Water multi-split system, end equipment, computing equipment and control equipment
By setting multiple computing devices in the air-conditioning system to distribute the calculation and control authority for cold volume data, the bottleneck in the data calculation and response time of the air-conditioning system is solved, and faster energy consumption regulation and response are achieved.
Patent Information
- Application Number
- CN202310601940.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2023-05-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2043-05-25
AI Technical Summary
There are bottlenecks in data calculation and response time of existing air conditioning systems, resulting in limited energy consumption regulation efficiency.
Using a multi-online system, multiple computing devices distribute cold data calculation and control permissions, shorten the data calculation time and speed up the response rate.
Effectively reduce the calculation pressure of the air conditioner host, improve the response rate, and achieve faster energy consumption adjustment.
Smart Images

Figure CN119022409A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of smart home appliances, for example, to a water multi-connection system, a terminal device, a computing device and a control device. Background Art
[0002] At present, the energy consumption of central air-conditioning systems accounts for a large proportion of building energy consumption. During the operation of air-conditioning, there is a demand to reduce air-conditioning energy consumption.
[0003] In order to meet the demand for reducing air-conditioning energy consumption, the relevant technology discloses a terminal cooling capacity balancing control system, including: terminal equipment and control equipment. The terminal equipment collects the total cooling capacity demand of each terminal and communicates with the air-conditioning host. The air-conditioning host calculates the optimal number of operating refrigerators and the operating frequency of the water pump, and controls the operation of the equipment. Then, the PID controller is used to adjust the frequency of the terminal air duct, so that the chilled water system can be dynamically adjusted according to the terminal load demand to ensure the energy-saving operation of the system.
[0004] In the process of implementing the embodiments of the present disclosure, it is found that there are at least the following problems in the related art:
[0005] Although the relevant technology reduces the operating energy consumption of the air-conditioning system, all collected data are fed back to the air-conditioning host for calculation. The amount of calculated data is large, resulting in slow response time.
[0006] It should be noted that the information disclosed in the above background technology section is only used to enhance the understanding of the background of the present application, and therefore may include information that does not constitute the prior art known to ordinary technicians in the field. Summary of the invention
[0007] In order to provide a basic understanding of some aspects of the disclosed embodiments, a brief summary is given below. The summary is not an extensive review, nor is it intended to identify key / critical components or delineate the scope of protection of these embodiments, but rather serves as a prelude to the detailed description that follows.
[0008] The disclosed embodiments provide a water multi-connection system, a terminal device, a computing device, and a control device to reduce the computing pressure of an air-conditioning host and speed up the response rate.
[0009] In some embodiments, the water multi-split system includes: a terminal device, which is used to distribute the cooling capacity generated by the water system and generate actual cooling capacity based on the collected cooling capacity parameters; multiple computing devices, each computing device is respectively connected to one or more terminal devices, and is used to calculate the predicted cooling capacity based on the actual cooling capacity generated by one or more terminal devices, and generate adjustment instructions for controlling the operation of the terminal devices; a control device, which is respectively connected to the multiple computing devices, and is used to generate control instructions for adjusting the cooling capacity of the water system based on the predicted cooling capacity calculated by the multiple computing devices.
[0010] In some embodiments, the terminal device includes: multiple terminal coils; a parameter acquisition module for acquiring the cooling capacity parameters of each terminal coil; a model calling module connected to the parameter acquisition module, for generating the actual cooling capacity of each terminal coil according to the cooling capacity parameters of each terminal coil; a first summary module for summarizing the actual cooling capacity of each terminal coil to generate the total actual cooling capacity; and a first communication module for sending the total actual cooling capacity to the corresponding computing device.
[0011] In some embodiments, the model calling module includes: a calling submodule, which is used to call the cooling capacity model after receiving the cooling capacity parameters of the corresponding terminal coil; and a cooling capacity generation module, which is used to map the cooling capacity parameters of each terminal coil into the actual cooling capacity of each terminal coil according to the cooling capacity model.
[0012] In some embodiments, the computing device includes: a load prediction module, used to calculate the total actual cooling capacity as the predicted cooling capacity according to a preset load prediction model; a second communication module, including a receiving submodule, used to receive the total actual cooling capacity sent by the terminal device; and a sending submodule, used to send the predicted cooling capacity to the control device.
[0013] In some embodiments, the sending submodule is also used to, when the total actual cooling capacity is outside the set range, adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
[0014] In some embodiments, the set range is 95% to 105% of the predicted cooling capacity.
