Mine pipeline anti-blocking monitoring device and monitoring method thereof
By combining an ultrasonic detection probe and an infrared ranging semi-ring, the pipe dirt is removed by rotation, solving the problem of dirt interference with mine pipeline monitoring devices, achieving more accurate flow and velocity detection, and reducing the risk of explosion.
Patent Information
- Application Number
- CN202411148021.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-21
- Publication Date
- 2024-11-26
AI Technical Summary
Existing mine pipeline monitoring devices are ineffective under the interference of dirt and grime, making it difficult to accurately detect the flow rate and velocity of the medium in the pipeline, which makes the risk of explosion difficult to predict.
The system employs a combination of an ultrasonic detection probe and an infrared ranging semi-ring. A rotating component drives a piezoelectric crystal column to rotate and remove dirt. The thickness of the dirt is determined by combining the obstruction detection model, and adjustment commands are generated to ensure detection accuracy.
It improves the accuracy of detecting medium flow rate and velocity in mine pipelines, reduces the risk of explosion, and ensures the stability and safety of the monitoring device by rotating it to remove dirt.
Smart Images

Figure CN119022237A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of mine pipeline monitoring, and in particular relates to a mine pipeline anti-blocking monitoring device and a monitoring method thereof. Background Art
[0002] Mine safety is one of the most important aspects of mining production, because the mine environment has many potential dangerous factors, such as gas explosion, mine collapse, fire, dust, equipment failure and water damage. Mine pipelines are an important part of mine ventilation and gas transmission systems. Mine pipelines are prone to blockage and leakage during transportation. When mine pipelines are blocked or leaked, they are very likely to cause pipeline explosions. Mine pipeline explosions can cause injuries to people in the surrounding area. Existing technologies usually monitor mine pipelines in real time to avoid mine pipeline explosions.
[0003] For example, the Chinese patent with publication number CN114060091A discloses a coal mine gas explosion early warning and protection device. The above patent sets a blowpipe. When the gas detector or dust detector detects that the gas concentration or coal powder concentration in the mine is relatively high, the controller controls the fresh air duct on the well to supply gas to the blowpipe. Although the above patent performs real-time monitoring through the instrument and avoids the occurrence of explosion to a certain extent, it still has the following defects:
[0004] Although the above patent carries out real-time monitoring, it ignores the impact of dirt inside the pipeline on monitoring. During ventilation through the mine pipeline, there will be dirt flowing inside the pipeline, such as coal ash. Therefore, in the process of monitoring the flow and flow rate of the gas inside the pipeline, the monitoring device will be interfered by the dirt, resulting in poor monitoring effect. Summary of the invention
[0005] The purpose of this section is to summarize some aspects of embodiments of the present invention and briefly introduce some preferred embodiments. Some simplifications or omissions may be made in this section and the specification abstract and the invention title of this application to avoid blurring the purpose of this section, the specification abstract and the invention title, and such simplifications or omissions cannot be used to limit the scope of the present invention.
[0006] To solve the above problems, the present invention adopts the following technical solutions.
[0007] A monitoring device for preventing pipeline blockage in a mine, comprising an ultrasonic detector and a rotating member, wherein the ultrasonic detector is fixed on the surface of the pipeline, an ultrasonic detection probe is arranged on the ultrasonic detector, the ultrasonic detection probe extends into the pipeline, the rotating member is arranged between the ultrasonic detection probe and the ultrasonic detector, so that the ultrasonic detector and the ultrasonic detection probe are rotatably connected; a blocking block is fixed at the end of the ultrasonic detection probe;
[0008] The infrared ranging semi-ring is movably mounted on the outside of the ultrasonic detection probe, and the transmitting end of the infrared ranging semi-ring is arranged opposite to the blocking block, and is used to transmit infrared rays to the blocking block to obtain multiple reflection signal times;
[0009] The central processing unit determines the real-time reflection signal time according to the multiple reflection signal times, inputs the real-time reflection signal time into the pre-trained occlusion detection model, outputs the dirt occlusion thickness, and determines whether to generate an adjustment instruction according to the dirt occlusion thickness.
[0010] The rotating part drives the ultrasonic detection probe to rotate according to the adjustment instruction, and throws out the dirt on the surface of the ultrasonic detection probe.
