Roadbed construction method
By setting up geogrid chambers and anchor rods in the reinforced earth roadbed, lateral constraints are formed, the problem of destroying the reinforced structure during pipeline maintenance is solved, the stability of the roadbed is ensured and construction is simplified, and the efficiency and safety of pipeline maintenance is achieved.
Patent Information
- Application Number
- CN202411425975.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-14
- Publication Date
- 2024-11-26
AI Technical Summary
In reinforced earth roadbeds with pipeline crossing, the reinforced structure of the roadbed needs to be destroyed during pipeline maintenance, resulting in uneven settlement of subsequent roadbeds and affecting overall safety.
A roadbed construction method is adopted, by alternately laying lateral geonets and reinforced soil layers on the flat foundation surface, setting up geogrid chambers, and laying filling layers and covering layers in the pipeline excavation area, using geogrid chambers and anchorages The rod forms lateral constraints to ensure the stability of the pipeline excavation area and avoid damage to the reinforced structure.
It realizes that the side reinforcement area is not damaged during pipeline maintenance, ensures the stability of the roadbed, prevents collapse and deformation, simplifies the construction process, reduces costs and construction periods, and allows the reuse of geonets in the excavation area.
Smart Images

Figure CN119021050A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of roadbed pipeline maintenance, and in particular relates to a roadbed construction method. Background Art
[0002] Taking into account problems such as uneven settlement and deformation of the roadbed, geogrids are often added and combined with the original fill to form a reinforced soil roadbed.
[0003] During the inspection and maintenance of pipelines on reinforced soil roadbeds with pipelines crossing, it is often necessary to destroy the reinforced structure in the roadbed and expose the pipelines, which will cause serious uneven settlement of the roadbed during subsequent service and affect the overall safety of the roadbed. Summary of the invention
[0004] In view of the above analysis, the present invention aims to provide a roadbed construction method, which solves the problem of damaging the reinforced structure in the roadbed when inspecting pipelines in the prior art.
[0005] The purpose of the present invention is mainly achieved through the following technical solutions:
[0006] The present invention provides a roadbed construction method, comprising the following steps:
[0007] Step 1: Alternately lay multiple layers of lateral geonets and multiple layers of reinforced soil on the flat foundation surface to complete the construction of the reinforced paving area;
[0008] Step 2: Place two groups of geocells symmetrically on the surface of the reinforced paving area according to the designed position, lay the side reinforcement area on the side of the geocell away from the pipeline excavation area, and the construction area of the pipeline excavation area is between the two groups of geocells;
[0009] Step 3: Lay the filling layer in the construction area of the pipeline excavation area, bury the pipeline during the laying of the filling layer, alternately lay multiple layers of covering layers and multiple layers of excavation area geonets on the surface of the filling layer until it is flush with the height of the two sets of geocells, and fix the two ends of the excavation area geonet with the geocells to obtain covering soil, thereby completing the construction of the roadbed.
[0010] Furthermore, step 1 includes the following steps:
[0011] Step 11: Lay a layer of lateral geonet on the flat foundation surface, reserve the reverse length at the tail end of the lateral geonet, stack the blocks on the lateral geonet according to the designed number of layers, reversely wrap the blocks at the tail end of the lateral geonet, and connect the reversed part with the main body of the lateral geonet with a connecting rod, and lay the reinforced soil layer on the lateral geonet;
[0012] Step 12: Repeat step 11 on the surface of the reinforced soil layer until the designed height is reached;
[0013] Step 13: Lay a layer of lateral geonet on the top reinforced soil layer, reserve a reverse length at the tail end of the lateral geonet, stack and level and compact the blocks on the lateral geonet according to the designed number of layers, reversely wrap the blocks at the tail of the lateral geonet, and connect the reversed part to the main body of the lateral geonet with connecting rods to complete the construction of the reinforced paving area.
