Differential pressure opening and closing mode switching method and system based on self-elevating platform pile washing-out requirement
By using the differential pressure opening and closing mode switching method and automatic spray valve on the jack-up platform, the problem of increasing resistance in the vacuum environment when the pile legs are pulled out is solved, the pull-out efficiency and stability are improved, and the pile insertion and pull-out are optimized. Out of order.
Patent Information
- Application Number
- CN202411120349.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-11-26
- Estimated Expiration
- 2044-08-14
AI Technical Summary
When the pile legs of the jack-up platform are pulled out, the vacuum environment is formed due to the silt silt in the river and sea bed, which increases the pull-out resistance and leads to low pull-out efficiency.
Based on the pressure differential opening and closing mode switching method of the jack-up platform, by comparing the pressure value at the bottom of the pile leg with the preset threshold, the automatic opening and closing high-efficiency spray valve is controlled to perform spraying work or pause, and spray water to erode the mud at the bottom of the pile leg Sand is used to improve the extraction efficiency and optimize the order of pile insertion and pile extraction with meteorological forecast information.
The pull-out efficiency of the pile legs of the jack-up platform is improved, energy consumption is reduced, and the stability and safety of the platform are improved by optimizing the insertion order and pull-out order.
Smart Images

Figure CN119024726A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of self-elevating platforms, and in particular to a method and system for switching pressure difference opening and closing modes based on the pile driving requirements of self-elevating platforms. Background Art
[0002] With the promotion of marine resource exploitation technology, the application of water self-elevating platforms is becoming more and more extensive. Self-elevating platforms are usually equipped with a number of pile legs that can be raised and lowered, and the platform body also has the function of pumping / draining water, so as to utilize the gravity / buoyancy of the platform body to insert the pile legs into the river / seabed and pull the pile legs out of the river / seabed; wherein, when the pile legs are inserted into the river / seabed, the silt in the river / seabed has a certain effect of isolating water and air, resulting in a vacuum environment being easily formed between the pile legs and the pile leg pits when the pile legs are pulled out, thereby increasing the resistance to pulling out the pile legs; therefore, the above-mentioned related technologies have the problem of difficulty in pulling out the pile legs.
[0003] By providing an automatic opening and closing high-efficiency spray valve as shown in Chinese utility model patent CN220646981U at the bottom of the pile leg of the self-elevating platform, it is helpful to improve the efficiency of pulling out the pile leg of the self-elevating platform. Summary of the invention
[0004] In order to improve the efficiency of pulling out the pile legs of a jack-up platform, the present application provides a pressure difference opening and closing mode switching method and system based on the pile driving requirements of the jack-up platform.
[0005] The first invention objective of this application is achieved by adopting the following technical solution:
[0006] The pressure difference opening and closing mode switching method based on the pile driving demand of the jack-up platform includes:
[0007] Receiving a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and comparing the pile bottom pressure value with a preset pressure threshold group;
[0008] When the pile bottom pressure value is less than the first pressure value, a pile punching start instruction is generated to control the automatic opening and closing high-efficiency spray valve to perform spraying;
[0009] When the pile bottom pressure value is greater than the second pressure value, a pile impact pause instruction is generated to control the automatic opening and closing high-efficiency spray valve to pause the spraying work;
[0010] The pressure threshold group includes a first pressure value and a second pressure value, and the first pressure value is less than the second pressure value; the self-elevating platform includes a platform body, the platform body is movably connected to a plurality of pile legs, and is provided with a driving component for driving the pile legs to rise and fall, the platform body is provided with a pumping and drainage component, and an automatic opening and closing high-efficiency spray valve is provided at the bottom of the pile legs, and the automatic opening and closing high-efficiency spray valve is connected to the pumping and drainage component.
[0011] By adopting the above technical solution, the platform body of the self-elevating platform is used to carry and install pile legs, driving components, pumping and drainage components and water operation equipment, etc. The driving components are used to drive the pile legs to rise and fall so as to insert the pile legs into the river / seabed or drive the pile legs to be pulled out from the river / seabed. The pumping and drainage components are used to control the deadweight of the platform body, thereby assisting in improving the efficiency of plugging and pulling out the pile legs in the river / seabed, and at the same time used to supply water for the automatic opening and closing of the high-efficiency spray valve; when the pile legs need to be pulled out from the river / seabed, the pile pulling instruction is received, the pressure value at the bottom of the pile legs is detected to obtain the pile bottom pressure value and compare it with the preset The pressure threshold group is compared to determine whether pile punching treatment is needed; when the pile bottom pressure value is less than the first pressure value, the vacuum degree at the bottom of the pile leg is large, and a pile punching start instruction is generated to control the automatic opening and closing of the high-efficiency spray valve to spray water to flush the mud at the bottom of the pile leg, so as to improve the efficiency of pulling the pile leg out of the river / seabed; when the pile bottom pressure value is greater than the second pressure value, the vacuum degree at the bottom of the pile leg is small, and the pile punching efficiency is low, and the water spraying and pile punching work of the automatic opening and closing of the high-efficiency spray valve is suspended to reduce unnecessary energy consumption, thereby intelligently improving the efficiency of pulling out the pile legs of the jack-up platform.
[0012] In a preferred example, the present application also includes:
[0013] Receive the pile-insertion planning instruction, obtain the weather forecast information of the platform operation site, and generate the pile-insertion wind vector, pile-insertion ocean current vector, operation wind vector and operation ocean current vector according to the preset pile-insertion time period, the next operation cycle time period and the weather forecast information;
[0014] Based on the operation wind vector and the operation current vector, determine the operation comprehensive vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine the pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion current vector, and determine the pile insertion order of each pre-pile insertion point based on the pile insertion comprehensive vector;
[0015] Obtain the water depth value of each pre-insertion pile point, calculate the pile leg pre-drop depth based on the water depth value and the preset pile insertion buffer value, so as to generate a pile leg pre-drop instruction and send it to the corresponding drive component;
[0016] The step of determining the wind vector includes:
[0017] S401: determining the main wind direction and main wind speed of all time units in the target period based on the weather forecast information, and determining the corresponding wind unit vector according to the angle value of the main wind direction and the main wind speed of each time unit;
[0018] S402: Calculate the sum vector of all wind unit vectors in the target period, and determine the wind force vector based on the direction and magnitude of the sum vector;
[0019] The steps to determine the ocean current vector include:
[0020] S403: determining the mainstream direction and mainstream velocity of all time units in the target period based on the weather forecast information, and determining the corresponding ocean current unit vector according to the angle value and mainstream velocity of the mainstream direction of each time unit;
[0021] S404: Calculate the sum vector of all ocean current unit vectors within the target period, and determine the ocean current vector based on the direction and magnitude of the sum vector.
[0022] By adopting the above technical solution, before the pile driving operation is carried out, the pile driving planning instruction is received to obtain the weather forecast information of the platform operation site, and the pile driving wind vector and pile driving current vector corresponding to the pile driving period are determined in combination with the time information of the preset pile driving period and the next operation cycle period, as well as the operation wind vector and operation current vector corresponding to the operation cycle period, so as to facilitate the subsequent analysis of the sea conditions during the pile driving and the water operation; according to the sea conditions in the next operation cycle period, the pre-pile driving points are planned to improve the rationality of the pile driving position of the self-elevating platform, and according to the sea conditions in the pile driving period, the pile driving sequence of each pre-pile driving point is planned during the pile driving, so as to reduce the degree of influence of the sea conditions on the self-elevating platform during the pile driving period; the water depth value of each pre-pile driving point is obtained, the pile leg pre-drop depth is calculated based on the water depth value and the pile driving buffer value, and the pile leg pre-drop instruction is generated based on the pile leg pre-drop depth, so as to improve the pile driving efficiency when the pile driving work is performed subsequently.
