Bridge pile foundation isolation structure penetrating through landslide mass and construction method

By setting up anti-slip units and 'TO' combined isolation pipe piles on the landslide body, combining the overall reinforcement and local isolation of anti-slip piles, the problems of disturbance and isolation failure of bridge pile foundation construction on the landslide body are solved, and the bridge pile foundation is realized Stable crossing and safe operation.

CN118997204APending Publication Date: 2024-11-22CHANGJIANG SURVEY PLANNING DESIGN & RES CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411275798.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-12
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

When crossing the landslide body, the existing bridge pile foundation construction will disturb the landslide body and increase the risk of slippage. The traditional steel pipe pile isolation structure is prone to deform under the soil lateral pressure, resulting in isolation failure and affecting bridge safety.

Method used

The isolation pipe columns arranged on the bridge pile foundation and the anti-slip unit arranged on the landslide body are adopted, including a circular pipe column and a 'T' column combined isolation pipe pile. The anti-slip unit is located at the lower edge of the potential sliding direction and isolates it. The lower end of the pipe column passes through the landslide body to the stable rock formation, combining the overall reinforcement and local isolation of the anti-sliding piles to ensure the stability of the bridge pile foundation.

Benefits of technology

It effectively reduces the displacement of the isolation structure, enhances the bending moment of inertia, avoids the horizontal force of the bridge pile foundation, ensures the stability of the landslide body and the safety of the bridge, and reduces the risks of construction and operation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997204A_ABST
    Figure CN118997204A_ABST
Patent Text Reader

Abstract

The invention relates to a bridge pile foundation isolation structure penetrating through a landslide mass and a construction method.The bridge pile foundation isolation structure comprises an isolation pipe column arranged on a bridge pile foundation in a sleeving mode and an anti-sliding unit arranged on the landslide mass, and the anti-sliding unit is located on the lower edge of the potential sliding direction of a bridge; the lower end of the isolation pipe column penetrates through the landslide mass and goes deep into a stable rock stratum. Firstly, a landslide body is integrally stabilized and reinforced through anti-slide piles; secondly, a TO combined isolation pipe pile is adopted at a bridge pile foundation for local isolation and stabilization, the bridge pile foundation is constructed in the isolation pipe pile, and the direction of a T-shaped column must be located on the upper edge of the potential sliding direction of the landslide mass; and finally, other structures of the bridge are constructed according to a conventional method after the bridge pile foundations are completely completed, so that the bridge penetrates through the landslide mass.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of bridges crossing landslide bodies, and in particular to a pile foundation isolation structure of a bridge crossing a landslide body and a construction method thereof. Background Art

[0002] Landslide is an unfavorable geological phenomenon in which the rock and soil of a slope slide along a continuous shear failure surface. In the engineering community, even when talking about "landslides", it is required to stay away from the landslide body and maintain a certain safe distance. However, due to limited conditions, when it is impossible to avoid and must cross the landslide body, it is often required to completely remove the landslide body before building structures or buildings. Since the volume of landslide bodies is generally millions of cubic meters or even tens of millions of cubic meters, the cost of removing them is high, and the exposed slope surface must also be treated for environmental protection and greening. At the same time, the removed waste soil also damages the environment.

[0003] When a road, as a linear structure, must cross a landslide, a bridge is usually used to cross it. Since the construction of the bridge foundation will disturb the landslide, and the bridge load will increase the force on the landslide, and even destroy the original balance condition of the landslide, increase the risk of landslide sliding, and pose safety hazards to bridge construction and operation, conventional bridge pile foundation construction methods cannot be used. In order to reduce the disturbance of the landslide during construction and the load of the bridge on the landslide during operation, and to avoid the bridge pile foundation from bearing the horizontal force from the landslide during operation, a new type of bridge pile foundation form and construction method is urgently needed to realize the bridge pile foundation crossing the landslide, so as to realize the bridge pile foundation passing through the landslide.

