Water damage and erosion integrated protection and repair method for black brick lining tunnel

Through the integrated protection and repair method of water damage and erosion of blue brick-lined tunnels, including leakage treatment of tunnel walls, repair of blue brick walls and installation of protective corridors, the problem of inability to effectively retain the tunnel style in the existing technology is solved. Long-term leakage plugging and appearance protection have been achieved.

CN119021722APending Publication Date: 2024-11-26CHINA ELECTRONICS WANWEI (HEFEI) TECH CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411300927.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-18
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

When dealing with the penetration and leakage of underground tunnels, the existing technology cannot effectively retain the original blue brick wall style, and the long-term effect is poor, resulting in the treatment of symptoms but not the root cause.

Method used

The integrated protection and repair method of water damage and erosion of tunnels in blue brick lining is adopted, including leakage and permeation treatment of tunnel walls, repair of blue brick walls and the production and installation of protective corridor frames, and the slurry is stably introduced through exploration marking, grouting, and stabilizing slurry. Repair and custom installation of the corridor frame reduce damage to the original structure and retain the original appearance.

Benefits of technology

It effectively reduces the damage to the tunnel appearance, achieves long-term leakage blocking, and protects the tunnel walls without affecting the later visits, ensuring the retention of the original appearance in the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119021722A_ABST
    Figure CN119021722A_ABST
Patent Text Reader

Abstract

The invention discloses a black brick lining tunnel water damage and erosion integrated protection and repair method, which comprises a tunnel wall surface leakage and permeation treatment method, black brick wall surface repair and protection gallery frame manufacturing and installation, and the tunnel wall surface leakage and permeation treatment method comprises the following steps: S1, exploration and marking; s2, grouting is conducted; s3, stable slurry feeding and slurry stopping; and S4, grouting is finished. According to the method, the lining tunnel is repaired through a tunnel wall face leakage and permeation treatment method, black brick wall face repairing and protection gallery frame manufacturing and mounting, damage to the original style and appearance can be effectively reduced, meanwhile, leakage stopping can be conducted in the long-term use process, and the original style and appearance in the tunnel can be effectively reserved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of lining tunnel repair, and in particular to an integrated protection and repair method for water damage and erosion of a blue brick lining tunnel. Background Art

[0002] Underground tunnel projects are inevitably affected by the harmful effects of groundwater. If there are no reliable waterproofing measures, underground projects will inevitably have some infiltration and leakage points in the underground tunnels after long-term erosion by groundwater. At present, the domestic approach to such infiltration and leakage points is usually to demolish the original blue brick wall, waterproof the inside of the lining, and restore the blue brick wall to its original state. Although this approach can solve the infiltration and leakage points for a period of time, it still cannot achieve long-term plugging measures from a long-term perspective. It is a method that only treats the symptoms and not the root cause. Moreover, the blue brick wall restored to its original state also loses its original appearance and cannot achieve the effect of retaining the original appearance.

[0003] In view of this, how to deal with the infiltration and leakage points in underground tunnels while preserving the original appearance to reduce the damage to the original appearance and the technological measures to effectively preserve the original appearance of the tunnel are technical issues that the construction industry needs to consider and solve. Summary of the invention

[0004] The purpose of the present invention is to solve the shortcomings of the prior art and to propose an integrated protection and repair method for water damage and erosion of a blue brick lining tunnel.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions:

[0006] The integrated protection and repair method for water damage and erosion of blue brick lining tunnels includes the treatment method for leakage and infiltration of tunnel walls, the repair of blue brick walls, and the production and installation of protective corridors. The treatment method for leakage and infiltration of tunnel walls includes the following steps:

[0007] S1. Exploration and marking: Exploration is carried out on site to find specific leakage or penetration points, then the leakage or penetration points are marked and grouting holes are opened at the points with a hole diameter of not less than 40 mm and the grouting holes are drilled into the surrounding rock behind the lining for not less than 1 m;

