Reservoir sediment flocculation settling velocity calculation method
By establishing a one-dimensional non-constant flowing water sand mathematical model and a detailed calculation formula for sediment flocculation and subsidence rate calculation, the problem of low calculation accuracy in the existing technology is solved, and more accurate calculation of sediment flocculation and subsidence rate in reservoirs is achieved, which improves reservoir scheduling. scientific nature.
Patent Information
- Application Number
- CN202411131508.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-18
- Publication Date
- 2024-11-26
AI Technical Summary
The calculation method for sediment flocculation in the existing reservoir is simple and crude, or the formula structure is unreasonable, and the particle size parameters and sand content are not effectively considered, resulting in low calculation accuracy, which is not conducive to scientific scheduling of the reservoir.
A one-dimensional non-constant flowing water sand mathematical model is used to collect relevant data, and a formula for calculating the sediment flocculation rate of reservoir sediment is established. Taking into account the critical particle size, sand content and flow velocity conditions, the flocculation rate of silt of each particle size group is calculated.
The accuracy of silt silt calculation in reservoirs has been improved, technical support is provided for scientific scheduling of reservoirs, and is suitable for silt flocculation and settlement speed calculation in large river reservoirs.
Smart Images

Figure CN119025796A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of water conservancy engineering, and more specifically, to a method for calculating the flocculation settling velocity of reservoir sediment. Background Art
[0002] In the existing research on the calculation of sediment flocculation settling velocity in reservoirs, one is to simply and crudely make the settling velocity of sediment that may flocculate directly equal to the settling velocity of a larger particle size sediment that will not flocculate, and the other is that the sediment flocculation settling velocity calculation formula does not consider the particle size parameter, does not consider the sediment content, or the sediment content considers the mixed sand instead of the flocculated sediment, etc. The existing technology has problems such as simple and crude processing methods or unreasonable formula structure, inconvenient use, etc., which will reduce the calculation accuracy of reservoir sediment scouring and silting, and is not conducive to scientific reservoir scheduling. Summary of the invention
[0003] The purpose of the embodiments of the present application is to provide a method for calculating the flocculation and sedimentation velocity of reservoir sediment, so as to solve the problems that the processing methods in the prior art are simple and crude or the formula structure is unreasonable and inconvenient to use, which will reduce the accuracy of reservoir sediment scouring and siltation calculation.
[0004] To achieve the above objectives, this application provides the following technical solutions:
[0005] The present application provides a method for calculating the sediment flocculation velocity of a reservoir, comprising the following steps:
[0006] Step 1: Collect data on suspended sediment group size, group settling velocity, reservoir river topography, inflow water and sediment, and reservoir dispatching mode;
[0007] Step 2, establishing a one-dimensional non-steady flow and sediment mathematical model for the main and tributary rivers of the reservoir;
[0008] Step 3, calculate the average flow velocity of each section along the reservoir area and the suspended sediment content of different particle size groups;
[0009] Step 4, establishing a calculation formula for reservoir sediment flocculation settling velocity;
[0010] Step 5: For mixed sand with an average sand content greater than 0.3 kg / m 3 The average flow velocity in the perennial backwater section of the reservoir is less than 0.7m / s. The flocculation and sedimentation velocity of each particle size group of sediment less than 0.02mm in the section is calculated according to the sediment flocculation and sedimentation velocity calculation formula of the constructed reservoir.
[0011] The model equation constructed in step 2 is:
[0012] Continuity equation for water flow
[0013] Equations of motion for water flow
[0014] Suspended sediment continuity equation
[0015] Suspended sediment bed deformation equation
[0016] Branch point flow connection equation
[0017] Branch point water level connection equation
[0018] Where: ω is the sediment settling velocity; the subscript i is the section number; Q is the flow rate; A is the water flow area; t is the time; x is the coordinate along the flow path; Z is the water level; K is the section flow modulus; S is the sediment content; S * is the sediment-carrying force of the water flow; ρ′ is the dry bulk density of the sediment; B is the cross-sectional width; g is the acceleration of gravity; α is the recovery saturation coefficient; A d is the suspended sediment scouring and silting area of the riverbed; Ω is the water storage capacity of the branch point; U is the flow velocity; q L , S L are the lateral inflow per unit length of the river section and the corresponding sediment content, respectively.
[0019] In step 4, the formula for calculating the flocculation and settling rate of reservoir sediment is as follows:
[0020]
[0021] In the formula, ω L0 and ω Lf is the non-flocculation settling velocity and flocculation settling velocity of the Lth particle size group, in m / s; D L is the sediment particle size of the Lth particle size group, in m; S is the sum of the sediment content of each particle size group with a particle size less than 0.02 mm, in kg / m 3 ; β1, β2, and n are unknown coefficients and exponents.
[0022] Compared with the prior art, the present invention has the following beneficial effects:
[0023] The present invention can achieve more accurate calculation of sediment flocculation and settling velocity, improve the accuracy of reservoir sediment scouring and silting calculation, and provide technical support for scientific reservoir scheduling. The method of the present invention is also applicable to the calculation of sediment flocculation and settling velocity in other large river-type reservoirs. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for use in the embodiments of the present application will be briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present application and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without paying creative work.
[0025] Figure 1 The figure is a flow chart of a method according to an embodiment of the present invention. DETAILED DESCRIPTION
[0026] The technical solutions in the embodiments of the present application will be described below in conjunction with the drawings in the embodiments of the present application. It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings.
[0027] The terms "comprises," "comprising," or any other variation thereof are intended to encompass non-exclusive inclusion, such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also other elements not explicitly listed, or elements inherent to such process, method, article, or apparatus. In the absence of further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article, or apparatus that includes the element.
