Layout planning method and device for marine charging station

By optimizing the layout planning method of marine charging stations, the problem of insufficient overall optimization of the 'ship-shore-network' system was solved, and the rational construction and resource matching of port charging stations in inland river basin was achieved, and the benefits of shipping electrification were improved.

CN119005823APending Publication Date: 2024-11-22CHINA ELECTRIC POWER RESEARCH INSTITUTE CO LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410903981.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-08
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing technology has not yet discussed the 'ship-shore-network' system as an organic whole, and has not fully optimized the layout planning of marine charging stations, which affects shipping efficiency and grid load, and has not effectively considered the layout planning of marine charging facilities in port areas. .

Method used

A layout planning method for marine charging stations is proposed. By obtaining the charging needs of ports in the inland river basin, it is substituted with a pre-constructed marine charging station layout planning model. The optimization results include the planning coefficient and planning quantity of marine charging stations, and the objective function is minimized construction. Cost, wiring costs, operating costs and ship queue waiting time, constraints include grid line capacity and new energy consumption indicators.

Benefits of technology

The rational construction of port charging stations in the inland river basin has been achieved, ensuring the matching of the scale of pure electric ships with the power and quantity of charging piles, preventing resource mismatch and waste, balancing construction costs and port and shipping efficiency, improving overall benefits, and promoting the development of shipping electrification .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119005823A_ABST
    Figure CN119005823A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of marine charging station planning, and particularly provides a layout planning method and device for a marine charging station, and the method comprises the steps: obtaining the actual charging demands of each port of an inland river basin; substituting the charging demand into a pre-constructed marine charging station layout planning model and solving to obtain an optimization result; performing marine charging station layout planning on each port of the inland river basin by using the optimization result; wherein the optimization result comprises at least one of the following: a ship charging station planning coefficient of each port of the inland river basin and a ship charging station planning number. According to the technical scheme provided by the invention, the reasonable construction of the port charging station in the inland river basin is guided, the scale of the purely-electric launched ships is more matched with the configuration of the power and number of the charging piles, mismatching and waste of resources can be prevented, and the balance between the construction cost and the port and navigation efficiency is realized; and the overall benefit is improved to promote further development of shipping motorization.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of ship charging station planning, and in particular to a layout planning method and device for a ship charging station. Background Art

[0002] At present, the inland waterway industry is huge, but most ships are powered by fuel, resulting in high carbon emissions and serious pollution in the inland waterway industry. Pure electric ships are usually powered by batteries, do not consume fuel, are clean and pollution-free, and can be widely used in passenger ships, cargo ships, special operation ships and other scenarios. In recent years, pure electric ships have achieved a series of preliminary applications in the industry.

[0003] With the widespread use of pure electric ships, there will inevitably be a large demand for charging at ports. However, the existing traditional shore power is mainly for the daily power load of ships, with limited design capacity and relatively simple interfaces. Therefore, a large number of ship charging stations need to be built to meet the future ship charging needs. As the supporting infrastructure for shipping electrification, whether the overall layout of the ship charging station is appropriate and whether the ratio of the number of built-in charging piles is reasonable will directly affect the ship's operating efficiency. By rationally planning the layout of charging facilities to improve port and shipping efficiency and reduce the waiting time for charging queues, it can play a positive role in promoting the promotion of pure electric ships. Therefore, before large-scale construction, it is necessary to make reasonable plans for the site selection and layout of ship charging stations and the selection of the number of charging piles.

[0004] Referring to the experience of the new energy vehicle industry, many scholars have conducted a series of studies on charging station planning. Among them, the optimization of the distribution of charging stations for electric vehicles on the highway network, based on the analysis of the charging demand of electric vehicles on the highway network, adopted a two-stage method to determine the planning scheme of the charging station. In the prior art, electric vehicle charging stations are jointly planned with distribution networks to reduce the impact on the power grid. The prior art additionally considers the impact of battery degradation and multiple uncertainties on charging station planning. The reinforcement planning of the active distribution system of electric vehicle charging stations was further studied. The above-mentioned prior art provides a series of solutions at the method level, but there are still significant differences between new energy vehicles and pure electric ships in terms of operating mechanism, transportation organization, etc. Further research is still needed to broaden the scope of application of the original planning model.

[0005] In recent years, research on the electrification of shipping has also received much attention. One proposal studied the optimization of the operation of the integrated energy system of ports with multi-energy coordination, and the impact of berth optimization on the optimal scheduling of ports. One proposal focused on the impact of ship shore power on the multi-source coordinated energy supply system of ports. One proposal studied the multi-objective planning model of all-electric ship charging stations that takes into account both power quality and chemical energy consumption in offshore island scenarios, and used a multi-objective particle swarm algorithm to obtain the Pareto optimal solution set. On the other hand, one proposal discussed the site selection and sizing optimization model for pure electric ship charging and swapping stations based on the ship-battery separation mode, but this model also has challenges such as the difficulty of battery lifting and high requirements for port machinery and equipment, and its safety needs to be strengthened.

