Load data processing method and device, computer equipment and storage medium

By converting the local coordinate system load of the offshore fan into the overall coordinate system load and generating files suitable for SACS software, the problem of load data cannot be directly input is solved, and the efficiency and accuracy of data processing are improved.

CN119026259APending Publication Date: 2024-11-26HUADIAN HEAVY IND CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202410846151.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-27
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the prior art, the load data of offshore fans cannot be directly input into the SACS software, resulting in a large amount of manual editing data writing program, affecting the efficiency of subsequent analysis and verification.

Method used

By obtaining the node information and member information of the target model, the local coordinate system load is converted into the overall coordinate system load based on the timing load file, and the total output file and the target timing load file are generated. The files that can be input into the SACS software are batch generated using an automated program. .

Benefits of technology

Improves file accuracy and conversion efficiency of specified format files, reduces manual editing errors, simplifies data processing flow, and is easy for users to use.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026259A_ABST
    Figure CN119026259A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of data processing, and discloses a load data processing method and device, computer equipment and a storage medium, and the method comprises the steps: obtaining node information and rod piece information of a target model, converting a local coordinate system load into an overall coordinate system load based on a time sequence load file, the node information and the rod piece information, and summarizing the overall coordinate system load according to the node numbers to generate a total output file, and performing data conversion on the total output file to generate a target time sequence load file. According to the method, the files capable of being input into the SACS software are generated in batches by adopting an automatic program, the files do not need to be manually converted, the file accuracy and the conversion efficiency of the files in the specified format are improved, and the user can use the files conveniently.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the field of data processing technology, and in particular to a load data processing method, device, computer equipment and storage medium. Background Art

[0002] At present, the design of offshore wind turbine foundation mainly adopts the separation design method, which has the problem of insufficient coupling between the upper and lower structures. The load uncertainty and risk are often counteracted by increasing the safety reserve. In recent years, the integrated design method has begun to attract attention, considering the wind turbine, tower and foundation as an overall coupling system to avoid distortion of load superposition calculation and reduce the bottom load. At present, the unit and foundation design are respectively the responsibility of the whole machine supplier and the design institute. The design institute provides the foundation model to the whole machine supplier. After the whole machine supplier conducts integrated modeling, it provides the internal forces of all rods under each working condition to the design institute.

[0003] The time series load data provided by the whole machine supplier is the internal force in the local coordinate system of each rod, including 6 directions (force and moment of X, Y, and Z axes). These data cannot be directly input as input loads in SACS (Strutural Anylysis Computer System) software because the software may require load data in a specific format. Since the load file usually has a large amount of data, the manual editing of data into the program is very labor-intensive, affecting the efficiency of subsequent analysis and verification. Summary of the invention

[0004] In view of this, the present invention provides a load data processing method, apparatus, computer equipment and storage medium to generate data that is easy to identify and facilitate subsequent calculation and analysis.

[0005] In a first aspect, the present invention provides a load data processing method, the method comprising:

[0006] Acquire node information and member information of the target model, wherein the node information at least includes node numbers and coordinates, and the member information at least includes a corresponding relationship between member numbers, member start points or end points, and node numbers;

[0007] Convert local coordinate system loads into global coordinate system loads based on time series load files, node information, and member information;

[0008] Summarizing the load of the overall coordinate system according to the node numbers to generate a total output file, wherein the total output file at least includes load information of all nodes at each moment;

[0009] Data conversion is performed on the total output file to generate a target timing load file.

[0010] In an optional implementation, the converting of the local coordinate system load into the global coordinate system load based on the time series load file, the node information and the member information includes:

[0011] Extracting data from the rod information to generate a dictionary, wherein the dictionary at least includes a node number corresponding to each rod, a rod start load file name, and a rod end load file name;

[0012] Based on the dictionary and the time series load file, coordinate transformation is performed on the node coordinates to determine the rotation vector of the overall coordinate system;

[0013] The local coordinate system loads are converted to global coordinate system loads based on the rotation vector of the global coordinate system.

