Single-phase electric energy meter upper shell nameplate automatic assembling device and method

By designing an automated single-phase power meter upper case nameplate assembly device, the automatic assembly of upper case and nameplate is achieved using robots and turntables, the problems of low efficiency and low quality of manual assembly in the prior art are solved, and the production efficiency and products are improved consistency.

CN119036024AInactive Publication Date: 2024-11-29STATE GRID BEIJING ELECTRIC POWER CO +1

Patent Information

Application Number
CN202411461591.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The assembly of existing single-phase electric meter shells and nameplates relies on manual operation, resulting in low production efficiency and low pass rate, and is prone to errors.

Method used

A single-phase electric energy meter upper shell nameplate automatic assembly device is designed, including a workbench, upper shell cache turntable, nameplate installation unit, feeding robot and installation robot. The assembly of upper shell and nameplate is completed through automated means, using robot and turntable Implement automated material transport and assembly, and be equipped with pressure sensors for quality inspection.

Benefits of technology

Automatic assembly of upper shell and nameplate is realized, production efficiency is improved, error rate of manual operation is reduced, product consistency and quality is ensured, manual labor is saved, and deviations in the assembly process are prevented through pressure sensor detection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119036024A_ABST
    Figure CN119036024A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of electric energy equipment assembly, and relates to a single-phase electric energy meter upper shell nameplate automatic assembly device and method.The device comprises a workbench, the workbench is located on one side of a single-phase electric energy meter semi-finished product conveying line, and an upper shell cache rotating disc and a nameplate installation unit are arranged on the workbench; the nameplate mounting unit is arranged on one side of the upper shell cache turntable, a conveying tray on which single-phase electric energy meter semi-finished products are fixed is arranged on the other side of the upper shell cache turntable, an upper shell feeding manipulator is arranged on one side, close to the nameplate mounting unit, of the worktable, and an upper shell mounting manipulator is arranged on one side, close to the conveying tray, of the worktable. Feeding of an upper shell, assembling of a nameplate and assembling of the upper shell and a lower shell of a single-phase electric energy meter are integrated into one device, material distribution is carried out through the material box and the turnover box, the rotating disc is responsible for material transferring, and then the mechanical arm is responsible for automatic assembling of materials of the upper shell and a bottom shell. Combination and adaptation of various materials are completed through an automatic means, labor is saved, and product assembling consistency is guaranteed.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of electric energy equipment assembly, and relates to an automatic assembly device and method for a nameplate on a shell of a single-phase electric energy meter. Background Art

[0002] A single-phase energy meter is a multifunctional measuring instrument specially designed to monitor and control the energy, power and power of single-phase loads (especially household appliances). It determines the energy consumption by measuring the changes in current and voltage, and displays it on the meter in digital or analog form. Some intelligent single-phase energy meters also have functions such as remote communication, data processing, and power consumption monitoring, which can provide more comprehensive energy management solutions.

[0003] The assembly process of the upper shell and the upper nameplate of the single-phase electricity meter is a relatively delicate step that requires certain professional skills. The existing upper shell and the upper nameplate of the single-phase electricity meter are assembled manually, and the main defects are: first, the efficiency of manual turning is low, the nameplate and the upper shell are in a separated state, the loading speed is slow, and the production rhythm is affected; second, due to the low degree of automation, the upper shell assembly relies on operators, and the operators are prone to mistakes when they are tired, which affects the assembly quality and the production failure rate is high. Summary of the invention

[0004] The purpose of the present invention is to provide a device and method for automatically assembling the nameplate on the upper shell of a single-phase electric energy meter, so as to solve the technical problems in the prior art that the loading of the upper shell of the single-phase electric energy meter, the assembly of the nameplate, and the assembly of the upper shell and the lower shell rely on manual labor, which leads to low production efficiency and low pass rate.

