Method for transmitting uplink signal, user equipment and processing device, storage medium, and method for receiving uplink signal and base
By managing the scheduling request resources and logical channels in the wireless communication system, the problems of low resource usage efficiency and latency are solved, and efficient data transmission and multi-service support are achieved.
Patent Information
- Application Number
- CN202380035527.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Priority Date
- 2022-04-29
- Filing Date
- 2023-04-28
- Publication Date
- 2024-11-22
AI Technical Summary
In wireless communication systems, due to the increase in density of nodes and user equipment, limited radio resources are difficult to efficiently process uplink and downlink data and control information, and require support for different services, and there is delay and jitter. The problem.
By implementing the configuration and management of scheduling request (SR) resources between user equipment and base stations, data transmission is used using logical channels, and information related to residual packet data budget (PDB) is sent on the SR resources to optimize resource usage and reduce latency .
It improves the total throughput of wireless communication systems, supports the needs of multiple services, allocates resources in a timely manner, reduces communication delays, and improves resource usage efficiency.
Smart Images

Figure CN119014110A_ABST
Abstract
Description
Technical Field
[0001] The present disclosure relates to a wireless communication system. Background Art
[0002] Various technologies such as machine-to-machine (M2M) communication, machine-type communication (MTC), and various devices requiring high data throughput (e.g., smart phones and tablet personal computers (PCs)) have emerged and become popular. As a result, the data throughput required to be processed in cellular networks has increased rapidly. In order to meet this rapidly increasing data throughput, carrier aggregation technology or cognitive radio technology for effectively using more frequency bands and multiple input multiple output (MIMO) technology or multiple base station (BS) cooperation technology for increasing the data capacity transmitted on limited frequency resources have been developed.
[0003] As more and more communication devices require greater communication capacity, enhanced mobile broadband (eMBB) communication is needed relative to traditional radio access technology (RAT). In addition, massive machine type communication (mMTC), which provides various services anytime and anywhere by connecting multiple devices and objects to each other, is a major issue to be considered in next-generation communications.
[0004] Discussions are also underway to design communication systems that take into account services / user equipment (UE) that are sensitive to reliability and latency. Discussions are also underway to introduce next generation RATs that take into account eMBB communications, mMTC, ultra-reliable low latency communications (URLLC), etc. Summary of the invention
[0005] Technical issues
[0006] With the introduction of new radio communication technologies, the number of UEs that the BS should provide services to in a specified resource area is increasing, and the amount of data and control information sent / received by the BS to / from the UEs provided services by the BS is also increasing. Since the amount of resources that the BS can use to communicate with the UE is limited, a new method for the BS to effectively receive / send uplink / downlink data and / or uplink / downlink control information using limited radio resources is needed. In other words, due to the increase in the density of nodes and / or the density of UEs, a method for efficiently using high-density nodes or high-density UEs for communication is needed.
[0007] There is also a need for a method of efficiently supporting various services with different requirements in a wireless communication system.
[0008] For applications whose performance is sensitive to delay / latency, overcoming delay or latency is a significant challenge.
[0009] Further, there is a need for a method of efficiently transmitting data packets in a wireless communication system where jitter may occur.
[0010] Additionally, a method of providing resource allocation to a user equipment (UE) in a timely manner is needed.
[0011] The objects to be achieved by using the present disclosure are not limited to those specifically described above, and other objects not described herein will be more clearly understood by those skilled in the art from the following detailed description.
[0012] Technical Solution
[0013] In one aspect of the present disclosure, a method for transmitting an uplink signal by a user equipment (UE) in a wireless communication system is provided herein, the method comprising: receiving a configuration related to a scheduling request (SR) resource; determining an SR resource related to the logical channel based on uplink data for a logical channel becoming available for transmission at the UE based on the configuration; and transmitting the SR on the SR resource. Transmitting the SR on the SR resource includes transmitting information related to a remaining packet data budget (PDB) of the uplink data.
[0014] In another aspect of the present disclosure, a user equipment (UE) configured to send an uplink signal in a wireless communication system is provided herein. The UE includes: at least one transceiver; at least one processor; and at least one computer memory, the computer memory being operably connected to the at least one processor and storing instructions that, when executed, cause the at least one processor to perform operations. The operations include: receiving a configuration related to a scheduling request (SR) resource; determining an SR resource related to the logical channel based on uplink data for a logical channel becoming available for transmission at the UE based on the configuration; and sending the SR on the SR resource. Sending the SR on the SR resource may include sending information related to a remaining PDB of the uplink data.
[0015] In another aspect of the present disclosure, a processing device in a wireless communication system is provided herein. The processing device includes: at least one processor; and at least one computer memory, the computer memory being operably connected to the at least one processor and storing instructions, which, when executed, cause the at least one processor to perform operations. The operations include: receiving a configuration related to a scheduling request (SR) resource; determining an SR resource related to the logical channel based on the configuration, based on uplink data for a logical channel becoming available for transmission at the user equipment (UE); and sending the SR on the SR resource. Sending the SR on the SR resource may include sending information related to a remaining PDB of the uplink data.
[0016] In another aspect of the present disclosure, a computer-readable storage medium configured to store at least one program code including instructions is provided herein, which, when executed, causes at least one processor to perform operations. The operations include: receiving a configuration related to SR resources; determining SR resources related to the logical channel based on uplink data for the logical channel becoming available for transmission at the UE based on the configuration; and sending the SR on the SR resources. Sending the SR on the SR resources may include sending information related to the remaining PDB of the uplink data.
[0017] In another aspect of the present disclosure, a method for receiving an uplink signal from a UE by a base station (BS) in a wireless communication system is provided herein. The method includes: sending a configuration related to an SR resource; and receiving an SR on the SR resource related to a logical channel based on the configuration. Receiving the SR on the SR resource may include receiving information related to a remaining PDB of uplink data of the UE.
[0018] In another aspect of the present disclosure, a BS configured to receive an uplink signal from a UE in a wireless communication system is provided herein. The BS includes: at least one transceiver; at least one processor; and at least one computer memory, the computer memory being operably connected to the at least one processor and storing instructions that, when executed, cause the at least one processor to perform operations. The operations include: sending a configuration related to an SR resource; receiving an SR on the SR resource related to a logical channel based on the configuration. Receiving the SR on the SR resource may include receiving information related to a remaining PDB of uplink data of the UE.
[0019] In each aspect of the present disclosure, the method for the UE or the operation of the UE, the processing device, or the storage medium may include receiving scheduling information including an uplink grant in response to the SR.
[0020] In each aspect of the present disclosure, the method for the UE or the operation of the UE, the processing device, or the storage medium may include: sending a transport block including the uplink data on a physical uplink shared channel (PUSCH) based on the HARQ process information.
[0021] In each aspect of the present disclosure, the method for the UE or the operation of the UE, the processing device, or the storage medium may further include clearing hybrid automatic repeat request (HARQ) process information related to the transport block and a buffer related to the HARQ process information based on expiration of the lifetime associated with the uplink grant.
[0022] In each aspect of the present disclosure, transmitting the transport block including the uplink data on the PUSCH based on the uplink grant may include: transmitting information about a PDB of the transport block on the PUSCH.
[0023] In each aspect of the present disclosure, the method and operation of the BS may further include: transmitting scheduling information including an uplink grant in response to the SR.
[0024] In each aspect of the present disclosure, the method and operation of the BS may include receiving a transport block including the uplink data on a PUSCH based on the uplink grant.
[0025] In each aspect of the present disclosure, the method and operation of the BS may further include: based on expiration of the lifetime associated with the uplink grant, clearing the HARQ process information associated with the transport block and a buffer associated with the HARQ process information.
[0026] In each aspect of the present disclosure, receiving the transport block including the uplink data on the PUSCH based on the uplink grant may include: receiving information about a PDB of the transport block on the PUSCH.
[0027] In each aspect of the present disclosure, the SR resource is configured with a physical uplink control channel (PUCCH) format 2, a PUCCH format 3, or a PUCCH format 4.
[0028] In each aspect of the present disclosure, the scheduling information may include information on a lifetime associated with the uplink grant.
[0029] The above solutions are only some examples of the present disclosure, and those skilled in the art can deduce and understand various examples into which the technical features of the present disclosure are incorporated from the following detailed description.
[0030] Beneficial Effects
[0031] According to some embodiments of the present disclosure, wireless communication signals can be efficiently transmitted / received, and thus the overall throughput of the wireless communication system can be improved.
[0032] According to some embodiments of the present disclosure, various services with different requirements may be efficiently supported in a wireless communication system.
[0033] According to some embodiments of the present disclosure, resource allocation may be provided to a user equipment (UE) in a timely manner.
[0034] According to some embodiments of the present disclosure, appropriate radio resources may be allocated to services that need to be transmitted.
[0035] According to some embodiments of the present disclosure, latency / delay generated during radio communications between communication devices may be reduced.
[0036] Effects according to the present disclosure are not limited to those specifically described above, and other effects not described herein will be more clearly understood by those skilled in the art to which the present disclosure relates from the following detailed description. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] The accompanying drawings are included to provide a further understanding of the present disclosure, and illustrate examples of embodiments of the present disclosure and together with the detailed description serve to explain embodiments of the present disclosure:
[0038] Figure 1 An example of a communication system 1 to which an embodiment of the present disclosure is applied is illustrated;
[0039] Figure 2 is a block diagram illustrating an example of a communication device capable of performing the method according to the present disclosure;
[0040] Figure 3 Another example of a wireless device capable of performing embodiments of the present disclosure is illustrated;
[0041] Figure 4 An example of a frame structure used in a wireless communication system based on the 3rd Generation Partnership Project (3GPP) is illustrated;
[0042] Figure 5 A resource grid of illustrated time slots;
[0043] Figure 6 An example of a physical downlink shared channel (PDSCH) time domain resource assignment (TDRA) caused by a physical downlink control channel (PDCCH) and an example of a physical uplink shared channel (PUSCH) TDRA caused by a PDCCH are illustrated;
[0044] Figure 7 Figure 1 shows a hybrid automatic repeat request-acknowledgement (HARQ-ACK) transmission / reception process;
[0045] Figure 8 An example of a group of pictures (GOP) structure / pattern is shown;
[0046] Fig. 9 Figure 1 shows the uplink (UL) transmission process;
[0047] Fig.10 An example of a scheduling request (SR) and UL transmission process based thereon is illustrated according to some embodiments of the present disclosure;
[0048] Fig.11 and Fig.12 An example of SR and UL transmission process based thereon is illustrated according to some embodiments of the present disclosure;
[0049] Fig.13 and Fig.14 illustrates a flow of UL signal transmission at a UE according to some embodiments of the present disclosure; and
[0050] Fig.15 and Fig.16 A UL signal reception process at a BS according to some embodiments of the present disclosure is illustrated. DETAILED DESCRIPTION
[0051] Hereinafter, embodiments according to the present disclosure will be described in detail with reference to the accompanying drawings. The detailed description given below with reference to the accompanying drawings is intended to illustrate exemplary embodiments of the present disclosure, rather than to show the only embodiments that can be implemented according to the present disclosure. The following detailed description includes specific details in order to provide a thorough understanding of the present disclosure. However, it will be apparent to those skilled in the art that the present disclosure can be practiced without these specific details.
[0052] In some cases, known structures and devices may be omitted or may be shown in block diagram form, thereby focusing on important features of the structures and devices so as not to obscure the concepts of the present disclosure. The same reference numerals will be used throughout the present disclosure to refer to the same or similar parts.
[0053] The following techniques, devices, and systems may be applied to various wireless multiple access systems. For example, multiple access systems may include code division multiple access (CDMA) systems, frequency division multiple access (FDMA) systems, time division multiple access (TDMA) systems, orthogonal frequency division multiple access (OFDMA) systems, single carrier frequency division multiple access (SC-FDMA) systems, multi-carrier frequency division multiple access (MC-FDMA) systems, etc. CDMA may be implemented by radio technologies such as Universal Terrestrial Radio Access (UTRA) or CDMA2000. TDMA may be implemented by radio technologies such as Global System for Mobile Communications (GSM), General Packet Radio Service (GPRS), Enhanced Data Rate for GSM Evolution (EDGE) (i.e., GERAN), etc. OFDMA may be specifically implemented by radio technologies such as Institute of Electrical and Electronics Engineers (IEEE) 802.11 (Wi-Fi), IEEE802.16 (WiMAX), IEEE 802.20, Evolved UTRA (E-UTRA), etc. UTRA is part of Universal Mobile Telecommunications System (UMTS), and 3rd Generation Partnership Project (3GPP) Long Term Evolution (LTE) is part of E-UMTS using E-UTRA. 3GPP LTE adopts OFDMA on downlink (DL) and SC-FDMA on uplink (UL). LTE-advanced (LTE-A) is an evolved version of 3GPP LTE.
[0054] For the convenience of description, the description will be given under the assumption that the present disclosure is applied to LTE and / or new RAT (NR). However, the technical features of the present disclosure are not limited thereto. For example, although the following detailed description is given based on a mobile communication system corresponding to a 3GPP LTE / NR system, the mobile communication system is applicable to any other mobile communication system except for matters specific to the 3GPP LTE / NR system.
[0055] For terms and techniques not described in detail among the terms and techniques used in the present disclosure, reference may be made to standard specifications based on 3GPP (e.g., 3GPP TS 36.211, 3GPP TS 36.212, 3GPP TS 36.213, 3GPP TS 36.321, 3GPP TS 36.300, 3GPP TS 36.331, 3GPP TS 37.213, 3GPP TS 38.211, 3GPP TS 38.212, 3GPP TS 38.213, 3GPP TS 38.214, 3GPP TS 38.300, 3GPP TS 38.321, 3GPP TS 38.331, etc.).
[0056] In an example of the present disclosure described later, if a device "assumes" something, this may mean that a channel transmission entity transmits a channel in accordance with the corresponding "assumption". This may also mean that a channel reception entity receives or decodes a channel in a form that conforms to the "assumption" under the premise that the channel is transmitted in accordance with the "assumption".
[0057] In the present disclosure, a user equipment (UE) may be fixed or mobile. Each of various devices that transmit and / or receive user data and / or control information by communicating with a base station (BS) may be a UE. The term UE may be referred to as a terminal device, a mobile station (MS), a mobile terminal (MT), a user terminal (UT), a subscriber station (SS), a wireless device, a personal digital assistant (PDA), a wireless modem, a handheld device, etc. In the present disclosure, a BS refers to a fixed station that communicates with a UE and / or another BS and exchanges data and control information with the UE and another BS. The term BS may be referred to as an advanced base station (ABS), a node B (NB), an evolved node B (eNB), a base transceiver system (BTS), an access point (AP), a processing server (PS), etc. Specifically, a BS of a universal terrestrial radio access (UTRAN) is referred to as an NB, a BS of an evolved UTRAN (E-UTRAN) is referred to as an eNB, and a BS of a new radio access technology network is referred to as a gNB. In the following, for the convenience of description, NB, eNB, or gNB will be referred to as a BS regardless of the type or version of the communication technology.
[0058] In the present disclosure, a node refers to a fixed point that can send / receive a radio signal to / from a UE by communicating with the UE. Regardless of its name, various types of BSs may be used as nodes. For example, a BS, NB, eNB, picocell eNB (PeNB), home eNB (HeNB), relay, transponder, etc. may be a node. In addition, a node may not be a BS. For example, a radio remote head (RRH) or a radio remote unit (RRU) may be a node. Typically, RRH and RRU have a power level lower than that of a BS. Since the RRH or RRU (hereinafter, RRH / RRU) is typically connected to the BS via a dedicated line such as an optical cable, the collaborative communication according to the RRH / RRU and the BS can be smoothly performed compared to the collaborative communication according to the BS connected via a wireless link. At least one antenna is installed per node. An antenna may refer to a physical antenna port or to a virtual antenna or an antenna group. A node may also be referred to as a point.
[0059] In the present disclosure, a cell refers to a specific geographical area where one or more nodes provide communication services. Therefore, in the present disclosure, communication with a specific cell may mean communication with a BS or node that provides communication services to a specific cell. The DL / UL signal of a specific cell refers to the DL / UL signal from / to the BS or node that provides communication services to the specific cell. A cell that provides UL / DL communication services to a UE is particularly referred to as a service cell. In addition, the channel state / quality of a specific cell refers to the channel state / quality of a channel or communication link generated between a BS or node that provides communication services to a specific cell and a UE. In a 3GPP-based communication system, a UE can use a CRS sent on a cell-specific reference signal (CRS) resource and / or a CSI-RS sent on a channel state information reference signal (CSI-RS) resource (allocated to a specific node by an antenna port of a specific node) to measure the DL channel state from a specific node.
