Wind power enterprise production data prediction evaluation method and system based on big data platform
Through the wind power enterprise production data prediction and evaluation method based on the big data platform, the problem of large and cumbersome data volume in the assessment of wind power enterprise production and operation indicators has been solved, and the accurate evaluation of target values and significant display of scores has been achieved, which has improved the Evaluation efficiency and accuracy.
Patent Information
- Application Number
- CN202410526604.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-04-29
- Publication Date
- 2024-11-26
AI Technical Summary
In terms of management model, new energy enterprises have problems such as large amount of data, cumbersome evaluation process and inability to accurately evaluate target values, especially in the evaluation of production and operation indicators of wind power enterprises.
Using the wind power enterprise production data prediction and evaluation method based on the big data platform, by obtaining historical production operation information and current annual target values, using the preset annual evaluation target value prediction model and evaluation model, design scoring rules, and perform horizontal and vertical benchmarking. Examination, output final score.
Effectively measure the completion of indicators of regional companies and stations of new energy enterprises, significantly display the final score, and improve the accuracy and efficiency of the assessment.
Smart Images

Figure CN119026968A_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to the technical field of index evaluation of new energy power generation enterprises, and in particular to a method and system for predicting and evaluating production data of wind power enterprises based on a big data platform. [Background technology]
[0002] With the continuous development of renewable energy, my country's wind and solar installed capacity continues to rise. New energy enterprises have a large number of wind power stations and photovoltaic power stations. The traditional management model can no longer meet the digital transformation of new energy enterprises. New energy enterprises have gradually begun to formulate corresponding indicators for the production and operation of their branches and realize refined management of enterprises through evaluation, but there is still a large amount of data, cumbersome evaluation process and inability to accurately evaluate target values.
[0003] Therefore, it is necessary to study a wind power enterprise production data prediction and evaluation method and system based on a big data platform to address the shortcomings of existing technologies and to solve or alleviate one or more of the above problems. [Summary of the invention]
[0004] In view of this, the present invention provides a wind power enterprise production data prediction and evaluation method and system based on a big data platform, which is used to collect production and operation index information of wind power plants under each regional branch through the wind power enterprise big data platform, avoid the collection of a single indicator quantity, and effectively measure the indicator completion status by comparing the indicator completion value with the target value, and conduct evaluation and scoring.
[0005] In one aspect, the present invention provides a method for predicting and evaluating production data of a wind power enterprise based on a big data platform, the method comprising:
[0006] Step 1: Obtain historical production and operation information of all target units based on the big data platform;
[0007] Step 2: Obtain the target values of the current annual assessment of all target units based on the big data platform;
[0008] Step 3: Preset the annual assessment target value prediction model, and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit;
[0009] Step 4: Design an evaluation model based on the volume data of the target unit;
[0010] Step 5: Input the target value of the current year's assessment and the predicted results of the annual assessment target value into the assessment model, and output the wind power enterprise production data prediction assessment results.
[0011] According to the aspects and any possible implementation methods described above, an implementation method is further provided, wherein step one is specifically: obtaining historical production and operation information of wind farms under each regional company in the past two years from a time series database through a big data platform.
[0012] According to the aspects described above and any possible implementation methods, an implementation method is further provided, wherein the historical production and operation information in step one includes power generation, power marketing, wind utilization hours and comprehensive plant power consumption rate.
[0013] According to the aspects and any possible implementation methods described above, an implementation method is further provided, wherein the target units in step one include regional companies and wind power stations within the new energy enterprise that need to be benchmarked and evaluated.
[0014] According to the aspects and any possible implementation methods described above, an implementation method is further provided, wherein the target value of the current year evaluation in step 2 is the value that the target unit needs to achieve in the current year as preset at the beginning of the year.
[0015] According to the aspects and any possible implementation methods described above, an implementation method is further provided, and the process of obtaining the prediction result of the annual assessment target value of the target unit through the annual assessment target value prediction model in step three is specifically: based on the historical production and operation information of the target unit, the power generation, power marketing data, wind utilization small comprehensive plant power consumption rate, maintenance and technical transformation average and median summary statistical data of each regional company are calculated, and the target value of the current annual production and operation indicator is calculated using the autoregressive model.