[0005] In order to achieve the above object, the present invention adopts the following technical solutions: The first invention, the present application discloses an automatic assembly device for the upper shell nameplate of a single-phase electric energy meter, including a workbench, the workbench is located on one side of the single-phase electric energy meter semi-finished product conveyor line, an upper shell cache turntable and a nameplate installation unit are arranged on the workbench, the nameplate installation unit is arranged on one side of the upper shell cache turntable, and the other side of the upper shell cache turntable is a conveying tray on which the single-phase electric energy meter semi-finished product is fixed, the conveying tray is arranged on the single-phase electric energy meter semi-finished product conveyor line, an upper shell loading robot is arranged on the side of the workbench close to the nameplate installation unit, and an upper shell installation robot is arranged on the side of the workbench close to the conveying tray.

[0006] Preferably, a plurality of limit grooves are evenly arranged radially on the upper shell cache turntable, the limit grooves are adapted to the size of the upper shell of the single-phase electric energy meter, and a through hole adapted to the nameplate is opened in the limit groove at the position corresponding to the transparent window of the upper shell of the single-phase electric energy meter.

[0007] Preferably, the conveying tray includes a supporting device, which is arranged on the single-phase electric energy meter semi-finished product conveying line, and an electric energy meter tray is arranged on the upper end of the supporting device. The electric energy meter tray is provided with positioning terminals surrounded on four sides, and the positioning terminals are adjusted by a cylinder structure.

[0008] Preferably, the nameplate installation unit includes a nameplate installation mechanism and a nameplate clip, the nameplate clip is used to hold the nameplate to be installed, and the nameplate clip is installed on the back of the nameplate installation mechanism, and the front of the nameplate installation mechanism is arranged facing the upper shell cache turntable, and is used to fix the nameplate to be installed in the nameplate clip on the upper shell of the single-phase electric energy meter fixed on the upper shell cache turntable.

[0009] Preferably, the nameplate installation mechanism includes a feeding mechanism and a pressing mechanism, the feeding mechanism is arranged below the pressing mechanism, a guide rail is also arranged between the feeding mechanism and the pressing mechanism, and the upper shell of the single-phase electric energy meter on the upper shell cache turntable is located between the two; the nameplate clip is arranged on the feeding mechanism, and the feeding mechanism can move the nameplate to be installed in the nameplate clip along the guide rail to below the upper shell of the single-phase electric energy meter, and fix the nameplate to be installed and the upper shell of the single-phase electric energy meter by the pressing mechanism.

[0010] Preferably, the feeding mechanism includes a fixed frame, a telescopic rod and a suction cup; the fixed frame is arranged on the workbench below the pressing mechanism, the nameplate clip is fixed on the fixed frame, one end of the telescopic rod is arranged on the fixed frame, and the other end is connected to the suction cup, so that the suction cup can move between below the nameplate clip and below the upper shell of the single-phase electric energy meter.

[0011] Preferably, the nameplate clip includes a nameplate limiting rail, a nameplate pressing mechanism and a base, the base is fixed on the workbench, the nameplate limiting rail is arranged on the base, the nameplate is placed in the nameplate limiting rail, the nameplate pressing mechanism is arranged in the nameplate limiting rail and is located above the nameplate, and the nameplate pressing mechanism can move up and down along the nameplate limiting rail, and cooperate with the feeding mechanism to move a single nameplate to the position to be processed.

[0012] Preferably, the upper shell installation robot includes a robotic arm, an upper shell clamp and a pressure sensor. The upper shell clamp is fixed on the top of the robotic arm and is used for positioning and grasping the upper shell of the single-phase electricity meter. The pressure sensor is arranged between the robotic arm and the upper shell clamp and is used to detect the pressure value of the assembly process. When the pressure value is greater than the preset value, an alarm is sounded and the assembly action is stopped.

[0013] The second invention, the present application also discloses an assembly method of an automatic assembly device for a nameplate on a single-phase electric energy meter, comprising: S1: The upper shell loading manipulator grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable; S2: The upper shell cache turntable rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the nameplate installation unit, and the nameplate installation unit completes the nameplate installation; S3: The upper shell cache turntable rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to a fixed position by a conveying tray.

