Production line material frame circulation method and system and medium
By automatically matching the material frame flow path and monitoring time-consuming abnormalities, the problem of poor adaptability of existing production lines to different material processing processes is solved, and efficient and flexible material frame flow and dynamic balance of production lines is achieved.
Patent Information
- Application Number
- CN202411064682.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-05
- Publication Date
- 2024-11-26
AI Technical Summary
The existing production lines cannot fully adapt to different types of material processing processes, which makes processing preparation time-consuming and labor-intensive, and errors are prone to material flow reliance on manual scheduling, resulting in low production efficiency and poor flexibility.
By obtaining information about materials and stations, automatically match the material frame flow path, use the transmission and return mechanism to realize the material frame circulation flow, automatically judge the process sequence and employee expertise, monitor time-consuming abnormalities, and achieve fully automated flow and dynamic balance.
It improves the efficiency and flexibility of the production line material frame flow, reduces the risk of material blockage, ensures the reliability and standardization of the production process, and improves the dynamic balance of the production line and the utilization of employee resources.
Smart Images

Figure CN119026844A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of production line automation, and in particular to a production line material frame circulation method, system and medium. Background Art
[0002] In order to improve production efficiency, existing production lines usually set up workstations for different processes in sequence according to the production process. The material flow method is to complete one process and then send it to the next process until the entire production process is completed.
[0003] However, due to the differences in the processing procedures for different materials, the production line in the prior art that sets up workstations according to the order of the processing procedures cannot fully adapt to the processing of different types of materials. When the processing procedure needs to be changed, the order of different workstations needs to be adjusted accordingly, resulting in a time-consuming and labor-intensive preparation process before processing. In addition, the flow of materials must be carried out in the order of the production process. When an abnormality occurs in the previous process, all workstations in the subsequent processes will be affected, thereby affecting production efficiency. At the same time, the material flow process in the prior art usually requires manual allocation and material delivery to the workstations of each process, and is highly dependent on manual labor. However, in a relatively busy production process, manual scheduling of the material production process is prone to errors. When errors occur in the material flow scheduling, problems such as material blockage may occur, resulting in low overall efficiency and poor flexibility of the production line. Summary of the invention
[0004] The purpose of this application is to provide a production line material frame circulation method, system and medium to improve the efficiency and flexibility of production line material frame circulation.
[0005] In the first aspect, the present application provides a production line material frame circulation method using the following technical solution: A production line material frame circulation method, comprising: Obtaining material production information of the material to be produced, wherein the material production information includes the process sequence and the standard time consumption of each process; Obtaining the workstation information of each workstation on the production line, wherein the workstation information includes the workstation number corresponding to the workstation, the available processes and the current working status; Obtaining material frame information of the material frame to be dispatched collected by the material dispatching mechanism, wherein the material frame information includes a material frame number corresponding to the material frame and a current process; Obtain the material-waiting station according to the material frame information of the material-waiting station and the station information of each station; Control the conveying mechanism to transfer the material frame to be dispatched to the material waiting station; Obtaining the material frame information of the material frame after the current process is completed collected by the reflow mechanism; According to the material frame information, the reflux mechanism is controlled to transfer the material frame after the current process is completed to the material delivery mechanism or quality inspection mechanism.
[0006] By adopting the above-mentioned technical scheme, the present application obtains the workstation information and the material frame information of the current material frame to be sent, and circulates the material frame according to the current process matching the corresponding material-waiting workstation. After the current process is completed, the material frame can continue to be circulated according to the next process matching the next material-waiting workstation, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different process sequences. At the same time, the circulation of the material frame is realized through the coordination of the conveying mechanism and the reflux mechanism, which effectively solves the problem of material blockage that may occur during the circulation process, improves the efficiency and flexibility of the material frame circulation of the production line, and realizes the dynamic balance of the production line.
[0007] Furthermore, the controlling of the reflow mechanism according to the material frame information to transfer the material frame after the current process is completed to the material delivery mechanism or the quality inspection mechanism specifically includes: Determine whether the material frame has completed all processes based on the material frame information after the current process is completed; When all processes have been completed, the control return mechanism transfers the material frames that have completed all processes to the quality inspection mechanism; When all processes are not completed, the current process of the material frame information is modified to the next process according to the process sequence, and the reflux mechanism is controlled to transfer the material frame that needs to undergo the next process to the material delivery mechanism.