[0023] In a preferred example of the present application: a plurality of the legs are evenly arranged around the platform body; the center points of the legs and the platform center point constitute corresponding leg vectors, wherein the center point of the legs is the geometric center point of the projection of the legs on the sea level, and the platform center point is the geometric center point of the projection of the platform body on the sea level;
[0024] The method of determining an operation comprehensive vector based on an operation wind vector and an operation ocean current vector, determining each pre-pile insertion point based on the operation comprehensive vector, determining a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, and determining a pile insertion sequence of each pre-pile insertion point based on the pile insertion comprehensive vector includes:
[0025] Calculate the operation comprehensive vector. If the number of pile legs is an odd number, align the platform center point with the target center point, and one pile leg vector is collinear with the operation comprehensive vector to determine each pre-insertion pile point. If the number of pile legs is an even number, align the platform center point with the target center point, and two pile leg vectors in opposite directions are collinear with the operation comprehensive vector to determine each pre-insertion pile point.
[0026] Calculate the pile insertion comprehensive vector, and determine the pile insertion order of the pre-pile insertion points corresponding to each pile leg based on the angle between the straight line where each pile leg vector is located and the straight line where the pile insertion comprehensive vector is located in ascending order;
[0027] Among them, the calculation formula of the operation comprehensive vector is:
[0028]
[0029] The calculation formula of the instrumentation comprehensive vector is:
[0030]
[0031] is the operation comprehensive vector, k W is the wind influence coefficient, k C is the ocean current influence coefficient, is the operating wind force vector, is the operating current vector, is the instrumentation synthesis vector, is the wind force vector for the pile, is the plugged current vector.
[0032] By adopting the above technical scheme, each pile leg of the self-elevating platform is arranged around the platform body, and a number of pile leg vectors are determined based on the center point of the pile leg and the center point of the platform, so as to facilitate the subsequent planning of the pre-insertion points of each pile leg; the operation comprehensive vector is calculated to obtain the main direction of the force of the sea condition on the self-elevating platform during the water operation. If the number of pile legs is an odd number, one pile leg vector is made to be collinear with the operation comprehensive vector. If the number of pile legs is an even number, two pile leg vectors in opposite directions are made to be collinear with the operation comprehensive vector, so that each pile leg can be symmetrically arranged relative to the operation comprehensive vector, thereby improving the stability of the self-elevating platform during the operation; the pile insertion comprehensive vector is calculated to obtain the main direction of the force of the sea condition on the self-elevating platform during the pile insertion work, and the pile insertion order is determined in order from small to large based on the angle between the straight line where each pile leg vector is located and the straight line where the pile insertion comprehensive vector is located, so as to improve the stability of the self-elevating platform during the pile insertion work.
[0033] In a preferred example of the present application, the method further includes: determining the operation comprehensive vector based on the operation wind vector and the operation ocean current vector, and determining the pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector before:
[0034] Obtain the platform status information of the jack-up platform to determine the center of mass height H of the jack-up platform G , frontal area S W 、Floating center depth H -M and frontage area S C ;
[0035] Based on the centroid height H G , frontal area S W 、Floating center depth H -M , frontage area S C , the preset wind force influence coefficient calculation formula and the preset ocean current influence coefficient calculation formula are used to calculate the wind force influence coefficient and the ocean current influence coefficient;
[0036] The calculation formula of wind influence coefficient is:
[0037] k W =(k1H G +B1)S W
[0038] The calculation formula of ocean current influence coefficient is:
[0039] k C =(k2H -M +B2)S C
[0040] Wherein k1 is the first influence coefficient, B1 is the first influence adjustment value, k2 is the second influence coefficient, and B2 is the second influence adjustment value;
[0041] The center of mass height H G It refers to the height of the mass center of the jack-up platform relative to the sea level. The windward area refers to the projection area of the jack-up platform above the sea level perpendicular to the wind vector in the current period. The buoyancy center depth H -M It refers to the depth of the buoyancy center of the jack-up platform relative to the sea level, and the headwater area refers to the projection area of the jack-up platform below the sea level perpendicular to the ocean current vector in the current period.
[0042] By adopting the above technical scheme, since the degree to which the jack-up platform is affected by wind on the sea surface mainly depends on the windward area and the height of the center of mass of the jack-up platform, and the degree to which the jack-up platform is affected by ocean currents mainly depends on the waterfront area and the depth of the buoyancy center of the jack-up platform, the platform status information of the jack-up platform is obtained to evaluate the center of mass, the position of the center of buoyancy, the windward area and the waterfront area of the jack-up platform, and then determine the center of mass height and the center of buoyancy depth, so as to subsequently evaluate the degree to which the jack-up platform is affected by wind and ocean currents; based on the center of mass height, windward area, center of buoyancy depth, waterfront area, wind influence coefficient calculation formula and ocean current influence coefficient calculation formula, the wind influence coefficient and the ocean current influence coefficient are calculated to improve the accuracy of the evaluation of the comprehensive operation vector and the comprehensive pile insertion vector.
[0043] In a preferred example of the present application: before receiving the pile pulling instruction to obtain the pile bottom pressure value at the bottom of the pile leg, the method further includes:
[0044] Obtain weather forecast information at the platform operation site, generate a pile pulling wind vector and a pile pulling current vector according to a preset pile pulling period and weather forecast information, and determine a pile pulling comprehensive vector based on the pile pulling wind vector and the pile pulling current vector; when the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold, determine the pile pulling sequence corresponding to each of the pile legs based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large;
[0045] When the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold, the pile pulling sequence of each pile leg is set to be pulled out simultaneously;
[0046] When the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, a pile pulling suspension instruction is generated;
[0047] Among them, the calculation formula of the pile pulling comprehensive vector is:
[0048]
[0049] is the comprehensive vector of pile pulling, is the wind force vector for pile pulling, is the pile pulling current vector; the first pile pulling sea condition threshold is less than the second pile pulling sea condition threshold.
[0050] By adopting the above technical solution, the weather forecast information of the platform operation site is obtained, and the pile pulling wind force vector and the pile pulling current vector are generated in combination with the pile pulling period, and the pile pulling comprehensive vector is further determined, so as to obtain the comprehensive sea conditions during the pile pulling period; when the modulus of the pile pulling comprehensive vector is less than the preset first pile pulling sea condition threshold, it means that the sea conditions at the platform operation site are good, and the pile pulling sequence of the pile legs is determined based on the angle between each pile leg vector and the pile insertion comprehensive vector in the order from small to large, so as to first pull out the pile leg away from the side where the comprehensive sea condition acts on the jack-up platform, so as to utilize the force of the sea condition on the jack-up platform to improve the pulling efficiency of the pile leg pulled out later; when the modulus of the pile pulling comprehensive vector is between the first pile pulling sea condition threshold and the second pile pulling sea condition threshold, it means that the sea conditions are general, and taking the method of pulling out all the pile legs at the same time is helpful to reduce the possibility of capsizing of the jack-up platform when pulling out the pile legs; when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, it means that the sea conditions are poor, and the pulling out of the pile legs should be suspended to prevent the jack-up platform from capsizing and being damaged.
