Method and device for estimating station service power consumption rate of gas generator set, electronic equipment and medium

By determining the target electricity load and calculating the power of each load in combination with the shaft power method and the conversion coefficient method, considering equipment losses, the problem of low accuracy of the electricity rate estimation method in the gas generator set plant is solved, and higher estimation accuracy and Economical.

CN119009951APending Publication Date: 2024-11-22CHINA CITY ENVIRONMENT PROTECTION ENGINEERING LIMITED COMPANY
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411005826.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The existing gas generator plant power consumption rate estimation method has low accuracy, mainly due to the deviation between the auxiliary machine power estimation and actual measured data. The existing method relies on empirical data and is suitable for coal-fired generator sets but not for gas generator sets. .

Method used

By determining the target power load, dividing the first load and the second load, and calculating the power of each load based on the shaft power method and the conversion coefficient method, considering the losses of the substation and distribution equipment, and using improved calculation rules to estimate the total Factory power load and factory power rate.

Benefits of technology

It improves the accuracy of the factory power consumption rate, reduces estimation errors, and is suitable for gas generator sets, avoids the problem of excessive deviation from the actual measured value due to performance guarantee value, and reduces economic losses.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119009951A_ABST
    Figure CN119009951A_ABST
Patent Text Reader

Abstract

The invention relates to a method and device for estimating the station service power consumption rate of a gas generator set, electronic equipment and a medium, and belongs to the technical field of thermal power generation engineering.The method comprises the steps that a first load and a second load are determined based on a target power consumption load corresponding to the gas generator set; the target electrical load is determined based on the technological process of the gas generator set; on the basis of the shaft power of the first load, the calculated load of the second load, the operation loss of the power transformation equipment and the operation loss of the power distribution equipment, determining the main plant power load of the gas generator set; and determining the station power consumption rate based on the total station power consumption load. According to the method for estimating the station service power consumption rate of the gas generator set, different calculation methods are adopted for loads with different powers, the loss of the power transformation equipment and the loss of the power distribution equipment are considered, and therefore the accuracy of total station power consumption load calculation is improved, the station service power consumption rate is determined according to the total station power consumption load, and the accuracy of the station service power consumption rate is improved; and the error is small.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of thermal power generation engineering, and in particular to a method, device, electronic equipment and medium for estimating the power consumption rate of a coal gas generator set. Background Art

[0002] The plant power consumption rate is an important technical and economic indicator for evaluating the design, construction and operation of thermal power generating units. The plant power consumption rate is usually understood as the ratio of the plant power consumption to the power generation of a power plant, and the plant power consumption refers to the electric energy consumed by the thermal power plant itself during the power generation process. The size of the plant power consumption rate is related to factors such as the type of generator set, capacity, degree of automation, type of fuel, combustion method, steam parameters, etc. Generally speaking, with the same parameters, the larger the capacity, the lower the required plant power consumption rate; with the same capacity and different parameters, the higher the parameters, the higher the plant power consumption rate.

[0003] The value of the plant power consumption rate can be obtained by two methods, one is to obtain it through load estimation, and the other is to measure it after the power plant is put into operation. Due to different operating conditions, the corresponding system status and auxiliary power consumption are different. Therefore, both methods need to be estimated or measured based on the agreed assessment conditions. At present, there are still the following problems in the early project estimation and later project measurement statistics of the plant power consumption rate: (1) There is still a certain deviation between the auxiliary power estimation and actual measurement in the early stage of the project. The shaft power of the auxiliary equipment has a certain deviation due to the factors of flow rate, pressure conversion and the efficiency of the equipment itself. Since the calculation condition of the plant power rate is THA condition (the performance assessment condition of the unit), and the pump or fan is selected and calculated based on the parameters of VWO condition (the maximum operating condition of the unit), the actual power estimation not only requires flow rate, pressure, and selection reserve coefficient, but also needs to consider the difference between THA condition and VWO condition. There is a deviation in the parameter selection and conversion process.