[0011] Preferably, the ultrasonic detection probe includes a piezoelectric crystal column and a combination tube movably mounted on the surface of the piezoelectric crystal column. The combination tube is fixedly inserted into the surface of the pipeline and fixed to the ultrasonic detector. The rotating part is fixed in the combination tube. The rotating end of the rotating part is fixed to one end of the piezoelectric crystal column, and the other end of the piezoelectric crystal column is fixedly connected to a blocking block. The infrared ranging semi-ring is fixedly mounted on the outside of the combination tube.
[0012] Preferably, the maximum and minimum values among the multiple reflection signal times are removed, and then the average value is taken to obtain the real-time reflection signal time; the dirt blocking thickness is compared and analyzed with the preset threshold S1 and the preset threshold S2 to determine whether to generate an adjustment instruction.
[0013] Preferably, the infrared ranging half ring includes a ranging ring body and a plurality of infrared emitting heads, the plurality of infrared emitting heads are arranged in a ring shape inside the ranging ring body, and the interior of the ranging ring body is communicated with the outside.
[0014] Preferably, the ultrasonic detector is connected to a pipe burst monitoring control box via a wire, and the central processing unit is arranged inside the pipe burst monitoring control box.
[0015] Preferably, the training process of the occlusion detection model is: obtaining multiple groups of measured data, the measured data including the dirt occlusion thickness and the transmission signal time difference, taking the dirt occlusion thickness and the transmission signal time difference as sample sets, dividing the sample sets into training sets and test sets, constructing a classifier, taking the reflection signal time in the training set as input data, taking the dirt occlusion thickness in the training set as output data, training the classifier to obtain an initial classifier, testing the initial classifier with the test set, and outputting the initial classifier that meets the preset accuracy as the occlusion detection model, wherein the classifier is specifically one of a logistic regression model, a naive Bayes model or a support vector machine model.
[0016] Preferably, the adjustment instruction includes a first adjustment instruction and a second adjustment instruction, and the logic for determining whether to generate the adjustment instruction is:
[0017] When 0<dirt cover thickness<preset threshold S2, the CPU does not generate any instructions;
[0018] When the preset threshold value S2 ≤ the dirt shielding thickness ≤ the preset threshold value S1, the central processing unit generates a first adjustment instruction, and the rotating member receives the first adjustment instruction and rotates;
[0019] When the preset threshold value S1 is less than the dirt shielding thickness, the central processing unit generates a second adjustment instruction, and the rotating member receives the second adjustment instruction to accelerate the rotation.
[0020] Preferably, the rotating member is a micro motor or a micro gyroscope.
[0021] Preferably, a protective structure is also provided on the surface of the pipeline, the protective structure is connected to an actuator, the protective structure is used to block the occurrence of secondary disasters, and the actuator is used to control the rapid opening and closing of the protective structure;
[0022] The central processing unit compares and analyzes the dirt blocking thickness with the preset threshold value S1 and the preset threshold value S2 to determine whether to generate an adjustment instruction, and the adjustment instruction includes a first adjustment instruction, a second adjustment instruction, and a third adjustment instruction; the logic for determining whether to generate an adjustment instruction is:
[0023] When 0<dirt cover thickness<preset threshold S2, the CPU does not generate any instructions;
[0024] When the preset threshold value S2 ≤ dirt shielding thickness ≤ preset threshold value S1, the central processing unit generates a first adjustment instruction, the rotating member receives the first adjustment instruction and rotates for T time, and makes another determination after T time;
[0025] When the preset threshold value S1 is less than the dirt shielding thickness, the central processing unit generates a second adjustment instruction, and the rotating part receives the second adjustment instruction to accelerate the rotation for T time, and makes another judgment after T time;
[0026] The methods for re-determination after T time include:
[0027] If the preset threshold value 0 < the dirt cover thickness < the preset threshold value S2, the central processing unit does not generate an instruction;
[0028] If the preset threshold value S2 ≤ the dirt shielding thickness, the central processing unit generates a third adjustment instruction, and the actuator closes the protective structure after receiving the third adjustment instruction.