[0004] In order to prevent the pile foundation from bearing the horizontal force of the landslide, the bridge pile foundation must be physically isolated by using an isolation structure to protect the bridge pile foundation from the active downward force of the landslide. In the past, isolation structures generally used large-diameter steel pipe piles, but due to the diameter-to-thickness ratio of the steel pipe, the steel pipe's own bending stiffness and the soil pressure of the landslide, the steel pipe deformed greatly in the later stage. Therefore, larger diameter and thicker wall steel pipe piles are needed to resist the deformation of the isolation structure. The ability of steel pipe piles to resist deformation is mainly determined by the bending moment of inertia of the cross section, that is, According to the results of mechanics, under the lateral pressure of the soil, the displacement value of the cantilever beam end of the isolation structure is If the displacement value f is greater than the distance between the isolation structure and the bridge pile foundation, the steel pipe pile isolation will fail, causing the bridge pile foundation to bear horizontal force and pile foundation displacement, thereby causing the bridge pier to deviate and affecting driving safety. Summary of the invention

[0005] To solve the above problems, the present invention provides a bridge pile foundation isolation structure and construction method for crossing a landslide body, ensuring that the water balance state of the landslide body and the force transmission of the bridge pile foundation are not destroyed, so that the bridge can cross the landslide body.

[0006] The technical solution adopted by the present invention is: a bridge pile foundation isolation structure that crosses a landslide body, characterized in that it includes an isolation pipe column mounted on the bridge pile foundation and an anti-slip unit arranged on the landslide body, the anti-slip unit is located at the lower edge of the potential sliding direction of the bridge; the lower end of the isolation pipe column passes through the landslide body and penetrates into the stable rock layer. First, the anti-slip unit is applied to the landslide body to stabilize and reinforce the landslide body as a whole, ensuring that the landslide body is in a stable state; secondly, an isolation structure (isolation pipe column) is inserted into the bridge foundation of the landslide body to partially isolate and stabilize the landslide body; a pile foundation casing is arranged in the isolation structure, and conventional mechanical equipment is used to form the bridge pile foundation; finally, after the bridge pile foundation is completed, other bridge structures are constructed according to conventional methods.

[0007] Preferably, the isolation pipe column includes a circular pipe column and a "T"-shaped column. The circular pipe column is a hollow structure and is sleeved outside the bridge pile foundation. The "T"-shaped column is arranged along the upper edge of the potential sliding direction of the landslide body, and the tail is fixed on the outer wall of the circular pipe column. Compared with traditional pipe piles, the "TO" combined isolation pipe pile can obtain a larger horizontal bending moment of inertia in the superposition direction, reducing the displacement of the isolation structure. At the same time, the existence of the soil around the isolation structure prevents local instability from occurring, ensuring the isolation effect of the bridge pile foundation. The "T"-shaped column is arranged along the upper edge of the potential sliding direction of the landslide body, so that the combined bending moment of inertia of the isolation structure can play a maximum effect and reduce the horizontal displacement of the isolation structure in the potential sliding direction.

[0008] Preferably, the center of the circular pipe column coincides with the center of the bridge pile foundation.

[0009] Preferably, the width of the "T"-shaped column is approximately 0.6 to 0.8 times the diameter of the bridge pile foundation, and the height is approximately 0.3 to 0.4 times the diameter of the bridge pile foundation.

[0010] Preferably, the radius of the circular pipe column is 50 cm larger than the radius of the bridge pile foundation.

[0011] Preferably, a pile foundation casing is provided between the circular pipe column and the bridge pile foundation, and the pile foundation casing extends to below the sliding surface interface.

[0012] Preferably, the pile foundation casing is a positioning steel pipe used for drilling holes for bridge pile foundations in soil strata, and its radius is 20 cm larger than that of the bridge pile foundation.

[0013] Preferably, the anti-slide unit comprises a crown beam and a plurality of evenly distributed anti-slide piles, the lower end of the anti-slide pile passes through the landslide body and penetrates into the stable rock layer, and the top of the pile uses the crown beam to connect all the anti-slide piles in series. The anti-slide piles are rows of piles set at the foot of the landslide body to resist the sliding of the landslide body.

[0014] Preferably, the anti-sliding unit is perpendicular to the potential sliding direction of the landslide body.