[0004] (2) There is a deviation between the operating conditions and the agreed conditions when the project actually measures data. Different operating conditions will result in different operating states of the corresponding systems of the unit, and the corresponding operating powers of the auxiliary machines will also be different, resulting in different plant power consumption rates. During the actual measurement of the plant power consumption rate, a small number of projects strictly operate in accordance with the corresponding operating conditions. The operating modes of the auxiliary machines, the opening and closing of the valves, the control of the medium temperature, pressure, and flow are all in an appropriate state. At this time, the measured plant power consumption rate is relatively accurate. However, there are still many projects that do not consider the influence of the above factors when measuring the plant power consumption rate, which will result in the measured data not being the actual data under the agreed conditions, and a certain deviation will occur in the calculation based on this.

[0005] (3) The estimation method of comprehensive power load in the early stage of the project still needs to be further optimized. When calculating the comprehensive power load, the conversion coefficient method or the shaft power method is usually used. There are also methods that use big data technology, use intelligent algorithms to train and model data, and input equipment data to obtain the designed power rate. In general, the relevant provisions of the "Technical Regulations for Power Design of Thermal Power Plants" (DL / T5153) are used for calculation, but some of the empirical data such as the simultaneous rate, load rate, average power factor, etc. are summarized from coal-fired generators, and there are also certain deviations from gas generators.

[0006] In summary, there is a certain deviation between the estimated value obtained by the existing plant power consumption rate estimation method and the actual value, and the accuracy is low. Summary of the invention

[0007] In view of this, it is necessary to provide a method, device, electronic equipment and medium for estimating the power consumption rate of a gas-fired power generating set, so as to solve the problem of low accuracy of the existing power consumption rate estimation method.

[0008] In order to solve the above problems, the present invention provides a method for estimating the power consumption rate of a gas-fired power generation unit, comprising: Based on the target power load corresponding to the gas generator set, a first load and a second load are determined; the target power load is determined based on the process flow of the gas generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; Determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment, and the operating loss of the power distribution equipment; Based on the total plant power load, a plant power consumption rate is determined.

[0009] In a possible implementation, before determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer equipment, and the operating loss of the distribution equipment, the method further includes: Determine the performance assessment conditions based on the boundary conditions corresponding to the gas generator set; Under the performance assessment condition, the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment and the operating loss of the power distribution equipment are determined.

[0010] In a possible implementation manner, determining the shaft power of the first load includes: Based on a shaft power method, a shaft power of the first load is determined.

[0011] In a possible implementation manner, determining the computational load of the second load includes: Based on the conversion factor method, the calculated load of the second load is determined.

[0012] In a possible implementation, the performance assessment conditions include: Steam turbine parameters, fuel conditions, boiler operating conditions and environmental conditions.

[0013] In a possible implementation, the total plant power load is expressed as follows:

[0014] in, Indicates the total plant power load, represents the load shaft power, represents the efficiency of the motor and transmission, represents the computational load, represents the power factor, Indicates operating loss.

[0015] In a possible implementation, the expression of the plant power consumption rate is as follows:

[0016] in, Indicates the power consumption rate of the plant, Indicates the total plant power load, Indicates the rated power of the turbine.

[0017] The present invention also provides a gas generator set power consumption rate estimation device, comprising: A first determination module is used to determine a first load and a second load based on a target power load corresponding to the gas generator set; the target power load is determined based on the process flow of the gas generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; A second determination module is used to determine the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment and the operating loss of the power distribution equipment; The third determination module is used to determine the plant power consumption rate based on the total plant power load.

[0018] On the other hand, the present invention also provides an electronic device, including a memory and a processor, wherein: The memory is used to store programs; The processor is coupled to the memory and is used to execute the program stored in the memory to implement the method for estimating the power consumption rate of a gas-fired power generation unit described in any of the above implementations.

[0019] On the other hand, the present invention further provides a computer-readable storage medium having a computer program stored thereon, and when the computer program is executed by a processor, the method for estimating the power consumption rate of a gas-fired power generation unit described in any of the above-mentioned implementations is implemented.

