Electric loader operation risk real-time evaluation system based on data analysis
Through the real-time evaluation system for operating risks of electric loaders based on data analysis, the problem of difficult to judge the emergency and operation safety of electric loaders is solved, real-time risk monitoring and early warning of electric loaders is realized, and operation safety hazards are reduced. Ensure the safe and stable operation of the electric loader.
Patent Information
- Application Number
- CN202411137696.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-26
AI Technical Summary
The prior art cannot accurately judge the maintenance emergency status of electric loaders, and it is difficult to analyze its operating safety and operational safety in real time, resulting in high operating safety risks.
Design a real-time evaluation system for operating risks of electric loaders based on data analysis, including servers, maintenance emergency detection modules, operation risk detection and evaluation modules and operation risk comprehensive evaluation modules. The corresponding signals are generated through analysis and sent to the display warning end. Realize real-time monitoring and early warning of the maintenance urgency, operational risks and operational risks of electric loaders.
Accurately judge the emergency maintenance status of the electric loader, reduce operating safety hazards, ensure the operating safety and stability of the electric loader, and improve the overall safety of the electric loader by combining the analysis of operational risks and operational risks, and improve the overall safety of the electric loader.
Smart Images

Figure CN119027096A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of electric loader operation supervision, and in particular to a real-time evaluation system for electric loader operation risks based on data analysis. Background Art
[0002] Electric loaders are earthwork machines widely used in construction projects such as highways, railways, buildings, hydropower, ports, and mines. They are mainly used to shovel bulk materials such as soil, sand, lime, and coal, and can also perform light shoveling operations on ore and hard soil. The operating safety of electric loaders is crucial to production efficiency and personnel safety.
[0003] At present, when testing and evaluating the operating risks of electric loaders, it is not only impossible to accurately judge the maintenance urgency of the electric loader before operation, but also impossible to operate the electric loader when it is judged that the maintenance is low-urgency and to analyze its operating safety and operational safety in real time and reasonably. It is difficult to timely warn and effectively control the potential risks in the operation of the electric loader, which is not conducive to reducing the hidden dangers of electric loader operation safety;
[0004] In view of the above technical defects, a solution is now proposed. Summary of the invention
[0005] The purpose of the present invention is to provide a real-time assessment system for the operation risk of an electric loader based on data analysis, which solves the problem that the prior art is not only unable to accurately judge the maintenance urgency of the electric loader before operation, but also unable to operate the electric loader when it is judged that the maintenance is low-urgency and to analyze its operation safety and operational safety in real time and reasonably, resulting in great safety hazards in the operation of the electric loader.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A real-time evaluation system for operation risk of an electric loader based on data analysis comprises a server, a maintenance urgency detection module, an operation risk detection and evaluation module, an operation risk comprehensive evaluation module and a display warning terminal; the maintenance urgency detection module analyzes the maintenance urgency status of the electric loader, generates a maintenance high urgency signal or a maintenance low urgency signal through the analysis, and sends the maintenance high urgency signal or the maintenance low urgency signal to the display warning terminal via the server, and the display warning terminal issues a corresponding warning when receiving the maintenance high urgency signal;
[0008] When a maintenance low urgency signal is generated, the electric loader is allowed to operate normally. The operation risk detection and evaluation module performs real-time risk detection and evaluation on the operation process of the electric loader. When a high-risk operation signal or a low-risk operation signal is generated through analysis, the high-risk operation signal or the low-risk operation signal is sent to the display warning end via the server. When the display warning end receives the high-risk operation signal, a corresponding warning is issued;
[0009] The comprehensive operation risk assessment module monitors the driver of the electric loader in real time and detects the real-time blind spot risks during the operation of the electric loader. It determines whether to generate a high-risk operation signal through analysis, and sends the high-risk operation signal to the display warning end via the server. When the display warning end receives the high-risk operation signal, it issues a corresponding warning.
[0010] Furthermore, the specific operation process of the maintenance urgency detection module includes:
[0011] The last maintenance date of the electric loader is obtained, and the time difference between the current date and the last maintenance date is calculated to obtain the maintenance interval; all faults occurring in the electric loader within the maintenance interval are collected and classified, and the number of occurrences of each type of fault is compared with the single-type fault incidence rate; each type of fault is set in advance to correspond to a set of fault impact values, and the single-type fault incidence rate of the corresponding type is multiplied by the corresponding fault impact value to obtain the fault class detection value, and the fault class detection values of all types of faults occurring in the electric loader within the maintenance interval are summed up to obtain the total fault detection value;
[0012] The total movement mileage of the electric loader within the maintenance interval is collected, and the bump overload detection value of the electric loader within the maintenance interval is obtained through bump overload decision analysis. The maintenance interval, the total fault inspection value, the total movement mileage and the bump overload detection value are numerically calculated to obtain the maintenance emergency coefficient;
[0013] The degradation judgment information of the electric loader is retrieved from the server. If the electric loader is in a high degradation state, a first preset maintenance emergency coefficient threshold is allocated thereto. If the electric loader is in a medium degradation state, a second preset maintenance emergency coefficient threshold is allocated thereto. If the electric loader is in a low degradation state, a third preset maintenance emergency coefficient threshold is allocated thereto; and the third preset maintenance emergency coefficient threshold > the second preset maintenance emergency coefficient threshold > the first preset maintenance emergency coefficient threshold > 0. The maintenance emergency coefficient is numerically compared with the corresponding preset maintenance emergency coefficient threshold. If the maintenance emergency coefficient exceeds the corresponding preset maintenance emergency coefficient threshold, a high maintenance urgency signal is generated. If the maintenance emergency coefficient does not exceed the corresponding preset maintenance emergency coefficient threshold, a low maintenance urgency signal is generated.
