Mountainous area steel truss girder large-span side-span cantilever assembling method

By using sling towers and cables for pretension in the construction of steel truss in mountainous areas, the problem of excessive stress in the cantilever section is solved, the safety and reliability of construction are achieved, and large-span side-span steel in mountainous areas is provided. An effective solution for truss assembly.

CN119021111APending Publication Date: 2024-11-26CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411204892.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the construction of steel truss in mountainous areas, due to the complex terrain and large span, the stress of the steel truss in the cantilever section may exceed the structural tolerance value, resulting in irreversible structural damage and affecting safety.

Method used

A method of assembling a large-span side span cantilever in mountainous steel truss. By installing a sling tower at the rear end of the main beam and setting two cables, pre-tensioning is performed, and the main beam and secondary beam are spliced ​​section by section to avoid stress in the large cantilever section. Too big problem.

Benefits of technology

This method effectively avoids the problem of excessive stress in the cantilever section, ensures safe and reliable construction, is easy to operate, and has great promotion value, providing a solution for the assembly of large-span side span steel trusses in mountainous areas.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021111A_ABST
    Figure CN119021111A_ABST
Patent Text Reader

Abstract

The invention provides a large-span side-span cantilever splicing method for a steel truss girder in a mountainous area. The method comprises the following steps: splicing a plurality of sections of secondary girders on a plurality of corresponding auxiliary piers section by section; the rear end of the main beam and the front end of the adjacent secondary beam are spliced together on the auxiliary pier close to the main pier in a cantilever splicing mode; a sling tower is vertically installed at the top of the main beam, and the sling tower corresponds to the auxiliary pier connected with the rear end of the main beam; the front side and the rear side of the sling tower are each provided with an inhaul cable. The two inhaul cables are pre-tensioned; subsequent sections of the main beam are installed, and the front end of the main beam is connected to the main tower; and after the side span steel truss girders are completely installed, the two inhaul cables and the sling tower are dismantled. The method has the beneficial effects that when the large-span side-span cantilever is installed, safety and reliability are achieved, operation is easy and convenient, economical efficiency is high, large popularization value is achieved, and a reference function is provided for assembling of the large-span side-span steel truss girder in the mountainous area.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of bridge construction, and in particular relates to a method for assembling a large-span side span cantilever of a steel truss beam in a mountainous area. Background Art

[0002] When constructing steel trusses in mountainous areas, due to the complex terrain, large spans and deep valleys, the cantilever assembly method is often used to assemble steel trusses section by section. However, as the assembly length gradually increases, the stress of the cantilever section steel trusses will gradually increase. When the cantilever span is large, the stress of the steel trusses may exceed the allowable stress of the structure, resulting in irreversible structural damage and affecting the safety of the structure. Summary of the invention

[0003] In view of this, the present invention aims to overcome the deficiencies of the above-mentioned problems in the prior art and proposes a method for assembling a large-span side span cantilever of a steel truss in mountainous areas.

[0004] To achieve the above object, the technical solution of the present invention is achieved as follows:

[0005] A method for assembling a large-span side-span cantilever of a steel truss beam in a mountainous area comprises the following steps:

[0006] A. The steel derivative beam connected to the main tower in the side span steel truss is set as the main beam, the steel truss on the side of the main beam away from the main tower is set as the secondary beam, and the pier where the main tower is installed is set as the main pier, and the piers corresponding to the bottom of each secondary beam at both ends are set as auxiliary piers, and multiple sections of secondary beams are assembled section by section on multiple corresponding auxiliary piers;

[0007] B. On the auxiliary pier close to the main pier, the rear end of the main beam is spliced ​​with the front end of the adjacent secondary beam by cantilever splicing;

[0008] C. Install a cable tower vertically on the top of the main beam, and the cable tower corresponds to the auxiliary pier connected to the rear end of the main beam;

[0009] D. A cable is installed on both the front and rear sides of the cable tower;

[0010] E. Pre-tension the two cables;

[0011] F. Install the subsequent sections of the main beam so that the front end of the main beam is connected to the main tower;

[0012] G. After all the side span steel trusses are installed, the two cables and the suspension tower are dismantled.

[0013] Furthermore, in step D, the two cables on the front and rear sides of the suspension tower are symmetrically arranged.

[0014] Furthermore, the upper end of the cable is fixedly connected to the ear plate on the side corresponding to the top of the sling tower, the lower end of the cable on the side to be assembled is fixed in the ear plate at the front end of the cantilever on the side to be assembled of the main beam, and the lower end of the cable on the side to be assembled is fixed in the ear plate on the secondary beam at a symmetrical position with the other cable.

[0015] Furthermore, in step A, the secondary beam is hoisted by a beam erecting crane for cantilever splicing.

[0016] Compared with the prior art, the present invention has the following advantages:

[0017] The method for assembling cantilever of large-span side span steel truss beams in mountainous areas described in the present invention comprises the following steps: during the cantilever assembly construction of large-span side span steel truss beams in mountainous areas, a cable tower is installed at the rear end of the main beam, and one end of two cables are fixed to the ear plates on both sides of the top of the cable tower, and the other end is fixed to the ear plates of the corresponding steel truss beams, and the two cables are pre-tensioned, thereby completely avoiding the problem of excessive stress of the steel truss beams in the large cantilever section that may occur during the cantilever assembly of traditional steel truss beams. The method is safe and reliable, easy to operate, highly economical, has great promotion value, and provides a reference for the assembly of large-span side span steel truss beams in mountainous areas. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] The accompanying drawings constituting a part of the present invention are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention. In the accompanying drawings:

[0019] Figure 1 It is a schematic diagram of the connection structure of the suspension tower on the side span steel derivative beam cantilever according to an embodiment of the present invention.