[0014] Furthermore, step 2 includes the following steps:
[0015] Step 21: Place a pair of geocells on the surface of the reinforced paving area according to the designed position;
[0016] Step 22: Install a mounting plate on the surface of the geocell, and pass the anchor rod through the mounting plate, the geocell and the lateral geonet of the lower layer and extend it into the reinforced soil layer;
[0017] Step 23: laying a reinforced soil layer on the surface of the lateral geonet and outside the pair of geocells, laying the lateral geonet on the surface of the reinforced soil layer, and hanging the head end of the lateral geonet on the anchor rod;
[0018] Step 24: Repeat steps 21 to 23 until the two groups of geocells reach the design elevation and the construction area of the pipeline excavation area is enclosed between the two groups of geocells.
[0019] Further, step 3 includes the following steps:
[0020] Step 31: laying a geonet in the excavation area on the surface of the filling layer, hanging both ends of the geonet in the excavation area on anchor rods, and laying a covering layer on the geonet in the excavation area;
[0021] Step 32: laying a geonet in the excavation area on the surface of the cover layer, hanging both ends of the geonet in the excavation area on anchor rods, and laying a cover layer on the geonet in the excavation area;
[0022] Step 33: Repeat step 32 until the geonet in the excavation area reaches the designed elevation and the covering soil is obtained.
[0023] Furthermore, when excavating for pipeline maintenance, the above step 33 further includes the following steps:
[0024] Step A: Clean the surface of the pipeline excavation area;
[0025] Step B: Laying out the pipeline excavation area in sections along the longitudinal direction of the pipeline;
[0026] Step C: Excavate the pipeline excavation area. During the excavation process, when the excavation reaches the geonet in the excavation area, separate the geonet from the geocell and lift it up and remove it until the pipeline is exposed.
[0027] Step D: Inspection and repair of pipelines;
[0028] Step E: Repeat steps 31 to 33 to complete the backfilling of the pipeline excavation area.
[0029] Furthermore, from bottom to top, the multiple geocells in each group of geocells are stacked, and the distances between the multiple geocells and the center line of the pipeline excavation area gradually increase, forming a stepped shape.
[0030] Furthermore, the slope of each group of geocells is 60 to 80 degrees.
[0031] Furthermore, the lateral geonet is a unidirectional stretched geogrid.
[0032] Furthermore, the geonet in the excavation area is a biaxially stretched geogrid.
[0033] Furthermore, the roadbed includes a geotechnical wall and side foundations located on the side of the side reinforcement area away from the pipeline excavation area and on both sides of the reinforced paving area, and the side foundation is located below the geotechnical wall. Before step 1, the following steps are also included:
[0034] Step a: Support the formwork at the setting position of the side foundation;
[0035] Step b: pouring concrete into the formwork to form a side foundation after the concrete solidifies;
[0036] Step c: stack multiple geobags vertically on the side foundation to form a geotextile wall.
[0037] Compared with the prior art, the present invention can achieve at least one of the following beneficial effects:
[0038] A) The roadbed construction method provided by the present invention is provided with a pipeline excavation area specially used for laying pipelines. The two sides of the pipeline excavation area are laterally limited by two groups of geocells. When the pipeline needs to be inspected, it is only necessary to dig out the covering soil and the filling layer to inspect the pipeline. After the inspection, the two ends of the geonet in the excavation area are fixedly connected to the geocell again. Before and after the pipeline inspection, the unidirectional geogrid and the reinforced soil layer in the side reinforcement area will not be damaged, and the stability of the original roadbed before and after the pipeline inspection construction can be ensured, and the collapse and deformation of the roadbed during the pipeline excavation construction process can be effectively prevented. The geonet in the excavation area can be reused, and the construction is convenient and fast.
[0039] B) The construction method of the roadbed provided by the present invention can serve as temporary support on both sides of the pit wall during the excavation of the covering soil and the filling layer because the geocell has a strong lateral restraint effect, thereby limiting the lateral displacement of the pit wall during the inspection and excavation of the pipeline, increasing the bearing capacity and lateral restraint around the pipeline excavation area, ensuring the stability of the original structure, and eliminating the need for a temporary support process, thereby greatly saving construction time and costs.