[0014] In an optional implementation, the coordinate transformation of the node coordinates based on the dictionary and the time series load file to determine the rotation vector of the overall coordinate system includes:

[0015] Extracting data from the dictionary and the time series load file to determine the starting number and the ending number of the member;

[0016] Coordinate transformation is performed based on the node coordinates, the member start point number and the member end point number in the node information to determine the rotation vector of the global coordinate system.

[0017] In an optional implementation, extracting data from the dictionary and the time series load file to determine the rod start number and the rod end number includes:

[0018] Traverse all time series load files and extract the load file names;

[0019] Determines the member start number and member end number based on the load file name and dictionary.

[0020] In an optional implementation, the coordinate transformation of the node coordinates, the rod starting point number and the rod end point number in the node information to determine the rotation vector of the global coordinate system includes:

[0021] Read the node coordinates corresponding to each node from the node information;

[0022] Determine the starting point coordinates and the ending point coordinates of each member based on the node coordinates, the member starting point number and the member ending point number;

[0023] A rotation matrix is ​​calculated based on the starting point coordinates and the rod coordinates to determine a rotation vector of the global coordinate system.

[0024] In an optional implementation, the global coordinate system loads are summarized according to the node numbers to generate a total output file, including:

[0025] Sorting and summarizing the data of the global coordinate system load based on the node numbers to generate a first output file;

[0026] The loads of all nodes at each moment are summarized based on the first output file to generate a total output file.

[0027] In an optional implementation manner, performing data conversion on the total output file to generate a target timing load file includes:

[0028] Read the total output file, extract the node number, and generate an original character string;

[0029] The original character string is converted to determine a target character string, and all target character strings are summarized to generate a target timing load file.

[0030] In a second aspect, the present invention provides a load data processing device, the device comprising:

[0031] An information acquisition module, used to acquire node information and rod information of a target model, wherein the node information at least includes a node number and a coordinate, and the rod information at least includes a rod number, a rod starting point or an end point, and a corresponding relationship between a node number;

[0032] Load conversion module, used to convert local coordinate system loads into global coordinate system loads based on time series load files, node information and member information;

[0033] A data summary module, used to summarize the load of the overall coordinate system according to the node numbers to generate a total output file, wherein the total output file at least includes the load information of all nodes at each moment;

[0034] The data conversion module is used to perform data conversion on the total output file to generate a target time series load file.

[0035] In a third aspect, the present invention provides a computer device, comprising: a memory and a processor, the memory and the processor being communicatively connected to each other, the memory storing computer instructions, and the processor executing the method of the first aspect or any corresponding embodiment thereof by executing the computer instructions.

[0036] In a fourth aspect, the present invention provides a computer-readable storage medium having computer instructions stored thereon, the computer instructions being used to cause a computer to execute the method of the first aspect or any corresponding embodiment thereof.

[0037] The load data processing method provided in this embodiment obtains the node information and rod information of the target model, converts the local coordinate system load into the global coordinate system load based on the time series load file, the node information and the rod information, summarizes the global coordinate system load according to the node number, generates a total output file, performs data conversion on the total output file, and generates a target time series load file. This method uses an automated program to batch generate files that can be input into the SACS software, without the need to manually convert the files, thereby improving the file accuracy and the conversion efficiency of the specified format file, and is convenient for users to use. BRIEF DESCRIPTION OF THE DRAWINGS

[0038] In order to more clearly illustrate the specific implementation methods of the present invention or the technical solutions in the prior art, the drawings required for use in the specific implementation methods or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are some implementation methods of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0039] Figure 1 is a flow chart of a load data processing method according to an embodiment of the present invention;

[0040] Figure 2 is a flow chart of a load data processing method according to an embodiment of the present invention;

[0041] Figure 3 is a structural block diagram of a load data processing device according to an embodiment of the present invention;

[0042] Figure 4 It is a schematic diagram of the hardware structure of a computer device according to an embodiment of the present invention. DETAILED DESCRIPTION

[0043] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those skilled in the art without creative work are within the scope of protection of the present invention.