[0008] By adopting the above-mentioned technical solution, the present application controls the reflux mechanism to automatically transfer the material frame to the quality inspection mechanism or the material delivery mechanism by judging whether the material has completed all production processes. There is no need to transfer the material frame in sequence according to the process sequence and finally transfer it to the quality inspection mechanism, thereby making the material frame flow of the production line more flexible.
[0009] Furthermore, when the control reflux mechanism transfers the material frame that needs to be processed in the next process to the material delivery mechanism, it also includes: Get whether the material issuing agency currently has a material frame to be issued; When the material delivery mechanism has no material frames to be delivered, the material frames that need to be processed in the next process are transferred to the material delivery mechanism; When the material delivery mechanism already has material frames to be delivered, the material frames that need to undergo the next process will be transferred to the loading mechanism.
[0010] By adopting the above-mentioned technical scheme, the present application stores material frames that have not yet been dispatched through the loading mechanism. Therefore, when the material frame needs to be dispatched again after completing the previous process, it is necessary to first determine whether the current material delivery mechanism already has material frames to be dispatched, and then transfer the material frame to the material delivery mechanism or the loading mechanism based on the judgment result, to ensure the stability of the material frame during the circulation process, realize fully automatic circulation, and improve the reliability of the material frame circulation of the production line.
[0011] Furthermore, before obtaining the workstations waiting for materials according to the material frame information of the material frame to be sent and the workstation information of each workstation, the method further includes: Obtaining employee information for each workstation, the employee information including the employee number, the corresponding workstation number, and the number of abnormal warnings for each process; Determine whether each employee corresponds to a workstation based on employee information and workstation information; When each employee corresponds to a workstation, the workstation waiting for materials is obtained according to the material frame information of the material frame to be sent and the workstation information of each workstation; When an employee does not correspond to a workstation, an employee abnormality warning signal is sent to the workstation where the employee does not correspond to the workstation.
[0012] By adopting the above-mentioned technical scheme, the employees on the production line of the present application correspond one-to-one to the workstations, so that it is possible to determine whether each employee is at the corresponding workstation based on the employee information and the workstation information. At the same time, since the processes that each employee is good at or not good at are usually different, the processes that can be performed in the workstation information are based on the several processes that the corresponding employee is good at. Therefore, the present application can allocate each process more flexibly, and transfer the material frame to the workstation corresponding to the employee who is good at the current process, thereby improving the flexibility of the material frame flow of the production line while ensuring production efficiency and achieving dynamic balance of the production line.
[0013] Furthermore, the method of transferring the material frame after the current process is completed to the material delivery mechanism or the quality inspection mechanism according to the material frame information further includes: Get the actual time consumed after the current process is completed; Perform time consumption analysis based on actual time consumption and standard time consumption to obtain time consumption analysis results; Preset the time consumption requirement range, and judge whether the time consumption analysis result meets the requirements based on the time consumption analysis result and the time consumption requirement range; When the time consumption analysis result meets the requirements, the material frame after the current process is completed will be transferred to the material delivery organization or quality inspection organization according to the material frame information; When the time consumption analysis result does not meet the requirements, a time consumption abnormality warning signal is sent to the workstation where the time consumption analysis result does not meet the requirements, and the number of abnormal warnings for the current process of the employee corresponding to the workstation is accumulated and increased by one.
[0014] By adopting the above-mentioned technical scheme, the present application determines whether the current process has an abnormal situation of taking too long or too short a time by monitoring the actual time consumption. A long time consumption may be due to the low proficiency of the employee or production errors, and a short time consumption may be due to the employee's carelessness in production or just doing it perfunctorily. Therefore, it is necessary to send a time-consuming abnormal warning signal and increase the number of abnormal warnings for the current process of the employee corresponding to the workstation by one, so as to ensure the reliability and standardization of the production process.
[0015] Furthermore, the preset time consumption requirement range determines whether the time consumption analysis result meets the requirement according to the time consumption analysis result and the time consumption requirement range, specifically including: The time consumption analysis result is ST / CT, where ST is the standard time consumption and CT is the actual time consumption; The preset time requirement range is 0.8~1.5; When ST / CT is greater than or equal to 0.8 and less than or equal to 1.5, the time consumption analysis results meet the requirements; When ST / CT is less than 0.8 or greater than 1.5, the time consumption analysis result does not meet the requirements.
[0016] By adopting the above technical solution, the present application can more intuitively judge whether the actual time consumption meets the standard through ST / CT. When ST / CT is within a reasonable range, the actual time consumption will not be too long or too short, which meets the actual time consumption requirements. When ST / CT exceeds the reasonable range, the actual time consumption is too long or too short, which does not meet the actual time consumption requirements, so that the corresponding employees can be warned in time to confirm or correct it in time, ensuring the reliability and standardization of the production process.