[0051] The second invention objective of this application is achieved by the following technical solution:
[0052] The pressure difference opening and closing mode switching system based on the pile driving demand of the jack-up platform is applied to any of the above-mentioned pressure difference opening and closing mode switching methods based on the pile driving demand of the jack-up platform, comprising:
[0053] A pile bottom pressure value acquisition module is used to receive a pile pulling instruction to acquire a pile bottom pressure value at the bottom of the pile leg, and compare the pile bottom pressure value with a preset pressure threshold group;
[0054] A spraying work execution module, used for generating a pile punching start instruction to control the automatic opening and closing high-efficiency spray valve to perform the spraying work when the pile bottom pressure value is less than the first pressure value;
[0055] A spraying work suspension module is used to generate a pile impact suspension instruction to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work when the pile bottom pressure value is greater than the second pressure value;
[0056] The pressure threshold group includes a first pressure value and a second pressure value, and the first pressure value is less than the second pressure value; the self-elevating platform includes a platform body, the platform body is movably connected to a plurality of pile legs, and is provided with a driving component for driving the pile legs to rise and fall, the platform body is provided with a pumping and drainage component, and an automatic opening and closing high-efficiency spray valve is provided at the bottom of the pile legs, and the automatic opening and closing high-efficiency spray valve is connected to the pumping and drainage component.
[0057] In a preferred example, the present application also includes:
[0058] The pile-insertion sea condition analysis module is used to receive pile-insertion planning instructions, obtain weather forecast information at the platform operation site, and generate pile-insertion wind vectors, pile-insertion ocean current vectors, operation wind vectors, and operation ocean current vectors according to the preset pile-insertion time period, the next operation cycle time period, and weather forecast information;
[0059] A pile insertion sequence determination module is used to determine an operation comprehensive vector based on an operation wind vector and an operation ocean current vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, and determine the pile insertion sequence of each pre-pile insertion point based on the pile insertion comprehensive vector;
[0060] The pile leg pre-drop instruction generation module is used to obtain the water depth value of each pre-pile insertion point, calculate the pile leg pre-drop depth based on the water depth value and the preset pile insertion buffer value, so as to generate the pile leg pre-drop instruction and send it to the corresponding drive component;
[0061] The step of determining the wind vector includes:
[0062] S401: determining the main wind direction and main wind speed of all time units in the target period based on the weather forecast information, and determining the corresponding wind unit vector according to the angle value of the main wind direction and the main wind speed of each time unit;
[0063] S402: Calculate the sum vector of all wind unit vectors in the target period, and determine the wind force vector based on the direction and magnitude of the sum vector;
[0064] The steps to determine the ocean current vector include:
[0065] S403: determining the mainstream direction and mainstream velocity of all time units in the target period based on the weather forecast information, and determining the corresponding ocean current unit vector according to the angle value and mainstream velocity of the mainstream direction of each time unit;
[0066] S404: Calculate the sum vector of all ocean current unit vectors within the target period, and determine the ocean current vector based on the direction and magnitude of the sum vector.
[0067] In a preferred example of the present application: the pile bottom pressure value acquisition module includes:
[0068] The pile pulling comprehensive vector calculation submodule is used to obtain the weather forecast information of the platform operation site, generate the pile pulling wind force vector and the pile pulling ocean current vector according to the preset pile pulling time period and weather forecast information, and determine the pile pulling comprehensive vector based on the pile pulling wind force vector and the pile pulling ocean current vector;
[0069] A safe sea condition pile pulling planning submodule is used to determine the pile pulling sequence corresponding to each pile leg based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large when the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold;
[0070] The normal sea condition pile pulling planning submodule is used to set the pile pulling sequence of each pile leg to be pulled out simultaneously when the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold;
[0071] The risk sea condition pile pulling planning submodule is used to generate a pile pulling suspension instruction when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold.
[0072] The third invention objective of this application is achieved by the following technical solution:
[0073] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, the steps of the pressure difference opening and closing mode switching method based on the pile driving demand of a self-elevating platform are implemented.
[0074] The fourth invention objective of this application is achieved by the following technical solution:
[0075] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps of the pressure difference opening and closing mode switching method based on the pile driving demand of a self-elevating platform.
[0076] In summary, the present application includes at least one of the following beneficial technical effects:
[0077] 1. The platform body of the jack-up platform is used to carry and install pile legs, drive components, pumping and drainage components and water operation equipment, etc. The drive components are used to drive the pile legs to rise and fall so as to insert the pile legs into the river / seabed or drive the pile legs to be pulled out from the river / seabed. The pumping and drainage components are used to control the deadweight of the platform body, thereby assisting in improving the efficiency of plugging and pulling out the pile legs in the river / seabed, and are also used to supply water for the automatic opening and closing of the high-efficiency spray valve; when the pile legs need to be pulled out from the river / seabed, the pile pulling instruction is received, the pressure value at the bottom of the pile legs is detected to obtain the pile bottom pressure value and compare it with the preset pressure threshold The first pressure value is used for comparison to determine whether pile flushing treatment is needed; when the pile bottom pressure value is less than the first pressure value, the vacuum degree at the bottom of the pile leg is relatively large, and a pile flushing start instruction is generated to control the automatic opening and closing of the high-efficiency spray valve to spray water to flush the mud at the bottom of the pile leg, so as to improve the efficiency of pulling out the pile leg from the river / seabed; when the pile bottom pressure value is greater than the second pressure value, the vacuum degree at the bottom of the pile leg is relatively small, and the pile flushing efficiency is relatively low, and the water spraying and pile flushing work of the automatic opening and closing of the high-efficiency spray valve is suspended to reduce unnecessary energy consumption, thereby intelligently improving the efficiency of pulling out the pile legs of the jack-up platform.
[0078] 2. Obtain the weather forecast information at the platform operation site, combine it with the pile pulling period to generate the pile pulling wind vector and the pile pulling current vector, and further determine the pile pulling comprehensive vector, so as to know the comprehensive sea conditions during the pile pulling period; when the modulus of the pile pulling comprehensive vector is less than the preset first pile pulling sea condition threshold, it means that the sea conditions at the platform operation site are good, and the pile pulling sequence of the pile legs is determined based on the angle between each pile leg vector and the pile insertion comprehensive vector in order from small to large, so as to first pull out the pile leg away from the side of the combined force of the comprehensive sea condition on the jack-up platform, so as to utilize the force of the sea condition on the jack-up platform to improve the pulling efficiency of the pile leg pulled out later; when the modulus of the pile pulling comprehensive vector is between the first pile pulling sea condition threshold and the second pile pulling sea condition threshold, it means that the sea conditions are general, and taking the method of pulling out all the pile legs at the same time will help reduce the possibility of capsizing of the jack-up platform when pulling out the pile legs; when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, it means that the sea conditions are poor, and the pulling out of the pile legs should be suspended to prevent the jack-up platform from capsizing and being damaged.