[0060] The 3GPP-based communication system uses the concept of a cell in order to manage radio resources, and distinguishes a cell related to radio resources from a cell of a geographical area.
[0061] A "cell" of a geographic area can be understood as a coverage area where a node can use a carrier to provide services, and a "cell" of radio resources is associated with a bandwidth (BW) that is a frequency range configured by a carrier. Since the DL coverage (the range in which a node can send a valid signal) and the UL coverage (the range in which a node can receive a valid signal from a UE) depend on the carrier that carries the signal, the coverage of a node can also be associated with the coverage of a "cell" of the radio resources used by the node. Therefore, the term "cell" can be used to indicate the service coverage of a node at times, to indicate a radio resource at other times, or to indicate a range that a signal using a radio resource can reach with effective strength at other times.
[0062] In the 3GPP communication standard, the concept of a cell is used in order to manage radio resources. A "cell" associated with a radio resource is defined by a combination of DL resources and UL resources (i.e., a combination of DL component carriers (CCs) and UL CCs). A cell may be configured only by DL resources, or by a combination of DL resources and UL resources. If carrier aggregation is supported, the link between the carrier frequency of the DL resource (or DL CC) and the carrier frequency of the UL resource (or UL CC) may be indicated by system information. For example, the combination of DL resources and UL resources may be indicated by a system information block type 2 (SIB2) link. In this case, the carrier frequency may be equal to or different from the center frequency of each cell or CC. When carrier aggregation (CA) is configured, the UE has only one radio resource control (RRC) connection with the network. During RRC connection establishment / reestablishment / handover, one serving cell provides non-access stratum (NAS) mobility information. During RRC connection reestablishment / handover, one serving cell provides security input. This cell is called a primary cell (Pcell). Pcell refers to a cell operating on the primary frequency where the UE performs an initial connection establishment process or initiates a connection reestablishment process. Depending on the UE capabilities, the secondary cell (Scell) can be configured to form a set of serving cells together with the Pcell. The Scell can be configured after the RRC connection establishment is completed and is used to provide additional radio resources in addition to the resources of the specific cell (SpCell). The carrier corresponding to the Pcell on the DL is called the downlink primary CC (DL PCC), and the carrier corresponding to the Pcell on the UL is called the uplink primary CC (UL PCC). The carrier corresponding to the Scell on the DL is called the downlink secondary CC (DL SCC), and the carrier corresponding to the Scell on the UL is called the uplink secondary CC (UL SCC).
[0063] In dual connectivity (DC) operation, the term special cell (SpCell) refers to a Pcell of a primary cell group (MCG) or a primary secondary cell (Pcell) of a secondary cell group (SCG). SpCell supports PUCCH transmission and contention-based random access and is always enabled. MCG is a set of serving cells associated with a master node (e.g., BS) and includes SpCell (Pcell) and optionally one or more Scells. For a UE configured with DC, SCG is a subset of serving cells associated with a secondary node and includes PSCell and 0 or more Scells. PSCell is the primary Scell of SCG. For a UE in RRC_CONNECTED state, not configured with CA or DC, there is only one serving cell including only Pcell. For a UE in RRC_CONNECTED state, configured with CA or DC, the term serving cell refers to a set of cells including SpCell and all Scells. In DC, two medium access control (MAC) entities are configured for the UE, i.e., one MAC entity for MCG and one MAC entity for SCG.
[0064] For a UE configured with CA but not with DC, a Pcell PUCCH group (also referred to as a primary PUCCH group) including a Pcell and 0 or more Scells and a Scell PUCCH group (also referred to as a secondary PUCCH group) including only Scells may be configured. For an Scell, an Scell (hereinafter, a PUCCH cell) that sends a PUCCH associated with a corresponding cell may be configured. The Scell indicating a PUCCH Scell belongs to a Scell PUCCH group (i.e., a secondary PUCCH group) and performs PUCCH transmission of related uplink control information (UCI) on the PUCCH Scell. If a PUCCH Scell is not indicated for the Scell or the cell indicating PUCCH transmission for the Scell is a Pcell, the Scell belongs to a Pcell PUCCH group (i.e., a primary PUCCH group) and performs PUCCH transmission of related UCI on the Pcell. In the following, if the UE is configured with an SCG and some embodiments of the present disclosure related to PUCCH are applied to the SCG, the primary cell may refer to a PSCell of the SCG. If the UE is configured with a PUCCH Scell and some embodiments of the present disclosure related to PUCCH are applied to a secondary PUCCH group, the primary cell may refer to a PUCCH Scell of the secondary PUCCH group.
[0065] In a wireless communication system, a UE receives information from a BS on DL, and a UE transmits information to a BS on UL. The information transmitted and / or received by the BS and the UE includes data and various control information, and there are various physical channels according to the type / purpose of the information transmitted and / or received by the UE and the BS.
[0066] The communication standards based on 3GPP define DL physical channels corresponding to resource elements carrying information from higher layers and DL physical signals corresponding to resource elements used by the physical layer but not carrying information from higher layers. For example, the physical downlink shared channel (PDSCH), physical broadcast channel (PBCH), physical multicast channel (PMCH), physical control format indicator channel (PCFICH), physical downlink control channel (PDCCH), etc. are defined as DL physical channels, and reference signals (RS) and synchronization signals are defined as DL physical signals. RS (also called pilot) represents a signal with a predefined special waveform known to both BS and UE. For example, demodulation reference signal (DMRS), channel state information RS (CSI-RS), etc. are defined as DL RS. The communication standards based on 3GPP define UL physical channels corresponding to resource elements carrying information from higher layers and UL physical signals corresponding to resource elements used by the physical layer but not carrying information from higher layers. For example, a physical uplink shared channel (PUSCH), a physical uplink control channel (PUCCH), and a physical random access channel (PRACH) are defined as UL physical channels, and a DMRS for UL control / data signals, a sounding reference signal (SRS) for UL channel measurement, etc. are defined.
[0067] In the present disclosure, PDCCH refers to a set of time-frequency resources (e.g., resource elements (REs)) carrying downlink control information (DCI), and PDSCH refers to a set of time-frequency resources carrying DL data. PUCCH, PUSCH, and PRACH refer to a set of time-frequency resources carrying UCI, a set of time-frequency resources carrying UL data, and a set of time-frequency resources carrying random access signals, respectively. In the following description, "UE transmits / receives PUCCH / PUSCH / PRACH" is used as the same meaning as the UE transmits / receives UCI / UL data / random access signal on PUCCH / PUSCH / PRACH or through PUSCH / PUCCH / PRACH, respectively. In addition, "BS transmits / receives PBCH / PDCCH / PDSCH" is used as the same meaning as the BS transmits broadcast information / DCI / DL data on PBCH / PDCCH / PDSCH or through PBCH / PDCCH / PDSCH, respectively.
[0068] In the present specification, radio resources (eg, time-frequency resources) scheduled or configured by a BS for a UE to transmit or receive a PUCCH / PUSCH / PDSCH may be referred to as PUCCH / PUSCH / PDSCH resources.
[0069] Since the communication device receives a synchronization signal block (SSB), DMRS, CSI-RS, PBCH, PDCCH, PDSCH, PUSCH and / or PUCCH in the form of a radio signal on a cell, the communication device may not select and receive a radio signal including only a specific physical channel or a specific physical signal through a radio frequency (RF) receiver, or may not select and receive a radio signal without a specific physical channel or a specific physical signal through an RF receiver. In actual operation, the communication device receives a radio signal on a cell via an RF receiver, converts the radio signal as an RF band signal into a baseband signal, and then uses one or more processors to decode the physical signal and / or physical channel in the baseband signal. Therefore, in some embodiments of the present disclosure, not receiving a physical signal and / or a physical channel may mean that the communication device does not attempt to recover the physical signal and / or the physical channel from the radio signal, for example, does not attempt to decode the physical signal and / or the physical channel, rather than the non-communication device actually receiving a radio signal including the corresponding physical signal and / or the physical channel.
[0070] As more and more communication devices require greater communication capacity, eMBB communication relative to traditional radio access technology (RAT) is needed. In addition, large-scale MTC, which provides various services anytime and anywhere by connecting multiple devices and objects to each other, is a major issue to be considered in the next generation of communications. In addition, the design of communication systems that take into account services / UEs that are sensitive to reliability and delay is also being discussed. Considering eMBB communication, large-scale MTC, ultra-reliable low-latency communication (URLLC), etc., the introduction of the next generation RAT is being discussed. Currently, in 3GPP, research on the next generation mobile communication system after EPC is underway. In this disclosure, for convenience, the corresponding technology is referred to as new RAT (NR) or fifth generation (5G) RAT, and a system using NR or supporting NR is referred to as an NR system.
[0071] Figure 1 An example of a communication system 1 to which an embodiment of the present disclosure is applied is shown. Figure 1, the communication system 1 applied to the present disclosure includes a wireless device, a BS, and a network. Here, the wireless device refers to a device that performs communication using a RAT (e.g., 5G NR or LTE (e.g., E-UTRA)), and may be referred to as a communication / radio / 5G device. The wireless device may include (but is not limited to) a robot 100a, a vehicle 100b-1 and 100b-2, an extended reality (XR) device 100c, a handheld device 100d, a home appliance 100e, an Internet of Things (IoT) device 100f, and an artificial intelligence (AI) device / server 400. For example, a vehicle may include a vehicle with a wireless communication function, an autonomous driving vehicle, and a vehicle capable of performing vehicle-to-vehicle communication. Here, a vehicle may include an unmanned aerial vehicle (UAV) (e.g., a drone). The XR device may include an augmented reality (AR) / virtual reality (VR) / mixed reality (MR) device, and may be implemented in the form of a head-mounted device (HMD), a head-up display (HUD) installed in a vehicle, a television, a smart phone, a computer, a wearable device, a home appliance device, a digital signage, a vehicle, a robot, and the like. Handheld devices may include smart phones, smart boards, wearable devices (e.g., smart watches or smart glasses), and computers (e.g., notebooks). Home appliances may include TVs, refrigerators, and washing machines. IoT devices may include sensors and smart meters. For example, BSs and networks may also be implemented as wireless devices, and a specific wireless device may operate as a BS / network node relative to another wireless device.
[0072] The wireless devices 100a to 100f may be connected to the network 300 via the BS 200. AI technology may be applied to the wireless devices 100a to 100f, and the wireless devices 100a to 100f may be connected to the AI server 400 via the network 300. The network 300 may be configured using a 3G network, a 4G (e.g., LTE) network, or a 5G (e.g., NR) network. Although the wireless devices 100a to 100f may communicate with each other via the BS 200 / network 300, the wireless devices 100a to 100f may perform direct communication (e.g., side link communication) with each other without passing through the BS / network. For example, the vehicles 100b-1 and 100b-2 may perform direct communication (e.g., vehicle-to-vehicle (V2V) / vehicle-to-everything (V2X) communication). An IoT device (e.g., a sensor) may perform direct communication with other IoT devices (e.g., a sensor) or other wireless devices 100a to 100f.
[0073] Wireless communication / connection 150a and 150b may be established between the wireless devices 100a to 100f and the BS 200 and between the wireless devices 100a to 100f. Here, wireless communication / connection such as UL / DL communication 150a and sidelink communication 150b (or device-to-device (D2D) communication) may be established through various RATs (e.g., 5G NR). The wireless device and the BS / wireless device may send / receive radio signals to / from each other through the wireless communication / connection 150a and 150b. To this end, various configuration information configuration processes for sending / receiving radio signals, various signal processing processes (e.g., channel coding / decoding, modulation / demodulation, and resource mapping / demapping), and at least a portion of the resource allocation process may be performed based on various proposals of the present disclosure.
[0074] Figure 2 is a block diagram showing an example of a communication device capable of executing the method according to the present disclosure. Figure 2 , the first wireless device 100 and the second wireless device 200 may transmit and / or receive radio signals through various RATs (eg, LTE and NR). Here, {the first wireless device 100 and the second wireless device 200} may correspond to Figure 1 {wireless device 100x and BS 200} and / or {wireless device 100x and wireless device 100x}.
[0075] The first wireless device 100 may include one or more processors 102 and one or more memories 104, and further include one or more transceivers 106 and / or one or more antennas 108. The processor 102 may control the memory 104 and / or the transceiver 106, and may be configured to implement the functions, processes and / or methods described / proposed below. For example, the processor 102 may process the information in the memory 104 to generate first information / signal, and then transmit a radio signal including the first information / signal through the transceiver 106. The processor 102 may receive a radio signal including second information / signal through the transceiver 106, and then store information obtained by processing the second information / signal in the memory 104. The memory 104 may be connected to the processor 102, and may store various information related to the operation of the processor 102. For example, the memory 104 may execute part or all of the processes controlled by the processor 102 or store software codes including commands for executing the processes and / or methods described / proposed below. Here, the processor 102 and the memory 104 may be part of a communication modem / circuit / chip designed to implement a RAT (e.g., LTE or NR). The transceiver 106 may be connected to the processor 102 and transmit and / or receive radio signals through one or more antennas 108. Each transceiver 106 may include a transmitter and / or a receiver. The transceiver 106 may be used interchangeably with a radio frequency (RF) unit. In the present disclosure, a wireless device may represent a communication modem / circuit / chip.
[0076] The second wireless device 200 may include one or more processors 202 and one or more memories 204, and further include one or more transceivers 206 and / or one or more antennas 208. The processor 202 may control the memory 204 and / or the transceiver 206, and may be configured to implement the functions, processes and / or methods described / proposed below. For example, the processor 202 may process the information in the memory 204 to generate third information / signals, and then transmit a radio signal including the third information / signals through the transceiver 206. The processor 202 may receive a radio signal including fourth information / signals through the transceiver 206, and then store information obtained by processing the fourth information / signals in the memory 204. The memory 204 may be connected to the processor 202, and may store various information related to the operation of the processor 202. For example, the memory 204 may execute part or all of the processes controlled by the processor 202 or store software codes including commands for executing the processes and / or methods described / proposed below. Here, the processor 202 and the memory 204 may be part of a communication modem / circuit / chip designed to implement a RAT (e.g., LTE or NR). The transceiver 206 may be connected to the processor 202 and transmit and / or receive radio signals through one or more antennas 208. Each transceiver 206 may include a transmitter and / or a receiver. The transceiver 206 may be used interchangeably with an RF unit. In the present disclosure, a wireless device may represent a communication modem / circuit / chip.
[0077] The wireless communication technology implemented in the wireless devices 100 and 200 of the present disclosure may include narrowband Internet of Things for low power communication as well as LTE, NR and 6G. For example, NB-IoT technology may be an example of low power wide area network (LPWAN) technology and is implemented in standards such as LTE Cat NB1 and / or LTE Cat NB2. However, NB-IoT technology is not limited to the above names. Additionally or alternatively, the wireless communication technology implemented in the wireless devices XXX and YYY of the present disclosure may perform communication based on LTE-M technology. For example, LTE-M technology may be an example of LPWAN technology and is referred to as various names including enhanced machine type communication (eMTC). For example, LTE-M technology may be implemented in accordance with at least one of the following various standards: 1) LTE CAT 0, 2) LTE Cat M1, 3) LTE Cat M2, 4) LTE non-bandwidth limited (non-BL), 5) LTE-MTC, 6) LTE machine type communication and / or 7) LTE M, etc., but LTE-M technology is not limited to the above names. Additionally or alternatively, in consideration of low power communication, the wireless communication technology implemented in the wireless devices XXX and YYY of the present disclosure may include at least one of ZigBee, Bluetooth, and LPWAN, but the wireless communication technology is not limited to the above names. For example, ZigBee technology may be based on various standards such as IEEE 802.15.4 to create a personal area network (PAN) related to small / low power digital communication, and ZigBee technology may be referred to as various names.