[0014] Furthermore, the specific analysis process of the turbulence overload decision analysis is as follows:
[0015] The duration of each overload state and each bump state of the electric loader within the maintenance interval is collected and marked as a single overload duration value and a single bump duration value, respectively; all single overload duration values of the electric loader within the maintenance interval are summed up to obtain a total overload duration value; all single bump duration values of the electric loader within the maintenance interval are summed up to obtain a total bump duration value;
[0016] And the single overload duration value and the single bump duration value are numerically compared with the preset single overload duration threshold and the preset single bump duration threshold respectively; if the single overload duration value exceeds the preset single overload duration threshold, the corresponding single overload duration value is marked as a high continuous overload value; if the single bump duration value exceeds the preset single bump duration threshold, the corresponding single bump duration value is marked as a high continuous bump value; the number of high continuous overload values and the number of high continuous bump values of the electric loader within the maintenance interval are marked as high load inspection value and high continuous bump inspection value respectively;
[0017] The total overload time value, total bump time value, high load detection value and high bump detection value of the electric loader within the maintenance interval are numerically calculated to obtain the bump overload detection value.
[0018] Furthermore, the server is connected to the loader degradation judgment module for communication. The loader degradation judgment module collects the total movement time and maintenance times of the electric loader during historical use, calculates the time difference between the production date of the electric loader and the current date to obtain the production interval time, and numerically calculates the production interval time, the total movement time and the maintenance times of the electric loader to obtain the degradation value of the electric loader;
[0019] The degradation value of the electric loader is numerically compared with the preset electric loader degradation value range. If the degradation value of the electric loader exceeds the maximum value of the preset electric loader degradation value range, the electric loader is judged to be in a high degradation state; if the degradation value of the electric loader is within the preset electric loader degradation value range, the electric loader is judged to be in a medium degradation state; if the degradation value of the electric loader does not exceed the minimum value of the preset electric loader degradation value range, the electric loader is judged to be in a low degradation state; and the degradation judgment information of the electric loader is sent to the server for storage.
[0020] Furthermore, the specific operation process of the operation risk detection and assessment module includes:
[0021] During the movement of the electric loader, real-time load data of the electric loader is collected, and the real-time load data is numerically compared with a preset real-time load data threshold. If the real-time load data exceeds the preset real-time load data threshold, it is determined that the electric loader is in an overload state; and bump amplitude data and bump frequency data of the electric loader are collected, and the bump amplitude data and the bump frequency data are numerically compared with a preset bump amplitude data threshold and a preset bump frequency data threshold, respectively. If the bump amplitude data or the bump frequency data exceeds the corresponding preset threshold, it is determined that the electric loader is in a bump state;
[0022] If the electric loader is in an overloaded or bumpy state, a high-risk operation signal is generated; if the electric loader is not in an overloaded or bumpy state, the running speed of the electric loader and the wind data in the running environment are collected, and the running speed, wind data, real-time load data, bump amplitude data and bump frequency data of the electric loader are numerically calculated to obtain a risk inspection value; and the running direction of the electric loader is obtained. If the electric loader is in a straight state, a direction influence value FX1 is assigned to it, and if the electric loader is in a turning state, a direction influence value FX2 is assigned to it, and FX2>FX1>1;
[0023] Multiply the risk inspection value with the corresponding directional impact value to obtain the initial risk assessment value, and compare the initial risk assessment value with the preset initial risk assessment threshold. If the initial risk assessment value exceeds the preset initial risk assessment threshold, a high operation risk signal is generated.
[0024] Furthermore, if the initial operation evaluation value does not exceed the preset initial operation evaluation threshold, the pressure data of the oil circuit in the electric loader is collected, the difference between the pressure data of the oil circuit and the preset pressure data standard value is calculated and the absolute value is taken to obtain the oil pressure value of the electric loader, and the temperature data of the cooling water of the electric loader is collected and marked as the water temperature value of the electric loader; the oil pressure value and the water temperature value of the electric loader are numerically calculated to obtain a risk re-evaluation value, and the risk re-evaluation value is numerically compared with the preset risk re-evaluation threshold. If the risk re-evaluation value exceeds the preset risk re-evaluation threshold, a high operation risk signal is generated; if the operation re-evaluation value does not exceed the preset risk re-evaluation threshold, a low operation risk signal is generated.