[0028] The terms "first", "second", etc. are only used to distinguish one entity or operation from another entity or operation, and should not be understood as indicating or implying relative importance, nor should they be understood as requiring or implying any such actual relationship or order between these entities or operations.
[0029] like Figure 1 As shown, a method for calculating the sediment flocculation velocity of a reservoir comprises the following steps:
[0030] Step 1: Collect data on suspended sediment group size, group settling velocity, reservoir river topography, inflow water and sediment, and reservoir dispatching mode;
[0031] Step 2, establishing a one-dimensional non-steady flow and sediment mathematical model for the main and tributary rivers of the reservoir;
[0032] Step 3, calculate the average flow velocity of each section along the reservoir area and the suspended sediment content of different particle size groups;
[0033] Step 4, establishing a calculation formula for reservoir sediment flocculation settling velocity;
[0034] Step 5: For mixed sand with an average sand content greater than 0.3 kg / m 3The average flow velocity in the perennial backwater section of the reservoir is less than 0.7m / s. The flocculation and sedimentation velocity of each particle size group of sediment less than 0.02mm in the section is calculated according to the sediment flocculation and sedimentation velocity calculation formula of the constructed reservoir.
[0035] The conditions for establishing the sediment flocculation settling velocity calculation formula proposed in the invention are as follows: ① The critical flocculation particle size is determined to be 0.02 mm, and the flocculation effect is not considered for sediments with a particle size greater than 0.02 mm; ② The premise for considering the flocculation effect is that the average sediment content of the mixed sand in the section is greater than 0.3 kg / m3; ③ The premise for considering the flocculation effect is that the average flow velocity in the section is less than 0.7 m / s. When the average flow velocity in the section is between 0.0 and 0.7 m / s, the degree of sediment flocculation does not change with the flow velocity; ④ The influence range of sediment flocculation is determined to be the perennial backwater area of the reservoir; ⑤ The sediment flocculation corrected settling velocity is inversely proportional to the particle size and directly proportional to the sediment content.
[0036] Embodiment 1:
[0037] Collect data on the suspended sediment group size, group sedimentation velocity, reservoir river topography, inflow water and sediment, and reservoir dispatching methods in the SX reservoir;
[0038] Establish a one-dimensional non-steady flow and sediment mathematical model for the main and tributary rivers of the SX reservoir;
[0039] Calculate the average flow velocity of each section along the SX reservoir and the suspended sediment content of different particle size groups;
[0040] Establish a calculation formula for sediment flocculation and settling velocity in SX reservoir;
[0041] For mixed sand with an average sand content greater than 0.3 kg / m 3 The average flow velocity in the perennial backwater section of the SX reservoir is less than 0.7m / s. The flocculation and sedimentation velocity of each particle size group of sediment less than 0.02mm in the section is calculated according to the sediment flocculation and sedimentation velocity calculation formula of the constructed reservoir.
[0042] The changes in the accuracy of sediment scouring and silting simulation in the SX reservoir before and after the improvement of sediment flocculation and settling velocity calculation are shown in Table 1.
[0043] Table 1 Changes in the accuracy of SX reservoir sediment scouring and silting simulation before and after the improvement of sediment flocculation calculation (2003-2017, sediment transport method) Unit: billion t
[0044]
[0045] The above description is only an embodiment of the present application and is not intended to limit the protection scope of the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims
1. A method for calculating the flocculation velocity of reservoir sediment, characterized in that: The following steps are involved: Step 1: Collect data on suspended sediment group size, group settling velocity, reservoir river topography, inflow water and sediment, and reservoir dispatching mode; Step 2, establishing a one-dimensional non-steady flow and sediment mathematical model for the main and tributary rivers of the reservoir; Step 3, calculate the average flow velocity of each section along the reservoir area and the suspended sediment content of different particle size groups; Step 4, establishing a calculation formula for reservoir sediment flocculation settling velocity; Step 5: For mixed sand with an average sand content greater than 0.3 kg / m 3 The average flow velocity in the perennial backwater section of the reservoir is less than 0.7m / s. The flocculation and sedimentation velocity of each particle size group of sediment less than 0.02mm in the section is calculated according to the sediment flocculation and sedimentation velocity calculation formula of the constructed reservoir.
2. A reservoir sediment flocculation settling velocity calculation method according to claim 1, characterized in that: The model equation constructed in step 2 is: Continuity equation for water flow Equations of motion for water flow Suspended sediment continuity equation Suspended sediment bed deformation equation Branch point flow connection equation Branch point water level connection equation Where: ω is the sediment settling velocity; the subscript i is the section number; Q is the flow rate; A is the water flow area; t is the time; x is the coordinate along the flow path; Z is the water level; K is the section flow modulus; S is the sediment content; S * is the sediment-carrying force of the water flow; ρ′ is the dry bulk density of the sediment; B is the cross-sectional width; g is the acceleration of gravity; α is the recovery saturation coefficient; A d is the suspended sediment scouring and silting area of the riverbed; Ω is the water storage capacity of the branch point; U is the flow velocity; q L , S L are the lateral inflow per unit length of the river section and the corresponding sediment content, respectively.
3. A reservoir sediment flocculation settling velocity calculation method according to claim 1, characterized in that: In step 4, the formula for calculating the flocculation and settling rate of reservoir sediment is as follows: In the formula, ω L0 and ω Lf is the non-flocculation settling velocity and flocculation settling velocity of the Lth particle size group, in m / s; D L is the sediment particle size of the Lth particle size group, in m; S is the sum of the sediment content of each particle size group with a particle size less than 0.02 mm, in kg / m 3 ; β1, β2, and n are unknown coefficients and exponents.
