Inclined strut combined oyster reef construction method
Through the construction method of obliquely supported combination oyster reef, freshwater immersion and non-standing kiln cement reinforced concrete are used to solve the displacement problem of oyster reef under the influence of sea waves, and the stability and construction efficiency of oyster reef are improved, providing more Many oyster habitats.
Patent Information
- Application Number
- CN202411394533.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-08
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The oyster reefs constructed in the prior art are prone to displacement under the influence of sea waves, resulting in changes in the reef position, destroying the ecological environment, and large-scale ship transportation is required during the construction process, which is inefficient.
The oyster reef construction method is adopted to soak the reef in a freshwater pool, use ordinary silicate cement and reinforced concrete produced by non-standing kilns to make the reef for precise positioning and installation, and use Φ12mm hemp rope to fix the main and auxiliary Reef body and rapid installation and oyster seedling arrangement on site.
The precise positioning and stable structure of the reef are achieved, the impact of waves is reduced, more oyster habitat is provided, construction efficiency is improved, and the demand for large-scale ship transportation is avoided.
Smart Images

Figure CN119014355A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of marine ecological restoration, and in particular to a method for constructing an oblique-braced combined oyster reef. Background Art
[0002] As an important coastal habitat, oyster reefs play an irreplaceable role in purifying water, providing biological habitats and maintaining ecological balance. Oysters are engineers of harbor and estuary ecosystems, also known as "nature's water filter." Oyster reefs are biological aggregates composed of a large number of living oysters growing on the ground and the shells of dead oysters deposited. Oyster reef ecosystems are marine ecosystems composed of biological reefs and various organisms living in this habitat. However, due to the influence of human activities and natural factors, oyster reefs have been severely damaged and are in urgent need of effective restoration and protection methods.
[0003] By building oyster reefs, we can purify water bodies, create a good ecological environment, and provide benthic organisms with a habitat for reproduction, growth, development, and foraging, thereby achieving the goal of restoring biological resources.
[0004] The ecological reefs constructed in the prior art are first processed on land as a whole, and then transported to the reef deployment area by large ships. However, after the reefs are deployed in this scheme, the position of each reef will be directly affected by wind and waves, resulting in displacement. Ultimately, over a long period of use, it is easy for reefs in different areas to approach or move away from each other, or even intertwine, thereby destroying the ecological environment of the oyster reef. Summary of the invention
[0005] In view of the shortcomings of the prior art, the purpose of the present invention is to provide a method for constructing an oblique-braced combined oyster reef to solve the problems raised in the above-mentioned background technology. The present invention can effectively reduce the impact of waves on the coastal zone, reduce shoreline erosion, and provide more oyster habitats.
[0006] In order to achieve the above-mentioned purpose, the present invention is realized through the following technical scheme: a method for constructing an oblique-braced combined oyster reef, comprising reef body production, reef body de-alkali removal, reef body transportation and placement, and oyster seedling installation. During the reef body de-alkali removal process, the prepared main and auxiliary reef bodies are completely immersed in a freshwater pool, and all surfaces are covered with water. The water level is checked regularly to ensure that the water level is always higher than the surface of the main and auxiliary reef bodies to prevent the concrete from being partially exposed to the air; during the reef body transportation and placement process, the treated main and auxiliary reef bodies are transported to the oyster reef installation point by ship at high water level, and manually unloaded to the mud surface. On-site construction personnel first install the main reef according to the oyster reef installation point, and then install all auxiliary reefs. The main and auxiliary reef bodies are tied and fixed with Φ12mm hemp ropes; the oblique-braced combined oyster reefs are arranged at a spacing of 6m×6m.
[0007] Furthermore, the cement used in the reef production process is ordinary silicate cement or silicate cement produced by non-vertical kiln, with a grade of not less than 425, and the content of tricalcium aluminate in the clinker is preferably controlled within the range of 6% to 12%; the steel bar strength is 400MPa, the tensile strength is 360MPa, and the elastic modulus is 2.0×10 5 MPa, straight, without local twists and turns, clean surface, without damage and oil stains.