[0078] Hereinafter, the hardware elements of the wireless devices 100 and 200 will be described in more detail. One or more protocol layers may be implemented by (but not limited to) one or more processors 102 and 202. For example, one or more processors 102 and 202 may implement one or more layers (e.g., functional layers such as a physical (PHY) layer, a medium access control (MAC) layer, a radio link control (RLC) layer, a packet data convergence protocol (PDCP) layer, a radio resource control (RRC) layer, and a service data adaptation protocol (SDAP) layer). One or more processors 102 and 202 may generate one or more protocol data units (PDUs) and / or one or more service data units (SDUs) according to the functions, procedures, proposals, and / or methods disclosed in the present disclosure. One or more processors 102 and 202 may generate messages, control information, data, or information according to the functions, procedures, proposals, and / or methods disclosed in the present disclosure. One or more processors 102 and 202 may generate a signal (e.g., a baseband signal) including a PDU, an SDU, a message, control information, data, or information according to the functions, procedures, proposals, and / or methods disclosed in the present disclosure, and provide the generated signal to one or more transceivers 106 and 206. One or more processors 102 and 202 may receive a signal (e.g., a baseband signal) from one or more transceivers 106 and 206 and obtain the PDU, SDU, message, control information, data, or information according to the functions, procedures, proposals, and / or methods disclosed in the present disclosure.
[0079] One or more processors 102 and 202 may be referred to as controllers, microcontrollers, microprocessors, or microcomputers. One or more processors 102 and 202 may be implemented by hardware, firmware, software, or a combination thereof. As an example, one or more application specific integrated circuits (ASICs), one or more digital signal processors (DSPs), one or more digital signal processing devices (DSPDs), one or more programmable logic devices (PLDs), or one or more field programmable gate arrays (FPGAs) may be included in one or more processors 102 and 202. The functions, processes, proposals, and / or methods disclosed in the present disclosure may be implemented using firmware or software, and the firmware or software may be configured to include modules, processes, or functions. Firmware or software configured to perform the functions, processes, proposals, and / or methods disclosed in the present disclosure may be included in one or more processors 102 and 202 or stored in one or more memories 104 and 204 to be driven by one or more processors 102 and 202. The functions, processes, proposals, and / or methods disclosed in the present disclosure may be implemented using firmware or software in the form of code, commands, and / or command sets.
[0080] One or more memories 104 and 204 may be connected to one or more processors 102 and 202 and store various types of data, signals, messages, information, programs, codes, commands and / or instructions. One or more memories 104 and 204 may be configured by read-only memory (ROM), random access memory (RAM), electrically erasable programmable read-only memory (EPROM), flash memory, hard disk drive, register, cache memory, computer-readable storage medium and / or a combination thereof. One or more memories 104 and 204 may be located inside and / or outside of one or more processors 102 and 202. One or more memories 104 and 204 may be connected to one or more processors 102 and 202 by various technologies such as wired or wireless connections.
[0081] One or more transceivers 106 and 206 may send the user data, control information and / or radio signal / channel mentioned in the method and / or operation flow chart of the present disclosure to one or more other devices. One or more transceivers 106 and 206 may receive the user data, control information and / or radio signal / channel mentioned in the function, process, proposal, method and / or operation flow chart disclosed in the present disclosure from one or more other devices. For example, one or more transceivers 106 and 206 may be connected to one or more processors 102 and 202 and send and receive radio signals. For example, one or more processors 102 and 202 may perform control so that one or more transceivers 106 and 206 may send user data, control information or radio signal to one or more other devices. One or more processors 102 and 202 may perform control so that one or more transceivers 106 and 206 may receive user data, control information or radio signal from one or more other devices. One or more transceivers 106 and 206 may be connected to one or more antennas 108 and 208. One or more transceivers 106 and 206 may be configured to send and receive user data, control information and / or radio signals / channels mentioned in the functional, process, proposal, method and / or operation flow chart disclosed in the present disclosure through one or more antennas 108 and 208. In the present disclosure, one or more antennas may be multiple physical antennas or multiple logical antennas (e.g., antenna ports). One or more transceivers 106 and 206 may convert received radio signals / channels, etc. from RF band signals to baseband signals so as to process received user data, control information, radio signals / channels, etc. using one or more processors 102 and 202. One or more transceivers 106 and 206 may convert user data, control information, radio signals / channels, etc. processed using one or more processors 102 and 202 from baseband signals to RF band signals. To this end, one or more of the transceivers 106 and 206 may include (analog) oscillators and / or filters.
[0082] Figure 3 Another example of a wireless device capable of executing an embodiment of the present disclosure is shown. Figure 3 , the wireless devices 100 and 200 may correspond to Figure 2 The wireless devices 100 and 200 of the present invention may be configured by various elements, components, units / parts and / or modules. For example, each of the wireless devices 100 and 200 may include a communication unit 110, a control unit 120, a memory unit 130 and an additional component 140. The communication unit may include a communication circuit 112 and a transceiver 114. For example, the communication circuit 112 may include Figure 2One or more processors 102 and 202 and / or one or more memories 104 and 204. For example, the transceiver 114 may include Figure 2 The control unit 120 is electrically connected to the communication unit 110, the memory 130, and the additional components 140, and controls the overall operation of the wireless device. For example, the control unit 120 may control the electrical / mechanical operation of the wireless device based on the program / code / command / information stored in the memory unit 130. The control unit 120 may transmit information stored in the memory unit 130 to the outside (e.g., other communication devices) via the communication unit 110 through a wireless / wired interface, or store information received from the outside (e.g., other communication devices) via the communication unit 110 in the memory unit 130 through a wireless / wired interface.
[0083] The additional components 140 may be configured differently depending on the type of wireless device. For example, the additional components 140 may include at least one of a power supply unit / battery, an input / output (I / O) unit, a drive unit, and a computing unit. The wireless device may be configured in the form of, but not limited to, a robot ( Figure 1 100a), vehicles ( Figure 1 100b-1 and 100b-2), XR devices ( Figure 1 100c), handheld device ( Figure 1 100d), household appliances ( Figure 1 100e), IoT devices ( Figure 1 100f), digital broadcast UE, holographic device, public safety device, MTC device, medical device, fintech device (or financial device), security device, climate / environmental device, AI server / device ( Figure 1 400), BS ( Figure 1 200), network nodes, etc. The wireless device can be used in a mobile or fixed location depending on the usage / service.
[0084] exist Figure 3In the wireless devices 100 and 200, various elements, components, units / parts and / or modules in the wireless devices 100 and 200 may all be connected to each other through a wired interface, or at least a part thereof may be wirelessly connected through the communication unit 110. For example, in each of the wireless devices 100 and 200, the control unit 120 and the communication unit 110 may be wired, and the control unit 120 and the first unit (e.g., 130 and 140) may be wirelessly connected through the communication unit 110. The various elements, components, units / parts and / or modules within the wireless devices 100 and 200 may also include one or more elements. For example, the control unit 120 may be configured by a collection of one or more processors. As an example, the control unit 120 may be configured by a collection of a communication control processor, an application processor, an electronic control unit (ECU), a graphics processing unit, and a memory control processor. As another example, the memory 130 may be configured by a random access memory (RAM), a dynamic RAM (DRAM), a read-only memory (ROM)), a flash memory, a volatile memory, a non-temporary memory, and / or a combination thereof.
[0085] In the present disclosure, at least one memory (e.g., 104 or 204) may store instructions or programs, and these instructions or programs, when executed, may cause at least one processor operatively connected to the at least one memory to perform operations according to some embodiments or implementations of the present disclosure.
[0086] In the present disclosure, a computer-readable (non-transitory) storage medium may store at least one instruction or program, and when the at least one instruction or program is executed by at least one processor, the at least one processor may cause the at least one processor to perform operations according to some embodiments or implementations of the present disclosure.
[0087] In the present disclosure, a processing device or apparatus may include at least one processor and at least one computer memory operatively connected to the at least one processor. The at least one computer memory may store instructions or programs, and these instructions or programs, when executed, may cause at least one processor operatively connected to the at least one memory to perform operations according to some embodiments or implementations of the present disclosure.
[0088] In the present disclosure, a computer program may include program code stored on at least one computer-readable (non-transitory) storage medium, and when executed, it is configured to perform operations according to some embodiments of the present disclosure or cause at least one processor to perform operations according to some embodiments of the present disclosure. The computer program may be provided in the form of a computer program product. The computer program product may include at least one computer-readable (non-transitory) storage medium.
[0089] The communication device of the present disclosure includes: at least one processor; and at least one computer memory, which is operatively connected to the at least one processor and configured to store instructions, which when executed cause the at least one processor to perform operations according to examples of the present disclosure described later.
[0090] Figure 4 An example of a frame structure used in a 3GPP-based wireless communication system is shown.
[0091] Figure 4 The frame structure is only exemplary, and the number of subframes, the number of time slots, and the number of symbols in the frame may be changed differently. In the NR system, different OFDM parameter sets (e.g., subcarrier spacing (SCS)) may be configured for multiple cells aggregated for one UE. Therefore, the (absolute time) duration of time resources including the same number of symbols (e.g., subframes, time slots, or transmission time intervals (TTIs)) may be configured differently for the aggregated cells. Here, the symbol may include an OFDM symbol (or a cyclic prefix-OFDM (CP-OFDM) symbol) and an SC-FDMA symbol (or a discrete Fourier transform-spread-OFDM (DFT-s-OFDM) symbol). In the present disclosure, symbols, OFDM-based symbols, OFDM symbols, CP-OFDM symbols, and DFT-s-OFDM symbols may be used interchangeably.
[0092] Reference Figure 4 In the NR system, UL transmission and DL transmission are organized into frames. Each frame has T f =(△f max *N f / 100)*T c = 10 ms duration and is divided into two half frames of 5 ms each. The basic time unit of NR is T c =1 / (△f max *N f ), where △f max =480*10 3 Hz and N f =4096. For reference, the basic time unit of LTE is T s =1 / (△f ref *N f,ref ), where △f ref =15*10 3 Hz and N f,ref =2048. T c and T f With constant κ=T c / T f =64. Each half frame includes 5 subframes, and the duration of a single subframe is Tsf The subframe is further divided into slots, and the number of slots in a subframe depends on the SCS. Each slot includes 14 or 12 OFDM symbols based on the cyclic prefix. In normal CP, each slot includes 14 OFDM symbols, and in extended CP, each slot includes 12 OFDM symbols. The parameter set depends on the exponentially scalable subcarrier spacing △f=2 u *15 kHz. The following table shows the number of OFDM symbols per time slot (N slot symb ), the number of time slots per frame (N frame,u slot ) and the number of time slots per subframe (N subframe,u slot ).
[0093] [Table 1]
[0094]
[0095] The following table shows that according to SCS △f=2 u *15 kHz, number of OFDM symbols per slot, number of slots per frame and number of slots per subframe.
[0096] [Table 2]
[0097]
[0098] For SCS configuration u, the time slots may be indexed in ascending order within a subframe as follows: n u s ∈{0, ..., n subframe,u slot -1}, and are indexed in ascending order within the frame as follows: n u s,f ∈{0, ..., n frame,u slot -1}.
[0099] Figure 5 A resource grid of a time slot is shown. A time slot includes multiple (e.g., 14 or 12) symbols in the time domain. For each parameter set (e.g., subcarrier spacing) and carrier, a common resource block (CRB) N is indicated by higher layer signaling (e.g., RRC signaling). start,u grid Begins to define N size,u grid,x *N RB sc subcarriers and N subframe,u symb OFDM symbol resource grid, where N size,u grid,xis the number of resource blocks (RBs) in the resource grid, and the subscript x is DL for the downlink and UL for the uplink. N RB sc is the number of subcarriers per RB. In 3GPP-based wireless communication systems, N RB sc Typically 12. For a given antenna port p, SCS configuration u, and transmission link (DL or UL), there is one resource grid. The carrier bandwidth N of SCS configuration u is given to the UE through higher-layer parameters (e.g., RRC parameters). size,u grid . Each element in the resource grid for antenna port p and SCS configuration u is called a resource element (RE), and one complex symbol can be mapped to each RE. Each RE in the resource grid is uniquely identified by an index k in the frequency domain and an index l representing the symbol position relative to a reference point in the time domain. In the NR system, an RB is defined by 12 consecutive subcarriers in the frequency domain. In the NR system, RBs are classified into CRBs and physical resource blocks (PRBs). For SCS configuration u, CRBs are numbered from 0 upwards in the frequency domain. The center of subcarrier 0 of CRB 0 of SCS configuration u is equal to "point A" used as a common reference point for the RB grid. PRBs for subcarrier spacing configuration u are defined within a bandwidth part (BWP) and are numbered from 0 to N size,u BWP,i −1 numbering, where i is the number of BWPs. PRB n in BWP i PRB With CRB u CRB The relationship between n u PRB =n u CRB +N size,u BWP,i Given, where N size BWP,i is the CRB at which the BWP starts relative to CRB 0. A BWP includes multiple consecutive RBs in the frequency domain. For example, a BWP may be a CRB with a given parameter set u in BWP i on a given carrier. i A carrier may include up to N (e.g., 5) BWPs. A UE may be configured with one or more BWPs on a given component carrier. Data communication is performed through enabled BWPs, and only a predetermined number of BWPs (e.g., one BWP) among the BWPs configured for the UE may be active on the component carrier.
[0100] For each serving cell in the set of DL BWP or UL BWP, the network may configure at least an initial DL BWP and one (if the serving cell is configured with uplink) or two (if supplementary uplink is used) initial UL BWPs. The network may configure additional UL and DL BWPs. For each DL BWP or UL BWP, the following parameters may be provided to the UE for the serving cell: i) SCS; ii) CP; iii) start BWP= 275 indicates the offset RB set and length L RB CRB N provided as the RRC parameter locationAndBandwidth of the Resource Indicator Value (RIV) start BWP =O carrier +RB start and the number of adjacent RBs N size BWP =L RB , and the value O provided by the RRC parameter offsetToCarrier for SCS carrier ; an index into a set of DL BWP or UL BWP; a set of BWP common parameters; and a set of BWP dedicated parameters.
[0101] Virtual Resource Blocks (VRBs) can be defined within a BWP and are numbered from 0 to N. size,u BWP,i -1 index, where i represents the BWP number. VRBs may be mapped to PRBs according to an interleaved mapping or a non-interleaved mapping. In some embodiments, for non-interleaved VRB to PRB mapping, VRB n may be mapped to PRB n.
[0102] A UE configured with carrier aggregation may be configured to use one or more cells. If the UE is configured with multiple serving cells, the UE may be configured with one or more cell groups. The UE may also be configured with multiple cell groups associated with different BSs. Alternatively, the UE may be configured with multiple cell groups associated with a single BS. Each cell group of the UE includes one or more serving cells and includes a single PUCCH cell configured with PUCCH resources. The PUCCH cell may be a Pcell or an Scell configured as a PUCCH cell among the Scells of the corresponding cell group. Each serving cell of the UE belongs to one of the cell groups of the UE and does not belong to multiple cells.
[0103] NR frequency bands are defined as two types of frequency ranges, namely, FR1 and FR2. FR2 is also known as millimeter wave (mmW). The following table shows the frequency ranges in which NR can operate.
[0104] [Table 3]
[0105]
[0106] Hereinafter, physical channels available in a 3GPP-based wireless communication system will be described in detail.
[0107] PDCCH carries DCI. For example, PDCCH (i.e., DCI) carries information about the transmission format and resource allocation of the downlink shared channel (DL-SCH), information about the resource allocation of the uplink shared channel (UL-SCH), paging information about the paging channel (PCH), system information about DL-SCH, information about resource allocation of control messages of a layer higher than the physical layer (hereinafter, high layer) in the protocol stack of UE / BS (e.g., random access response (RAR) sent on PDSCH), transmission power control commands, information about activation / deactivation of configuration scheduling (CS), etc. DCI including resource allocation information about DL-SCH is called PDSCH scheduling DCI, and DCI including resource allocation information about UL-SCH is called PUSCH scheduling DCI. DCI includes a cyclic redundancy check (CRC). The CRC is masked / scrambled with various identifiers (e.g., radio network temporary identifier (RNTI)) according to the owner and purpose of the PDCCH. For example, if the PDCCH is for a specific UE, the CRS is masked with a UE identifier (e.g., cell-RNTI (C-RNTI)). If the PDCCH is for a paging message, the CRC is masked with a paging RNTI (P-RNTI). If the PDCCH is for system information (e.g., system information block (SIB)), the CRC is masked with a system information RNTI (SI-RNTI). If the PDCCH is for a random access response, the CRC is masked with a random access-RNTI (RA-RNTI).