[0014] Preferably, the nameplate installation unit includes a nameplate installation mechanism and a nameplate clip; the nameplate installation mechanism includes a feeding mechanism and a pressing mechanism; the method includes: S1: The upper shell loading manipulator grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable; S2: The upper shell buffer turntable rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the pressing mechanism, and the feeding mechanism extracts a single nameplate from the nameplate clip and moves it to the processing position of the upper shell of the single-phase electric energy meter to be processed; the pressing mechanism cooperates with the feeding mechanism to press the nameplate to complete the assembly of the nameplate; S3: The upper shell cache turntable rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to a fixed position by a conveying tray.

[0015] Compared with the prior art, the present invention has the following beneficial effects: The present application discloses an automatic assembly device for the nameplate on the upper shell of a single-phase electric energy meter. The device clamps the upper shell of the single-phase electric energy meter to be processed from a turnover box through a four-axis robot on the upper cover, and fixes it on an upper shell cache turntable to realize automatic loading. The upper shell cache turntable rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the nameplate installation unit, and the nameplate installation unit completes the nameplate installation; the upper shell cache turntable rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from the bottom of the nameplate installation unit, and the upper shell installation robot grabs the upper shell of the single-phase electric energy meter with the nameplate installed; the upper shell installation robot simulates the manual assembly process and assembly angle of the upper shell, and installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to a fixed position by a conveyor tray, thereby solving the problem of automatic assembly of the upper shell. This application integrates the loading of the upper shell of the single-phase electric energy meter, the assembly of the nameplate, and the assembly of the upper shell and the lower shell into one device. The materials are distributed through the material box and the turnover box, the turntable is responsible for the transportation of the materials, and the manipulator is responsible for the automatic assembly of the upper shell and the bottom shell materials. The device completely adopts the automatic assembly method, and completes the combination and adaptation of multiple materials through automatic means, saving labor. In addition, the equipment has strong reliability, which ensures the consistency of product assembly.

[0016] Furthermore, the upper shell installation manipulator of the present application is provided with a pressure sensor for detecting the real-time data of the force value during the upper shell assembly process. If the force value is too large, an alarm is given in time to stop the assembly action, so as to prevent deviations during the assembly process from causing damage to the product. With the quality inspection function, the product assembly quality can be judged and the qualified rate of the product production process can be improved. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0018] Figure 1 It is a schematic diagram of the structure of the device of the present invention; Figure 2 It is a schematic diagram of the structure of the conveying tray of the present invention; Figure 3 This is a schematic diagram of the upper shell installation mechanical arm structure of the present invention; Figure 4 This is a schematic diagram of the structure of the upper shell cache turntable of the present invention; Figure 5 Schematic diagram of the nameplate installation mechanism structure of the present invention; wherein (a) is a front view and (b) is a side view; Figure 6It is a schematic diagram of the nameplate clip structure of the present invention.

[0019] Among them: 1-workbench; 2-upper shell cache turntable; 201-limiting slot; 3-upper shell loading robot; 4-conveyor tray; 401-support device; 402-electricity meter tray; 403-positioning terminal; 5-upper shell installation robot; 501-mechanical arm; 502-upper shell clamp; 503-pressure sensor; 6-nameplate installation mechanism; 601-loading mechanism; 6011-fixed frame; 6012-telescopic rod; 6013-suction cup; 602-pressing mechanism; 7-nameplate clip; 701-nameplate limiting track; 702-nameplate pressing mechanism; 703-base. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Generally, the components of the embodiments of the present invention described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the invention claimed for protection, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, further definition and explanation thereof is not required in subsequent drawings.

[0023] In the description of the embodiments of the present invention, it should be noted that if the terms "upper", "lower", "horizontal", "inner", etc. indicate an orientation or positional relationship based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship in which the product of the invention is usually placed when in use, it is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In addition, the terms "first", "second", etc. are only used to distinguish the description, and cannot be understood as indicating or implying relative importance.