[0008] Furthermore, the steps of making the reef body specifically include:
[0009] S1. Install the mold: The main reef and the auxiliary reef are two different molds. Determine the installation position of the mold and prepare the foundation for placing the mold to ensure that the foundation is flat and stable;
[0010] S2. Tie the steel bars: Tie the steel bars according to the design requirements to form the steel skeleton of the reef. The steel bars should be tied firmly and the spacing should meet the design requirements to ensure the structural strength and stability of the column.
[0011] S3. Pour concrete: Mix cement, sand and aggregate in a certain proportion, add appropriate amount of water and stir to make the mixture evenly distributed, use a spray gun or hand-held funnel to evenly pour the concrete into the mold until the entire mold space is filled;
[0012] S4. Remove the mold: After the concrete reaches a certain strength and stability, gradually disassemble the mold in the vertical direction to ensure that the concrete surface is not damaged. After removing the mold, check that there is no damage or cracking on the concrete surface;
[0013] S5. Concrete curing: Wrap it with plastic film for curing and water it once a day to ensure that the concrete is adequately cured without losing water.
[0014] Furthermore, the reef body is cleaned of paint and rust before use. In step S3, during the concrete pouring process, a vibrator or a tamping rod is used to vibrate or knock the mold to ensure that the concrete is fully compacted and air is removed.
[0015] Furthermore, when the reef body is dealkalied, the soaking water is replaced regularly as needed to keep the water fresh and pure.
[0016] Furthermore, after the main and auxiliary reef bodies have been soaked for one month, the concrete is taken out of the water and placed in a well-ventilated, cool and dry place, avoiding direct sunlight. During the drying process, the concrete can be turned over regularly to ensure that all surfaces are evenly dried.
[0017] Furthermore, during the installation of the oyster seedlings, scallop shells with oyster seedlings attached are strung together using coir ropes, with no fewer than 30 oyster shells on each coir rope, and the scallop shells with oyster seedlings are tied to the secondary reefs, with no fewer than 30 shells installed on each secondary reef. The specifications of the oyster seedlings should be 1 to 2 mm.
[0018] Furthermore, it also includes a reef design, in which the reef is cast by reinforced concrete, including a main reef column and four "7"-shaped secondary reef columns.
[0019] Furthermore, the main reef column has specifications of 12cm×12cm×300cm, and is inserted into the mudflat by 200cm; the secondary reef body is 155cm long, the "7" bend is 26cm long, and is inserted into the mudflat by 60cm.
[0020] Beneficial effects of the present invention:
[0021] 1. The diagonal brace combined oyster reef construction method can achieve precise positioning through the diagonal brace combined oyster reef, and is installed in the sea mud with a stable structure. When disasters such as hurricanes and typhoons strike, it can also effectively reduce the impact of waves on the coastal zone and reduce shoreline erosion.
[0022] 2. Each reef in the oblique-braced combined oyster reef construction method consists of one main reef and four secondary reefs. Each reef can provide a habitat for numerous marine organisms and increase fishery resources. The oblique-braced structure increases the surface area of the reef and can provide more oyster habitats.
[0023] 3. In this method, each reef structure is relatively small, and the transportation, placement and installation of reefs and the installation of oyster seedlings are more convenient and quick. No large ships are required for transportation and installation, and multiple people can work at multiple locations at the same time, greatly improving construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 It is a flow chart of reef body production in a method for constructing an oblique-braced combined oyster reef of the present invention;
[0025] Figure 2 A diagram of a reef structure used in a method for constructing an oblique-braced combined oyster reef according to the present invention;
[0026] In the figure: 1. Main reef column; 2. Secondary reef column. DETAILED DESCRIPTION
[0027] In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention is further explained below in conjunction with specific implementation methods.
[0028] See also Figure 1 to Figure 2 The present invention provides the following technical solution: a method for constructing an oblique brace combined oyster reef, the method comprising the following contents:
[0029] Step 1: Reef Design
[0030] The reef is made of reinforced concrete, including a main reef column 1 and four "7"-shaped secondary reef columns 2. The main reef column 1 is 12cm×12cm×300cm in size and is inserted 200cm into the beach; the secondary reef is 155cm long, the "7" bend is 26cm long, and is inserted 60cm into the beach. The reef design takes into account structural stability and ecological suitability, ensuring that the reef can withstand the erosion of the marine environment while providing a good growth environment for oysters.