[0079] 3. Before performing the pile driving operation, receive the pile driving planning instruction to obtain the weather forecast information of the platform operation site, and determine the pile driving wind vector and pile driving current vector corresponding to the pile driving period, as well as the operation wind vector and operation current vector corresponding to the operation cycle period in combination with the preset pile driving period and the time information of the next operation cycle period, so as to facilitate the subsequent analysis of the sea conditions during pile driving and water operations; plan the pre-pile driving points according to the sea conditions in the next operation cycle period to improve the rationality of the pile driving position of the self-elevating platform, and plan the pile driving sequence of each pre-pile driving point during pile driving according to the sea conditions in the pile driving period to reduce the degree to which the self-elevating platform is affected by the sea conditions during pile driving; obtain the water depth value of each pre-pile driving point, calculate the pre-drop depth of the pile leg based on the water depth value and the pile driving buffer value, and generate the pile leg pre-drop instruction based on the pile leg pre-drop depth, so as to improve the pile driving efficiency when performing the pile driving work later. BRIEF DESCRIPTION OF THE DRAWINGS
[0080] Figure 1 It is a flow chart of the pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform in Example 1 of the present application.
[0081] Figure 2 It is a principle block diagram of a pressure difference opening and closing mode switching system based on the pile driving demand of a self-elevating platform in Example 2 of the present application.
[0082] Figure 3 It is a schematic diagram of the equipment in Example 3 of the present application. DETAILED DESCRIPTION
[0083] The following is combined with Figures 1 to 3 This application is described in further detail.
[0084] Embodiment 1
[0085] Reference Figure 1 The present application discloses a pressure difference opening and closing mode switching method based on the pile driving demand of a self-elevating platform, wherein the self-elevating platform includes a platform body, the platform body is movably connected with a plurality of pile legs, the platform body is provided with a driving assembly for driving the pile legs to vertically lift and lower, the platform body is provided with a pumping and drainage assembly, the pumping and drainage assembly is provided with a water storage container, and an automatic opening and closing high-efficiency spray valve as shown in Chinese utility model patent CN220646981U is provided at the bottom of the pile leg, and the automatic opening and closing high-efficiency spray valve is connected to the pumping and drainage assembly.
[0086] The platform body of the jack-up platform is used to carry and install pile legs, drive components, pumping and drainage components and other water operation equipment. The drive components are used to drive the pile legs to rise and fall so as to insert the pile legs into the river / seabed or drive the pile legs to be pulled out of the river / seabed. The pumping and drainage components are used to control the deadweight of the platform body, thereby adjusting the deadweight of the jack-up platform or the buoyancy in the water to assist in improving the insertion and extraction efficiency of the pile legs in the river / seabed, and are also used to supply water for the automatic opening and closing of high-efficiency spray valves.
[0087] The pressure difference opening and closing mode switching method based on the pile driving demand of the jack-up platform specifically includes the following steps:
[0088] S10: receiving a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and comparing the pile bottom pressure value with a preset pressure threshold group.
[0089] In this embodiment, the pressure threshold group includes a first pressure value and a second pressure value, the first pressure value is smaller than the second pressure value, and the second pressure value is smaller than the water pressure value at the bottom elevation of the pile leg.
[0090] Specifically, when the pile leg needs to be pulled out from the river / seabed, a pile pulling instruction is received, the pressure value at the bottom of the pile leg is detected to obtain the pile bottom pressure value and compare it with the preset pressure threshold group to determine whether pile punching is required.
[0091] S20: When the pile bottom pressure value is less than the first pressure value, a pile impact start instruction is generated to control the automatic opening and closing high-efficiency spray valve to perform spraying.
[0092] Specifically, when the pile bottom pressure value is less than the first pressure value, the vacuum degree at the bottom of the pile leg is relatively large, and a pile-punching start instruction is generated to control the automatic opening and closing of the high-efficiency spray valve to spray water to flush the mud and sand at the bottom of the pile leg, so as to destroy the vacuum environment formed at the bottom of the pile leg in the river / seabed and improve the efficiency of pulling the pile leg out of the river / seabed.
[0093] S30: When the pile bottom pressure value is greater than the second pressure value, a pile impact suspension instruction is generated to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work.
[0094] Specifically, when the pile bottom pressure value is greater than the second pressure value, the vacuum degree at the bottom of the pile leg is small, the pile punching efficiency is low, and the water spraying pile punching work of the automatic opening and closing high-efficiency spray valve is suspended to reduce unnecessary energy consumption, thereby intelligently improving the efficiency of pulling out the pile legs of the self-elevating platform.
[0095] Among them, the pressure difference opening and closing mode switching method based on the pile punching demand of the self-elevating platform also includes:
[0096] S40: Receive a pile-insertion planning instruction, obtain weather forecast information for the platform operation site, and generate a pile-insertion wind vector, a pile-insertion ocean current vector, an operation wind vector, and an operation ocean current vector according to a preset pile-insertion time period, a next operation cycle time period, and weather forecast information.
[0097] In this embodiment, weather forecast information refers to information obtained from authoritative meteorological agencies, including at least wind direction, wind speed, ocean current direction, and ocean current velocity; pile insertion period refers to the planned period for the self-elevating platform to perform the pile insertion work of inserting the pile legs into the river / seabed; operation cycle period refers to a number of time periods obtained by dividing the water operation time of the self-elevating platform. Preferably, each operation cycle period can be a week, a month, or can be divided according to the occurrence time of risk meteorological events such as typhoons; pile insertion wind vector refers to the wind vector within the pile insertion period, pile insertion ocean current vector refers to the ocean current vector within the pile insertion period, operation wind vector refers to the wind vector within the next operation cycle period, and operation ocean current vector refers to the ocean current vector within the next operation cycle period; all vectors and directions mentioned in this embodiment are located in a plane coordinate system on the sea level.
[0098] The wind direction is determined according to the wind direction judgment interval, and the angle value of the wind direction is the middle value of the upper limit angle and the lower limit angle of the corresponding wind direction judgment interval. Preferably, there are 18 wind direction judgment intervals, with the east direction as 0°, and the wind direction judgment intervals are (350°, 10°], (10°, 30°], (30°, 50°], (50°, 70°], (70°, 90°], (90°, 110°], (110°, 130°], (130°, 150°], (150°, 170°], (170°, 190°], (190°, 210°], (210°, 230°], (23 [0°, 250°], [250°, 270°], [270°, 290°], [290°, 310°], [310°, 330°], [330°, 350°], and the corresponding wind direction angle values are 0°, 20°, 40°, 60°, 80°, 100°, 120°, 140°, 160°, 180°, 200°, 220°, 240°, 260°, 280°, 300°, 320°, 340° respectively; for example, if the actual angle of the current wind direction is 5°, which is within the wind direction judgment interval of (350°, 10°], then the current wind direction is determined to be 0°.
[0099] The step of determining the wind vector includes:
[0100] S401: Determine the main wind direction and main wind speed of all time units in the target period based on the weather forecast information, and determine the corresponding wind unit vector according to the angle value of the main wind direction and the main wind speed of each time unit.
[0101] S402: Calculate the sum vector of all wind unit vectors within the target period, and determine the wind force vector based on the direction and magnitude of the sum vector.
[0102] In this embodiment, a time unit refers to a number of time periods equal to or not greater than a unit time obtained by dividing a target time period, wherein a unit time may be 10 minutes, 30 minutes or 60 minutes, and the specific time may refer to the update time of the weather forecast information or the data granularity; the main wind direction is the wind direction with the longest duration in a time unit, and the main wind speed refers to the average wind speed in the main wind direction in a time unit.