[0016] According to the aspects described above and any possible implementation method, an implementation method is further provided, wherein the volume information in step four includes the number of sites and installed capacity of the company and its regional companies.
[0017] According to the aspects and any possible implementation methods described above, an implementation method is further provided, in which the design of the evaluation model in step five is specifically: based on the target value, the number of regional companies and stations under the company, the customized modification of installed capacity and the design of evaluation scoring rules, the scoring rules are reflected in the evaluation formula, and the evaluation formula is the completion value of the evaluation object in this year. The evaluation objects include this year's power generation, power marketing, wind utilization hours, comprehensive plant power consumption rate and maintenance and technical transformation.
[0018] Regarding the aspects and any possible implementation methods described above, an implementation method is further provided, wherein the evaluation levels in step five include horizontal benchmarking evaluation and vertical benchmarking evaluation, wherein the horizontal benchmarking evaluation is a horizontal evaluation between regional companies, and the vertical benchmarking evaluation is a vertical evaluation of all wind farms under the same regional company.
[0019] According to the above aspects and any possible implementation, a wind power enterprise production data prediction and evaluation system based on a big data platform is further provided, and the wind power enterprise production data prediction and evaluation system includes:
[0020] The historical production and operation information acquisition module is used to obtain the historical production and operation information of all target units based on the big data platform;
[0021] The target value acquisition module for the current annual evaluation is used to obtain the target values of the current annual evaluation of all target units based on the big data platform;
[0022] The annual assessment target value prediction module is used to preset the annual assessment target value prediction model and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit;
[0023] Evaluation model design module, used to design the evaluation model based on the volume data of the target unit;
[0024] The evaluation result output module is used to input the target value of the current annual evaluation and the predicted result of the annual evaluation target value into the evaluation model, and output the wind power enterprise production data prediction evaluation result.
[0025] Compared with the prior art, the present invention can achieve the following technical effects:
[0026] The present invention obtains the completion value of the evaluation index of this year based on the big data platform, selects the evaluation level, and compares it with the annual evaluation target value, scores it according to the scoring method, determines the final score and displays it significantly, which effectively measures the indicator completion of regional companies and sites of new energy enterprises.
[0027] Of course, any product implementing the present invention does not necessarily need to achieve all of the above-mentioned technical effects at the same time.
Brief Description of the Drawings
[0028] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0029] Figure 1 This is a flow chart of a method for predicting and evaluating production data of a wind power enterprise provided by an embodiment of the present invention;
[0030] Figure 2 It is a structural diagram of a wind power enterprise production data prediction and evaluation system provided by an embodiment of the present invention. [Specific implementation method]
[0031] In order to better understand the technical solution of the present invention, the embodiments of the present invention are described in detail below with reference to the accompanying drawings.
[0032] It should be clear that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0033] The terms used in the embodiments of the present invention are only for the purpose of describing specific embodiments, and are not intended to limit the present invention. The singular forms "a", "said" and "the" used in the embodiments of the present invention and the appended claims are also intended to include plural forms, unless the context clearly indicates other meanings.
[0034] The present invention provides a wind power enterprise production data prediction and evaluation method based on a big data platform, the wind power enterprise production data prediction and evaluation method comprising:
[0035] Step 1: Obtain historical production and operation information of all target units based on the big data platform;
[0036] Step 2: Obtain the target values of the current annual assessment of all target units based on the big data platform;
[0037] Step 3: Preset the annual assessment target value prediction model, and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit;
[0038] Step 4: Design an evaluation model based on the volume data of the target unit;
[0039] Step 5: Input the target value of the current year's assessment and the predicted results of the annual assessment target value into the assessment model, and output the wind power enterprise production data prediction assessment results.
[0040] The step one is specifically as follows: obtaining the historical production and operation information of the wind farms under each regional company in the past two years from the time series database through the big data platform.
[0041] The historical production and operation information in step 1 includes power generation, power marketing, wind utilization hours and comprehensive plant power consumption rate.