[0044] In recent years, the industry has begun to adopt an "integrated" design approach for offshore wind turbines. In the integrated design, the wind turbine unit-tower-foundation is regarded as an integrally coupled dynamic system, and the overall coupling effect of wind load and wave load is considered to avoid the calculation distortion of the load at the bottom of the wind turbine tower caused by the linear superposition of wind and wave loads in the separate design, thereby reducing the load at the bottom of the tower. At present, the design of the unit and foundation is respectively undertaken by the whole machine supplier and the design institute. The design institute provides the foundation model to the whole machine supplier. After the whole machine supplier conducts integrated modeling and time domain analysis, it submits the internal forces of all rods under each working condition to the design institute. After receiving the submission, the design institute analyzes and verifies the rods. The time series load data provided by the whole machine supplier is the internal force in the local coordinate system of each rod, including 6 directions (force and moment of the X, Y, and Z axes). These data cannot be directly input as input loads in the SACS (Strutural Anylysis Computer System) software because the software may require load data in a specific format. Since the amount of data in a load file is usually large, the amount of work required to manually edit the data and write it into the program is very large, which affects the efficiency of subsequent analysis and verification. Based on this, an embodiment of the present invention provides a load data processing method.

[0045] According to an embodiment of the present invention, an embodiment of a load data processing method is provided. It should be noted that the steps shown in the flowchart of the accompanying drawings can be executed in a computer system such as a set of computer executable instructions, and although a logical order is shown in the flowchart, in some cases, the steps shown or described can be executed in an order different from that shown here.

[0046] In this embodiment, a load data processing method is provided. Figure 1 is a flow chart of a load data processing method according to an embodiment of the present invention. Figure 1 As shown, the process includes the following steps:

[0047] Step S101, obtaining node information and member information of the target model.

[0048] The node information at least includes the node number and coordinates, and the rod information at least includes the corresponding relationship between the rod number, the starting point or end point of the rod, and the node number.

[0049] The node information and member information are tabular files. The total file provided by the relevant parties can be split to obtain node information files and member information files respectively. The node information file stores the number and corresponding coordinates of each node. Each line in the member information file stores the time series load file name, node number, member number, start or end point identification, diameter, wall thickness and other data. Each line of data is a group of data. The start and end points of the same member have corresponding load file names. The start-point related data and the end-point related data may be distributed in two lines, that is, the same member number occupies two lines of data.

[0050] Step S102: converting the local coordinate system load into the global coordinate system load based on the time series load file, the node information and the member information.

[0051] The timing load file is a file in a tabular format. If the original load file provided by the relevant party is in a text file format, the original load file in the text file format needs to be converted into a timing load file in a tabular format.

[0052] The node information contains the number and corresponding coordinates of each node. The node information is combined with the member information, the members are renumbered, the start and end coordinates of each member are determined, the local coordinates of the member unit are transformed based on a specific function, the rotation vector of the global coordinates is obtained, and then the load under the local coordinates of each member is converted into the global coordinate system load based on a custom method.

[0053] Step S103, summarizing the overall coordinate system loads according to the node numbers to generate a total output file.

[0054] The total output file at least includes the load information of all nodes at each moment. The global coordinate system load obtained in step S102 is used as the input file, and based on Python's parallel processing technology, the start and end loads of all rods in the target model are sorted and summarized to obtain a summary file. Since each moment has its corresponding summary file, all load information at each moment is summarized to generate a total output file, and the numbers of all rods and nodes in the total output file are arranged in order.

[0055] Step S104, performing data conversion on the total output file to generate a target time series load file.