[0017] Furthermore, it also includes modifying the workstation information of the corresponding workstation according to the number of abnormal warnings of each process of the employee, including: A threshold value of the number of abnormal warnings is preset. When the number of abnormal warnings for a process of a certain employee exceeds the threshold value, the process is removed from the available processes of the corresponding workstation of the employee.
[0018] By adopting the above technical solution, the present application records the number of abnormal warnings for each process through employee information. When the number of abnormal warnings exceeds the abnormal warning threshold, it indicates that the employee is not good at the process. Therefore, the workstation information will be modified accordingly. The next time the material frame to be sent needs to perform the process, the workstation will not be matched, making the workstation matching more reasonable and further improving the flexibility and reliability of the material frame flow of the production line.
[0019] Further, the obtaining of the material-waiting station according to the material frame information of the material frame to be sent and the station information of each station specifically includes: Obtain idle workstation information based on the current working status of each workstation; According to the idle station information, the station number of the current process in the process containing the material to be dispatched frame is obtained; Select the station with the earliest station number as the waiting station.
[0020] By adopting the above-mentioned technical scheme, when matching the material frame to be dispatched and the workstation, the present application mainly matches the processes that can be performed after removing the processes whose number of abnormal warnings exceeds the threshold number of abnormal warnings in the workstation information with the current process of the material frame to be dispatched. This can more reasonably arrange the workstations suitable for the current process, improve the flexibility and reliability of the material frame flow of the production line, and ensure production efficiency.
[0021] In the second aspect, the present application provides a production line material frame circulation system adopting the following technical solution: A production line material frame circulation system, comprising a production line body and a processor, wherein the production line body and the processor are in communication connection, and the processor is used to execute a production line material frame circulation method according to the first aspect; The production line itself includes: The material delivery mechanism is used to collect the material frame information of the material frame to be delivered and upload it to the processor; The conveying mechanism is used to transfer the material frame to be sent to the material waiting station under the control of the processor; The reflux mechanism is used to collect the material frame information of the material frame after the current process is completed and upload it to the processor, and under the control of the processor, the material frame after the current process is completed is transferred to the material delivery mechanism or the quality inspection mechanism; The quality inspection mechanism is used to unload and inspect the material frames that have completed all processes under the control of the processor.
[0022] By adopting the above technical solution, the present application realizes the fully automatic circulation of material frames of the production line through the processor-controlled automation system, and can flexibly adjust the circulation target according to the actual production situation, thereby improving the efficiency and flexibility of the circulation of material frames of the production line.
[0023] In a third aspect, the present application provides a computer-readable storage medium that adopts the following technical solution: A computer-readable storage medium stores a computer program that can be loaded by a processor and executed by a production line material frame flow method as described in the first aspect.
[0024] By adopting the above-mentioned technical scheme, the present application obtains the workstation information and the material frame information of the current material frame to be sent, and circulates the material frame according to the current process matching the corresponding material-waiting workstation. After the current process is completed, the material frame can continue to be circulated according to the next process matching the next material-waiting workstation. The production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different process sequences, thereby improving the efficiency and flexibility of the material frame circulation of the production line.
[0025] In summary, the present application includes at least one of the following beneficial technical effects: 1. This application obtains the station information and the material frame information of the current material frame to be sent, and circulates the material frame according to the current process matching the corresponding material station to be sent. After the current process is completed, the material frame can continue to be circulated according to the next process matching the next material station to be sent, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different process sequences, thereby improving the efficiency and flexibility of the material frame circulation of the production line; 2. This application automatically transfers the material frame to the quality inspection agency or the delivery agency by judging whether the material has completed all the production processes. It does not need to be transferred in sequence according to the process sequence and finally transferred to the quality inspection agency, making the production line material frame flow more flexible; 3. This application can allocate each process more flexibly, and transfer the material frame to the corresponding workstation of the employee who is good at the current process, thereby improving the flexibility of the material frame flow of the production line while ensuring production efficiency and achieving dynamic balance of the production line. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] Figure 1 is a method flow chart of an embodiment of the present application; Figure 2 This is a flow chart of the employee abnormality warning method of an embodiment of the present application; Figure 3 This is a flow chart of the time-consuming abnormal warning method according to an embodiment of the present application; Figure 4 is a system structure diagram of an embodiment of the present application; In the figure, 100 is the production line body; 101 is the material delivery mechanism; 102 is the conveying mechanism; 103 is the return mechanism; 104 is the quality inspection mechanism; 200 is the processor. DETAILED DESCRIPTION
[0027] The following is combined with Figure 1 -Attached Figure 4 , further details of this application are given.