[0103] The flow direction is determined according to the flow direction judgment interval, and the angle value of the flow direction is the middle value of the upper limit angle and the lower limit angle of the corresponding flow direction judgment interval. Preferably, there are 18 flow direction judgment intervals, with the east direction as 0°, and the flow direction judgment intervals are (350°, 10°], (10°, 30°], (30°, 50°], (50°, 70°], (70°, 90°], (90°, 110°], (110°, 130°], (130°, 150°], (150°, 170°], (170°, 190°], (1 [90°, 210°], (210°, 230°], (230°, 250°], (250°, 270°], (270°, 290°], (290°, 310°], (310°, 330°], (330°, 350°], and the corresponding flow direction angle values are 0°, 20°, 40°, 60°, 80°, 100°, 120°, 140°, 160°, 180°, 200°, 220°, 240°, 260°, 280°, 300°, 320°, 340° respectively.
[0104] The steps to determine the ocean current vector include:
[0105] S403: determining the mainstream direction and mainstream velocity of all time units in the target period based on the weather forecast information, and determining the corresponding ocean current unit vector according to the angle value and mainstream velocity of the mainstream direction of each time unit;
[0106] S404: Calculate the sum vector of all ocean current unit vectors within the target period, and determine the ocean current vector based on the direction and magnitude of the sum vector.
[0107] In this embodiment, the main flow direction is the flow direction with the longest duration in a time unit, and the main flow velocity refers to the average flow velocity in the main flow direction in a time unit.
[0108] Specifically, before performing the pile driving operation, the pile driving planning instructions are received to obtain the weather forecast information of the platform operation site, and the pile driving wind vector and pile driving current vector corresponding to the pile driving period are determined in combination with the time information of the preset pile driving period and the next operation cycle period, as well as the operation wind vector and operation current vector corresponding to the operation cycle period, so as to facilitate the subsequent analysis of the sea conditions during pile driving and water operations.
[0109] S50: Determine an operation comprehensive vector based on the operation wind vector and the operation current vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion current vector, and determine the pile insertion order of each pre-pile insertion point based on the pile insertion comprehensive vector.
[0110] In this embodiment, the order of pre-insertion pile points is related to the pre-drop depth of the corresponding pile legs. The pre-drop depth of the pile legs in the front order is 10 cm or 20 cm greater than the pre-drop depth of the pile legs in the back order.
[0111] Specifically, according to the sea conditions in the next operation cycle, the pre-pile insertion points are planned to improve the rationality of the pile insertion position of the self-elevating platform. According to the sea conditions in the pile insertion period, the pile insertion sequence of each pre-pile insertion point is planned during the pile insertion to reduce the degree to which the self-elevating platform is affected by the sea conditions during the pile insertion period.
[0112] Among them, a number of pile legs are evenly arranged around the platform body; the center points of the pile legs and the platform center point constitute a corresponding pile leg vector, and the direction of the pile leg vector is from the platform center point to the pile leg center point, wherein the pile leg center point is the geometric center point of the projection of the pile legs on the sea level, and the platform center point is the geometric center point of the projection of the platform body on the sea level; each pile leg of the self-elevating platform is arranged around the platform body, and a number of pile leg vectors are determined based on the pile leg center point and the platform center point, which is convenient for subsequent planning of the pre-insertion pile points of each pile leg.
[0113] In step S50, it includes:
[0114] S51: Calculate the operation comprehensive vector. If the number of pile legs is an odd number, align the platform center point with the target center point, and one pile leg vector is collinear with the operation comprehensive vector to determine each pre-insertion pile point. If the number of pile legs is an even number, align the platform center point with the target center point, and two pile leg vectors in opposite directions are collinear with the operation comprehensive vector to determine each pre-insertion pile point.
[0115] In this embodiment, the calculation formula of the operation comprehensive vector is:
[0116]
[0117] is the operation comprehensive vector, k Wis the wind influence coefficient, k C is the ocean current influence coefficient, is the operating wind force vector, is the operating current vector.
[0118] Specifically, the operation comprehensive vector is calculated to obtain the main direction of the force exerted by the sea conditions on the self-elevating platform during the water operation. If the number of pile legs is an odd number, one pile leg vector is made to be collinear with the operation comprehensive vector. If the number of pile legs is an even number, two pile leg vectors in opposite directions are made to be collinear with the operation comprehensive vector, so that each pile leg can be symmetrically arranged relative to the operation comprehensive vector, thereby improving the stability of the self-elevating platform during operation.
[0119] S52: Calculate the pile insertion comprehensive vector, and determine the pile insertion order of the pre-pile insertion points corresponding to each pile leg based on the angles between the straight line where each pile leg vector is located and the straight line where the pile insertion comprehensive vector is located in ascending order.
[0120] In this embodiment, the calculation formula of the plugging comprehensive vector is:
[0121]
[0122] is the instrumentation synthesis vector, is the wind force vector for the pile, is the plugged current vector.
[0123] Specifically, the comprehensive vector of pile insertion is calculated to obtain the main direction of the force exerted by the sea conditions on the self-elevating platform during the pile insertion work, and the pile insertion order is determined in order from small to large based on the angle between the straight line where each pile leg vector is located and the straight line where the comprehensive vector of pile insertion is located, so as to improve the stability of the self-elevating platform during the pile insertion work.
[0124] Before step S50, the method further includes:
[0125] S53: Acquire the platform status information of the jack-up platform to determine the mass center height H of the jack-up platform G , frontal area S W 、Floating center depth H -M and frontage area S C .
[0126] In this embodiment, the platform status information includes status information on the self-elevating platform that may change the center of mass position and the center of buoyancy position of the self-elevating platform, including at least the elevation height information of each pile leg relative to the sea level, the water storage capacity and water storage position information of the drainage assembly, etc.
[0127] Center of mass height H GIt refers to the height of the center of mass of the jack-up platform relative to the sea level. It takes a positive value when the center of mass is higher than the sea level. The windward area refers to the projection area of the jack-up platform above the sea level perpendicular to the wind vector in the current period. The buoyancy center depth H -M It refers to the depth of the buoyancy center of the jack-up platform relative to the sea level. It takes a positive value when the buoyancy center is below the sea level. The headwater area refers to the projection area of the jack-up platform below the sea level perpendicular to the ocean current vector in the current period.
[0128] Specifically, since the degree to which the jack-up platform is affected by wind on the sea surface mainly depends on the windward area and the height of the center of mass of the jack-up platform, and the degree to which it is affected by ocean currents mainly depends on the waterfront area and the depth of the center of buoyancy of the jack-up platform, the platform status information of the jack-up platform is obtained to evaluate the center of mass, center of buoyancy position, windward area, and waterfront area of the jack-up platform, and then determine the center of mass height and center of buoyancy depth, so as to subsequently evaluate the degree to which the jack-up platform is affected by wind and ocean currents.
[0129] S54: Based on the centroid height H G , frontal area S W 、Floating center depth H -M , frontage area S C , the preset wind influence coefficient calculation formula and the preset ocean current influence coefficient calculation formula are used to calculate the wind influence coefficient and the ocean current influence coefficient.