[0042] The target units in step one include regional companies and wind power stations within new energy enterprises that need to undergo benchmarking assessment.
[0043] The target value of the current year assessment in step 2 is the value that the target unit needs to achieve in the current year as preset at the beginning of the year.
[0044] The process of obtaining the prediction result of the annual assessment target value of the target unit through the annual assessment target value prediction model in step three is specifically as follows: based on the historical production and operation information of the target unit, the average and median summary statistical data of the power generation, power marketing data, wind utilization small comprehensive plant power consumption rate, and maintenance and technical transformation of each regional company are calculated, and the target value of the current annual production and operation indicator is calculated using the autoregressive model.
[0045] The volume information in step 4 includes the number of sites and installed capacity of the company and its regional subsidiaries.
[0046] The evaluation model design in step five is specifically as follows: based on the target value, the number of regional companies and stations under the company, the customized modification of installed capacity and the design of evaluation scoring rules, the scoring rules are reflected in the evaluation formula, and the evaluation formula is the completion value of the evaluation object in this year. The evaluation objects include this year's power generation, power marketing, wind utilization hours, comprehensive plant power consumption rate and maintenance and technical transformation.
[0047] The evaluation levels in step five include horizontal benchmarking and vertical benchmarking. The horizontal benchmarking is conducted between regional companies, and the vertical benchmarking is conducted between all wind farms under the same regional company.
[0048] The present invention also provides a wind power enterprise production data prediction and evaluation system based on a big data platform, the wind power enterprise production data prediction and evaluation system comprising:
[0049] The historical production and operation information acquisition module is used to obtain the historical production and operation information of all target units based on the big data platform;
[0050] The target value acquisition module for the current annual evaluation is used to obtain the target values of the current annual evaluation of all target units based on the big data platform;
[0051] The annual assessment target value prediction module is used to preset the annual assessment target value prediction model and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit;
[0052] Evaluation model design module, used to design the evaluation model based on the volume data of the target unit;
[0053] The evaluation result output module is used to input the target value of the current annual evaluation and the predicted result of the annual evaluation target value into the evaluation model, and output the wind power enterprise production data prediction evaluation result.
[0054] Embodiment 1:
[0055] The present invention provides a wind power enterprise production data prediction and evaluation method and system based on a big data platform. It is used to collect production and operation index information of wind power plants under each regional branch through the wind power enterprise big data platform, avoid the collection of a single index, and effectively measure the completion of the index by comparing the completion value of the index with the target value, and conduct evaluation and scoring. Figure 1 As shown, the wind power enterprise production index prediction and evaluation method based on the big data platform is implemented by the following steps:
[0056] Step 1: Obtain historical production and operation information of all target units based on the big data platform;
[0057] Step 2: Determine the annual assessment target value based on the historical production information of the wind power plant;
[0058] Step 3: Design an evaluation formula based on the target value, and customize the evaluation formula based on company size, regional companies, number of stations, and installed capacity;
[0059] Step 4: Obtain annual production and operation evaluation index information of all target units based on the big data platform;
[0060] Step 5: Based on the big data platform, obtain the completion value of the assessment indicators for this year, select the assessment level, and compare it with the annual assessment target value. Score it according to the scoring method, determine the final score and display it significantly.
[0061] In this embodiment: the target unit refers to the regional companies and wind power stations within the new energy enterprise that need to be benchmarked and evaluated.
[0062] In this embodiment: historical production and operation information refers to annual power generation, power marketing data, wind utilization hours, and comprehensive plant power consumption rate.
[0063] In this embodiment, the production operation evaluation target value refers to the value that needs to be achieved by the total annual target unit set at the beginning of the year.
[0064] In this embodiment, the annual production and operation evaluation index information value refers to various indicators evaluated at the end of the year, including annual power generation, power marketing data, wind utilization hours, and comprehensive plant power consumption rate.
[0065] In this embodiment, the evaluation level refers to the selection of horizontal benchmarking and vertical benchmarking.
[0066] In this embodiment, the significant display means that the top three evaluation scores are displayed in the evaluation system using the front-end effect significance.