[0056] Define a function A(input_path), which can extract data such as node number, force and moment by reading a given table file, generate a string in a specified format, and then batch process the time series load files. The user can create an output folder in advance, and process the data in the total output file in sequence by calling function A, and summarize them in the output folder. In actual use, the user only needs to enter the folder path of the total output file to be processed and the path of the output folder, and the system will output multiple target time series load files in the specified format. The format of the target time series load file is the format of the input SACS software, which is easy for SACS software to recognize.

[0057] The load data processing method provided in this embodiment obtains the node information and rod information of the target model, converts the local coordinate system load into the global coordinate system load based on the time series load file, the node information and the rod information, summarizes the global coordinate system load according to the node number, generates a total output file, performs data conversion on the total output file, and generates a target time series load file. This method uses an automated program to batch generate files that can be input into the SACS software, without the need to manually convert the files, thereby improving the file accuracy and the conversion efficiency of the specified format file, and is convenient for users to use.

[0058] In some optional implementations, the above step S102 includes the following steps:

[0059] Step S201, extracting data from rod information and generating a dictionary.

[0060] The dictionary at least includes the node number corresponding to each member, the member start load file name and the member end load file name. The member number in the member information is extracted, and the dictionary is generated in sequence, for example: the dictionary format is {'Index':1,'Node1':72,'Node2':76,'load1':H_-37#N_72#Mbr 1End1,'load2':H_-36#N_76#Mbr 1End 2}, where 'Index':1 indicates that the member number is 1, 'Node1':72 indicates that the number of the first node of the member is 72, 'Node2':76 indicates that the number of the second node of the member is 76, 'load1':H_-37#N_72#Mbr 1End 1 indicates the load file name of the first node and the first node is the member start, 'load2':H_-36#N_76#Mbr 1End 2 indicates the load file name of the second node and the second node is the member end.

[0061] Step S202 , performing coordinate transformation on the node coordinates based on the dictionary and the time series load file, and determining the rotation vector of the overall coordinate system.

[0062] Specifically, it includes:

[0063] Step S2021, extract data from the dictionary and the time series load file to determine the rod start number and the rod end number.

[0064] The dictionary contains the names of the load files, from which the start and end numbers of each member and the time series load files corresponding to the start and end points are extracted.

[0065] Step S2022: performing coordinate transformation based on the node coordinates, the rod start number and the rod end number in the node information to determine the rotation vector of the global coordinate system.

[0066] Based on the correspondence between the starting number and the end number of the rod and the node, the starting coordinates and the end coordinates of each rod can be determined from the node information, and the rotation vector from the starting coordinates to the end coordinates, that is, the rotation vector of the overall coordinate system, can be calculated.

[0067] Step S203: converting the local coordinate system load into the global coordinate system load based on the rotation vector of the global coordinate system.

[0068] After obtaining the rotation vector of the global coordinate system, a custom method can be used:

[0069] transform_load(load_local,rotation_matrix) converts the load in the local coordinate system of the starting point of the rod into the load in the global coordinate system. load_local represents the load defined in the local coordinate system of the starting point of the rod, and rotation_matrix represents the rotation vector of the global coordinate system, which describes the rotation from the local coordinate system of the rod to the global coordinate system. The load_local is transformed from the local coordinate system to the global coordinate system through the custom function transform_load, thereby obtaining the load in the global coordinate system.

[0070] In some optional implementations, the above step S2021 includes:

[0071] Step a1, traverse all time series load files and extract the load file names;

[0072] Step a2, determining the member start number and the member end number based on the load file name and the dictionary.

[0073] There are one or more folders containing a series of time series load files. Traverse these folders and read the name of each file to extract the load file name. Determine the member start number and member end number through the custom method get_value(dictionary,keyword). This function retrieves the value from the dictionary passed in according to the specified keyword (keyword), and the function can return two values ​​related to the member element: the member start number and the end number.