[0015] In some embodiments, the computing device also includes: a fuzzy control module, which is used to obtain the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters, and perform fuzzy output according to the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters to generate a fuzzy signal; an instruction generation module, which is used to generate a PID signal according to the fuzzy signal, and generate an adjustment instruction according to the PID signal.
[0016] In some embodiments, the control device includes: a third communication module for receiving the predicted cooling capacity sent by the computing device; and a module for sending control instructions to the water system; a second aggregation module for aggregating the predicted cooling capacity sent by multiple computing devices to generate a total predicted cooling capacity; a data acquisition module for acquiring environmental parameters and user control data; an optimization module for performing coupled solution based on the total predicted cooling capacity, environmental parameters and user control data to generate optimal control parameters, and generating control instructions based on the optimal control parameters.
[0017] In some embodiments, the terminal device is used in a water multi-split system, comprising: a regulation module for distributing the cooling capacity generated by the water system; a cooling capacity generation module for generating actual cooling capacity according to collected cooling capacity parameters; wherein the actual cooling capacity is used to generate predicted cooling capacity.
[0018] In some embodiments, the cooling capacity generation module includes: a parameter acquisition module, used to obtain the cooling capacity parameters of each terminal coil; a model calling module, connected to the parameter acquisition module, used to generate the actual cooling capacity of each terminal coil according to the cooling capacity parameters of each terminal coil; a first summary module, used to summarize the actual cooling capacity of each terminal coil to generate the total actual cooling capacity; a first communication module, used to send the total actual cooling capacity to the corresponding computing device.
[0019] In some embodiments, the model calling module includes: a calling submodule, which is used to call the cooling capacity model after receiving the cooling capacity parameters of the corresponding terminal coil; and a cooling capacity generation module, which is used to map the cooling capacity parameters of each terminal coil into the actual cooling capacity of each terminal coil according to the cooling capacity model.
[0020] In some embodiments, the computing device, used in a water multi-split system, includes: a computing module, used to calculate predicted cooling capacity based on actual cooling capacity generated by one or more terminal devices; wherein the predicted cooling capacity is used to generate control instructions for adjusting the cooling capacity of the water system; and a control module, used to generate adjustment instructions for controlling the operation of the terminal devices.
[0021] In some embodiments, the calculation module includes: a load prediction module, which is used to calculate the total actual cooling capacity as the predicted cooling capacity according to a preset load prediction model; a second communication module, including a receiving submodule, which is used to receive the total actual cooling capacity sent by the terminal device; and a sending submodule, which is used to send the predicted cooling capacity to the control device.
[0022] In some embodiments, the sending submodule is also used to, when the total actual cooling capacity is outside the set range, adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
[0023] In some embodiments, the set range is 95% to 105% of the predicted cooling capacity.
[0024] In some embodiments, the computing device also includes: a fuzzy control module, which is used to obtain the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters, and perform fuzzy output according to the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters to generate a fuzzy signal; an instruction generation module, which is used to generate a PID signal according to the fuzzy signal, and generate an adjustment instruction according to the PID signal.
[0025] In some embodiments, the control device is used in a water multi-split system and includes: a processing module, which is used to generate control instructions for adjusting the cooling capacity of the water system based on the predicted cooling capacity calculated by the computing device.
[0026] In some embodiments, the processing module includes: a third communication module for receiving the predicted cooling capacity sent by the computing device; and a second aggregation module for sending control instructions to the water system; a second aggregation module for aggregating the predicted cooling capacity sent by multiple computing devices to generate a total predicted cooling capacity; a data acquisition module for acquiring environmental parameters and user control data; an optimization module for performing coupled solution based on the total predicted cooling capacity, environmental parameters and user control data to generate optimal control parameters, and generating control instructions based on the optimal control parameters.
[0027] The water multi-connection system, terminal device, computing device and control device provided in the embodiments of the present disclosure can achieve the following technical effects:
[0028] Set up multiple computing devices, use the computing devices to calculate the predicted cooling capacity based on the cooling data collected at the terminal, and transmit it to the control device. The control device sends a control instruction to the water system based on the predicted cooling capacity. The water system generates cooling capacity according to the control command, and finally the computing device adjusts the terminal device. In this way, multiple independent computing devices are set up, and a large amount of cooling data is dispersed to multiple computing devices for calculation, thereby shortening the data calculation time, and the control authority is dispersed to the computing devices to achieve rapid response. Therefore, it can reduce the computing pressure of the air conditioner host and speed up the response rate.
