Power grid monitoring system based on Internet of Things
By using an IoT-based power grid monitoring system, the data and load of the power system can be analyzed and managed in real time, solving the problems of data transmission delay and power imbalance when service nodes fail, and achieving efficient and secure data transmission and power regulation.
Patent Information
- Application Number
- CN202410819374.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-24
- Publication Date
- 2024-11-22
- Estimated Expiration
- 2044-06-24
AI Technical Summary
Existing technologies cannot efficiently process data during sudden failures of service nodes in power systems, resulting in data transmission delays and losses, and an inability to accurately allocate power loads, leading to power supply imbalances.
An IoT-based power grid monitoring system is adopted, including data acquisition, monitoring management, and data storage modules. It analyzes the load and electricity consumption habits of distribution lines in real time, assesses the importance and priority of data, caches data and encrypts its transmission when service nodes fail, switches service nodes using the node management module, adjusts the parameters of power distribution equipment through the power supply management module, and allocates different network layers for data transmission.
It improves data transmission efficiency and accuracy, avoids data loss and power imbalance, and ensures data security and efficient system operation.
Smart Images

Figure CN119010323A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power grid monitoring, and in particular to a power grid monitoring system based on the Internet of Things. Background Art
[0002] With the rapid development of Internet technology, the monitoring method of power systems is no longer centralized monitoring. Distributed edge service node clusters are gradually adopted for deployment and detection to realize intelligent monitoring of power systems.
[0003] At present, most power companies still deploy host computers on service node clusters to process data. However, when a service node suddenly fails, it cannot process the instructions of the host computer. The existing technology generally packages the data of the service node and transmits it to the new service node for processing, resulting in the service node being unable to receive and process data during the data transfer process, waiting for a long time, resulting in low processing efficiency and data loss. Moreover, in the power distribution process, due to the large number of factors affecting the load of the transmission line, the existing technology cannot accurately distribute the load to the transmission line, resulting in power supply imbalance and power system failure. Therefore, it is necessary to design an IoT-based power grid monitoring system to improve efficiency and accuracy. Summary of the invention
[0004] The purpose of the present invention is to provide a power grid monitoring system based on the Internet of Things to solve the problems raised in the above background technology.
[0005] In order to solve the above technical problems, the present invention provides the following technical solutions: a power grid monitoring system based on the Internet of Things, including a data acquisition module, a monitoring management module and a data storage module, characterized in that: the data acquisition module is used to collect the historical power consumption data of the power plant and the comprehensive production data of the plant in real time, and enter the comprehensive data of the historical processing record into the system; the monitoring management module is used to analyze the load of the distribution line, analyze the impact of the power consumption habits and production plans of the plant on the load of the distribution line, adjust the power supply parameters of the distribution line according to the analysis results, and evaluate the importance and priority of the data when switching the service node; the data storage module is used to cache the process in the failed service node when the server node fails, and encrypt and transmit the data to the new service node; the data acquisition module, the monitoring management module and the data storage module are connected to each other for communication;
[0006] The node management module includes a node adjustment submodule and a data evaluation submodule. The node adjustment submodule is used to switch the service node of the control device for the host computer when a service node fails. The data evaluation submodule is used to analyze data and evaluate the importance and priority of the data.
[0007] The power supply management module includes a load detection submodule, a power consumption analysis submodule and a power supply regulation submodule. The load detection submodule is used to analyze the power load on each distribution line in real time. The power consumption analysis submodule is used to analyze the impact of the factory's power consumption habits and production plans on the power load on the distribution line. The power supply regulation submodule is used to adjust the parameters of the distribution transformer.
[0008] According to the above technical solution, the data acquisition module includes a data collection module, a sensor module and a historical comprehensive data entry module. The data collection module is used for the real-time historical power consumption data of the factory and the comprehensive production data of the factory. The sensor module is used to collect the power parameters in the distribution line in real time. The historical comprehensive data entry module is used to enter the comprehensive data of historical processing records into the system.