[0067] The beneficial effects of the above technical solution are: by collecting historical production data, reasonable assessment target values are established, and custom assessment scoring rules are designed. When collecting the indicator values of this year, the actual values and target values are brought into the scoring rules and scored, and the significance of the assessment scores is displayed, so as to effectively understand the production and operation status of new energy enterprises this year.
[0068] The present invention provides a wind power enterprise production index prediction and evaluation method based on a big data platform, which obtains the historical production information of wind power stations under each regional company in the past two years from a time series database based on the big data platform. The historical production information includes power generation, power marketing, wind utilization hours, and comprehensive plant power consumption rate.
[0069] The beneficial effect of the above technical solution is that by determining the database, it is easy to obtain complete data, thereby facilitating the subsequent establishment of target values and ensuring the reliability of the establishment of target values.
[0070] The present invention provides a method for predicting and evaluating production indicators of wind power enterprises based on a big data platform. Based on the historical production and operation information of the target unit, the average and median summary statistical data of the power generation, power marketing data, wind utilization small comprehensive plant power consumption rate, and maintenance and technical transformation of each regional company are calculated. At the same time, the autoregressive model is used to calculate the target value of the production and operation indicators of this year, as follows:
[0071] y(t)=μ+β1*(y(t-1)-μ)+β2*(y(t-2)-μ)+...+βq*(y(tq)-μ)+ε(t)
[0072] Where y(t) represents the target value of the production and operation index for this year; μ represents the mean value; β1, β2, ..., βq represent the coefficients of the lagged values of the performance index (i.e., the moving average coefficients); y(t-1), y(t-2), ..., y(tq): lagged values of the performance index (i.e., the values of the performance index q years before); ε(t): error term or residual, representing the difference between the predicted value and the actual value at time t; based on historical data, the values of μ and β coefficients are estimated using the least squares method;
[0073] The beneficial effect of the above technical solution is that by determining the target value through historical data, the reliability of the target value can be guaranteed and a basis for subsequent assessment scores can be provided.
[0074] The present invention provides a wind power enterprise production index prediction and evaluation method based on a big data platform, which is based on target values, the number of regional companies and stations under the company, and installed capacity, and customized modification and design of evaluation scoring rules. The scoring rules are mainly reflected in evaluation formulas.
[0075] The evaluation formula includes the current year's power generation, power marketing, wind utilization hours, comprehensive plant power consumption rate, and maintenance and technical transformation as the current year's completion value.
[0076] The annual power generation evaluation formula includes
[0077] k score = max(0.8*10,min(1.2*10,10+0.2*(x / y-1)*10*if(z<10e 8 ,0.5, 1)))
[0079] Among them, x represents the completion value, y represents the target value, and z represents the power generation. The evaluation rules are that if the completion value is 1% higher than the target value, 0.2 points will be added, and if it is 1% lower than the target value, 0.2 points will be deducted; when the power generation is less than 1 billion kilowatts, the points added (subtracted) will be halved; finally, according to the score range, the minimum is not less than 80% of the basic score, and the maximum is not more than 120% of the basic score.
[0080] The power marketing evaluation formula includes:
[0081]
[0082] Where T is the moisturizing target value, C means completion, and S means the score. Where S0 is the basic score. The evaluation rule is that for every 0.1 percentage point higher than the target value, 0.1 point will be added; for every 0.1 percentage point lower than the target value, 0.1 point will be deducted. The maximum score is 6 points and the minimum score is 4 points.
[0083] The wind power hour evaluation formula includes:
[0084] Set different target values according to power-restricted areas and non-power-restricted areas
[0085]
[0086] Among them, x represents the actual value, y represents the target value, b represents the basic score, and s represents the score. The evaluation rule is that for every 1% improvement (deterioration) of the completed value over the benchmark target value, 1% of the basic score will be added (subtracted), with a maximum of 6 points and a minimum of 4 points.