[0025] Furthermore, the specific operation process of the comprehensive assessment module of operational risk includes:
[0026] The driver in the electric loader is monitored by a monitoring camera, and the moment when the driver closes his eyes is taken as the starting point of time and timing is performed to obtain the eyes-closing duration value. When the eyes-closing duration value exceeds the preset eyes-closing duration threshold, a high-risk operation signal is generated; and all non-standard behaviors of the driver in the detection period are collected and classified, and the duration of each non-standard behavior of the corresponding type is summed up to obtain the non-standard duration value, and each type of non-standard behavior is set in advance to correspond to a set of behavior weight values, and the non-standard duration value of the corresponding type of non-standard behavior is multiplied by the corresponding behavior weight value to obtain the non-standard impact value; the non-standard impact values of all types of non-standard behaviors of the driver in the detection period are summed up to obtain the non-standard total inspection value, and the non-standard total inspection value is numerically compared with the preset non-standard total inspection threshold. If the non-standard total inspection value exceeds the preset non-standard total inspection threshold, a high-risk operation signal is generated.
[0027] Furthermore, the specific operation process of the comprehensive assessment module of operational risk also includes:
[0028] A 3D model is built based on the layout and terrain of the road section where the electric loader moves, and the field of view that the driver can see in the cab of the electric loader is simulated according to the model of the electric loader and the height and perspective of the driver. By simulating the driver's field of view, the area that the driver cannot see is obtained in real time and marked as a real-time blind spot;
[0029] The real-time blind spot monitoring image is collected and it is determined whether there is an obstacle object. If there is an obstacle object, the distance reduction value and the real-time distance detection value of the two are obtained based on the orientation and movement speed of the obstacle object and the movement direction and movement speed of the electric loader; the distance reduction value and the real-time distance detection value are numerically compared with the preset distance reduction threshold and the preset real-time distance detection threshold respectively. If the distance reduction value exceeds the preset distance reduction threshold or the real-time distance detection value does not exceed the preset real-time distance detection threshold, a high-risk operation signal is generated.
[0030] Compared with the prior art, the present invention has the following beneficial effects:
[0031] 1. In the present invention, the maintenance urgency detection module is used to analyze and generate a maintenance high urgency signal or a maintenance low urgency signal, so that the maintenance urgency of the electric loader can be accurately determined. When the maintenance high urgency signal is generated, the electric loader is temporarily not operated and the electric loader is maintained and comprehensively inspected in time to ensure the operation safety and operation stability of the electric loader; and the loader degradation judgment module is used to judge the performance degradation of the electric loader, so as to provide data support for the analysis of the maintenance urgency detection module to ensure the accuracy of its analysis results, and facilitate the formulation of corresponding management standards and supervision intensity for different levels of degradation status, so as to ensure the supervision effect of the electric loader and further improve the operation safety of the electric loader;
[0032] 2. In the present invention, when a maintenance low urgency signal is generated, the electric loader is allowed to operate normally, the operation risk detection and evaluation module performs real-time risk detection and analysis on the operation process of the electric loader, and the driver of the electric loader is monitored in real time through the operation risk comprehensive evaluation module, and the real-time blind spot risk during the operation of the electric loader is detected. By combining the electric loader operation risk analysis and the operation risk analysis and providing real-time feedback and warning, the operation safety hazards of the electric loader are further reduced. BRIEF DESCRIPTION OF THE DRAWINGS
[0033] In order to facilitate understanding by those skilled in the art, the present invention is further described below in conjunction with the accompanying drawings;
[0034] Figure 1 This is a system block diagram of Embodiment 1 of the present invention;
[0035] Figure 2 This is a system block diagram of Embodiment 2 of the present invention. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] Embodiment 1: Figure 1 As shown, the present invention proposes a real-time evaluation system for operation risk of an electric loader based on data analysis, comprising a server, a maintenance urgency detection module, an operation risk detection and evaluation module, an operation risk comprehensive evaluation module and a display and warning terminal, and the server is communicatively connected with the maintenance urgency detection module, the operation risk detection and evaluation module, the operation risk comprehensive evaluation module and the display and warning terminal;
[0038] Among them, the maintenance urgency detection module analyzes the maintenance urgency status of the electric loader, generates a high maintenance urgency signal or a low maintenance urgency signal through analysis, and sends the high maintenance urgency signal or the low maintenance urgency signal to the display warning end via the server. When the display warning end receives the high maintenance urgency signal, it issues a corresponding warning, and can accurately judge the maintenance urgency status of the electric loader. When the high maintenance urgency signal is generated, the electric loader should not be operated temporarily, and the electric loader should be maintained and comprehensively inspected in time to ensure the operation safety and operation stability of the electric loader. The specific operation process of the maintenance urgency detection module is as follows:
[0039] The last maintenance date of the electric loader is obtained, and the time difference between the current date and the last maintenance date is calculated to obtain the maintenance interval; all faults that occur in the electric loader within the maintenance interval are collected and classified, and the number of occurrences of each type of fault is compared with the single-type fault rate; a set of fault impact values corresponding to each type of fault is set in advance, wherein the values of the fault impact values are all greater than zero, and are pre-set by the management personnel and stored in the server;
[0040] It should be noted that the greater the damage caused by the corresponding type of fault, the greater the value of the fault impact value that matches it; the single-type fault occurrence rate of the corresponding type is multiplied by the corresponding fault impact value to obtain the fault type inspection value, and the fault type inspection values of all types of faults that occur in the electric loader within the maintenance interval are summed up to obtain the total fault inspection value; and the larger the total fault inspection value, the more serious the fault condition of the electric loader within the maintenance interval, and the more timely maintenance is needed;
[0041] The bump overload decision analysis is performed to obtain the bump overload detection value of the electric loader within the maintenance interval, specifically: the duration of each overload state and each bump state of the electric loader within the maintenance interval is collected and marked as a single overload duration value and a single bump duration value, respectively, all single overload duration values of the electric loader within the maintenance interval are summed up to obtain the total overload duration value, and all single bump duration values of the electric loader within the maintenance interval are summed up to obtain the total bump duration value; wherein, the larger the total bump duration value and the total overload duration value, the greater the damage to the electric loader within the maintenance interval;
[0042] And the single overload duration value and the single bump duration value are numerically compared with the preset single overload duration threshold and the preset single bump duration threshold respectively; if the single overload duration value exceeds the preset single overload duration threshold, the corresponding single overload duration value is marked as a high continuous overload value; if the single bump duration value exceeds the preset single bump duration threshold, the corresponding single bump duration value is marked as a high continuous bump value; the number of high continuous overload values and the number of high continuous bump values of the electric loader within the maintenance interval are marked as high load inspection value and high continuous bump inspection value respectively;
[0043] By formula The total overload time value BK, the total bump time value BG, the high load detection value BY and the high bump detection value BF of the electric loader within the maintenance interval are numerically calculated to obtain the bump overload detection value BZ; wherein a1, a2, a3 and a4 are preset proportional coefficients, and a3>a4>a1>a2>0; and the larger the value of the bump overload detection value BZ is, the greater the damage to the electric loader is within the maintenance interval, and the more timely the maintenance and comprehensive inspection of the electric loader is required;
[0044] The total mileage of the electric loader during the maintenance interval is collected and the maintenance urgency normalization analysis formula is used. The maintenance interval time YF, the total fault inspection value YP, the total movement mileage YL and the bump overload detection value BZ are numerically calculated to obtain the maintenance emergency coefficient YK; among them, ep1, ep2, ep3, ep4 are preset proportional coefficients whose values are greater than zero, and the larger the value of the maintenance emergency coefficient YK is, the more timely maintenance and comprehensive inspection are needed for the electric loader to ensure the safe operation of the electric loader.
[0045] Retrieving degradation judgment information of the electric loader from the server, if the electric loader is in a high degradation state, assigning a first preset maintenance emergency coefficient threshold to it, if the electric loader is in a medium degradation state, assigning a second preset maintenance emergency coefficient threshold to it, if the electric loader is in a low degradation state, assigning a third preset maintenance emergency coefficient threshold to it; and the third preset maintenance emergency coefficient threshold> the second preset maintenance emergency coefficient threshold> the first preset maintenance emergency coefficient threshold> 0; by assigning a matching preset maintenance emergency coefficient threshold based on the performance degradation status of the electric loader, the accuracy of the maintenance urgency analysis result can be significantly improved;
[0046] The maintenance urgency coefficient YK is numerically compared with the corresponding preset maintenance urgency coefficient threshold. If the maintenance urgency coefficient YK exceeds the corresponding preset maintenance urgency coefficient threshold, it indicates that the electric loader generally requires timely maintenance and a comprehensive inspection, and a high maintenance urgency signal is generated; if the maintenance urgency coefficient YK does not exceed the corresponding preset maintenance urgency coefficient threshold, it indicates that the electric loader generally does not require timely maintenance and a comprehensive inspection, and a low maintenance urgency signal is generated.