[0006] As an important interface between the "ship-shore-grid" system, the ship charging station not only affects the shipping efficiency, but also is an additional load on the power grid. The above research has not yet discussed the "ship-shore-grid" system as an organic whole, and the research content rarely involves the layout planning of ship charging facilities in the port area. At the same time, as an additional load, the ship charging station will also have an impact on the green power consumption of the regional power grid.

[0007] In summary, the layout planning of marine charging stations needs to be optimized. Summary of the invention

[0008] In order to overcome the above-mentioned defects, the present invention proposes a layout planning method and device for a marine charging station.

[0009] In a first aspect, a layout planning method for a ship charging station is provided, the layout planning method for a ship charging station comprising:

[0010] Obtain the actual charging demand of each port in the inland river basin;

[0011] Substituting the charging demand into a pre-built ship charging station layout planning model and solving it to obtain an optimization result;

[0012] Using the optimization results, layout planning of ship charging stations is carried out in various ports in the inland river basin;

[0013] The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

[0014] Preferably, the actual charging requirements of the ports in the inland river basin are as follows:

[0015] Q' j =Q j -△Q j

[0016] In the above formula, Q' j is the actual charging demand of inland river port j, Qj is the total charging demand generated by pure electric ships passing through port j, △Q j is the reduced charging demand at port j due to the construction of charging stations in adjacent ports.

[0017] Preferably, the reduced charging demand of port j due to the construction of charging stations in adjacent ports is as follows:

[0018]

[0019] In the above formula, n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

[0020] Furthermore, the pre-constructed ship charging station layout planning model includes: an objective function with the goal of minimizing the loss of the ship charging station layout planning and its corresponding constraints.

[0021] Furthermore, the objective function is as follows:

[0022] min f = τf in +τf line +f op +ef w

[0023] In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

[0024] Furthermore, the construction cost of the charging station is as follows:

[0025]

[0026] The wiring costs are as follows:

[0027]

[0028] The operating costs are as follows:

[0029]

[0030] In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

[0031] Furthermore, the transformer capacity of the port j is as follows:

[0032]

[0033] In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

[0034] Furthermore, the ship queue waiting time is as follows:

[0035]

[0036] In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,j is the average charging waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows:

[0037]

[0038] In the above formula, ρ is the service intensity, k j is the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

[0039] Furthermore, the constraint condition is:

[0040]

[0041] In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

[0042] In a second aspect, a layout planning device for a ship charging station is provided, the layout planning device for a ship charging station comprising:

[0043] An acquisition module is used to obtain the actual charging demand of each port in the inland river basin;

[0044] An analysis module is used to substitute the charging demand into a pre-built marine charging station layout planning model and solve it to obtain an optimization result;

[0045] A planning module, for planning the layout of ship charging stations at various ports in the inland river basin using the optimization results;

[0046] The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

[0047] Preferably, the actual charging requirements of the ports in the inland river basin are as follows:

[0048] Q' j =Q j -△Q j

[0049] In the above formula, Q' jis the actual charging demand of inland river port j, Q j is the total charging demand generated by pure electric ships passing through port j, △Q j is the reduced charging demand at port j due to the construction of charging stations in adjacent ports.

[0050] Preferably, the reduced charging demand of port j due to the construction of charging stations in adjacent ports is as follows:

[0051]

[0052] In the above formula, n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

[0053] Furthermore, the pre-constructed ship charging station layout planning model includes: an objective function with the goal of minimizing the loss of the ship charging station layout planning and its corresponding constraints.

[0054] Furthermore, the objective function is as follows:

[0055] min f = τf in +τf line +f op +ef w

[0056] In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

[0057] Furthermore, the construction cost of the charging station is as follows:

[0058]

[0059] The wiring costs are as follows:

[0060]

[0061] The operating costs are as follows:

[0062]

[0063] In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

[0064] Furthermore, the transformer capacity of the port j is as follows:

[0065]

[0066] In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

[0067] Furthermore, the ship queue waiting time is as follows:

[0068]

[0069] In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,j is the average charging waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows:

[0070]

[0071] In the above formula, ρ is the service intensity, k j is the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

[0072] Furthermore, the constraint condition is:

[0073]

[0074] In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

[0075] In a third aspect, a computer device is provided, comprising: one or more processors;

[0076] The processor is configured to execute one or more programs;

[0077] When the one or more programs are executed by the one or more processors, the layout planning method of the ship charging station is implemented.

