TACS system data boundary point generation method, equipment and medium

By automatically generating boundary point data in the TACS system, the high training costs and error problems caused by complex manual configuration rules are solved, efficient and accurate boundary point configuration is achieved, manual intervention is reduced, and data production efficiency and accuracy are improved. .

CN119018207APending Publication Date: 2024-11-26CASCO SIGNAL LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411262111.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-10
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The configuration of data boundary points in existing TACS systems requires manual familiarity with complex layout rules, resulting in high training costs, long configuration time and error-prone, and lack of automated generation methods.

Method used

By defining the input data tables 'track', 'trackside resource management area' and 'manual control area', the parameters in these tables are automatically created, and the boundary point data is retained and named according to the priority and positional relationships to achieve boundary points. Automatic generation.

Benefits of technology

Reduces the time for manually configuring boundary point data, reduces training costs, improves the efficiency and accuracy of data production, avoids manual errors, and improves the accuracy of data by prioritizing the processing of the boundary points of the same track number and kilometer mark. .

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119018207A_ABST
    Figure CN119018207A_ABST
Patent Text Reader

Abstract

The invention relates to a TACS system data boundary point generation method and device and a medium. The method comprises the following steps that S1, an input data track table, a trackside resource management area table and a manual control area table are defined; s2, automatically creating boundary point data according to the definition in the step S1; s3, for all the boundary points created in the step S2, if the boundary points with the same track sequence number and kilometer post exist, only one boundary point needs to be reserved according to the priority; s4, naming the boundary points reserved in the step S3; and S5, numbering all the created boundary points, wherein the serial number is progressively increased from 1. Compared with the prior art, the method has the advantages that the time for manually configuring the boundary point data is shortened, and the efficiency and accuracy of data production are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a train signal control system, and in particular to a method, device and medium for generating data boundary points of a TACS system. Background Art

[0002] TACS stands for Train Autonomous Circumambulate System, which is called Train Autonomous Operation System Based on Train-to-Train Communication in Chinese. It refers to the signal system that enables trains to achieve autonomous resource management and active interval protection based on operation plans and real-time positions. The system achieves safer, more efficient and more economical goals through train-to-ground interlocking and train-to-train coordination.

[0003] In the TACS system data, a parameter information called boundary point is configured, which is used to identify when a specific operation is performed at the boundary of the system protection area or the trackside area management area; or when a manual train needs to move without a signal or a car block, the boundary point plays a blocking role, allowing the manual train to operate within a limited range; currently, the configuration of boundary points is manually configured by data producers according to relevant rules, and the manually configured data has the following problems:

[0004] 1) Data producers need to be fully familiar with the layout rules of boundary points, so relevant personnel need to be trained and assessed. The training takes a long time and increases the training cost.

[0005] 2) Since the positions of boundary points are determined manually one by one, data production takes a lot of time.

[0006] 3) There are restrictions on the arrangement of boundary points, such as non-overlapping, etc.; manual efforts are required to ensure that data production complies with the restrictions, which is prone to errors.

[0007] After searching, Chinese patent publication number CN113535543A discloses a test data generation method, device, equipment and medium for TACS system, which specifically discloses the following steps: Step 101, create a data table and create new data according to the determined data structure and parameters; Step 102, create a row of data for each data, and attach a unique ID to each row of data; Step 103, input relevant data content and attributes in each data according to project requirements and data structure; Step 104, for data that needs to be associated with each other, the tool will associate according to the ID, etc. This patent can improve the efficiency of data production, but it does not involve the automatic generation of data boundary points. Therefore, how to use tools to realize the automatic generation of data boundary points, thereby reducing the time of manually configuring boundary point data, becomes a technical problem that needs to be solved. Summary of the invention

[0008] The purpose of the present invention is to overcome the defects of the above-mentioned prior art and to provide a method, device and medium for generating data boundary points of a TACS system.

[0009] The purpose of the present invention can be achieved by the following technical solutions:

[0010] According to a first aspect of the present invention, a method for generating data boundary points of a TACS system is provided, the method comprising the following steps:

[0011] Step S1, defining the input data "track" table, "trackside resource management area" table and "manual control area" table;

[0012] Step S2, automatically creating boundary point data according to the definition of step S1;

[0013] Step S3, for all the boundary points created in step S2, if there are boundary points with the same track number and kilometer mark, only one boundary point needs to be retained according to the priority;

[0014] Step S4, naming the boundary points retained in step S3;

[0015] Step S5: number all created boundary points, with the serial numbers starting from 1 and increasing in sequence.