[0047] When a maintenance low urgency signal is generated, the electric loader is allowed to operate normally. The operation risk detection and evaluation module performs real-time risk detection and evaluation on the operation process of the electric loader. When a high-risk operation signal or a low-risk operation signal is generated through analysis, the high-risk operation signal or the low-risk operation signal is sent to the display warning end via the server. When the display warning end receives the high-risk operation signal, it issues a corresponding warning. It can reasonably evaluate the operation risk of the electric loader and provide real-time feedback warnings so that the driver can make reasonable adjustments in time, thereby ensuring the safety and stability of the operation process of the electric loader. The specific operation process of the operation risk detection and evaluation module is as follows:
[0048] During the movement of the electric loader, real-time load data of the electric loader is collected, the real-time load data is a data value indicating the weight of the goods or materials carried by the electric loader, and the real-time load data is numerically compared with a preset real-time load data threshold value. If the real-time load data exceeds the preset real-time load data threshold value, it is determined that the electric loader is in an overload state; and bump amplitude data and bump frequency data of the electric loader are collected, wherein the bump amplitude data and the bump frequency data are data values indicating the magnitude of the shaking amplitude and the shaking frequency of the electric loader; the bump amplitude data and the bump frequency data are numerically compared with a preset bump amplitude data threshold value and a preset bump frequency data threshold value respectively. If the bump amplitude data or the bump frequency data exceeds the corresponding preset threshold value, it is determined that the electric loader is in a bump state;
[0049] It should be noted that both the overload state and the bump state have great safety hazards and are likely to cause damage to the electric loader; if the electric loader is in an overload state or a bump state, a high-risk operation signal is generated; if the electric loader is not in an overload state or a bump state, the running speed of the electric loader and the wind force data in the running environment are collected, wherein the wind force data is a data value indicating the wind speed in the running environment of the electric loader; the running speed FD of the electric loader, the wind force data FY, the real-time load data FK, the bump amplitude data FM and the bump frequency data FW are numerically calculated by the formula FX=by1*FD+by2*FY+by3*FK+by4*FM+by5*FW to obtain the risk inspection value FX;
[0050] Among them, b1, b2, b3, b4, b5 are preset proportional coefficients, and b1, b2, b3, b4, b5 are all positive numbers; and, the larger the value of the risk inspection value FX is, the greater the operating risk of the electric loader is; and the running direction of the electric loader is obtained, if the electric loader is in a straight state, a direction influence value FX1 is assigned to it, if the electric loader is in a turning state, a direction influence value FX2 is assigned to it, and FX2>FX1>1; the risk inspection value FX is multiplied by the corresponding direction influence value to obtain a risk initial assessment value, and the risk initial assessment value is numerically compared with the preset risk initial assessment threshold value. If the risk initial assessment value exceeds the preset risk initial assessment threshold value, it indicates that the operating risk of the electric loader is relatively large, and a high-risk operation signal is generated;
[0051] If the initial operation evaluation value does not exceed the preset initial operation evaluation threshold, the pressure data of the oil circuit in the electric loader is collected, the difference between the pressure data of the oil circuit and the preset pressure data standard value is calculated and the absolute value is taken to obtain the oil pressure value of the electric loader, and the temperature data of the cooling water of the electric loader is collected and marked as the water temperature value of the electric loader; it should be noted that the pressure of the oil circuit of the electric loader is very important to ensure the lubrication and normal operation of the mechanical parts. The greater the deviation of the oil circuit pressure, the more unfavorable it is to ensure the safe and stable operation of the electric loader; when the cooling water of the electric loader is high, it is easy to cause damage to the mechanical parts and reduce the working efficiency;
[0052] The risk reassessment value FB is obtained by numerically calculating the oil pressure value FQ and the water temperature value FH of the electric loader through the formula FB=wq1*FQ+wq2*FH, wherein wq1 and wq2 are preset weight coefficients, wq1>wq2>0; and, the larger the value of the risk reassessment value FB is, the greater the operating risk of the electric loader is, and the less conducive it is to ensure the safe and stable operation of the electric loader; the risk reassessment value FB is numerically compared with the preset risk reassessment threshold value, if the risk reassessment value FB exceeds the preset risk reassessment threshold value, it indicates that the operating risk of the electric loader is relatively large, and a high operating risk signal is generated; if the operating reassessment value FB does not exceed the preset risk reassessment threshold value, it indicates that the operating risk of the electric loader is relatively small, and a low operating risk signal is generated.
[0053] The operation risk comprehensive assessment module monitors the driver of the electric loader in real time, and detects the real-time blind spot risk during the operation of the electric loader. It determines whether to generate a high-risk operation signal through analysis, and sends the high-risk operation signal to the display warning end through the server. When the display warning end receives the high-risk operation signal, it issues a corresponding warning to remind the driver to make timely adjustments to reduce the operation risk to ensure the driving safety of the electric loader, thereby further reducing the safety hazards of the electric loader. The specific operation process of the operation risk comprehensive assessment module is as follows:
[0054] The driver in the electric loader is monitored by a surveillance camera, and the time when the driver closes his eyes is used as the starting point of time and timing is performed to obtain the eye-closing duration value. When the eye-closing duration value exceeds the preset eye-closing duration threshold, it indicates that the driver is overly tired and sleepy, which seriously affects the operating safety of the electric loader, and a high-risk operation signal is generated; and all non-standard behaviors of the driver during the detection period (such as answering the phone, talking with people, etc.) are collected and classified, and the duration of each non-standard behavior of the corresponding type is summed up to obtain the non-standard duration value, and each type of non-standard behavior is set in advance to correspond to a set of behavior weight values, wherein the values of the behavior weight values are all greater than zero, and are pre-set by the management personnel and stored in the server;
[0055] It should be noted that the greater the potential safety hazard brought by the corresponding type of non-standard behavior, the greater the value of the corresponding behavior weighting value; the non-standard duration value of the corresponding type of non-standard behavior is multiplied by the corresponding behavior weighting value to obtain the non-standard impact value; the non-standard impact values of all types of non-standard behaviors of the driver in the detection period are summed up to obtain the non-standard total inspection value, and the larger the value of the non-standard total inspection value, the greater the safety hazard brought by the driver and the lower the operation safety; the non-standard total inspection value is numerically compared with the preset non-standard total inspection threshold. If the non-standard total inspection value exceeds the preset non-standard total inspection threshold, it indicates that the safety hazard brought by the driver is large, and a high-risk operation signal is generated.