[0008] S2. Grouting: Grouting requires that the cement slurry should be ordinary Portland cement, and the grouting pressure should be 0.5-1.5MPa greater than the hydrostatic pressure at the location;

[0009] S3, stable grouting and grouting stop, when the grouting volume of each hole section reaches the design requirement and should be stable for 10 minutes, and the grouting speed is 1 / 4 of the initial grouting speed, the grouting should be stopped;

[0010] S4. After grouting is completed, the grouting holes should be sealed tightly. After all grouting work is completed, the inspection unit should be arranged to re-inspect the grouting area to ensure the grouting is dense.

[0011] Preferably, after the leakage and infiltration treatment of the tunnel wall is completed, the blue brick wall can be repaired, wherein the blue brick wall repair process is as follows:

[0012] S1. Weathered brick repairs should remove the deteriorated layer to the solid brick surface and should be classified and repaired according to the following regulations:

[0013] a. When the weathering depth is less than 2mm, no repair is required;

[0014] b. When the weathering depth is greater than 2mm and less than 20mm, brick powder should be used for repair. The color of the brick powder should be adjusted according to the color of the well-preserved part. When using brick powder for repair, deep chiseling should not be done, and interface agents that will cause aggravated damage to the original bricks should not be used;

[0015] c. When the weathering depth is greater than or equal to 20mm, it is advisable to use brick chips for repair. The brick chips should be made of replacement brick slices of the same size, color, and basically the same material. The brick chips should use outer bricks, and the cut inner smooth surface should not be used. The brick chip adhesive should be lime adhesive, and cement mortar should not be used.

[0016] d. When the weathered volume exceeds 2 / 3 of the original state, it can be removed and replaced;

[0017] S2. The wall repair brick powder should be made from a certain proportion of old bricks, with the old brick powder content not less than 10%. The repair brick powder should be a special hydraulic lime-based brick powder, and the adhesive should be a low-alkali product. Flat colors should use inorganic color powder;

[0018] S3. When repairing exposed brick walls and using brick slabs for tiling, the following provisions shall be met:

[0019] a. Bricks should be old bricks used in the same building, or old bricks of the same specifications, texture and color used in other buildings;

[0020] b. Bricks of special sizes and bricks for repairing special components should be commissioned to be specially molded and customized by brick factories;

[0021] c. The thickness of the tiles should not be less than 10mm;

[0022] d. Brick bonding materials should use low-alkali mortar or special adhesive;

[0023] 4. Lime-based materials should be used as grouting materials for exposed brick walls. If the original joints are cement-based, lime mortar with a small amount of cement added should be used for grouting.

[0024] Preferably, after the repair of the blue brick wall is completed, a repair device can be used to make and install the protective gallery. The specific process of making and installing the protective gallery is as follows:

[0025] S1. The space in the tunnel environment is small, and the construction of concrete gallery is difficult and takes a long time. Steel gallery can be customized from steel structure manufacturers and directly installed on site, which is easy to construct and takes a short time. Therefore, steel gallery is a more reasonable method.

[0026] S2. Conduct on-site survey to determine the precise dimensions of the tunnel and plan the steel column spacing of the tunnel gallery in a reasonable manner according to the on-site conditions of the tunnel;

[0027] S3. Arrange the steel beams reasonably according to the planned column spacing of the gallery, determine the reasonable and economical size of the steel components, arrange the manufacturer to customize the steel gallery, and then transport it to the site for installation;

[0028] S4. After the gallery is installed, reasonable tempered laminated glass is customized according to the gallery size on site and installed on the sides and top of the gallery, so as to achieve the dual effects of protecting the original wall without affecting the subsequent visits, and can ensure the protection of gallery visitors in the event of wall falling off in the future.

[0029] Preferably, during the leakage and infiltration treatment of the tunnel wall, single-hole step-by-step grouting is used for backfilling to reduce the damage of multi-hole grouting to the original lining structure, ensure the integrity of the original structure, and preserve the original architectural style as much as possible.

