Facility exception management method and device, computer equipment and storage medium

By adjusting the detection time period and route of factory equipment and combining the abnormal prediction results, the problem of low detection management efficiency in the prior art is solved, and more efficient abnormal detection and management is achieved.

CN119026804APending Publication Date: 2024-11-26WUHAN HUAXIN DATA SYST CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411183948.5
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

The prior art lacks flexibility in factory equipment abnormal detection and cannot effectively deal with various abnormal situations, resulting in low management efficiency.

Method used

By obtaining the initial detection plan and abnormal prediction results of the facility to be detected, adjusting the detection time period and route, generating detection plan handover information that meets the abnormal prediction results, and performing target detection.

Benefits of technology

It improves the accuracy and efficiency of the detection time period and route, ensures the accuracy of the information handed over to the detection plan, and thus improves the management efficiency of facility abnormality management.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119026804A_ABST
    Figure CN119026804A_ABST
Patent Text Reader

Abstract

The invention provides a facility exception management method and device, computer equipment and a storage medium, and the method comprises the steps: obtaining an initial detection scheme and an exception prediction result of a to-be-detected facility, the initial detection scheme comprising a scheme attribution parameter, an initial detection route and an initial detection time period; adjusting the initial detection time period according to the abnormal prediction result to obtain a target detection time period; according to the target detection time period and the abnormal prediction result, adjusting the initial detection route to obtain a target detection route; generating detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period; and performing anomaly detection on the to-be-detected facility according to the target detection route, the target detection time period and the detection scheme handover information. The efficiency of detecting the to-be-detected facility is improved, and meanwhile, the accurate detection scheme handover information is combined, so that the management efficiency of managing the facility abnormality is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of data processing technology, and in particular to a facility abnormality management method, device, computer equipment and storage medium. Background Art

[0002] In the management of some large factories (such as water plants), abnormal detection of factory equipment is an indispensable part of industrial production. How to ensure that factory equipment can operate efficiently and stably has become an important issue.

[0003] In the related art, usually a patrol schedule is made, with fixed routes and timetables, and the factory equipment is inspected by the inspectors on the patrol schedule. This model lacks flexibility and cannot effectively deal with various abnormal situations that occur during factory operation, resulting in low efficiency of abnormal management. Summary of the invention

[0004] The embodiments of the present application provide a facility abnormality management method, apparatus, computer equipment and storage medium to improve the management efficiency of facility abnormalities.

[0005] In one aspect, the present application provides a facility abnormality management method, comprising:

[0006] Acquire an initial detection plan of a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection plan includes plan attribution parameters, an initial detection route, and an initial detection time period;

[0007] Adjusting the initial detection time period according to the abnormality prediction result to obtain a target detection time period;

[0008] According to the target detection time period and the abnormality prediction result, the initial detection route is adjusted to obtain a target detection route;

[0009] Generate detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period;

[0010] The facility to be inspected is subjected to abnormality detection according to the target detection route, the target detection time period, and the detection scheme handover information.

[0011] In one aspect, the present application provides a facility abnormality management device, comprising:

[0012] An acquisition module, used to acquire an initial detection scheme of a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection scheme includes scheme attribution parameters, an initial detection route, and an initial detection time period;

[0013] A first adjustment module, configured to adjust the initial detection time period according to the abnormality prediction result to obtain a target detection time period;

[0014] A second adjustment module, configured to adjust the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route;

[0015] A generating module, configured to generate detection scheme handover information having the same scheme attribution parameters according to the target detection route and the target detection time period;

[0016] The detection module is used to perform abnormal detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information.

[0017] On the one hand, the present application provides a computer device, which includes a memory, a processor, and a computer program stored in the memory and executable on the processor. When the processor executes the computer program, the steps in the above-mentioned facility abnormality management method are implemented.

[0018] On the one hand, the present application provides a computer-readable storage medium, which stores a computer program. When the computer program is executed by a processor, the steps in the above-mentioned facility abnormality management method are implemented.

[0019] On the one hand, the present application also provides a computer program product, including a computer program / instruction, which is used to execute the steps in the above-mentioned facility abnormality management method when the computer program / instruction is executed by a processor.

[0020] An embodiment of the present application provides a facility anomaly management method, the method obtaining an initial detection plan of a facility to be detected and an anomaly prediction result of the facility to be detected, the facility to be detected including multiple detection devices, the initial detection plan including plan attribution parameters, an initial detection route and an initial detection time period; adjusting the initial detection time period according to the anomaly prediction result to obtain a target detection time period; adjusting the initial detection route according to the target detection time period and the anomaly prediction result to obtain a target detection route; generating detection plan handover information with the same plan attribution parameters according to the target detection route and the target detection time period; performing an anomaly detection on the facility to be detected according to the target detection route, the target detection time period and the detection plan handover information. The present application utilizes the abnormality prediction results to adjust the initial detection time period in the initial detection plan, and adjusts the initial detection route in the initial detection plan according to the adjusted detection time period, ensuring that the adjusted detection time period and detection route are more in line with the operating conditions of the object to be detected, improving the accuracy of the adjusted detection time period and detection route, and determining the target detection route and target detection time period and the scheme attribution parameters, thereby ensuring the accuracy of the detection scheme handover information. Therefore, according to the target detection route and the target detection time period, the efficiency of detecting the facilities to be detected is improved, and at the same time, combined with accurate detection scheme handover information, the management efficiency of facility abnormalities is improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0021] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0022] in:

[0023] Figure 1 is a flow chart of a facility abnormality management method in one embodiment;

[0024] Figure 2 is a flow chart of a facility abnormality management method in another embodiment;

[0025] Figure 3 A schematic diagram of a page for presetting handover information in an embodiment;

[0026] Figure 4 A schematic diagram of a page for presetting handover information in another embodiment;

[0027] Figure 5 is a structural block diagram of a facility abnormality management device in one embodiment;

[0028] Figure 6 FIG. 4 is a structural block diagram of a computer device in one embodiment. DETAILED DESCRIPTION

[0029] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] like Figure 1 As shown, in one embodiment, a facility abnormality management method is provided. The facility abnormality management method can be applied to a terminal or a server. This embodiment is illustrated by applying to a server. The facility abnormality management method specifically includes the following steps:

[0031] Step 102, obtaining an initial detection plan for the facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection plan includes plan attribution parameters, an initial detection route and an initial detection time period.

[0032] Among them, the facilities to be inspected are objects that need to be detected for abnormalities, such as factories, water plants, etc. The inspection objects include multiple detection equipment, among which the detection equipment can be the equipment of the factory or the facilities and equipment of the water plant. Taking the water plant as an example, the facilities to be inspected are the sedimentation tank, flocculation tank, dosing room, water inlet pump, coarse screen, fine screen, water pipe, blower, etc.

[0033] The initial detection scheme is a pre-configured detection scheme for abnormalities of the facilities to be detected, which includes the initial detection route, the initial detection time period and the scheme attribution parameters. The initial detection route is used to characterize the detection equipment involved in abnormality detection and the corresponding detection sequence, and the initial detection time period is the time period for performing abnormality detection on the facilities to be detected. The scheme attribution parameters are the object parameters for executing the detection scheme, such as the detection terminal, the detection equipment itself, the detection expert, the detection robot, etc.

[0034] For example, for a total of 8 detection devices in a water plant, including a sedimentation tank, a flocculation tank, a dosing room, a water inlet pump, a coarse screen, a fine screen, a water pipe, and a blower, the initial detection route may be water pipe-blower-sedimentation tank-flocculation tank-dosing room-water inlet pump-coarse screen-fine screen. The initial detection time period may be 0:00-3:00.

[0035] The abnormal prediction result is data that characterizes the abnormal situation of the facility to be detected in the future time period. For example, the abnormal prediction result can be the abnormal frequency, abnormal level, or abnormal probability of the facility to be detected in certain time periods in the future. The abnormal prediction result of the facility to be detected can be obtained by calling and analyzing the abnormal problem database.

[0036] Among them, the abnormal problem database is a database that records abnormal data detected by various detection equipment in the facilities to be detected. It is used to analyze the abnormal conditions of the equipment to be detected based on the abnormal problem database, and provide a reference basis for adjusting the detection route and detection time period of the facilities to be detected.

[0037] Exemplarily, the abnormal problem database includes abnormal problem data tables of various detection devices in the facility to be detected, as shown in Table 1, which is an abnormal problem data table of the facility to be detected on a certain day.

[0038] Testing equipment Exception Type Exception description Abnormal period water pipe other Broken water pipes Daytime Blower equipment Pressure difference is too high at night Fine grille Technology Water pipe leakage of fine grid press at night

[0039] Table 1. Data table of abnormal problems of the facilities to be tested on a certain day

[0040] The abnormal prediction result is data that characterizes the abnormal situation of the facility to be detected in a future time period. For example, the abnormal prediction result can be the abnormal frequency, abnormal level, or abnormal probability of the facility to be detected in certain future time periods.

[0041] Specifically, the anomaly database can be called periodically or dynamically, and the anomaly data in the anomaly database can be analyzed. The data analysis method can be to statistically analyze the abnormal results of each detection device within a preset historical time period, such as statistical abnormal frequency, statistical abnormal frequency or statistical abnormal level. The abnormal results of each detection device in the corresponding time period in the future can be predicted based on the abnormal results of the historical time period, which is the abnormal prediction result.

[0042] In one embodiment, calling and analyzing an abnormal problem database to obtain an abnormal prediction result of a facility to be inspected may include: upon listening to a preset calling condition that triggers the calling of the abnormal problem database, calling the abnormal problem database, and analyzing the abnormal data in the abnormal problem database to determine first abnormal assessment data of the facility to be inspected that is abnormal within a historical preset time period; based on multiple first abnormal assessment data, predicting second abnormal assessment data of the facility to be inspected that is abnormal within a future preset time period to obtain the abnormal prediction result.

[0043] The preset calling condition is a critical condition pre-set for making a decision to call the abnormal problem database. For example, the preset calling condition can be a change in abnormal data in the abnormal problem database or a preset trigger time. As a preferred embodiment of this embodiment, the preset calling condition is a change in abnormal data in the abnormal problem database, so that abnormal analysis can be performed dynamically and in real time, thereby improving the accuracy of the analysis results.