[0074] In some optional implementations, the above step S2022 includes:

[0075] Step b1, reading the node coordinates corresponding to each node from the node information;

[0076] Step b2, determining the starting point coordinates and the ending point coordinates of each rod based on the node coordinates, the rod starting point number and the rod ending point number;

[0077] Step b3, calculating the rotation matrix based on the starting point coordinates and the rod coordinates to determine the rotation vector of the global coordinate system.

[0078] The node coordinates corresponding to each node are read from the node information. Each rod has a corresponding node at the start and end. When reading, the start and end coordinates of each rod can be determined by combining the node coordinates according to the corresponding relationship between the determined numbers. The rotation vector of the overall coordinate system of the rod unit is calculated using the custom method calc_rotation_matrix(start,end).

[0079] Among them, start and end are the starting point and end point of the rod respectively. The starting point coordinates and the end point coordinates have been determined here. The global coordinate system is used to describe the unified reference frame of the entire target model.

[0080] The calc_rotation_matrix function is a custom function whose purpose is to calculate the rotation vector from the local coordinate system to the global coordinate system based on the start and end coordinates of the bar element.

[0081] In some optional implementations, the above step S103 includes the following steps:

[0082] Step S301, sorting and summarizing the data of the global coordinate system load based on the node number to generate a first output file.

[0083] The global coordinate system load is used as the input file. Based on Python's parallel processing technology, the start and end loads of all members in the target model are summarized in the order of node numbers, and the merged results are saved in the specified directory. First, a core data processing function merge_load_files(root_dir,output_path) is defined, which is specifically used to process all load files under a single condition. By traversing all table files in the specified folder, the node numbers are identified and extracted, and then the data is aggregated according to the node numbers. If the node numbers are the same, the corresponding data are merged by timestamp and their sum is calculated. This processing process makes data management more efficient and helps subsequent analysis work. By creating a process pool and adopting process parallel technology, the speed of data processing is greatly improved. When processing each condition folder, this technology also uses a progress bar to show the user the current processing progress, which improves the user experience. In order to improve the transparency of data processing and the traceability of results, every time the data of a node is processed and successfully saved as an Excel file, the system will notify the user through the console that the file has been successfully created and saved. This mechanism ensures the transparency of the data processing process.

[0084] Step S302: Summarize the loads of all nodes at each moment based on the first output file to generate a total output file.

[0085] The first output file is used as the input file of this step, and the load information of all nodes at each moment is summarized to generate a new load file, that is, the total output file. Define a function called merge_excel_files(input_folder,output_folder), which first scans the input folder and its subfolders to locate all table files ending with .xlsx. For each folder found, the module creates a corresponding output folder to keep the organizational structure unified and clear. Using a progress bar to show progress, the system opens each table file one by one and reads the time series load data in it. Each row of data will be captured and added to a dictionary with the original row where the data is located as the key. Each key in the dictionary corresponds to a list that contains the data rows with the same row number in all files. At the same time, the name of the file is added to the end of each row of data as a new column to identify the source of the data. For each set of row data, the system creates a new set containing the merged data and an additional column to display the source file name, and then outputs the list set to a new table file. Each output file corresponds to a row of data in the original table file. Once all data merge operations are completed, the system will provide users with a prompt message that the operation is completed, ensuring that users know that all Excel files have been successfully processed and the merged output files have been generated.

[0086] In some optional implementations, step S104 includes the following steps:

[0087] Step S401, read the total output file, extract the node number, and generate an original character string.

[0088] Take the total output file as the input file and define a function A(input_path), which can extract data such as node number, force and moment by reading the given table file and generate a string in the specified format.

[0089] Step S402 , converting the original character string, determining the target character string, and summarizing all the target character strings to generate a target timing load file.

[0090] Define the generate_thload function for batch processing of timing load files. Users can create an output folder in the output folder path, and process the data in the total output file in sequence by calling function A, and summarize them in the output folder. In actual use, users only need to enter the folder path of the total output file to be processed and the path of the output folder, and the system will output multiple target timing load files in the specified format. The format of the target timing load file is the format of the input SACS software, which is easy for SACS software to recognize.