[0030] Preferably, during the leakage and infiltration treatment process of the tunnel wall, the grouting pressure is controlled according to the water pressure actually measured on site, so that the hollow part can be filled with grouting in a better unified pressure.

[0031] Preferably, the repair device comprises a frame, a lifting slot is provided on the side wall of the frame, a lifting screw is rotatably connected in the lifting slot, a lifting nut is threadedly connected to the lifting screw, a material plate is fixedly connected to the side wall of the lifting nut, a workbench is fixedly connected to the side wall of the frame, a through hole is provided on the upper end of the workbench, and a folding ladder assembly is installed on the workbench

[0032] Preferably, the folding ladder assembly comprises a plurality of ladder frames, wherein every two adjacent ladder frames are rotatably connected together, a climbing rod is fixedly connected to each of the ladder frames, a strip plate is fixedly connected to the side wall of the workbench, a first threaded hole is provided at the lower end of the strip plate, a second threaded hole is provided on the side wall of the ladder frame, and a first locking screw is threadedly connected to the ladder frame.

[0033] Preferably, a third threaded hole is opened at the lower end of the workbench, a second locking screw is threadedly connected to the third threaded hole, and the second locking screw slides through each ladder frame, and the lower end of the second locking screw is fixedly connected to a support plate.

[0034] Preferably, a servo motor is fixedly mounted on the upper end of the frame, the output shaft of the servo motor is fixedly connected to the lifting screw, a protective enclosure is fixedly connected to the upper end of the workbench, and a universal wheel is mounted on the lower end of the frame.

[0035] The present invention has the following beneficial effects:

[0036] 1. Repairing the lining tunnel through treatment of tunnel wall leakage, repairing the blue brick wall, and making and installing protective gallery frames can effectively reduce the damage to the original style and appearance, and can also effectively preserve the original style and appearance of the tunnel by plugging leaks during long-term use;

[0037] 2. By using the repair device, during the production and installation of the protective gallery, the lifting screw, lifting nut and material plate can be used to quickly transport the keel, glass plate and other materials to the upper workbench to facilitate the production and installation of the gallery on the top of the tunnel;

[0038] 3. By setting up a folding ladder assembly, the folding ladder can be unfolded when in use, making it convenient for operators to climb to the workbench to perform repair work on the top of the tunnel. At the same time, the folding ladder can be stored when not in use, making it convenient to move and transport it to the next location for work. BRIEF DESCRIPTION OF THE DRAWINGS

[0039] Figure 1 It is a schematic diagram of the structure of the repair device of the present invention when it is inside the tunnel;

[0040] Figure 2 for Figure 1 A schematic diagram of the structure enlargement at point A;

[0041] Figure 3 It is a schematic diagram of the structure of the workbench, strip board and part of the folding ladder assembly when they are unfolded in the present invention;

[0042] Figure 4 It is a schematic diagram of the side structure of a partial folding ladder of the present invention when it is unfolded.

[0043] In the figure: 1 tunnel, 2 frame, 3 lifting slot, 4 lifting screw, 5 lifting nut, 6 material plate, 7 universal wheel, 8 servo motor, 9 protective enclosure, 10 workbench, 11 through hole, 12 ladder frame, 13 strip plate, 14 first threaded hole, 15 second threaded hole, 16 first locking screw, 17 climbing pole, 18 support plate, 19 third threaded hole, 20 second locking screw. DETAILED DESCRIPTION

[0044] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all the embodiments.