[0108] When the PDCCH on one serving cell schedules the PDSCH or PUSCH on another serving cell, it is called cross-carrier scheduling. Cross-carrier scheduling with a carrier indicator field (CIF) allows the PDCCH on the serving cell to schedule resources on another serving cell. When the PDSCH on the serving cell schedules the PDSCH or PUSCH on the serving cell, it is called self-carrier scheduling. When cross-carrier scheduling is used in a cell, the BS may provide information about the cell of the scheduling cell to the UE. For example, the BS may inform the UE whether the serving cell is scheduled by the PDCCH on another (scheduling) cell or by the serving cell. If the serving cell is scheduled by another (scheduling) cell, the BS may inform the UE which cell signals the DL assignment and UL grant of the serving cell. In the present disclosure, the cell carrying the PDCCH is referred to as the scheduling cell, and the cell whose transmission of the PUSCH or PDSCH is scheduled by the DCI included in the PDCCH (i.e., the cell carrying the PUSCH or PDSCH scheduled by the PDCCH) is referred to as the scheduled cell.
[0109] PDSCH is a physical layer UL channel for UL data transmission. PDSCH carries DL data (e.g., DL-SCH transport blocks) and is subjected to modulation such as quadrature phase shift keying (QPSK), 16 quadrature amplitude modulation (QAM), 64 QAM, 256 QAM, etc. Codewords are generated by encoding transport blocks (TBs). PDSCH can carry up to two codewords. Scrambling and modulation mapping of each codeword can be performed, and modulation symbols generated from each codeword can be mapped to one or more layers. Each layer is mapped to a radio resource together with a DMRS and generated as an OFDM symbol signal. Then, the OFDM symbol signal is sent through the corresponding antenna port.
[0110] PUCCH is a physical layer UL channel for uplink control information (UCI) transmission. PUCCH carries UCI. The types of UCI sent on PUCCH include hybrid automatic repeat request acknowledgment (HARQ-ACK) information, scheduling request (SR) and channel state information (CSI). UCI bits include HARQ-ACK information bits (if present), SR information bits (if present), link recovery request (LRR) information bits (if present) and CSI bits (if present). In the present disclosure, the HARQ-ACK information bits correspond to the HARQ-ACK codebook. In particular, the bit sequence in which the HARQ-ACK information bits are arranged according to a predetermined rule is referred to as the HARQ-ACK codebook.
[0111] - Scheduling Request (SR): Information used to request UL-SCH resources.
[0112] - Hybrid Automatic Repeat Request (HARQ)-Acknowledgement (ACK): A response to a DL data packet (e.g., a codeword) on the PDSCH. The HARQ-ACK indicates whether the communication device successfully received the DL data packet. In response to a single codeword, a 1-bit HARQ-ACK may be sent. In response to two codewords, a 2-bit HARQ-ACK may be sent. The HARQ-ACK response includes a positive ACK (abbreviated as ACK), a negative ACK (NACK), a discontinuous transmission (DTX), or NACK / DTX. Here, the term HARQ-ACK may be used interchangeably with HARQ ACK / NACK, ACK / NACK, or A / N.
[0113] - Channel State Information (CSI): Feedback information about a DL channel. CSI may include channel quality information (CQI), rank indicator (RI), precoding matrix indicator (PMI), CSI-RS resource indicator (CRI), SS / PBCH resource block indicator (SSBRI), and layer indicator (L1). According to the type of UCI included in the CSI, the CSI may be classified into CSI part 1 and CSI part 2. For example, CRI, RI, and / or CQI of a first codeword may be included in CSI part 1, and LI, PMI, and / or CQI of a second codeword may be included in CSI part 2.
[0114] - Link Recovery Request (LRR)
[0115] In the present disclosure, for convenience, the PUCCH resources configured / indicated by the BS for / to the UE for HARQ-ACK, SR, and CSI transmission are respectively referred to as HARQ-ACK PUCCH resources, SR PUCCH resources, and CSI PUCCH resources.
[0116] A Scheduling Request (SR) is used by a UE to request UL-SCH resources for (new) transmission. The MAC entity in the MAC layer above the PHY layer can be configured with zero, one or more SR configurations. An SR configuration includes a set of PUCCH resources for SR across different BWPs. In order to accommodate different types of data transmission services, multiple types of logical channels are defined, each supporting a specific type of information. The MAC entity supports mapping between logical channels and transport channels (e.g., UL-SCH and DL SCH). For a logical channel, at most one PUCCH resource is configured for the SR per BWP. For example, for a logical channel, the SR configuration applicable to the logical channel can be indicated to the UE by the ID of the SR configuration. Each SR configuration corresponds to one or more logical channels. Each logical channel can be mapped to zero or more SR configurations, which are configured by RRC signaling from the network. If SR is triggered, the MAC entity has an SR transmission opportunity on a valid PUCCH resource configured for SR, the SR prohibit timer is not running at the SR transmission opportunity, and the PUCCH resource used for the SR transmission opportunity does not overlap with a measurement gap or a UL-SCH resource (e.g., a PUSCH resource), and the MAC entity instructs the PHY layer below the MAC layer to signal the SR on one valid PUCCH resource for SR. If UL data is available for the MAC entity for a logical channel belonging to a logical channel group including one or more logical channels, and if there are no UL resources available for new transmission, SR may be triggered.
[0117] The UE is configured with a set of configurations for SR in PUCCH transmission using PUCCH format 0 or PUCCH format 1 through a higher layer (e.g., RRC) parameter SchedulingRequestResourceConfig provided by the network. The higher layer (e.g., RRC) parameter SchedulingRequestResourceConfig may include a parameter SchedulingRequestResourceId identifying the SR resources on the PUCCH, a parameter SchedulingRequestId indicating the ID of the SR configuration using the SR resources, and a parameter periodityAndOffset indicating the SR periodicity and SR offset. The parameter SchedulingRequestResourceConfig may include the ID of the PUCCH resource on which the UE will send the SR. The UE is configured with the PUCCH resources by providing the higher layer parameter SchedulingRequestResourceId of PUCCH format 0 resources or PUCCH format 1 resources. The UE is also configured with the periodic SR in a symbol or in a slot through a higher layer parameter periodityAndOffset of the network. PERIODICITY and the offset SR in the time slot OFFSET , used to transmit the PUCCH transmission of SR. If SR PERIODICITY is greater than one time slot, then if (n f *N frame,u slot +n u s,f -SR OFFSET )mod SR PERIODICITY = 0, the UE can determine that the SR transmission opportunity in the PUCCH is at the time with number n f The frame with number N u s,f If SR PERIODICITY is a time slot, then the UE expects SR OFFSET = 0, and each time slot is an opportunity for SR transmission in PUCCH. PERIODICITY Less than one time slot, then if (l-l0mod SR PERIODICITY ) mod SR PERIODICITY=0, the UE determines that the SR transmission opportunity in the PUCCH starts from the symbol of index l, where l0 is the index of the starting symbol of the corresponding PUCCH format. According to some opportunities (for example, 3GPP TS 38.213 Rel-15), the UE sends PUCCH in the PUCCH resources used for the corresponding SR configuration only when the UE sends a positive SR. Further, according to some scenarios (for example, 3GPP TS 38.213 Rel-150), determined by the set of SchedulingRequestResourceId, the UE is configured to send K PUCCHs for respective K SRs in the time slot using SR transmission opportunities that will overlap with PUCCH transmissions with HARQ-ACK information from the UE in the time slot or that will overlap with PUCCH transmissions with CSI reports from the UE in the time slot.
[0118] For example, if the UE uses PUCCH format 2, PUCCH format 3, or PUCCH format 4 in a time slot, ACK If HARQ-ACK information bits are sent on PUCCH, ceil{log2(K+1)} bits representing negative SR or positive SR are appended to the HARQ-ACK information bits in ascending order of the value of SchedulingRequestResourceId, and the UE sends combined UCI bits on PUCCH for transmission of HARQ-ACK information bits using resources with PUCCH format 2, PUCCH format 3, or PUCCH format 4. An all-zero value for ceil{log2(K+1)} bits represents a negative SR value across all K SRs.
[0119] In another example, if the UE is to send periodic / semi-persistent CSI in resources using PUCCH format 2 or PUCCH format 3 or PUCCH format 4 in a time slot, the ceil{log2(K+1)} bits representing the corresponding negative SR or positive SR are appended to the periodic / semi-persistent CSI bits in ascending order of SchedulingRequestResourceId values, and the UE sends PUCCH with combined UCI bits for CSI reporting in resources with PUCCH format 2 or PUCCH format 3 or PUCCH format 4.
[0120] According to the UCI payload size and / or transmission length (eg, the number of symbols included in the PUCCH resource), the PUCCH format may be defined as follows. For the PUCCH format, reference may also be made to Table 4.
[0121] (0) PUCCH format 0 (PF0 or F0)
[0122] - Supported UCI payload size: up to K bits (e.g., K=2)
[0123] -Number of OFDM symbols constituting a single PUCCH: 1 to X symbols (e.g., X=2)
[0124] -Transmission structure: Only UCI signal without DMRS is included in PUCCH format 0. UE sends UCI status by selecting and sending one of multiple sequences. For example, UE sends specific UCI to BS by sending one of multiple sequences via PUCCH (PUCCH format 0). UE sends PUCCH (PUCCH format 0) in PUCCH resources for corresponding SR configuration only when sending positive SR.
[0125] - The configuration of PUCCH format 0 includes the following parameters corresponding to the PUCCH resource: the index of the initial cyclic shift, the number of symbols used for PUCCH transmission and / or the first symbol used for PUCCH transmission.
[0126] (1) PUCCH format 1 (PF1 or F1)
[0127] - Supported UCI payload size: up to K bits (e.g., K=2)
[0128] -The number of OFDM symbols constituting a single PUCCH: Y to Z symbols (e.g., Y=4 and Z=14)
[0129] -Transmission structure: DMRS and UCI are configured in / mapped to different OFDM symbols by TDM. In other words, DMRS is transmitted in symbols where modulation symbols are not transmitted, and UCI is expressed as the product between a specific sequence (e.g., orthogonal cover code (OCC)) and a modulation (e.g., QPSK) symbol. Code division multiplexing (CDM) is supported between multiple PUCCH resources (compliant with PUCCH format 1) (within the same RB) by applying cyclic shift (CS) / OCC to both UCI and DMRS. PUCCH format 1 carries up to 2 bits of UCI, and modulation symbols are spread in the time domain by OCC (configured differently depending on whether frequency hopping is performed).
[0130] - The configuration of PUCCH format 1 includes the following parameters corresponding to the PUCCH resource: the index of the initial cyclic shift, the number of symbols used for PUCCH transmission, the first symbol used for PUCCH transmission and / or the index of the OCC.
[0131] (2) PUCCH format 2 (PF2 or F2)
[0132] - Supported UCI payload size: more than K bits (e.g., K=2)
[0133] -Number of OFDM symbols constituting a single PUCCH: 1 to X symbols (e.g., X=2)
[0134] -Transmission structure: DMRS and UCI are configured / mapped using frequency division multiplexing (FDM) within the same symbol. The UE transmits UCI by applying IFFT without DFT to the coded UCI bits. PUCCH format 2 carries UCI of a larger bit size than K bits, and the modulation symbols are subjected to FDM with DMRS for transmission. For example, DMRS is located in symbol indexes #1, #4, #7, and #10 within a given RB with a density of 1 / 3. Pseudo-noise (PN) sequence is used for the DMRS sequence. Frequency hopping can be enabled for 2-symbol PUCCH format 2.
[0135] - The configuration of PUCCH format 2 includes the following parameters corresponding to the PUCCH resources: the number of PRBs, the number of symbols used for PUCCH transmission and / or the first symbol used for PUCCH transmission.
[0136] (3) PUCCH format 3 (PF3 or F3)
[0137] - Supported UCI payload size: more than K bits (e.g., K=2)
[0138] -The number of OFDM symbols constituting a single PUCCH: Y to Z symbols (e.g., Y=4 and Z=14)
[0139] -Transmission structure: DMRS and UCI are configured / mapped to different OFDM symbols by TDM. UE transmits UCI by applying DFT to the coded UCI bits. PUCCH format 3 does not support UE multiplexing for the same time-frequency resource (eg, the same PRB).
[0140] - The configuration of PUCCH format 3 includes the following parameters corresponding to the PUCCH resources: the number of PRBs, the number of symbols used for PUCCH transmission and / or the first symbol used for PUCCH transmission.
[0141] (4) PUCCH format 4 (PF4 or F4)
[0142] - Supported UCI payload size: more than K bits (e.g., K=2)
[0143] -The number of OFDM symbols constituting a single PUCCH: Y to Z symbols (e.g., Y=4 and Z=14)
[0144] - Transmission structure: DMRS and UCI are configured / mapped in TDM to different OFDM symbols. By applying OCC at the front end of the DFT and CS to DMRS (or interleaved FDM (IFDM) mapping), PUCCH format 4 can multiplex up to 4 UEs in the same PRB. In other words, the modulation symbols of UCI undergo TDM with DMRS for transmission.
[0145] - The configuration of PUCCH format 4 includes the following parameters for the corresponding PUCCH resource: the number of symbols for PUCCH transmission, the length of OCC, the index of OCC, and the first symbol for PUCCH transmission.
[0146] The following table shows PUCCH formats. According to the PUCCH transmission length, PUCCH formats can be divided into short PUCCH formats (format 0 and 2) and long PUCCH formats (format 1, 3, and 4).
[0147] [Table 4]
[0148]
[0149] PUCCH resources can be determined according to the UCI type (e.g., A / N, SR, or CSI). The PUCCH resources for UCI transmission can be determined based on the UCI (payload) size. For example, the BS can configure multiple PUCCH resource sets for the UE, and the UE can select a specific PUCCH resource set corresponding to a specific range according to the range of the UCI (payload) size (e.g., the number of UCI bits). For example, the UE can select one of the following PUCCH resource sets according to the number of UCI bits NUCI.
[0150] - PUCCH resource set #0, if the number of UCI bits <= 2
[0151] - PUCCH resource set #1, if 2 < the number of UCI bits <= N1 ...
[0153] - PUCCH resource set #(K - 1), if N K-2 < the number of UCI bits <= N K-1
[0154] Here, K represents the number of PUCCH resource sets (K > 1), and N i represents the maximum number of UCI bits supported by PUCCH resource set #i. For example, PUCCH resource set #1 can include resources of PUCCH formats 0 to 1, and other PUCCH resource sets can include resources of PUCCH formats 2 to 4 (see Table 4).
[0155] The configuration of each PUCCH resource includes the configuration of a PUCCH resource index, a starting PRB index, and one of PUCCH formats 0 to PUCCH formats 4. The BS configures the UE, through the high-level parameter maxCodeRate, the code rate for multiplexing HARQ-ACK, SR, and CSI reports within a PUCCH transmission using PUCCH format 2, PUCCH format 3, or PUCCH format 4. The high-level parameter maxCodeRate is used to determine how to feed back UCI on a PUCCH resource of PUCCH format 2, 3, or 4.
[0156] If the UCI type is SR and CSI, the PUCCH resources to be used for UCI transmission in the PUCCH resource set may be configured for the UE through high-layer signaling (e.g., RRC signaling). If the UCI type is HARQ-ACK for a semi-persistently scheduled (SPS) PDSCH, the PUCCH resources to be used for UCI transmission in the PUCCH resource set may be configured for the UE through high-layer signaling (e.g., RRC signaling). On the other hand, if the UCI type is HARQ-ACK for a PDSCH scheduled by DCI, the PUCCH resources to be used for UCI transmission in the PUCCH resource set may be scheduled by DCI.
[0157] In the case of DCI-based PUCCH resource scheduling, the BS may send DCI to the UE on the PDCCH and indicate the PUCCH resources to be used for UCI transmission in a specific PUCCH resource set through an ACK / NACK resource indicator (ARI) in the DCI. The ARI may be used to indicate the PUCCH resources used for ACK / NACK transmission and is also referred to as a PUCCH resource indicator (PRI). Here, the DCI may be used for PDSCH scheduling and the UCI may include HARQ-ACK for the PDSCH. The BS may configure a PUCCH resource set including a greater number of PUCCH resources than the state that the ARI can represent for the UE through (UE-specific) high-layer (e.g., RRC) signaling. The ARI may indicate a PUCCH resource subset of the PUCCH resource set, and which PUCCH resource in the indicated PUCCH resource subset to be used may be determined according to an implicit rule based on transmission resource information about the PDCCH (e.g., the starting CCE index of the PDCCH).
[0158] For UL-SCH data transmission, the UE should include UL resources available to the UE, and for DL-SCH data reception, the UE should include DL resources available to the UE. The BS assigns UL resources and DL resources to the UE through resource allocation. Resource allocation may include time domain resource allocation (TDRA) and frequency domain resource allocation (FDRA). In the present disclosure, UL resource allocation is also referred to as UL grant, and DL resource allocation is referred to as DL assignment. The UL grant is dynamically received by the UE on the PDCCH or in the RAR, or semi-persistently configured by the BS for the UE through RRC signaling. The DL assignment is dynamically received by the UE on the PDCCH, or semi-persistently configured by the BS for the UE through RRC signaling.