[0015] A method for constructing a bridge pile foundation isolation structure crossing a landslide body as described above comprises the following steps:

[0016] S1. Detect the boundary range of the landslide on the ground according to the design drawings;

[0017] S2. According to the soil mechanics balance of the anti-slide piles, the required number of anti-slide piles to resist the sliding of the landslide body is calculated, and the anti-slide piles are driven into the boundary range of the landslide body to stabilize and reinforce the landslide body as a whole, so that the landslide body as a whole is in a stable state;

[0018] S3. All anti-sliding piles are connected in series by a crown beam at the top of the anti-sliding piles;

[0019] S4, welding the circular pipe column and the "T"-shaped column to form a "TO"-combined isolation pipe pile;

[0020] S5. Insert isolation pipe piles along the potential sliding direction of the landslide on the overall stable and reinforced landslide body, ensure that the lower end of the isolation pipe pile passes through the landslide body and penetrates into the stable rock layer, the center of the circular pipe column coincides with the center of the bridge pile foundation, and the "T"-shaped column is arranged at the upper edge of the potential sliding direction of the landslide;

[0021] S6. Drive the pile foundation casing into the circular steel pipe, and the pile foundation casing penetrates below the sliding surface interface;

[0022] S7. constructing a bridge pile foundation in the pile foundation casing;

[0023] S8. After the bridge pile foundation is completed, the bridge cap is constructed;

[0024] S9. After the construction of the bridge foundation is completed, the piers and other bridge structures will be constructed.

[0025] The beneficial effects achieved by the present invention are as follows: firstly, the landslide body is stabilized and reinforced as a whole by using anti-slide piles; secondly, the bridge pile foundation is partially isolated and stabilized by using "TO" combined isolation pipe piles, and the bridge pile foundation is constructed inside the isolation pipe piles, wherein the direction of the "T"-shaped column must be located at the upper edge of the potential sliding direction of the landslide body; finally, after the bridge pile foundation is completed, the other structures of the bridge are constructed according to conventional methods, so that the bridge passes through the landslide body; the present invention has the following advantages:

[0026] 1. The present invention proposes a design concept of combining overall landslide reinforcement with local isolation and stabilization;

[0027] 2. The present invention adjusts the traditional steel pipe isolation piles to "TO" combined isolation pipe piles with a larger horizontal bending inertia moment. The "TO" combined isolation pipe piles with a larger horizontal bending inertia moment can resist the active sliding force of a thicker landslide body, and its horizontal deformation is smaller;

[0028] 3. The "TO" combined isolation pipe piles used in the present invention have a smaller diameter and thinner wall than simple steel pipe piles, thereby reducing the mutual influence between pile foundations and the investment in isolation piles;

[0029] 4. The present invention proposes to use pile foundation casings in isolated pipe piles to construct bridge pile foundations, so as to prevent the "TO" combined isolated pipe piles from deforming due to local soil pressure, causing the bridge pier pile foundation to deform due to horizontal force. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] Figure 1 The plan layout of the bridge crossing the landslide;

[0031] Figure 2 This is the cross-sectional layout of the bridge crossing the landslide;

[0032] Figure 3 It is a simplified diagram of the forces acting on the isolation structure;

[0033] Figure 4 It is the bending moment diagram of the isolated structure;

[0034] Figure 5 This is the deformation diagram of the isolation structure;

[0035] Figure 6 This is a schematic diagram of the "TO" combined isolation pipe pile structure;

[0036] In the figure: 1. Earth; 2. Landslide body; 3. Anti-slide piles; 4. Crown beam; 5. Round steel pipe; 6. "T"-shaped column; 7. Pile foundation casing; 8. Bridge pile foundation; 9. Bridge abutment; 10. Bridge pier. DETAILED DESCRIPTION

[0037] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] like Figure 1-6As shown, a bridge pile foundation isolation structure that crosses a landslide body of the present invention includes an isolation pipe column mounted on a bridge pile foundation 8 and an anti-slip unit mounted on a landslide body 2, wherein the anti-slip unit is arranged at the lower edge of the bridge in the potential sliding direction; the lower end of the isolation pipe column passes through the landslide body 2 and penetrates into the stable rock layer. First, the anti-slip unit is applied to the landslide body 2 to stabilize and reinforce the landslide body 2 as a whole, ensuring that the landslide body 2 is in a stable state; secondly, an isolation structure (isolation pipe column) is inserted into the bridge pile foundation 8 of the landslide body 2 to isolate and stabilize the landslide body 2 locally; a pile foundation casing 7 is arranged in the isolation structure, and conventional mechanical equipment is used to form a bridge pile foundation 8; finally, after the bridge pile foundation 8 is completed, other structures of the bridge are constructed according to conventional methods.