[0020] Description of reference numerals:

[0021] 1. Main beam; 2. Secondary beam; 3. Main tower; 4. Main pier; 5. Auxiliary pier; 6. Cable tower; 7. Cable. DETAILED DESCRIPTION

[0022] It should be noted that, in the absence of conflict, the embodiments of the present invention and the features in the embodiments may be combined with each other.

[0023] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and the like are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first", "second", and the like may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more.

[0024] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood by specific circumstances.

[0025] The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0026] As shown in the figure, a method for assembling a large-span side span cantilever of a steel truss beam in a mountainous area includes the following steps:

[0027] A. The steel derivative beam connected to the main tower 3 in the side span steel truss beam is set as the main beam 1, the steel truss beam on the side of the main beam 1 away from the main tower 3 is set as the secondary beam 2, and the piers on which the main tower 3 is installed are set as the main piers 4, and the piers corresponding to the bottom of both ends of each secondary beam 2 are set as auxiliary piers 5, and multiple sections of secondary beams 2 are assembled section by section on multiple corresponding auxiliary piers 5;

[0028] B. On the auxiliary pier 5 close to the main pier 4, the rear end of the main beam 1 is spliced ​​with the front end of the adjacent secondary beam 2 by cantilever splicing. At this time, the cantilever length reaches the maximum, and the stress of the steel beam at the auxiliary pier 5 is relatively large;

[0029] C. A sling tower 6 is vertically installed on the top of the main beam 1, and the sling tower 6 corresponds to the auxiliary pier 5 connected to the rear end of the main beam 1;

[0030] D. A cable 7 is provided on both the front and rear sides of the cable tower 6;

[0031] E. Pre-tensioning the two cables 7;

[0032] F. Install the subsequent segments of the main beam 1 so that the front end of the main beam 1 is connected to the main tower 3;

[0033] G. After all the side span steel trusses are installed, the two cables 7 and the suspension tower 6 are dismantled.

[0034] In step D, two cables 7 on the front and rear sides of the cable tower 6 are symmetrically arranged.

[0035] The upper end of the cable 7 is fixedly connected to the ear plate on the corresponding side of the top of the suspension tower 6, the lower end of the cable 7 on the side to be assembled is fixed in the ear plate at the front end of the cantilever on the side to be assembled of the main beam 1, and the lower end of the cable 7 on the side to be assembled is fixed in the ear plate on the secondary beam 2 at a symmetrical position with another cable 7.

[0036] In step A, the secondary beam 2 is hoisted by a beam erecting crane for cantilever splicing.

[0037] In this embodiment, when performing cantilever assembly construction of large-span side span steel trusses in mountainous areas, a cable tower 6 is installed in advance at the rear end of the main beam 1, and one end of two cables 7 is fixed to the ear plates on both sides of the top of the cable tower 6, and the other end is fixed to the ear plates of the corresponding steel trusses, and the two cables 7 are pre-tensioned, which completely avoids the problem of excessive stress in the large cantilever section of the steel trusses that may occur during the traditional cantilever assembly of steel trusses. This method is safe and reliable, easy to operate, and highly economical. It has great promotion value and provides a reference for the assembly of large-span side span steel trusses in mountainous areas.

[0038] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for assembling a large-span cantilever side span of a steel truss beam in a mountainous area, characterized in that: The following steps are involved: A. The steel derivative beam connected to the main tower in the side span steel truss is set as the main beam, the steel truss on the side of the main beam away from the main tower is set as the secondary beam, and the pier where the main tower is installed is set as the main pier, and the piers corresponding to the bottom of each secondary beam at both ends are set as auxiliary piers, and multiple sections of secondary beams are assembled section by section on multiple corresponding auxiliary piers; B. On the auxiliary pier close to the main pier, the rear end of the main beam is spliced ​​with the front end of the adjacent secondary beam by cantilever splicing; C. Install a cable tower vertically on the top of the main beam, and the cable tower corresponds to the auxiliary pier connected to the rear end of the main beam; D. A cable is installed on both the front and rear sides of the cable tower; E. Pre-tension the two cables; F. Install the subsequent sections of the main beam so that the front end of the main beam is connected to the main tower; G. After all the side span steel trusses are installed, the two cables and the suspension tower are dismantled.

2. The method for assembling a large-span cantilever side span steel truss beam in mountainous areas according to claim 1, characterized in that: In step D, the two cables on the front and rear sides of the suspension tower are symmetrically arranged.

3. The method for assembling a large-span cantilever side span steel truss beam in mountainous areas according to claim 1, characterized in that: The upper end of the cable is fixed to the ear plate on the corresponding side of the top of the sling tower, the lower end of the cable on the side to be assembled is fixed in the ear plate at the front end of the cantilever on the side to be assembled of the main beam, and the lower end of the cable on the side to be assembled is fixed in the ear plate on the secondary beam at a symmetrical position with the other cable.

4. The method for assembling a large-span cantilever side span steel truss beam in mountainous areas according to claim 1, characterized in that: In step A, the secondary beam is hoisted by a beam erecting crane for cantilever splicing.