[0024] In addition, if the term "horizontal" appears, it does not mean that the component is required to be absolutely horizontal, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", which does not mean that the structure must be completely horizontal, but can be slightly tilted.

[0025] In the description of the embodiments of the present invention, it is also necessary to explain that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0026] The present invention is further described in detail below in conjunction with the accompanying drawings: See also Figure 1 The present application discloses an automatic assembly device for the upper shell nameplate of a single-phase electric energy meter, comprising a workbench 1, wherein the workbench 1 is located at one side of a semi-finished product conveying line of a single-phase electric energy meter, an upper shell cache turntable 2 and a nameplate installation unit are arranged on the workbench 1, the nameplate installation unit is arranged on one side of the upper shell cache turntable 2, and the other side of the upper shell cache turntable 2 is a conveying tray 4 on which the semi-finished product of the single-phase electric energy meter is fixed, the conveying tray 4 is arranged on the semi-finished product conveying line of the single-phase electric energy meter, an upper shell loading robot 3 is arranged on the side of the workbench 1 close to the nameplate installation unit, and an upper shell installation robot 5 is arranged on the side of the workbench 1 close to the conveying tray 4. The upper shell loading manipulator 3 clamps the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell cache turntable 2; the upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the nameplate installation unit, and the nameplate installation unit completes the nameplate installation; the upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from the bottom of the nameplate installation unit, and the upper shell installation manipulator 5 grabs the upper shell of the single-phase electric energy meter with the nameplate installed; the upper shell installation manipulator 5 installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray 4. Solve the problem of automatic assembly of the upper shell. While saving manpower, it also improves work efficiency and safety. The patent of the present invention has the outstanding characteristics of high integration and automation.

[0027] Directions: S1: The upper shell loading manipulator 3 grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable 2; S2: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the nameplate installation unit, and the nameplate installation unit completes the nameplate installation; S3: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator 5 grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot 5 installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray 4.

[0028] In some embodiments, see Figure 4 , a plurality of limit grooves 201 are evenly arranged along the radial direction on the upper shell cache turntable 2, and the limit grooves 201 are adapted to the size of the upper shell of the single-phase electric energy meter. A through hole adapted to the nameplate is opened in the limit groove 201 at the position corresponding to the transparent window of the upper shell of the single-phase electric energy meter. The upper shell cache turntable 2 is used for the loading link of the upper shell of the single-phase electric energy meter. The upper shell loading manipulator 3 grabs the upper shell of the single-phase electric energy meter from the turnover box to the loading position. In this embodiment, the upper shell cache turntable 2 rotates clockwise to move the upper shell of the single-phase electric energy meter to the nameplate assembly position, and the nameplate installation unit completes the assembly process of the upper nameplate. After the nameplate assembly is completed, the upper shell cache turntable 2 continues to rotate to the upper shell material taking position, and the upper shell installation manipulator 5 completes the upper shell material taking process, preparing for the upper shell assembly link.

[0029] In some embodiments, see Figure 2 The conveying tray 4 includes a supporting device 401, which is arranged on the semi-finished product conveying line of the single-phase electric energy meter. The upper end of the supporting device 401 is provided with an electric energy meter tray 402, and the electric energy meter tray 402 is provided with positioning terminals 403 surrounded by four sides, and the positioning terminals 403 are regulated by a cylinder structure. The conveying tray 4 is used to carry the single-phase electric energy meter for transportation. In this embodiment, the semi-finished single-phase electric energy meter is transported to the designated position by the double-sided belt line through the conveying tray 4, and the positioning terminal 403 performs secondary positioning of the electric energy meter to be assembled through the cylinder structure to ensure the accuracy of the subsequent assembly links.

[0030] In some embodiments, the nameplate installation unit includes a nameplate installation mechanism 6 and a nameplate clip 7. The nameplate clip 7 is used to hold the nameplate to be installed, and the nameplate clip 7 is installed on the back of the nameplate installation mechanism 6. The front of the nameplate installation mechanism 6 is arranged facing the upper shell cache turntable 2, and is used to fix the nameplate to be installed in the nameplate clip 7 on the upper shell of the single-phase electric energy meter fixed on the upper shell cache turntable 2.