[0020] The beneficial effects of the present invention are as follows: the method for estimating the plant power consumption rate of a gas-fired generator set provided by the present invention determines the target power load involved in the calculation of the plant power consumption rate according to the process flow of the gas-fired generator set, thereby determining the first load and the second load according to the target power load, and calculating the shaft power of the first load and the calculated load of the second load, and determining the total plant power load of the gas-fired generator set according to the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer equipment, and the operating loss of the distribution equipment, that is, different calculation methods are used for loads of different powers, and the losses of the transformer equipment and the distribution equipment are taken into consideration, thereby improving the accuracy of the calculation of the total plant power load, and determining the plant power consumption rate according to the total plant power load, thereby improving the accuracy of the plant power consumption rate, and the error is small. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0022] Figure 1 One of the method flow charts of an embodiment of the method for estimating the power consumption rate of a gas-fired power generation unit provided by the present invention; Figure 2 A second method flow chart of an embodiment of a method for estimating power consumption rate of a gas-fired power generation unit provided by the present invention; Figure 3 A schematic diagram of the structure of an embodiment of a device for estimating power consumption rate of a gas-fired power generation unit provided by the present invention; Figure 4 A schematic structural diagram of an embodiment of an electronic device provided by the present invention. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0024] In the description of the embodiments of the present invention, unless otherwise specified, "multiple" means two or more than two. "And / or" describes the association relationship of associated objects, indicating that three relationships may exist. For example, "A and / or B" may mean: A exists alone, A and B exist at the same time, and B exists alone.

[0025] The descriptions of "first", "second", etc. involved in the embodiments of the present invention are only for descriptive purposes and cannot be understood as indicating or implying their relative importance or implicitly indicating the number of the indicated technical features. Therefore, the technical features defined as "first" or "second" may explicitly or implicitly include at least one of the features.

[0026] Figure 1 One of the method flow charts of an embodiment of the method for estimating the power consumption rate of a gas-fired power generation unit provided by the present invention is as follows: Figure 1 As shown in the figure, the method for estimating the power consumption rate of gas-fired power generation units includes: S101. Determine a first load and a second load based on a target power load corresponding to the gas-fired generator set; the target power load is determined based on the process flow of the gas-fired generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; S102, determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment, and the operating loss of the power distribution equipment; S103: Determine the plant power consumption rate based on the total plant power load.

[0027] It should be noted that the target power load is the power load involved in the calculation of the power consumption rate of the thermal power plant, which is calculated based on the statistical rules of the process flow of the gas-fired generator set and the technical regulations for the design of power consumption of the thermal power plant. The load statistics should also include air conditioning and lighting equipment required for auxiliary equipment and production. The preset power can be 200kW. According to the target power load corresponding to the gas-fired generator set, the load with a rated power greater than or equal to 200kW is determined as the first load, and the load with a rated power less than 200kW is determined as the second load.

[0028] Compared with the prior art, the method for estimating the plant power consumption rate of a gas-fired generator set provided in an embodiment of the present invention determines the target power load involved in the calculation of the plant power consumption rate according to the process flow of the gas-fired generator set, thereby determining the first load and the second load according to the target power load, and calculating the shaft power of the first load and the calculated load of the second load, and determining the total plant power load of the gas-fired generator set according to the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer and the operating loss of the distribution equipment, that is, different calculation methods are used for loads of different powers, and the losses of the transformer and the distribution equipment are taken into consideration, thereby improving the accuracy of the calculation of the total plant power load, and determining the plant power consumption rate according to the total plant power load, thereby improving the accuracy of the plant power consumption rate, and the error is small.

[0029] In some embodiments of the present invention, before determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer equipment and the operating loss of the distribution equipment, the method further includes: Determine the performance assessment conditions based on the boundary conditions corresponding to the gas generator set; Under the performance assessment condition, the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment and the operating loss of the power distribution equipment are determined.

[0030] In some embodiments of the present invention, the performance assessment conditions include: Steam turbine parameters, fuel conditions, boiler operating conditions and environmental conditions.

[0031] The unit performance assessment condition (THA) is determined based on the known boundary conditions. The performance assessment condition of the gas generator set is determined based on the known boundary conditions and the THA definition (the turbine is under rated air intake parameters, rated back pressure, normal operation of the heat recovery system, the water makeup rate is 0, and the power can be continuously generated).

[0032] The performance assessment conditions need to clearly define the turbine THA parameters, fuel conditions, boiler agreed conditions and environmental conditions.

[0033] The specific parameters of the steam turbine include: main steam pressure, main steam temperature, turbine back pressure, circulating water inlet temperature, turbine rated power, condenser water replenishment rate. The specific parameters of the boiler include: main steam pressure, main steam temperature, boiler rated evaporation capacity, air leakage coefficient, boiler furnace outlet excess air coefficient, exhaust gas temperature. Fuel operating parameters include: flow rate, calorific value, temperature, calorific value ratio. Environmental parameters include: air temperature, relative humidity.