[0009] According to the above technical solution, the monitoring management module includes a node management module, which is used to detect the operating status of the service node, adjust the service node between the host computer and the power distribution equipment according to the analysis results, analyze data characteristics, and evaluate the importance and priority of the data.
[0010] According to the above technical solution, the monitoring and management module also includes a power supply management module, which is used to detect the power load of each distribution line in real time, analyze the impact of the factory's production habits and production plans on the power load of the distribution lines, match a better distribution plan for the factory based on the analysis results, and adjust the parameters of the power supply equipment.
[0011] According to the above technical solution, the data storage module includes a process cache module and a data protection module. The process cache module is used to cache the data being processed when an abnormality occurs in the service node, and the data protection module is used to assign different network layers to the data for encrypted transmission according to the importance and priority of the data.
[0012] According to the above technical solution, the operation method of the power grid monitoring system mainly includes the following steps:
[0013] Step S1: Through the data collection module, the historical power consumption data and the comprehensive production data of the factory are collected in real time, through the sensor module, the power parameters in the distribution line are collected in real time, and through the historical comprehensive data entry module, the comprehensive data of the historical processing records are entered into the system;
[0014] Step S2: After data collection is completed, the system starts the power supply management module, tests and analyzes the load of each distribution line, analyzes the impact of the factory's production habits and production plans on the load of each distribution line, matches the factory with a better distribution plan based on the analysis results, and adjusts the distribution equipment parameters;
[0015] Step S3: During the process of the upper computer controlling the power distribution equipment, the node management module starts to detect the operating status of the service node, switches the service node according to the analysis results, analyzes the data characteristics, and evaluates the importance and priority of the data according to the analysis results;
[0016] Step S4: When an abnormality occurs in a service node, the system locks the process running in the service node and caches it, and allocates a network layer for data transmission based on the analysis results of the data characteristics.
[0017] According to the above technical solution, step S2 further includes the following steps:
[0018] Step S21: Obtain distribution line detection data, identify the current and voltage in the distribution line, and calculate the three-phase imbalance of the three-phase low-voltage distribution through the formula In the formula, P represents the three-phase unbalance of three-phase low-voltage power distribution, U1 represents the maximum phase voltage of three-phase power, Indicates the average phase voltage of the three-phase electricity. Compare with the database. If the three-phase imbalance is greater than the maximum threshold set by the system, the three-phase low-voltage distribution line is marked as three-phase unbalanced. Otherwise, the system continues to detect;
[0019] Step S22: Identify the mark in the line, obtain the load of each phase in the line with the three-phase unbalance mark, identify the total load of each phase corresponding to the three-phase transmission line, calculate the difference between the total load of each phase and the average load, and when the difference is greater than the system set threshold, identify the load of each device on the phase, select the device closest to the difference, identify the device code, retrieve the code of the phase connected at this time in the database according to the device code, disconnect the relay corresponding to the code of the phase, and connect the phase with the smallest total load at this time;
[0020] Step S23: When the difference is less than the threshold, the voltage amplitude and the corresponding electrical phase angle in the three-phase low-voltage distribution line are identified, and a circular vector coordinate system is constructed. According to the identified voltage amplitude and the corresponding electrical phase angle of each phase of the three-phase electricity, they are marked in the circular vector coordinate system, and the marked points are connected with the center of the circle in sequence to construct a three-phase electrical vector diagram, which is overlapped and compared with the three-phase electrical standard vector diagram in the database. When the vectors of the corresponding phases completely overlap, the system continues to detect. When the vectors of the corresponding phases cannot completely overlap, the corresponding phase vector phase angle difference is calculated, and the amplitude difference between the corresponding phases is calculated. If the corresponding phase vector phase angle difference is greater than the maximum threshold, the voltage output frequency of the phase is reduced. If the corresponding phase vector phase angle difference is less than the minimum threshold, the voltage output frequency of the phase is increased. Otherwise, the system continues to detect. If the amplitude difference between the corresponding phases is greater than the maximum threshold, the output amplitude of the voltage of the phase is reduced. If the amplitude difference between the corresponding phases is less than the minimum threshold, the voltage output amplitude of the phase is increased.