[0045] The integrated protection and repair method for water damage and erosion of blue brick lining tunnels includes the treatment method for leakage and infiltration of tunnel walls, the repair of blue brick walls, and the production and installation of protective corridors. The treatment method for leakage and infiltration of tunnel walls includes the following steps:

[0046] S1. Exploration and marking: Exploration is conducted on site to find specific leakage or penetration points, and then the leakage or penetration points are marked, and grouting holes are opened at the points, with a hole diameter of not less than 40mm, and the depth of the grouting holes into the surrounding rock behind the lining is not less than 1m; during the treatment of leakage and penetration of the tunnel wall, the backfill injection adopts single-hole step-by-step grouting to reduce the damage of multi-hole grouting to the original lining structure, ensure the integrity of the original structure, and try to preserve the original architectural style. It should be noted that when the depth of the grouting hole is less than 10m, the maximum allowable deviation of the hole position should be 100mm, and the maximum allowable deviation of the drilling deviation rate should be 1%.

[0047] S2. Grouting. Grouting requires that ordinary Portland cement be used as cement slurry, and the grouting pressure should be 0.5-1.5MPa greater than the hydrostatic pressure at that location. During the treatment of leakage and infiltration on the tunnel wall, the grouting pressure is controlled according to the actual water pressure measured on site, which can better unify the pressure grouting to fill the void part with grouting.

[0048] S3. Stabilize grouting and stop grouting. When the grouting volume of each hole section reaches the design requirement and should be stable for 10 minutes, and the grouting speed is 1 / 4 of the initial grouting speed, the grouting should be stopped. In addition, monitoring should be strengthened during the grouting process. When abnormal conditions such as deformation of surrounding rock or lining, blockage of drainage system, grouting, and danger to ground buildings occur, the grouting pressure can be reduced or intermittent grouting can be used until the grouting is stopped; the grouting material can be changed or the slurry gel time can be shortened; the grouting implementation plan can be adjusted.

[0049] S4. After grouting is completed, the grouting holes should be sealed and tightly plugged. After all grouting work is completed, the inspection unit should be arranged to re-inspect the grouting parts to ensure the grouting is dense. It should be noted that since grouting is a relatively complex project, the process should be appropriately adjusted according to the changes in the strata during the on-site construction. Before the grouting construction, a support frame should be set up within 2 meters of the drilling and grouting location. The top of the frame uses arc-shaped steel to support the vault structure layer to prevent the vault structure from being damaged and falling off or collapsing during the drilling and grouting process, thereby causing safety accidents.

[0050] If grouting or leakage is found during the grouting process, appropriate treatment measures should be taken, such as caulking, surface plugging, and intermittent grouting. If grouting is found during the grouting process, if the grouting hole is ready for grouting, grouting can be carried out at the same time, and one pump is required to grout one hole. Otherwise, the grouting hole should be plugged with a plug. After the grouting hole is completed, the grouting hole should be swept and flushed, and then drilling and grouting should be continued. Grouting work must be carried out continuously. If it is interrupted for some reason, grouting should be resumed as soon as possible. It occurs during the grouting process.

[0051] After the leakage and infiltration treatment of the tunnel wall is completed, the blue brick wall can be repaired. The specific repair process of the blue brick wall is as follows:

[0052] S1. Weathered brick repairs should remove the deteriorated layer to the solid brick surface and should be classified and repaired according to the following regulations:

[0053] a. When the weathering depth is less than 2mm, no repair is required;

[0054] b. When the weathering depth is greater than 2mm and less than 20mm, brick powder should be used for repair. The color of the brick powder should be adjusted according to the color of the well-preserved part. When using brick powder for repair, deep chiseling should not be done, and interface agents that will cause aggravated damage to the original bricks should not be used;

[0055] c. When the weathering depth is greater than or equal to 20mm, it is advisable to use brick chips for repair. The brick chips should be made of replacement brick slices of the same size, color, and basically the same material. The brick chips should use outer bricks, and the cut inner smooth surface should not be used. The brick chip adhesive should be lime adhesive, and cement mortar should not be used.

