Method for mining and filling coal mine under building
By dividing the working face into multiple filling groups and adopting specific filling branch structures and reinforcement measures, the problem of rapid mining and filling in the "three soft" coal seam mining is solved, improving the safety of the tunnel and reducing surface buildings risk of settlement.
Patent Information
- Application Number
- CN202411188614.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-28
- Publication Date
- 2024-11-22
AI Technical Summary
During the mining of "three soft" coal seams, it is impossible to quickly re-mine and fill before the top plate sinks, resulting in surface buildings being prone to cracking and settlement.
Divide the working surface into several block sections, each block is divided into multiple filling groups. The filling branch and tunnels in the filling group are mined and filled in sequence, and the filling method of different structures is adopted in the filling branch and tunnel, including the first mining of all coal Filling lanes, single-coated paste filling lanes and double-coated paste filling lanes are reinforced with anchor rods and mesh structures, and are exploited and filled at intervals to reduce stress disturbances in excavation.
By optimizing the feeding and filling order and filling branch structure, rapid mining and filling are achieved before the top plate sinking changes, reducing the amount of top plate sinking and avoiding cracking and settlement of surface buildings.
Smart Images

Figure CN118997761A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mining and filling, and in particular to a coal mining and filling method under a building. Background Art
[0002] "Three soft" coal seams are widely distributed in my country, and there are usually villages, railways, highways and other buildings on the surface above the coal seams. "Three soft" coal seams refer to coal seams with soft roof, soft floor and soft coal quality. Among them, the soft roof layer refers to the direct top rock layer of the coal seam with developed fissures, high degree of fragmentation, low compressive strength, and unstable roof. This kind of roof is prone to caving problems during mining; the soft floor refers to the low compressive strength of the bottom rock layer of the coal seam, which is prone to deformation and bulging during mining; the soft coal quality refers to the low strength of the coal body of the coal seam, developed joints, unstable coal seams, and easy to break, which makes it easy for problems such as coal wall spalling and coal body breakage to occur during mining and transportation.
[0003] Based on the above characteristics of "three soft" coal seams, it is currently very difficult to mine "three soft" coal seams. Since it is impossible to quickly recover and fill before the roof sinks, it is easy to form a collapse zone above the goaf, causing cracks and settlement problems in buildings on the surface. Summary of the invention
[0004] In view of the problem that when mining "three soft" coal seams, it is impossible to quickly recover and fill before the roof sinks, which easily leads to cracking and subsidence of surface buildings, the present invention provides a method for mining and filling coal under buildings.
[0005] In order to solve the above technical problems, the present invention adopts the following technical solutions: a method for coal mining and filling under a building, comprising the following steps: S1 dividing the working face into a number of blocks according to the direction; S2 dividing each block into a number of filling groups, each filling group including a number of filling branch tunnels, and the filling branch tunnels in different filling groups are adjacent and arranged at intervals; S3 mining and filling each filling branch tunnel in a filling group in sequence, and then mining and filling each filling branch tunnel in another filling group in sequence until the mining and filling of the block are completed; S4 completing the mining and filling of the working face.
[0006] Further, in S2, each block segment includes a first filling group, a second filling group, a third filling group and a fourth filling group, and each filling group has four filling branch lanes.
[0007] Furthermore, in S3, the first filling group, the second filling group, the third filling group and the fourth filling group are mined and filled in sequence. Each filling branch tunnel in each filling group is mined and filled in sequence from left to right.
[0008] Furthermore, in S2, adjacent filling branch tunnels in the same filling group are spaced at least 13.5 m apart.
[0009] Furthermore, in S3, the construction interval between different filling groups is at least 12 days.
[0010] Furthermore, when filling the branch tunnels, they are divided into full-coal first-mining filling tunnels, single-wall paste filling tunnels and double-wall paste filling tunnels according to the different structures of the two sides.
[0011] Furthermore, a number of threaded steel anchor rods are installed in the roof, cheeks and two side walls of the first full coal mining filling tunnel. Metal meshes are set on the roof and cheeks, and plastic meshes are set on the two side walls. Anchor beams are installed at a spacing of 1.3m and are fixed by several groups of threaded steel anchor rods. Anchor cables are installed on one side of the empty top of the anchor beam for reinforcement and hanging of π steel.
[0012] Furthermore, a number of threaded steel anchor rods are driven into the top plate and cheeks in the single-wall paste-filled tunnel, a metal mesh is arranged on the top plate and cheeks, a plastic mesh is arranged on the side wall away from the paste-filled material, and a row of fiberglass anchor rods are driven downward at a position 100 mm away from the cheeks on the side wall away from the paste-filled material, and the fiberglass anchor rods and the threaded steel anchor rods are in the same plane.
[0013] Furthermore, at a position 13m away from the opening of the filling branch tunnel, anchor beams are injected inward at a spacing of 1.5m on the side wall away from the paste filling material, and are fixed by several groups of fiberglass anchor rods.
[0014] Furthermore, a number of threaded steel anchor rods are applied to the top plate and cheeks in the double-sided paste filling tunnel, and metal meshes are arranged on the top plate and cheeks.