[0078] In a fourth aspect, a computer-readable storage medium is provided, on which a computer program is stored, and when the computer program is executed, the layout planning method of the ship charging station is implemented.

[0079] The above one or more technical solutions of the present invention have at least one or more of the following beneficial effects:

[0080] The present invention provides a layout planning method and device for ship charging stations, including: obtaining the actual charging demand required by each port in the inland river basin; substituting the charging demand into a pre-constructed ship charging station layout planning model and solving it to obtain an optimization result; using the optimization result to plan the layout of ship charging stations for each port in the inland river basin; wherein the optimization result includes at least one of the following: a ship charging station planning coefficient and a planned number of ship charging stations for each port in the inland river basin. The technical solution provided by the present invention is helpful to guide the rational construction of charging stations in inland river ports, so that the scale of pure electric ships deployed is more matched with the configuration of the power and number of charging piles, which can prevent resource mismatch and waste, achieve a balance between construction cost and port and shipping efficiency, and improve overall benefits to promote the further development of shipping electrification. BRIEF DESCRIPTION OF THE DRAWINGS

[0081] Figure 1 It is a schematic flow chart of the main steps of the layout planning method of the marine charging station according to an embodiment of the present invention;

[0082] Figure 2 is a schematic diagram of the inland river basin ports and waterways of the charging station after modeling by the planning system in an embodiment of the present invention;

[0083] Figure 3 This is a schematic diagram of a ship charging queuing waiting process according to an embodiment of the present invention;

[0084] Figure 4 is a schematic diagram of constraint conditions for the configuration of a charging pile according to an embodiment of the present invention;

[0085] Figure 5 Schematic diagram of equivalent navigation distances between ports in inland river basins according to an embodiment of the present invention;

[0086] Figure 6 is a schematic diagram of various calculation results under scenario 1 of an embodiment of the present invention;

[0087] Figure 7 This is a schematic diagram of various calculation results under scenario 2 of an embodiment of the present invention;

[0088] Figure 8 It is a schematic diagram of planning results under three different planning tendencies of an embodiment of the present invention. DETAILED DESCRIPTION

[0089] The specific implementation modes of the present invention will be further described in detail below in conjunction with the accompanying drawings.

[0090] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0091] As disclosed in the background technology, the inland waterway industry is currently huge, but most ships are powered by fuel, resulting in high carbon emissions and serious pollution in the inland waterway industry. Pure electric ships are usually powered by batteries, do not consume fuel, are clean and pollution-free, and can be widely used in passenger ships, cargo ships, special operation ships and other scenarios. In recent years, pure electric ships have achieved a series of preliminary applications in the industry.

[0092] With the widespread use of pure electric ships, there will inevitably be a large demand for charging at ports. However, the existing traditional shore power is mainly for the daily power load of ships, with limited design capacity and relatively simple interfaces. Therefore, a large number of ship charging stations need to be built to meet the future ship charging needs. As the supporting infrastructure for shipping electrification, whether the overall layout of the ship charging station is appropriate and whether the ratio of the number of built-in charging piles is reasonable will directly affect the ship's operating efficiency. By rationally planning the layout of charging facilities to improve port and shipping efficiency and reduce the waiting time for charging queues, it can play a positive role in promoting the promotion of pure electric ships. Therefore, before large-scale construction, it is necessary to make reasonable plans for the site selection and layout of ship charging stations and the selection of the number of charging piles.

[0093] Referring to the experience of the new energy vehicle industry, many scholars have conducted a series of studies on charging station planning. Among them, the optimization of the distribution of charging stations for electric vehicles on the highway network, based on the analysis of the charging demand of electric vehicles on the highway network, adopted a two-stage method to determine the planning scheme of the charging station. In the prior art, electric vehicle charging stations are jointly planned with distribution networks to reduce the impact on the power grid. The prior art additionally considers the impact of battery degradation and multiple uncertainties on charging station planning. The reinforcement planning of the active distribution system of electric vehicle charging stations was further studied. The above-mentioned prior art provides a series of solutions at the method level, but there are still significant differences between new energy vehicles and pure electric ships in terms of operating mechanism, transportation organization, etc. Further research is still needed to broaden the scope of application of the original planning model.

[0094] In recent years, research on the electrification of shipping has also received much attention. One proposal studied the optimization of the operation of the integrated energy system of ports with multi-energy coordination, and the impact of berth optimization on the optimal scheduling of ports. One proposal focused on the impact of ship shore power on the multi-source coordinated energy supply system of ports. One proposal studied the multi-objective planning model of all-electric ship charging stations that takes into account both power quality and chemical energy consumption in offshore island scenarios, and used a multi-objective particle swarm algorithm to obtain the Pareto optimal solution set. On the other hand, one proposal discussed the site selection and sizing optimization model for pure electric ship charging and swapping stations based on the ship-battery separation mode, but this model also has challenges such as the difficulty of battery lifting and high requirements for port machinery and equipment, and its safety needs to be strengthened.