[0040] Other features and advantages of the present invention will be described in the following description, and part of them will become obvious from the description, or will be understood by practicing the present invention. The purpose and other advantages of the present invention can be realized and obtained by the structures particularly pointed out in the written description and the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The drawings are only for the purpose of illustrating particular embodiments and are not to be considered limiting of the present invention. Like reference symbols denote like components throughout the drawings.
[0042] Figure 1 A construction flow chart of the roadbed construction method provided by the present invention;
[0043] Figure 2 A schematic diagram of the cross-sectional structure of a roadbed obtained by the roadbed construction method provided by the present invention;
[0044] Figure 3 A schematic diagram of the structure of the lateral geonet in the roadbed construction method provided by the present invention;
[0045] Figure 4 A schematic diagram of the connection of the excavation area geonet, lateral geonet, geocell, anchor rod and installation buckle group in the roadbed construction method provided by the present invention;
[0046] Figure 5 A schematic diagram of the connection between the excavation area geonet and the lateral geonet in the roadbed construction method provided by the present invention;
[0047] Figure 6 The present invention provides a schematic structural diagram of the buckles, elastic cantilever and spherical protrusions in the roadbed construction method provided by the present invention.
[0048] Reference numerals:
[0049] 1- pipeline; 2- lateral geonet; 3- geocell; 4- geonet in excavation area; 5- anchor rod; 6- mounting buckle group; 61- row of buckles; 62- mounting plate; 7- reinforced soil layer; 8- pressure block; 9- spherical protrusion; 10- side foundation; 11- filling layer; 12- covering layer; 13- elastic cantilever. DETAILED DESCRIPTION
[0050] Preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings, wherein the accompanying drawings constitute a part of the present invention and are used to explain the principles of the present invention together with the embodiments of the present invention.
[0051] The present invention provides a roadbed construction method, see Figure 1 , including the following steps:
[0052] Step 1: alternately laying multiple layers of lateral geonets 2 (e.g., unidirectional tensile geogrids) and multiple layers of reinforced soil layers 7 on a flat foundation surface to complete the construction of the reinforced paving area;
[0053] Step 2: Two groups of geocells 3 are symmetrically placed on the surface of the reinforced paving area according to the designed position, and a side reinforcement area is laid on the side of the geocell 3 away from the pipeline excavation area. The construction area of the pipeline excavation area is between the two groups of geocells 3;
[0054] Step 3: Lay a filling layer 11 in the construction area of the pipeline excavation area, bury the pipeline 1 during the laying of the filling layer 11, alternately lay multiple layers of covering layers 12 and multiple layers of excavation area geogrids 4 (for example, biaxially stretched geogrids) on the surface of the filling layer 11 until they are flush with the height of the two groups of geocells 3, and the two ends of the excavation area geogrid 4 are fixedly connected to the geocells 3 to obtain covered soil, thereby completing the construction of the roadbed.
[0055] Compared with the prior art, the roadbed construction method provided by the present invention is provided with a pipeline excavation area specifically used for laying the pipeline 1. The two sides of the pipeline excavation area are laterally limited by two groups of geocells 3. When the pipeline 1 needs to be inspected, it is only necessary to dig out the covering soil and the filling layer 11 to inspect the pipeline 1. After the inspection, the two ends of the geonet 4 in the excavation area can be fixedly connected to the geocell 3 again. Before and after the inspection of the pipeline 1, the unidirectional geogrid and the reinforced soil layer 7 in the side reinforcement area will not be damaged, and the stability of the original roadbed before and after the inspection and construction of the pipeline 1 can be ensured, and the collapse and deformation of the roadbed during the excavation and construction of the pipeline 1 can be effectively prevented. The geonet 4 in the excavation area can be reused, and the construction is convenient and quick.