[0029] A method for monitoring anti-blocking of a mine pipeline is implemented using the above-mentioned monitoring device for anti-blocking of a mine pipeline, comprising:
[0030] The infrared ranging half ring in the monitoring device is used to emit infrared rays to the blocking block to obtain multiple reflection signal times;
[0031] The maximum and minimum values of the multiple reflection signal times are removed, and then the average value is taken to obtain the real-time reflection signal time;
[0032] Input the real-time reflection signal time into the pre-trained occlusion detection model and output the dirt occlusion thickness;
[0033] The dirt shielding thickness is compared and analyzed with the preset threshold value S1 and the preset threshold value S2 to determine whether to generate an adjustment instruction.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] 1. The present invention arranges an ultrasonic detection probe inside the pipeline to detect the flow rate and flow velocity of the medium in the pipeline, so as to determine whether the pipeline has the risk of explosion. At the same time, infrared rays are emitted to the blocking block through the infrared ranging semi-ring to obtain the reflection signal time, and the thickness of the dirt attached to the piezoelectric crystal column is obtained through the reflection signal time. The rotating part drives the piezoelectric crystal column to rotate, and the piezoelectric crystal column throws out the dirt on the surface through the centrifugal force, thus avoiding the interference of the dirt on the ultrasonic detection probe, making the flow detection result of the medium in the pipeline more accurate, and improving the monitoring effect of the mine pipeline.
[0036] 2. Timing the rotation of the rotating parts and the piezoelectric crystal column. If the piezoelectric crystal column fails to remove the dirt on the surface due to the strong adsorption force of the dirt within the specified time, the flow rate and flow velocity of the medium in the pipeline cannot be detected by the ultrasonic detection probe, which also means that it is impossible to determine whether the pipeline is explosive. At this time, it is necessary to immediately close the protective structure through the actuator to limit the flow of the medium in the pipeline and reduce the risk of pipeline explosion. BRIEF DESCRIPTION OF THE DRAWINGS
[0037] Figure 1 Schematic diagram of a pipeline inspection by a monitoring device for preventing pipeline blockage in a mine;
[0038] Figure 2 for Figure 1 A schematic diagram of the enlarged structure at A in the middle;
[0039] Figure 3 This is a schematic diagram of the ultrasonic detection probe when it is not affected by dirt;
[0040] Figure 4 for Figure 3 A schematic diagram of the enlarged structure at B in the middle;
[0041] Figure 5 This is a schematic diagram of an ultrasonic detection probe being affected by dirt;
[0042] Figure 6 for Figure 5 Schematic diagram of the enlarged structure at C in the middle;
[0043] Figure 7 This is a schematic diagram of the structure of the infrared ranging half ring;
[0044] Figure 8 It is a schematic diagram of the structure of the ultrasonic detection probe;
[0045] Fig. 9 This is a schematic diagram of the structure when a micro motor is provided inside the ultrasonic detection probe;
[0046] Fig.10 This is a cross-sectional view of the pipe burst monitoring control box.
[0047] Reference numerals:
[0048] 10. Pipe burst monitoring control box; 11. Central processing unit; 20. Ultrasonic detector; 21. Ultrasonic detection probe; 211. Combination tube; 212. Piezoelectric crystal column; 213. Blocking block; 214. Rotating part; 30. Protection structure; 40. Infrared ranging half ring; 41. Ranging ring body; 42. Infrared transmitter. DETAILED DESCRIPTION
[0049] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the specific implementation methods of the present invention are described in detail below in conjunction with the accompanying drawings.
[0050] In the following description, many specific details are set forth to facilitate a full understanding of the present invention, but the present invention may also be implemented in other ways different from those described herein, and those skilled in the art may make similar generalizations without violating the connotation of the present invention. Therefore, the present invention is not limited to the specific embodiments disclosed below.
[0051] Secondly, the term "one embodiment" or "embodiment" as used herein refers to a specific feature, structure, or characteristic that may be included in at least one implementation of the present invention. The term "in one embodiment" that appears in different places in this specification does not necessarily refer to the same embodiment, nor is it a separate or selective embodiment that is mutually exclusive with other embodiments.