[0028] In the prior art, a production line that sets workstations according to the order of the production process cannot fully adapt to the production of different types of materials, and the flow of materials must be carried out in the order of the production process. When an abnormality occurs in the previous process, all workstations in the subsequent processes will be affected, which will affect the production efficiency and lead to poor overall flexibility of the production line. Therefore, the embodiment of the present application provides a production line material frame flow method, referring to Figure 1 ,include: S1. Obtain material production information of the material currently to be produced.
[0029] Specifically, the production information for different types of materials is different. Therefore, before starting production, it is necessary to obtain the material production information of the material to be produced. The material production information includes the process sequence and the standard time for each process. The process sequence is pre-set according to demand, and the standard time for each process is obtained based on past experience records.
[0030] S2. Obtain the workstation information of each workstation on the production line.
[0031] Specifically, a production line is usually provided with multiple workstations. Unlike the prior art in which workstations are arranged in the order of the production process, the workstations in the embodiment of the present application do not have a fixed order. Each workstation corresponds to a workstation information, and the workstation information includes the workstation number corresponding to the workstation, the available processes, and the current working status. Among them, the available processes are the processes that the workstation can perform, which are usually multiple. The current working status includes working, resting, and idle. If the current working status is working, it means that the workstation is currently working. If the current working status is resting, it means that the workstation is currently resting and cannot work. If the current working status is idle, it means that the workstation is currently idle and can work.
[0032] S3. Obtaining the material frame information of the material frame to be dispatched collected by the material dispatching mechanism.
[0033] Specifically, a production line usually uses multiple material frames, which are used to place multiple materials to facilitate material flow. Each material frame corresponds to a material frame information, which includes the material frame number and the current process corresponding to the material frame. The current process is the process that the material frame needs to perform next. In the specific implementation process, a label chip storing the corresponding material frame information is set on the surface of the material frame. When the material frame information needs to be obtained, the material delivery mechanism performs non-contact data communication with the label of the material frame through radio frequency identification technology (RFID), thereby reading the material frame information.
[0034] S4. Obtain the material-waiting station according to the material frame information of the material-waiting station and the station information of each station.
[0035] Specifically, according to the current process in the material frame information, a workstation that can perform the process and is currently in an idle state is matched as a waiting workstation.
[0036] S5. Control the conveying mechanism to transfer the material frame to be dispatched to the material waiting station.
[0037] Specifically, the conveying mechanism includes a conveyor belt and a baffle plate in front of each workstation. When the waiting station is matched, the conveyor belt conveys the waiting frame toward the waiting station and controls the baffle plate in front of the waiting station to open. When the waiting frame is conveyed to the waiting station, it flows to the waiting station due to the limiting of the baffle plate, thereby realizing the automatic flow of the waiting frame.
[0038] S6. Obtaining material frame information of the material frame after the current process is completed collected by the reflow mechanism.
[0039] Specifically, the material frame after the current process is completed enters the reflow mechanism, and the reflow mechanism performs non-contact data communication with the tag of the material frame through radio frequency identification technology (RFID), thereby reading the material frame information.
[0040] S7. According to the material frame information, the reflow mechanism is controlled to transfer the material frame after the current process is completed to the material delivery mechanism or the quality inspection mechanism.
[0041] Specifically, the material frame is judged whether all processes have been completed according to the material frame information after the current process is completed. When all processes have been completed, the reflux mechanism is controlled to transfer the material frame that has completed all processes to the quality inspection mechanism, so that the quality inspection mechanism can perform quality inspection on the materials in the material frame that has completed all processes. When all processes have not been completed, the current process of the material frame information is modified to the next process according to the process sequence, and the reflux mechanism is controlled to transfer the material frame that needs to undergo the next process to the material delivery mechanism, so that the material delivery mechanism can re-match the material waiting station according to the next process.
[0042] The implementation principle of the embodiment of the present application is: by obtaining the workstation information and the material frame information of the current material frame to be sent, and matching the corresponding material-waiting workstation according to the current process to circulate the material frame, after the current process is completed, it can continue to match the next material-waiting workstation according to the next process to circulate the material frame, so that the production line is no longer limited to a specific process sequence, and can be more adaptable to the production of materials with different process sequences, thereby improving the efficiency and flexibility of the material frame circulation of the production line.