[0039] In this embodiment, the isolation column includes an "O"-shaped circular column 5 and a "T"-shaped column 6. The circular column 5 is a hollow structure and is sleeved outside the bridge pile foundation 8. The "T"-shaped column 6 is arranged along the upper edge of the potential sliding direction of the landslide body 2, and the tail is fixed on the outer wall of the circular column 5. The isolation column is a steel structure, and the circular column 5 and the "T"-shaped column 6 are welded into a "TO" combined isolation steel pipe pile. Compared with traditional pipe piles, the "TO" combined isolation pipe pile can obtain a larger horizontal bending moment of inertia in the superposition direction, reducing the displacement of the isolation structure. At the same time, the existence of the soil around the isolation structure prevents local instability from occurring, thereby ensuring the isolation effect of the bridge pile foundation. The "T"-shaped column 6 is arranged along the upper edge of the potential sliding direction of the landslide body 2, so that the combined bending moment of inertia of the isolation structure can play a maximum effect and reduce the horizontal displacement of the isolation structure in the potential sliding direction.

[0040] According to material mechanics, the bending stiffness of the independent "T"-shaped column 6 and the independent circular column 5 are E O I O and E T I T The combined bending stiffness of the combined section "TO" combined isolated steel pipe pile is:

[0041]

[0042] According to structural mechanics, the displacement formula of the cantilever end of the isolation structure is Among them, q is the soil pressure, which is determined by the soil of the landslide body and is difficult to change artificially; L is the cantilever length of the isolation pile, which is determined by the thickness of the landslide body and is difficult to change artificially; E is the elastic modulus of the isolation structure, which is determined by the material of the isolation structure and is also difficult to change artificially; I is the bending moment of inertia in the force direction, which is determined by the cross-sectional form of the isolation structure and can be adjusted through engineering means. The larger the bending moment of inertia of the isolation structure, the smaller the displacement of the isolation structure.

[0043] Compared with traditional steel pipe piles, the "TO" combined isolation steel pipe piles can obtain a larger horizontal bending moment of inertia in the superposition direction, reducing the displacement of the isolation structure. At the same time, the existence of soil around the isolation structure prevents local instability from occurring, thus ensuring the isolation effect of the bridge pile foundation.

[0044] In this embodiment, the center of the circular tube column 5 coincides with the center of the bridge pile foundation 8, the width a of the "T"-shaped column 6 is approximately 0.6 to 0.8 times the diameter of the bridge pile foundation 8, the height b is approximately 0.3 to 0.4 times the diameter of the bridge pile foundation 8, and the radius of the circular tube column 5 is approximately 50 cm larger than the radius of the bridge pile foundation 8.

[0045] In this embodiment, a pile foundation casing 7 is provided between the circular pipe column 5 and the bridge pile foundation 8. The pile foundation casing 7 extends to below the sliding surface interface. The pile foundation casing 7 is a positioning steel pipe used to drill holes for the bridge pile foundation 8 in the soil stratum. The radius is about 20 cm larger than the radius of the bridge pile foundation 8.

[0046] In this embodiment, the landslide body 2 is a slope rock body that slides along the through shear failure surface; the anti-slide piles 3 are rows of piles set at the foot of the landslide body 2 to resist the sliding of the landslide body 2;

[0047] In this embodiment, the anti-slip unit is perpendicular to the potential sliding direction of the landslide body 2. The anti-slip unit includes a crown beam 4 and a plurality of evenly distributed anti-slip piles 3. The anti-slip piles 3 are rows of piles arranged at the foot of the landslide body 2 to resist the sliding of the landslide body 2. The lower ends of the anti-slip piles 3 pass through the landslide body 2 and penetrate into the stable rock formation. The crown beam 4 at the pile top connects all the anti-slip piles 3 in series to enhance the coordinated force between the anti-slip piles 3.