[0052] Example 1
[0053] This embodiment provides a method for monitoring anti-blocking of a mine pipeline, the method comprising:
[0054] S10: Utilize the infrared ranging half ring 40 in the monitoring device to emit infrared rays to the blocking block 213 to obtain multiple reflection signal times.
[0055] S20: removing the maximum value and the minimum value of the multiple reflection signal times, and then taking the average value thereof to obtain the real-time reflection signal time.
[0056] It should be noted that if Figure 1 , Figure 2 and Figure 3 As shown, the monitoring device for preventing mine pipeline blockage includes a pipe burst monitoring control box 10, one side of the pipe burst monitoring control box 10 is fixedly connected to two ultrasonic detectors 20 through a wire, the two ultrasonic detectors 20 are both arranged on the surface of the pipeline, and one side of the two ultrasonic detectors 20 is fixedly connected to an ultrasonic detection probe 21, the ultrasonic detection probe 21 is located inside the pipeline, and an infrared ranging semi-ring 40 is also arranged on the outside of the ultrasonic detection probe 21.
[0057] like Figure 7 and Figure 8 As shown, the infrared ranging half ring 40 includes a ranging ring body 41 and an infrared emitting head 42. A plurality of infrared emitting heads 42 are arranged inside the ranging ring body 41. The ranging ring body 41 can be a ring box-shaped object, and the internal space is communicated with the outside world, so that the ranging ring body 41 does not block the infrared rays from being emitted to the outside world. The ultrasonic detection probe 21 includes a combination tube 211, a piezoelectric crystal column 212 and a blocking block 213. One end of the combination tube 211 is connected to the piezoelectric crystal column 212, and the other end of the piezoelectric crystal column 212 is fixedly connected to the blocking block 213. The piezoelectric crystal column 212 is used to send and receive ultrasonic waves. The two ultrasonic detection probes 21 send and receive ultrasonic waves inside the pipeline through their own piezoelectric crystal columns 212 to measure the flow rate and flow velocity of the medium in the pipeline. The blocking block 213 is used to reflect the infrared rays emitted by the infrared ranging semi-ring 40. Since a plurality of infrared transmitting heads 42 are provided in the infrared ranging semi-ring 40, and the plurality of infrared transmitting heads 42 are arranged in a ring shape, when the infrared ranging semi-ring 40 transmits infrared rays to the blocking block 213, a plurality of reflection signal times can be obtained.
[0058] It should be understood that if Figure 4 , Figure 5 and Figure 6As shown, the reflection signal time does not only refer to the time consumed by the infrared ray after the blocking block 213 reflects the infrared ray and then the infrared transmitter 42 receives it. Because there may be dirt on the surface of the piezoelectric crystal column 212, the reflection signal time at this time refers to the time consumed by the infrared ray after the dirt reflects the infrared ray and then the infrared transmitter 42 receives it. At the same time, the reason for setting the blocking block 213 is that if the blocking block 213 does not exist, in order to obtain the reflection signal time, the infrared transmitter 42 needs to reflect through the inner wall on the other side of the pipe after emitting the infrared ray, which means that the infrared ray needs to reach the other side of the inner wall of the pipe from one side of the inner wall of the pipe and needs to completely pass through the medium. Then, because the medium may contain some impurities, it will greatly affect the ranging effect of the infrared ray. The present invention is to detect the volume of dirt on the piezoelectric crystal column 212, so it is only necessary to set the blocking block 213 at one end of the piezoelectric crystal column 212, and the infrared ray only needs to pass through a distance equivalent to the length of the piezoelectric crystal column 212, thereby avoiding the influence of impurities in the medium and improving the accuracy of infrared ranging.
[0059] S30: Input the real-time reflection signal time into the pre-trained occlusion detection model, and output the dirt occlusion thickness.
[0060] It should be noted that the dirt obstruction thickness is the thickness of the dirt attached to the surface of the piezoelectric crystal column 212. The training process of the occlusion detection model is: obtain a large amount of measured data, the measured data includes the dirt obstruction thickness and the transmission signal time difference, use the dirt obstruction thickness and the transmission signal time difference as sample sets, divide the sample sets into training sets and test sets, build a classifier, use the reflection signal time in the training set as input data, use the dirt obstruction thickness in the training set as output data, train the classifier to obtain an initial classifier, test the initial classifier with the test set, and output the initial classifier that meets the preset accuracy as the occlusion detection model. The above classifier is specifically one of the logistic regression model, the naive Bayes model or the support vector machine model.