[0056] Furthermore, the operation risk comprehensive assessment module is also used to establish a 3D model according to the layout and terrain of the road section where the electric loader moves, and simulate the field of view that the driver can see in the cab of the electric loader according to factors such as the model of the electric loader and the height and viewing angle of the driver; by simulating the driver's field of view, the area that the driver cannot see is obtained in real time and marked as a real-time blind spot, so as to achieve real-time capture of the driver's blind spot, monitor the real-time blind spot, and send the monitoring image of the real-time blind spot to the display warning end, so that the driver can have a detailed understanding of the safety hazard status of the real-time blind spot;
[0057] Collect monitoring images of the real-time blind spot and determine whether there are obstacles, wherein the obstacle refers to static objects (such as buildings, potholes, etc.) or dynamic objects (such as animals, small vehicles, pedestrians, etc.) in the real-time blind spot that affect the safe operation of the electric loader. If there is an obstacle, the distance reduction speed value and the real-time distance detection value of the two are obtained based on the direction and movement speed of the obstacle and the movement direction and movement speed of the electric loader; wherein the distance reduction speed value is a data value indicating the speed of shortening the distance between the obstacle and the electric loader, and the real-time distance detection value is a data value indicating the real-time distance between the obstacle and the electric loader;
[0058] It should be noted that the larger the distance speed reduction value and the smaller the real-time distance detection value, the greater the safety hazard brought by the obstacle. The distance speed reduction value and the real-time distance detection value are compared with the preset distance speed reduction threshold and the preset real-time distance detection threshold respectively. If the distance speed reduction value exceeds the preset distance speed reduction threshold or the real-time distance detection value does not exceed the preset real-time distance detection threshold, indicating that there is a large safety hazard in the real-time blind spot during the operation of the electric loader, a high-risk operation signal is generated, the obstacle is marked in the monitoring image and sent to the display warning terminal to reduce the driving risk of the driver.
[0059] Embodiment 2: Figure 2 As shown, the difference between this embodiment and embodiment 1 is that the server is connected to the loader degradation judgment module in communication, the loader degradation judgment module collects the total movement time and maintenance times of the electric loader in the historical use process, and calculates the time difference between the production date of the electric loader and the current date to obtain the production interval time, and numerically calculates the production interval time ZS, the total movement time ZD and the maintenance times ZF of the electric loader through the formula ZT=(c1*ZS+c2*ZD) / (c3*ZF+1) to obtain the electric loader degradation value ZT; wherein c1, c2, c3 are preset proportional coefficients, c3>c2>c1>0; and, the larger the value of the electric loader degradation value ZT, the more serious the performance degradation of the electric loader, the more difficult it is to ensure the safe and stable operation of the electric loader, and the more it needs to be supervised or scrapped as needed;
[0060] The degradation value of the electric loader is compared with the preset electric loader degradation value range. If the degradation value of the electric loader exceeds the maximum value of the preset electric loader degradation value range, the electric loader is judged to be in a high degradation state; if the degradation value of the electric loader is within the preset electric loader degradation value range, the electric loader is judged to be in a medium degradation state; if the degradation value of the electric loader does not exceed the minimum value of the preset electric loader degradation value range, the electric loader is judged to be in a low degradation state; and the degradation judgment information of the electric loader is sent to the server for storage, and the server sends the degradation judgment information of the electric loader to the display warning terminal and the maintenance urgency detection module to provide data support for the analysis of the maintenance urgency detection module to ensure the accuracy of its analysis results. When the driver receives the degradation judgment information, corresponding management standards and supervision intensity are formulated for different levels of degradation states, thereby ensuring the supervision effect of the electric loader and improving the operation safety of the electric loader.