[0048] The method for constructing a bridge pile foundation isolation structure crossing a landslide body of the present invention comprises the following steps:

[0049] 1) According to Figure 1 Detecting the boundary range of the landslide body 2 on the ground 1;

[0050] 2) According to the soil mechanics balance of the anti-slide piles, the required number of anti-slide piles to resist the sliding of the landslide body 2 is calculated, and anti-slide piles 3 are driven into the boundary range of the landslide body 2 to stabilize and reinforce the landslide body as a whole, so that the landslide body as a whole is in a stable state;

[0051] 3) A crown beam 4 is used at the top of the anti-sliding piles to connect all the anti-sliding piles in series to enhance the coordinated force between the anti-sliding piles;

[0052] 4) Welding the “O” circular steel pipe 5 and the “T” shaped steel 6 to form a “TO” combined isolation steel pipe pile;

[0053] 5) On the landslide body 2 after overall stabilization and reinforcement, insert and drive the "TO" combined isolation steel pipe pile along the potential sliding direction of the landslide. It must be ensured that the lower end of the "TO" combined isolation steel pipe pile must pass through the landslide body and penetrate into the stable rock layer. The center of the steel pipe pile must coincide with the center of the bridge pile foundation. The "T"-shaped steel direction of the "TO" combined isolation steel pipe pile must be located at the upper edge of the potential sliding direction of the landslide, so that the combined bending moment of inertia of the isolation structure can play the maximum effect and reduce the horizontal displacement of the isolation structure in the potential sliding direction;

[0054] 6) Drive the pile foundation steel casing 7 into the “O” circular steel pipe 5 of the “TO” combined isolation steel pipe pile. The pile foundation steel casing must penetrate below the sliding surface interface;

[0055] 7) Use conventional mechanical equipment in the pile foundation steel casing to form the bridge pile foundation;

[0056] 8) After the bridge pile foundation is completed, the bridge cap shall be constructed according to the conventional method;

[0057] 9) After the bridge abutment is constructed, the bridge pier 10 and other bridge structures are constructed according to conventional methods.

[0058] 10) During the bridge construction process, the displacement of the “TO” combined isolation steel pipe piles must be tested and evaluated.

[0059] 11) Complete the final acceptance of the bridge crossing the landslide.

[0060] The assembly process of the present invention is:

[0061] Step 1: Detect the boundary of the landslide on the ground.

[0062] Step 2: Construct anti-slide piles on the landslide body to reinforce the overall stability of the landslide body and keep the landslide body in a stable state.

[0063] Step 3: The tops of the anti-slip piles are connected in series with crown beams to enhance the coordinated force between the anti-slip piles.

[0064] Step 4: Weld the "T" shaped steel and the "O" round steel pipe to form a "TO" combined isolation steel pipe pile.

[0065] Step 5: Slide and drive "TO" combined isolation steel pipe piles into the reinforced landslide body along the potential sliding direction of the landslide. The lower end of the combined isolation steel pipe pile must pass through the landslide body and penetrate into the stable rock layer.

[0066] Step 6: Drive the pile foundation steel casing into the "TO" combined isolation steel pipe pile.

[0067] Step 7: Use conventional mechanical equipment to form the bridge pile foundation inside the pile foundation steel casing.

[0068] Step 8: After the bridge pile foundation is completed, construct the bridge pedestal according to conventional methods.

[0069] Step 9: After the bridge abutment is constructed, the bridge pier 10 and other bridge structures are constructed according to conventional methods.

[0070] Step 10: During the bridge construction process, the displacement of the "TO" combined isolation steel pipe piles must be tested and evaluated.

[0071] Step 11: Complete the final acceptance of the bridge crossing the landslide.

[0072] It should be noted that the description of the above technical solutions is exemplary, and this specification can be embodied in different forms and should not be interpreted as being limited to the technical solutions set forth herein. On the contrary, providing these descriptions will make the disclosure of the present invention thorough and complete, and will fully convey the scope disclosed in this specification to those skilled in the art. In addition, the technical solutions of the present invention are limited only by the scope of the claims.