[0043] The employees on the production line of this application correspond to the workstations one by one. Since each employee is usually good at or not good at different processes, the available processes in the workstation information are based on the number of processes that the corresponding employee is good at. In order to further improve the flexibility of the material frame flow of the production line while ensuring production efficiency, refer to Figure 2 , before obtaining the material-waiting station according to the material frame information of the material frame to be sent and the station information of each station, the embodiment of the application also includes: A1. Get the employee information of each workstation.
[0044] Specifically, employee information includes employee number, corresponding workstation number and the number of abnormal warnings for each process. Employee information also includes basic information of employees, such as name, age, length of service and training status of various skills, etc. In the specific implementation process, employee information can be matched with employee facial data. Facial recognition equipment is installed in front of each workstation. The facial data of employees at each workstation is collected through the facial recognition equipment, so as to match employee information according to facial data.
[0045] A2. Determine whether each employee corresponds to a workstation based on the employee information and workstation information.
[0046] Specifically, by one-to-one correspondence between employee numbers and workstation numbers, it can be determined whether each employee is currently at the workstation corresponding to him / her.
[0047] A3. When each employee corresponds to a workstation, the workstation waiting for materials is obtained according to the material frame information of the material frame to be sent and the workstation information of each workstation.
[0048] Specifically, when it is ensured that each employee is at his or her corresponding workstation, material delivery can be carried out normally.
[0049] A4. When an employee does not correspond to a workstation, an employee abnormality warning signal is sent to the workstation where the employee does not correspond to the workstation.
[0050] Specifically, when an employee is not at the corresponding workstation, an alarm warning will sound at the workstation to prompt the employee to return to his or her corresponding workstation as soon as possible.
[0051] In order to ensure the reliability and standardization of the production process, refer to Figure 3 , the embodiment of the present application can also determine whether the current process has an abnormal situation of taking too long or too short time by monitoring the actual time consumption, including: B1. Get the actual time consumed after the current process is completed.
[0052] Specifically, the timing starts from when the material frame flows to the material waiting station, and stops when the material frame enters the reflow mechanism after the current process is completed, so as to obtain the actual time consumed after the current process is completed.
[0053] B2. Perform time analysis based on actual time and standard time to obtain the time analysis results.
[0054] Specifically, the time consumption analysis result is expressed by ST / CT, where ST is the standard time consumption and CT is the actual time consumption.
[0055] B3. Preset the time requirement range, and determine whether the time analysis results meet the requirements based on the time analysis results and the time requirement range.
[0056] Specifically, the preset time requirement range is 0.8~1.5. During the specific implementation process, the preset time requirement range can be adjusted according to the actual conditions of different employees or different processes.
[0057] B4. When the time consumption analysis results meet the requirements, the material frame after the current process is completed will be transferred to the material delivery agency or quality inspection agency according to the material frame information.
[0058] Specifically, when ST / CT is greater than or equal to 0.8 and less than or equal to 1.5, the time consumption analysis result meets the requirements and the next step can be carried out normally.
[0059] B5. When the time consumption analysis result does not meet the requirements, a time consumption abnormality warning signal is sent to the workstation where the time consumption analysis result does not meet the requirements, and the number of abnormality warnings for the current process of the employee corresponding to the workstation is increased by one.
[0060] Specifically, when ST / CT is less than 0.8 or greater than 1.5, the time analysis result does not meet the requirements. If ST / CT is less than 0.8, the current process is abnormally too time-consuming, which may be due to the low proficiency of the employee or production errors. If ST / CT is greater than 1.5, the current process is abnormally too short, which may be due to the employee's carelessness in production or perfunctory work. Therefore, a time-consuming abnormality warning signal needs to be sent and the number of abnormality warnings for the current process of the corresponding employee at the workstation is accumulated once.
[0061] In order to further increase the rationality of the matching of the workstations for materials to be sent, the embodiment of the present application also includes modifying the workstation information of the corresponding workstation according to the number of abnormal warnings of each process of the employee, specifically including: presetting the threshold of the number of abnormal warnings, when the number of abnormal warnings of a certain process of a certain employee exceeds the threshold of the number of abnormal warnings, the process is removed from the available processes of the corresponding workstation of the employee. Since the number of abnormal warnings exceeds the threshold of the number of abnormal warnings, it indicates that the employee is not good at the process, so the workstation information will be modified accordingly, and the workstation will not be matched when the next material frame needs to perform the process.