[0056] Since the geocell 3 has a strong lateral restraint effect, it can be used as temporary support on both sides of the pit wall during the excavation of the covering soil and the filling layer 11, limiting the lateral displacement of the pit wall during the inspection and excavation of the pipeline 1, increasing the bearing capacity and lateral restraint around the pipeline excavation area, ensuring the stability of the original structure, and eliminating the need for temporary support procedures, thereby greatly saving construction time and costs.
[0057] Specifically, for the construction of the reinforced paving area, the above step 1 includes the following steps:
[0058] Step 11: Lay a layer of lateral geonet 2 on the flat foundation surface, reserve a reverse length at the tail end of the lateral geonet 2, stack and level and compact the compressed blocks 8 filled with coarse sand and gravel on the lateral geonet 2 according to the designed number of layers, reversely wrap the compressed blocks 8 at the tail end of the lateral geonet 2, and connect the reversed part to the main body of the lateral geonet 2 with a connecting rod, lay a reinforced soil layer 7 on the lateral geonet 2, and level and compact it;
[0059] Step 12: Repeat step 11 on the surface of the reinforced soil layer 7 until the designed height is reached;
[0060] Step 13: Lay a layer of lateral geonet 2 on the topmost reinforced soil layer 7, leaving a reserved length for the reverse wrap at the tail end of the lateral geonet 2, stack and level and compact the compacts 8 filled with coarse sand and gravel on the lateral geonet 2 according to the designed number of layers, wrap the compacts 8 in the reverse direction at the tail of the lateral geonet 2, and connect the reverse wrap part to the main body of the lateral geonet 2 with a connecting rod to complete the construction of the reinforced paving area.
[0061] In order to ensure the structural strength of the two groups of geocells 3, the above step 2 includes the following steps:
[0062] Step 21: placing a pair of geocells 3 on the surface of the reinforced paving area according to the designed position;
[0063] Step 22: Install the mounting plate 62 on the surface of the geocell 3, and pass the anchor rod 5 through the geocell 3 and the lower lateral geonet 2 and extend it into the reinforced soil layer 7;
[0064] Step 23: laying a reinforced soil layer 7 on the surface of the lateral geonet 2 and outside a pair of geocells 3, laying the lateral geonet 2 on the surface of the reinforced soil layer 7, and hanging the head end of the lateral geonet 2 on the buckle 61 and the anchor rod 5;
[0065] Step 24: Repeat steps 21 to 23 until the two groups of geocells 3 reach the design elevation, and the construction area of the pipeline excavation area is enclosed between the two groups of geocells 3.
[0066] For example, from bottom to top, multiple geocells 3 in each group of geocells 3 are stacked, and are overlapped layer by layer according to the designed slope ratio on both sides, and the distance from the center line of the pipeline excavation area gradually increases, thereby forming a stepped shape, and then obtaining an inverted trapezoidal pipeline excavation area. In this way, on the one hand, the inverted trapezoidal pipeline excavation area is more stable, which is convenient for the maintenance of the pipeline 1. On the other hand, the side of the geocell 3 away from the pipeline 1 also has a certain slope, which plays a transition role from the pipeline excavation area to the side reinforcement area, reducing the influence of different stiffness of different areas of the reinforced soil roadbed.
[0067] It should be noted that in order to further improve the lateral constraints of the two groups of geocells 3 on the pipeline excavation area, the slope of each group of geocells is 60 to 80 degrees.
[0068] In order to improve the structural strength of the covering soil, the step 3 includes the following steps:
[0069] Step 31: laying the excavation area geonet 4 on the surface of the filling layer 11, with both ends of the excavation area geonet 4 hung on the anchor rods 5 and the buckles 61, laying the cover layer 12 on the excavation area geonet 4, and leveling and compacting it;
[0070] Step 32: laying the excavation area geonet 4 on the surface of the cover layer 12, with both ends of the excavation area geonet 4 hung on the anchor rods 5 and the buckles 61, laying the cover layer 12 on the excavation area geonet 4, and leveling and compacting;
[0071] Step 33: Repeat step 32 until the geonet 4 in the excavation area reaches the designed elevation and the covering soil is obtained.