[0091] In this embodiment, a load data processing method is provided. Figure 2 It is a flow chart of a load data processing method according to an embodiment of the present invention. Two documents are prepared, namely nodes.xlsx (node ​​information file) and members.xlsx (member information file). The time series load file is converted from txt (text file) format to excel (table) format, and the load under local coordinates is converted to load under global coordinates. Then, the node loads are summarized and the load files of all nodes at each moment are aggregated. Finally, the load file thload.dat that can be recognized by SACS software is generated. The method adopts an automated program to improve the accuracy of the file, avoid errors in manual input, and has a fast calculation speed, which can improve the calculation efficiency and is convenient for users to use.

[0092] In this embodiment, a load data processing device is also provided, which is used to implement the above-mentioned embodiments and preferred implementation modes, and the descriptions that have been made will not be repeated. As used below, the term "module" can be a combination of software and / or hardware that implements a predetermined function. Although the devices described in the following embodiments are preferably implemented in software, the implementation of hardware, or a combination of software and hardware, is also possible and conceivable.

[0093] This embodiment provides a load data processing device, such as Figure 3As shown, including:

[0094] The information acquisition module 501 is used to acquire the node information and the member information of the target model, wherein the node information at least includes the node number and the coordinates, and the member information at least includes the corresponding relationship between the member number, the starting point or the end point of the member, and the node number;

[0095] A load conversion module 502, for converting a local coordinate system load into a global coordinate system load based on a time series load file, node information, and member information;

[0096] A data summary module 503 is used to summarize the load of the entire coordinate system according to the node numbers to generate a total output file, wherein the total output file at least includes the load information of all nodes at each moment;

[0097] The data conversion module 504 is used to perform data conversion on the total output file to generate a target time series load file.

[0098] In some optional implementations, the load conversion module 502 includes:

[0099] A data extraction unit, used to extract data from the rod information and generate a dictionary, wherein the dictionary at least includes a node number corresponding to each rod, a rod start load file name, and a rod end load file name;

[0100] A coordinate conversion unit, used to perform coordinate conversion on the node coordinates based on the dictionary and the time series load file to determine the rotation vector of the overall coordinate system;

[0101] The overall conversion unit is used to convert the local coordinate system load into the overall coordinate system load based on the rotation vector of the overall coordinate system.

[0102] In some optional embodiments, the coordinate conversion unit includes:

[0103] A number determination subunit is used to extract data from the dictionary and the time series load file to determine the starting number of the member and the end number of the member;

[0104] The rotation vector determination subunit is used to perform coordinate transformation based on the node coordinates, the rod start point number and the rod end point number in the node information to determine the rotation vector of the global coordinate system.

[0105] In some optional implementations, the number determination subunit includes:

[0106] The traversal file subunit is used to traverse all time series load files and extract the load file names;

[0107] The second number determination subunit is used to determine the member start point number and the member end point number based on the load file name and the dictionary.

[0108] In some optional implementations, the rotation vector determination subunit includes:

[0109] A coordinate reading subunit is used to read the node coordinates corresponding to each node from the node information;

[0110] A coordinate calculation subunit, used for determining the starting point coordinates and the ending point coordinates of each member based on the node coordinates, the starting point number of the member and the ending point number of the member;

[0111] The second rotation vector determination subunit is used to calculate the rotation matrix based on the starting point coordinates and the rod coordinates to determine the rotation vector of the overall coordinate system.

[0112] In some optional implementations, the data aggregation module 503 includes:

[0113] A first output file determining unit, configured to sort and summarize the data of the overall coordinate system load based on the node numbers to generate a first output file;

[0114] The load summarizing unit is used to summarize the loads of all nodes at each moment based on the first output file to generate a total output file.