[0034] Furthermore, the target power load involved in the calculation of the power consumption rate can be determined based on the statistical rules of the process flow of gas generator sets and the technical regulations for power consumption design of thermal power plants. The load statistics should also include air conditioning and lighting equipment required for auxiliary equipment and production.

[0035] Only the auxiliary load of the unit in operation during the performance assessment is counted, and the statistics are based on the rules in Appendix A.0.3 of the Technical Code for Design of Power Consumption of Thermal Power Plants (DL / T 5153-2014). The load characteristics are considered in accordance with Appendix B of the Technical Code for Design of Power Consumption of Thermal Power Plants (DL / T 5153-2014). The participating auxiliary equipment is determined based on the boiler steam-water system diagram, turbine thermal system diagram, and turbine heat balance diagram of each project. The external power load that is not related to the normal operation of the unit is not counted, and the water production load of the chemical water station is not counted.

[0036] The method for estimating the power consumption rate of a gas-fired power generation unit provided in an embodiment of the present invention clarifies the unit operating conditions and analyzes the load working mechanism according to known boundary conditions, and combines the process system flow statistics to calculate the power load of the power consumption rate, so that the load can be calculated by different methods to obtain a more accurate estimation result.

[0037] In some embodiments of the present invention, determining the shaft power of the first load includes: Based on a shaft power method, a shaft power of the first load is determined.

[0038] The shaft power method can be used to calculate the power of motor loads with a rated power ≥ 200kW, that is, the shaft power of the first load P z .

[0039] Among the target power loads involved in the calculation of the plant power consumption rate, the motor power load with a rated power ≥ 200kW shall have its load shaft power calculated based on the THA operating condition parameters.

[0040] The motor loads of gas generator sets include fans and water pumps. The fan shaft power depends on the fan's air volume and pressure head. The fan shaft power is obtained by multiplying the air volume by the pressure head and then considering the fan efficiency and calculation coefficient. The pump shaft power depends on the flow rate and head. The pump shaft power is obtained by multiplying the flow rate by the head and then considering the pump efficiency and calculation coefficient.

[0041] In the process of shaft power calculation, the fan and water pump efficiency is taken in combination with the actual value of the project, and the margin coefficient is not considered. In the process of pressure head and lift calculation, a certain damping loss is considered according to the actual project.

[0042] The shaft power calculation method for fan load is as follows:

[0043] in, are the reserve coefficients of air volume and wind pressure, respectively. are respectively the atmospheric pressure and the muffler resistance at the local altitude (kPa), are the fan efficiency and mechanical transmission efficiency at full pressure head, is the cold air volume at the air preheater inlet under TMCR conditions (Nm 3 / h), is the number of fans, It is the total resistance of air preheater, burner and air duct (Pa).

[0044] The calculation method of shaft power of water pump load is as follows:

[0045] in, is the pump outlet flow rate (m 3 / h), is the pump head (m), is the pump middle tap flow rate (t / h), is the intermediate tap pressure (MPa), is the density of water (kg / m 3 ), =9.8m / s 2 , is the efficiency of the pump.

[0046] In some embodiments of the present invention, determining the computational load of the second load includes: Based on the conversion factor method, the calculated load of the second load is determined.

[0047] The conversion coefficient method can be used to calculate the calculated load of the target power load other than the first load, that is, the calculated load of the second load S j .

[0048] The calculation formula of the conversion coefficient method is in accordance with the calculation formula and conversion coefficients in F.0.1, F.0.4 and F.0.5 in Appendix F of the Technical Code for Power Supply Design of Thermal Power Plants (DL / T 5153-2014).

[0049] The expression for calculating the load is as follows:

[0050] in, is the conversion factor, which is taken from Table F.0.1 of DL / T5153-2014. P is the calculated power of the load (kW).

[0051] Furthermore, the operating losses of substation equipment and distribution equipment can be calculated. P o , calculate the operating losses of power transformers, reactors, and inverters. The high and low power transformer losses are calculated separately for no-load and load losses and summed. The reactor and inverter losses are calculated according to the load rate under THA conditions.