[0130] In this embodiment, the calculation formula of the wind force influence coefficient is:
[0131] k W =(k1H G +B1)S W
[0132] The calculation formula of ocean current influence coefficient is:
[0133] k C =(k2H -M +B2)S C
[0134] Among them, k1 is the first influence coefficient, B1 is the first influence adjustment value, k2 is the second influence coefficient, B2 is the second influence adjustment value, and the values of the first influence coefficient, the first influence adjustment value, the second influence coefficient, and the second influence adjustment value can be set and adjusted according to actual needs.
[0135] Specifically, based on the center of mass height, windward area, center of buoyancy depth, waterfront area, wind influence coefficient calculation formula and ocean current influence coefficient calculation formula, the wind influence coefficient and ocean current influence coefficient are calculated to improve the accuracy of the operation comprehensive vector and pile driving comprehensive vector evaluation.
[0136] S60: Obtain the water depth value of each pre-pile insertion point, calculate the pile leg pre-drop depth based on the water depth value and the preset pile insertion buffer value, generate a pile leg pre-drop instruction and send it to the corresponding drive component.
[0137] In this embodiment, the number of pre-inserted pile points is consistent with the number of pile legs and corresponds one to one.
[0138] Specifically, the water depth value of each pre-pile insertion point is obtained, the pile leg pre-drop depth is calculated based on the water depth value and the pile insertion buffer value, and the pile leg pre-drop instruction is generated based on the pile leg pre-drop depth, so as to improve the pile insertion efficiency when the pile insertion work is performed subsequently.
[0139] Before step S10, the method further includes:
[0140] S11: Obtain weather forecast information at the platform operation site, generate a pile pulling wind vector and a pile pulling current vector according to a preset pile pulling time period and weather forecast information, and determine a comprehensive pile pulling vector based on the pile pulling wind vector and the pile pulling current vector.
[0141] In this embodiment, the calculation formula of the pile pulling comprehensive vector is:
[0142]
[0143] is the comprehensive vector of pile pulling, is the wind force vector for pile pulling, is the pile pulling current vector; the first pile pulling sea condition threshold is less than the second pile pulling sea condition threshold, and the first pile pulling sea condition threshold and the second pile pulling sea condition threshold are both thresholds used to compare with the modulus of the pile pulling comprehensive vector.
[0144] Specifically, the weather forecast information of the platform operation site is obtained, combined with the pile pulling period to generate the pile pulling wind vector and the pile pulling current vector, and the pile pulling comprehensive vector is further determined to obtain the comprehensive sea conditions during the pile pulling period.
[0145] S12: When the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold, the pile pulling sequence corresponding to each pile leg is determined based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large.
[0146] Specifically, when the modulus of the pile pulling comprehensive vector is less than the preset first pile pulling sea condition threshold, it means that the sea condition at the platform operation site is good, and the pile pulling order of the pile legs is determined based on the angle between each pile leg vector and the pile insertion comprehensive vector in ascending order, so as to first pull out the pile leg away from the side where the combined force of the comprehensive sea condition on the self-elevating platform is applied, so as to utilize the force of the sea condition on the self-elevating platform to improve the pulling out efficiency of the pile legs that are pulled out later.
[0147] S13: When the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold, the pile pulling sequence of each pile leg is set to be pulled out simultaneously.
[0148] Specifically, when the modulus of the pile extraction comprehensive vector is between the first pile extraction sea condition threshold and the second pile extraction sea condition threshold, it indicates that the sea condition is general, and pulling out all pile legs simultaneously can help reduce the possibility of capsizing of the jack-up platform when pulling out the pile legs.
[0149] S14: When the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, a pile pulling suspension instruction is generated.
[0150] Specifically, when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, it indicates that the sea condition is poor and the pulling out of the pile legs should be suspended to prevent the jack-up platform from capsizing and being damaged.
[0151] It should be understood that the serial numbers of the steps in the above embodiments do not imply a sequence of execution. The execution sequence of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present application.
[0152] Embodiment 2
[0153] A pressure differential opening and closing mode switching system based on the pile driving demand of a self-elevating platform corresponds to the pressure differential opening and closing mode switching method based on the pile driving demand of a self-elevating platform in the above-mentioned embodiment.
[0154] like Figure 2 As shown in the figure, the pressure difference opening and closing mode switching system based on the pile driving demand of the self-elevating platform includes a pile bottom pressure value acquisition module, a spraying work execution module and a spraying work suspension module. The detailed description of each functional module is as follows:
[0155] A pile bottom pressure value acquisition module is used to receive a pile pulling instruction to acquire a pile bottom pressure value at the bottom of the pile leg, and compare the pile bottom pressure value with a preset pressure threshold group;
[0156] A spraying work execution module, used for generating a pile punching start instruction to control the automatic opening and closing high-efficiency spray valve to perform the spraying work when the pile bottom pressure value is less than the first pressure value;
[0157] The spraying work suspension module is used to generate a pile impact suspension instruction to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work when the pile bottom pressure value is greater than the second pressure value.
[0158] Among them, the pile bottom pressure value acquisition module also includes:
[0159] The pile pulling comprehensive vector calculation submodule is used to obtain the weather forecast information of the platform operation site, generate the pile pulling wind force vector and the pile pulling ocean current vector according to the preset pile pulling time period and weather forecast information, and determine the pile pulling comprehensive vector based on the pile pulling wind force vector and the pile pulling ocean current vector;
[0160] A safe sea condition pile pulling planning submodule is used to determine the pile pulling sequence corresponding to each pile leg based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large when the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold;
[0161] The normal sea condition pile pulling planning submodule is used to set the pile pulling sequence of each pile leg to be pulled out simultaneously when the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold;
[0162] The risk sea condition pile pulling planning submodule is used to generate a pile pulling suspension instruction when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold.
[0163] Among them, the pressure difference opening and closing mode switching system based on the pile driving requirements of the self-elevating platform also includes:
[0164] The pile-insertion sea condition analysis module is used to receive pile-insertion planning instructions, obtain weather forecast information at the platform operation site, and generate pile-insertion wind vectors, pile-insertion ocean current vectors, operation wind vectors, and operation ocean current vectors according to the preset pile-insertion time period, the next operation cycle time period, and weather forecast information;
[0165] A pile insertion sequence determination module is used to determine an operation comprehensive vector based on an operation wind vector and an operation ocean current vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, and determine the pile insertion sequence of each pre-pile insertion point based on the pile insertion comprehensive vector;
[0166] The pile leg pre-lowering instruction generation module is used to obtain the water depth value of each pre-pile insertion point, calculate the pile leg pre-lowering depth based on the water depth value and the preset pile insertion buffer value, so as to generate the pile leg pre-lowering instruction and send it to the corresponding drive component.
[0167] The plugging sequence determination module also includes:
[0168] The pre-insertion pile point determination submodule is used to calculate the operation comprehensive vector. If the number of pile legs is an odd number, the platform center point is aligned with the target center point, and one pile leg vector is collinear with the operation comprehensive vector to determine each pre-insertion pile point. If the number of pile legs is an even number, the platform center point is aligned with the target center point, and two pile leg vectors in opposite directions are collinear with the operation comprehensive vector to determine each pre-insertion pile point.
[0169] The plugging sequence determination submodule is used to calculate the plugging comprehensive vector and determine the plugging sequence of the pre-plugging points corresponding to each pile leg based on the angle between the straight line where each pile leg vector is located and the straight line where the plugging comprehensive vector is located in ascending order.