[0056] d. When the weathered volume exceeds 2 / 3 of the original state, it can be removed and replaced;

[0057] S2. The wall repair brick powder should be made from a certain proportion of old bricks, with the old brick powder content not less than 10%. The repair brick powder should be a special hydraulic lime-based brick powder, and the adhesive should be a low-alkali product. Flat colors should use inorganic color powder;

[0058] S3. When repairing exposed brick walls and using brick slabs for tiling, the following provisions shall be met:

[0059] a. Bricks should be old bricks used in the same building, or old bricks of the same specifications, texture and color used in other buildings;

[0060] b. Bricks of special sizes and bricks for repairing special components should be commissioned to be specially molded and customized by brick factories;

[0061] c. The thickness of the tiles should not be less than 10mm;

[0062] d. Brick bonding materials should use low-alkali mortar or special adhesive;

[0063] S4. The grouting material for exposed brick walls should be lime-based. If the original joints are cement-based, lime mortar with a small amount of cement added should be used for grouting.

[0064] After the repair of the blue brick wall is completed, the repair device can be used to make and install the protective gallery. The specific process of making and installing the protective gallery is as follows:

[0065] S1. The space in the tunnel environment is small, and the construction of concrete gallery is difficult and takes a long time. Steel gallery can be customized from steel structure manufacturers and directly installed on site, which is easy to construct and takes a short time. Therefore, steel gallery is a more reasonable method.

[0066] S2. Conduct on-site survey to determine the precise dimensions of the tunnel and plan the steel column spacing of the tunnel gallery in a reasonable manner according to the on-site conditions of the tunnel;

[0067] S3. Arrange the steel beams reasonably according to the planned column spacing of the gallery, determine the reasonable and economical size of the steel components, arrange the manufacturer to customize the steel gallery, and then transport it to the site for installation;

[0068] S4. After the gallery is installed, reasonable tempered laminated glass is customized according to the gallery size on site and installed on the sides and top of the gallery, so as to achieve the dual effects of protecting the original wall without affecting the subsequent visits, and can ensure the protection of gallery visitors in the event of wall falling off in the future.

[0069] The specific process of making and installing the protective gallery is as follows:

[0070] S1. Embedded parts production

[0071] ① Mark and cut the plates according to the dimensions given in the construction drawing. After the embedded steel plates are cut, use anti-rust paint for anti-corrosion treatment. Stack the finished embedded parts for future use.

[0072] ②Measurement and layout

[0073] a Use tools such as heavy hammers, steel wires, measuring instruments and levels to determine the reference lines of the corridor plane, columns, grids and axis angles.

[0074] b. Based on the determined baseline and construction drawings, review the grid dimensions of the corridor and make adjustments based on the review results.

[0075] c. Remeasure and confirm using theodolite based on the adjusted grid size.

[0076] d. While measuring and laying out, the position deviation of the embedded parts should be checked and located. The upward, downward, left and right deviation values ​​should not exceed ±10mm.

[0077] S2. Embedded parts installation

[0078] ① Before installation, determine the installation point according to the measurement and layout results. And check it against the construction drawing. The review content includes elevation and axis position.

[0079] ② Before installing the embedded parts, the oil and rust on the embedded parts must be removed. When installing, the embedded parts should be spot welded first, and then the flatness and verticality and other geometric dimensions should be checked by drawing a line. If they meet the requirements, they should be fully welded.

[0080] S3. Steel structure construction

[0081] a. Use 150x150x5mm galvanized square tube as the main structural frame, and install the steel structure after the concrete floor has a certain strength. After the frame is erected, it is calibrated, and the error is ≤10mm. After the calibration is correct, it is fully welded and connected, using J422 welding materials.

[0082] b keel installation

[0083] ⑴ Weld the clamp ears. Connect the clamp ears and the uprights with stainless steel bolts, and separate the clamp ears from the main keel with asbestos pads with a thickness of 2mm.

[0084] ⑵ Install the vertical support. The clamping ears on the vertical support are first spot welded to the embedded parts, and the horizontality and verticality are adjusted. After the vertical support is installed, the installation dimensions are re-measured and adjusted until they are accurate, and then the clamping ears are fully welded to the steel structure frame.