[0044] The first abnormality assessment data is data used to assess the abnormality of the facility to be inspected within a preset historical time period. For example, the first abnormality assessment data may be that the abnormality frequencies in the five time periods last week are 0, 1, 1, 2, and 1. The second abnormality assessment data is data used to assess the abnormality of the facility to be inspected in a future time period. For example, the second abnormality assessment data may be that the abnormality frequencies in the seven time periods next week are 1, 0, 1, 2, 1, 3, and 2, respectively.

[0045] Specifically, when the preset calling conditions that trigger the calling of the abnormal problem database are monitored, the abnormal problem database is called, and the abnormal data in the abnormal problem database is analyzed. The specific analysis method can be: from the abnormal problem data, query the abnormal data of each detection device in the time period recorded in the database (recorded as the first historical time period), and then perform statistical analysis on the abnormal data in the first historical time period, such as preprocessing the abnormal data in the first historical time period. The preprocessing can be to complete the abnormal data, delete the obviously erroneous abnormal data, etc., and then count the abnormal data of the preprocessed abnormal data in each historical preset time period to obtain the first abnormal evaluation data. Then, pre-trained abnormal evaluation data prediction models, such as Long Short-Term Memory (LSTM), Recurrent Neural Network (RNN), etc., can be used to predict abnormal data of the facility to be detected in the future preset time period to obtain second abnormal evaluation data, that is, the abnormal prediction result. It is understandable that in this embodiment, by dynamically calling the abnormal problem database in real time and analyzing the abnormal data, the accuracy of the first abnormal assessment data obtained by the analysis is ensured, and the accuracy of the predicted second abnormal assessment data can be improved through the accurate first abnormal assessment data, thereby ensuring the subsequent accurate adjustment of the initial detection time period and the initial detection route. It is understandable that by predicting the abnormal conditions of the facilities to be detected in the future time period based on the real abnormal data in the abnormal problem database, the abnormal conditions of the facilities to be detected can be predicted in advance, and then the detection route and detection time period of the facilities to be detected can be adjusted according to the predicted abnormal conditions, so that the adjusted detection route and detection time period are consistent with the actual operation of the facilities to be detected, which is conducive to improving the efficiency of the detection of the facilities to be detected and saving detection costs.

[0046] Specifically, the initial detection plan of the facility to be detected can be obtained from the memory of the computer device, or a corresponding initial detection plan can be manually formulated according to the situation of the facility to be detected.

[0047] Step 104: adjust the initial detection time period according to the abnormality prediction result to obtain a target detection time period.

[0048] The manner of adjusting the initial detection time period includes, but is not limited to, increasing the detection time period, decreasing the detection time period, or modifying the detection time period.

[0049] Specifically, each future preset time period in the abnormal prediction result and the corresponding abnormal data can be analyzed to determine in which time periods the abnormal data of the facility to be detected represents a higher degree of abnormality and in which time periods the abnormal data represents a lower degree of abnormality. Then, based on these time periods, the initial detection time period is adjusted to obtain the target detection time period. The specific analysis methods can be the following two:

[0050] The first method is: in a two-dimensional coordinate system, the time period of the abnormal prediction result is used as the horizontal coordinate, and the abnormal data of different time periods of the abnormal prediction result is used as the vertical coordinate. Points are plotted and fitted on the two-dimensional coordinate system to obtain the abnormal result curve corresponding to the abnormal prediction result. At the same time, the detection period is determined according to the initial detection time period. Then, according to the abnormal result curve and the cycle length corresponding to the detection period, a time segment with the maximum integral result (the area enclosed by the curve and the horizontal axis is the largest) and the length corresponding to the horizontal axis is the cycle length is obtained from the abnormal result curve as the target detection time period, that is, the time period that needs to be paid attention to.

[0051] The second method is to represent the time period of the abnormal prediction results and the abnormal data of different time periods in the form of an abnormal matrix, and then analyze the abnormal matrix through the matrix operation function of MATLAB. The analysis method can be: combined with the cycle duration corresponding to the detection cycle, from the abnormal matrix, obtain a time segment that represents a high degree of abnormality and has a time period length of the cycle length as the target time segment, that is, the time period that needs to be paid attention to.

[0052] It can be understood that since the abnormal prediction results can accurately characterize the operating conditions of the facilities to be inspected in the future preset time period, in this embodiment, the initial detection time period is adjusted according to the abnormal prediction results, so that the target detection time period matches the operating conditions of the facilities to be inspected in the future preset time period, thereby improving the accuracy of the target detection time period.

[0053] Step 106: adjusting the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route.

[0054] Specifically, according to the target detection time period, the detection equipment that needs attention is determined from the abnormal prediction result, and then the initial detection route is adjusted according to the determined detection equipment that needs attention to obtain the target detection route. It can be understood that in this embodiment, since the target detection time period and the predicted detection result both have high accuracy, therefore, adjusting the initial detection route based on the target detection time period and the abnormal prediction result can improve the accuracy of the target detection route.

[0055] In a specific embodiment, the initial detection route is adjusted according to the target detection time period and the abnormality prediction result to obtain the target detection route, including: determining the detection equipment abnormality assessment data corresponding to multiple target detection time periods among the multiple detection equipment abnormality assessment data; and adjusting the initial detection route according to the detection equipment whose abnormality assessment data corresponding to the multiple target detection time periods meet the preset abnormal conditions to obtain the target detection route.