[0062] When matching the material frame to be dispatched and the workstation, the embodiment of the present application mainly matches the current process of the material frame to be dispatched with the processes that can be retained after removing the processes whose abnormal warning times exceed the abnormal warning times threshold in the workstation information, so that the workstations suitable for the current process can be arranged more reasonably, the flexibility and reliability of the material frame flow of the production line can be improved, and the production efficiency can be ensured. Therefore, step S4 of the embodiment of the present application specifically includes: S41. Obtain idle workstation information according to the current working status of each workstation.
[0063] Specifically, the current working status includes working, resting, and idle. If the current working status is idle, it means that the workstation is currently idle and can be used for work.
[0064] S42, obtaining the station number of the current process of the frame to be dispatched in the process according to the idle station information.
[0065] Specifically, the workstation number containing the current process is selected from the workstations whose current working status is idle, that is, the process whose number of abnormal warnings does not exceed the abnormal warning number threshold, that is, the process that the employee corresponding to the workstation is more proficient in.
[0066] S43, select the station with the earliest station number as the waiting station.
[0067] Specifically, if there are multiple workstations that meet the first two requirements, the workstations that meet the first two requirements are sorted according to the workstation numbers, and the first workstation is selected as the material waiting workstation.
[0068] In order to further ensure the stability of the material frame transfer process and material delivery, the embodiment of the present application further includes: S71. Obtain whether the material delivery mechanism currently has a frame to be delivered.
[0069] Specifically, the material delivery mechanism performs contactless data communication with the tag of the material frame through radio frequency identification technology (RFID). When the tag is not read, it indicates that the material delivery mechanism currently has no material delivery frame.
[0070] S72. When the material delivery mechanism has no material frames to be delivered, the material frames that need to be processed in the next process are transferred to the material delivery mechanism.
[0071] Specifically, the material delivery mechanism re-matches the corresponding material waiting station according to the next process that the material frame needs to perform.
[0072] S73. When the material delivery mechanism has material frames to be delivered, the material frames that need to be processed in the next step are transferred to the loading mechanism.
[0073] Specifically, the feeding mechanism stores all the material frames that have not been delivered, and sequentially feeds the material frames to the delivery mechanism according to the order in which they are transferred to the feeding mechanism.
[0074] The present application also provides a production line material frame circulation system, referring to Figure 4 , including a production line body 100 and a processor 200, the production line body 100 includes a material sending mechanism 101, a conveying mechanism 102, a return mechanism 103 and a quality inspection mechanism 104, the production line body 100 and the processor 200 are communicatively connected, and the processor 200 is used to execute a production line material frame circulation method: S1. Obtain material production information of the material currently to be produced.
[0075] S2. Obtain the workstation information of each workstation on the production line.
[0076] S3. Obtaining the material frame information of the material frame to be dispatched collected by the material dispatching mechanism 101.
[0077] S4. Obtain the material-waiting station according to the material frame information of the material-waiting station and the station information of each station.
[0078] S5, controlling the conveying mechanism 102 to transfer the material frame to be dispatched to the material waiting station.
[0079] S6. Obtaining the material frame information of the material frame after the current process is completed collected by the reflow mechanism 103.
[0080] S7. Control the reflow mechanism 103 according to the material frame information to transfer the material frame after the current process is completed to the material delivery mechanism 101 or the quality inspection mechanism 104.
[0081] The material delivery mechanism 101 of the embodiment of the present application is used to collect the material frame information of the material frame to be delivered and upload it to the processor 200, so that the processor 200 obtains the material-delivery station according to the material frame information of the material frame to be delivered and the station information of each station. In the specific implementation process, the material delivery mechanism performs non-contact data communication with the label of the material frame through radio frequency identification technology (RFID) to read the material frame information. The conveying mechanism 102 is used to transfer the material frame to be delivered to the material-delivery station under the control of the processor 200. In the specific implementation process, the conveying mechanism 102 includes a conveyor belt and a baffle plate in front of each station. When the material-delivery station is matched, the conveyor belt conveys the material frame to be delivered toward the material-delivery station, controls the baffle plate in front of the material-delivery station to open, and when the material frame to be delivered is transferred to the material-delivery station due to the limit of the baffle plate, it flows to the material-delivery station. The reflux mechanism 103 is used to collect the material frame information of the material frame after the current process is completed and upload it to the processor 200. Under the control of the processor 200, the material frame after the current process is completed is transferred to the material sending mechanism 101 or the quality inspection mechanism 104. In the specific implementation process, the reflux mechanism 103 performs non-contact data communication with the tag of the material frame through radio frequency identification technology (RFID) to read the material frame information. The reflux mechanism 103 includes a reverse conveyor belt arranged under the conveying mechanism 102. According to the material frame information after the current process is completed, it is determined whether the material frame has completed all processes. When all processes have been completed, the reflux mechanism 103 is controlled to transfer the material frame that has completed all processes to the quality inspection mechanism 104, so that the quality inspection mechanism 104 can perform quality inspection on the materials in the material frame that has completed all processes. When all processes are not completed, the current process of the material frame information is modified to the next process according to the process sequence, and the return mechanism 103 is controlled to transfer the material frame that needs to undergo the next process to the material delivery mechanism 101, so that the material delivery mechanism 101 can re-match the material waiting station according to the next process. The quality inspection mechanism 104 is used to unload and inspect the material frame that has completed all processes under the control of the processor 200. In the specific implementation process, manual quality inspection can be used or automatic quality inspection functions such as visual inspection can be used.