[0029] The above general description and the following description are exemplary and explanatory only and are not intended to limit the present application. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] One or more embodiments are exemplarily described by corresponding drawings, which do not limit the embodiments. Elements with the same reference numerals in the drawings are shown as similar elements, and the drawings do not constitute a scale limitation, and wherein:
[0031] Figure 1 It is a schematic diagram of the structure of a water multi-connection system provided by an embodiment of the present disclosure;
[0032] Figure 2 is a schematic diagram of the structure of a terminal device provided by an embodiment of the present disclosure;
[0033] Figure 3 is a structural diagram of a model calling module provided by an embodiment of the present disclosure;
[0034] Figure 4 is a schematic diagram of a computing device structure provided by an embodiment of the present disclosure;
[0035] Figure 5 is a flow chart for establishing a load forecasting model provided by an embodiment of the present disclosure;
[0036] Figure 6 is a schematic diagram of a control device structure provided by an embodiment of the present disclosure;
[0037] Figure 7 It is a structural diagram of a practical application provided by an embodiment of the present disclosure. DETAILED DESCRIPTION
[0038] In order to be able to understand the features and technical contents of the embodiments of the present disclosure in more detail, the implementation of the embodiments of the present disclosure is described in detail below in conjunction with the accompanying drawings. The attached drawings are for reference only and are not used to limit the embodiments of the present disclosure. In the following technical description, for the convenience of explanation, a full understanding of the disclosed embodiments is provided through multiple details. However, one or more embodiments can still be implemented without these details. In other cases, to simplify the drawings, well-known structures and devices can be simplified for display.
[0039] The terms "first", "second", etc. in the specification and claims of the embodiments of the present disclosure and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the terms used in this way can be interchanged where appropriate, so that the embodiments of the embodiments of the present disclosure described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions.
[0040] Unless otherwise stated, the term "plurality" means two or more.
[0041] The term "correspondence" may refer to an association relationship or a binding relationship. The correspondence between A and B means that there is an association relationship or a binding relationship between A and B.
[0042] It should be noted that, in the absence of conflict, the embodiments and features in the embodiments of the present disclosure may be combined with each other.
[0043] Combination Figure 1As shown, the embodiment of the present disclosure provides a water multi-split system, including multiple terminal devices 130, multiple computing devices 120 and a control device 110. The terminal device 130 is used to distribute the cooling capacity generated by the water system, and to generate actual cooling capacity according to the collected cooling capacity parameters; each computing device 120 is respectively connected to one or more terminal devices 130, and is used to calculate the predicted cooling capacity according to the actual cooling capacity generated by one or more terminal devices 130, and to generate a regulation instruction for controlling the operation of the terminal device 130; the control device 110 is respectively connected to multiple computing devices 120, and is used to generate a control instruction for regulating the cooling capacity of the water system according to the predicted cooling capacity calculated by the multiple computing devices 120.
[0044] Set up multiple computing devices, use the computing devices to calculate the predicted cooling capacity based on the cooling data collected at the terminal, and transmit it to the control device. The control device sends a control instruction to the water system based on the predicted cooling capacity. The water system generates cooling capacity according to the control command, and finally the computing device adjusts the terminal device. In this way, multiple independent computing devices are set up, and a large amount of cooling data is dispersed to multiple computing devices for calculation, thereby shortening the data calculation time, and the control authority is dispersed to the computing devices to achieve rapid response. Therefore, it can reduce the computing pressure of the air conditioner host and speed up the response rate.
[0045] Optionally, combined Figure 1 and Figure 2 As shown, the terminal device 130 includes a terminal coil 131, a parameter acquisition module 132, a model calling module 133, a first summary module 134 and a first communication module 135. The parameter acquisition module 132 is used to acquire the cooling capacity parameters of each terminal coil 131; the model calling module 133 is connected to the parameter acquisition module 132, and is used to generate the actual cooling capacity of each terminal coil 131 according to the cooling capacity parameters of each terminal coil 131; the first summary module 134 is used to summarize the actual cooling capacity of each terminal coil 131 to generate the total actual cooling capacity; the first communication module 135 is used to send the total actual cooling capacity to the corresponding computing device 120.
[0046] Optionally, the cooling capacity parameters include part or all of the environmental parameters, control parameters, crowd intensity, fresh air volume, and comfort. The actual cooling capacity of each terminal coil is generated according to the cooling capacity parameters, so as to make statistics on the cooling capacity of each area, which is convenient for subsequent cooling by area, thereby contributing to energy-saving operation of the system.