[0061] S40: Compare and analyze the dirt shielding thickness with the preset threshold value S1 and the preset threshold value S2 to determine whether to generate an adjustment instruction.
[0062] The central processor 11 compares and analyzes the dirt shielding thickness with the preset threshold value S1 and the preset threshold value S2. The preset threshold value S1> the preset threshold value S2> 0. The adjustment instruction includes the first adjustment instruction and the second adjustment instruction. The logic for determining whether to generate the adjustment instruction is:
[0063] When 0<dirt shielding thickness<preset threshold S2, the central processor 11 does not generate any instruction;
[0064] It shows that the thickness of dirt attached to the surface of the piezoelectric crystal column 212 is within a very small range. Although the dirt has a certain impact on the sending and receiving of ultrasonic waves by the piezoelectric crystal column 212, the impact is very small. In order to ensure the working stability of the pipe burst monitoring device, the piezoelectric crystal column 212 does not need to be rotated. What needs to be ensured is that the piezoelectric crystal column 212 works normally.
[0065] When the preset threshold value S2 ≤ dirt shielding thickness ≤ preset threshold value S1, the central processor 11 generates a first adjustment instruction;
[0066] This indicates that the thickness of dirt on the surface of the piezoelectric crystal column 212 is within the range that needs to be processed. The rotating member 214 receives the first adjustment instruction and rotates, driving the piezoelectric crystal column 212 to rotate, and uses centrifugal force to throw away the dirt on the surface of the piezoelectric crystal column 212.
[0067] When the preset threshold value S1 is less than the dirt shielding thickness, the central processing unit 11 generates a second adjustment instruction;
[0068] This indicates that the thickness of dirt on the surface of the piezoelectric crystal column 212 is within a very large range. The rotating member 214 receives the second adjustment instruction and accelerates its rotation, driving the piezoelectric crystal column 212 to rotate rapidly, and also uses centrifugal force to throw away the dirt on the surface of the piezoelectric crystal column 212.
[0069] S50: After receiving the adjustment instruction, the rotating member 214 drives the piezoelectric crystal column 212 to rotate to remove the dirt attached to the surface.
[0070] It should be noted that if Fig.10 As shown, the central processor 11 can be arranged inside the pipe burst monitoring control box 10, and can also be arranged in other places. As long as the central processor 11 can be electrically connected with the ultrasonic detector 20, the infrared ranging half ring 40 and the rotating member 214, and the piezoelectric crystal column 212 is in a continuous working state during the rotation, the piezoelectric crystal column 212 is usually powered by a conductive slip ring in the electrical design, which not only solves the problem of powering the piezoelectric crystal column 212 in the rotating state, but also avoids the phenomenon of wire entanglement.
[0071] like Fig. 9As shown, the ultrasonic detection probe 21 also includes a rotating member 214. A cavity is opened inside the combination tube 211, and the rotating member 214 is arranged in the cavity. The output end of the rotating member 214 is fixedly connected to the piezoelectric crystal column 212, and one end of the piezoelectric crystal column 212 is fixedly connected to the blocking block 213. When the rotating member 214 receives the first adjustment instruction, it drives the piezoelectric crystal column 212 and the blocking block 213 to rotate in turn. During the rotation of the piezoelectric crystal column 212, due to the action of centrifugal force, the dirt attached to the surface of the piezoelectric crystal column 212 will be subjected to an outward force, so the dirt will be separated from the surface of the piezoelectric crystal column 212, and the surface of the piezoelectric crystal column 212 will not be covered by the dirt, and ultrasonic transmission and reception can be performed normally. In this way, the influence of dirt in the pipeline on ultrasonic transmission and reception can be eliminated, so that the ultrasonic detection probe 21 can realize accurate detection of the flow rate and flow velocity of the medium in the pipeline.