[0016] 2. According to claim 1, a method for generating data boundary points of a TACS system is characterized in that the parameters contained in the "track" table include the track's serial number, name, starting kilometer mark, terminal kilometer mark, connection relationship between tracks, and vehicle stops.

[0017] 3. According to the method for generating data boundary points of a TACS system as described in claim 1, it is characterized in that the parameters contained in the "trackside resource management area" table include the trackside resource management area serial number, name, track serial number, resource management area starting track serial number, kilometer mark, resource management area terminal track serial number, and kilometer mark.

[0018] As a preferred technical solution, the parameters contained in the "artificial control area" table include the artificial control area's serial number, name, track serial number of the starting point of the artificial control area, kilometer mark, track serial number of the terminal of the artificial control area, and kilometer mark.

[0019] As a preferred technical solution, step S2 specifically includes:

[0020] 21) From the trackside resource management area table, search for the track number and kilometer mark of the trackside resource management area defined by step S1. If the track number and kilometer mark found exist in both trackside resource management areas, then the track number and kilometer mark are the location of the boundary point.

[0021] As a preferred technical solution, step S2 specifically includes:

[0022] 22) Find the starting and ending tracks of the trackside resource management area from the trackside resource management area table defined in step S1. If the track has no connection with other tracks and there is no car block at the starting or ending point of the track, the track number and kilometer mark are the location of the boundary point.

[0023] 23) Find the starting or ending track of the trackside resource management area from the trackside resource management area table defined in step S1. If there are two different tracks in different trackside resource management areas, and the two tracks are connected to each other, the kilometer mark of the connecting point of the two tracks is the kilometer mark of the boundary point, and the track with the smaller track number is the track number of the boundary point.

[0024] As a preferred technical solution, step S2 specifically includes:

[0025] 24) Search the track number and kilometer mark information of the starting and ending points of the artificial control area defined in step S1 from the artificial control area table, and create a boundary point at each starting and ending point found. The track number and kilometer mark of the starting and ending points are the track number and kilometer mark of the boundary point.

[0026] As a preferred technical solution, the priorities in step S3 are as follows from high to low:

[0027] 31) Boundary point created by two connected trackside resource management areas;

[0028] 32) Boundary points created by trackside resource management areas and non-trackside resource management areas;

[0029] 33) Boundary points created by artificial control areas.

[0030] As a preferred technical solution, the boundary points in step S4 are specifically named as: BO_X_Y_Z",

[0031] Where "BO" is the abbreviation of boundary point;

[0032] If the boundary point is created for two connected resource management areas, X is the name of the current resource management area; Y is the name of the adjacent resource management area; Z is the name of the track where the boundary point is located;

[0033] If the boundary point is created by the trackside resource management area and the non-trackside resource management area, X is the name of the current resource management area; Y does not exist; Z is the name of the track where the boundary point is located;

[0034] If the boundary point is created by an artificial control area, X is the name of the current artificial control area; Y is the name of the track where the boundary point is located; Z is "B" or "E", where "B" means the boundary point is at the beginning of the artificial control area and "E" means the boundary point is at the end of the artificial control area.

[0035] As a preferred technical solution, the ordering method of the sequence numbers in step S5 is specifically as follows:

[0036] 51) Find the boundary points created by two trackside resource management areas and sort them in ascending order according to the sequence number of the trackside resource management areas;

[0037] 52) Find the boundary points created by the trackside resource management area and the non-trackside resource management area, and sort them in ascending order according to the sequence number of the trackside resource management area;

[0038] 53) Find the boundary points created by the boundary of the artificial control area and sort them in ascending order according to the sequence number of the artificial control area.

[0039] According to a second aspect of the present invention, there is provided an electronic device, comprising a memory and a processor, wherein a computer program is stored in the memory, and the method described above is implemented when the processor executes the program.

[0040] According to a third aspect of the present invention, there is provided a computer-readable storage medium having a computer program stored thereon, wherein the program implements the method described above when executed by a processor.