[0095] As an important interface between the "ship-shore-grid" system, the ship charging station not only affects the shipping efficiency, but also is an additional load on the power grid. The above research has not yet discussed the "ship-shore-grid" system as an organic whole, and the research content rarely involves the layout planning of ship charging facilities in the port area. At the same time, as an additional load, the ship charging station will also have an impact on the green power consumption of the regional power grid.

[0096] In summary, the layout planning of marine charging stations needs to be optimized.

[0097] In order to improve the above problems, the present invention provides a layout planning method and device for ship charging stations, including: obtaining the actual charging demand required by each port in the inland river basin; substituting the charging demand into a pre-constructed ship charging station layout planning model and solving it to obtain an optimization result; using the optimization result to plan the layout of ship charging stations for each port in the inland river basin; wherein the optimization result includes at least one of the following: the ship charging station planning coefficient and the planned number of ship charging stations for each port in the inland river basin. The technical solution provided by the present invention is helpful to guide the rational construction of charging stations in inland river ports, so that the scale of pure electric ships deployed is more matched with the configuration of the power and number of charging piles, which can prevent resource mismatch and waste, achieve a balance between construction cost and port and shipping efficiency, and improve overall benefits to promote the further development of shipping electrification.

[0098] The above scheme is described in detail below.

[0099] Example 1

[0100] See attached Figure 1 , Figure 1 FIG. 1 is a flow chart showing the main steps of a layout planning method for a marine charging station according to an embodiment of the present invention. Figure 1 As shown, the layout planning method of the marine charging station in the embodiment of the present invention mainly includes the following steps:

[0101] Step S101: obtaining the actual charging demand of each port in the inland river basin;

[0102] Step S102: Substituting the charging demand into a pre-built ship charging station layout planning model and solving it to obtain an optimization result;

[0103] Step S103: using the optimization results to plan the layout of ship charging stations at various ports in the inland river basin;

[0104] The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

[0105] In this embodiment, after excluding some unusable ports and unnavigable waterways, a river basin can be abstracted as follows: Figure 2 The port nodes and waterway pathways shown in the figure allow the construction of charging stations in all ports, and the charging stations are equipped with several charging piles of different specifications. The planning algorithm will be developed based on this abstract model. During the navigation process, pure electric ships will be affected by water flow, wind direction, and channel restrictions. That is, the actual amount of electricity consumed when sailing from port i to port j is not equal to that consumed when sailing from port j to port i. In addition, during the navigation process, additional electricity may be consumed due to queuing at the lock. By converting these factors that affect power consumption into the navigation distance, the equivalent navigation distance matrix S between ports can be obtained. The matrix S is an asymmetric zero diagonal matrix, and the element S ij represents the actual distance a ship travels from port i to port j, where all the main diagonal elements are zero. In addition, since some waterways can only travel in one direction, S ji On the other hand, the optimization object is determined as the number of charging piles of different power levels configured in each port, which is represented by a natural number matrix W. The element in the i-th row and j-th column of the matrix W represents the number of charging piles of the i-th type in port j. ij The subsequent optimization algorithm will cyclically modify the W matrix and eventually converge to the optimal solution Wopt to characterize the optimal configuration of the charging pile.

[0106] For the convenience of calculation, a Boolean variable w is defined to indicate whether each port has built a ship charging station. j = 0, which means that port j does not have a charging station and no charging piles. If w j = 1. Furthermore, the actual charging requirements of the ports in the inland river basin are as follows:

[0107] Q' j =Q j -△Q j

[0108] In the above formula, Q' j is the actual charging demand of inland river port j, Q j is the total charging demand generated by pure electric ships passing through port j, △Qj is the reduced charging demand at port j due to the construction of charging stations in adjacent ports, Where n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

[0109] In one embodiment, the site selection of the charging station and the number of charging piles in the station are taken as optimization objects, the construction cost, wiring cost, operating cost and ship queuing waiting time cost of the charging station are taken as objective functions, and the actual charging demand of the port, the number of stations built in the river basin, the network line capacity, the distance between charging stations and the new energy consumption index are taken as constraints to construct the pre-constructed ship charging station layout planning model, including: an objective function with the goal of minimizing the loss of the ship charging station layout planning and its corresponding constraints.