[0021] According to the above technical solution, step S23 further includes the following steps:
[0022] Step S231: Obtain the historical power consumption data of the factory, identify the power consumption of the factory and the corresponding timestamp, establish a coordinate system, mark the power consumption and the corresponding timestamp in the coordinate system, connect the marked points in the coordinate system in sequence, construct the power consumption change curve of the factory, identify the power consumption change characteristics of the factory, and retrieve the corresponding power supply mode in the database according to the power consumption change characteristics;
[0023] Step S232: Obtain the factory's production plan, retrieve the corresponding electrical equipment according to the factory's production plan, identify the code of each electrical equipment, retrieve the corresponding power load and the corresponding connection phase in the data according to the code of the electrical equipment, and adjust the load balance on each phase.
[0024] According to the above technical solution, step S3 further includes the following steps:
[0025] Step S31: obtaining a first control instruction of the host computer received by the first service node, calling the corresponding power distribution equipment control parameter in the database according to the first control instruction, generating a feedback identifier and transmitting it to the host computer, identifying the time interval between the first control instruction and the feedback identifier, and if the time interval is greater than a system-set threshold, marking the first service node as faulty, otherwise the system continues to detect;
[0026] Step S32: when the first service node fails, the process cache in the first service node is read, and if there is an unfinished process in the first service node, it is marked as first priority data, otherwise the system continues to detect;
[0027] Step S33: Read the cached data in the first service node, identify the data features in the first service node, compare with the database, retrieve the data feature level with a similarity greater than a threshold to mark the data in the first service node, sort the data in the first service node in ascending order according to the data feature level, mark the priority of the first service node data according to the arrangement order, obtain the data features of the first service node, compare with the database, and retrieve the data level corresponding to the data features in the database.
[0028] According to the above technical solution, step S4 further includes the following steps:
[0029] Step S41: Obtain the control instruction in the service node, compare the control instruction with the database, retrieve the number of processing steps of the control instruction in the database, and if the number of processing steps of the control instruction is greater than a threshold, obtain the control instruction processing process in real time and cache the process in real time;
[0030] Step S42: Obtain cached data in the first service node, identify the priority of the cached data, transmit the data according to the priority of the cached data, identify the data level of the cached data, if the data level is greater than the maximum threshold, call the first slice network, build a virtual transmission link, encapsulate the virtual transmission link, and perform encrypted transmission; if the data level is less than the maximum threshold and greater than the minimum threshold, call the second slice network, build a virtual transmission link for encrypted transmission, otherwise call the third slice network for encrypted transmission.