[0072] During the service period of the completed roadbed, when it is necessary to perform maintenance excavation of the pipeline 1, the above step 3 further includes the following steps:
[0073] Step A: Clean the surface of the pipeline excavation area to ensure the necessary construction conditions;
[0074] Step B: Lay out the pipeline excavation area in sections along the longitudinal direction of pipeline 1, and set up guardrails for protection and safety warning according to design requirements;
[0075] Step C: excavating the pipeline excavation area. During the excavation process, when the excavation reaches the geonet 4 in the excavation area, separate the geonet 4 from the geocell 3, lift it up and remove it until the pipeline 1 is exposed;
[0076] Step D: Perform maintenance work on pipeline 1;
[0077] Step E: Repeat step 3 to complete the backfilling of the pipeline excavation area.
[0078] It can be understood that when the roadbed includes a geotechnical wall and side foundations 10 located on the side of the side reinforcement area away from the pipeline excavation area and on both sides of the reinforcement paving area, and the side foundations 10 are located below the geotechnical wall, the following steps are also included before the above step 1:
[0079] The original ground roadbed slope retaining wall foundation is sequentially excavated, ground treated, and the side foundation 10 and geotechnical wall are constructed.
[0080] The construction of the side foundation 10 and the geotechnical wall specifically includes the following steps:
[0081] Step a: supporting the formwork at the setting position of the side foundation 10;
[0082] Step b: pouring concrete into the formwork to form a side foundation 10 after the concrete solidifies;
[0083] Step c: stack multiple geobags in a vertical direction on the side foundation 10 to form a geotextile wall.
[0084] For ease of understanding, illustratively, the roadbed structure obtained by the above construction method is as follows:
[0085] The structure of the roadbed can be found in Figure 2, including a reinforced paving area, a pipeline excavation area located above the reinforced paving area, and side reinforcement areas located on both sides of the pipeline excavation area, wherein the pipeline excavation area includes a pipeline 1, a filling layer 11, a geocell 3 and a covering soil, the pipeline 1 is buried in the filling layer 11, the covering soil covers the filling layer 11, the geocell 3 is located on both sides of the covering soil and the filling layer 11, wherein the covering soil includes alternately stacked covering layers 12 and excavation area geonet 4, one end of the excavation area geonet 4 is detachably connected to the geocell 3 on one side, and the other end of the excavation area geonet 4 is detachably connected to the geocell 3 on the other side.
[0086] The structures of the reinforced paving area and the side reinforced area are basically the same. Specifically, they include lateral geonets 2 (see Figure 3 ), reinforced soil layer 7, geotextile wall and side foundation 10, the side foundation 10 is located below the geotextile wall, the geotextile wall includes a plurality of blocks 8 stacked from top to bottom, the lateral geonet 2 and the reinforced soil layer 7 are alternately stacked, the lateral geonet 2 is close to one end (tail end) of the geotextile wall and reversely covers the blocks 8, a layer of lateral geonet 2 reversely covers a plurality of blocks 8 (for example, two blocks 8), the lateral geonet 2 below the pipeline excavation area is laid through the entire side reinforcement area, thereby enhancing the overall stability and bearing capacity below the pipeline excavation area.
[0087] In order to form an overall tensioned structure, the geocell 3 is detachably connected to the excavation area geonet 4 through a connecting assembly. In the horizontal direction, the corresponding lateral geonet 2 passes through the gap between two adjacent geocells 3 and is overlapped with the geocell 3 and the excavation area geonet 4 through the connecting assembly to form a complete reinforced structure.