[0041] Compared with the prior art, the present invention has the following advantages:

[0042] 1) The present invention manually configures a small amount of data parameters and automatically generates boundary points through tools, which reduces the time for manually configuring boundary point data, eliminates the need to train data production personnel on layout rules, reduces the training cost of data production personnel, and improves the efficiency and accuracy of data production;

[0043] 2) The present invention avoids errors caused by manually configuring boundary point data, thereby improving the accuracy of data production;

[0044] 3) In the present invention, since the boundary points are obtained by calculation by the tool, the data production personnel do not need to fully master the layout rules, thus eliminating the training cost;

[0045] 4) In the present invention, if there are boundary points with the same track number and kilometer mark, only one boundary point needs to be retained, and it can be retained according to the set priority, further improving the accuracy of the data;

[0046] 5) The present invention adopts a self-designed naming method for boundary points, which further improves the efficiency of data production. BRIEF DESCRIPTION OF THE DRAWINGS

[0047] Figure 1 It is a flow chart of the method for realizing data boundary points of TACS system of the present invention;

[0048] Figure 2 A schematic diagram of the boundary point where two trackside resource management areas are connected;

[0049] Figure 3 A schematic diagram of the boundary point where the trackside resource management area and the non-trackside resource management area are connected;

[0050] Figure 4 Schematic diagram of boundary points located at the boundary of the artificial control area. DETAILED DESCRIPTION

[0051] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0052] like Figure 1 As shown, the present invention provides a method for automatically generating data boundary points of a TACS system. By manually configuring a small amount of data parameters and automatically generating boundary points through a tool, the time for manually configuring boundary point data is reduced, and there is no need to train data production personnel on layout rules, thereby reducing the training cost of data production personnel and improving the efficiency and accuracy of data production.

[0053] The specific implementation process of the present invention is as follows:

[0054] Step 1, define the input data "Track" table (Track). This data table contains the following parameters: track number, name, starting kilometer mark, terminal kilometer mark, connection relationship between tracks, and vehicle stop;

[0055] Step 2, define the input data "trackside resource management area" table (WRC). The data table contains the following parameters: trackside resource management area serial number, name, track serial number, resource management area start track serial number, kilometer mark, resource management area terminal track serial number, kilometer mark;

[0056] Step 3, define the input data "ConsignableZone" table. This data table contains the following parameters: the serial number and name of the consignable zone, the track serial number and kilometer mark of the beginning of the consignable zone, and the track serial number and kilometer mark of the end of the consignable zone;

[0057] Create boundary point data:

[0058] Step 4, from the trackside resource management area table, find the track number and kilometer mark of the trackside resource management area defined in step 2. If the track number and track kilometer mark found exist in both trackside resource management areas, then the track number and kilometer mark are the location of the boundary point.

[0059] Step 5, find the starting and ending tracks of the trackside resource management area from the trackside resource management area table defined in step 2. If the track has no connection with other tracks and there is no car stop at the beginning or end of the track, then the serial number and kilometer mark of the track are the location of the boundary point.

[0060] Step 6: Find the starting or ending track of the management area from the trackside resource management area table defined in step 2. If there are two different tracks in different areas managed by trackside resource managers, and the two tracks are connected, the kilometer mark of the connection point of the two tracks is the kilometer mark of the boundary point. The track with the smaller track number is the track number of the boundary point.

[0061] Step 7, search the artificial control area table for the track number and kilometer mark information of the start and end of the artificial control area defined in step 3. Create a boundary point at each start and end found, and the track number and kilometer mark of the start and end are the track number and kilometer mark of the boundary point.

[0062] Step 8: For all the boundary points created in steps 4 to 7, if there are boundary points with the same track number and kilometer mark, and only one boundary point needs to be retained, the priority of retention is as follows:

[0063] 1) A boundary point created by two connected trackside resource management areas;

[0064] 2) Boundary points created by trackside resource management areas and non-trackside resource management areas;

[0065] 3) Boundary points created by artificial control areas.

[0066] Step 9: Name the boundary points as follows: “BO_X_Y_Z”, where “BO” is the abbreviation of boundary point Boundary.

[0067] If the boundary point is created for two connected resource management areas, X is the name of the current resource management area; Y is the name of the adjacent resource management area; and Z is the name of the track where the boundary point is located.

[0068] If the boundary point is created by the trackside resource management area and the non-trackside resource management area, X is the name of the current resource management area; Y does not exist; and Z is the name of the track where the boundary point is located.