[0031] Compared with the prior art, the beneficial effects achieved by the present invention are as follows: the present invention, by calculating the three-phase imbalance, further analyzes the cause of the three-phase imbalance of the three-phase low-voltage distribution line, and regulates through relays, can accurately control the load on each phase, thereby avoiding three-phase imbalance, greatly improving the accuracy of the system, by analyzing the difference between the three-phase electric vector diagram and the marked vector diagram, can accurately obtain the compensation parameters required for each phase of the three-phase electricity, and then accurately adjust the three-phase imbalance, further improving the accuracy of the system, by analyzing the power consumption characteristics and production plans of the factory, further adjusting the power supply mode of the distribution equipment and the connection phase of the power equipment, can accurately adjust the load of each phase in the distribution line, avoid the occurrence of unbalanced loads of each phase in the line, resulting in three-phase imbalance, greatly improving The accuracy of the system is improved. By analyzing the priority and level of the data and allocating sufficient transmission resources to it, the data can be accurately and quickly transmitted from the first service node to the second service node, avoiding data congestion and the risk of data loss in the overall transmission, and further improving the data transmission efficiency. By analyzing the priority and level of the data and allocating sufficient transmission resources to it, the data can be accurately and quickly transmitted from the first service node to the second service node, avoiding data congestion and the risk of data loss in the overall transmission, and further improving the data transmission efficiency. By analyzing the data level and priority of the data, different slice networks are allocated for isolation, and different encryption methods are used to encrypt the data, which can avoid data leakage and greatly improve the security of the data. BRIEF DESCRIPTION OF THE DRAWINGS
[0032] The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
[0033] Figure 1 It is a schematic diagram of the system module composition of the present invention. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0035] See also Figure 1 , the present invention provides a technical solution: a power grid monitoring system based on the Internet of Things, including a data acquisition module, a monitoring management module and a data storage module, characterized in that: the data acquisition module is used to collect the historical power consumption data of the power plant and the comprehensive production data of the plant in real time, and enter the comprehensive data of the historical processing record into the system, the monitoring management module is used to analyze the load of the distribution line, analyze the impact of the power consumption habits and production plans of the plant on the load of the distribution line, adjust the power supply parameters of the distribution line according to the analysis results, and evaluate the importance and priority of the data when switching the service node. The data storage module is used to cache the process in the failed service node when the server node fails, and encrypt and transmit the data to the new service node. The data acquisition module, the monitoring management module and the data storage module are connected to each other for communication;
[0036] The node management module includes a node adjustment submodule and a data evaluation submodule. The node adjustment submodule is used to switch the service node of the control device for the host computer when a service node fails. The data evaluation submodule is used to analyze the data and evaluate the importance and priority of the data.
[0037] The power supply management module includes a load detection submodule, a power consumption analysis submodule and a power supply regulation submodule. The load detection submodule is used to analyze the power load on each distribution line in real time. The power consumption analysis submodule is used to analyze the impact of the factory's power consumption habits and production plans on the power load on the distribution line. The power supply regulation submodule is used to adjust the parameters of the distribution transformer.
[0038] The data acquisition module includes a data collection module, a sensor module and a historical comprehensive data entry module. The data collection module is used for the real-time historical power consumption data of the factory and the comprehensive production data of the factory. The sensor module is used to collect the power parameters in the distribution line in real time. The historical comprehensive data entry module is used to enter the comprehensive data of historical processing records into the system.
[0039] The monitoring management module includes a node management module, which is used to detect the operating status of the service node, adjust the service node between the host computer and the power distribution equipment according to the analysis results, analyze the data characteristics, and evaluate the importance and priority of the data.
[0040] The monitoring and management module also includes a power supply management module, which is used to detect the power load of each distribution line in real time, analyze the impact of the factory's production habits and production plans on the power load of the distribution lines, match the factory with a better distribution plan based on the analysis results, and adjust the parameters of the power supply equipment.
[0041] The data storage module includes a process cache module and a data protection module. The process cache module is used to cache the data being processed when an abnormality occurs in the service node. The data protection module is used to assign different network layers to the data for encrypted transmission according to the importance and priority of the data.
[0042] The operation method of the power grid monitoring system mainly includes the following steps:
[0043] Step S1: Through the data collection module, the historical power consumption data and the comprehensive production data of the factory are collected in real time, through the sensor module, the power parameters in the distribution line are collected in real time, and through the historical comprehensive data entry module, the comprehensive data of the historical processing records are entered into the system;
[0044] Step S2: After data collection is completed, the system starts the power supply management module, tests and analyzes the load of each distribution line, analyzes the impact of the factory's production habits and production plans on the load of each distribution line, matches the factory with a better distribution plan based on the analysis results, and adjusts the distribution equipment parameters;
[0045] Step S3: During the process of the upper computer controlling the power distribution equipment, the node management module starts to detect the operating status of the service node, switches the service node according to the analysis results, analyzes the data characteristics, and evaluates the importance and priority of the data according to the analysis results;
[0046] Step S4: When an abnormality occurs in a service node, the system locks the process running in the service node and caches it, and allocates a network layer for data transmission based on the analysis results of the data characteristics.