[0047] Optionally, combined Figure 2 and Figure 3As shown, the model calling module 133 includes a calling submodule 1331 and a cooling capacity generating module 1332. The calling submodule 1331 is used to call the cooling capacity model after receiving the cooling capacity parameters of the corresponding terminal coil 131; the cooling capacity generating module 1332 is used to map the cooling capacity parameters of each terminal coil 131 to the actual cooling capacity of each terminal coil 131 according to the cooling capacity model.
[0048] The preset cooling model is called to map the cooling parameters to the actual cooling, thereby speeding up the generation rate of the actual cooling and reducing the calculation pressure.
[0049] Optionally, the cooling capacity model is stored in a computing device. The modeling of the cooling capacity model includes inputting part or all of environmental parameters, control parameters, crowd intensity, fresh air volume and comfort level. A standardized model is used to train and generate a mapping function relationship.
[0050] Among them, the standardized model can be a black box model or an expression model.
[0051] Optionally, combined Figure 1 and Figure 4 As shown, the computing device 120 includes a load prediction module 121 and a second communication module 122. The load prediction module 121 is used to calculate the total actual cooling capacity as the predicted cooling capacity according to the preset load prediction model; the second communication module 122 includes a receiving submodule and a sending submodule, the receiving submodule is used to receive the total actual cooling capacity sent by the terminal device 130; the sending submodule is used to send the predicted cooling capacity to the control device 110.
[0052] Using multiple computing devices to predict the cooling capacity of the corresponding terminal coils at the next moment helps to improve the accuracy of the prediction, facilitates subsequent regional cooling, disperses the computing pressure, and speeds up the response rate.
[0053] When forecasting load, an overall load forecast is performed for the area covered by the computing device based on the actual situation of the computing device and the historical operating data of the computing device. It is necessary to preliminarily process the historical data into historical load data for the area corresponding to each computing device.
[0054] In this embodiment, a long short-term memory network plus an attention mechanism is used to predict the load of each computing device. The factors that need to be considered are mainly: external temperature, external radiation intensity, external enthalpy value, fresh air volume, and previous load data.
[0055] Combination Figure 5 As shown in Figure 1, the process of establishing a load forecasting model using a long short-term memory network plus an attention mechanism includes:
[0056] S101, obtaining a data structure;
[0057] S102, cleaning the data;
[0058] S103, completing the feature quantity of the cleaned data;
[0059] S104, dividing the data after feature quantity completion into a training set and a test set;
[0060] S105, performing network training on the data in the training set to generate a load forecasting model;
[0061] S106, testing the load forecasting model using the data in the test set;
[0062] S107, outputting a load forecasting model.
[0063] Optionally, data acquisition and cleaning are based on time to ensure that data corresponds to time, and a corresponding time is not directly deleted when data is missing. The feature completion of data includes: extraction of seasonal factors and filling of missing values. Among them, it is recommended to fill in the seasonal factors first for missing values. For example, whether it is a working day, number of hours, month, week of the year, etc. Then use machine learning-like interpolation methods, such as K nearest neighbors. In this way, both missing values can be filled and periodic features can be enhanced.
[0064] Optionally, the data may be divided into a training set and a test set according to a certain ratio; the training set is used to train and generate a load forecasting model, and the test set is used to test the generated load forecasting model.
[0065] In this embodiment, the output load forecasting model is stored on the computing device, and the training model used to establish the load forecasting model is stored on the host computer, that is, the cloud server of the control device. Each time the load is predicted, it is directly run on the computing device, and the training model is regularly used to train the load forecasting model and update the deployed model parameters.
[0066] Optionally, the sending submodule is also used to adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm when the total actual cooling capacity is outside the set range, until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
[0067] Optionally, the setting range is 95% to 105% of the predicted cooling capacity of the corresponding terminal coil, and specifically can be 95%, 97%, 103% or 105%.
[0068] When the total actual cooling capacity uploaded by the terminal coil does not meet the predicted cooling capacity, the sending submodule automatically triggers the group planning algorithm to adjust the corresponding terminal coil with the minimum sacrifice of comfort to achieve the total actual cooling capacity in line with the predicted cooling capacity range. This can help improve the accuracy of cooling capacity prediction, achieve cooling according to regional demand, emphasize comfort while maximizing energy saving space.
[0069] Optional, combined Figure 1 and Figure 4 As shown, the computing device 120 also includes a fuzzy control module 123 and an instruction generation module 124. The fuzzy control module 123 is used to obtain the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameter, and perform fuzzy output according to the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameter to generate a fuzzy signal; the instruction generation module 124 is used to generate a PID signal according to the fuzzy signal, and generate an adjustment instruction according to the PID signal.