[0115] In some optional implementations, the data conversion module 504 includes:

[0116] A character string generating unit, used for reading the total output file, extracting the node number, and generating an original character string;

[0117] The target file generation unit is used to convert the original character string, determine the target character string, and summarize all the target character strings to generate a target timing load file.

[0118] The further functional description of each of the above modules and units is the same as that of the above corresponding embodiments and will not be repeated here.

[0119] The load data processing device in this embodiment is presented in the form of a functional unit, where the unit refers to an ASIC (Application Specific Integrated Circuit) circuit, a processor and memory that executes one or more software or fixed programs, and / or other devices that can provide the above functions.

[0120] The embodiment of the present invention also provides a computer device having the above Figure 3 The load data processing device shown.

[0121] See also Figure 4 , Figure 4 is a schematic diagram of the structure of a computer device provided by an optional embodiment of the present invention, such as Figure 4 As shown, the computer device includes: one or more processors 10, a memory 20, and interfaces for connecting various components, including high-speed interfaces and low-speed interfaces. Various components are connected to each other using different buses for communication, and can be installed on a common mainboard or installed in other ways as needed. The processor can process the instructions executed in the computer device, including instructions stored in or on the memory to display the graphical information of the GUI on an external input / output device (such as, a display device coupled to the interface). In some optional embodiments, if necessary, multiple processors and / or multiple buses can be used together with multiple memories and multiple memories. Similarly, multiple computer devices can be connected, and each device provides some necessary operations (for example, as a server array, a group of blade servers, or a multi-processor system). Figure 4 A processor 10 is taken as an example.

[0122] The processor 10 may be a central processing unit, a network processor or a combination thereof. The processor 10 may further include a hardware chip. The hardware chip may be a dedicated integrated circuit, a programmable logic device or a combination thereof. The programmable logic device may be a complex programmable logic device, a field programmable gate array, a general purpose array logic or any combination thereof.

[0123] The memory 20 stores instructions executable by at least one processor 10, so that the at least one processor 10 executes the method shown in the above embodiment.

[0124] The memory 20 may include a program storage area and a data storage area, wherein the program storage area may store an operating system, an application required for at least one function; the data storage area may store data created according to the use of the computer device, etc. In addition, the memory 20 may include a high-speed random access memory, and may also include a non-transient memory, such as at least one disk storage device, a flash memory device, or other non-transient solid-state storage device. In some optional embodiments, the memory 20 may optionally include a memory remotely arranged relative to the processor 10, and these remote memories may be connected to the computer device via a network. Examples of the above-mentioned network include, but are not limited to, the Internet, an intranet, a local area network, a mobile communication network, and combinations thereof.

[0125] The memory 20 may include a volatile memory, such as a random access memory; the memory may also include a non-volatile memory, such as a flash memory, a hard disk or a solid state drive; the memory 20 may also include a combination of the above types of memory.

[0126] The computer device further comprises a communication interface 30 for the computer device to communicate with other devices or a communication network.

[0127] The embodiment of the present invention also provides a computer-readable storage medium. The method according to the embodiment of the present invention can be implemented in hardware, firmware, or can be implemented as a computer code that can be recorded in a storage medium, or can be implemented as a computer code that is originally stored in a remote storage medium or a non-temporary machine-readable storage medium and will be stored in a local storage medium through a network download, so that the method described herein can be stored in such software processing on a storage medium using a general-purpose computer, a dedicated processor, or programmable or dedicated hardware. Among them, the storage medium can be a magnetic disk, an optical disk, a read-only storage memory, a random access memory, a flash memory, a hard disk or a solid-state hard disk, etc.; further, the storage medium can also include a combination of the above types of memories. It can be understood that a computer, a processor, a microprocessor controller, or programmable hardware includes a storage component that can store or receive software or computer code. When the software or computer code is accessed and executed by a computer, a processor, or hardware, the method shown in the above embodiment is implemented.