[0085] ⑶ Install the horizontal frame. Use stainless steel self-tapping screws to connect the horizontal frame and the vertical support, and pay attention to the horizontality. After the entire keel is installed, re-measure the installation dimensions to check whether it meets the design requirements. If there is an error, adjust it in time. The verticality is allowed to deviate by 10mm (check with a theodolite), and the horizontality is allowed to deviate by 1mm (check with a level).

[0086] S4. Glass installation

[0087] ① The corridor uses 6+1.14+6 tempered laminated glass. During the transportation of the glass, each piece of glass must be separated by thick paper, and the coating layer must not be damaged during the installation process.

[0088] ②Install the glass: transport the glass to the installation site, pay attention to the protection work during transportation and installation, and avoid scratching the coating layer. The glass can be installed from top to bottom. During the installation process, pay attention to the level of the glass panels. The flatness and verticality should meet the acceptance requirements. The pressure block connecting the glass frame and the keel should be flattened and the self-tapping screws should be tightened.

[0089] ③ Gluing: According to the gap between the glass plates, choose a suitable foam rod to fill the gap, and apply adhesive tape on both sides of the gap. The lower edge of the tape should be in a straight line and meet the straightness requirements. When gluing, the operation should be smooth, the glue gun should move evenly, and the glue surface should be flat and smooth without bubbles or bumps.

[0090] ④ Cleaning: After the sealant is dry, you can tear off the paper tape and clean the glass surface.

[0091] The repair device used in the production and installation process of the protective gallery includes a frame 2, a lifting groove 3 is opened on the side wall of the frame 2, a lifting screw 4 is rotatably connected in the lifting groove 3, and a lifting nut 5 is threadedly connected on the lifting screw 4. It should be noted that the inner wall of the lifting groove 3 is a square structure, the outer wall of the lifting nut 5 is also a square structure, and the side wall of the lifting nut 5 is tightly fitted with the inner wall of the lifting groove 3, so the lifting nut 5 cannot rotate in the lifting groove 3. When the lifting screw 4 rotates, the lifting nut 5 will only rise or fall along the lifting groove 3 under the action of the thread transmission.

[0092] A material plate 6 is fixedly connected to the side wall of the lifting nut 5 , a workbench 10 is fixedly connected to the side wall of the frame 2 , a through hole 11 is opened at the upper end of the workbench 10 , and a folding ladder assembly is installed on the workbench 10 .

[0093] The folding ladder assembly includes a plurality of ladder frames 12, wherein every two adjacent ladder frames 12 are rotatably connected together, a climbing rod 17 is fixedly connected inside each ladder frame 12, a strip plate 13 is fixedly connected to the side wall of the workbench 10, a first threaded hole 14 is provided at the lower end of the strip plate 13, a second threaded hole 15 is provided on the side wall of the ladder frame 12, and a first locking screw 16 is threadedly connected to the ladder frame 12.

[0094] A third threaded hole 19 is formed at the lower end of the workbench 10 . A second locking screw 20 is threadedly connected to the inner thread of the third threaded hole 19 . The second locking screw 20 slides through each ladder frame 12 . The lower end of the second locking screw 20 is fixedly connected to the support plate 18 .

[0095] A servo motor 8 is fixedly mounted on the upper end of the frame 2, the output shaft of the servo motor 8 is fixedly connected to the lifting screw 4, a protective enclosure 9 is fixedly connected to the upper end of the workbench 10, and a universal wheel 7 is mounted on the lower end of the frame 2. It should be noted that the universal wheel 7 is a universal wheel with a foot brake, and the entire device can be moved conveniently by loosening the foot brake, and after moving to the specified position, the foot brake can be locked to keep the position of the entire device fixed.