[0072] When the rotating member 214 receives the second adjustment instruction, it also drives the piezoelectric crystal column 212 and the blocking block 213 to rotate. However, at this time, the rotation speed of the output end of the rotating member 214 is greater than the rotation speed of the output end after the rotating member 214 receives the first adjustment instruction. In this way, during the rotation of the piezoelectric crystal column 212, due to the action of centrifugal force, the dirt attached to the surface of the piezoelectric crystal column 212 will be subjected to a greater outward force, causing the dirt to quickly detach from the surface of the piezoelectric crystal column 212. The purpose of this setting is to allow the central processing unit 11 to select different rotation speeds according to the thickness of the dirt attached to the surface of the piezoelectric crystal column 212. This can not only ensure the stability of the ultrasonic detection probe 21 during operation, but also remove the dirt on the surface of the piezoelectric crystal column 212. The above-mentioned rotating member 214 can be a micro motor or a micro gyroscope and other components that can drive the piezoelectric crystal column 212 to rotate.
[0073] Example 2
[0074] This embodiment is a further improvement on the basis of the embodiment 1. A protective structure 30 is further provided on the surface of the pipeline. The protective structure 30 is connected to the actuator. The protective structure 30 is used to block the occurrence of secondary disasters, and the actuator is used to control the rapid opening and closing of the protective structure 30.
[0075] It should be noted that the protection structure 30 is specifically one of a solenoid valve, a ball valve or a regulating valve. The secondary disaster generally refers to the explosion of the pipeline due to a large pressure, which causes injuries to surrounding personnel and pollutes the environment. Then, the protection structure 30 blocks the secondary disaster by closing the pipeline and reducing the flow of the medium in the pipeline, thereby reducing the risk of pipeline explosion. The actuator is specifically one of a BV balanced blade actuator, a fork actuator, a gear rack actuator or a linear stroke pneumatic actuator.
[0076] Similarly, the dirt shielding thickness is compared and analyzed with the preset threshold value S1 and the preset threshold value S2 to determine whether to generate an adjustment instruction.
[0077] The central processor 11 compares and analyzes the dirt shielding thickness with the preset threshold value S1 and the preset threshold value S2. The preset threshold value S1> the preset threshold value S2> 0. The adjustment instruction includes the first adjustment instruction, the second adjustment instruction and the third adjustment instruction. The logic for determining whether to generate the adjustment instruction is:
[0078] When 0<dirt shielding thickness<preset threshold S2, the central processor 11 does not generate any instruction;
[0079] Because the thickness of dirt attached to the surface of the piezoelectric crystal column 212 is within an extremely small range, the dirt has little effect on the sending and receiving of ultrasonic waves by the piezoelectric crystal column 212. Therefore, the burst pipe protection monitoring device can still measure the flow rate and flow velocity of the medium in the pipeline through ultrasonic waves, and judge whether the pipeline is likely to explode by the flow rate and flow velocity of the medium. Therefore, the central processor 11 does not need to control the actuator and the protection structure 30. Judging whether the pipeline is likely to explode by the flow rate and flow velocity of the medium is a conventional technology, so it will not be elaborated on.
[0080] When the preset threshold value S2 ≤ dirt shielding thickness ≤ preset threshold value S1, the central processor 11 generates a first adjustment instruction, the rotating member 214 receives the first adjustment instruction and rotates for T time, and makes another determination after T time;
[0081] It can be understood that when the preset threshold value S2 ≤ dirt blocking thickness ≤ preset threshold value S1, it indicates that the thickness of dirt attached to the surface of the piezoelectric crystal column 212 is within the range that needs to be processed, and the rotating part 214 receives the first adjustment instruction to rotate, and drives the piezoelectric crystal column 212 to rotate, and uses centrifugal force to throw out the dirt on the surface of the piezoelectric crystal column 212. In this embodiment, the time for the rotating part 214 to drive the piezoelectric crystal column 212 to rotate is set to T.
[0082] Similarly, when the preset threshold value S1 is less than the dirt shielding thickness, the central processor 11 generates a second adjustment instruction, and the rotating member 214 receives the second adjustment instruction to accelerate the rotation for T time, and makes another determination after T time;
[0083] The methods for re-determination after T time include:
[0084] If the preset threshold value 0 < the dirt shielding thickness < the preset threshold value S2, the central processing unit 11 does not generate an instruction;
[0085] This indicates that the dirt has a weak adsorption force and the piezoelectric crystal column 212 has thrown out the dirt by rotating. At this time, the pipe burst protection monitoring device can still measure the flow rate and flow velocity of the medium in the pipeline by ultrasonic wave to determine whether the pipeline is likely to explode.