[0087] The comprehensive plant power consumption rate evaluation formula includes:
[0088]
[0089] Where f(s) represents the score, tb represents the target value, and c represents the completion value, which is basically divided into 5 points. The evaluation rule is that the basic score for completing the benchmark target is 5 points, 0.1 point will be added for every 0.1% higher than the target value, and 0.3 point will be subtracted for every 0.1% lower than the target value. The highest score is 6 points and the lowest score is 4 points.
[0090] The customized modification and design of the evaluation scoring rules include customized design and modification of the parameters in the evaluation rules, and customized design of new evaluation rules.
[0091] The beneficial effects of the above technical solution are: by designing evaluation rules for various production operation indicators, the final score can be effectively calculated, and by converting parameters and custom-designed calculations, the fairness of the evaluation can be effectively guaranteed for different situations.
[0092] The present invention provides a wind power enterprise production index prediction and evaluation method based on a big data platform. The method obtains the completion value of the evaluation index of this year based on the big data platform, selects the evaluation level, and compares it with the annual evaluation target value. The method scores according to the evaluation rules, determines the final score and displays it significantly.
[0093] The evaluation levels are divided into horizontal benchmarking and vertical benchmarking. Horizontal evaluation refers to horizontal evaluation between regional companies, while vertical evaluation refers to vertical evaluation of all wind farms under the same regional company.
[0094] The present invention also provides a wind power enterprise production index evaluation system based on a big data platform, such as Figure 2 As shown, it includes: a data acquisition module, which is used to collect production information of various regional companies within the enterprise based on a big data platform, including power generation, power marketing, wind utilization hours, and comprehensive plant power consumption rate.
[0095] The target value setting module is used to set the target value based on the autoregressive model according to the historical production information of the same indicator of each regional company within two years. It also has the target value adjustment function, which can customize the target value automatically calculated and generated by the system.
[0096] The formula design module is used to modify and add calculation formulas for various indicator evaluations.
[0097] The formula design module includes a formula design unit, an indicator selection unit, a function operator selection unit, and an information display unit.
[0098] The indicator selection unit is used to select an indicator applicable to the scoring formula.
[0099] The function operator selection box is used to select the functions and four arithmetic operators required for formula calculation.
[0100] The information display unit is used to display the designed evaluation formula, including the formula and formula description.
[0101] The ranking display module is used to arrange the scores in order after the indicator evaluation.
[0102] The beneficial effects of the above technical solution are: by collecting historical production data, reasonable assessment target values are established, and custom assessment scoring rules are designed. When collecting the indicator values of this year, the actual values and target values are brought into the scoring rules and scored, and the significance of the assessment scores is displayed, so as to effectively understand the production and operation status of new energy enterprises this year.
[0103] The above is a detailed introduction to a method and system for predicting and evaluating production data of wind power enterprises based on a big data platform provided by the embodiment of the present application. The description of the above embodiment is only used to help understand the method and core idea of the present application; at the same time, for those skilled in the art, according to the idea of the present application, there will be changes in the specific implementation method and application scope. In summary, the content of this specification should not be understood as a limitation on the present application.
[0104] For example, certain words are used in the specification and claims to refer to specific components. Those skilled in the art should understand that hardware manufacturers may use different nouns to refer to the same component. This specification and claims do not use differences in names as a way to distinguish components, but use differences in the functions of components as the criteria for distinction. As mentioned throughout the specification and claims, "including" and "comprising" are open-ended terms, so they should be interpreted as "including / including but not limited to". "Approximately" means that within an acceptable error range, those skilled in the art can solve the technical problem within a certain error range and basically achieve the technical effect. The subsequent description of the specification is a preferred embodiment of the present application, but the description is for the purpose of illustrating the general principles of the present application, and is not used to limit the scope of the present application. The scope of protection of the present application shall be determined by the definition of the attached claims.
[0105] It should also be noted that the terms "include", "comprises" or any other variations thereof are intended to cover non-exclusive inclusion, so that a product or system including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such a product or system. In the absence of more restrictions, the elements defined by the sentence "comprises a ..." do not exclude the existence of other identical elements in the product or system including the elements.
[0106] It should be understood that the term "and / or" used in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article generally indicates that the associated objects before and after are in an "or" relationship.