[0159] On the UL, the BS can dynamically allocate UL resources to the UE through a PDCCH addressed to a cell radio network temporary identifier (C-RNTI). The UE monitors the PDCCH to discover possible UL grants for UL transmission. The BS can allocate UL resources to the UE using a configuration grant. Two types of configuration grants are available, type 1 and type 2. In type 1, the BS directly provides the configured UL grant (including periodicity) through RRC signaling. In type 2, the BS can configure the periodicity of the RRC-configured UL grant through RRC signaling, and signal, enable or disable the configured UL grant by PDCCH addressed to the configuration scheduling RNTI (CS-RNTI). For example, in type 2, the PDCCH addressed to the CS-RNTI indicates that until deactivation, the corresponding UL grant can be implicitly reused according to the periodicity configured through RRC signaling.
[0160] On the DL, the BS may dynamically allocate DL resources to the UE via a PDCCH addressed to the C-RNTI. The UE monitors the PDCCH to discover possible DL grants. The BS may use SPS to allocate DL resources to the UE. The BS may configure the periodicity of the configured DL assignments via RRC signaling, and signal, enable, or disable the configured DL assignments via a PDCCH addressed to the CS-RNTI. For example, the PDCCH addressed to the CS-RNTI indicates that until deactivation, the corresponding DL assignment may be implicitly reused according to the periodicity configured via RRC signaling.
[0161] Hereinafter, resource allocation through PDCCH and resource allocation through RRC will be described in more detail.
[0162] * Resource allocation via PDCCH: dynamic grant / assignment
[0163] The PDCCH may be used to schedule DL transmissions on the PDSCH and UL transmissions on the PUSCH. The DCI on the PDCCH for scheduling DL transmissions may include a DL resource assignment, which includes at least a modulation and coding format associated with the DL-SCH (e.g., a modulation and coding scheme (MCS) index IMCS), resource allocation, and HARQ information. The DCI on the PDCCH for scheduling UL transmissions may include a UL scheduling grant, which includes at least a modulation and coding format associated with the UL-SCH, resource allocation, and HARQ information. The HARQ information about the DL-SCH or UL-SCH may include a new information indicator (NDI), a transport block size (TBS), a redundancy version (RV), and a HARQ process ID (ie, a HARQ process number). The size and purpose of the DCI carried by one PDCCH vary depending on the DCI format. For example, DCI format 0_0, DCI format 0_1, or DCI format 0_2 may be used to schedule PUSCH, and DCI format 1_0, DCI format 1_1, or DCI format 1_2 may be used to schedule PDSCH. Specifically, DCI format 0_2 and DCI format 1_2 may be used to schedule transmissions with higher transmission reliability and lower delay requirements than those guaranteed by DCI format 0_0, DCI format 0_1, DCI format 1_0, or DCI format 1_1. Some embodiments of the present disclosure may be applied to UL data transmission based on DCI format 0_2. Some embodiments of the present disclosure may be applied to DL data reception based on DCI format 1_2.
[0164] Figure 7 An example of PDSCH TDRA caused by PDCCH and an example of PUSCH TDRA caused by PDCCH are shown.
[0165] The DCI carried by the PDCCH for scheduling PDSCH or PUSCH includes a TDRA field. The TDRA field provides a value m of row index m+1 for the allocation table of the PDSCH or PUSCH. The predefined default PDSCH time domain allocation is applied as the allocation table of the PDSCH, or the PDSCH TDRA table configured by the BS through the RRC signal pdsch-TimeDomainAllocationList is applied as the allocation table of the PDSCH. The predefined default PUSCH time domain allocation is applied as the allocation table of the PUSCH, or the PUSCH TDRA table configured by the BS through the RRC signal pusch-TimeDomainAllocationList is applied as the allocation table of the PUSCH. The PDSCH TDRA table to be applied and / or the PUSCH TDRA table to be applied can be determined according to fixed / predefined rules (for example, refer to 3GPP TS 38.214).
[0166] In the PDSCH time domain resource configuration, each index row defines the DL assignment with the PDSCH slot offset K0, the start and length indicator value SLIV (or the starting position (e.g., starting symbol index S) and allocation length (e.g., number of symbols L) of the PDSCH in the direct slot), and the PDSCH mapping type. In the PUSCH time domain resource configuration, each index row defines the UL grant with the PUSCH slot offset K2, the starting position (e.g., starting symbol index S) and allocation length (e.g., number of symbols L) of the PUSCH in the slot, and the PUSCH mapping type. K0 of PDSCH and K2 of PUSCH indicate the difference between the slot with PDCCH and the slot with PDSCH or PUSCH corresponding to PDCCH. SLIV represents a joint indicator of the starting symbol S relative to the start of the slot with PDSCH or PUSCH and the number of consecutive symbols L counted from symbol S. There are two PDSCH / PUSCH mapping types: one is mapping type A and the other is mapping type B. In the case of PDSCH / PUSCH mapping type A, DMRS is mapped to the PDSCH / PUSCH resource relative to the start of the time slot. Depending on other DMRS parameters, one or two symbols of the PDSCH / PUSCH resource may be used as DMRS symbols. For example, in the case of PDSCH / PUSCH mapping type A, according to RRC signaling, the DMRS is located in the third symbol (symbol #2) or the fourth symbol (symbol #3) in the time slot. In the case of PDSCH / PUSCH mapping type B, DMRS is mapped relative to the first OFDM symbol of the PDSCH / PUSCH resource. Depending on other DMRS parameters, one or two symbols from the first symbol of the PDSCH / PUSCH resource may be used as DMRS symbols. For example, in the case of PDSCH / PUSCH mapping type B, DMRS is located at the first symbol allocated for PDSCH / PUSCH. In the present disclosure, the PDSCH / PUSCH mapping type may be referred to as a mapping type or a DMRS mapping type. For example, in the present disclosure, PUSCH mapping type A may be referred to as mapping type A or DMRS mapping type A, and PUSCH mapping type B may be referred to as mapping type B or DMRS mapping type B.
[0167] The scheduling DCI includes an FDRA field that provides assignment information about RBs for PDSCH or PUSCH. For example, the FDRA field provides information about a cell used for PDSCH or PUSCH transmission to a UE, information about a BWP used for PDSCH or PUSCH transmission, and / or information about RBs used for PDSCH or PUSCH transmission.
[0168] * Resource allocation via RRC
[0169] As described above, there are two types of transmission without dynamic grant: configuration grant type 1 and configuration grant type 2. In configuration grant type 1, the UL grant is provided by RRC and stored as a configuration UL grant. In configuration grant type 2, the UL grant is provided by PDCCH and stored or cleared as a configuration UL grant based on L1 signaling indicating activation or deactivation of the configuration UL grant. Type 1 and type 2 can be configured by RRC per serving cell and per BWP. Multiple configurations can be valid simultaneously on different serving cells.
[0170] When configuration grant type 1 is configured, the following parameters may be provided to the UE via RRC signaling:
[0171] -cs-RNTI, corresponding to the CS-RNTI used for retransmission;
[0172] -periodicity, corresponds to the periodicity of configuration permission type 1;
[0173] -timeDomainOffset, indicating the resource offset in the time domain relative to the system frame number (SFN) = 0;
[0174] -timeDomainAllocation value m, providing the row index m+1 pointing to the allocation table, indicating the combination of start symbol S, length L and PUSCH mapping type;
[0175] -frequencyDomainAllocation, which provides frequency domain resource allocation; and
[0176] -mcsAndTBS, which provides I2C indicating the modulation order, target code rate, and transport block size MCS .
[0177] When a configured grant type 1 is configured for a serving cell through RRC, the UE stores the UL grant provided by the RRC as the configured UL grant for the indicated serving cell, and initializes or reinitializes the configured UL grant to start at a symbol according to timeDomainOffset and S (derived from SLIV) and repeat with periodicity. After configuring UL grant for configuration grant type 1, the UE may consider the UL grant to be repeated in association with each symbol satisfying the following formula: [(SFN*numberOfSlotsPerFrame(numberOfSymbolsPerSlot)+(number of slots in frame*numberOfSymbolsPerSlot)+number of symbols in slot]=(timeDomainOffset*numberOfSymbolsPerSlot+S+N*periodicity) modulo (1024*numberOfSlotsPerFrame*numberOfSymbolsPerSlot), for all N>=0, where numberOfSlotsPerFrame and numberOfSymbolsPerSlot indicate the number of consecutive slots per frame and the number of consecutive OFDM symbols per slot, respectively (refer to Table 1 and Table 2).
[0178] For configuration grant type 2, the BS may provide the following parameters to the UE via RRC signaling:
[0179] -cs-RNTI, corresponding to the CS-RNTI used for activation, deactivation and retransmission; and
[0180] -periodicity, provides the periodicity for configuring permission type 2.
[0181] The actual UL grant is provided to the UE via the PDCCH (addressed to the CS-RNTI). After configuring the UL grant for configuration grant type 2, the UE may consider the UL grant to be repeated in association with each symbol satisfying the following equation: [(SFN * numberOfSlotsPerFrame * numberOfSymbolsPerSlot) + (number of slots in a frame * numberOfSymbolsPerSlot) + number of symbols in a slot] = [(SFN 开始时间 *numberOfSlotsPerFrame*numberOfSymbolsPerSlot+slot 开始时间 *numberOfSymbolsPerSlot+symbol 开始时间)+N*periodicity] modulo (1024*numberOfSlotsPerFrame*numberOfSymbolsPerSlot), for all N>=0, where SFN 开始时间 、slot 开始时间 and symbol 开始时间 denote the SFN, slot and symbol of the first transmission opportunity of PUSCH after the configuration grant is (re)initialized, respectively. numberOfSlotsPerFrame and numberOfSymbolsPerSlot indicate the number of consecutive slots per frame and the number of consecutive OFDM symbols per slot, respectively (refer to Table 1 and Table 2).
[0182] In some scenarios, the BS may further provide the UE with a parameter harq-ProcID-Offset and / or a parameter harq-ProcID-Offset2 for deriving the HARQ process ID of the configured UL grant. harq-ProcID-Offset is an offset of the HARQ process of the configured grant for shared spectrum channel access operation, and harq-ProcID-Offset2 is an offset of the HARQ process of the configured grant. In the present disclosure, cg-RetransmissionTimer is a duration after a transmission (retransmission) based on the configured grant, wherein the UE should not autonomously perform retransmissions based on the HARQ process of the transmission (retransmission). The cg-RetransmissionTimer may be provided to the UE by the BS when configuring retransmissions regarding the configured UL grant. For a configuration grant where neither harq-ProcID-Offset nor cg-RetransmissionTimer is configured, the HARQ process ID associated with the first symbol of UL transmission may be derived from the following formula: HARQ process ID = [floor (CURRENT_symbol / periodicity)] modulonrofHARQ-Processes. For a configured UL grant with harq-ProcID-Offset2, the HARQ process ID associated with the first symbol of the UL transmission can be derived from the following formula: HARQ process ID = [floor (CURRENT_symbol / periodicity)] modulo nrofHARQ-Processes + harq-ProcID-Offset2, where CURRENT_symbol = (SFN * numberOfSlotsPerFrame * numberOfSymbolsPerSlot + number of slots in a frame * numberOfSymbolsPerSlot + number of symbols in a slot), and numberOfSlotsPerFrame and numberOfSymbolsPerSlot represent the number of consecutive slots per frame and the number of consecutive OFDM symbols per slot, respectively. For a configured UL grant with cg-RetransmissionTimer, the UE can select the HARQ process ID from the HARQ process IDs available for the configured grant configuration.
[0183] On the DL, semi-persistent scheduling (SPS) may be provided to the UE via RRC signaling from the BS per serving cell and per BWP. For DL SPS, the DL assignment is provided to the UE via PDCCH and is stored or cleared based on L1 signaling indicating SPS activation or deactivation. When SPS is configured, the following parameters may be provided by the BS to the UE via RRC signaling (e.g., SPS configuration) for configuring semi-persistent transmission:
[0184] -cs-RNTI, corresponding to the CS-RNTI used for activation, deactivation and retransmission;
[0185] -nrofHARQ-Processes, provides the number of HARQ processes used for SPS;
[0186] -periodicity, provides the periodicity of the configured DL assignments for SPS;
[0187] -n1PUCCH-AN, which provides HARQ resources for PUCCH for SPS (the network configures the HARQ resources as format 0 or format 1, and the actual PUCCH resources are configured by PUCCH-Config and referenced by its ID in n1PUCCH-AN).
[0188] Multiple DL SPS configurations may be configured within the BWP of the serving cell. After configuring DL assignments for SPS, the UE may sequentially consider that the Nth DL assignment occurs in a slot that satisfies the following equation: (numberOfSlotsPerFrame*SFN+number of slots in a frame) = [(numberOfSlotsPerFrame*SFN 开始时间 +slot 开始时间 )+N*periodicity*numberOfSlotsPerFrame / 10] modulo (1024*numberOfSlotsPerFrame), where SFN start time and slot 开始时间 denote the SFN and time slot of the first transmission of PDSCH after the configuration DL assignment is (re)initialized, numberOfSlotsPerFrame and numberOfSymbolsPerSlot respectively indicate the number of consecutive time slots per frame and the number of consecutive OFDM symbols per time slot (refer to Table 1 and Table 2).
[0189] In some scenarios, the BS may further provide the UE with a parameter harq-ProcID-Offset for deriving the HARQ process ID of the configured DL assignment. harq-ProcID-Offset is the offset of the HARQ process of the SPS. For a configured DL assignment without harq-ProcID-Offset, the HARQ process ID associated with the time slot in which the DL transmission starts may be determined from the following formula: HARQ Process ID = [floor (CURRENT_slot*10 / (numberOfSlotsPerFrame*periodicity))] modulonrofHARQ-Processes, where CURRENT_slot = [(SFN*numberOfSlotsPerFrame) + the time slot number in the frame], and numberOfSlotsPerFrame represents the number of consecutive time slots per frame. For a configured DL assignment with harq-ProcID-Offset, the HARQ process ID associated with the time slot where the DL transmission starts can be determined from the following formula: HARQ Process ID = [floor (CURRENT_slot / periodicity)] modulo nrofHARQ-Processes + harq-ProcID-Offset, where CURRENT_slot = [(SFN*numberOfSlotsPerFrame) + time slot number in the frame], and numberOfSlotsPerFrame represents the number of consecutive time slots per frame.
[0190] If the CRC of the corresponding DCI format is scrambled with the CS-RNTI provided by the RRC parameter cs-RNTI and the New Data Indicator field of the Enabled Transport Block is set to 0, the UE verifies the DL SPS assignment PDCCH or configures the UL grant type 2 PDCCH for scheduling enablement or scheduling release. If all fields of the DCI format are set according to Table 5 and Table 6, the verification of the DCI format is achieved. Table 5 shows an example of special fields for DL SPS and UL grant type 2 scheduling enable PDCCH verification, and Table 6 shows an example of special fields for DL SPS and UL grant type 2 scheduling release PDCCH verification.
[0191] [Table 5]
[0192]
[0193] [Table 6]
[0194]
[0195] The actual DL assignment and UL grant and corresponding MCS for DL SPS or UL grant type 2 are provided by the resource assignment fields (e.g., the TDRA field providing the TDRA value m, the FDRA field providing the frequency resource block assignment, and / or the MCS field) in the DCI format carried by the corresponding DL SPS or UL grant type 2 scheduling enable PDCCH. If verification is implemented, the UE regards the information in the DCI format as a valid enablement or a valid release of DL SPS or configuration UL grant type 2.
[0196] In the present disclosure, a PDSCH based on DL SPS may be referred to as an SPS PDSCH, and a PUSCH based on an UL configuration grant (CG) may be referred to as a CG PUSCH. A PDSCH dynamically scheduled by a DCI carried on a PDCCH may be referred to as a dynamic grant (DG) PDSCH, and a PUSCH dynamically scheduled by a DCI carried on a PDCCH may be referred to as a DG PUSCH.
[0197] Figure 7 The HARQ-ACK transmission / reception process is shown.
[0198] Reference Figure 7 , the UE may detect the PDCCH in slot n. Next, the UE may receive the PDSCH in slot n+K0 according to the scheduling information received through the PDCCH in slot n, and then send the UCI through the PUCCH in slot n+K1. In this case, the UCI includes the HARQ-ACK response for the PDSCH.