[0086] If the preset threshold value S2 ≤ the dirt shielding thickness, the central processor 11 generates a third adjustment instruction, and the actuator closes the protection structure 30 after receiving the third adjustment instruction;
[0087] After T time, if the dirt blocking thickness is still greater than or equal to the preset threshold value S2, it indicates that the dirt has a strong adsorption force and the piezoelectric crystal column 212 fails to throw out the dirt by rotating. At this time, the burst pipe protection monitoring device cannot measure the flow rate and flow velocity of the medium in the pipeline through ultrasound, and cannot determine whether the pipeline is likely to explode. Therefore, the central processor 11 generates a third adjustment instruction, and the actuator closes the protection structure 30 after receiving the third adjustment instruction, so as to protect the pipeline and avoid the occurrence of secondary disasters.
[0088] The above content is a further detailed description of the present invention in combination with specific implementation methods. It cannot be determined that the specific implementation of the present invention is limited to these descriptions. For ordinary technicians in the technical field to which the present invention belongs, several simple deductions or substitutions can be made without departing from the concept of the present invention, which should be regarded as belonging to the protection scope determined by the claims submitted for the present invention.
Claims
1. A monitoring device for preventing mine pipeline blockage, characterized in that: The invention comprises an ultrasonic detector (20) and a rotating member (214), wherein the ultrasonic detector (20) is fixed on the surface of a pipeline, an ultrasonic detection probe (21) is provided on the ultrasonic detector (20), the ultrasonic detection probe (21) extends into the pipeline, and the rotating member (214) is arranged between the ultrasonic detection probe (21) and the ultrasonic detector (20) so that the ultrasonic detector (20) and the ultrasonic detection probe (21) are rotatably connected; a blocking block (213) is fixed at the end of the ultrasonic detection probe (21); An infrared distance measuring half ring (40) is movably mounted on the outside of the ultrasonic detection probe (21), and a transmitting end of the infrared distance measuring half ring (40) is arranged opposite to the blocking block (213) and is used to transmit infrared rays to the blocking block (213) to obtain multiple reflection signal times; A central processing unit (11) determines a real-time reflection signal time according to a plurality of reflection signal times, inputs the real-time reflection signal time into a pre-trained occlusion detection model, outputs a dirt occlusion thickness, and determines whether to generate an adjustment instruction according to the dirt occlusion thickness; The rotating member (214) drives the ultrasonic detection probe (21) to rotate according to the adjustment instruction, thereby throwing away the dirt on the surface of the ultrasonic detection probe (21).
2. A monitoring device for preventing mine pipeline blockage according to claim 1, characterized in that: The ultrasonic detection probe (21) comprises a piezoelectric crystal column (212) and a combination tube (211) movably sleeved on the surface of the piezoelectric crystal column (212); the combination tube (211) is fixedly inserted into the surface of the pipeline and fixed to the ultrasonic detector (20); a rotating member (214) is fixed in the combination tube (211); a rotating end of the rotating member (214) is fixed to one end of the piezoelectric crystal column (212); and a blocking block (213) is fixedly connected to the other end of the piezoelectric crystal column (212); and an infrared distance measuring half ring (40) is fixedly sleeved on the outside of the combination tube (211).
3. A monitoring device for preventing mine pipeline blockage according to claim 2, characterized in that: The maximum and minimum values among the multiple reflection signal times are removed, and then the average value is taken to obtain the real-time reflection signal time; the dirt blocking thickness is compared and analyzed with the preset threshold S1 and the preset threshold S2 to determine whether to generate an adjustment instruction.
4. A monitoring device for preventing mine pipeline blockage according to claim 3, characterized in that: The infrared distance measuring half ring (40) comprises a distance measuring ring body (41) and a plurality of infrared emitting heads (42). The plurality of infrared emitting heads (42) are arranged in a ring shape inside the distance measuring ring body (41). The interior of the distance measuring ring body (41) is communicated with the outside.