[0082] The production line body of the embodiment of the present application also includes a loading mechanism, which is used to load materials to the material frames to be delivered under the control of the processor 200. The loading mechanism stores all material frames that have not been delivered and loads the material frames in sequence.
[0083] The present application also provides a computer-readable storage medium on which a computer program is stored. When the computer program is executed by the processor 200, the following steps are implemented: S1. Obtain material production information of the material currently to be produced.
[0084] S2. Obtain the workstation information of each workstation on the production line.
[0085] S3. Obtaining the material frame information of the material frame to be dispatched collected by the material dispatching mechanism 101.
[0086] S4. Obtain the material-waiting station according to the material frame information of the material-waiting station and the station information of each station.
[0087] S5, controlling the conveying mechanism 102 to transfer the material frame to be dispatched to the material waiting station.
[0088] S6. Obtaining the material frame information of the material frame after the current process is completed collected by the reflow mechanism 103.
[0089] S7. Control the reflow mechanism 103 according to the material frame information to transfer the material frame after the current process is completed to the material delivery mechanism 101 or the quality inspection mechanism 104.
[0090] When the processor 200 executes the computer program, it can also execute the steps of the production line material frame flow method in any of the above embodiments.
[0091] Those of ordinary skill in the art can understand that all or part of the processes in the above-mentioned embodiment methods can be completed by instructing the relevant hardware through a computer program, and the computer program can be stored in a non-volatile computer-readable storage medium. When the computer program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, any reference to memory, storage, database or other media used in the embodiments provided in this application may include non-volatile and / or volatile memory. Non-volatile memory may include read-only memory (ROM), programmable ROM (PROM), electrically programmable ROM (EPROM), electrically erasable programmable ROM (EEPROM) or flash memory. Volatile memory may include random access memory (RAM) or external cache memory. As an illustration and not limitation, RAM is available in many forms, such as static RAM (SRAM), dynamic RAM (DRAM), synchronous DRAM (SDRAM), double data rate SDRAM (DDRSDRAM), enhanced SDRAM (ESDRAM), synchronous link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic RAM (DRDRAM) and memory bus dynamic RAM (RDRAM).
[0092] Those skilled in the art can clearly understand that for the convenience and simplicity of description, only the division of the above-mentioned functional units and modules is used as an example. In actual applications, the above-mentioned functions can be distributed and completed by different functional units and modules as needed, that is, the internal structure of the device can be divided into different functional units or modules to complete all or part of the functions described above.
[0093] The embodiments of this specific implementation are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. The same components are represented by the same figure marks. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. A production line material frame circulation method, characterized in that: include: Obtaining material production information of the material to be produced, wherein the material production information includes the process sequence and the standard time consumption of each process; Obtaining the workstation information of each workstation on the production line, wherein the workstation information includes the workstation number corresponding to the workstation, the available processes and the current working status; Obtaining material frame information of the material frame to be dispatched collected by the material dispatching mechanism, wherein the material frame information includes a material frame number corresponding to the material frame and a current process; Obtain the material-waiting station according to the material frame information of the material-waiting station and the station information of each station; Control the conveying mechanism to transfer the material frame to be dispatched to the material waiting station; Obtaining the material frame information of the material frame after the current process is completed collected by the reflow mechanism; According to the material frame information, the reflux mechanism is controlled to transfer the material frame after the current process is completed to the material delivery mechanism or quality inspection mechanism.
2. A production line material frame circulation method according to claim 1, characterized in that: The controlling of the reflow mechanism according to the material frame information to transfer the material frame after the current process is completed to the material delivery mechanism or the quality inspection mechanism specifically includes: Determine whether the material frame has completed all processes based on the material frame information after the current process is completed; When all processes have been completed, the control return mechanism transfers the material frames that have completed all processes to the quality inspection mechanism; When all processes are not completed, the current process of the material frame information is modified to the next process according to the process sequence, and the reflux mechanism is controlled to transfer the material frame that needs to undergo the next process to the material delivery mechanism.