[0015] The beneficial effects of the present invention are as follows: the present invention divides the working face into several filling branch tunnels, optimizes the mining and filling sequence to achieve interval mining of the filling branch tunnels, improves tunnel safety, and can quickly mine and fill before the roof sinks, thereby reducing the amount of roof sinking and avoiding cracking and settlement problems in surface buildings. BRIEF DESCRIPTION OF THE DRAWINGS
[0016] Figure 1 Shown is a schematic diagram of an embodiment of the present invention.
[0017] Figure 2 Shown is the structural schematic diagram of the first full coal mining filling tunnel.
[0018] Figure 3 Shown is a schematic diagram of the structure of a single-side paste filling tunnel.
[0019] Figure 4 Shown is a schematic diagram of the structure of a double-sided paste filling tunnel. DETAILED DESCRIPTION
[0020] The invention discloses a method for mining and filling coal under a building. An implementation mode of the invention is described in detail below in conjunction with the accompanying drawings.
[0021] like Figure 1 As shown, a method for coal mining and filling under a building includes the following steps: the first step is to divide the working face into several blocks according to the direction.
[0022] In the second step, each block segment is divided into the first filling group, the second filling group, the third filling group and the fourth filling group, each filling group includes four filling branch lanes. The first filling group includes the first filling branch lane 1, the fifth filling branch lane 5, the ninth filling branch lane 9 and the thirteenth filling branch lane 13; the second filling group includes the second filling branch lane 2, the sixth filling branch lane 6, the tenth filling branch lane 10 and the fourteenth filling branch lane 14; the third filling group includes the third filling branch lane 3, the seventh filling branch lane 7, the eleventh filling branch lane 11 and the fifteenth filling branch lane 15; the fourth filling group includes the fourth filling branch lane 4, the eighth filling branch lane 8, the twelfth filling branch lane 12 and the sixteenth filling branch lane 16. The filling branch lanes are adjacent and arranged from left to right in order as the first filling branch lane 1, the second filling branch lane 2, the third filling branch lane 3, the fourth filling branch lane 4, the fifth filling branch lane 5, the sixth filling branch lane 6, the seventh filling branch lane 7, the eighth filling branch lane 8, the ninth filling branch lane 9, the tenth filling branch lane 10, the eleventh filling branch lane 11, the twelfth filling branch lane 12, the thirteenth filling branch lane 13, the fourteenth filling branch lane 14, the fifteenth filling branch lane 15, and the sixteenth filling branch lane 16. The length of each block section is at least 72m, and there is at least 13.5m between the filling branch lanes in the first filling group, at least 13.5m between the filling branch lanes in the second filling group, at least 13.5m between the filling branch lanes in the third filling group, and at least 13.5m between the filling branch lanes in the fourth filling group. The interval of 13.5m can effectively reduce the impact of excavation stress disturbance on adjacent tunnels.
[0023] In the third step, first, in the first filling group, the first filling branch tunnel 1, the fifth filling branch tunnel 5, the ninth filling branch tunnel 9 and the thirteenth filling branch tunnel 13 are mined and filled in turn. After an interval of 12 days, the second filling branch tunnel 2, the sixth filling branch tunnel 6, the tenth filling branch tunnel 10 and the fourteenth filling branch tunnel 14 in the second filling group are mined and filled. After an interval of 12 days, the third filling branch tunnel 3, the seventh filling branch tunnel 7, the eleventh filling branch tunnel 11 and the fifteenth filling branch tunnel 15 in the third filling group are mined and filled. After an interval of 12 days, the fourth filling branch tunnel 4, the eighth filling branch tunnel 8, the twelfth filling branch tunnel 12 and the sixteenth filling branch tunnel 16 in the fourth filling group are mined and filled. During construction, there is an interval of 12 days between adjacent filling groups, which can leave time for the curing and stabilization of the filling material to ensure that the compressive strength of the filling material reaches the predetermined strength. When mining the downward-inclined filling branch tunnel, coal is discharged from the upper material tunnel opening boring machine, and then the coal is transported out of the working face through 40T chutes, scraper conveyors, belt conveyors and other equipment until the coal is discharged. When filling the filling branch tunnel, the lower end of the filling branch tunnel is solid coal and does not need to be blocked. Only the slurry retaining wall is constructed at the upper end of the filling branch tunnel. The filling material is transported to the filling branch tunnel through the ground filling pump and filling borehole, and then the gangue is filled from the upper end of the filling branch tunnel by gravity. The lower end of the filling branch tunnel can avoid blocking operation by blocking with solid coal, effectively avoid paddle collapse, and improve safety. The filling aggregate mainly uses fly ash, slag, etc., which are directly transported to the filling working face through pipelines after being made at the ground filling station. There is no need to arrange a gangue conveyor belt. Coal discharge and filling share a tunnel, which effectively reduces the number of tunnels that need to be excavated, improves work efficiency and reduces mining and filling costs.
[0024] The fourth step is to complete the mining and filling of the entire working face.