5. A monitoring device for preventing mine pipeline blockage according to claim 3, characterized in that: The ultrasonic detector (20) is connected to the pipe burst monitoring control box (10) via a wire, and the central processing unit (11) is arranged inside the pipe burst monitoring control box (10).
6. A monitoring device for preventing mine pipeline blockage according to claim 3, characterized in that: The training process of the occlusion detection model is as follows: obtain multiple sets of measured data, the measured data include dirt occlusion thickness and emission signal time difference, use the dirt occlusion thickness and emission signal time difference as sample sets, divide the sample sets into training sets and test sets, build a classifier, use the reflection signal time in the training set as input data, use the dirt occlusion thickness in the training set as output data, train the classifier to obtain an initial classifier, test the initial classifier with the test set, and output the initial classifier that meets the preset accuracy as the occlusion detection model, wherein the classifier is one of a logistic regression model, a naive Bayes model or a support vector machine model.
7. A monitoring device for preventing mine pipeline blockage according to claim 3, characterized in that: The adjustment instruction includes a first adjustment instruction and a second adjustment instruction. The logic for determining whether to generate an adjustment instruction is: When 0<dirt shielding thickness<preset threshold value S2, the central processor (11) does not generate any instruction; When the preset threshold value S2 ≤ the dirt shielding thickness ≤ the preset threshold value S1, the central processor (11) generates a first adjustment instruction, and the rotating member (214) receives the first adjustment instruction and rotates; When the preset threshold value S1 is less than the dirt shielding thickness, the central processor (11) generates a second adjustment instruction, and the rotating member (214) receives the second adjustment instruction to accelerate the rotation.
8. A monitoring device for preventing mine pipeline blockage according to claim 3, characterized in that: The rotating member (214) is a micro motor or a micro gyroscope.
9. A monitoring device for preventing mine pipeline blockage according to claim 7, characterized in that: A protective structure (30) is also provided on the surface of the pipeline. The protective structure (30) is connected to an actuator. The protective structure (30) is used to block the occurrence of secondary disasters. The actuator is used to control the rapid opening and closing of the protective structure (30). The central processing unit (11) compares and analyzes the dirt shielding thickness with a preset threshold value S1 and a preset threshold value S2 to determine whether to generate an adjustment instruction, wherein the adjustment instruction includes a first adjustment instruction, a second adjustment instruction and a third adjustment instruction; the logic for determining whether to generate an adjustment instruction is: When 0<dirt shielding thickness<preset threshold value S2, the central processor (11) does not generate any instruction; When the preset threshold value S2 ≤ the dirt shielding thickness ≤ the preset threshold value S1, the central processor (11) generates a first adjustment instruction, the rotating member (214) receives the first adjustment instruction and rotates for T time, and makes another determination after T time; When the preset threshold value S1 is less than the dirt shielding thickness, the central processor (11) generates a second adjustment instruction, and the rotating member (214) receives the second adjustment instruction and accelerates the rotation for T time, and makes another judgment after T time; The methods for re-determination after T time include: If the preset threshold value S2 ≤ the dirt shielding thickness ≤ the preset threshold value S1, the central processor (11) generates a third adjustment instruction, and the actuator closes the protection structure (30) after receiving the third adjustment instruction; If the preset threshold value 0 < the dirt shielding thickness < the preset threshold value S2, the central processing unit (11) does not generate an instruction.
10. A method for monitoring anti-blocking of a mine pipeline, implemented based on a monitoring device for anti-blocking of a mine pipeline according to any one of claims 1 to 9, characterized in that: include: Using an infrared distance measuring half ring (40) in the monitoring device to emit infrared rays to the blocking block (213) to obtain multiple reflection signal times; The maximum and minimum values of the multiple reflection signal times are removed, and then the average value is taken to obtain the real-time reflection signal time; The real-time reflection signal time is input into the pre-trained occlusion detection model, and the dirt occlusion thickness is output; Compare and analyze the dirt shielding thickness with the preset threshold value S1 and the preset threshold value S2 to determine whether to generate an adjustment instruction; After receiving the adjustment instruction, the rotating member (214) drives the piezoelectric crystal column (212) to rotate to remove the dirt adhering to the surface.