[0069] If the boundary point is created by an artificial control area, X is the name of the current artificial control area; Y is the name of the track where the boundary point is located; Z is "B" or "E". "B" means the boundary point is at the beginning of the artificial control area, and "E" means the boundary point is at the end of the artificial control area.

[0070] Step 10: Number all the created boundary points, starting from 1 and increasing in number. The order of the numbers is as follows:

[0071] First, find the boundary points created by the two trackside resource management areas and sort them in ascending order according to the sequence number of the trackside resource management areas;

[0072] Then, find the boundary points created by the trackside resource management area and the non-trackside resource management area, and sort them in ascending order according to the sequence number of the trackside resource management area;

[0073] Finally, find the boundary points created by the boundaries of the artificially controlled areas and sort them in ascending order by the sequence number of the artificially controlled areas. Specific embodiments

[0075] like Figure 1 As shown in the figure, the data table structure required to define the boundary points and the implementation method flow chart are shown. The data table structure is as follows:

[0076] 1). Track table (track)

[0077] ID: track number;

[0078] Name: track name;

[0079] TrackBegin: track start kilometer mark;

[0080] TrackEnd: track terminal kilometer mark;

[0081] Connection: the connection between tracks;

[0082] BufferStop: A buffer stop at the beginning or end of a track.

[0083] 2). Trackside Resource Management Area Table (WRC)

[0084] ID: The serial number of the trackside resource management area

[0085] Name: the name of the trackside resource management area;

[0086] WRCBeginTrackID: the starting track number of the trackside resource management area;

[0087] WRCBeginKp: the starting kilometer mark of the trackside resource management area;

[0088] WRCEndTrackID: terminal track number of the trackside resource management area;

[0089] WRCEndKp: The terminal kilometer mark of the trackside resource management area.

[0090] 3). Manual control zone table (ConsignableZone)

[0091] ID: the serial number of the manual control area;

[0092] Name: The name of the artificial control area:

[0093] CSZBeginTrackID: the starting track number of the manual control zone;

[0094] CSZBeginKp: the starting kilometer mark of the artificial control zone;

[0095] CSZEndTrackID: terminal track number of the manual control zone;

[0096] CSZEndKp: The terminal kilometer mark of the manual control zone.

[0097] 4). Boundary Point Table (Boundary)

[0098] ID: the serial number of the boundary point;

[0099] Name: the name of the boundary point;

[0100] BoTrackID: the track number where the boundary point is located;

[0101] BoKp: kilometer marker of the border point location.

[0102] The implementation process includes: the user defines three manual input tables according to the needs, namely the track table, the trackside resource management area table and the manual control area table. After completing the input, the tool will automatically calculate and generate the boundary point data according to the content of the input table and the implementation method in the technical solution.

[0103] like Figure 2 As shown, taking the generation of boundary point 1 as an example,

[0104] In the data, manually define the track table (Track) data:

[0105] ID=1, Name=TR1, TrackBegin=0, TrackEnd=500, BufferStop=BS_1;

[0106] ID=2, Name=TR2, TrackBegin=0, TrackEnd=500, BufferStop=BS_2;

[0107] Define the Trackside Resource Management Area (WRC) data:

[0108] ID=1, Name=WRC_A, WRCBeginTrackID=1,2, WRCBeginKp=0,0, WRCEndTrackID=1,2, WRCEndKp=200,220;

[0109] ID=2, Name=WRC_B, WRCBeginTrackID=1,2, WRCBeginKp=200,220, WRCEndTrackID=1,2, WRCEndKp=500,500;

[0110] From the above input data, we can see that track 1 is covered by both WRC_A and WRC_B. The WRCEndKp of WRC_A and the WRCBeginKp of WRC_B are both 200. There is a car stop at the beginning of track 1. According to the technical solution, the information of boundary point 1 calculated by the tool is:

[0111] ID=1, Name=BO_WRC_A_WRC_B_TR1, BoTrackID=1, BoKp=200.

[0112] The same is true for track 2, which will not be repeated here.