[0110] In one embodiment, the objective function is as follows:

[0111] min f = τf in +τf line +f op +ef w

[0112] In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

[0113] In one embodiment, the construction cost of the charging station is as follows:

[0114]

[0115] The wiring costs are as follows:

[0116]

[0117] The operating costs are as follows:

[0118]

[0119] In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

[0120] In one embodiment, the transformer capacity of the port j is as follows:

[0121]

[0122] In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

[0123] In one embodiment, the ship queue waiting time is as follows:

[0124]

[0125] In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,j is the average charging waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows:

[0126]

[0127] In the above formula, ρ is the service intensity, k jis the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

[0128] The construction cost of a charging station mainly refers to the cost of purchasing charging piles and increasing the capacity of distribution capacity (mainly distribution transformers and supporting electrical cabinets). It can be calculated in two parts: the fixed cost of building a station x j , which has nothing to do with the power and number of the actual configured charging piles. This fee will be incurred once the port station is built; the second is related to the configuration plan of the charging piles in the charging station, which is a variable cost. The greater the power of the charging piles and the greater the number, the higher this part of the cost; the wiring cost is to supply power to the charging station. Under the premise of ensuring the safety of electricity use, for economic considerations, the newly built charging station can be connected to the power grid through the nearest substation; the operating cost is to ensure that the constructed charging station can maintain operation, and a certain amount of manpower costs are required to operate and maintain the charging facilities. In addition, considering factors such as equipment aging and damage, there are inevitable maintenance costs;

[0129] Due to limited shoreline and berth resources, pure electric ships will inevitably have to wait in line when entering the port for charging. When a pure electric ship arrives at the port, if there are idle charging piles, it can immediately receive charging services, otherwise it will enter the queue. Since pure electric ships not only cannot produce economic benefits while waiting in line for charging, but also consume resources on board, the average waiting time cost of ships needs to be included as a negative variable in the consideration indicators.

[0130] like Figure 3 As shown in the figure, the arrival of pure electric ships at the port can be regarded as a typical random event, that is, the number of pure electric ships arriving in succession within a unit time follows a Poisson distribution with an average arrival rate of λ. Charging at the port can be compared to a queuing model, where the ship is regarded as a customer of the queuing system and the service provider is the charging pile. It can be considered that the time for the ship to dock and charge is independent of the time of entry, and the behaviors of different ships are independent of each other. The charging time of the ship follows a negative exponential distribution with a parameter of μ, and the average charging time t ch =1 / μ. Then the service intensity of port j is:

[0131]

[0132] An optimization model for the configuration of charging piles for ships in inland ports is established. The goal of this optimization problem is to minimize the sum of the construction cost, operating cost, wiring cost, and queuing time cost (converted to each year) of the charging and swapping station.

[0133] like Figure 4As shown in the figure, (1) under the current policy, there is a clear upper limit on the number of stations built in the basin, that is, the total number of ports equipped with charging piles must be limited to a certain range; (2) due to the constraints of the power grid line capacity, the total capacity of each charging station should be limited, and the number of charging piles that can be installed in the port is also limited by the number of berths; (3) to ensure that the charging needs of pure electric ships can be met, the distance between two adjacent charging stations should not be too large. At the same time, the distance between adjacent charging stations should not be too small, which will cause a waste of resources. Therefore, the distance between adjacent charging stations is d x It should meet certain interval restriction conditions; (4) The number of charging piles arranged should be able to meet the electricity demand of ships during daily navigation under the condition of the average equivalent working hours of ships per day H; (5) Due to the rapid growth of photovoltaic and wind power installed capacity, the problems of "wind abandonment" and "light abandonment" in the basin are becoming increasingly prominent. Adding port charging stations can reduce the phenomenon of new energy abandonment, so it is necessary to consider the new energy power generation output P new uncertainty, reducing the power P of renewable energy new,ab , in order to complete the minimum new energy consumption index χ min The constraints are specifically:

[0134]

[0135] In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

[0136] In a specific implementation, the GUROBI solver is used to solve the pre-built ship charging station layout planning model. Specifically, the charging demand modeling and various cost analysis during the navigation of pure electric ships are carried out. The inland port charging pile configuration optimization model can be represented by a most integer programming problem (X). The specific solution process includes three main steps: decomposition, relaxation, and analysis and processing.

[0137] In order to verify the feasibility of the optimization scheme in this paper, the GUROBI solver was planned and designed in the MATLAB environment. The example assumes that there are 18 ports in the whole basin. Considering that ships need to consume additional electricity when passing through the lock, the unit power consumption is different when traveling downstream or upstream. The equivalent sailing distance between ports after conversion is marked in the figure, as shown in the figure. Figure 5 As shown, some waterways only allow one-way travel, marked by a one-way arrow, such as the waterway from Port 3 to Port 4. Currently, there are three different power levels of charging piles available, with rated powers of 720kW, 280kW and 110kW, which can meet the charging needs of different types of pure electric ships in the inland river basin.