[0170] The plugging sequence determination module also includes:
[0171] The platform status analysis submodule is used to obtain the platform status information of the jack-up platform to determine the center of mass height H of the jack-up platform. G , frontal area S W 、Floating center depth H -M and frontage area S C ;
[0172] The influence coefficient evaluation submodule is used to evaluate the influence coefficient based on the centroid height H G , frontal area S W 、Floating center depth H -M , frontage area S C , the preset wind influence coefficient calculation formula and the preset ocean current influence coefficient calculation formula are used to calculate the wind influence coefficient and the ocean current influence coefficient.
[0173] For the specific limitations of the pressure differential opening and closing mode switching system based on the pile driving requirements of the self-elevating platform, please refer to the limitations of the pressure differential opening and closing mode switching method based on the pile driving requirements of the self-elevating platform above, which will not be repeated here; each module in the above-mentioned pressure differential opening and closing mode switching system based on the pile driving requirements of the self-elevating platform can be fully or partially implemented by software, hardware and their combination; each of the above-mentioned modules can be embedded in or independent of the processor in the computer device in the form of hardware, or can be stored in the memory of the computer device in the form of software, so that the processor can call and execute the corresponding operations of each of the above modules.
[0174] Embodiment 3
[0175] A computer device, which may be a server, may have an internal structure as shown in Figure 3 As shown. The computer device includes a processor, a memory, a network interface and a database connected through a system bus. Among them, the processor of the computer device is used to provide computing and control capabilities. The memory of the computer device includes a non-volatile storage medium and an internal memory. The non-volatile storage medium stores an operating system, a computer program and a database. The internal memory provides an environment for the operation of the operating system and the computer program in the non-volatile storage medium. The database of the computer device is used to store data such as pile pulling instructions, pile bottom pressure values, pressure threshold groups, pile driving start instructions and pile driving pause instructions. The network interface of the computer device is used to communicate with an external terminal through a network connection. When the computer program is executed by the processor, a pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform is implemented.
[0176] In one embodiment, a computer device is provided, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program:
[0177] S10: receiving a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and comparing the pile bottom pressure value with a preset pressure threshold group;
[0178] S20: when the pile bottom pressure value is less than the first pressure value, generating a pile punching start instruction to control the automatic opening and closing high-efficiency spray valve to perform spraying;
[0179] S30: When the pile bottom pressure value is greater than the second pressure value, a pile impact suspension instruction is generated to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work.
[0180] In one embodiment, a computer readable storage medium is provided, on which a computer program is stored, and when the computer program is executed by a processor, the following steps are implemented:
[0181] S10: receiving a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and comparing the pile bottom pressure value with a preset pressure threshold group;
[0182] S20: when the pile bottom pressure value is less than the first pressure value, generating a pile punching start instruction to control the automatic opening and closing high-efficiency spray valve to perform spraying;
[0183] S30: When the pile bottom pressure value is greater than the second pressure value, a pile impact suspension instruction is generated to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work.
[0184] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory can include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory can include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink), DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).
[0185] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0186] The embodiments described above are only used to illustrate the technical solutions of the present application, rather than to limit them. Although the present application has been described in detail with reference to the aforementioned embodiments, it should be understood by those skilled in the art that the technical solutions described in the aforementioned embodiments may still be modified, or some of the features thereof may be replaced by equivalents. Such modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present application, and should all be included in the protection scope of the present application.
Claims
1. A pressure differential opening and closing mode switching method based on the pile punching requirements of the jack-up platform. It is characterized in that include: Receiving a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and comparing the pile bottom pressure value with a preset pressure threshold group; When the pile bottom pressure value is less than the first pressure value, a pile punching start instruction is generated to control the automatic opening and closing high-efficiency spray valve to perform spraying; When the pile bottom pressure value is greater than the second pressure value, a pile impact pause instruction is generated to control the automatic opening and closing high-efficiency spray valve to pause the spraying work; The pressure threshold group includes a first pressure value and a second pressure value, and the first pressure value is less than the second pressure value; the self-elevating platform includes a platform body, the platform body is movably connected to a plurality of pile legs, and is provided with a driving component for driving the pile legs to rise and fall, the platform body is provided with a pumping and drainage component, and an automatic opening and closing high-efficiency spray valve is provided at the bottom of the pile legs, and the automatic opening and closing high-efficiency spray valve is connected to the pumping and drainage component.
2. The pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform according to claim 1, Features: Also includes: Receive the pile-insertion planning instruction, obtain the weather forecast information of the platform operation site, and generate the pile-insertion wind vector, pile-insertion ocean current vector, operation wind vector and operation ocean current vector according to the preset pile-insertion time period, the next operation cycle time period and the weather forecast information; Based on the operation wind vector and the operation current vector, determine the operation comprehensive vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine the pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion current vector, and determine the pile insertion order of each pre-pile insertion point based on the pile insertion comprehensive vector; Obtain the water depth value of each pre-insertion pile point, calculate the pile leg pre-drop depth based on the water depth value and the preset pile insertion buffer value, so as to generate a pile leg pre-drop instruction and send it to the corresponding drive component; The step of determining the wind vector includes: S401: determining the main wind direction and main wind speed of all time units in the target period based on the weather forecast information, and determining the corresponding wind unit vector according to the angle value of the main wind direction and the main wind speed of each time unit; S402: Calculate the sum vector of all wind unit vectors in the target period, and determine the wind force vector based on the direction and magnitude of the sum vector; The steps to determine the ocean current vector include: S403: determining the mainstream direction and mainstream velocity of all time units in the target period based on the weather forecast information, and determining the corresponding ocean current unit vector according to the angle value and mainstream velocity of the mainstream direction of each time unit; S404: Calculate the sum vector of all ocean current unit vectors within the target period, and determine the ocean current vector based on the direction and magnitude of the sum vector.
3. The pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform according to claim 2, Features: The legs are evenly arranged around the platform body; the leg center points and the platform center point form corresponding leg vectors, wherein the leg center point is the geometric center point of the projection of the legs on the sea level, and the platform center point is the geometric center point of the projection of the platform body on the sea level; The method of determining an operation comprehensive vector based on an operation wind vector and an operation ocean current vector, determining each pre-pile insertion point based on the operation comprehensive vector, determining a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, and determining a pile insertion sequence of each pre-pile insertion point based on the pile insertion comprehensive vector includes: Calculate the operation comprehensive vector. If the number of pile legs is an odd number, align the platform center point with the target center point, and one pile leg vector is collinear with the operation comprehensive vector to determine each pre-insertion pile point. If the number of pile legs is an even number, align the platform center point with the target center point, and two pile leg vectors in opposite directions are collinear with the operation comprehensive vector to determine each pre-insertion pile point. Calculate the pile insertion comprehensive vector, and determine the pile insertion order of the pre-pile insertion points corresponding to each pile leg based on the angle between the straight line where each pile leg vector is located and the straight line where the pile insertion comprehensive vector is located in ascending order; Among them, the calculation formula of the operation comprehensive vector is: The calculation formula of the instrumentation comprehensive vector is: is the operation comprehensive vector, k W is the wind influence coefficient, k C is the ocean current influence coefficient, is the operating wind force vector, is the operating current vector, is the instrumentation synthesis vector, is the wind force vector of the pile, is the plugged current vector.