[0070] In practical applications, the fuzzy control module can be a fuzzy controller; the instruction generation module can be a PID controller. After the fuzzy controller obtains the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameter, it performs fuzzy output and generates a fuzzy signal; the PID controller generates an adjustment instruction for adjusting the terminal coil frequency according to the fuzzy signal.
[0071] The computing device controls the frequency of the terminal coil according to the fuzzy control module and the instruction generation module, thereby distributing the wind system control authority of the host computer to the computing device. This helps to respond quickly. At the same time, when the computing device controls the frequency of the terminal coil, it gives control freedom through fuzzy control, and does not strictly divide the control comfort and cooling supply, which helps to reduce the computing pressure.
[0072] Optional, combined Figure 1 and Figure 6 As shown, the control device 110 includes a third communication module 111, a second aggregation module 112, a data acquisition module 113 and an optimization module 114. The third communication module 111 is used to receive the predicted cooling capacity sent by the computing device 120; and, is used to send control instructions to the water system; the second aggregation module 112 is used to aggregate the predicted cooling capacity sent by multiple computing devices 120 to generate a total predicted cooling capacity; the data acquisition module 113 is used to obtain environmental parameters and user control data; the optimization module 114 is used to perform coupled solution based on the total predicted cooling capacity, environmental parameters and user control data, generate optimal control parameters, and generate control instructions based on the optimal control parameters.
[0073] The optimization module can be a cloud solver. After receiving the total predicted cooling capacity, the cloud solver reads the current environmental parameters according to the real-time variables required in the preset fitness objective function. At the same time, the user needs to input the adjustable range of the control parameters to be optimized, and customize the boundary conditions, which are coupled to the fitness objective function of the cloud solver to solve the optimal control parameters and send commands to the water system cooling.
[0074] After the water system is cooled, the environmental parameters, control parameter range, boundary conditions, and time characteristics change accordingly, forming a closed control loop. On this basis, the water system can actively respond to real-time loads, ensure the optimized operation of each device, and achieve multi-level autonomous brain control.
[0075] Optionally, a terminal device is used for a water multi-split system, comprising a regulating module and a cooling capacity generation module. The regulating module is used to distribute the cooling capacity generated by the water system; the cooling capacity generation module is used to generate actual cooling capacity according to the collected cooling capacity parameters; wherein the actual cooling capacity is used to generate predicted cooling capacity.
[0076] Optionally, the cooling capacity generation module includes a plurality of terminal coils, a parameter acquisition module, a model calling module, a first summarizing module and a first communication module. The parameter acquisition module is used to acquire the cooling capacity parameters of each terminal coil; the model calling module is connected to the parameter acquisition module and is used to generate the actual cooling capacity of each terminal coil according to the cooling capacity parameters of each terminal coil; the first summarizing module is used to summarize the actual cooling capacity of each terminal coil to generate the total actual cooling capacity; the first communication module is used to send the total actual cooling capacity to the corresponding computing device.
[0077] Optionally, the cooling capacity parameters include part or all of the environmental parameters, control parameters, crowd intensity, fresh air volume, and comfort. The actual cooling capacity of each terminal coil is generated according to the cooling capacity parameters, so as to make statistics on the cooling capacity of each area, which is convenient for subsequent cooling by area, thereby contributing to energy-saving operation of the system.
[0078] Optionally, the model calling module includes a calling submodule and a cooling capacity generation module. The calling submodule is used to call the cooling capacity model after receiving the cooling capacity parameters of the corresponding terminal coil; the cooling capacity generation module is used to map the cooling capacity parameters of each terminal coil to the actual cooling capacity of each terminal coil according to the cooling capacity model.
[0079] The preset cooling model is called to map the cooling parameters to the actual cooling, thereby speeding up the generation rate of the actual cooling and reducing the calculation pressure.
[0080] Optionally, the cooling capacity model is stored in a computing device. The modeling of the cooling capacity model includes inputting part or all of environmental parameters, control parameters, crowd intensity, fresh air volume and comfort level. A standardized model is used to train and generate a mapping function relationship.
[0081] Among them, the standardized model can be a black box model or an expression model.
[0082] Optionally, a computing device is used in a water multi-split system, comprising a computing module and a control module. The computing module is used to calculate the predicted cooling capacity based on the actual cooling capacity generated by one or more terminal devices; wherein the predicted cooling capacity is used to generate a control instruction for adjusting the cooling capacity of the water system. The control module is used to generate an adjustment instruction for controlling the operation of the terminal device.