3. A production line material frame circulation method according to claim 2, characterized in that: When the control reflux mechanism transfers the material frame that needs to be processed in the next process to the material delivery mechanism, it also includes: Get whether the material issuing agency currently has a material frame to be issued; When the material delivery mechanism has no material frames to be delivered, the material frames that need to be processed in the next process are transferred to the material delivery mechanism; When the material delivery mechanism already has material frames to be delivered, the material frames that need to undergo the next process will be transferred to the loading mechanism.
4. A production line material frame circulation method according to claim 1, characterized in that: Before obtaining the material-waiting station according to the material frame information of the material frame to be sent and the station information of each station, the method further includes: Obtaining employee information for each workstation, the employee information including the employee number, the corresponding workstation number, and the number of abnormal warnings for each process; Determine whether each employee corresponds to a workstation based on employee information and workstation information; When each employee corresponds to a workstation, the workstation to be dispatched is obtained based on the material frame information of the material frame to be dispatched and the workstation information of each workstation; When an employee does not correspond to a workstation, an employee abnormality warning signal is sent to the workstation where the employee does not correspond to the workstation.
5. A production line material frame circulation method according to claim 4, characterized in that: The method of transferring the material frame after the current process is completed to the material delivery mechanism or the quality inspection mechanism according to the material frame information also includes: Get the actual time consumed after the current process is completed; Perform time consumption analysis based on actual time consumption and standard time consumption to obtain time consumption analysis results; Preset the time consumption requirement range, and judge whether the time consumption analysis result meets the requirements based on the time consumption analysis result and the time consumption requirement range; When the time consumption analysis result meets the requirements, the material frame after the current process is completed will be transferred to the material delivery organization or quality inspection organization according to the material frame information; When the time consumption analysis result does not meet the requirements, a time consumption abnormality warning signal is sent to the workstation where the time consumption analysis result does not meet the requirements, and the number of abnormal warnings for the current process of the employee corresponding to the workstation is accumulated and increased by one.
6. A production line material frame circulation method according to claim 5, characterized in that: The preset time consumption requirement range is used to determine whether the time consumption analysis result meets the requirement based on the time consumption analysis result and the time consumption requirement range, specifically including: The time consumption analysis result is ST / CT, where ST is the standard time consumption and CT is the actual time consumption; The preset time requirement range is 0.8~1.5; When ST / CT is greater than or equal to 0.8 and less than or equal to 1.5, the time consumption analysis result meets the requirements; When ST / CT is less than 0.8 or greater than 1.5, the time-consuming analysis result does not meet the requirements.
7. A production line material frame circulation method according to claim 5, characterized in that: It also includes modifying the workstation information of the corresponding workstation according to the number of abnormal warnings of each process of the employee, including: A threshold value of the number of abnormal warnings is preset. When the number of abnormal warnings for a process of a certain employee exceeds the threshold value, the process is removed from the available processes of the corresponding workstation of the employee.
8. A production line material frame circulation method according to any one of claims 1 to 7, characterized in that: The step of obtaining the material-waiting station according to the material frame information of the material-waiting station and the station information of each station specifically includes: Obtain idle workstation information based on the current working status of each workstation; According to the idle station information, the station number of the current process in the process containing the material to be dispatched frame is obtained; Select the station with the earliest station number as the waiting station.
9. A production line material frame circulation system, characterized in that: The invention comprises a production line body (100) and a processor (200), wherein the production line body (100) and the processor (200) are communicatively connected, and the processor (200) is used to execute a production line material frame circulation method according to any one of claims 1 to 8; The production line body (100) comprises: A material delivery mechanism (101), used for collecting material frame information of a material frame to be delivered and uploading it to a processor (200); A conveying mechanism (102) is used to transfer the material frame to be sent to the material waiting station under the control of the processor (200); The reflux mechanism (103) is used to collect the material frame information of the material frame after the current process is completed and upload it to the processor (200), and under the control of the processor (200), transfer the material frame after the current process is completed to the material delivery mechanism (101) or the quality inspection mechanism (104); The quality inspection mechanism (104) is used to unload and inspect the quality of the material frames that have completed all processes under the control of the processor (200).
10. A computer-readable storage medium, characterized in that: A computer program is stored which can be loaded by a processor (200) and executes a production line material frame flow method as claimed in any one of claims 1 to 8.