[0047] Step S2 further comprises the following steps:
[0048] Step S21: Obtain distribution line detection data, identify the current and voltage in the distribution line, and
[0049] P= U1 ×100%
[0050] The three-phase imbalance degree U of three-phase low-voltage power distribution is calculated by the formula, where P represents the three-phase imbalance degree of three-phase low-voltage power distribution, U1 represents the maximum phase voltage of three-phase power, and U represents the average phase voltage of three-phase power. By comparing with the database, if the three-phase imbalance degree is greater than the maximum threshold set by the system, the three-phase low-voltage power distribution line is marked as three-phase imbalance, otherwise the system continues to detect;
[0051] Step S22: Identify the mark in the line, obtain the load of each phase in the line with the three-phase unbalance mark, identify the total load of each phase corresponding to the three-phase transmission line, calculate the difference between the total load of each phase and the average, and when the difference is greater than the system set threshold, identify the load of each device on the phase, select the device closest to the difference, identify the device code, retrieve the code of the phase connected at this time in the database according to the device code, disconnect the relay corresponding to the code of the phase, and connect the phase with the smallest total load at this time. By calculating the three-phase imbalance, further analyze the cause of the three-phase imbalance of the three-phase low-voltage distribution line, and adjust it through the relay, it can accurately control the load on each phase, thereby avoiding three-phase imbalance and greatly improving the accuracy of the system;
[0052] Step S23: When the difference is less than the threshold, the voltage amplitude and the corresponding electrical phase angle in the three-phase low-voltage distribution line are identified, and a circular vector coordinate system is constructed. According to the voltage amplitude and the corresponding electrical phase angle of each phase of the three-phase electricity identified, the circular vector coordinate system is marked, and the marked points are connected with the center of the circle in sequence to construct a three-phase electrical vector diagram, which is overlapped and compared with the three-phase electrical standard vector diagram in the database. When the vectors of the corresponding phases completely overlap, the system continues to detect. When the vectors of the corresponding phases cannot completely overlap, the phase angle difference of the corresponding phase vector is calculated, and the amplitude difference between the corresponding phases is calculated. If the corresponding If the phase angle difference of the phase vector is greater than the maximum threshold, the voltage output frequency of the phase is reduced; if the corresponding phase vector phase angle difference is less than the minimum threshold, the voltage output frequency of the phase is increased; otherwise, the system continues to detect; if the amplitude difference between the corresponding phases is greater than the maximum threshold, the output amplitude of the voltage of the phase is reduced; if the amplitude difference between the corresponding phases is less than the minimum threshold, the voltage output amplitude of the phase is increased. By analyzing the difference between the three-phase electric vector diagram and the marked vector diagram, the compensation parameters required for each phase of the three-phase electricity can be accurately obtained, and then the three-phase imbalance can be accurately adjusted, further improving the accuracy of the system.
[0053] Step S23 further includes the following steps:
[0054] Step S231: Obtain the historical power consumption data of the factory, identify the power consumption of the factory and the corresponding timestamp, establish a coordinate system, mark the power consumption and the corresponding timestamp in the coordinate system, connect the marked points in the coordinate system in sequence, construct the power consumption change curve of the factory, identify the power consumption change characteristics of the factory, and retrieve the corresponding power supply mode in the database according to the power consumption change characteristics;
[0055] Step S232: Obtain the factory's production plan, retrieve the corresponding electrical equipment according to the factory's production plan, identify the code of each electrical equipment, retrieve the corresponding power load and the corresponding connection phase in the data according to the code of the electrical equipment, and adjust the load balance on each phase. By analyzing the factory's power consumption characteristics and the factory's production plan, further adjust the power supply mode of the distribution equipment and the connection phase of the electrical equipment, and accurately adjust the load of each phase in the distribution line to avoid unbalanced loads on each phase in the line, resulting in three-phase imbalance, thereby greatly improving the accuracy of the system.