[0096] The repair device is mainly used in the production and installation steps of the protective gallery. When it is necessary to install keels, glass plates, etc. on the top of the tunnel, the keels, glass plates and other materials can be placed on the material plate 6. By starting the servo motor 8 to drive the lifting screw 4 to rotate, the lifting nut 5 can be made to rise along the lifting groove 3, thereby driving the material plate 6 to rise. The material on the material plate 6 can pass through the through hole 11 to the top of the workbench 10. At this time, the operator on the workbench 10 can take the material located in the protective enclosure 9, and then perform repair operations on the top of the tunnel.

[0097] In addition, when the staff needs to perform repair work on the top of the tunnel and needs to climb onto the workbench 10, they can first rotate the lower support plate 18 to drive the second locking screw 20 to rotate, so that the second locking screw 20 can be disengaged from the third threaded hole 19, and then remove the second locking screw 20 to release the lock of each ladder frame 12, and then pull down each ladder frame 12, so that the folded ladder frames 12 are vertically spliced ​​together, such as Figure 3 As shown, at this time, each first locking screw 16 is screwed, the uppermost first locking screw 16 is screwed into the first threaded hole 14, and the remaining first locking screws 16 are screwed into the corresponding second threaded holes 15, so that each ladder frame 12 is locked in a vertical state and fixed to the upper strip plate 13. At this time, the staff can climb to the workbench 10 through the climbing rod 17 on the ladder frame 12.

[0098] After use, the first locking screws 16 can be unscrewed again, and after the ladder frames 12 are folded again, the second locking screws 20 are passed through the ladder frames 12 and screwed into the third threaded holes 19 to complete the locking of the folded state, so as to facilitate moving and transporting to the next location for operation.

[0099] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.

Claims

1. An integrated protection and repair method for water damage and erosion of a blue brick lined tunnel, characterized in that: It includes the treatment method for leakage and infiltration of tunnel walls, the repair of blue brick walls, and the production and installation of protective corridors. The treatment method for leakage and infiltration of tunnel walls includes the following steps: S1. Exploration and marking: Exploration is carried out on site to find specific leakage or penetration points, then the leakage or penetration points are marked and grouting holes are opened at the points with a hole diameter of not less than 40 mm and the grouting holes are drilled into the surrounding rock behind the lining for not less than 1 m; S2. Grouting: Grouting requires that the cement slurry should be ordinary Portland cement, and the grouting pressure should be 0.5-1.5MPa greater than the hydrostatic pressure at the location; S3, stable grouting and grouting stop, when the grouting volume of each hole section reaches the design requirement and should be stable for 10 minutes, and the grouting speed is 1 / 4 of the initial grouting speed, the grouting should be stopped; S4. After grouting is completed, the grouting holes should be sealed tightly. After all grouting work is completed, the inspection unit should be arranged to re-inspect the grouting area to ensure the grouting is dense.

2. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 1 is characterized in that: After the leakage and infiltration treatment of the tunnel wall is completed, the blue brick wall can be repaired. The specific repair process of the blue brick wall is as follows: S1. Weathered brick repairs should remove the deteriorated layer to the solid brick surface and should be classified and repaired according to the following regulations: a. When the weathering depth is less than 2mm, no repair is required; b. When the weathering depth is greater than 2mm and less than 20mm, brick powder should be used for repair. The color of the brick powder should be adjusted according to the color of the well-preserved part. When using brick powder for repair, deep chiseling should not be done, and interface agents that will cause aggravated damage to the original bricks should not be used; c. When the weathering depth is greater than or equal to 20mm, brick chips should be used for repair. The brick chips should be made of replacement brick slices of the same size, color and basically the same material. Bricks should be used as outer bricks, and the cut inner smooth surface should not be used. Brick adhesive should be lime adhesive, and cement mortar should not be used. d. When the weathered volume exceeds 2 / 3 of the original state, it can be removed and replaced; S2. The wall repair brick powder should be made from a certain proportion of old bricks, with the old brick powder content not less than 10%. The repair brick powder should be a special hydraulic lime-based brick powder, and the adhesive should be a low-alkali product. Flat colors should use inorganic color powder; S3. When repairing exposed brick walls and using brick slabs for tiling, the following provisions shall be met: a. Bricks should be old bricks used in the same building, or old bricks of the same specifications, texture and color used in other buildings; b. Bricks of special sizes and bricks for repairing special components should be commissioned to be specially molded and customized by brick factories; c. The thickness of the tiles should not be less than 10mm; d. Brick bonding materials should use low-alkali mortar or special adhesive; S4. The grouting material for exposed brick walls should be lime-based. If the original joints are cement-based, lime mortar with a small amount of cement added should be used for grouting.

3. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 2 is characterized in that: After the repair of the blue brick wall is completed, the repair device can be used to make and install the protective gallery. The specific process of making and installing the protective gallery is as follows: S1. The space in the tunnel environment is small, and the construction of concrete gallery is difficult and takes a long time. Steel gallery can be customized from steel structure manufacturers and directly installed on site, which is easy to construct and takes a short time. Therefore, steel gallery is a more reasonable method. S2. Conduct on-site survey to determine the precise dimensions of the tunnel and plan the steel column spacing of the tunnel gallery in a reasonable manner according to the on-site conditions of the tunnel; S3. Arrange the steel beams reasonably according to the planned column spacing of the gallery, determine the reasonable and economical size of the steel components, arrange the manufacturer to customize the steel gallery, and then transport it to the site for installation; S4. After the gallery is installed, reasonable tempered laminated glass is customized according to the gallery size on site and installed on the sides and top of the gallery, so as to achieve the dual effects of protecting the original wall without affecting the subsequent visits, and can ensure the protection of gallery visitors in the event of wall falling off in the future.

4. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 1 is characterized in that: During the treatment of leakage and infiltration on the tunnel wall, single-hole step-by-step grouting is used for backfilling to reduce the damage of multi-hole grouting to the original lining structure, ensure the integrity of the original structure, and preserve the original architectural style as much as possible.

5. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 1 is characterized in that: During the treatment of leakage and infiltration on the tunnel wall, the grouting pressure is controlled according to the actual water pressure measured on site, which can better unify the pressure grouting to fill the void part with grouting.

6. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 3 is characterized in that: The repair device comprises a frame (2), a side wall of the frame (2) is provided with a lifting slot (3), a lifting screw (4) is rotatably connected in the lifting slot (3), a lifting nut (5) is threadedly connected to the lifting screw (4), a material plate (6) is fixedly connected to the side wall of the lifting nut (5), a workbench (10) is fixedly connected to the side wall of the frame (2), a through hole (11) is provided at the upper end of the workbench (10), and a folding ladder assembly is installed on the workbench (10).

7. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 6 is characterized in that: The folding ladder assembly comprises a plurality of ladder frames (12), wherein every two adjacent ladder frames (12) are rotatably connected together, a climbing rod (17) is fixedly connected inside each of the ladder frames (12), a strip plate (13) is fixedly connected to the side wall of the workbench (10), a first threaded hole (14) is provided at the lower end of the strip plate (13), a second threaded hole (15) is provided on the side wall of the ladder frame (12), and a first locking screw (16) is threadedly connected to the ladder frame (12).

8. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 7 is characterized in that: A third threaded hole (19) is provided at the lower end of the workbench (10), a second locking screw (20) is internally threadedly connected to the third threaded hole (19), and the second locking screw (20) slides through each ladder frame (12), and the lower end of the second locking screw (20) is fixedly connected to a support plate (18).

9. The integrated protection and repair method for water damage and erosion of a blue brick lined tunnel according to claim 8 is characterized in that: A servo motor (8) is fixedly mounted on the upper end of the frame (2), the output shaft of the servo motor (8) is fixedly connected to the lifting screw (4), a protective enclosure (9) is fixedly connected to the upper end of the workbench (10), and a universal wheel (7) is mounted on the lower end of the frame (2).