[0056] Specifically, the abnormal assessment data of detection devices corresponding to multiple target detection time periods can be determined from the abnormal assessment data of multiple detection devices, and the detection devices that meet the preset abnormal conditions are selected from the abnormal assessment data of detection devices corresponding to the multiple target detection time periods as the focus detection devices. According to the focus detection devices, the initial detection circuit is adjusted. The initial detection circuit can be adjusted to the circuit composed of the focus detection devices to obtain the target detection circuit.

[0057] It can be understood that in this embodiment, the initial detection line is adjusted according to the detection equipment whose abnormal evaluation data corresponding to multiple target detection time periods meets the preset abnormal conditions, thereby achieving adjustment based on the abnormal conditions of the detection equipment represented by the detection equipment whose abnormal evaluation data corresponding to multiple target detection time periods meets the preset abnormal conditions, ensuring that the target detection line matches the operating conditions of multiple detection equipment in the facilities to be inspected, thereby improving the accuracy of the target detection line.

[0058] In a specific embodiment, the initial detection route is adjusted according to the detection equipment whose abnormal evaluation data corresponding to multiple target detection time periods meet the preset abnormal conditions to obtain the target detection route, including: obtaining the real position information of the detection equipment whose abnormal evaluation data corresponding to multiple target detection time periods meet the preset abnormal conditions; adjusting the initial detection route according to the real position information and the shortest path principle to obtain the target detection route.

[0059] Specifically, after obtaining the real position information of the detection equipment whose abnormal assessment data corresponding to multiple target detection time periods meet the preset abnormal conditions, the initial detection route is adjusted according to the real position information of the detection equipment and the shortest path principle to obtain the target detection route, so that the detection order of the detection equipment in the target detection route meets the shortest path principle, thereby realizing the optimization of the target detection route, which is conducive to further improving the efficiency of detecting the facilities to be detected.

[0060] Step 108 : generating detection scheme handover information having the same scheme attribution parameters according to the target detection route and the target detection time period.

[0061] Among them, the testing plan handover information is information used to guide the handover between the executors corresponding to the scheme attribution parameters involved in the testing process of the facilities to be tested, such as the handover of tools in the testing process, the handover of the quantity and type of drugs in the dosing management, etc., and the executor in the testing plan handover information is the same as the scheme attribution parameter. For example, if the scheme attribution parameter is the testing personnel, then the executor in the testing plan handover information is the same testing personnel. If the scheme attribution parameter is the testing equipment itself, then the executor in the testing plan handover information is the same testing equipment.

[0062] Specifically, the detection targets that need to be detected for anomaly and the handover information involved in the detection process can be determined according to each target detection route and target detection time period, and then based on the detection targets of anomaly detection and the handover information involved in the detection process and the scheme attribution parameters, the detection scheme handover information with the same scheme attribution parameters is generated. It can be understood that in this embodiment, the detection scheme handover information with the same scheme attribution parameters is generated through the target detection route and the target detection time period, so that the handover of anomaly detection is subsequently performed based on the detection scheme handover information, thereby improving the management efficiency of subsequent anomaly management.

[0063] Step 110 , performing abnormal detection on the facility to be detected according to the target detection route, the target detection time period, and the detection plan handover information.

[0064] Specifically, abnormal detection can be performed on the facilities to be inspected according to the detection plan consisting of the target detection route, the target detection time period and the detection plan handover information. It can be understood that since the target detection route and the target detection time period are consistent with the operating conditions of the facilities to be inspected, and the detection plan handover information is determined based on the target detection route, the target detection time period and the plan attribution parameters, the accuracy of the detection plan handover information is ensured. Therefore, according to the target detection route and the target detection time period, the efficiency of detecting the facilities to be inspected can be improved. At the same time, combined with accurate detection plan handover information, the management efficiency of facility abnormalities is improved.

[0065] The above-mentioned facility anomaly management method obtains the initial detection plan of the facility to be detected and the anomaly prediction results of the facility to be detected, the facility to be detected includes multiple detection equipment, and the initial detection plan includes plan attribution parameters, initial detection route and initial detection time period; the initial detection time period is adjusted according to the anomaly prediction results to obtain the target detection time period; according to the target detection time period and the anomaly prediction results, the initial detection route is adjusted to obtain the target detection route; according to the target detection route and the target detection time period, the detection plan handover information with the same plan attribution parameters is generated; according to the target detection route and the target detection time period, the detection plan handover information is performed; the facility to be detected is subjected to anomaly detection according to the target detection route, the target detection time period and the detection plan handover information. The present application utilizes the abnormality prediction results to adjust the initial detection time period in the initial detection plan, and adjusts the initial detection route in the initial detection plan according to the adjusted detection time period, ensuring that the adjusted detection time period and detection route are more in line with the operating conditions of the object to be detected, improving the accuracy of the adjusted detection time period and detection route, and determining the target detection route and target detection time period and the scheme attribution parameters, thereby ensuring the accuracy of the detection scheme handover information. Therefore, according to the target detection route and the target detection time period, the efficiency of detecting the facilities to be detected is improved, and at the same time, combined with accurate detection scheme handover information, the management efficiency of facility abnormalities is improved.