[0107] The above description shows and describes several preferred embodiments of the present application, but as mentioned above, it should be understood that the present application is not limited to the form disclosed herein, and should not be regarded as excluding other embodiments, but can be used in various other combinations, modifications and environments, and can be modified within the scope of the application concept described herein through the above teachings or the technology or knowledge of the relevant field. The changes and modifications made by those skilled in the art do not deviate from the spirit and scope of the present application, and should be within the scope of protection of the claims attached to the present application.
Claims
1. A wind power enterprise production data prediction and evaluation method based on big data platform, It is characterized in that The wind power enterprise production data prediction and evaluation method comprises: Step 1: Obtain historical production and operation information of all target units based on the big data platform; Step 2: Obtain the target values of the current annual assessment of all target units based on the big data platform; Step 3: Preset the annual assessment target value prediction model, and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit; Step 4: Design an evaluation model based on the volume data of the target unit; Step 5: Input the target value of the current year's assessment and the predicted results of the annual assessment target value into the assessment model, and output the wind power enterprise production data prediction assessment results.
2. The wind power enterprise production data prediction and evaluation method according to claim 2, It is characterized in that The step one is specifically as follows: obtaining the historical production and operation information of the wind farms under each regional company in the past two years from the time series database through the big data platform.
3. The wind power enterprise production data prediction and evaluation method according to claim 1, It is characterized in that The historical production and operation information in step 1 includes power generation, power marketing, wind utilization hours and comprehensive plant power consumption rate.
4. The method for predicting and evaluating production data of a wind power enterprise according to claim 1, It is characterized in that The target units in step one include regional companies and wind power stations within new energy enterprises that need to undergo benchmarking assessment.
5. The wind power enterprise production data prediction and evaluation method according to claim 1, It is characterized in that The target value of the current year assessment in step 2 is the value that the target unit needs to achieve in the current year as preset at the beginning of the year.
6. The wind power enterprise production data prediction and evaluation method according to claim 1, It is characterized in that The process of obtaining the prediction result of the annual assessment target value of the target unit through the annual assessment target value prediction model in step three is specifically as follows: based on the historical production and operation information of the target unit, the average and median summary statistical data of the power generation, power marketing data, wind utilization small comprehensive plant power consumption rate, and maintenance and technical transformation of each regional company are calculated, and the target value of the current annual production and operation indicator is calculated using the autoregressive model.
7. The wind power enterprise production data prediction and evaluation method according to claim 1, It is characterized in that The volume information in step 4 includes the number of sites and installed capacity of the company and its regional subsidiaries.
8. The method for predicting and evaluating production data of a wind power enterprise according to claim 7, It is characterized in that The evaluation model design in step five is specifically as follows: based on the target value, the number of regional companies and stations under the company, the customized modification of installed capacity and the design of evaluation scoring rules, the scoring rules are reflected in the evaluation formula, and the evaluation formula is the completion value of the evaluation object in this year. The evaluation objects include this year's power generation, power marketing, wind utilization hours, comprehensive plant power consumption rate and maintenance and technical transformation.
9. The method for predicting and evaluating production data of a wind power enterprise according to claim 8, It is characterized in that The evaluation levels in step five include horizontal benchmarking and vertical benchmarking. The horizontal benchmarking is conducted between regional companies, and the vertical benchmarking is conducted between all wind farms under the same regional company.
10. A wind power enterprise production data prediction and evaluation system based on a big data platform. It is characterized in that The wind power enterprise production data prediction and evaluation system comprises: The historical production and operation information acquisition module is used to obtain the historical production and operation information of all target units based on the big data platform; The target value acquisition module for the current annual evaluation is used to obtain the target values of the current annual evaluation of all target units based on the big data platform; The annual assessment target value prediction module is used to preset the annual assessment target value prediction model and obtain the prediction result of the annual assessment target value of the target unit based on the historical production and operation information of the target unit; Evaluation model design module, used to design the evaluation model based on the volume data of the target unit; The evaluation result output module is used to input the target value of the current annual evaluation and the predicted result of the annual evaluation target value into the evaluation model, and output the wind power enterprise production data prediction evaluation result.