[0083] Optionally, the calculation module includes a load prediction module, which is used to calculate the total actual cooling capacity as the predicted cooling capacity according to a preset load prediction model; the second communication module includes a receiving submodule, which is used to receive the total actual cooling capacity sent by the terminal device; and a sending submodule, which is used to send the predicted cooling capacity to the control device.
[0084] Using multiple computing devices to predict the cooling capacity of the corresponding terminal coils at the next moment helps to improve the accuracy of the prediction, facilitates subsequent regional cooling, disperses the computing pressure, and speeds up the response rate.
[0085] When forecasting load, an overall load forecast is performed for the area covered by the computing device based on the actual situation of the computing device and the historical operating data of the computing device. It is necessary to preliminarily process the historical data into historical load data for the area corresponding to each computing device.
[0086] In this embodiment, a long short-term memory network plus an attention mechanism is used to predict the load of each computing device. The factors that need to be considered are mainly: external temperature, external radiation intensity, external enthalpy value, fresh air volume, and previous load data.
[0087] Combination Figure 5 As shown in Figure 1, the process of establishing a load forecasting model using a long short-term memory network plus an attention mechanism includes:
[0088] S101, obtaining a data structure;
[0089] S102, cleaning the data;
[0090] S103, completing the feature quantity of the cleaned data;
[0091] S104, dividing the data after feature quantity completion into a training set and a test set;
[0092] S105, performing network training on the data in the training set to generate a load forecasting model;
[0093] S106, testing the load forecasting model using the data in the test set;
[0094] S107, outputting a load forecasting model.
[0095] Optionally, data acquisition and cleaning are based on time to ensure that data corresponds to time, and a corresponding time is not directly deleted when data is missing. The feature completion of data includes: extraction of seasonal factors and filling of missing values. Among them, it is recommended to fill in the seasonal factors first for missing values. For example, whether it is a working day, number of hours, month, week of the year, etc. Then use machine learning-like interpolation methods, such as K nearest neighbors. In this way, both missing values can be filled and periodic features can be enhanced.
[0096] Optionally, the data may be divided into a training set and a test set according to a certain ratio; the training set is used to train and generate a load forecasting model, and the test set is used to test the generated load forecasting model.
[0097] In this embodiment, the output load forecasting model is stored on the computing device, and the training model used to establish the load forecasting model is stored on the host computer, that is, the cloud server of the control device. Each time the load is predicted, it is directly run on the computing device, and the training model is regularly used to train the load forecasting model and update the deployed model parameters.
[0098] Optionally, the sending submodule is also used to, when the total actual cooling capacity is outside the set range, adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
[0099] Optionally, the setting range is 95% to 105% of the predicted cooling capacity, and specifically may be 95%, 97%, 103% or 105%.
[0100] When the total actual cooling capacity uploaded by the terminal coil does not meet the predicted cooling capacity, the sending submodule automatically triggers the group planning algorithm to adjust the corresponding terminal coil with the minimum sacrifice of comfort to achieve the total actual cooling capacity in line with the predicted cooling capacity range. This can help improve the accuracy of cooling capacity prediction, achieve cooling according to regional demand, emphasize comfort while maximizing energy saving space.
[0101] Optionally, the computing device also includes a fuzzy control module, which is used to obtain the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters, and perform fuzzy output according to the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameters to generate a fuzzy signal; an instruction generation module, which is used to generate a PID signal according to the fuzzy signal, and generate an adjustment instruction according to the PID signal.
[0102] In practical applications, the fuzzy control module can be a fuzzy controller; the instruction generation module can be a PID controller. After the fuzzy controller obtains the cooling error, the cooling error change rate, the fuzzy control rule table and the membership parameter, it performs fuzzy output and generates a fuzzy signal; the PID controller generates an adjustment instruction for adjusting the terminal coil frequency according to the fuzzy signal.
[0103] The computing device controls the frequency of the terminal coil according to the fuzzy control module and the instruction generation module, thereby distributing the wind system control authority of the host computer to the computing device. This helps to respond quickly. At the same time, when the computing device controls the frequency of the terminal coil, it gives control freedom through fuzzy control, and does not strictly divide the control comfort and cooling supply, which helps to reduce the computing pressure.
[0104] Optionally, a control device is used for a water multi-split system, including a processing module for generating control instructions for adjusting the cooling capacity of the water system based on the predicted cooling capacity calculated by the computing device.
