pile steel positioning device on the first steel section 6, so that the first steel section 6 is located in the upper and lower frame areas of an SMW construction method pile steel positioning device;

[0056] After assembling one SMW pile steel positioning device, connect the connecting channel steel 5 to one SMW pile steel positioning device, assemble another SMW pile steel positioning device at the other end of the connecting channel steel 5, and after the other SMW pile steel positioning device is assembled, insert the second steel 7 into the upper and lower frame areas of the other SMW pile steel positioning device;

[0057] After the second steel section 7 is inserted, the SMW pile steel positioning device on the first steel section 6 is removed and moved to the position where the third steel section is to be inserted. Then, the channel steel 5 is connected to the SMW pile steel positioning device on the second steel section 7, and the cycle is repeated until all the steel sections are installed.

[0058] The positioning method of this embodiment can effectively control the spacing between the steel sections. At the same time, the interaction between the upper and lower positioning frames of the positioning device can well ensure the vertical insertion of the steel sections, so that the vertical deviation angle can be well controlled. The two positioning devices are cyclically rotated, so that all the steel sections can achieve a good positioning effect.

[0059] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as limiting the present invention.

[0060] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include at least one of the features. In the description of the present invention, the meaning of "plurality" is at least two, such as two, three, etc., unless otherwise clearly and specifically defined.

[0061] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements, unless otherwise clearly defined. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0062] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may mean that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. Moreover, a first feature being "above", "above" or "above" a second feature may mean that the first feature is directly above or obliquely above the second feature, or simply means that the first feature is higher in level than the second feature. A first feature being "below", "below" or "below" a second feature may mean that the first feature is directly below or obliquely below the second feature, or simply means that the first feature is lower in level than the second feature.

[0063] In the description of this specification, the description with reference to the terms "one embodiment", "some embodiments", "example", "specific example", or "some examples" etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representations of the above terms do not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in any one or more embodiments or examples in a suitable manner. In addition, those skilled in the art may combine and combine the different embodiments or examples described in this specification and the features of the different embodiments or examples, without contradiction.

[0064] Although the embodiments of the present invention have been shown and described above, it is to be understood that the above embodiments are exemplary and are not to be construed as limitations of the present invention. A person skilled in the art may change, modify, replace and vary the above embodiments within the scope of the present invention.

Claims

1. A SMW pile steel positioning device, characterized in that: It includes two positioning frames and a plurality of positioning steel pipes, wherein the positioning frame includes two first connecting steel pipes and two second connecting steel pipes, and the two first connecting steel pipes and the two second connecting steel pipes are connected to each other to form a positioning frame of a rectangular structure; Both positioning frames are set horizontally and arranged with intervals up and down. The projection of the area inside the upper positioning frame directly below coincides with the area inside the lower positioning frame. The second connecting steel pipe of the upper positioning frame and the second connecting steel pipe of the lower positioning frame are connected and fixed by multiple positioning steel pipes, and the multiple positioning steel pipes are arranged vertically.

2. The SMW pile steel positioning device according to claim 1, characterized in that: One side wall of the first connecting steel pipe is a plug-in side wall, and two first plug-in holes arranged at intervals are formed on the plug-in side wall; The two first connecting steel pipes are arranged in parallel and at intervals, and the first plug holes on the two first connecting steel pipes are arranged relatively to each other in a one-to-one manner. The two ends of the second connecting steel pipe are respectively plugged and fixed in a group of first plug holes arranged relatively, and the second connecting steel pipe is arranged perpendicular to the first connecting steel pipe.

3. The SMW pile steel positioning device according to claim 2, characterized in that: The other side wall of the first connecting steel pipe is the connecting side wall, the plug-in side wall and the connecting side wall are adjacent and vertically arranged, and one end of the second connecting steel pipe inserted into the first plug-in hole is fixed to the connecting side wall by bolts.

4. The SMW pile steel positioning device according to claim 3, characterized in that: The two first plugging holes on the first connecting steel pipe are respectively arranged close to the two ends of the first connecting steel pipe, the distance between one first plugging hole and one end of the first connecting steel pipe is a, and the distance between the other first plugging hole and the other end of the first connecting steel pipe is b, a=b.

5. A SMW pile steel positioning device according to claim 4, characterized in that: A group of first channel steel connecting holes is opened on the connecting side wall between one end of the first connecting steel pipe and the adjacent first plug-in hole, and a group of second channel steel connecting holes is opened on the connecting side wall between the other end of the first connecting steel pipe and the adjacent first plug-in hole; the distance between a group of first channel steel connecting holes and one end of the first connecting steel pipe is c, and the distance between a group of second channel steel connecting holes and the other end of the first connecting steel pipe is d, c=d.

6. The SMW pile steel positioning device according to claim 1, characterized in that: A second plugging hole is provided on the lower side wall of the two second connecting steel pipes of the upper positioning frame, and a third plugging hole is provided on the upper side wall of the two second connecting steel pipes of the lower positioning frame. The second plugging holes and the third plugging holes on the two second connecting steel pipes arranged opposite to each other are arranged one by one, and the upper and lower ends of the positioning steel pipe are respectively plugged and fixed in a group of second plugging holes and third plugging holes arranged opposite to each other.

7. The SMW pile steel positioning device according to claim 6, characterized in that: One end of the positioning steel pipe inserted into the second plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe by bolts, and one end of the positioning steel pipe inserted into the third plug hole is fixedly connected to the left side wall or right side wall of the corresponding second connecting steel pipe by bolts.

8. The SMW pile steel positioning device according to claim 1, characterized in that: The first connecting steel pipe, the second connecting steel pipe and the positioning steel pipe are all square steel pipes. The width of the first connecting steel pipe is greater than the width of the second connecting steel pipe, and the width of the second connecting steel pipe is greater than the width of the positioning steel pipe.

9. A positioning component, characterized in that: It comprises two SMW method pile steel positioning devices as described in any one of claims 1 to 8, and also comprises connecting channel steel, the two SMW method pile steel positioning devices are arranged side by side, the two first connecting steel pipes of the lower positioning frame of one SMW method pile steel positioning device correspond to the two first connecting steel pipes of the lower positioning frame of the other SMW method pile steel positioning device one by one and are arranged coaxially, the two coaxially arranged first connecting steel pipes are connected and fixed by the connecting channel steel, and the two ends of the connecting channel steel are respectively connected and fixed to the two coaxially arranged first connecting steel pipes by bolts.

10. A positioning method, characterized in that: The method is implemented by using a positioning assembly as claimed in claim 9, comprising the following steps: directly inserting a first steel section through GPS positioning, assembling an SMW pile steel positioning device on the first steel section, so that the first steel section is located in the upper and lower frame areas of an SMW pile steel positioning device; After assembling one SMW method pile steel positioning device, connect the connecting channel steel to the one SMW method pile steel positioning device, assemble another SMW method pile steel positioning device at the other end of the connecting channel steel, and after the other SMW method pile steel positioning device is assembled, insert the second steel into the upper and lower frame areas of the other SMW method pile steel positioning device; After the second steel section is inserted, remove the SMW pile steel positioning device on the first steel section and move it to the position where the third steel section is to be inserted. Then connect it to the SMW pile steel positioning device on the second steel section through the connecting channel steel, and repeat the process until all the steel sections are installed.