[0199] The DCI (eg, DCI format 1_0 or DCI format 1_1) carried by the PDCCH for scheduling the PDSCH may include the following information.
[0200] -FDRA: FDRA indicates the RB set allocated to PDSCH.
[0201] -TDRA: TDRA indicates the DL assignment with the PDSCH slot offset K0, the starting position (e.g., symbol index S) and length (e.g., number of symbols L) of the PDSCH in the slot, and the PDSCH mapping type. PDSCH mapping type A or PDSCH mapping type B may be indicated by TDRA. For PDSCH mapping type A, the DMRS is located in the third symbol (symbol #2) or the fourth symbol (symbol #3) in the slot. For PDSCH mapping type B, the DMRS is allocated in the first symbol allocated for the PDSCH.
[0202] -PDSCH-to-HARQ_feedback timing indicator: This indicator indicates K1.
[0203] If the PDSCH is configured to send up to one TB, the HARQ-ACK response may consist of one bit. If the PDSCH is configured to send up to 2 TBs, the HARQ-ACK response may consist of 2 bits when spatial bundling is not configured and one bit when spatial bundling is configured. When the HARQ-ACK transmission timing for multiple PDSCHs is specified as time slot n+K1, the UCI sent in time slot n+K1 includes the HARQ-ACK responses for multiple PDSCHs.
[0204] In the present disclosure, a HARQ-ACK payload consisting of HARQ-ACK bits of one or more PDSCHs may be referred to as a HARQ-ACK codebook. According to the HARQ-ACK payload determination scheme, the HARQ-ACK codebook may be classified into i) a semi-static HARQ-ACK codebook, ii) a dynamic HARQ-ACK codebook, and iii) a HARQ process-based HARQ-ACK codebook.
[0205] In the case of a semi-static HARQ-ACK codebook, parameters related to the HARQ-ACK payload size to be reported by the UE are semi-statically determined by a (UE-specific) high-level (e.g., RRC) signal. The HARQ-ACK payload size of the semi-static HARQ-ACK codebook (e.g., the (maximum) HARQ-ACK payload (size) sent by one PUCCH in one slot) can be determined based on the number of HARQ-ACK bits corresponding to the combination (hereinafter, the bundling window) of all DL carriers (i.e., DL serving cells) configured for the UE and all DL scheduling slots (or PDSCH transmission slots or PDCCH monitoring slots) that can indicate HARQ-ACK transmission timing. That is, in the semi-static HARQ-ACK codebook scheme, the size of the HARQ-ACK codebook is fixed (to a maximum value) regardless of the amount of DL data actually scheduled. For example, the DL grant DCI (PDCCH) includes PDSCH and HARQ-ACK timing information, and the PDSCH and HARQ-ACK timing information can have one of multiple values (e.g., k). For example, when a PDSCH is received in slot #m and the PDSCH and HARQ-ACK timing information in the DL grant DCI (PDCCH) for scheduling the PDSCH indicates k, the HARQ-ACK information of the PDSCH may be sent in slot #(m+k). As an example, k∈{1,2,3,4,5,6,7,8}. When HARQ-ACK information is sent in slot #n, the HARQ-ACK information may include the maximum possible HARQ-ACK based on the bundling window. That is, the HARQ-ACK information of slot #n may include the HARQ-ACK corresponding to slot #(nk). For example, when k∈{1,2,3,4,5,6,7,8}, the HARQ-ACK information of slot #n may include the HARQ-ACK corresponding to slot #(n-8) to slot #(n-1), regardless of the actual DL data reception (ie, the maximum number of HARQ-ACKs). Here, the HARQ-ACK information may be replaced by a HARQ-ACK codebook or a HARQ-ACK payload. The time slot may be understood / replaced as a candidate time for DL data reception. As described in the example, the bundling window may be determined based on the PDSCH and HARQ-ACK timing based on the HARQ-ACK time slot, and the PDSCH and HARQ-ACK timing sets may have predefined values (e.g., {1, 2, 3, 4, 5, 6, 7, 8}) or may be configured by high-level (RRC) signaling. The semi-static HARQ-ACK codebook is referred to as a type 1 HARQ-ACK codebook. For a type 1 HARQ-ACK codebook, the number of bits to be sent in the HARQ-ACK report is fixed and may be large. If many cells are configured but only a few are scheduled, the type 1 HARQ-ACK codebook may be inefficient.
[0206] In the case of a dynamic HARQ-ACK codebook, the HARQ-ACK payload size to be reported by the UE can be dynamically changed through DCI or the like. The dynamic HARQ-ACK codebook is called a type 2 HARQ-ACK codebook. The type 2 HARQ-ACK codebook can be regarded as an optimized HARQ-ACK feedback because the UE sends feedback only for the scheduled serving cells. However, under poor channel conditions, the UE may incorrectly determine the number of scheduled serving cells. To address this problem, a downlink assignment index (DAI) may be included as part of the DCI. For example, in a dynamic HARQ-ACK codebook scheme, the DL scheduling DCI may include a counter-DAI (ie, c-DAI) and / or a total-DAI (ie, t-DAI). Here, the DAI indicates a downlink assignment index and is used by the BS to inform the UE of the PDSCH whose HARQ-ACK is to be included in a HARQ-ACK transmission sent or scheduled by the UE. Specifically, c-DAI is an index indicating the order between PDCCHs carrying DL scheduling DCI (hereinafter, DL scheduling PDCCHs), and t-DAI is an index indicating the total number of DL scheduling PDCCHs until the current slot in which there is a PDCCH with t-DAI.
[0207] In the case of a HARQ process-based HARQ-ACK codebook, the HARQ-ACK payload is determined based on all HARQ processes of all configured (or enabled) serving cells in the PUCCH group. For example, the size of the HARQ-ACK payload to be reported by the UE using the HARQ process-based HARQ-ACK codebook may be determined based on the number of all configured or enabled serving cells in the PUCCH group configured for the UE and the number of HARQ processes of the serving cells. The HARQ process-based HARQ-ACK codebook is also referred to as a type 3 HARQ-ACK codebook. The type 3 HARQ-ACK codebook may be applied to one-time feedback.
[0208] Extended reality (XR) is an ultra-immersive technology and service that provides an environment in which users can communicate and live in a virtual space similar to reality without time and space constraints by utilizing virtual reality (VR), augmented reality (AR), mixed reality (MR), holographic technology, etc. XR is one of the main services introduced in the NR wireless communication system. The typical feature of XR is a specific business with one or more DL video streams that are tightly synchronized with frequent UL gesture / control updates. In addition, XR has a high data rate and a strict packet delay budget (PDB). The PDB defines an upper limit on the time that a packet can be delayed between the UE and the user plane function (UPF) in the core network. In other words, the PDB represents the amount of time within which the generated packet should be sent.
[0209] Video streaming is the most important flow for XR use cases. Video is divided into individual frames before transmission. For example, a group of pictures (GOP) for video coding can include the following picture types.
[0210] >I picture or I frame (intra-coded picture, also called key frame or i-frame): I picture or I frame is coded independently of all other pictures. Each GOP starts with this type of picture (in decoding order).
[0211] >P picture or P frame (predictively coded picture): A P picture or P frame includes motion compensated difference information relative to the previously decoded picture. In older designs such as MPEG-1, H.262 / MPEG-2, and H.263, each P picture can only reference one picture, and the picture needs to be before the P picture not only in decoding order but also in display order. In addition, the picture should be an I or P picture. These restrictions are not applied to newer standards such as H.264 / MPEG-4 AVC and HEVC.
[0212] >B-picture or B-frame (bi-predictively coded picture): A B-picture or B-frame includes motion compensated difference information relative to the previously decoded picture. In older designs such as MPEG-1, H.262 / MPEG-2, and H.263, each B-picture can only reference two pictures: one before the B-picture and one after the B-picture in display order. All referenced pictures must be I or P pictures. These restrictions do not apply to newer standards such as H.264 / MPEG-4 AVC and HEVC.
[0213] >D picture or D frame (DC direct coded picture): D picture or D frame is used as a fast access representation of a picture for loss robustness or fast forward. D pictures are only used in MPEG-1 video.
[0214] Figure 8Example of a GOP structure / pattern illustrated. An I frame indicates the start of a GOP, followed by several P and B frames. In older designs, the allowed ordering and reference structure were relatively limited. The GOP structure is often referenced by two numbers, such as M=3 and N=12. The first number indicates the distance between two anchor frames (I or P). The second number indicates the distance between two complete images (I frames), which is the size of the GOP. In the example of M=3 and N=12, the GOP structure is IBBPBBPBBPBBI. The maximum number of B frames between two consecutive anchor frames can be used instead of the M parameter. For example, in a sequence with an IBBBBBBBBBBBBBI pattern, the GOP size (N value) is 15 (the distance between I frames), and the distance between two anchor frames (M value) is 5 (the distance between an I frame and a P frame or between two consecutive P frames). An I frame includes a complete image and does not require any additional information for reconstruction. Typically, encoders use a GOP structure that allows each I-frame to be a clean random access point so that decoding can start cleanly at the I-frame and any errors within the GOP structure can be corrected after the I-frame is processed correctly.
[0215] Video streaming is the most important flow for XR use cases. Video is divided into individual frames before transmission. Data packets representing video frames can be sent wirelessly. The mean inter-arrival time of packets is the inverse of the frame rate in frames per second. For video streaming, if there are many changes in the video on the screen, the traffic is high, whereas if there are few changes in the video, the traffic is low.
[0216] In XR, the video needs to be displayed accurately on the screen as the time stream passes. Therefore, after the time point at which XR data needs to be provided, the previous data becomes useless and it is better to provide new data.
[0217] The successful implementation of XR requires the support of the wireless system. In a 3GPP-based wireless communication system, such as an NR wireless communication system, consideration is being given to supporting XR with preconfigured resources such as SPS / CG. For example, the BS may provide the SPS / CG configuration to the UE considering the average inter-arrival time of the packets. However, due to jitter, the actual inter-arrival time of the packets is random. Jitter refers to a deviation in time that is not expected to occur in a signal with periodicity. In XR, since the amount of information per frame is different, the time required to process the frame before sending it is different, resulting in jitter. Therefore, even if a periodically occurring SPS / CG resource is configured for the UE, the UE may not be able to perform PDSCH reception / PUSCH transmission at the PDSCH opportunity / PUSCH opportunity due to jitter.
[0218] Some embodiments of the present disclosure are described below regarding SR, resource allocation, and resource usage based on traffic requirements of UEs using XR services, and more specifically PDB.
[0219] In NR, one or more SPS PDSCHs or CG PUSCHs can be configured for the UE for periodic transmission and reception or low latency and PDCCH overhead. The corresponding configured / indicated resources can be repeated periodically in the time domain according to each SPS / CG configuration. For example, the SPS / CG configuration can repeat the first configured / indicated resource allocation with a configured periodicity, and the UE can perform DL reception / UL transmission on the corresponding resources without a separate PDCCH reception process. At the same time, there are various types of data that can be generated in XR. Among these data, the sensor and location information of the UE and the video data that is usually reported with a specific periodicity are sent and received on the SPS / CG resources. In such data, the service arrival time is not constant and may jitter due to reasons such as video encoding time, sensor measurement time, higher layer operations, or routing changes of the network.
[0220] Resource allocation through dynamic scheduling can be considered for XR services. When delay-sensitive XR services are used, a method needs to be considered to ensure that such transmissions are not canceled by other transmissions. In addition, the UE needs to receive appropriate DL assignments and / or UL grants for the service. To ensure appropriate resource allocation for the service, the UE can provide requirements for service data that needs to be sent to the BS during SR. Alternatively, the UE can send information via radio resources allocated by the BS.
[0221] If the BS considers the jitter at the data occurrence time point and allocates resources to a location far enough away from the expected service occurrence time point, the availability of resources can be guaranteed, but delay time may occur. On the contrary, if SPS / CG resources with fixed periodicity are allocated at the expected data occurrence time point, during the jitter period, a larger delay time may occur due to the waiting time for the next available resource.
[0222] On the other hand, since some data is generated based on events, it is impossible to accurately determine the actual data occurrence time point. However, even for such data, the use of SPS / CG resources is considered to reduce the delay time caused by scheduling. In this case, it is possible to consider skipping a method in which the network allocates a sufficiently large amount of resources at a short period to prepare for data occurrence and the UE or BS selectively uses some of these resources and does not actually use other resources. However, in order to use the method of skipping transmission and reception, the UE and BS need to carefully consider the response signal for determining whether to perform reception and / or transmission between the UE and the BS. If the UE needs to send a response signal, even for a transmission that the UE has not yet received, the BS should always be prepared for the resources on which the UE is to send a response signal. Considering that the skip method is based on configuring a sufficiently large amount of resources within the wireless resources, configuring the resources so that the UE can send a response signal, even for a transmission that the UE has not yet received, can also act as a significant UL burden. Considering that these resources can be multiplexed between UEs, the burden of UL resources should be considered to be more important.
[0223] When XR services or similar third-party services are used, the aforementioned aspects need to be considered. In addition, the receiver may not be able to accurately predict the importance and requirements of the ongoing transmission, and only the transmitter that sends the service on the scheduled wireless resources knows the importance and requirements of the transmission. Therefore, consideration needs to be given. For example, if the service includes data that is sensitive to PDB, the receiver may not be able to accurately predict the PDB required for the TB. Therefore, it is difficult to allocate resources for retransmission at the appropriate time. If the PDB of the service is exceeded, unnecessary retransmissions may result, which not only wastes the UE's transmission power, but also wastes the system's radio resources. This may not only result in a waste of the UE's transmission power, but also a waste of the system's radio resources.
[0224] Hereinafter, while the embodiments of the present disclosure are described based on semi-statically configured DL SPS and UL CG radio resources, the embodiments of the present disclosure are not limited thereto and can be widely applied to radio resources allocated by dynamic scheduling received by the UE. As an example, an embodiment of the present disclosure in which the UE determines a HARQ-ACK timing of multiple DL radio resources allocated thereto can be applied without considering the SPS PDSCH and the PDSCH indicated by dynamic scheduling. Additionally, when multiple radio resources are not semi-statically configured and are configured by dynamic indication, for example, even when multiple radio resources are configured simultaneously by DCI, the embodiments of the present disclosure can be applied. Therefore, even if there is no separate explanation, the embodiments of the present disclosure can be applied to all types of transmission / reception methods desired by the BS and the UE. Hereinafter, for convenience of description, SPS is used as a general term collectively referred to as semi-statically configured radio resources (e.g., DL / UL SPS and CG) to describe the embodiments of the present disclosure.
[0225] In some embodiments of the present disclosure, a transmission opportunity (TO) may refer to a radio resource configured for SPS / CG (e.g., SPS PDSCH or CG PUSCH). An entity performing transmission in a TO (e.g., a BS on DL or a UE on UL) may attempt to perform transmission in the TO, and a receiver (e.g., a UE on DL or a BS on UL) may attempt to perform reception while expecting that there will be a transmission in each TO.
[0226] Hereinafter, while the embodiments of the present disclosure are described based on the NR system, the embodiments of the present disclosure are not limited to the transmission / reception of NR. Additionally, while the features and structures of XR services are used as examples in the present disclosure to describe the embodiments of the present disclosure, the embodiments of the present disclosure are not limited to the support of XR services. Even if not described separately, the embodiments of the present disclosure can be applied to all wireless communication transmission / reception structures and services.
[0227] The present disclosure describes an embodiment in which a UE sends information about requirements of a service being used through an SR and / or a buffer status report (BSR) in order to receive radio resources suitable for the requirements. In addition, the present disclosure describes an embodiment related to a method and process in which a BS schedules radio resources for a UE by considering the provided information and the UE and the BS perform transmission and reception on the radio resources.
[0228] The present disclosure describes an embodiment for activating / deactivating a semi-static configuration. For example, an embodiment of the present disclosure may include a method for a BS to allocate PDSCH / PUSCH radio resources to a UE and a method for a UE to perform DL reception or UL transmission on the allocated radio resources. Some embodiments of the present disclosure may include a method for a UE to send a HARQ-ACK PUCCH response to a PDSCH reception result, and a method for receiving a retransmitted DCI of a BS via a PDCCH after sending a PUSCH. In some embodiments of the present disclosure, a UE may send a signal and channel for announcing its capabilities and / or service requirements, and a BS may receive the signal and channel.