[0066] In a specific embodiment, the scheme attribution parameters include initial patrol personnel information, and the method also includes: adjusting the initial patrol personnel information corresponding to the target detection time period according to the abnormality prediction result to obtain the target patrol personnel information; before performing abnormality detection on the facility to be inspected according to the target detection route, the target detection time period, and the detection scheme handover information, it also includes: sending the target detection route, the target detection time period, and the detection scheme handover information to the terminal carried by the target patrol personnel corresponding to the target patrol personnel information.

[0067] The target inspection personnel information is the personnel information obtained by adjusting and optimizing the initial inspection personnel information.

[0068] Specifically, the initial patrol personnel information corresponding to the target time period is adjusted according to the abnormal prediction result to obtain the target patrol personnel information. The specific process may be: according to the abnormal prediction result, such as the abnormal degree or abnormal probability, the detection equipment with an abnormal probability greater than a preset probability (such as 50%) is selected as the equipment to be inspected within the target detection time period, and the corresponding inspection department or patrol personnel information is determined according to the equipment to be inspected as the target patrol personnel information. After determining the target patrol personnel information, before performing abnormal detection on the facilities to be inspected, the target detection route, target detection time period, and detection plan handover information are sent to the terminal carried by the target patrol personnel corresponding to the target patrol personnel information, so that the target patrol personnel can perform abnormal detection and management on the facilities to be inspected according to the target detection route, target detection time period, and detection plan handover information.

[0069] In a specific embodiment, the scheme attribution parameters include initial inspection equipment information, and the method further includes: adjusting the initial inspection equipment information corresponding to the target detection time period according to the abnormality prediction result to obtain the target inspection equipment; before performing abnormality detection on the facility to be inspected according to the target detection route, the target detection time period, and the detection scheme handover information, the method further includes: sending the target detection route, the target detection time period, and the detection scheme handover information to the target inspection equipment to realize automatic inspection of the target inspection equipment during the target detection time period.

[0070] Among them, the target inspection equipment is a device that adjusts and optimizes the initial inspection equipment information, such as the equipment to be inspected in the facility to be inspected, which is used for automatic inspection.

[0071] Specifically, the initial inspection equipment information corresponding to the target time period is adjusted according to the abnormal prediction result to obtain the target inspection equipment. The specific process may be: according to the abnormal prediction result, such as the abnormal degree or abnormal probability, the detection equipment with an abnormal probability greater than a preset probability (such as 50%) is selected as the equipment to be inspected within the target detection time period, and the equipment to be inspected is the target inspection equipment. After determining the target inspection equipment, before performing abnormal detection on the facilities to be inspected, the target detection route, target detection time period, and detection plan handover information are sent to the target inspection equipment to realize automatic inspection of the target inspection equipment in the target detection time period, thereby improving the degree of automation and inspection efficiency of the facilities to be inspected.

[0072] In a specific embodiment, Figure 2 As shown, the generation of the detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period includes:

[0073] Step 108A, determining the preset handover information involved in each inspection point according to the inspection points corresponding to each detection device in the target detection route;

[0074] Step 108B, obtaining preset handover information of the target inspection route in the previous target detection time period in the target detection time period;

[0075] Step 108C, obtaining actual handover information of the target inspection personnel when inspecting the target inspection route in the previous target detection time period;

[0076] Step 108D, when the actual handover information is inconsistent with the preset handover information, sending a prompt message to the target inspection personnel who inspected the target inspection route in the previous target detection time period, the prompt message is used to prompt the corresponding target inspection personnel to hand over the information according to the preset handover information;

[0077] Step 108E, when the actual handover information is consistent with the preset handover information, the actual handover information corresponding to the previous target detection time period is determined as the scheme attribution parameter corresponding to the next target detection time period, and the detection scheme handover information with the same scheme attribution parameter is obtained.

[0078] The preset handover information may be tool handover information and the number of tools involved in the inspection process of the inspection point, and / or drug addition management information and the number of drugs at the drug addition point.

[0079] Specifically, according to the inspection points corresponding to each detection equipment in the target detection route, the preset handover information involved in each inspection point is determined. For the target inspection route in the previous target detection time period, after the inspection of the corresponding inspection points is completed, the actual handover information of the target inspection personnel is obtained. Then, the preset handover information and the actual handover information are compared. If they are consistent, it indicates that the handover information of the detection scheme with the same scheme attribution parameters is accurate, and the actual handover information is determined as the handover information of the detection scheme with the same scheme attribution parameters. If they are inconsistent, it indicates that the handover information of the detection scheme with the same scheme attribution parameters is accurate. If there is a missed handover or an erroneous handover, a prompt message is sent to the target inspection personnel who inspected the target inspection route in the previous target detection time period to prompt the corresponding target inspection personnel to hand over the information according to the preset handover information, so as to ensure the accuracy of the handover information and improve the accuracy of subsequent detections.