[0113] like Figure 3 As shown, take the generation of boundary point 3 as an example:

[0114] In the data, manually define the track table (Track) to input data:

[0115] ID=1, Name=TR1, TrackBegin=0, TrackEnd=300, BufferStop=BS_1,BS_3;

[0116] ID=2, Name=TR2, TrackBegin=0, TrackEnd=320, BufferStop=BS_2, Connection=3;

[0117] ID=3, Name=TR3, TrackBegin=320, TrackEnd=430, Connection=2;

[0118] Enter the Trackside Resource Control Area Table (WRC):

[0119] ID=1, Name=WRC_A, WRCBeginTrackID=2, WRCBeginKp=0, WRCEndTrackID=2, WRCEndKp=320;

[0120] From the above input, it can be seen that for Track 1, since there are car blocks at the beginning and end of Track 1, the tool will not generate boundary points on Track 1.

[0121] For track 2, a car stop BS_2 is arranged at the beginning of the track, and the end of the track is connected to the beginning of track 3, and the kilometer mark of the connection is 320. At the same time, track 2 is covered by WRC_A. Track 3 is located in the non-resource management area. According to the technical solution, the information of boundary point 3 calculated by the tool is:

[0122] ID=1, Name=BO_WRC_A_TR2, BoTrackID=2, BoKp=320.

[0123] like Figure 4 As shown, take the generation of boundary point 1 and boundary point 2 as an example:

[0124] In the data, define the track table (Track) input data:

[0125] ID=1, Name=TR1, TrackBegin=0, TrackEnd=300;

[0126] Define the manual control zone table (ConsignableZone) input data:

[0127] ID=1, Name=CSZ_A, CSZBeginTrackID=1, CSZBeginKp=125, CSZEndTrackID=1, CSZEndKp=165;

[0128] Based on the input data information of the above manual control area, according to the technical solution, the data of boundary point 1 and boundary point 2 calculated by the tool are:

[0129] ID=1, Name=BO_CSZ_A_TR1_B, BoTrackID=1, BoKp=125.

[0130] ID=2, Name=BO_CSZ_A_TR1_E, BoTrackID=1, BoKp=165.

[0131] The above is an introduction to the method embodiment. The following further illustrates the scheme of the present invention through electronic equipment and storage embodiments.

[0132] The embodiment of the present invention also provides an electronic device including a central processing unit (CPU), which can perform various appropriate actions and processes according to computer program instructions stored in a read-only memory (ROM) or computer program instructions loaded from a storage unit into a random access memory (RAM). In the RAM, various programs and data required for device operation can also be stored. The CPU, ROM, and RAM are connected to each other via a bus. An input / output (I / O) interface is also connected to the bus.

[0133] Multiple components in the device are connected to the I / O interface, including: input units, such as keyboards, mice, etc.; output units, such as various types of displays, speakers, etc.; storage units, such as disks, optical disks, etc.; and communication units, such as network cards, modems, wireless communication transceivers, etc. The communication unit allows the device to exchange information / data with other devices through computer networks such as the Internet and / or various telecommunication networks.

[0134] The processing unit performs the various methods and processes described above, such as methods S1 to S5. For example, in some embodiments, methods S1 to S5 may be implemented as a computer software program, which is tangibly contained in a machine-readable medium, such as a storage unit. In some embodiments, part or all of the computer program may be loaded and / or installed on the device via a ROM and / or a communication unit. When the computer program is loaded into the RAM and executed by the CPU, one or more steps of methods S1 to S5 described above may be performed. Alternatively, in other embodiments, the CPU may be configured to execute methods S1 to S5 in any other appropriate manner (e.g., by means of firmware).

[0135] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0136] The program code for implementing the method of the present invention can be written in any combination of one or more programming languages. These program codes can be provided to a processor or controller of a general-purpose computer, a special-purpose computer or other programmable data processing device, so that the program code, when executed by the processor or controller, enables the functions / operations specified in the flow chart and / or block diagram to be implemented. The program code can be executed entirely on the machine, partially on the machine, partially on the machine as a stand-alone software package and partially on a remote machine, or entirely on a remote machine or server.

[0137] In the context of the present invention, a machine-readable medium may be a tangible medium that may contain or store a program for use by or in conjunction with an instruction execution system, device, or equipment. A machine-readable medium may be a machine-readable signal medium or a machine-readable storage medium. A machine-readable medium may include, but is not limited to, electronic, magnetic, optical, electromagnetic, infrared, or semiconductor systems, devices, or equipment, or any suitable combination of the foregoing. A more specific example of a machine-readable storage medium may include an electrical connection based on one or more lines, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the foregoing.