[0128] Although the embodiments of the present invention have been described in conjunction with the accompanying drawings, those skilled in the art may make various modifications and variations without departing from the spirit and scope of the present invention, and such modifications and variations are all within the scope defined by the appended claims.

Claims

1. A load data processing method, characterized in that: The method comprises: Acquire node information and member information of the target model, wherein the node information at least includes node numbers and coordinates, and the member information at least includes a corresponding relationship between member numbers, member start points or end points, and node numbers; Convert local coordinate system loads into global coordinate system loads based on time series load files, node information, and member information; Summarizing the load of the overall coordinate system according to the node numbers to generate a total output file, wherein the total output file at least includes load information of all nodes at each moment; Perform data conversion on the total output file to generate a target timing load file.

2. The method according to claim 1, characterized in that The method of converting the local coordinate system load into the global coordinate system load based on the time series load file, the node information and the member information includes: Extracting data from the rod information to generate a dictionary, wherein the dictionary at least includes a node number corresponding to each rod, a rod start load file name, and a rod end load file name; Based on the dictionary and the time series load file, coordinate transformation is performed on the node coordinates to determine the rotation vector of the overall coordinate system; The local coordinate system loads are converted to global coordinate system loads based on the rotation vector of the global coordinate system.

3. The method according to claim 2, characterized in that The step of performing coordinate transformation on the node coordinates based on the dictionary and the time series load file to determine the rotation vector of the overall coordinate system includes: Extracting data from the dictionary and the time series load file to determine the starting point number and the end point number of the member; Coordinate transformation is performed based on the node coordinates, the member start point number and the member end point number in the node information to determine the rotation vector of the global coordinate system.

4. The method according to claim 3, characterized in that The step of extracting data from the dictionary and the time series load file to determine the starting point number and the end point number of the member includes: Traverse all time series load files and extract the load file names; Determines the member start number and member end number based on the load file name and dictionary.

5. The method according to claim 3, characterized in that: The step of performing coordinate transformation on the node coordinates, the rod starting point number and the rod end point number in the node information to determine the rotation vector of the overall coordinate system includes: Read the node coordinates corresponding to each node from the node information; Determine the starting point coordinates and the ending point coordinates of each member based on the node coordinates, the member starting point number and the member ending point number; A rotation matrix is ​​calculated based on the starting point coordinates and the rod coordinates to determine a rotation vector of the global coordinate system.

6. The method according to claim 1, characterized in that The overall coordinate system load is summarized according to the node numbers to generate a total output file, including: Sorting and summarizing the data of the global coordinate system load based on the node numbers to generate a first output file; The loads of all nodes at each moment are summarized based on the first output file to generate a total output file.

7. The method according to claim 1, characterized in that The performing data conversion on the total output file to generate a target timing load file includes: Read the total output file, extract the node number, and generate an original character string; The original character string is converted to determine a target character string, and all target character strings are summarized to generate a target timing load file.

8. A load data processing device, characterized in that: The device comprises: An information acquisition module, used to acquire node information and rod information of a target model, wherein the node information at least includes a node number and a coordinate, and the rod information at least includes a rod number, a rod starting point or an end point, and a corresponding relationship between a node number; Load conversion module, used to convert local coordinate system loads into global coordinate system loads based on time series load files, node information and member information; A data summary module, used to summarize the load of the overall coordinate system according to the node numbers to generate a total output file, wherein the total output file at least includes the load information of all nodes at each moment; The data conversion module is used to perform data conversion on the total output file to generate a target time series load file.

9. A computer device, characterized in that: include: A memory and a processor, wherein the memory and the processor are communicatively connected to each other, the memory stores computer instructions, and the processor executes the load data processing method according to any one of claims 1 to 7 by executing the computer instructions.

10. A computer-readable storage medium, characterized in that: The computer-readable storage medium stores computer instructions, and the computer instructions are used to enable a computer to execute the load data processing method according to any one of claims 1 to 7.