Multi-project management method and system based on project cost
Through a multi-project management system based on engineering cost, the problems of inefficient efficiency and insufficient risk identification of traditional management methods are solved, and the precise control and resource optimization of multiple projects are achieved, ensuring that the projects are completed on time and on quality, improving the competitiveness and profit of enterprises are achieved. ability.
Patent Information
- Application Number
- CN202411001857.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-11-26
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In multi-project management, the traditional engineering cost management method is inefficient, prone to errors, lack of a unified management platform and data integration, resulting in unreasonable resource allocation, difficult cost control, insufficient progress management and risk identification and assessment, and adding projects Uncertainty and cost overrun risk.
Adopt a multi-project management system based on engineering cost, including project information management, importance assessment, comprehensive assessment, priority determination, cost management, resource management, progress management and risk management modules, and through digital and intelligent means, the Comprehensive, real-time and precise control of costs, progress, resources and risks of multiple projects, and optimize resource allocation and risk management.
It has achieved scientific and reasonable priority ranking and resource allocation for multiple projects, improved management efficiency, reduced cost risks, ensured that projects were completed on time, on quality and on budget, and improved the company's market competitiveness and profitability.
Smart Images

Figure CN119027042A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of project management, and specifically refers to a multi-project management method and system based on engineering cost. Background Art
[0002] In today's complex and ever-changing construction market environment, construction companies usually undertake multiple engineering projects at the same time. As the number and scale of projects increase, traditional project management methods face many challenges.
[0003] In the past, engineering cost management often relied on manual calculations and empirical judgments, which was not only inefficient but also prone to errors. In the case of multiple projects, due to the lack of a unified management platform and effective data integration, cost information between projects was difficult to share and compare, resulting in irrational resource allocation and increased difficulty in cost control.
[0004] At the same time, there is a lack of effective coordination mechanisms for project schedule management and resource allocation. When multiple projects are carried out in parallel, resource conflicts and schedule delays are prone to occur. For example, different projects may require the same type of professional technicians or key equipment at the same time. Due to poor information flow, reasonable allocation cannot be made in a timely manner, affecting the smooth progress of the project. In addition, traditional management methods are also insufficient in risk management. It is difficult to fully identify and evaluate the risks that may arise in multiple projects, and it is impossible to formulate effective response measures in advance, which increases the uncertainty of the project and the risk of cost overruns.
[0005] With the continuous development of information technology, enterprises need a multi-project management method and system based on engineering cost, which can realize comprehensive, real-time and accurate control of the cost, progress, resources and risks of multiple projects. Through digital and intelligent means, management efficiency can be improved, resource allocation can be optimized, cost risks can be reduced, and each project can be completed on time, according to quality and within budget, thus improving the market competitiveness and profitability of enterprises. Summary of the invention
[0006] In order to solve the problem that it is difficult to comprehensively identify and evaluate the risks that may occur in multiple projects, the present invention provides a multi-project management method and system based on engineering cost.
[0007] In order to achieve the above functions, the technical solution adopted by the present invention is as follows: a multi-project management system based on engineering cost, including a project information management module, an importance assessment module, a comprehensive assessment module, a priority determination module, a cost management module, a resource management module, a progress management module, a risk management module and a report and analysis module, wherein the project information management module is used to input and maintain basic information of the project, the importance assessment module analyzes the importance of the multi-project information and determines the importance of each project, the comprehensive assessment module sets corresponding weights for each assessment factor and calculates a comprehensive score, the priority determination module determines the priority order, the cost management module is used to support cost estimation, budget preparation, cost control and cost analysis, the resource management module uniformly manages the human, material and financial resources of the enterprise, including resource registration, allocation, scheduling and monitoring, the progress management module formulates a project progress plan, tracks the actual progress of the project, and generates a progress report and early warning information, the risk management module realizes the whole process management of risk identification, assessment, response and monitoring, and the report and analysis module provides various reports and data analysis functions to help managers fully understand the execution of the project and the overall operation of the enterprise.
[0008] Preferably, the importance assessment module includes strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource demand and availability assessment, and customer importance assessment.
[0009] Preferably, the weight ratios of the strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource demand and availability assessment, and customer importance assessment are 30%, 25%, 15%, 15%, 10%, and 5%.
[0010] A multi-project management method based on engineering cost includes the following steps:
[0011] (1) Project portfolio planning;
[0012] (2) Cost estimation and budget preparation;
[0013] (3) Resource allocation and scheduling;
[0014] (4) Progress management;
[0015] (5) Risk management.