[0138] The above is only a specific embodiment of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of various equivalent modifications or replacements within the technical scope disclosed by the present invention, and these modifications or replacements should be included in the protection scope of the present invention. Therefore, the protection scope of the present invention shall be based on the protection scope of the claims.

Claims

1. A method for generating data boundary points of a TACS system, characterized in that: The method comprises the following steps: Step S1, define the input data "track" table, "trackside resource management area" table and "manual control area" table; Step S2, automatically creating boundary point data according to the definition of step S1; Step S3, for all the boundary points created in step S2, if there are boundary points with the same track number and kilometer mark, only one boundary point needs to be retained according to the priority; Step S4, naming the boundary points retained in step S3; Step S5: number all created boundary points, with the serial numbers starting from 1 and increasing in sequence.

2. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: The parameters contained in the "track" table include the track's serial number, name, starting kilometer mark, terminal kilometer mark, connection relationship between tracks, and vehicle stops.

3. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: The parameters contained in the "Trackside Resource Management Area" table include the trackside resource management area serial number, name, track serial number, resource management area starting track serial number, kilometer mark, resource management area terminal track serial number, and kilometer mark.

4. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: The parameters contained in the "manual control area" table include the manual control area serial number, name, track serial number of the starting point of the manual control area, kilometer mark, track serial number of the terminal of the manual control area, and kilometer mark.

5. The method for generating data boundary points of a TACS system according to claim 2, characterized in that: The step S2 specifically includes: 21) From the trackside resource management area table, search for the track number and kilometer mark of the trackside resource management area defined by step S1. If the track number and kilometer mark found exist in both trackside resource management areas, then the track number and kilometer mark are the location of the boundary point.

6. The method for generating data boundary points of a TACS system according to claim 3, characterized in that: The step S2 specifically includes: 22) Find the starting and ending tracks of the trackside resource management area from the trackside resource management area table defined in step S1. If the track has no connection with other tracks and there is no car block at the starting or ending point of the track, the track number and kilometer mark are the location of the boundary point. 23) Find the starting or ending track of the trackside resource management area from the trackside resource management area table defined in step S1. If there are two different tracks in different trackside resource management areas, and the two tracks are connected to each other, the kilometer mark of the connecting point of the two tracks is the kilometer mark of the boundary point, and the track with the smaller track number is the track number of the boundary point.

7. The method for generating data boundary points of a TACS system according to claim 4, characterized in that: The step S2 specifically includes: 24) Search the track number and kilometer mark information of the starting and ending points of the artificial control area defined in step S1 from the artificial control area table, and create a boundary point at each starting and ending point found. The track number and kilometer mark of the starting and ending points are the track number and kilometer mark of the boundary point.

8. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: The priorities in step S3 are as follows from high to low: 31) Boundary point created by two connected trackside resource management areas; 32) Boundary points created by trackside resource management areas and non-trackside resource management areas; 33) Boundary points created by artificial control areas.

9. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: In step S4, the boundary points are specifically named as: BO_X_Y_Z", Where "BO" is the abbreviation for boundary point; If the boundary point is created for two connected resource management areas, X is the name of the current resource management area; Y is the name of the adjacent resource management area; Z is the name of the track where the boundary point is located; If the boundary point is created by the trackside resource management area and the non-trackside resource management area, X is the name of the current resource management area; Y does not exist; Z is the name of the track where the boundary point is located; If the boundary point is created by an artificial control area, X is the name of the current artificial control area; Y is the name of the track where the boundary point is located; Z is "B" or "E", where "B" means the boundary point is at the beginning of the artificial control area, and "E" means the boundary point is at the end of the artificial control area.

10. The method for generating data boundary points of a TACS system according to claim 1, characterized in that: The specific ordering method of the sequence numbers in step S5 is: 51) Find the boundary points created by two trackside resource management areas and sort them in ascending order according to the sequence number of the trackside resource management areas; 52) Find the boundary points created by the trackside resource management area and the non-trackside resource management area, and sort them in ascending order according to the sequence number of the trackside resource management area; 53) Find the boundary points created by the boundaries of the artificially controlled areas and sort them in ascending order according to the sequence number of the artificially controlled areas.

11. An electronic device comprising a memory and a processor, wherein a computer program is stored in the memory, wherein: When the processor executes the program, the method according to any one of claims 1 to 10 is implemented.

12. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the method according to any one of claims 1 to 10 is implemented.