[0025] When filling the branch tunnel, it is divided into full coal first mining filling tunnel, single-wall paste filling tunnel and double-wall paste filling tunnel according to the difference of the two-wall structure. Figure 2 As shown, several threaded steel anchor rods 17 are installed on the roof, cheeks and both sides of the first coal mining backfill tunnel, and a metal mesh with a diameter of 4mm is set on the roof and cheeks. Plastic mesh is set on both sides, and anchor beams are installed at a row spacing of 1.3m. The anchor beams are fixed by four groups of threaded steel anchor rods 17. Anchor cables 18 are installed at the top left position of the anchor beam for reinforcement and hanging π steel.
[0026] like Figure 3As shown, several threaded steel anchor rods 17 are applied to the top plate and cheeks in the single-wall paste-filled tunnel, and a metal mesh with a diameter of 4 mm is provided on the top plate and cheeks. A plastic mesh is provided on the side wall away from the paste-filled material 20, and a row of glass fiber reinforced plastic anchor rods 19 are applied downward at a position 100 mm away from the cheeks on the side wall away from the paste-filled material 20, and each glass fiber reinforced plastic anchor rod 19 is aligned with each threaded steel anchor rod 17 and is in the same plane. On the side wall away from the paste-filled material 20 at a position 13 m away from the opening of the single-wall paste-filled tunnel, anchor beams are applied inward at a row spacing of 1.5 m, and are fixed by several groups of glass fiber reinforced plastic anchor rods 19.
[0027] like Figure 4 As shown, a number of threaded steel anchor rods 17 are applied to the top plate and cheeks in the double-sided paste filling tunnel, and a metal mesh with a diameter of 4 mm is arranged on the top plate and cheeks.
[0028] Of course, the above description is not a limitation of the present invention, and the present invention is not limited to the above examples. Changes, modifications, additions or substitutions made by technicians in this technical field within the essential scope of the present invention should also fall within the protection scope of the present invention.
Claims
1. A method for mining and filling coal under a building, characterized in that: The following steps are involved: S1 divides the working face into several blocks according to the strike direction; S2 divides each block into several filling groups, each filling group includes several filling branch lanes, and the filling branch lanes in different filling groups are adjacent and arranged at intervals; S3: mining and filling each filling branch tunnel in one filling group in sequence, and then mining and filling each filling branch tunnel in another filling group in sequence, until the mining and filling of the block section are completed; S4 completes the mining and filling of the working face.
2. A method for mining and filling coal under a building according to claim 1, characterized in that: In S2, each block segment includes a first filling group, a second filling group, a third filling group and a fourth filling group, and each filling group has four filling branch lanes.
3. A method for mining and filling coal under a building according to claim 2, characterized in that: In S3, the first filling group, the second filling group, the third filling group and the fourth filling group are mined and filled in sequence. Each filling branch tunnel in each filling group is mined and filled in sequence from left to right.
4. The method for mining and filling coal under a building according to claim 1, characterized in that: In S2, adjacent filling branch tunnels in the same filling group are at least 13.5m apart.
5. The method for mining and filling coal under a building according to claim 1, characterized in that: In S3, the construction interval between different filling groups was at least 12 days.
6. The method for mining and filling coal under a building according to claim 1, characterized in that: When filling the branch tunnel, it is divided into full coal first mining filling tunnel, single-wall paste filling tunnel and double-wall paste filling tunnel according to the different structures of the two sides.
7. A method for mining and filling coal under a building according to claim 6, characterized in that: A number of threaded steel anchor rods (17) are installed on the roof, cheeks and both sides of the first full coal mining backfill tunnel. Metal mesh is set on the roof and cheeks, and plastic mesh is set on the both sides. Anchor beams are installed at a spacing of 1.3m. The anchor beams are fixed by a number of groups of threaded steel anchor rods (17). Anchor cables (18) are installed on one side of the empty top of the anchor beam for reinforcement and hanging of π steel.
8. The method for mining and filling coal under a building according to claim 6, characterized in that: A plurality of threaded steel anchor rods (17) are applied to the top plate and cheeks in a single-wall paste-filled tunnel, a metal mesh is arranged on the top plate and cheeks, a plastic mesh is arranged on the side wall away from the paste-filled material (20), and a row of glass fiber reinforced plastic anchor rods (19) are applied downward at a position 100 mm away from the cheeks on the side wall away from the paste-filled material (20), and the glass fiber reinforced plastic anchor rods (19) and the threaded steel anchor rods (17) are in the same plane.
9. A method for mining and filling coal under a building according to claim 8, characterized in that: At a position 13m away from the opening of the filling branch tunnel, anchor beams are injected inward at a row spacing of 1.5m on the side wall away from the paste filling material (20) and fixed by several groups of glass fiber reinforced plastic anchor rods (19).
10. The method for coal mining and filling under a building according to claim 6, characterized in that: A plurality of threaded steel anchor rods (17) are applied to the top plate and cheeks of the double-sided paste-filled tunnel, and metal meshes are arranged on the top plate and cheeks.