[0080] In one example, the preset handover information is tool handover information and the number of tools. Figure 3As shown, it is a page diagram of preset handover information. For the target inspection route in the previous target detection time period, after the inspection of the corresponding inspection points is completed, the actual handover information obtained by the target inspection personnel is that 1 vise and 1 plum blossom plate have been handed over, which is consistent with the preset handover information. Therefore, the actual handover information is determined as the detection scheme handover information with the same scheme attribution parameters and is sent to the target inspection personnel of the target inspection route in the next target detection time period, so that efficient inspection of the inspection points can be carried out subsequently based on the accurate detection scheme handover information.

[0081] In one example, the preset handover information is the dosing management information of the dosing point and the amount of the medicine. Figure 4 As shown, it is a page diagram of preset handover information. For the target inspection route in the previous target detection time period, after the inspection of the corresponding inspection points is completed, the actual handover information obtained by the target inspection personnel is that the dosage of polyaluminum chloride agent at the dosing point in the first phase dosing room is 0, which is consistent with the preset handover information. Therefore, the actual handover information is determined as the handover information of the detection scheme with the same scheme attribution parameters and is sent to the target inspection personnel of the target inspection route in the next target detection time period, so that the dosing management of the inspection points can be carried out based on the accurate detection scheme handover information.

[0082] In a specific embodiment, the preset handover information includes the handover object and the object quantity of the handover object; before determining the preset handover information involving each inspection point according to the inspection points corresponding to each detection equipment in the target detection route, it also includes: configuring the inspection handover objects and the number of inspection handover objects involved in each inspection point on the handover information configuration page; obtaining the updated inspection handover objects and the updated number of inspection handover objects filled in on the handover information configuration page after the target inspection personnel perform inspection operations on the corresponding inspection points, to obtain the preset handover information.

[0083] The preset handover information includes a handover object and the number of the handover object. For example, the handover object may be a handover tool and the number of the handover tools.

[0084] Specifically, the inspection handover objects and the number of inspection handover objects involved in each inspection point can be configured on the handover information configuration page. Then, after the target inspection personnel perform inspection operations on the corresponding inspection points, the updated inspection handover objects and the updated number of inspection handover objects filled in on the handover information configuration page can be obtained to obtain the preset handover information, thereby realizing real-time dynamic updating of the preset handover information and improving the accuracy of the preset handover information.

[0085] In a specific embodiment, before generating the detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period, it also includes: determining the inspection task volume of the patrol personnel corresponding to each initial patrol personnel information according to the target detection route, the target detection time period and the initial patrol personnel information; adjusting the initial patrol personnel information in the scheme attribution parameters according to each inspection task volume and a preset task volume threshold to obtain the adjusted scheme attribution parameters.

[0086] Specifically, the equipment to be inspected and the frequency of inspection for the equipment to be inspected can be determined based on the target detection routes in each target detection time period, and then the inspection task volume of the inspection personnel corresponding to each initial inspection personnel information can be determined. For example, for the blower, it is inspected 6 times in a week, that is, the corresponding inspection task volume is 6 times. When the inspection task volume is greater than the preset task volume threshold, the inspection personnel information can be added. When the inspection task volume is less than the preset task volume threshold, the inspection personnel information can be reduced to obtain the adjusted scheme attribution parameters, so as to improve the rationality of the scheme attribution parameters and greatly save manpower and material resources.

[0087] In a specific embodiment, before generating the detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period, it also includes: determining the inspection load of the inspection equipment corresponding to each initial inspection equipment information according to the target detection route, the target detection time period and the initial inspection equipment information; adjusting the initial inspection equipment information in the scheme attribution parameters according to each inspection load and a preset load threshold to obtain the adjusted scheme attribution parameters.

[0088] Specifically, the equipment to be inspected and the frequency of inspection for the equipment to be inspected can be determined based on the target detection routes in each target detection time period, and then the inspection load of the inspection equipment corresponding to each initial inspection equipment information can be determined. When the inspection load is greater than the preset load threshold, the inspection equipment can be added. When the inspection load is less than the preset load threshold, the inspection equipment can be reduced to obtain adjusted scheme attribution parameters, so as to improve the rationality of the scheme attribution parameters and improve the management efficiency of abnormal management of the facilities to be inspected.

[0089] like Figure 5 As shown, in one embodiment, a facility abnormality management device 200 is proposed, comprising:

[0090] An acquisition module 202 is used to acquire an initial detection plan of a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection plan includes a plan attribution parameter, an initial detection route, and an initial detection time period;

[0091] A first adjustment module 204, configured to adjust the initial detection time period according to the abnormality prediction result to obtain a target detection time period;

[0092] A second adjustment module 206, configured to adjust the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route;

[0093] A generating module 208, configured to generate detection scheme handover information having the same scheme attribution parameters according to the target detection route and the target detection time period;

[0094] The detection module 210 is used to perform abnormal detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information.

[0095] In one embodiment, the scheme attribution parameters include initial inspection personnel information; the facility abnormality management device also includes:

[0096] The third adjustment module is used to adjust the initial inspection personnel information corresponding to the target detection time period according to the abnormal prediction result to obtain the target inspection personnel information;

[0097] The first sending module is used to send the target detection route, the target detection time period, and the detection plan handover information to a terminal carried by the target inspection personnel corresponding to the target inspection personnel information.