[0016] Preferably, the specific operation steps of step (1) include:
[0017] (1.1) Analyze the importance of each factor in multiple project information;
[0018] (1.2) The factors include strategic fit assessment weight of 30%, financial indicator assessment weight of 25%, risk assessment weight of 15%, project urgency assessment weight of 15%, resource demand and availability assessment weight of 10%, and customer importance assessment weight of 5%;
[0019] (1.3) Conduct a comprehensive assessment based on the corresponding weights of each factor;
[0020] (1.4) Prioritize all projects to be built.
[0021] Preferably, the specific operation steps of step (2) include:
[0022] (2.1) Establish a standardized cost estimation model that takes into account labor, material, equipment, indirect costs, etc.
[0023] (2.2) Prepare a detailed budget for each project, including a total budget and phased budget, and set aside a certain amount of reserve funds to deal with possible changes and risks.
[0024] Preferably, the specific operation steps of step (3) include:
[0025] (3.1) Conduct a comprehensive inventory and analysis of the company’s human, material, financial and other resources;
[0026] (3.2) Optimize resource allocation plans based on project priorities and schedule requirements to ensure that key projects and key tasks receive adequate resource support.
[0027] Preferably, the specific operation steps of step (4) include:
[0028] (4.1) Develop a detailed schedule for each project, clearly defining the start and end time of each stage.
[0029] timing and key milestones;
[0030] (4.2) Establish a progress tracking and monitoring mechanism to regularly compare actual progress with planned progress, identify deviations in a timely manner and take corrective measures.
[0031] Preferably, the specific operation steps of step (5) include:
[0032] (5.1) Identify the risks that each project may face;
[0033] (5.2) Assess risks, analyze their likelihood and impact, and develop appropriate risk response strategies.
[0034] The present invention adopts the above scheme to achieve the following beneficial effects: the present invention can more scientifically and reasonably prioritize all projects to be built, thereby optimizing resource allocation and project management decisions; it can achieve comprehensive, real-time and accurate management and control of the costs, progress, resources and risks of multiple projects, and through digital and intelligent means, improve management efficiency, optimize resource allocation, reduce cost risks, ensure that each project is completed on time, according to quality and within budget, and enhance the company's market competitiveness and profitability. BRIEF DESCRIPTION OF THE DRAWINGS
[0035] Figure 1 A method flow chart of a multi-project management method based on engineering cost according to the present invention;
[0036] Figure 2 This is a system module diagram of a multi-project management system based on engineering cost according to the present invention. DETAILED DESCRIPTION
[0037] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] The invention discloses a multi-project management system based on engineering cost, comprising a project information management module, an importance evaluation module, a comprehensive evaluation module, a priority determination module, a cost management module, a resource management module, a progress management module, a risk management module and a report and analysis module, wherein the project information management module is used to input and maintain basic information of the project, the importance evaluation module performs importance analysis on the multi-project information and determines the importance of each project, the comprehensive evaluation module sets corresponding weights for each evaluation factor and calculates a comprehensive score, the priority determination module determines the priority sequence, the cost management module is used to support cost estimation, budget preparation, cost control and cost analysis, the resource management module performs unified management on the human, material and financial resources of the enterprise, including registration, allocation, scheduling and monitoring of resources, the progress management module formulates a project progress plan, tracks the actual progress of the project, generates a progress report and early warning information, the risk management module realizes the whole process management of risk identification, evaluation, response and monitoring, and the report and analysis module provides various reports and data analysis functions to help managers fully understand the execution of the project and the overall operation of the enterprise.
[0039] The importance assessment module includes strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource demand and availability assessment, and customer importance assessment. The weight ratios of the strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource demand and availability assessment, and customer importance assessment are 30%, 25%, 15%, 15%, 10%, and 5%.