[0052] The method for estimating the power consumption rate of a gas-fired generator set provided in an embodiment of the present invention calculates the load by combining the shaft power method and the conversion coefficient method, and takes into account the losses of the transformer and distribution equipment, so that the error of the calculation result is small.

[0053] In some embodiments of the present invention, the total plant power load is expressed as follows:

[0054] in, Indicates the total plant power load, represents the load shaft power, represents the efficiency of the motor and transmission, represents the computational load, represents the power factor, Indicates operating loss.

[0055] Calculate the total power consumption of the plant according to the improved rules P a For the calculated load of a common public auxiliary system for multiple units, the plant power load of a single unit is calculated and shared according to the demand ratio.

[0056] Total power consumption calculated load P a The calculation formula is as follows:

[0057] in, Indicates the total plant power load, represents the load shaft power, represents the efficiency of the motor and transmission, represents the computational load, It represents the power coefficient, which can be 0.8. Indicates operating loss.

[0058] In some embodiments of the present invention, the expression of the plant power consumption rate is as follows:

[0059] in, Indicates the power consumption rate of the plant, Indicates the total plant power load, Indicates the rated power of the turbine.

[0060] Therefore, the plant power consumption rate can be estimated based on the total plant power load, and the expression is as follows:

[0061] In the formula, P g is the rated power of the steam turbine (kW).

[0062] The method for estimating the power consumption rate of a gas-fired power generating set provided in an embodiment of the present invention clarifies the operating conditions of the set and analyzes the load working mechanism according to boundary conditions, combines the process system flow statistics to calculate the power load of the power consumption rate, calculates the load by combining the shaft power method and the conversion coefficient method, considers the loss of the substation equipment, and adopts an improved calculation rule to obtain the estimation result, and the error of the calculation result is small.

[0063] Figure 2 The second method flow chart of an embodiment of the method for estimating the power consumption rate of a gas-fired power generation unit provided by the present invention is to clarify the unit operating conditions and analyze the load working mechanism according to the known boundary conditions, combine the process system flow statistics to calculate the power consumption load of the power consumption rate, calculate the load by different methods, adopt the improved calculation rules, and calculate to obtain a more accurate estimation result. Figure 2 As shown in the figure, the method for estimating the power consumption rate of gas-fired power generation units includes: S201. Determine the unit performance assessment condition (THA) based on known boundary conditions.

[0064] The performance evaluation conditions of the unit are determined based on the known boundary conditions and THA definition (the power generated by the steam turbine under rated air inlet parameters, rated back pressure, normal operation of the heat recovery system, and a water makeup rate of 0, which can be continuously operated).

[0065] In step S201, it is required to clarify the turbine THA parameters, fuel operating conditions, boiler agreed operating conditions, and environmental conditions. The specific operating condition parameters are shown in Table 1.

[0066] Table 1: Operating parameters

[0067] S202. Count the power load involved in the calculation of the power consumption rate of the plant.

[0068] According to the statistical rules of the process flow of the gas generator set and the technical regulations for the design of power consumption of thermal power plants, the power load involved in the calculation of the power consumption rate is counted. This step clarifies the calculation scope of S203 and S204.

[0069] Step S202 requires providing the boiler steam-water system diagram, turbine thermal system diagram, turbine heat balance diagram and auxiliary machine load list, determining the power load involved in the plant power consumption rate calculation based on the process flow, and clarifying the working mechanism of each power load. The load statistics in step S202 should also include air conditioning equipment to ensure the power consumption of auxiliary machines and production.

[0070] S203. Calculate the load shaft power.

[0071] The shaft power method is used to calculate the power of the motor load with a rated power ≥ 200 kW. This step provides data support for step S205 and step S206.

[0072] According to the loads participating in the calculation of the power consumption rate of the plant calculated in S202, the motor power load with a rated power ≥ 200kW is calculated according to the working condition parameters determined in S201. In the process of calculating the shaft power in step S203, the efficiency of the fan, water pump and motor is combined with the actual value of the project, and the margin coefficient is not considered.

[0073] S204. Calculate the load of the factory's electrical equipment.

[0074] The calculation load of other loads in step S202 except step S203 is calculated using the conversion coefficient method.