[0138] According to the number of ships deployed in the basin, two scenarios are discussed separately. In scenario 1, the total number of pure electric ships to be deployed is 50, and in scenario 2, the total number of pure electric ships to be deployed is 200. In both scenarios, 6 different types of pure electric ships are deployed in the basin, and their basic parameters are given in Table 1. The pure electric ships to be deployed are mainly responsible for operating eight routes, and their specific routes are given in Table 2 (only one-way routes are listed, and the return routes have the same path).

[0139] Table 1

[0140]

[0141] Table 2

[0142]

[0143]

[0144] Based on the basic data mentioned above, when 50 and 200 pure electric ships are deployed in the whole basin, the optimal configuration scheme of the port charging station is calculated respectively. Among them, for scenario 1, the configuration scheme of the port charging station is listed in Table 3, and the estimated values ​​of various costs corresponding to the objective function can be obtained by calculation, such as Figure 6 As shown. It can be seen that under the condition that a total of 50 pure electric ships are deployed in the entire inland river basin, as long as the port is equipped with an appropriate number of charging piles, the waiting time for pure electric ships is short and the queuing phenomenon is not serious. The parts that account for a relatively high proportion of the total cost include the construction cost of the charging station, the wiring cost, and the capital and manpower costs of maintaining the daily operation of the charging station.

[0145] Table 3

[0146]

[0147] The configuration scheme corresponding to scenario 2 is given in Table 4. Different from the previous scenario, when the number of pure electric ships invested in the whole basin increases significantly, if there is no matching number of charging piles, it is easy to cause queuing for charging at the port. In this process, pure electric ships will waste a lot of queuing time, which will reduce the overall efficiency. Therefore, in this scenario, the queuing cost accounts for a high proportion of various costs, such as Figure 7 On the other hand, it can be seen from the results of Table 3 and Table 4 that some ports are not recommended to set up charging stations. The main reason is that there are fewer pure electric ship routes and only a small demand for charging will be generated. Therefore, the distance between adjacent charging stations can be increased, and charging stations can be built near ports.

[0148] Table 4

[0149]

[0150] Since pure electric ships waiting in line will not only lead to idle transport capacity, but also indirectly cause negative impacts such as port congestion, the priority can be reset through weight factors during planning and design to meet planning requirements with different tendencies. The following will discuss planning schemes under different tendencies based on scenario 2. Figure 8 As shown in the figure, from top to bottom, they are the planning results corresponding to the priority of ship charging convenience, the priority of construction cost, and the compromise between the two. By analyzing and comparing the different charging pile configuration results, it can be seen that under the condition of giving priority to construction cost, the number of charging piles recommended in the optimal configuration plan is small, which can reduce the cost of purchasing and operating charging piles. However, at the same time, the small number of charging piles will inevitably lead to an increase in ship charging queues and poor user experience, which is not conducive to the promotion of pure electric ships. If the tendency is to improve charging convenience, the number of charging piles will increase, and charging can basically be achieved on-demand, but this will greatly increase the construction and maintenance costs, and will also cause some charging piles to be idle. Therefore, in actual promotion and application, the weight coefficient can be appropriately set according to the specific conditions of the basin and the government policy orientation to obtain the most suitable charging station configuration plan.

[0151] Example 2

[0152] Based on the same inventive concept, the present invention also provides a layout planning device for a ship charging station, the layout planning device for a ship charging station comprising:

[0153] An acquisition module is used to obtain the actual charging demand of each port in the inland river basin;

[0154] An analysis module is used to substitute the charging demand into a pre-built marine charging station layout planning model and solve it to obtain an optimization result;

[0155] A planning module, for planning the layout of ship charging stations at various ports in the inland river basin using the optimization results;

[0156] The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

[0157] Preferably, the actual charging requirements of the ports in the inland river basin are as follows:

[0158] Q' j =Q j -△Q j

[0159] In the above formula, Q' j is the actual charging demand of inland river port j, Q j is the total charging demand generated by pure electric ships passing through port j, △Q j is the reduced charging demand at port j due to the construction of charging stations in adjacent ports, Where n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

[0160] Furthermore, the pre-constructed ship charging station layout planning model includes: an objective function with the goal of minimizing the loss of the ship charging station layout planning and its corresponding constraints.