4. The pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform according to claim 2, Features: Before determining the operation comprehensive vector based on the operation wind vector and the operation ocean current vector, and determining the pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, the method further includes: Obtain the platform status information of the jack-up platform to determine the center of mass height H of the jack-up platform G , frontal area S W 、Floating center depth H -M and frontage area S C ; Based on the centroid height H G , frontal area S W 、Floating center depth H -M , frontage area S C , the preset wind force influence coefficient calculation formula and the preset ocean current influence coefficient calculation formula are used to calculate the wind force influence coefficient and the ocean current influence coefficient; The calculation formula of wind influence coefficient is: k W =(k 1 H G +B 1 )S W The calculation formula of ocean current influence coefficient is: k C =(k 2 H -M +B 2 )S C where k 1 is the first influence coefficient, B 1 is the first impact adjustment value, k 2 is the second influence coefficient, B 2 Adjust the value for the second impact; The center of mass height H G It refers to the height of the mass center of the jack-up platform relative to the sea level. The windward area refers to the projection area of the jack-up platform above the sea level perpendicular to the wind vector in the current period. The buoyancy center depth H -M It refers to the depth of the buoyancy center of the jack-up platform relative to the sea level, and the headwater area refers to the projection area of the jack-up platform below the sea level perpendicular to the ocean current vector in the current period.
5. The pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform according to claim 2, Features: Before receiving the pile pulling instruction to obtain the pile bottom pressure value at the bottom of the pile leg, the method further includes: Obtaining weather forecast information at the platform operation site, generating a pile pulling wind force vector and a pile pulling current vector according to a preset pile pulling time period and weather forecast information, and determining a comprehensive pile pulling vector based on the pile pulling wind force vector and the pile pulling current vector; When the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold, the pile pulling order corresponding to each pile leg is determined based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large; When the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold, the pile pulling sequence of each pile leg is set to be pulled out simultaneously; When the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold, a pile pulling suspension instruction is generated; Among them, the calculation formula of the pile pulling comprehensive vector is: is the comprehensive vector of pile pulling, is the wind force vector for pile pulling, is the pile pulling current vector; the first pile pulling sea condition threshold is less than the second pile pulling sea condition threshold.
6. Pressure difference opening and closing mode switching system based on the pile driving requirements of the self-elevating platform, It is characterized in that The pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform as described in any one of claims 1 to 5 comprises: A pile bottom pressure value acquisition module is used to receive a pile pulling instruction to obtain a pile bottom pressure value at the bottom of the pile leg, and compare the pile bottom pressure value with a preset pressure threshold group; A spraying work execution module, used for generating a pile punching start instruction to control the automatic opening and closing high-efficiency spray valve to perform the spraying work when the pile bottom pressure value is less than the first pressure value; A spraying work suspension module is used to generate a pile impact suspension instruction to control the automatic opening and closing high-efficiency spray valve to suspend the spraying work when the pile bottom pressure value is greater than the second pressure value; The pressure threshold group includes a first pressure value and a second pressure value, and the first pressure value is less than the second pressure value; the self-elevating platform includes a platform body, the platform body is movably connected to a plurality of pile legs, and is provided with a driving component for driving the pile legs to rise and fall, the platform body is provided with a pumping and drainage component, and an automatic opening and closing high-efficiency spray valve is provided at the bottom of the pile legs, and the automatic opening and closing high-efficiency spray valve is connected to the pumping and drainage component.
7. The pressure difference opening and closing mode switching system based on the pile driving demand of the self-elevating platform according to claim 6, Features: Also includes: The pile-insertion sea condition analysis module is used to receive pile-insertion planning instructions, obtain weather forecast information at the platform operation site, and generate pile-insertion wind vectors, pile-insertion ocean current vectors, operation wind vectors, and operation ocean current vectors according to the preset pile-insertion time period, the next operation cycle time period, and weather forecast information; A pile insertion sequence determination module is used to determine an operation comprehensive vector based on an operation wind vector and an operation ocean current vector, determine each pre-pile insertion point based on the operation comprehensive vector, determine a pile insertion comprehensive vector based on the pile insertion wind vector and the pile insertion ocean current vector, and determine the pile insertion sequence of each pre-pile insertion point based on the pile insertion comprehensive vector; The pile leg pre-drop instruction generation module is used to obtain the water depth value of each pre-pile insertion point, calculate the pile leg pre-drop depth based on the water depth value and the preset pile insertion buffer value, so as to generate the pile leg pre-drop instruction and send it to the corresponding drive component; The step of determining the wind vector includes: S401: determining the main wind direction and main wind speed of all time units in the target period based on the weather forecast information, and determining the corresponding wind unit vector according to the angle value of the main wind direction and the main wind speed of each time unit; S402: Calculate the sum vector of all wind unit vectors in the target period, and determine the wind force vector based on the direction and magnitude of the sum vector; The steps to determine the ocean current vector include: S403: determining the mainstream direction and mainstream velocity of all time units in the target period based on the weather forecast information, and determining the corresponding ocean current unit vector according to the angle value and mainstream velocity of the mainstream direction of each time unit; S404: Calculate the sum vector of all ocean current unit vectors within the target period, and determine the ocean current vector based on the direction and magnitude of the sum vector.
8. The pressure difference opening and closing mode switching system based on the pile driving demand of the self-elevating platform according to claim 7, Features: The pile bottom pressure value acquisition module includes: The pile pulling comprehensive vector calculation submodule is used to obtain the weather forecast information of the platform operation site, generate the pile pulling wind force vector and the pile pulling ocean current vector according to the preset pile pulling time period and weather forecast information, and determine the pile pulling comprehensive vector based on the pile pulling wind force vector and the pile pulling ocean current vector; A safe sea condition pile pulling planning submodule is used to determine the pile pulling sequence corresponding to each pile leg based on the order of the angles between each pile leg vector and the pile insertion comprehensive vector from small to large when the modulus of the pile pulling comprehensive vector is less than a preset first pile pulling sea condition threshold; The normal sea condition pile pulling planning submodule is used to set the pile pulling sequence of each pile leg to be pulled out simultaneously when the modulus of the pile pulling comprehensive vector is greater than or equal to the first pile pulling sea condition threshold and less than the second pile pulling sea condition threshold; The risk sea condition pile pulling planning submodule is used to generate a pile pulling suspension instruction when the modulus of the pile pulling comprehensive vector is greater than or equal to the second pile pulling sea condition threshold.
9. A computer device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the steps of the pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform are implemented as described in any one of claims 1 to 5.
10. A computer-readable storage medium storing a computer program. It is characterized in that When the computer program is executed by the processor, the steps of the pressure difference opening and closing mode switching method based on the pile driving demand of the self-elevating platform as described in any one of claims 1 to 5 are implemented.
Citation Information
Patent Citations
Automatic opening and closing efficient spray valve
CN220646981U
System and process for monitoring and controlling plugging operation of pile shoe and pile leg of self-elevating platform
CN117250903A
Self-elevating platform pile washing assist device
CN219343186U
Lifting pile easy to pull
CN220813934U
System for bridge scour multi-source monitoring, monitoring method thereof, and scour depth evaluating method thereof
US20210404139A1
Cited By
Platform instrumentation order decision method, electronic device, medium, and program
CN119558008A