[0105] Optionally, the processing module includes a third communication module for receiving the predicted cooling capacity sent by the computing device; and a second aggregation module for sending control instructions to the water system; a second aggregation module for aggregating the predicted cooling capacity sent by multiple computing devices to generate a total predicted cooling capacity; a data acquisition module for acquiring environmental parameters and user control data; and an optimization module for performing coupled solution based on the total predicted cooling capacity, environmental parameters and user control data to generate optimal control parameters, and generating control instructions based on the optimal control parameters.
[0106] The optimization module can be a cloud solver. After receiving the total predicted cooling capacity, the cloud solver reads the current environmental parameters according to the real-time variables required in the preset fitness objective function. At the same time, the user needs to input the adjustable range of the control parameters to be optimized, and customize the boundary conditions, which are coupled to the fitness objective function of the cloud solver to solve the optimal control parameters and send commands to the water system cooling.
[0107] After the water system is cooled, the environmental parameters, control parameter range, boundary conditions, and time characteristics change accordingly, forming a closed control loop. On this basis, the water system can actively respond to real-time loads, ensure the optimized operation of each device, and achieve multi-level autonomous brain control.
[0108] Combination Figure 7 As shown, in actual applications, the terminal device is set as a terminal autonomous execution node; the computing device includes multiple computing nodes, which are set as secondary computing nodes; the control device includes a cloud solver, an intelligent control cabinet, and water system equipment, which are set as the highest control node.
[0109] The terminal coil collects cooling capacity and reports it to the corresponding computing node; the computing node calls the load prediction model, performs load prediction on the cooling capacity, generates predicted cooling capacity, and transmits the predicted cooling capacity to the cloud optimization solver; the cloud solver obtains real-time environmental parameters and receives control parameters and boundary conditions sent by the user, couples and solves the predicted cooling capacity, real-time environmental parameters, control parameters and boundary conditions, obtains the optimal control parameters, and sends commands to the intelligent control cabinet; the intelligent control cabinet adjusts the water system cooling according to the command; the computing node calls the terminal optimization model, that is, fuzzy control, to regulate the frequency of the terminal coil.
[0110] In this way, the control authority of the wind system controlled by the host computer is distributed to the computing nodes for control, thereby achieving rapid response.
[0111] In this embodiment, a multi-level node layer can be set between the terminal device and the control device, which helps to further improve the prediction accuracy and thus increase the energy saving space. At the same time, since the node layer has its own computing power, it can run independently of the cloud computing layer.
[0112] The above description and the accompanying drawings fully illustrate the embodiments of the present disclosure so that those skilled in the art can practice them. Other embodiments may include structural, logical, electrical, process and other changes. The embodiments represent only possible changes. Unless explicitly required, separate components and functions are optional, and the order of operation may vary. The parts and features of some embodiments may be included in or replace the parts and features of other embodiments. Moreover, the words used in this application are only used to describe the embodiments and are not used to limit the claims. As used in the description of the embodiments and the claims, unless the context clearly indicates, the singular forms of "a", "an" and "the" are intended to include plural forms as well. Similarly, the term "and / or" as used in this application refers to any and all possible combinations of listings containing one or more associated ones. In addition, when used in the present application, the term "comprise" and its variants "comprises" and / or comprising refer to the presence of stated features, wholes, steps, operations, elements, and / or components, but do not exclude the presence or addition of one or more other features, wholes, steps, operations, elements, components and / or groups thereof. In the absence of further restrictions, the elements defined by the sentence "comprising a ..." do not exclude the presence of other identical elements in the process, method or device comprising the elements. In this article, each embodiment may focus on the differences from other embodiments, and the same and similar parts between the various embodiments may refer to each other. For the methods, products, etc. disclosed in the embodiments, if they correspond to the method part disclosed in the embodiments, then the relevant parts can refer to the description of the method part.
Claims
1. A water multi-connection system, comprising a water system for refrigeration, characterized in that: Also includes: Multiple terminal devices are used to distribute the cooling capacity generated by the water system and generate actual cooling capacity according to the collected cooling capacity parameters; A plurality of computing devices, each computing device being connected to one or more terminal devices, and configured to calculate predicted cooling capacity based on actual cooling capacity generated by the one or more terminal devices, and to generate adjustment instructions for controlling operation of the terminal devices; The control device is connected to the multiple computing devices respectively, and is used to generate control instructions for adjusting the cooling capacity of the water system according to the predicted cooling capacity calculated by the multiple computing devices.