[0075] In step S204, the calculated load of the power load other than the motors with power ≥ 200kW counted in step S202 is calculated using the conversion coefficient method. For multiple units with a common public auxiliary system, the calculated load is evenly distributed according to the demand ratio. This step provides data support for steps 205 and 206.

[0076] S205. Calculate the operating loss.

[0077] Calculate the operating losses of the power distribution equipment used in the power plant, such as power transformers, reactors, and frequency converters. This step provides data support for step S206.

[0078] In step S205, the operating loss values ​​of low-voltage public auxiliary transformers such as reactors, high-voltage inverters, high-voltage plant transformers, low-voltage plant transformers, and desulfurization transformers in the plant power system are counted, and the loss values ​​are based on the corresponding operating losses under the working conditions of step S201.

[0079] S206. Calculate the load power of the factory power system.

[0080] The total plant power consumption load is calculated according to the improved calculation rule. This step provides data support for step S207.

[0081] The calculated load of a common auxiliary system of multiple units described in step S205 and step S206 is evenly distributed according to the demand ratio.

[0082] In step S206, the total calculated load in step S204 is multiplied by the average power factor, and then the total calculated load is summed with the motor shaft power in step S204 and the inverter and plant power system transformer losses in step S206 to obtain the plant power system load.

[0083] S207. Design estimate of plant power consumption rate.

[0084] The estimated plant power consumption rate is calculated according to the improved calculation rule, and the plant power system load power in step S206 is divided by the rated power of the steam turbine to obtain the unit design estimated plant power consumption rate.

[0085] The method for estimating the designed power consumption rate of a gas-fired generator set of the present invention is suitable for relatively accurate estimation of the designed power consumption rate of a gas-fired generator set in the early stage, and is also suitable for technical indicator comparison of the operating power consumption rate of the operating plant after commissioning and guidance of auxiliary machine operating conditions.

[0086] Gas-fired generator sets are different from conventional coal-fired generator sets, and their calculation methods should be different from those of conventional coal-fired generator sets. The method described in the present invention has been practiced in multiple gas-fired power generation projects of our company. Compared with the existing calculation methods, it has higher accuracy. When the power consumption performance of the gas-fired generator set is guaranteed, the calculation method of the present invention can be used to avoid large deviations in the assessment stage, which leads to economic losses; at the same time, it can also be used as a measurement indicator of economic operation.

[0087] Compared with the prior art, the present invention has the following beneficial effects: 1. The method for estimating the power consumption rate of a gas-fired power generating set provided by the present invention adopts shaft power and conversion coefficient for direct calculation, does not rely on historical data, and avoids a large amount of data iterative calculation, and has the characteristic of simple calculation process.

[0088] 2. The method for estimating the power consumption rate of a gas-fired power generating unit provided by the present invention clarifies the operating conditions of the unit and analyzes the load working mechanism according to boundary conditions, combines the process system flow statistics to calculate the power load of the power consumption rate, calculates the load by combining the shaft power method and the conversion coefficient method, considers the loss of the substation equipment, and adopts an improved calculation rule to obtain the estimation result, which has the characteristic of small calculation result error.

[0089] The above is the implementation process of the gas generator set power consumption rate estimation method provided by the present invention. It can be seen from the implementation process that the present invention classifies and calculates the calculated load of the auxiliary equipment of the power system of the power plant according to the boundary conditions and the agreed THA working conditions, combined with the statistical rules of the power plant load, using the shaft power method and the conversion coefficient method, and then obtains the estimated value of the designed power consumption rate of the power plant through the improved estimation formula. Due to the simplicity of the calculation process and high calculation efficiency, compared with the conventional calculation method, the calculation process is more sophisticated, the factors involved are more comprehensive, and the calculation result error is small. The calculation method of the present invention has the characteristics of high work efficiency and good work quality.

[0090] For a power generation project of our company, its scale is: 1×265t / h high-temperature and ultra-high-pressure boiler + 1×80MW intermediate primary reheat condensing steam turbine + 1×85MW generator set, with a circulating water pump room and a desalted water station. The plant power system voltage is 10kV and 0.4kV. The 10kV high-voltage load mainly includes blowers, induced draft fans, circulating water pumps, feed water pumps and 10kV power transformers.