[0229] The UE may receive RRC configurations such as PUSCH-config and SchedulingRequestConfig from the BS for UL transmission (refer to 3GPP TS 38.331), and perform SR based on the configuration. According to some embodiments of the present disclosure, the UE may perform SR and send information such as PDBs of services that need to be sent to the BS. When sending the SR, the UE may receive scheduling from the BS via a PDCCH, which is configured according to some embodiments of the present disclosure. Then, the UE may infer the PDB guaranteed for a given resource allocation based on the scheduling of the BS according to some embodiments of the present disclosure. Alternatively, the UE may arbitrarily select a TB size, a HARQ process, etc. based on the scheduling of the BS according to some embodiments of the present disclosure, and then perform UL transmission.
[0230] Some embodiments of the present disclosure may be selectively partially applied. Some embodiments of the present disclosure may be independently executed without being combined with other embodiments, or one or more embodiments may be combined and executed in an associated form. As long as the principles of the embodiments of the present disclosure are maintained, some terms, symbols, sequences, etc. used in the present disclosure may be replaced with other terms, symbols, sequences, etc.
[0231] Some embodiments of the present disclosure may be specifically applied only when the UE receives relevant configuration information from the BS (or core network). In this case, the configuration information may be provided through higher layer signaling (e.g., SIB or RRC signaling). Alternatively, a separate signaling (e.g., DCI or MAC control element) indicating activation or deactivation of the corresponding configuration may be used together with the configuration information. In some embodiments of the present disclosure, the UE may report information (e.g., capability information) about whether the UE can support the method according to the embodiment, and the BS (or core network) may receive the information.
[0232] * Implementation 1: SR with PBD indication
[0233] Fig. 9 The figure shows the UL transmission process.
[0234] The UE may be configured with PUCCH resources for SR from the BS.
[0235] When UL data may become available to the MAC entity of the UE, for example, when there are no UL-SCH resources available for new transmission, or when the UL-SCH resources available for new transmission do not satisfy the logical channel prioritization restrictions configured for the logical channel that triggered the BSR (see clause 5.4.3.1 of 3GPP TS 38.321), the SR is triggered. The UE sends the SR to the BS using PUCCH resources. Upon receiving the SR from the UE, the BS may provide the UE with a UL grant. Upon receiving the UL grant, the UE performs a logical channel prioritization (LCP) process, which is applied each time a new transmission is performed. When a new transmission is performed, the MAC entity of the UE selects a logical channel for each UL grant that satisfies a specific condition. The MAC entity of the UE allocates resources to the logical channels selected for the UL grant in descending order of priority, starting with the logical channel with the highest priority, until the UL grant is exhausted. Then, the UE sends a PUSCH with data of the logical channels for which resources are allocated to the BS.
[0236] refer to Fig. 9 , if the logical channel priority of data 1 is higher than that of data 2, and the size of the UL grant is not large enough to accommodate both data 1 and data 2, data 1 is first sent through the PUSCH based on the UL grant even if the lifetime of data 2 is about to end. In addition, if the UL grant is large enough for both data 1 and data 2, data 1 and data 2 will be sent together through the PUSCH. When data 1 is small but critical data and data 2 is large XR-related video data with a short lifetime, if the PUSCH is not correctly sent to the BS, retransmission occurs in units of TB or code block groups. In this case, data 2 may be sent unnecessarily to provide data 1 to the BS.
[0237] As referenced above Fig. 9 As described, in conventional NR, the UE can simply request UL transmission through a single SR resource. Alternatively, the UE can be configured with multiple SR resources. The UE can then select the SR resource associated with the logical channel (LCH) for the information that needs to be sent and request UL transmission by considering the LCH associated with each SR resource.
[0238] Fig.10 An example of SR and UL transmission process based thereon according to some embodiments of the present disclosure is illustrated.
[0239] In some embodiments of the present disclosure, it is considered that the UE provides additional information about the information that needs to be sent to the BS through the SR. Some embodiments of the present disclosure are described below, in which various information that may be required for the XR service is provided in addition to the LCH of the data to be sent. For example, in some embodiments, at least one of the following may be considered as information that can be sent together with the SR.
[0240] >Option 1: The LCH associated with the data that needs to be sent can be considered. The SR configuration ID can be used to indicate to the UE the SR configuration applicable to the LCH. Since each SR configuration corresponds to one or more LCHs, the PUCCH resource on which the SR is sent can be used to inform the BS which LCH is associated with the data that needs to be sent.
[0241] Option 2: Reference Fig.10 , the PDB of the data that needs to be sent may be considered. For example, the remaining PDB of the data that currently needs to be sent, the latency / delay requirement, the maximum number of retransmissions, and / or the lifetime of the data may be provided. For example, if the lifetime of the data is 20 milliseconds (ms), there may be a difference between the time when the associated SR is sent and the time when the data is generated. Therefore, information about the duration, such as the remaining PDB, the remaining lifetime, and the latency / delay requirement, may be sent to the BS together with the SR.
[0242] >>The information about the duration can be expressed in the form of the length of the time slot. In addition, whether the duration is long or short can also be expressed by 1 bit of information. The threshold for distinguishing long and short durations can be indicated by L1 signaling (e.g., DCI) from the BS, or configured to the UE through higher layer signaling (e.g., RRC signaling).
[0243] >Option 3: The HARQ process number (ie, HARQ process ID) where the PDB expires among the TBs on the current HARQ process may be considered.
[0244] > Option 4: It may be considered whether there is a TB whose PDB is about to expire among the TBs on the current HARQ process. This may be determined based on the remaining PDB of each TB. The threshold for distinguishing between the HARQ process in which the PDB is about to expire and the HARQ process in which the PDB is far from expiration may be predefined, indicated by L1 signaling (e.g., DCI) from the BS, or configured to the UE through higher layer signaling (e.g., RRC signaling).
[0245] >Option 5: Information based on the service characteristics of the data that needs to be sent can be considered. For example, the GOP structure of the video service can be indicated. For example, the UE can inform the BS via SR whether the information to be sent is video. If the information is video, the UE can inform the BS via SR whether the UE needs to send I frames, P frames, or both I frames and P frames. More specifically, a total of 4 bits based on 2 bits of information can be used to represent four types of SR: i) non-video, ii) video + I frame, iii) video + P frame, and iv) video + I frame + P frame.
[0246] > Option 6: The number of resources required for the data to be sent may be included in the SR. The UE may expect the BS to schedule multiple radio resources after receiving the SR. The multiple radio resources may be indicated by a single scheduling message, by multiple scheduling messages, or configured by a semi-static configuration from the BS such as SPS or CG.
[0247] The information provided with the SR (according to at least one of options 1 to 6) may be associated with each of a plurality of SR resources configured to the UE. The UE may provide the information to the BS based on resource selection (i.e., by selecting one of the plurality of SR resources). Alternatively, the information may be included in the payload of the SR transmission in the form of a bit representation and then provided to the BS.
[0248] For each SR resource configured to the UE, different information may be provided with the SR. For example, the UE may send additional information for one of the SR resources configured to the UE using option 1, while the UE may send additional information for another SR resource using option 5.
[0249] In order to send information provided together with SR together with SR on a single PUCCH resource according to some embodiments of the present disclosure, in some embodiments, PUCCH format 2, PUCCH format 3 and / or PUCCH format 4 can be configured for the SR resource configured to send information.
[0250] The BSR may be triggered when UL data for an LCH belonging to a logical channel group (LCG) becomes available for a MAC entity, or when a BSR-related timer expires. The UE may provide a BSR MAC control element to the BS via a PUSCH, which includes a buffer size value for the LCG. In some embodiments of the present disclosure, embodiment 1 may also be applied to BSR transmission. For example, information according to at least one of options 1 to 6 may be included in the BSR and sent to the BS.
[0251] * Implementation 2: Two or more positive SRs at the same time
[0252] If the UE is configured with multiple SR resources, where each SR resource is associated with a different LCH or carries different additional information (eg, additional information based on embodiment 1), the UE may send two or more SRs to the BS simultaneously.
[0253] To this end, the SR prohibit timer can operate for a group of specific SR configurations. For example, when an SR within a group needs to be sent as a positive SR and its transmission is performed (i.e., when a positive SR needs to be sent and its transmission is performed on PUCCH resources according to the SR configuration within the group of SR configurations), the SR prohibit timer for the group including the SR configuration is started or restarted. Before the SR prohibit timer expires, SR transmission based on other SR configurations within the corresponding group is not performed. Accordingly, only SR configurations included in different groups can be redundantly triggered and sent. In other words, for SR configurations belonging to the same group, no more than one SR is triggered or sent.
[0254] When multiple SRs are triggered and the resources configured to transmit SRs overlap in time, the UE may consider a bitmap based on the SR configuration index to send the SR on a single radio resource. For example, the UE may configure the bitmap based on the index of the SR configuration associated with the SR transmission opportunity that overlaps in time. Since each bit position in the bitmap is associated with the SR configuration of the SR transmission opportunity that overlaps in time, the UE may use the bitmap to represent the triggered SR. If additional information (e.g., the additional information described in Implementation 1) is configured to be sent by the SR configuration associated with the SR transmission opportunity that overlaps in time, the UE may connect or append the additional information to the bitmap in the order of the SR configuration index, and then send the additional information.
[0255] When multiple SRs can be triggered, the PUCCH resources for sending SRs can be configured separately in the form of a PUCCH resource list or a PUCCH resource set. The UE can select PUCCH resources from a given PUCCH resource list or a PUCCH resource set based on the SR payload. In another example, if among the SR configurations of the triggered SR, there is an SR configuration configured to use PUCCH format 2 / 3 / 4, the UE can use the PUCCH resources according to the corresponding SR configuration. In another example, in implementation 2, if the payload size required to send multiple SRs is less than or equal to 2 bits, multiple SRs can be sent on the configured SR PUCCH resources. If there are multiple available SR PUCCH resources, the SR PUCCH resources can be used starting from the earliest index in the order of the configuration indexes.
[0256] * Implementation 3: General UL Approval
[0257] As explained above, the receiver may not be able to accurately predict the importance and requirements of the ongoing transmission, and only the transmitter that sends the traffic on the scheduled radio resources knows the importance and requirements of the transmission. Therefore, in the case of UL transmission in a wireless communication system, only the UE can determine the importance and requirements of the necessary UL transmission. Therefore, a new scheduling method that allows the UE to arbitrarily send the required information can be considered.
[0258] In the prior art, UL grants are used as follows: the BS allocates predetermined resources to the UE, the UE performs transmission or retransmission of the HARQ process specified by the BS on the resources, and also indicates to the UE the size of the TB used for the corresponding transmission. Some embodiments of the present disclosure are described below, in which the UE is allowed to arbitrarily determine some information in the UL grant, so that the UE can prioritize the transmission of necessary information. The embodiments also save the size of the information used in the DCI, thereby enhancing the reliability of the PDCCH. For example, at least one of the following methods can be considered.
[0259] >Method 1: The UE can arbitrarily select and send the HARQ process for PUSCH transmission based on dynamic PUSCH indication (i.e., PUSCH transmission based on dynamic UL grant). The UE can encode the selected HARQ process separately in the form of UCI (e.g., DG-UCI) and use some REs of PUSCH resources to send the HARQ process. The BS can first receive the DG-UCI sent by the UE on the PUSCH, and determine which HARQ process the information received on the PUSCH is associated with based on the HARQ process number within the received DG-UCI.
[0260] >>When the UE selects a HARQ process arbitrarily, the UE may always assume that the New Data Indicator (NDI) is toggled. In other words, if the UE selects a HARQ process arbitrarily, the UE may always attempt a new transmission on the corresponding PUSCH.
[0261] >>When method 1 is used, the DCI field indicating the HARQ process number in the scheduling message may be omitted. In other words, if method 1 is used, the HARQ process number field among the fields of the DCI format may be excluded from the DCI format.
[0262] >Method 2: The UE can arbitrarily select and send the transport block size (TBS) and modulation coding scheme (MCS) for PUSCH transmission through dynamic PUSCH indication (i.e., PUSCH transmission based on dynamic UL grant). The UE can encode the selected TBS and MCS separately in the form of UCI (e.g., DG-UCI) and use some REs of the PUSCH resources to send the TBS and MCS. The BS can first receive the DG-UCI sent by the UE on the PUSCH. Based on the TBS or MCS information within the received DG-UCI, the BS can determine which TBS and MCS to assume for transmission and decode the information received on the PUSCH.
[0263] >>When method 2 is used, the DCI field indicating the MCS in the scheduling message can be omitted.
[0264] In some embodiments, in order to use the above method, the UE and the BS may use a separate DCI format, or add a new field in the conventional DCI format to define a scheduling message that allows the UE to use the method. For example, when method 1 and / or method 2 are used, the BS may configure the UE to detect the new DCI format on the PDCCH that does not include the HARQ process number field and the MCS field. In some embodiments, the UE may be specified to use method 1 and / or method 2 only for UL grants received in the corresponding DCI format.
[0265] In some embodiments, when the PUSCH is transmitted using the DG-UCI, the UE may send additional information to the BS. For example, the UE may provide the PDB or lifetime of the TB included in the PUSCH transmission. The UE may expect that the BS will guide the retransmission of the TB included in the PUSCH within the corresponding PDB or lifetime. After the PDB or lifetime has passed, the UE may expect that the BS will clear the HARQ process information associated with the corresponding PUSCH and its related receive buffer, and schedule a new TB for the corresponding HARQ process. Similar to the DG-UCI described above, the additional information may be separately compiled as UCI and transmitted together with UL data and / or other UCI using some REs of the PUSCH resources. Alternatively, the additional information may be provided using DMRS symbols (ie, OFDM symbols with DMRS) and DMRS REs (ie, REs with DMRS). For example, in order to send 1 bit of additional information, the UE may select one of the two DMRS ports provided by the BS. Each DMRS port may represent 1 bit of information "0" or "1".
[0266] * Implementation 4: UL Grant with PDB Indication
[0267] Fig.11 and Fig.12 An example of SR and UL transmission process based thereon according to some embodiments of the present disclosure is illustrated.
[0268] As explained above, the receiver may not be able to accurately predict the importance and requirement of the ongoing transmission, and only the transmitter that sends the traffic on the scheduled radio resources knows the importance and requirement of the transmission. Therefore, in the case of UL transmission in a wireless communication system, only the UE can determine the importance and requirement of the necessary UL transmission. Therefore, a new scheduling method can be considered that allows the UE to send appropriate information using the UL grant provided to the UE.
[0269] In the prior art, UL grant is used as follows: the BS allocates predetermined resources to the UE, on which the UE performs transmission or retransmission of the HARQ process specified by the BS, and also indicates to the UE the size of the TB used for the corresponding transmission. In some embodiments of the present disclosure, when the BS provides the UL grant to the UE, the BS may also indicate the PDB or lifetime of the UL grant, thereby allowing the UE to actively send information with a short lifetime on the UL grant. When the BS notifies the UE of the PDB or lifetime, it may mean that the BS indicates that any data not sent within the PDB or lifetime will be useless, even if the data is provided to the BS. By providing the UE with the PDB or lifetime associated with the UL grant, the BS can avoid scheduling unnecessary retransmissions, thereby enhancing the overall system efficiency. For example, at least one of the following methods may be considered.
[0270] >Method 1: Reference Fig.11 , when the BS may provide the UE with an UL grant with an indicated lifetime of a PDB or TB. In other words, when the BS provides the UE with an UL grant, the BS may also provide a lifetime, a valid period, or a lifespan. Based on the indicated lifetime, the UE may first send services with a shorter PDB or services with a PDB similar to the indicated lifetime. For example, refer to Fig.11 , the UE may send data 2 through the PUSCH based on the UL grant by considering the lifetime of the UL data or the remaining PDB and the lifetime indicated together with the UL grant.
[0271] >>When the UE receives an UL grant with an indicated PDB or lifetime, the UE may always assume that the NDI is switched. In other words, upon receiving an UL grant with an indicated PDB or lifetime, the UE may always attempt a new transmission on the PUSCH.
[0272] >> In some embodiments, reference Fig.12, the BS may perform retransmission of the TB only during the PDB or lifetime indicated to the UE. For example, by notifying the UE of the lifetime of the TB expected by the BS, the BS may attempt to receive the TB from the UE during the duration. Then, the BS may not send an UL grant to the UE after the duration expires. The UE may expect the BS to direct the retransmission of the TB included in the PUSCH only during the PDB or lifetime. After the PDB or lifetime expires, the UE may expect the BS to clear the HARQ process information associated with the PUSCH and the receive buffer associated therewith, and schedule a new TB for the HARQ process.