2. The system according to claim 1, characterized in that The terminal device comprises: Multiple terminal coils; A parameter acquisition module is used to obtain the cooling capacity parameters of each terminal coil; The model calling module is connected to the parameter acquisition module and is used to generate the actual cooling capacity of each terminal coil according to the cooling capacity parameters of each terminal coil; The first aggregation module is used to aggregate the actual cooling capacity of each terminal coil to generate the total actual cooling capacity; The first communication module is used to send the total actual cooling capacity to the corresponding computing device.
3. The system according to claim 1, characterized in that The computing device comprises: A load prediction module, used to calculate the total actual cooling capacity as the predicted cooling capacity according to a preset load prediction model; The second communication module includes a receiving submodule for receiving the total actual cooling capacity sent by the terminal device; and a sending submodule for sending the predicted cooling capacity to the control device.
4. The system according to claim 3, characterized in that The sending submodule is also used to adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm when the total actual cooling capacity is outside the set range, until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
5. The system according to claim 1, characterized in that The control device comprises: A third communication module is used to receive the predicted cooling capacity sent by the computing device; and, is used to send a control instruction to the water system; A second aggregation module is used to aggregate the predicted cooling capacity sent by multiple computing devices to generate a total predicted cooling capacity; A data acquisition module, used to acquire environmental parameters and user control data; The optimization module is used to perform coupled solution based on the total predicted cooling capacity, environmental parameters and user control data, generate optimal control parameters, and generate control instructions based on the optimal control parameters.
6. A terminal device for a water multi-connection system, characterized in that: include: A regulating module for distributing the cooling capacity generated by the water system; The cooling capacity generation module generates actual cooling capacity according to the collected cooling capacity parameters; wherein the actual cooling capacity is used to generate predicted cooling capacity.
7. The terminal device according to claim 6, characterized in that: The cold energy generation module comprises: A parameter acquisition module is used to obtain the cooling capacity parameters of each terminal coil; The model calling module is connected to the parameter acquisition module and is used to generate the actual cooling capacity of each terminal coil according to the cooling capacity parameters of each terminal coil; The first aggregation module is used to aggregate the actual cooling capacity of each terminal coil to generate the total actual cooling capacity; The first communication module is used to send the total actual cooling capacity to the corresponding computing device.
8. A computing device for a water multi-connection system, characterized in that: include: A calculation module, for calculating predicted cooling capacity based on actual cooling capacity generated by one or more terminal devices; wherein the predicted cooling capacity is used to generate control instructions for adjusting the cooling capacity of the water system; and, The control module is used to generate adjustment instructions for controlling the operation of the terminal equipment.
9. The computing device according to claim 8, characterized in that The computing module comprises: A load prediction module, used to calculate the total actual cooling capacity as the predicted cooling capacity according to a preset load prediction model; The second communication module includes a receiving submodule for receiving the total actual cooling capacity sent by the terminal device; and a sending submodule for sending the predicted cooling capacity to the control device.
10. The computing device according to claim 9, characterized in that The sending submodule is also used to adjust the actual cooling capacity of the terminal coil according to a preset group planning algorithm when the total actual cooling capacity is outside the set range, until the total actual cooling capacity is adjusted to within the set range, and send the total actual cooling capacity to the control device.
11. A control device for a water multi-connection system, characterized in that: include: The processing module is used to generate a control instruction for adjusting the cooling capacity of the water system according to the predicted cooling capacity calculated by the computing device.
12. The control device according to claim 11, characterized in that The processing module comprises: A third communication module is used to receive the predicted cooling capacity sent by the computing device; and, is used to send a control instruction to the water system; A second aggregation module is used to aggregate the predicted cooling capacity sent by multiple computing devices to generate a total predicted cooling capacity; A data acquisition module, used to acquire environmental parameters and user control data; The optimization module is used to perform coupled solution based on the total predicted cooling capacity, environmental parameters and user control data, generate optimal control parameters, and generate control instructions based on the optimal control parameters.
Citation Information
Patent Citations
Terminal flow amount adjustment device and mine cooling system
CN106401636A
Water-flow-variable air conditioner tail end and work method thereof
CN106765610A
Communication method and device for multi-split air conditioning system
CN106839313A
Tail end cooling capacity equilibrium control method
CN107421029A
Industrial central air conditioner monitoring system based on LORA
CN110986301A
Cited By
Water-based multi-split system, end device, computing device and control device
EP4636328A1
Water-based multi-split system, end device, computing device and control device
WO2024239665A1