[0091] When the calculation method specified in the regulations and design manual is used to calculate the estimated value of the design plant power consumption, the result is 5.91%, the actual plant power consumption rate measured in the field performance test is 6.16%, and the value calculated by the method provided by the present invention is 6.14%. From the comparison results, it can be seen that the deviation between the estimated value of the design plant power consumption rate obtained by the method provided by the present invention and the actual value is 0.32%, and the deviation of the calculation method specified in the regulations and design manual is 4.06%.

[0092] It can be seen from the above data that the method provided by the present invention has improved calculation accuracy compared with the traditional method and is closer to the actual measured value, which can effectively avoid the problem of the performance guarantee value deviating too much from the actual measured value, thereby reducing unnecessary economic losses.

[0093] In order to better implement the method for estimating the power consumption rate of a gas-fired generator set in the embodiment of the present invention, based on the method for estimating the power consumption rate of a gas-fired generator set, the embodiment of the present invention further provides a device for estimating the power consumption rate of a gas-fired generator set. Figure 3 The schematic diagram of the structure of an embodiment of the device for estimating the power consumption rate of a gas-fired power generation unit provided by the present invention is as follows: Figure 3 As shown, the gas power generation unit power consumption rate estimation device 300 includes: The first determination module 310 is used to determine the first load and the second load based on the target power load corresponding to the gas generator set; the target power load is determined based on the process flow of the gas generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; A second determination module 320, configured to determine a total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer equipment, and the operating loss of the distribution equipment; The third determination module 330 is configured to determine a plant power consumption rate based on the total plant power load.

[0094] The gas generator set power consumption rate estimation device 300 provided in the above embodiment can implement the technical solution described in the above embodiment of the gas generator set power consumption rate estimation method. The specific implementation principles of the above modules or units can refer to the corresponding contents in the embodiment of the gas generator set power consumption rate estimation method, which will not be repeated here.

[0095] like Figure 4 As shown, the present invention also provides an electronic device 400. The electronic device 400 includes a processor 401, a memory 402 and a display 403. Figure 4 Only some components of the electronic device 400 are shown, but it should be understood that it is not required to implement all of the components shown, and more or fewer components may be implemented instead.

[0096] In some embodiments, the processor 401 may be a central processing unit (CPU), a microprocessor or other data processing chip, which is used to run the program code or process data stored in the memory 402, such as the method for estimating the power consumption rate of a gas-fired generator set in the present invention.

[0097] In some embodiments, processor 401 may be a single server or a server group. The server group may be centralized or distributed. In some embodiments, processor 401 may be local or remote. In some embodiments, processor 401 may be implemented in a cloud platform. In some embodiments, the cloud platform may include a private cloud, a public cloud, a hybrid cloud, a community cloud, a distributed cloud, an internal cloud, a multi-cloud, etc., or any combination thereof.

[0098] In some embodiments, the memory 402 may be an internal storage unit of the electronic device 400, such as a hard disk or memory of the electronic device 400. In other embodiments, the memory 402 may also be an external storage device of the electronic device 400, such as a plug-in hard disk, a smart media card (SMC), a secure digital (SD) card, a flash card, etc., equipped on the electronic device 400.

[0099] Furthermore, the memory 402 may include both an internal storage unit of the electronic device 400 and an external storage device. The memory 402 is used to store application software installed in the electronic device 400 and various data.

[0100] In some embodiments, the display 403 may be an LED display, a liquid crystal display, a touch-sensitive liquid crystal display, an organic light-emitting diode (OLED) touch device, etc. The display 403 is used to display information on the electronic device 400 and to display a visual user interface. The components 401-403 of the electronic device 400 communicate with each other via a system bus.

[0101] In one embodiment, when the processor 401 executes the power consumption rate estimation program of the gas power generation unit in the memory 402, the following steps may be implemented: Based on the target power load corresponding to the gas generator set, a first load and a second load are determined; the target power load is determined based on the process flow of the gas generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; Determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment, and the operating loss of the power distribution equipment; Based on the total plant power load, a plant power consumption rate is determined.

[0102] It should be understood that: when the processor 401 executes the gas generator power consumption rate estimation program in the memory 402, in addition to the above functions, other functions can also be implemented. For details, please refer to the description of the corresponding method embodiment above.