[0031] Step 2: Reef making
[0032] The cement used shall be ordinary silicate cement or silicate cement produced by non-vertical kiln, with a grade not lower than 425. The content of tricalcium aluminate in the clinker shall be controlled within the range of 6% to 12%.
[0033] The steel bar has a strength of 400MPa, a tensile strength of 360MPa, an elastic modulus of 2.0×10-MPa, is straight without local twists and turns, and has a clean surface without damage or oil stains. Paint stains and rust should be removed before use.
[0034] Install the mold: The main reef and the auxiliary reef are two different molds. Determine the installation position of the mold and prepare the foundation for placing the mold, ensuring that the foundation is flat and stable.
[0035] Tie the steel bars: Tie the steel bars according to the design requirements to form the steel skeleton of the reef. The steel bars should be tied firmly and the spacing should meet the design requirements to ensure the structural strength and stability of the column.
[0036] Pour concrete: Mix cement, sand and aggregate in a certain proportion, add appropriate amount of water and stir to make the mixture evenly distributed. Use a spray gun or hand-held funnel to evenly pour the concrete into the mold until the entire mold space is filled. During the concrete pouring process, use a vibrator or tamper to vibrate or knock the mold to ensure that the concrete is fully compacted and the air is removed.
[0037] Removing the mold: After the concrete reaches a certain strength and stability, gradually remove the mold in the vertical direction to ensure that the concrete surface is not damaged. After removing the mold, check that there is no damage or cracking on the concrete surface.
[0038] Concrete curing: Wrap it in plastic film for curing and water it once a day to ensure that the concrete is adequately cured without losing water.
[0039] Step 3: Reef de-alkali
[0040] Completely immerse the prepared main and auxiliary reefs in a freshwater pool so that all surfaces are covered with water. Check the water level regularly to ensure that it is always higher than the surface of the main and auxiliary reefs to prevent the concrete parts from being exposed to the air. If necessary, the immersion water can be replaced regularly to keep the water fresh and pure.
[0041] After soaking for one month, take the concrete out of the water and place it in a well-ventilated, cool and dry place, avoiding direct sunlight. During the drying process, turn the concrete regularly to ensure that all surfaces can dry evenly. Spray it with clean water regularly or cover it with a wet cloth to keep its surface moist.
[0042] Step 4: Reef transportation and deployment
[0043] The treated main reef column 1 and auxiliary reef column 2 are transported to the oyster reef installation point by ship at high water level and unloaded to the mud surface manually. The on-site construction personnel install the main reef first according to the oyster reef installation point, and then install all the auxiliary reefs. The main reef column 1 and the auxiliary reef column 2 are tied and fixed with Φ12mm hemp rope. The diagonal braced combined oyster reef is arranged at a spacing of 6m×6m.
[0044] Step 5: Oyster seedling installation
[0045] Use palm ropes to string scallop shells with oyster fry attached, with no less than 30 oyster shells on each palm rope. Tie the scallop shells with oyster fry attached to the secondary reefs, with no less than 30 shells installed on each secondary reef. The size of the oyster fry should be 1-2 mm.
[0046] The basic principles and main features of the present invention and the advantages of the present invention are shown and described above. For those skilled in the art, it is obvious that the present invention is not limited to the details of the above exemplary embodiments, and the present invention can be implemented in other specific forms without departing from the spirit or basic characteristics of the present invention.
[0047] In addition, it should be understood that although the present specification is described according to implementation modes, not every implementation mode contains only one independent technical solution. This description of the specification is only for the sake of clarity. Those skilled in the art should regard the specification as a whole. The technical solutions in each embodiment may also be appropriately combined to form other implementation modes that can be understood by those skilled in the art.