[0073] Finally, it should be pointed out that the above embodiments are only representative examples of the present invention. Obviously, the present invention is not limited to the above embodiments, and there are many variations. Any simple modification, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention should be considered to belong to the protection scope of the present invention.

Claims

1. A bridge pile foundation isolation structure crossing a landslide body, characterized by: It includes an isolation pipe column sleeved on a bridge pile foundation and an anti-slip unit arranged on a landslide body, wherein the anti-slip unit is located at the lower edge of a potential sliding direction of the bridge; the lower end of the isolation pipe column passes through the landslide body and penetrates into a stable rock layer.

2. The bridge pile foundation isolation structure for crossing a landslide body according to claim 1 is characterized in that: The isolation column includes a circular column and a "T"-shaped column. The circular column is a hollow structure and is sleeved outside the bridge pile foundation; the "T"-shaped column is arranged along the upper edge of the potential sliding direction of the landslide body, and the tail is fixed on the outer wall of the circular column.

3. The bridge pile foundation isolation structure for crossing a landslide body according to claim 2 is characterized in that: The center of the circular pipe column coincides with the center of the bridge pile foundation.

4. The bridge pile foundation isolation structure for crossing a landslide body according to claim 2 is characterized in that: The width of the "T"-shaped column is approximately 0.6 to 0.8 times the diameter of the bridge pile foundation, and the height is approximately 0.3 to 0.4 times the diameter of the bridge pile foundation.

5. The bridge pile foundation isolation structure for crossing a landslide body according to claim 2 is characterized in that: The radius of the circular pipe column is 50 cm greater than the radius of the bridge pile foundation.

6. The bridge pile foundation isolation structure for crossing a landslide body according to claim 1 is characterized in that: A pile foundation casing is arranged between the circular pipe column and the bridge pile foundation, and the pile foundation casing extends to below the sliding surface interface.

7. The bridge pile foundation isolation structure for crossing a landslide body according to claim 6 is characterized in that: The pile foundation casing is a positioning steel pipe used for drilling holes for bridge pile foundations in soil strata, and its radius is 20 cm larger than the radius of the bridge pile foundation.

8. The bridge pile foundation isolation structure for crossing a landslide body according to claim 1 is characterized in that: The anti-sliding unit comprises a crown beam and a plurality of evenly distributed anti-sliding piles. The lower ends of the anti-sliding piles pass through the landslide body and penetrate into the stable rock layer. The crown beam is used at the pile top to connect all the anti-sliding piles in series.

9. The bridge pile foundation isolation structure for crossing a landslide body according to claim 1, characterized in that: The anti-sliding unit is perpendicular to the potential sliding direction of the landslide body.

10. A method for constructing a bridge pile foundation isolation structure crossing a landslide body as claimed in any one of claims 1 to 9, comprising the following steps: S1, detecting the boundary range of the landslide body 2 on the ground 1 according to the design drawings; S2. According to the soil mechanics balance of the anti-slide piles, the required number of anti-slide piles to resist the sliding of the landslide body 2 is calculated, and anti-slide piles 3 are driven into the boundary range of the landslide body 2 to stabilize and reinforce the landslide body 2 as a whole, so that the landslide body 2 is in a stable state as a whole; S3, the top of the anti-sliding pile 3 uses a crown beam 4 to connect all the anti-sliding piles 3 in series; S4, welding the circular pipe column 5 and the "T"-shaped column 6 to form a "TO"-combined isolation pipe pile; S5. Insert isolation pipe piles along the potential sliding direction of the landslide on the overall stable and reinforced landslide body 2 to ensure that the lower end of the isolation pipe pile passes through the landslide body and penetrates into the stable rock layer. The center of the circular pipe column 5 coincides with the center of the bridge pile foundation 8, and the "T"-shaped column 6 is arranged at the upper edge of the potential sliding direction of the landslide; S6, driving the pile foundation casing 7 into the circular steel pipe 5, and the pile foundation casing 7 penetrates below the sliding surface interface; S7, constructing a bridge pile foundation 8 in the pile foundation casing 7; S8, after the bridge pile foundation 8 is completed, the bridge cap 9 is constructed; S9. After the construction of the bridge cap 9 is completed, the bridge piers 10 and other bridge structures are constructed.