[0161] Furthermore, the objective function is as follows:

[0162] min f = τf in +τf line +f op +ef w

[0163] In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

[0164] Furthermore, the construction cost of the charging station is as follows:

[0165]

[0166] The wiring costs are as follows:

[0167]

[0168] The operating costs are as follows:

[0169]

[0170] In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

[0171] Furthermore, the transformer capacity of the port j is as follows:

[0172]

[0173] In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

[0174] Furthermore, the ship queue waiting time is as follows:

[0175]

[0176] In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,jis the average charging waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows:

[0177]

[0178] In the above formula, ρ is the service intensity, k j is the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

[0179] Furthermore, the constraint condition is:

[0180]

[0181] In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

[0182] Example 3

[0183] Based on the same inventive concept, the present invention also provides a computer device, which includes a processor and a memory, wherein the memory is used to store a computer program, the computer program includes program instructions, and the processor is used to execute the program instructions stored in the computer storage medium. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is suitable for implementing one or more instructions, and is specifically suitable for loading and executing one or more instructions in the computer storage medium to implement the corresponding method flow or corresponding function, so as to implement the steps of the layout planning method of a marine charging station in the above embodiment.

[0184] Example 4

[0185] Based on the same inventive concept, the present invention also provides a storage medium, specifically a computer-readable storage medium (Memory), which is a memory device in a computer device for storing programs and data. It can be understood that the computer-readable storage medium here can include both built-in storage media in the computer device and, of course, extended storage media supported by the computer device. The computer-readable storage medium provides a storage space, which stores the operating system of the terminal. In addition, one or more instructions suitable for being loaded and executed by the processor are also stored in the storage space, and these instructions can be one or more computer programs (including program codes). It should be noted that the computer-readable storage medium here can be a high-speed RAM memory or a non-volatile memory, such as at least one disk memory. The processor can load and execute one or more instructions stored in the computer-readable storage medium to implement the steps of a layout planning method for a marine charging station in the above embodiment.

[0186] Those skilled in the art will appreciate that embodiments of the present invention may be provided as methods, systems, or computer program products. Therefore, the present invention may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Moreover, the present invention may take the form of a computer program product implemented on one or more computer-usable storage media (including but not limited to disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.

[0187] The present invention is described with reference to flowcharts and / or block diagrams of methods, devices (systems), and computer program products according to embodiments of the present invention. It should be understood that each process and / or block in the flowchart and / or block diagram, as well as the combination of processes and / or blocks in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device generate instructions for implementing the processes in the flowchart and / or block diagram. Figure 1 A process or multiple processes and / or boxes Figure 1 A device that provides the functions specified in a block or multiple blocks.

[0188] These computer program instructions may also be stored in a computer-readable memory capable of directing a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce an article of manufacture comprising an instruction device, which implements the process Figure 1 A process or multiple processes and / or boxes Figure 1 A function specified in one or more boxes.

[0189] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, thereby providing instructions for implementing the process. Figure 1 A process or multiple processes and / or boxes Figure 1 The steps for the functions specified in one or more boxes.

[0190] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents. Any modification or equivalent replacement that does not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.

Claims

1. A layout planning method for a marine charging station, It is characterized in that include: Obtain the actual charging demand of each port in the inland river basin; Substituting the charging demand into a pre-built ship charging station layout planning model and solving it to obtain an optimization result; Using the optimization results, layout planning of ship charging stations is carried out in various ports in the inland river basin; The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

2. The method according to claim 1, It is characterized in that The actual charging requirements of the ports in the inland river basin are as follows: Q' j =Q j -△Q j In the above formula, Q' j is the actual charging demand of inland river port j, Q j is the total charging demand generated by pure electric ships passing through port j, △Q j is the reduced charging demand at port j due to the construction of charging stations in adjacent ports.

3. The method according to claim 2, It is characterized in that The reduced charging demand at port j due to the construction of charging stations at adjacent ports is as follows: In the above formula, n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

4. The method according to claim 2, It is characterized in that The pre-built ship charging station layout planning model includes: an objective function with the goal of minimizing the ship charging station layout planning loss and its corresponding constraint conditions.

5. The method according to claim 3, It is characterized in that The objective function is as follows: min f=τf in +τf line +f op +ef w In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

6. The method according to claim 5, It is characterized in that The construction costs of the charging station are as follows: The wiring costs are as follows: The operating costs are as follows: In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

7. The method according to claim 6, It is characterized in that The transformer capacity of the port j is as follows: In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

8. The method according to claim 7, It is characterized in that The vessel queue waiting times are as follows: In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,j is the average charging queue waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows: In the above formula, ρ is the service intensity, k j is the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

9. The method according to claim 8, It is characterized in that The constraints are: In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

10. A layout planning device for a marine charging station, It is characterized in that The device comprises: An acquisition module is used to obtain the actual charging demand of each port in the inland river basin; An analysis module is used to substitute the charging demand into a pre-built marine charging station layout planning model and solve it to obtain an optimization result; A planning module, used to plan the layout of ship charging stations for various ports in the inland river basin using the optimization results; The optimization results include at least one of the following: planning coefficients of ship charging stations and planned number of ship charging stations at ports in inland river basins.