Claims
1. A method for constructing an oblique brace combined oyster reef, characterized in that: It includes reef making, reef de-alkali removal, reef transportation and placement, and oyster seedling installation. During the reef de-alkali removal process, the prepared main and auxiliary reefs are completely immersed in a freshwater pool, and all surfaces are covered with water. The water level is checked regularly to ensure that the water level is always higher than the surface of the main and auxiliary reefs to prevent the concrete from being partially exposed to the air. During the reef transportation and placement process, the treated main and auxiliary reefs are transported by ships to the oyster reef installation site when the water level is high, and unloaded manually to the mud surface. On-site construction personnel install the main reef first and then all the auxiliary reefs according to the oyster reef installation site. The main and auxiliary reefs are tied and fixed with Φ12mm hemp ropes. The diagonally braced combined oyster reefs are arranged at a spacing of 6m×6m.
2. A method for constructing an oblique brace combined oyster reef according to claim 1, characterized in that: The cement used in the reef production process is ordinary silicate cement and silicate cement produced by non-vertical kiln, with a grade of not less than 425, and the content of tricalcium aluminate in the clinker is preferably controlled within the range of 6% to 12%; the steel bar strength is 400MPa, the tensile strength is 360MPa, and the elastic modulus is 2.0×10 5 MPa, straight, without local twists and turns, clean surface, without damage and oil stains.
3. A method for constructing an oblique brace combined oyster reef according to claim 2, characterized in that: The steps of reef body production specifically include: S1. Install the mold: The main reef and the auxiliary reef are two different molds. Determine the installation position of the mold and prepare the foundation for placing the mold to ensure that the foundation is flat and stable; S2. Tie the steel bars: Tie the steel bars according to the design requirements to form the steel skeleton of the reef. The steel bars should be tied firmly and the spacing should meet the design requirements to ensure the structural strength and stability of the column. S3. Pour concrete: Mix cement, sand and aggregate in a certain proportion, add appropriate amount of water and stir to make the mixture evenly distributed, use a spray gun or hand-held funnel to evenly pour the concrete into the mold until the entire mold space is filled; S4. Remove the mold: After the concrete reaches a certain strength and stability, gradually disassemble the mold in the vertical direction to ensure that the concrete surface is not damaged. After removing the mold, check that there is no damage or cracking on the concrete surface; S5. Concrete curing: Wrap it with plastic film for curing and water it once a day to ensure that the concrete is adequately cured without losing water.
4. A method for constructing an oblique brace combined oyster reef according to claim 2, characterized in that: The reef body is cleaned of paint and rust before use. In step S3, during the concrete pouring process, a vibrator or a tamping rod is used to vibrate or knock the mold to ensure that the concrete is fully compacted and air is removed.
5. The method for constructing an oblique brace combined oyster reef according to claim 1, characterized in that: When the reef body is de-alkalied, the soaking water is replaced regularly as needed to keep the water fresh and pure.
6. A method for constructing an oblique brace combined oyster reef according to claim 5, characterized in that: After the main and secondary reef bodies have been soaked for one month, take the concrete out of the water and place it in a well-ventilated, cool and dry place, avoiding direct sunlight. During the drying process, turn the concrete over regularly to ensure that all surfaces are evenly dried.
7. The method for constructing an oblique brace combined oyster reef according to claim 1, characterized in that: During the installation process of the oyster seedlings, scallop shells with oyster seedlings attached are strung together using coir ropes, with no less than 30 oyster shells on each coir rope. The scallop shells with oyster seedlings are tied to the secondary reefs, with no less than 30 shells installed on each secondary reef. The specifications of the oyster seedlings should be 1 to 2 mm.
8. The method for constructing an oblique brace combined oyster reef according to claim 1, characterized in that: It also includes reef design, in which the reef is cast by reinforced concrete, including a main reef column and four "7"-shaped secondary reef columns.
9. The method for constructing an oblique brace combined oyster reef according to claim 8, characterized in that: The main reef column has specifications of 12cm×12cm×300cm, and is inserted into the mudflat by 200cm; the secondary reef body is 155cm long, the "7" bend is 26cm long, and is inserted into the mudflat by 60cm.
Citation Information
Patent Citations
Oyster seedling growing method
CN106031366A
Seed adhering method for oysters
CN107372242A
C30 concrete material resisting marine erosion environment, preparation method and application
CN108409246A
Method of quickly building ecological oyster reef