[0088] Specifically, the connection assembly includes an anchor rod 5 and a mounting buckle assembly 6, see Figures 4 to 5 The mounting buckle group 6 includes a mounting plate 62 and a plurality of rows of buckles 61. The size of the anchor rod 5 can be set according to the actual height of the geocell 3. The mounting buckle group 6 is fixedly connected to the mounting plate 62. The mounting buckle group 6 penetrates the excavation area geonet 4 and the lateral geonet 2. A through hole is provided on the mounting plate 62. The anchor rod 5 penetrates the excavation area geonet 4, the lateral geonet 2, the through hole and the geocell 3, so that the above four are tightly connected as a whole, so that the excavation area geonet 4 is easy to disassemble and is tightly connected with the lateral geonet 2 and the geocell 3, reducing the overlap length of the excavation area geonet 4 and the lateral geonet 2, providing convenience for construction; at the same time, it can ensure that different reinforcement materials (excavation area geonet 4 and lateral geonet 2) are uniformly stressed after overlapping, ensuring that the whole is in a tensioned stress state, making the overall structure more stable, and overcoming the problem that the original reinforced structure is easily damaged during pipeline 1 construction.
[0089] It should be noted that when the geocell 3 is multi-layered, the anchor rods 5 penetrate the multi-layered geocell 3, so that the multi-layered geocell 3 also forms an integral structure. In addition, the provision of the anchor rods 5 can also effectively improve the vertical stability of the side reinforcement area.
[0090] In practical applications, when the geonet 4 in the excavation area is re-laid after the pipeline 1 is repaired, due to the long-term service of the geonet 4 in the excavation area, if the connection position of the geonet 4 in the excavation area is the same as that of the buckle 61, there may be insufficient tension, resulting in the collapse of the road surface in the pipeline excavation area in the later stage. Therefore, the above-mentioned connection assembly also includes two elastic cantilevers 13 and a plurality of spherical protrusions 9, see Figure 6 , multiple spherical protrusions 9 are all arranged on the grid side walls of the geonet 4 in the excavation area, and are arranged on different grid side walls along the transverse direction of the reinforced soil roadbed. One end of the elastic cantilever 13 is fixedly connected to the buckle 61, and the other end of the elastic cantilever 13 is suspended. The space between the two elastic cantilevers 13 is an accommodating space. The accommodating space is divided into a necking section and an accommodating section along the direction gradually approaching the buckle 61. The width of the necking section close to one end of the accommodating section is smaller than the diameter of the spherical protrusion 9. During the laying process of the geonet 4 in the excavation area, one of the spherical protrusions 9 is used as a trial protrusion, and the trial protrusion is placed in the diameter reduction section. If the trial protrusion passes through the diameter reduction section and enters the accommodating section, it means that the tensioning force of the geonet 4 in the excavation area is sufficient. If the trial protrusion does not enter the accommodating section, it means that the tensioning force of the geonet 4 in the excavation area is insufficient. The spherical protrusion 9 on the side of the trial protrusion close to the center line of the pipeline excavation area is used as a new trial protrusion and is placed in the diameter reduction section. In this way, by setting up multiple spherical protrusions 9 and elastic cantilevers 13, during the re-laying process of the geonet 4 in the excavation area, it is possible to predict whether the tensioning force of the geonet 4 in the excavation area is sufficient, thereby reducing the possibility of road collapse in the later stage.
[0091] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any changes or substitutions that can be easily conceived by any technician familiar with the technical field within the technical scope disclosed by the present invention should be covered within the protection scope of the present invention.
Claims
1. A roadbed construction method, characterized in that: The steps include: Step 1: Lay multiple layers of lateral geonet and reinforced soil alternately on the flat foundation surface to complete the construction of the reinforced paving area; Step 2: Place two sets of geocells symmetrically on the surface of the reinforced paving area according to the designed position. Lay the side reinforcement area on the side of the geocell away from the pipeline excavation area. The construction area of the pipeline excavation area is between the two sets of geocells. Step 3: Lay a filling layer in the construction area of the pipeline excavation area, bury the pipeline during the laying of the filling layer, and alternately lay multiple layers of cover layers and multiple layers of excavation area geonets on the surface of the filling layer until they are flush with the height of the two sets of geocells. The two ends of the excavation area geonet are fixedly connected to the geocells to obtain covering soil, thereby completing the construction of the roadbed.