[0056] Step S3 further comprises the following steps:
[0057] Step S31: obtaining a first control instruction of the host computer received by the first service node, calling the corresponding power distribution equipment control parameter in the database according to the first control instruction, generating a feedback identifier and transmitting it to the host computer, identifying the time interval between the first control instruction and the feedback identifier, and if the time interval is greater than a system-set threshold, marking the first service node as faulty, otherwise the system continues to detect;
[0058] Step S32: when the first service node fails, the process cache in the first service node is read, and if there is an unfinished process in the first service node, it is marked as first priority data, otherwise the system continues to detect;
[0059] Step S33: read the cached data in the first service node, identify the data features in the first service node, compare with the database, retrieve the data feature levels with a similarity greater than a threshold to mark the data in the first service node, sort the data in the first service node in ascending order according to the data feature levels, mark the priority of the first service node data according to the arrangement order, obtain the data features of the first service node, compare with the database, retrieve the data level corresponding to the data features in the database, and by analyzing the priority and data level of the data and allocating sufficient transmission resources to it, the data can be accurately and quickly transmitted from the first service node to the second service node, avoiding the risk of data congestion and data loss in the overall transmission, and further improving the data transmission efficiency.
[0060] Step S4 further comprises the following steps:
[0061] Step S41: Obtain the control instruction in the service node, compare the control instruction with the database, and retrieve the number of processing steps of the control instruction in the database. If the number of processing steps of the control instruction is greater than the threshold, obtain the control instruction processing process in real time, and cache the process in real time. By caching the control instruction processing process in real time, it is possible to avoid the need to reprocess the control instruction when replacing a new service node after the service node fails, thereby greatly improving the control efficiency.
[0062] Step S42: Obtain cached data in the first service node, identify the priority of the cached data, transmit the data according to the priority of the cached data, identify the data level of the cached data, if the data level is greater than the maximum threshold, call the first slice network, build a virtual transmission link, encapsulate the virtual transmission link, and encrypt the transmission; if the data level is less than the maximum threshold and greater than the minimum threshold, call the second slice network, build a virtual transmission link for encrypted transmission, otherwise call the third slice network for encrypted transmission. By analyzing the data level and data priority of the data, allocating different slice networks for isolation, and encrypting the data using different encryption methods, data leakage can be avoided, thereby greatly improving data security.
[0063] It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0064] Finally, it should be noted that the above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art can still modify the technical solutions described in the aforementioned embodiments or replace some of the technical features therein by equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. The power grid monitoring system based on the Internet of Things includes a data acquisition module, a monitoring management module and a data storage module, and is characterized by: The data acquisition module is used to collect the historical power consumption data of the power plant and the comprehensive production data of the plant in real time, and enter the comprehensive data of the historical processing records into the system. The monitoring and management module is used to analyze the load of the distribution line, analyze the impact of the power consumption habits and production plans of the plant on the load of the distribution line, adjust the power supply parameters of the distribution line according to the analysis results, and evaluate the importance and priority of the data when switching service nodes. The data storage module is used to cache the process in the failed service node when a server node fails, and encrypt and transmit the data to the new service node. The data acquisition module, the monitoring and management module and the data storage module are connected to each other in communication; The node management module includes a node adjustment submodule and a data evaluation submodule. The node adjustment submodule is used to switch the service node of the control device for the host computer when a service node fails. The data evaluation submodule is used to analyze data and evaluate the importance and priority of the data. The power supply management module includes a load detection submodule, a power consumption analysis submodule and a power supply regulation submodule. The load detection submodule is used to analyze the power load on each distribution line in real time. The power consumption analysis submodule is used to analyze the impact of the factory's power consumption habits and production plans on the power load on the distribution line. The power supply regulation submodule is used to adjust the parameters of the distribution transformer.