[0031] Directions: S1: The upper shell loading manipulator 3 grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable 2; S2: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter to be processed to the nameplate installation mechanism 6. The nameplate installation mechanism 6 extracts a single nameplate from the nameplate clip 7 and moves it to the processing position of the upper shell of the single-phase electric energy meter to be processed; the nameplate installation mechanism 6 performs a nameplate pressing action to complete the assembly of the nameplate; S3: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator 5 grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot 5 installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray 4.

[0032] In some embodiments, the nameplate installation mechanism 6 includes a feeding mechanism 601 and a pressing mechanism 602, wherein the feeding mechanism 601 is arranged below the pressing mechanism 602, and a guide rail is arranged between the feeding mechanism 601 and the pressing mechanism 602, and the upper shell of the single-phase electric energy meter on the upper shell cache turntable 2 is located between the two; the nameplate clip 7 is arranged on the feeding mechanism 601, and the feeding mechanism 601 moves the nameplate to be installed in the nameplate clip 7 along the guide rail to the lower side of the upper shell of the single-phase electric energy meter, and fixes the two together through the pressing mechanism 602. Figure 5 Description: The nameplate installation mechanism is mainly composed of a feeding mechanism and a pressing mechanism. The feeding mechanism completes a single feeding action of a whole stack of nameplates. The suction cup absorbs a single nameplate and places it at the bottom of the upper shell transparent window along the guide rail. The upper part of the upper shell transparent window is equipped with a pressing mechanism, which cooperates with the lower suction cup to press the nameplate to complete the nameplate assembly process.

[0033] Directions: S1: The upper shell loading manipulator 3 grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable 2; S2: The upper shell buffer turntable 2 rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the pressing mechanism 602, and the feeding mechanism 601 extracts a single nameplate from the nameplate clip 7 and moves it to the processing position of the upper shell of the single-phase electric energy meter to be processed; the pressing mechanism 602 cooperates with the feeding mechanism 601 to perform the nameplate pressing action to complete the assembly of the nameplate; S3: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator 5 grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot 5 installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray 4.

[0034] In some embodiments, the feeding mechanism 601 includes a fixed frame 6011, a telescopic rod 6012 and a suction cup 6013; the fixed frame 6011 is arranged on the workbench 1 below the pressing mechanism 602, the nameplate clip 7 is fixed on the fixed frame 6011, one end of the telescopic rod 6012 is arranged on the fixed frame 6011 below the nameplate clip 7, and the other end is connected to the suction cup 6013, so that the suction cup 6013 moves between below the nameplate clip 7 and below the upper shell of the single-phase electric energy meter.

[0035] Directions: S1: The upper shell loading manipulator 3 grabs the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable 2; S2: The upper shell buffer turntable 2 rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the pressing mechanism 602, and the suction cup 6013 in the feeding mechanism 601 sucks out a single nameplate from the nameplate clip 7 and moves it along the track to the processing position of the upper shell of the single-phase electric energy meter to be processed; the pressing mechanism 602 cooperates with the feeding mechanism 601 to perform the nameplate pressing action to complete the assembly of the nameplate; S3: The upper shell cache turntable 2 rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator 5 grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot 5 installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray 4.

[0036] In some embodiments, see Figure 6 The nameplate clip 7 includes a nameplate limiting track 701, a nameplate pressing mechanism 702 and a base 703. The nameplate limiting track 701 is arranged on the base 703, and the nameplate is placed in the nameplate limiting track 701. The nameplate pressing mechanism 702 is arranged in the nameplate limiting track 701 and is located above the nameplate. The nameplate pressing mechanism 702 moves up and down along the nameplate limiting track 701. The middle part of the base 703 is hollowed out to cooperate with the feeding mechanism 601 to move a single nameplate to the position to be processed. The nameplate clip 7 is mainly used for storing multiple nameplates. 200 nameplates can be stored at a time. The whole stack of nameplates is manually placed inside the nameplate limiting track 701 through the limiting track, the nameplate pressing mechanism 702 is installed, and then the entire nameplate clip 7 is placed in the nameplate installation mechanism 6, so as to cooperate with the nameplate installation mechanism 6 to complete the installation process.