[0273] >> In some implementations, the duration of the PDB or the life time may be indicated by a slot number. In this case, the length of one slot may be based on the slot number based on the UL BWP in which the BS schedules the PUSCH.
[0274] >>In some embodiments, the PDB or life time may be indicated by a new field in the scheduling DCI. Alternatively, the PDB or life time may be associated with the time domain resource allocation information used for scheduling and then indicated together. For example, in order to indicate the PDB or life time, the BS may provide a list of durations of the PDB or life time to the UE through higher layer signaling (e.g., RRC signaling). Alternatively, the duration of the PDB or life time that the UE can receive through the scheduling message may be determined based on a predefined list or table.
[0275] In order to use the above method, the UE and the BS may use a separate DCI format. Alternatively, the UE and the BS may add a new field in a conventional DCI format to limit the scheduling messages in which the UE can use the method. For example, when method 1 and / or method 2 is used, the BS may configure the UE to detect a new DCI format on the PDCCH that does not have a HARQ process number field and an MCS field. In some embodiments, the UE may be specified to use method 1 and / or method 2 only for UL grants received based on the corresponding DCI format.
[0276] In some embodiments, when PUSCH is sent using DG-UC, the UE may send additional information to the BS. For example, the UE may provide the PDB or lifetime of the TB included in the PUSCH transmission. Similar to the DG-UCI described above, the additional information may be separately compiled as UCI and sent together with UL data and / or other UCI using some REs of the PUSCH resources. Alternatively, DMRS symbols and DMRS REs may be used to provide additional information. For example, in order to send 1 bit of additional information, the UE may select one of the two DMRS ports provided by the BS. Each DMRS port may represent 1 bit of information of '0' or '1'.
[0277] In some embodiments, Embodiment Mode 4 can be applied together with Embodiment Mode 1.
[0278] * Implementation 5: Selective use of SR resources
[0279] Based on the information of the UE or the information sent by the UE to the BS, the selective use of the SR resources may be considered. The information of the UE may be the information received by the UE from the BS or the information received based on Embodiment 3 or Embodiment 4. The information sent by the UE to the BS may be the information sent via the SR / UL-SCH / UCI of the UE or the information sent based on Embodiment 1, Embodiment 2 or Embodiment 3. For example, the following may be considered:
[0280] >Method 1: Skipping SR resources based on I and / or P frame patterns
[0281] After the SR transmission for I-frames, the SR resources specific to I-frames may be skipped.
[0282] SR prohibit timer specific to I-frames (according to conventional NR standards, the SR prohibit timer is configured as per SR configuration).
[0283] >>> In other words, the UE may be provided with an SR configuration associated with each frame type in the GOP structure of the video. Additionally, the UE may be configured with an SR prohibit timer associated with the same frame type (e.g., I-frame). When the UE performs SR on an SR resource associated with a particular frame type, the UE may start the SR prohibit timer associated with the frame type. After the SR prohibit timer associated with the frame type is started, the UE may avoid using the SR configuration / resource associated with the same frame type and may not send an SR based on the SR resource / configuration until the SR prohibit timer expires.
[0284] After SR transmission for P frames, SR resources specific to I frames may be skipped.
[0285] >>SR resource group specific SR prohibit timer (i.e., SR prohibit timer for each SR configuration group)
[0286] >> In other words, the UE may be configured with an SR configuration associated with each frame type in the GOP structure of the video. Additionally, the UE may be configured with an SR prohibit timer associated with multiple SR resources or configurations (i.e., SR groups). When the UE performs SR on an SR resource associated with a specific frame type (e.g., P-frame), the UE may start the SR prohibit timer for the SR group associated with the SR resource. After the SR prohibit timer for the SR group is started, the UE may avoid using any SR configuration / resource within the SR group and may not send SR based on the SR resource / configuration until the SR prohibit timer expires.
[0287] * Implementation 6: Processing of dither and PDB information
[0288] As described above, in order to achieve efficient scheduling using XR services, information about potential jitter and information about the PDB required for generating the service may be required. According to the above-mentioned embodiments 1 to 4, the UE can receive a PDB that can be guaranteed by a specific radio resource from the BS via a scheduling message, and the BS can obtain PDB information about the service that reaches the UE and therefore needs to be sent from the UE (that is, information about the PDB required for user data generated on the UE that needs to be sent). In order to use the exchanged PDB information for TB generation and transmission, the MAC layer needs to consider the exchanged PDB information. Additionally, in order to achieve similar effects described in embodiments 1 to 4, it is also possible to consider exchanging PDB information via MAC / RRC signaling. For example, the following content can be considered:
[0289] >Method 1: Report the jitter for LCH or LCG in BSR or new MAC CE.
[0290] >>UE can report the presence or magnitude of jitter that may occur in LCH or LCG through BSR or new MAC CE.
[0291] >> For example, the BSR or new MAC CE may include a bit representation indicating the presence or absence of jitter. The UE may send a BSR or new MAC CE including a bit representation based on whether jitter occurs for the LCH or LCG.
[0292] >> In another example, the BSR or new MAC CE may include a bit representation indicating the magnitude of potential jitter. The UE may send a BSR or new MAC CE including a bit representation based on the maximum jitter magnitude for the LCH or LCG.
[0293] >>Based on the information about the presence of jitter or the reception of the maximum amplitude information about the jitter, the BS can configure the SPS / CG configuration or schedule dynamic PDSCH / PUSCH.
[0294] >Send 2: Report the shortest remaining PDB for LCH or LCG via BSR or new MAC CE.
[0295] >>UE can report the remaining PDBs of MAC protocol data units (PDUs) (or TBs) sent in LCH or LCG through BSR or new MAC CE.
[0296] >> For example, the BSR or new MAC CE may include a bit representation indicating the size of the remaining PDB. Based on the PDB of the LCH or LCG or the remaining PDB of the associated MAC PDU (or TB) being transmitted, the UE may send a BSR or new MAC CE including a bit representation.
[0297] >> In another example, the BSR or new MAC CE may include a bit representation indicating the LCH or LCG with the (most) adjacent PDB. Based on the PDB of the LCH or LCG or the remaining PDBs of the associated MAC PDU (or TB) being transmitted, the UE may send a BSR or new MAC CE including a bit representation.
[0298] >>In another example, the BSR or new MAC CE may include a bit representation indicating the LCH or LCG that needs to be prioritized for transmission. Based on the PDB of the LCH or LCG, the remaining PDB of the associated MAC PDU (or TB) being transmitted, or the buffer size, the UE may send a BSR or a new MAC CE including the bit representation. Upon receiving the BSR or the new MAC CE, the BS may schedule UL radio resources for sending data of the corresponding LCH or LCG that takes precedence over other UL transmissions. For example, the BS may generate a scheduling message with priority, or perform scheduling by or at the same time canceling radio resources used for other UL transmissions.
[0299] In some embodiments of the present disclosure, the UE may send information about the requirements of the service being used through the SR and / or BSR in order to receive radio resources suitable for the needs. In addition, the BS may schedule radio resources for the UE based on the information provided by the UE, and both the UE and the BS may perform transmission and reception on the corresponding resources. Therefore, according to some embodiments of the present disclosure, resource allocation may be provided to the UE in a timely manner. Additionally, according to some embodiments of the present disclosure, appropriate radio resources may be allocated for the services that need to be sent while ensuring low latency.
[0300] Fig.13 and Fig.14 The flow of UL signal transmission at a UE is illustrated according to some implementations of the present disclosure.
[0301] The UE may perform operations according to some embodiments of the present disclosure associated with uplink signal transmission. The UE may include at least one transceiver; at least one processor; and at least one computer memory, which is operably connected to the at least one processor and stores instructions, which, when executed, causes the at least one processor to perform operations according to some embodiments of the present disclosure. The processing device for the UE may include at least one processor; and at least one computer memory, which is operably connected to the at least one processor and stores instructions, which, when executed, causes the at least one processor to perform operations according to some embodiments of the present disclosure. A computer-readable (non-transitory) storage medium may store at least one computer program including instructions, which, when executed by at least one processor, causes the at least one processor to perform operations according to some embodiments of the present disclosure. A computer program or a computer program product may include instructions recorded in at least one computer-readable (non-transitory) storage medium, which, when executed, causes (at least one processor) to perform operations according to some embodiments of the present disclosure. A computer program or a computer program product may be recorded in at least one computer-readable (non-transitory) storage medium, and may include instructions, which, when executed, causes (at least one processor) to perform operations according to some embodiments of the present disclosure. In a UE, a processing device, a computer-readable (non-transitory) storage medium, and / or a computer program product, operations include: receiving a configuration related to an SR resource (S1301); based on UL data for an LCH becoming available for transmission at the UE, determining an SR resource associated with the LCH based on the configuration; and sending an SR on the SR resource (S1303). Sending the SR on the SR resource may include sending information related to a remaining PDB of the UL data.
[0302] In some embodiments, the SR resources may be configured with PUCCH format 2, PUCCH format 3, or PUCCH format 4.
[0303] In some embodiments, the operations may include receiving scheduling information including a UL grant in response to the SR (S1401). In some embodiments, the scheduling information may include information about a lifetime associated with the UL grant.
[0304] In some embodiments, the operation may include sending a TB including UL data on a PUSCH based on the UL grant ( S1403 ).
[0305] In some implementations, the operations may further include clearing HARQ process information associated with the TB and a buffer associated with the HARQ process information based on expiration of a lifetime associated with the UL grant.
[0306] In some embodiments, transmitting a TB including UL data on a PUSCH based on a UL grant may include transmitting information about a PDB of the TB on the PUSCH.
[0307] Fig.15 and Fig.16 A flow of UL signal reception at a BS according to some embodiments of the present disclosure is illustrated.
[0308] The BS may perform operations according to some embodiments of the present disclosure associated with uplink signal transmission. The BS may include at least one transceiver; at least one processor; and at least one computer memory, which is operably connected to the at least one processor and stores instructions, which, when executed, causes the at least one processor to perform operations according to some embodiments of the present disclosure. A processing device for a BS may include at least one processor; and at least one computer memory, which is operably connected to the at least one processor and stores instructions, which, when executed, causes the at least one processor to perform operations according to some embodiments of the present disclosure. A computer-readable (non-transitory) storage medium may store at least one computer program including instructions, which, when executed by at least one processor, causes the at least one processor to perform operations according to some embodiments of the present disclosure. A computer program or a computer program product may include instructions recorded in at least one computer-readable (non-transitory) storage medium, which, when executed, causes (at least one processor) to perform operations according to some embodiments of the present disclosure. In a BS, a processing device, a computer-readable (non-transitory) storage medium, and / or a computer program product, operations include: sending a configuration related to an SR resource (S1501); and receiving an SR on the SR resource associated with the LCH based on the configuration (S1503). Receiving the SR on the SR resource may include receiving information related to a remaining PDB of UL data of the UE.
[0309] In some embodiments, the SR resources may be configured with PUCCH format 2, PUCCH format 3, or PUCCH format 4.
[0310] In some embodiments, the operations may further include sending scheduling information including a UL grant in response to the SR (S1601). In some embodiments, the scheduling information may include information about a lifetime associated with the UL grant.
[0311] In some embodiments, the operation may include receiving a TB including UL data on a PUSCH based on the UL grant ( S1603 ).
[0312] In some implementations, the operations may include clearing HARQ process information associated with the TB and a buffer associated with the HARQ process information based on expiration of a lifetime associated with the UL grant.
[0313] In some embodiments, receiving a TB including UL data on a PUSCH based on a UL grant may include receiving information about a PDB of the TB on the PUSCH.
[0314] The examples of the present disclosure described above are intended to enable those of ordinary skill in the art to implement and practice the present disclosure. Although the present disclosure has been described with reference to examples, those skilled in the art may make various modifications and variations to the examples of the present disclosure. Therefore, the present disclosure is not limited to the examples set forth herein, but should be given the widest scope consistent with the principles and features disclosed herein.
[0315] The embodiments of the present disclosure may be applied to a BS, a UE or other devices in a wireless communication system.
Claims
1. A method for transmitting an uplink signal by a user equipment (UE) in a wireless communication system, the method comprising: receiving a configuration associated with a scheduling request (SR) resource; determining, based on uplink data for a logical channel becoming available for transmission at the UE, SR resources associated with the logical channel based on the configuration; and sending a SR on the SR resource, The sending of the SR on the SR resource includes sending information related to a remaining packet data budget (PDB) of the uplink data.
2. The method according to claim 1, wherein: The SR resource is configured with a physical uplink control channel (PUCCH) format 2, PUCCH format 3, or PUCCH format 4.
3. The method according to claim 1, further comprising: Scheduling information including an uplink grant in response to the SR is received, wherein the scheduling information includes information about a time to live associated with the uplink grant.
4. The method according to claim 2, further comprising: Based on the uplink grant, sending a transport block including the uplink data on a physical uplink shared channel (PUSCH); as well as Based on expiration of the lifetime associated with the uplink grant, hybrid automatic repeat request (HARQ) process information associated with the transport block and a buffer associated with the HARQ process information are cleared.
5. The method according to claim 3, wherein: The transport block including the uplink data on the PUSCH is transmitted based on that the uplink grant includes transmitting information about the PDB of the transport block on the PUSCH.
6. A user equipment (UE) configured to send an uplink signal in a wireless communication system, the UE comprising: at least one transceiver; at least one processor; as well as at least one computer memory operatively connected to the at least one processor and storing instructions that, when executed, cause the at least one processor to perform operations comprising: receiving a configuration associated with a scheduling request (SR) resource; determining, based on uplink data for a logical channel becoming available for transmission at the UE, SR resources associated with the logical channel based on the configuration; and sending a SR on the SR resource, The sending of the SR on the SR resource includes sending information related to a remaining packet data budget (PDB) of the uplink data.
7. A processing device in a wireless communication system, the processing device comprising: at least one processor; as well as at least one computer memory operatively connected to the at least one processor and storing instructions that, when executed, cause the at least one processor to perform operations comprising: receiving a configuration associated with a scheduling request (SR) resource; determining, based on uplink data for a logical channel becoming available for transmission at the user equipment (UE), SR resources associated with the logical channel based on the configuration; and sending a SR on the SR resource, The sending of the SR on the SR resource includes sending information related to a remaining packet data budget (PDB) of the uplink data.
8. A computer-readable storage medium configured to store at least one program code including instructions, which, when executed, cause at least one processor to perform operations, the operations comprising: receiving a configuration associated with a scheduling request (SR) resource; determining, based on uplink data for a logical channel becoming available for transmission at the user equipment (UE), SR resources associated with the logical channel based on the configuration; and sending the SR on the SR resource, The sending of the SR on the SR resource includes sending information related to a remaining packet data budget (PDB) of the uplink data.
9. A method for receiving an uplink signal from a user equipment (UE) by a base station (BS) in a wireless communication system, the method comprising: Sending configuration related to Scheduling Request (SR) resources; receiving an SR on an SR resource associated with a logical channel based on the configuration, Wherein, receiving the SR on the SR resource includes receiving information related to a remaining packet data budget (PDB) for uplink data of the UE.
10. A base station (BS) configured to receive an uplink signal from a user equipment (UE) in a wireless communication system, the BS comprising: at least one transceiver; at least one processor; as well as at least one computer memory operatively connected to the at least one processor and storing instructions that, when executed, cause the at least one processor to perform operations comprising: Sending configuration related to Scheduling Request (SR) resources; receiving an SR on an SR resource associated with a logical channel based on the configuration, Wherein, receiving the SR on the SR resource includes receiving information related to a remaining packet data budget (PDB) for uplink data of the UE.
11. The BS according to claim 10, wherein: The SR resource is configured with a physical uplink control channel (PUCCH) format 2, PUCCH format 3, or PUCCH format 4.
12. The BS according to claim 10, wherein: The operations further include sending scheduling information including an uplink grant in response to the SR, and The scheduling information includes information about a lifetime associated with the uplink grant.
13. The BS according to claim 12, wherein: The operations further include: receiving, based on the uplink grant, a transport block comprising the uplink data on a physical uplink shared channel (PUSCH); and Based on expiration of the lifetime associated with the uplink grant, hybrid automatic repeat request (HARQ) process information associated with the transport block and a buffer associated with the HARQ process information are cleared.
14. The BS according to claim 13, wherein: The transport block including the uplink data on the PUSCH is received based on the uplink grant including receiving information about the PDB of the transport block on the PUSCH.