2. The power grid monitoring system based on the Internet of Things according to claim 1 is characterized in that: The data acquisition module includes a data collection module, a sensor module and a historical comprehensive data entry module. The data collection module is used for real-time historical power consumption data of the factory and comprehensive production data of the factory. The sensor module is used for real-time collection of power parameters in the distribution line. The historical comprehensive data entry module is used to enter the comprehensive data of historical processing records into the system.
3. The power grid monitoring system based on the Internet of Things according to claim 2 is characterized in that: The monitoring management module includes a node management module, which is used to detect the operating status of the service node, adjust the service node between the host computer and the power distribution equipment according to the analysis results, analyze data characteristics, and evaluate the importance and priority of the data.
4. The power grid monitoring system based on the Internet of Things according to claim 3 is characterized in that: The monitoring management module also includes a power supply management module, which is used to detect the power load of each distribution line in real time, analyze the impact of the factory's production habits and production plans on the power load of the distribution lines, match a better distribution plan for the factory based on the analysis results, and adjust the parameters of the power supply equipment.
5. The power grid monitoring system based on the Internet of Things according to claim 4 is characterized in that: The data storage module includes a process cache module and a data protection module. The process cache module is used to cache the data being processed when an abnormality occurs in the service node. The data protection module is used to allocate different network layers to the data for encrypted transmission according to the importance and priority of the data.
6. The power grid monitoring system based on the Internet of Things according to claim 5 is characterized in that: The operation method of the power grid monitoring system mainly includes the following steps: Step S1: Through the data collection module, the historical power consumption data and the comprehensive production data of the factory are collected in real time, through the sensor module, the power parameters in the distribution line are collected in real time, and through the historical comprehensive data entry module, the comprehensive data of the historical processing records are entered into the system; Step S2: After data collection is completed, the system starts the power supply management module, tests and analyzes the load of each distribution line, analyzes the impact of the factory's production habits and production plans on the load of each distribution line, matches the factory with a better distribution plan based on the analysis results, and adjusts the distribution equipment parameters; Step S3: During the process of the upper computer controlling the power distribution equipment, the node management module starts to detect the operating status of the service node, switches the service node according to the analysis results, analyzes the data characteristics, and evaluates the importance and priority of the data according to the analysis results; Step S4: When an abnormality occurs in a service node, the system locks the process running in the service node and caches it, and allocates a network layer for data transmission based on the analysis results of the data characteristics.
7. The power grid monitoring system based on the Internet of Things according to claim 6 is characterized in that: The step S2 further comprises the following steps: Step S21: Obtain distribution line detection data, identify the current and voltage in the distribution line, and calculate the three-phase imbalance of the three-phase low-voltage distribution through the formula In the formula, P represents the three-phase unbalance of three-phase low-voltage power distribution, U1 represents the maximum phase voltage of three-phase power, Indicates the average phase voltage of the three-phase electricity. Compared with the database, if the three-phase imbalance is greater than the maximum threshold set by the system, the three-phase low-voltage distribution line is marked as three-phase unbalanced, otherwise the system continues to detect; Step S22: Identify the mark in the line, obtain the load of each phase in the line with the three-phase unbalance mark, identify the total load of each phase corresponding to the three-phase transmission line, calculate the difference between the total load of each phase and the average load, and when the difference is greater than the system set threshold, identify the load of each device on the phase, select the device closest to the difference, identify the device code, retrieve the code of the phase connected at this time in the database according to the device code, disconnect the relay corresponding to the code of the phase, and connect the phase with the smallest total load at this time; Step S23: When the difference is less than the threshold, the voltage amplitude and the corresponding electrical phase angle in the three-phase low-voltage distribution line are identified, and a circular vector coordinate system is constructed. According to the identified voltage amplitude and the corresponding electrical phase angle of each phase of the three-phase electricity, they are marked in the circular vector coordinate system, and the marked points are connected with the center of the circle in sequence to construct a three-phase electrical vector diagram, which is overlapped and compared with the three-phase electrical standard vector diagram in the database. When the vectors of the corresponding phases completely overlap, the system continues to detect. When the vectors of the corresponding phases cannot completely overlap, the corresponding phase vector phase angle difference is calculated, and the amplitude difference between the corresponding phases is calculated. If the corresponding phase vector phase angle difference is greater than the maximum threshold, the voltage output frequency of the phase is reduced. If the corresponding phase vector phase angle difference is less than the minimum threshold, the voltage output frequency of the phase is increased. Otherwise, the system continues to detect. If the amplitude difference between the corresponding phases is greater than the maximum threshold, the output amplitude of the voltage of the phase is reduced. If the amplitude difference between the corresponding phases is less than the minimum threshold, the voltage output amplitude of the phase is increased.