11. The device according to claim 10, It is characterized in that The actual charging requirements of the ports in the inland river basin are as follows: Q' j =Q j -△Q j In the above formula, Q' j is the actual charging demand of inland river port j, Q j is the total charging demand generated by pure electric ships passing through port j, △Q j is the reduced charging demand at port j due to the construction of charging stations in adjacent ports.

12. The device according to claim 11, It is characterized in that The reduced charging demand at port j due to the construction of charging stations at adjacent ports is as follows: In the above formula, n is the total number of ports in the inland river basin, w j is the planning coefficient of the ship charging station in the inland river port j. A value of 1 indicates that the inland river port j has a ship charging station, and a value of 0 indicates that the inland river port j does not have a ship charging station. △SOC j is the average state of charge of a pure electric ship passing through port j, is the average battery capacity, h jk is the number of ships from port j to port k, h kj is the number of ships from port k to port j, β is the proportion of ships docking for charging before and after port j, and γ is the proportion of ships docking for charging before and after port k.

13. The device according to claim 11, It is characterized in that The pre-built ship charging station layout planning model includes: an objective function with the goal of minimizing the ship charging station layout planning loss and its corresponding constraint conditions.

14. The device according to claim 12, It is characterized in that The objective function is as follows: min f=τf in +τf line +f op +ef w In the above formula, f is the target value, f in is the construction cost of the charging station, f line is the wiring cost, f op is the operating cost, f w is the waiting time of ships, τ is the capital recovery coefficient, e is the weight coefficient, y is the discount rate, and s is the expected service life of the charging pile.

15. The device according to claim 14, It is characterized in that The construction costs of the charging station are as follows: The wiring costs are as follows: The operating costs are as follows: In the above formula, w j is the planning coefficient of the ship charging station in the inland river port j, x j is the fixed cost of building a station at port j, W ij is the planned number of the i-th charging pile in port j, x i is the unit price of the i-th charging pile, x tr is the price of transformer per unit capacity, E j is the transformer capacity of port j, x con is the cost of overhead line per kilometer, d j is the minimum overhead line length for the charging station at port j to access the power grid, ψ line is the line redundancy adjustment factor, x ch is the average labor cost per charging station, x E is the management cost per unit capacity of the charging station, and n is the total number of ports in the inland river basin.

16. The device according to claim 15, It is characterized in that The transformer capacity of the port j is as follows: In the above formula, A j is the total power that the charging pile at port j can provide, is the rate at which the charging pile provides charging services, α is the proportion of the charging pile load to the total load, η is the charging efficiency of the charging pile, B max is the maximum load rate of the charging station, and cosφ is the power factor of the charging pile.

17. The device according to claim 16, It is characterized in that The vessel queue waiting times are as follows: In the above formula, G is the annual gross output value of the shipping industry, ζ is the proportion of pure electric ships to all ships, r j is the number of pure electric ships passing through port j, N ev is the total number of ships in the shipping industry, H is the average daily working hours, t w,j is the average charging queue waiting time of pure electric ships at port j, t ch is the average charging time, where the average charging queue waiting time of the pure electric ship at port j is as follows: In the above formula, ρ is the service intensity, k j is the total number of charging piles configured in port j, λ is the number of pure electric ships arriving successively per unit time, μ is the parameter followed by the ship charging time, and m is the parameter used for summation.

18. The device according to claim 17, It is characterized in that The constraints are: In the above formula, w min is the lower limit of the number of stations in the basin, w max is the upper limit of the number of stations in the basin, W line,min is the lower limit of the power line capacity, W line is the grid line capacity, W line,max is the upper limit of the grid line capacity, d min is the lower limit of the distance between adjacent charging stations, d x is the distance between adjacent charging stations, d max is the upper limit of the distance between adjacent charging stations, T is the preset time, P new,ab (t) is the power abandoned by renewable energy at time t, P new (t) is the power generation output of renewable energy at time t, χ min It is the minimum new energy consumption indicator.

19. A computer device, It is characterized in that include: one or more processors; The processor is used to store one or more programs; When the one or more programs are executed by the one or more processors, the layout planning method for a ship charging station according to any one of claims 1 to 9 is implemented.

20. A computer-readable storage medium, It is characterized in that A computer program is stored thereon, and when the computer program is executed, the layout planning method of the ship charging station as claimed in any one of claims 1 to 9 is implemented.