[0040] A multi-project management method based on engineering cost includes the following steps:
[0041] (1) Project portfolio planning: Analyze the importance of various factors in multiple project information, including strategic fit assessment with a weight of 30%, financial indicator assessment with a weight of 25%, risk assessment with a weight of 15%, project urgency assessment with a weight of 15%, resource demand and availability assessment with a weight of 10%, and customer importance assessment with a weight of 5%. Comprehensively evaluate the corresponding weight ratio of each factor and prioritize all projects to be built;
[0042] (2) Cost estimation and budget preparation: Establish a standardized cost estimation model, consider various costs such as labor, materials, equipment, and indirect expenses, prepare a detailed budget for each project, including a total budget and a phased budget, and set aside a certain amount of reserves to deal with possible changes and risks;
[0043] (3) Resource allocation and scheduling: conduct a comprehensive inventory and analysis of the company's human, material, financial and other resources, optimize resource allocation plans based on project priorities and progress requirements, and ensure that key projects and key tasks receive sufficient resource support;
[0044] (4) Progress management: formulate a detailed progress plan for each project, clarify the start and end time of each stage and key milestones, establish a progress tracking and monitoring mechanism, regularly compare the actual progress with the planned progress, promptly identify deviations and take corrective measures;
[0045] (5) Risk management: identify the risks that each project may face, such as policy changes, market price fluctuations, natural disasters, etc., assess the risks, analyze the possibility of their occurrence and the extent of their impact, and formulate corresponding risk response strategies.
[0046] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.
Claims
1. A multi-project management system based on engineering cost, characterized in that: It includes a project information management module, an importance assessment module, a comprehensive assessment module, a priority determination module, a cost management module, a resource management module, a progress management module, a risk management module and a report and analysis module. The project information management module is used to enter and maintain the basic information of the project. The importance assessment module analyzes the importance of the multiple project information and determines the importance of each project. The comprehensive assessment module sets corresponding weights for each assessment factor and calculates the comprehensive score. The priority determination module determines the priority order. The cost management module is used to support cost estimation, budget preparation, cost control and cost analysis. The resource management module manages the human, material and financial resources of the enterprise in a unified manner, including resource registration, allocation, scheduling and monitoring. The progress management module formulates a project progress plan, tracks the actual progress of the project, and generates progress reports and early warning information. The risk management module realizes the whole process management of risk identification, assessment, response and monitoring. The report and analysis module provides various reports and data analysis functions to help managers fully understand the execution of the project and the overall operation of the enterprise.
2. A multi-project management system based on engineering cost according to claim 1, characterized in that: The importance assessment module includes strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource demand and availability assessment, and customer importance assessment.
3. The multi-project management system based on engineering cost according to claim 2 is characterized in that: The weight ratios of the strategic fit assessment, financial indicator assessment, risk assessment, project urgency assessment, resource requirement and availability assessment, and customer importance assessment are 30%, 25%, 15%, 15%, 10%, and 5%, respectively.
4. A multi-project management method based on engineering cost according to any one of claims 1 to 3, characterized in that: The steps include: (1) Project portfolio planning; (2) Cost estimation and budget preparation; (3) Resource allocation and scheduling; (4) Progress management; (5) Risk management.
5. A multi-project management method based on engineering cost according to claim 4, characterized in that: The specific operation steps of step (1) include: (1.1) Analyze the importance of each factor in multiple project information; (1.2) The factors include strategic fit assessment weight of 30%, financial indicator assessment weight of 25%, risk assessment weight of 15%, project urgency assessment weight of 15%, resource demand and availability assessment weight of 10%, and customer importance assessment weight of 5%; (1.3) Conduct a comprehensive assessment based on the corresponding weights of each factor; (1.4) Prioritize all projects to be built.
6. A multi-project management method based on engineering cost according to claim 4, characterized in that: The specific operation steps of step (2) include: (2.1) Establish a standardized cost estimation model that takes into account labor, material, equipment, indirect costs, etc. (2.2) Prepare a detailed budget for each project, including a total budget and phased budget, and set aside a certain amount of reserve funds to deal with possible changes and risks.
7. The multi-project management method based on engineering cost according to claim 4 is characterized in that: The specific operation steps of step (3) include: (3.1) Conduct a comprehensive inventory and analysis of the company’s human, material, financial and other resources; (3.2) Optimize resource allocation plans based on project priorities and schedule requirements to ensure that key projects and key tasks receive adequate resource support.
8. The multi-project management method based on engineering cost according to claim 4 is characterized in that: The specific operation steps of step (4) include: (4.1) Develop a detailed schedule for each project, clearly defining the start and end dates of each phase and key milestones; (4.2) Establish a progress tracking and monitoring mechanism, regularly compare actual progress with planned progress, promptly identify deviations and take corrective measures.
9. The multi-project management method based on engineering cost according to claim 4 is characterized in that: The specific operation steps of step (5) include: (5.1) Identify the risks that each project may face; (5.2) Assess risks, analyze their likelihood and impact, and develop appropriate risk response strategies.