[0061] The working principle of the present invention is as follows: when in use, the maintenance urgency detection module is used to perform analysis to generate a high maintenance urgency signal or a low maintenance urgency signal, so as to accurately judge the maintenance urgency status of the electric loader, and when the high maintenance urgency signal is generated, the electric loader is temporarily not operated, and the electric loader is maintained and comprehensively inspected in time to ensure the operation safety and operation stability of the electric loader; when the low maintenance urgency signal is generated, the electric loader is operated normally, and the operation risk detection and evaluation module performs real-time risk detection and analysis on the operation process of the electric loader, so as to reasonably evaluate the operation risk of the electric loader and provide real-time feedback and early warning, so that the driver can make reasonable adjustments in time, and the operation risk comprehensive evaluation module is used to monitor the driver of the electric loader in real time, and detect the real-time blind spot risk during the operation of the electric loader, and through analysis to determine whether a high operation risk signal is generated, the operation risk analysis of the electric loader and the operation risk analysis are combined during the operation of the electric loader and real-time feedback and early warning are provided, so as to further reduce the operation safety hazards of the electric loader.
[0062] The above formulas are all dimensionless and numerical calculations. The formula is a formula obtained by collecting a large amount of data and performing software simulation to obtain the most recent real situation. The preset parameters in the formula are set by technicians in this field according to actual conditions. The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the contents of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that technicians in the relevant technical field can understand and use the present invention well. The present invention is only limited by the claims and their full scope and equivalents.
Claims
1. A real-time evaluation system for electric loader operation risk based on data analysis, characterized in that: It includes a server, a maintenance urgency detection module, an operation risk detection and evaluation module, an operation risk comprehensive evaluation module and a display warning terminal; the maintenance urgency detection module analyzes the maintenance urgency status of the electric loader, generates a maintenance high urgency signal or a maintenance low urgency signal through the analysis, and sends the maintenance high urgency signal or the maintenance low urgency signal to the display warning terminal via the server, and the display warning terminal issues a corresponding warning when receiving the maintenance high urgency signal; When a maintenance low urgency signal is generated, the electric loader is allowed to operate normally. The operation risk detection and evaluation module performs real-time risk detection and evaluation on the operation process of the electric loader. When a high-risk operation signal or a low-risk operation signal is generated through analysis, the high-risk operation signal or the low-risk operation signal is sent to the display warning end via the server. When the display warning end receives the high-risk operation signal, a corresponding warning is issued; The comprehensive operation risk assessment module monitors the driver of the electric loader in real time and detects the real-time blind spot risks during the operation of the electric loader. It determines whether to generate a high-risk operation signal through analysis, and sends the high-risk operation signal to the display warning end via the server. When the display warning end receives the high-risk operation signal, it issues a corresponding warning.
2. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 1 is characterized in that: The specific operation process of the maintenance urgency detection module includes: The last maintenance date of the electric loader is obtained, and the time difference between the current date and the last maintenance date is calculated to obtain the maintenance interval; all faults occurring in the electric loader within the maintenance interval are collected and classified, and the number of occurrences of each type of fault is compared with the single-type fault incidence rate; each type of fault is set in advance to correspond to a set of fault impact values, and the single-type fault incidence rate of the corresponding type is multiplied by the corresponding fault impact value to obtain the fault class detection value, and the fault class detection values of all types of faults occurring in the electric loader within the maintenance interval are summed up to obtain the total fault detection value; The total movement mileage of the electric loader within the maintenance interval is collected, and the bump overload detection value of the electric loader within the maintenance interval is obtained through bump overload decision analysis. The maintenance interval, the total fault inspection value, the total movement mileage and the bump overload detection value are numerically calculated to obtain the maintenance emergency coefficient; The degradation judgment information of the electric loader is retrieved from the server. If the electric loader is in a high degradation state, a first preset maintenance emergency coefficient threshold is assigned to it. If the electric loader is in a medium degradation state, a second preset maintenance emergency coefficient threshold is assigned to it. If the electric loader is in a low degradation state, a third preset maintenance emergency coefficient threshold is assigned to it; and the third preset maintenance emergency coefficient threshold > the second preset maintenance emergency coefficient threshold > the first preset maintenance emergency coefficient threshold > 0; if the maintenance emergency coefficient exceeds the corresponding preset maintenance emergency coefficient threshold, a high maintenance urgency signal is generated; if the maintenance emergency coefficient does not exceed the corresponding preset maintenance emergency coefficient threshold, a low maintenance urgency signal is generated.
3. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 2 is characterized in that: The specific analysis process of turbulence overload decision analysis is as follows: The duration of each overload state and each bump state of the electric loader within the maintenance interval is collected and marked as a single overload duration value and a single bump duration value, respectively; all single overload duration values of the electric loader within the maintenance interval are summed up to obtain a total overload duration value; all single bump duration values of the electric loader within the maintenance interval are summed up to obtain a total bump duration value; And the single overload duration value and the single bump duration value are numerically compared with the preset single overload duration threshold and the preset single bump duration threshold respectively; if the single overload duration value exceeds the preset single overload duration threshold, the corresponding single overload duration value is marked as a high continuous overload value; if the single bump duration value exceeds the preset single bump duration threshold, the corresponding single bump duration value is marked as a high continuous bump value; the number of high continuous overload values and the number of high continuous bump values of the electric loader within the maintenance interval are marked as high load inspection value and high continuous bump inspection value respectively; The total overload time value, total bump time value, high load detection value and high bump detection value of the electric loader within the maintenance interval are numerically calculated to obtain the bump overload detection value.
4. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 3 is characterized in that: The server is in communication connection with the loader degradation judgment module, and the loader degradation judgment module collects the total movement time and maintenance times of the electric loader during historical use, calculates the time difference between the production date of the electric loader and the current date to obtain the production interval time, and numerically calculates the production interval time, the total movement time and the maintenance times of the electric loader to obtain the degradation value of the electric loader; If the degradation value of the electric loader exceeds the maximum value of the preset electric loader degradation value range, the electric loader is judged to be in a high degradation state; if the degradation value of the electric loader is within the preset electric loader degradation value range, the electric loader is judged to be in a medium degradation state; if the degradation value of the electric loader does not exceed the minimum value of the preset electric loader degradation value range, the electric loader is judged to be in a low degradation state; and the degradation judgment information of the electric loader is sent to the server for storage.
5. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 4 is characterized in that: The specific operation process of the operation risk detection and assessment module includes: During the movement of the electric loader, real-time load data of the electric loader is collected. If the real-time load data exceeds a preset real-time load data threshold, it is determined that the electric loader is in an overload state; and bump amplitude data and bump frequency data of the electric loader are collected. If the bump amplitude data or the bump frequency data exceeds the corresponding preset threshold, it is determined that the electric loader is in a bump state; If the electric loader is in an overloaded or bumpy state, a high-risk operation signal is generated; if the electric loader is not in an overloaded or bumpy state, the operating speed of the electric loader and the wind data in the operating environment are collected, and the operating speed, wind data, real-time load data, bump amplitude data and bump frequency data of the electric loader are numerically calculated to obtain a risk inspection value; and the running direction information of the electric loader is obtained. If the electric loader is in a straight-ahead state, a direction influence value FX1 is assigned to it; if the electric loader is in a turning state, a direction influence value FX2 is assigned to it, and FX2>FX1>1; the risk inspection value is multiplied by the corresponding direction influence value to obtain a preliminary risk assessment value. If the preliminary risk assessment value exceeds the preset preliminary risk assessment threshold, a high-risk operation signal is generated.
6. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 5 is characterized in that: If the initial operation evaluation value does not exceed the preset initial operation evaluation threshold, the pressure data of the oil circuit in the electric loader is collected, the difference between the pressure data of the oil circuit and the preset pressure data standard value is calculated and the absolute value is taken to obtain the oil pressure value of the electric loader, and the temperature data of the cooling water of the electric loader is collected and marked as the water temperature value of the electric loader; the oil pressure value of the electric loader and the water temperature value of the electric loader are numerically calculated to obtain the risk re-evaluation value, and if the risk re-evaluation value exceeds the preset risk re-evaluation threshold, a high-risk operation signal is generated; If the operation reassessment value does not exceed the preset risk reassessment threshold, a low operation risk signal is generated.
7. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 1 is characterized in that: The specific operation process of the comprehensive assessment module of operational risk includes: The driver in the electric loader is monitored by a monitoring camera, and the moment when the driver closes his eyes is taken as the starting time and timing is performed to obtain the eyes-closing duration value. When the eyes-closing duration value exceeds the preset eyes-closing duration threshold, a high-risk operation signal is generated; and all non-standard behaviors of the driver in the detection period are collected and classified, and the duration of each non-standard behavior of the corresponding type is summed up to obtain the non-standard duration value, and each type of non-standard behavior is set in advance to correspond to a set of behavior weight values, and the non-standard duration value of the corresponding type of non-standard behavior is multiplied by the corresponding behavior weight value to obtain the non-standard impact value; the non-standard impact values of all types of non-standard behaviors of the driver in the detection period are summed up to obtain the non-standard total inspection value, and if the non-standard total inspection value exceeds the preset non-standard total inspection threshold, a high-risk operation signal is generated.
8. The real-time evaluation system for electric loader operation risk based on data analysis according to claim 7 is characterized in that: The specific operation process of the comprehensive assessment module of operational risk also includes: A 3D model is built based on the layout and terrain of the road section where the electric loader moves, and the field of view that the driver can see in the cab of the electric loader is simulated according to the model of the electric loader and the height and perspective of the driver. By simulating the driver's field of view, the area that the driver cannot see is obtained in real time and marked as a real-time blind spot; The real-time blind spot monitoring image is collected and it is determined whether there is an obstacle. If there is an obstacle, the distance reduction value and real-time distance detection value of the two are obtained based on the direction and movement speed of the obstacle and the movement direction and speed of the electric loader; if the distance reduction value exceeds the preset distance reduction threshold or the real-time distance detection value does not exceed the preset real-time distance detection threshold, a high-risk operation signal is generated.