2. The roadbed construction method according to claim 1, characterized in that: The step 1 comprises the following steps: Step 11: Lay a layer of lateral geonet on the flat foundation surface, reserve a reverse wrap length at the tail end of the lateral geonet, stack the blocks on the lateral geonet according to the designed number of layers, reversely wrap the blocks at the tail end of the lateral geonet, and connect the reverse wrap part to the main body of the lateral geonet with a connecting rod, and lay a reinforced soil layer on the lateral geonet; Step 12: Repeat step 11 on the surface of the reinforced soil layer until the designed height is reached; Step 13: Lay a layer of lateral geonet on the topmost reinforced soil layer, with a reserved reverse length at the tail end of the lateral geonet. Stack and level and compact the blocks on the lateral geonet according to the designed number of layers. Wrap the blocks in reverse at the tail end of the lateral geonet, and connect the reversed part to the main body of the lateral geonet with a connecting rod to complete the construction of the reinforced paving area.
3. The roadbed construction method according to claim 2, characterized in that: The step 2 comprises the following steps: Step 21: Place a pair of geocells on the surface of the reinforced paving area according to the designed position; Step 22: Install the mounting plate on the surface of the geocell, and insert the anchor rod through the mounting plate, the geocell and the lower lateral geonet and extend it into the reinforced soil layer; Step 23: Laying a reinforced soil layer on the surface of the lateral geonet and outside the pair of geocells, laying the lateral geonet on the surface of the reinforced soil layer, and hanging the head end of the lateral geonet on the anchor rod; Step 24: Repeat steps 21 to 23 until the two groups of geocells reach the design elevation and the construction area of the pipeline excavation area is enclosed between the two groups of geocells.
4. The roadbed construction method according to claim 3, characterized in that: The step 3 comprises the following steps: Step 31: laying an excavation area geonet on the surface of the filling layer, with both ends of the excavation area geonet hung on anchor rods, and laying a cover layer on the excavation area geonet; Step 32: laying an excavation area geonet on the surface of the cover layer, with both ends of the excavation area geonet hung on anchor rods, and laying a cover layer on the excavation area geonet; Step 33: Repeat step 32 until the geonet in the excavation area reaches the design elevation and the covering soil is obtained.
5. The roadbed construction method according to claim 4, characterized in that: When excavating for pipeline maintenance, the following steps are also included after step 33: Step A: Clean the surface of the pipeline excavation area; Step B: Lay out the pipeline excavation area in sections along the longitudinal direction of the pipeline; Step C: Excavate the pipeline excavation area. During the excavation process, when the geonet in the excavation area is reached, separate the geonet from the geocell and lift it up and remove it until the pipeline is exposed. Step D: Repair and maintenance of pipelines; Step E: Repeat steps 31 to 33 to complete the backfilling of the pipeline excavation area.
6. The roadbed construction method according to claim 1, characterized in that: From bottom to top, multiple geocells in each group of geocells are stacked, and the distances between the multiple geocells and the center line of the pipeline excavation area gradually increase, forming a stepped shape.
7. The roadbed construction method according to claim 6, characterized in that: The slope of each group of geocells is 60 to 80°.
8. The roadbed construction method according to claim 1, characterized in that: The lateral geonet is a unidirectional stretched geogrid.
9. The roadbed construction method according to claim 1, characterized in that: The excavation area geonet is a biaxially stretched geogrid.
10. The roadbed construction method according to claim 1, characterized in that: The roadbed includes a geotechnical wall and side foundations located on the side of the side reinforcement area away from the pipeline excavation area and on both sides of the reinforced paving area. The side foundations are located below the geotechnical wall. Before step 1, the following steps are also included: Step a: Support the formwork at the location where the side foundation is set; Step b: pouring concrete into the formwork to form the side foundation after the concrete solidifies; Step c: stack multiple geobags vertically on the side foundation to form a geowall.