[0098] In one embodiment, the scheme attribution parameters include initial inspection equipment information; the facility abnormality management device also includes:

[0099] A fourth adjustment module is used to adjust the initial inspection equipment information corresponding to the target detection time period according to the abnormality prediction result to obtain the target inspection equipment;

[0100] The second sending module is used to send the target detection route, the target detection time period, and the detection scheme handover information to the target inspection device, so that the target inspection device can perform automatic inspection in the target detection time period.

[0101] In one embodiment, the generating module is specifically used to: determine the preset handover information involved in each inspection point according to the inspection points corresponding to each detection device in the target detection route;

[0102] Obtaining preset handover information of a target inspection route in a previous target detection time period during the target detection time period;

[0103] Acquire actual handover information of target inspection personnel when inspecting the target inspection route in the previous target detection time period;

[0104] In the case where the actual handover information is inconsistent with the preset handover information, a prompt message is sent to the target inspection personnel who inspected the target inspection route in the previous target detection time period, and the prompt message is used to prompt the corresponding target inspection personnel to hand over the information according to the preset handover information;

[0105] When the actual handover information is consistent with the preset handover information, the actual handover information corresponding to the previous target detection time period is determined as the scheme attribution parameter corresponding to the next target detection time period to obtain the detection scheme handover information with the same scheme attribution parameter.

[0106] In one embodiment, the preset handover information includes the handover object and the number of the handover object; the facility abnormality management device further includes:

[0107] The configuration module is used to configure the inspection handover objects and the number of inspection handover objects involved in each inspection point on the handover information configuration page;

[0108] The update module is used to obtain the updated inspection handover object and the number of updated inspection handover objects filled in on the handover information configuration page after the target inspection personnel performs inspection operations on the corresponding inspection points, and obtain the preset handover information.

[0109] In one embodiment, the facility abnormality management device further includes:

[0110] A first determination module is used to determine the inspection task amount of the inspection personnel corresponding to each initial inspection personnel information according to the target detection route, the target detection time period, and the initial inspection personnel information;

[0111] The fifth adjustment module is used to adjust the initial inspection personnel information in the scheme attribution parameters according to each of the inspection task amounts and the preset task amount threshold, so as to obtain the adjusted scheme attribution parameters.

[0112] In one embodiment, the facility abnormality management device further includes:

[0113] A second determination module is used to determine the inspection load of the inspection equipment corresponding to each initial inspection equipment information according to the target detection route, the target detection time period, and the initial inspection equipment information;

[0114] The sixth adjustment module is used to adjust the initial inspection equipment information in the scheme attribution parameters according to each of the inspection loads and the preset load threshold to obtain the adjusted scheme attribution parameters.

[0115] Figure 6 FIG. 1 shows a block diagram of a computer device in an embodiment. The computer device may be a server, including but not limited to a high-performance computer and a high-performance computer cluster. Figure 6 As shown, the computer device includes a processor, a memory and a network interface connected via a system bus. The memory includes a non-volatile storage medium and an internal memory. The non-volatile storage medium of the computer device stores an operating system and may also store a computer program. When the computer program is executed by the processor, the processor may implement the facility abnormality management method. The internal memory may also store a computer program. When the computer program is executed by the processor, the processor may implement the facility abnormality management method. Those skilled in the art will understand that Figure 6 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0116] In one embodiment, the facility abnormality management method provided by the present application can be implemented in the form of a computer program. The computer program can be Figure 6 The computer device shown in the figure is run. The memory of the computer device can store various program templates constituting the facility abnormality management device, such as the acquisition module 202, the first adjustment module 204, the second adjustment module 206, the generation module 208, and the detection module 210.

[0117] A computer device comprises a memory, a processor and a computer program stored in the memory and executable on the processor, wherein the processor implements the following steps when executing the computer program: obtaining an initial detection scheme for a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected comprises a plurality of detection devices, and the initial detection scheme comprises scheme attribution parameters, an initial detection route and an initial detection time period; adjusting the initial detection time period according to the abnormality prediction result to obtain a target detection time period; adjusting the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route; generating detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period; and performing abnormality detection on the facility to be detected according to the target detection route, the target detection time period and the detection scheme handover information.

[0118] A computer-readable storage medium stores a computer program, which implements the following steps when executed by a processor: obtaining an initial detection scheme for a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes multiple detection devices, and the initial detection scheme includes scheme attribution parameters, an initial detection route, and an initial detection time period; adjusting the initial detection time period according to the abnormality prediction result to obtain a target detection time period; adjusting the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route; generating detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period; and performing abnormality detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information.

[0119] A computer program product includes a computer program / instruction, which implements the following steps when executed by a processor: obtaining an initial detection scheme for a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes multiple detection devices, and the initial detection scheme includes scheme attribution parameters, an initial detection route, and an initial detection time period; adjusting the initial detection time period according to the abnormality prediction result to obtain a target detection time period; adjusting the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route; generating detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period; and performing abnormality detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information.

[0120] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the program can be stored in a non-volatile computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application can include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM), and memory bus dynamic RAM (RDRAM).

[0121] The technical features of the above embodiments may be combined arbitrarily. To make the description concise, not all possible combinations of the technical features in the above embodiments are described. However, as long as there is no contradiction in the combination of these technical features, they should be considered to be within the scope of this specification.