[0103] Furthermore, the embodiment of the present invention does not specifically limit the type of the electronic device 400 mentioned, and the electronic device 400 may be a portable electronic device such as a mobile phone, a tablet computer, a personal digital assistant (PDA), a wearable device, a laptop computer, etc. Exemplary embodiments of portable electronic devices include but are not limited to portable electronic devices equipped with IOS, Android, Microsoft or other operating systems. The above-mentioned portable electronic device may also be other portable electronic devices, such as a laptop computer with a touch-sensitive surface (e.g., a touch panel). It should also be understood that in some other embodiments of the present invention, the electronic device 400 may not be a portable electronic device, but a desktop computer with a touch-sensitive surface (e.g., a touch panel).

[0104] Correspondingly, an embodiment of the present invention also provides a computer-readable storage medium, which is used to store computer-readable programs or instructions. When the program or instructions are executed by a processor, it can implement the steps or functions of the gas generator set plant power consumption rate estimation method provided in the above-mentioned method embodiments.

[0105] Those skilled in the art will appreciate that all or part of the processes of the above-mentioned embodiments can be implemented by instructing related hardware (such as a processor, a controller, etc.) through a computer program, and the computer program can be stored in a computer-readable storage medium, wherein the computer-readable storage medium is a disk, an optical disk, a read-only storage memory, or a random access memory, etc.

[0106] The above is a detailed introduction to the gas generator set plant power consumption rate estimation method, device, electronic equipment and medium provided by the present invention. Specific examples are used in this article to illustrate the principles and implementation methods of the present invention. The description of the above embodiments is only used to help understand the method of the present invention and its core idea; at the same time, for technical personnel in this field, according to the idea of ​​the present invention, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present invention.

Claims

1. A method for estimating the power consumption rate of gas-fired power generation units. It is characterized in that include: Determining a first load and a second load based on a target power load corresponding to the gas generator set; The target power load is determined based on the process flow of the gas-fired generator set; The first load is a load whose rated power is greater than or equal to the preset power; the second load is a load whose rated power is less than the preset power; Determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment, and the operating loss of the power distribution equipment; Based on the total plant power load, a plant power consumption rate is determined.

2. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 1, It is characterized in that Before determining the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the transformer equipment and the operating loss of the distribution equipment, the method further includes: Determine the performance assessment conditions based on the boundary conditions corresponding to the gas generator set; Under the performance assessment condition, the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment and the operating loss of the power distribution equipment are determined.

3. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 2, It is characterized in that The determining the shaft power of the first load comprises: Based on a shaft power method, a shaft power of the first load is determined.

4. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 2, It is characterized in that The determining of the computational load of the second load comprises: Based on the conversion factor method, the calculated load of the second load is determined.

5. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 2, It is characterized in that The performance assessment conditions include: Steam turbine parameters, fuel conditions, boiler operating conditions and environmental conditions.

6. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 1, It is characterized in that The expression of the total plant power load is as follows: in, Indicates the total plant power load, represents the load shaft power, represents the efficiency of the motor and transmission, represents the computational load, represents the power factor, Indicates operating loss.

7. The method for estimating power consumption rate of a gas-fired power generation unit according to claim 1, It is characterized in that The expression of the plant power consumption rate is as follows: in, Indicates the power consumption rate of the plant, Indicates the total plant power load, Indicates the rated power of the turbine.

8. A device for estimating power consumption rate of gas-fired generator sets. It is characterized in that include: A first determination module, configured to determine a first load and a second load based on a target power load corresponding to the gas generator set; The target power load is determined based on the process flow of the gas generator set; the first load is a load with a rated power greater than or equal to a preset power; the second load is a load with a rated power less than the preset power; A second determination module is used to determine the total plant power load of the gas generator set based on the shaft power of the first load, the calculated load of the second load, the operating loss of the power transformation equipment and the operating loss of the power distribution equipment; The third determination module is used to determine the plant power consumption rate based on the total plant power load.

9. An electronic device, It is characterized in that comprising a memory and a processor, wherein: The memory is used to store programs; The processor is coupled to the memory and is used to execute the program stored in the memory to implement the method for estimating the power consumption rate of a gas-fired power generation unit as described in any one of claims 1 to 7.

10. A computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method for estimating the power consumption rate of a gas-fired power generation unit as claimed in any one of claims 1 to 7 is implemented.