8. The power grid monitoring system based on the Internet of Things according to claim 7 is characterized in that: The step S23 further comprises the following steps: Step S231: Obtain the historical power consumption data of the factory, identify the power consumption of the factory and the corresponding timestamp, establish a coordinate system, mark the power consumption and the corresponding timestamp in the coordinate system, connect the marked points in the coordinate system in sequence, construct the power consumption change curve of the factory, identify the power consumption change characteristics of the factory, and retrieve the corresponding power supply mode in the database according to the power consumption change characteristics; Step S232: Obtain the factory's production plan, retrieve the corresponding electrical equipment according to the factory's production plan, identify the code of each electrical equipment, retrieve the corresponding power load and the corresponding connection phase in the data according to the code of the electrical equipment, and adjust the load balance on each phase.
9. The power grid monitoring system based on the Internet of Things according to claim 8, characterized in that: The step S3 further comprises the following steps: Step S31: obtaining a first control instruction of the host computer received by the first service node, calling the corresponding power distribution equipment control parameter in the database according to the first control instruction, generating a feedback identifier and transmitting it to the host computer, identifying the time interval between the first control instruction and the feedback identifier, and if the time interval is greater than a system-set threshold, marking the first service node as faulty, otherwise the system continues to detect; Step S32: when the first service node fails, the process cache in the first service node is read, and if there is an unfinished process in the first service node, it is marked as first priority data, otherwise the system continues to detect; Step S33: Read the cached data in the first service node, identify the data features in the first service node, compare with the database, retrieve the data feature level with a similarity greater than a threshold to mark the data in the first service node, sort the data in the first service node in ascending order according to the data feature level, mark the priority of the first service node data according to the arrangement order, obtain the data features of the first service node, compare with the database, and retrieve the data level corresponding to the data features in the database.
10. The power grid monitoring system based on the Internet of Things according to claim 9, characterized in that: The step S4 further comprises the following steps: Step S41: Obtain the control instruction in the service node, compare the control instruction with the database, retrieve the number of processing steps of the control instruction in the database, and if the number of processing steps of the control instruction is greater than a threshold, obtain the control instruction processing process in real time and cache the process in real time; Step S42: Obtain cached data in the first service node, identify the priority of the cached data, transmit the data according to the priority of the cached data, identify the data level of the cached data, if the data level is greater than the maximum threshold, call the first slice network, build a virtual transmission link, encapsulate the virtual transmission link, and perform encrypted transmission; if the data level is less than the maximum threshold and greater than the minimum threshold, call the second slice network, build a virtual transmission link for encrypted transmission, otherwise call the third slice network for encrypted transmission.
Citation Information
Patent Citations
Power fault detection system and method based on Internet of Things
CN113759215A
Priority-based uninterrupted guarantee method for unified service of data in power data
CN116055400A
Power supply system fault self-recovery method and system
CN117318069A
Slice data transmission method and apparatus, electronic device, and computer readable storage medium
WO2021254366A1