[0122] The above-mentioned embodiments only express several implementation methods of the present application, and the descriptions thereof are relatively specific and detailed, but they cannot be understood as limiting the scope of the present application. It should be pointed out that, for a person of ordinary skill in the art, several variations and improvements can be made without departing from the concept of the present application, and these all belong to the protection scope of the present application. Therefore, the protection scope of the present application shall be subject to the attached claims.

Claims

1. A facility abnormality management method, characterized in that: include: Acquire an initial detection plan of a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection plan includes plan attribution parameters, an initial detection route, and an initial detection time period; Adjusting the initial detection time period according to the abnormality prediction result to obtain a target detection time period; According to the target detection time period and the abnormality prediction result, the initial detection route is adjusted to obtain a target detection route; Generate detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period; The facility to be inspected is subjected to abnormality detection according to the target detection route, the target detection time period, and the detection scheme handover information.

2. The facility abnormality management method according to claim 1, characterized in that: The scheme attribution parameters include initial inspection personnel information; the method also includes: According to the abnormal prediction result, the initial inspection personnel information corresponding to the target detection time period is adjusted to obtain the target inspection personnel information; Before performing abnormality detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information, the method further includes: The target detection route, the target detection time period, and the detection scheme handover information are sent to a terminal carried by the target inspection personnel corresponding to the target inspection personnel information.

3. The facility abnormality management method according to claim 2, characterized in that: The scheme attribution parameters include initial inspection equipment information; the method also includes: According to the abnormal prediction result, the initial inspection equipment information corresponding to the target detection time period is adjusted to obtain the target inspection equipment; Before performing abnormality detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information, the method further includes: The target detection route, the target detection time period, and the detection scheme handover information are sent to the target inspection device, so that the target inspection device can perform automatic inspection in the target detection time period.

4. The facility abnormality management method according to claim 2, characterized in that: The generating, according to the target detection route and the target detection time period, the detection scheme handover information having the same scheme attribution parameters comprises: According to the inspection points corresponding to each detection equipment in the target detection route, determine the preset handover information involved in each inspection point; Obtaining preset handover information of a target inspection route in a previous target detection time period during the target detection time period; Acquire actual handover information of target inspection personnel when inspecting the target inspection route in the previous target detection time period; In the case where the actual handover information is inconsistent with the preset handover information, a prompt message is sent to the target inspection personnel who inspected the target inspection route in the previous target detection time period, and the prompt message is used to prompt the corresponding target inspection personnel to hand over the information according to the preset handover information; When the actual handover information is consistent with the preset handover information, the actual handover information corresponding to the previous target detection time period is determined as the scheme attribution parameter corresponding to the next target detection time period to obtain the detection scheme handover information with the same scheme attribution parameter.

5. The facility abnormality management method according to claim 4, characterized in that: The preset handover information includes the handover object and the object quantity of the handover object; Before determining the preset handover information involved in each inspection point according to the inspection points corresponding to each detection device in the target detection route, the method further includes: On the handover information configuration page, configure the inspection handover objects and the number of inspection handover objects involved in each inspection point; The preset handover information is obtained by obtaining the updated inspection handover object and the number of updated inspection handover objects filled in on the handover information configuration page after the target inspection personnel performs inspection operations on the corresponding inspection points.

6. The facility abnormality management method according to claim 2, characterized in that: Before generating the detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period, the method further includes: Determine the inspection task amount of the inspection personnel corresponding to each initial inspection personnel information according to the target detection route, the target detection time period, and the initial inspection personnel information; According to each of the inspection task amounts and the preset task amount threshold, the initial inspection personnel information in the scheme attribution parameter is adjusted to obtain the adjusted scheme attribution parameter.

7. The facility abnormality management method according to claim 3, characterized in that: Before generating the detection scheme handover information with the same scheme attribution parameters according to the target detection route and the target detection time period, the method further includes: Determine the inspection load of the inspection equipment corresponding to each initial inspection equipment information according to the target detection route, the target detection time period, and the initial inspection equipment information; According to each of the inspection loads and the preset load threshold, the initial inspection equipment information in the scheme attribution parameter is adjusted to obtain the adjusted scheme attribution parameter.

8. A facility abnormality management device, characterized in that: include: An acquisition module, used to acquire an initial detection scheme of a facility to be detected and an abnormality prediction result of the facility to be detected, wherein the facility to be detected includes a plurality of detection devices, and the initial detection scheme includes scheme attribution parameters, an initial detection route, and an initial detection time period; A first adjustment module, configured to adjust the initial detection time period according to the abnormality prediction result to obtain a target detection time period; A second adjustment module, configured to adjust the initial detection route according to the target detection time period and the abnormality prediction result to obtain a target detection route; A generating module, configured to generate detection scheme handover information having the same scheme attribution parameters according to the target detection route and the target detection time period; The detection module is used to perform abnormal detection on the facility to be detected according to the target detection route, the target detection time period, and the detection scheme handover information.

9. A computer device comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, characterized in that: When the processor executes the computer program, the facility abnormality management method according to any one of claims 1 to 7 is implemented.

10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the facility abnormality management method according to any one of claims 1 to 7 is implemented.