[0037] In some embodiments, see Figure 3The upper shell installation manipulator 5 includes a mechanical arm 501, an upper shell clamp 502 and a pressure sensor 503. The upper shell clamp 502 is fixed on the top of the mechanical arm 501 and is used to locate and grasp the upper shell of the single-phase electric energy meter; the pressure sensor 503 is set between the mechanical arm 501 and the upper shell clamp 502, and is used to detect the pressure value of the assembly process. When the pressure value is greater than the preset value, an alarm is issued and the assembly action is stopped. Prevent deviations during the assembly process from causing damage to the product.

[0038] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.

Claims

1. An automatic assembly device for the upper shell nameplate of a single-phase electric energy meter, characterized in that: The invention comprises a workbench (1), wherein the workbench (1) is located on one side of a semi-finished product conveying line of a single-phase electric energy meter, an upper shell buffer turntable (2) and a nameplate installation unit are arranged on the workbench (1), the nameplate installation unit is arranged on one side of the upper shell buffer turntable (2), and the other side of the upper shell buffer turntable (2) is a conveying tray (4) on which the semi-finished product of the single-phase electric energy meter is fixed, the conveying tray (4) is arranged on the semi-finished product conveying line of the single-phase electric energy meter, an upper shell loading manipulator (3) is arranged on the side of the workbench (1) close to the nameplate installation unit, and an upper shell installation manipulator (5) is arranged on the side of the workbench (1) close to the conveying tray (4).

2. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 1 is characterized in that: A plurality of limit grooves (201) are evenly arranged radially on the upper shell buffer turntable (2), the limit grooves (201) being adapted to the size of the upper shell of the single-phase electric energy meter, and a through hole adapted to a nameplate is provided in the limit grooves (201) at a position corresponding to the transparent window of the upper shell of the single-phase electric energy meter.

3. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 1 is characterized in that: The conveying tray (4) comprises a supporting device (401), the supporting device (401) being arranged on a single-phase electric energy meter semi-finished product conveying line, an electric energy meter tray (402) being arranged at the upper end of the supporting device (401), and positioning terminals (403) surrounding the electric energy meter tray (402) being arranged on four sides, the positioning terminals (403) being regulated by a cylinder structure.

4. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 1 is characterized in that: The nameplate installation unit comprises a nameplate installation mechanism (6) and a nameplate clip (7); the nameplate clip (7) is used to contain a nameplate to be installed, and the nameplate clip (7) is installed on the back of the nameplate installation mechanism (6); the nameplate installation mechanism (6) is arranged with its front side facing the upper shell cache turntable (2), and is used to fix the nameplate to be installed in the nameplate clip (7) on the upper shell of the single-phase electric energy meter fixed on the upper shell cache turntable (2).

5. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 4 is characterized in that: The nameplate installation mechanism (6) comprises a feeding mechanism (601) and a pressing mechanism (602); the feeding mechanism (601) is arranged below the pressing mechanism (602); a guide rail is further arranged between the feeding mechanism (601) and the pressing mechanism (602); and the upper shell of the single-phase electric energy meter on the upper shell buffer turntable (2) is located between the two; the nameplate clip (7) is arranged on the feeding mechanism (601); the feeding mechanism (601) can move the nameplate to be installed in the nameplate clip (7) along the guide rail to below the upper shell of the single-phase electric energy meter, and fix the nameplate to be installed and the upper shell of the single-phase electric energy meter by the pressing mechanism (602).

6. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 5 is characterized in that: The feeding mechanism (601) comprises a fixing frame (6011), a telescopic rod (6012) and a suction cup (6013); the fixing frame (6011) is arranged on the workbench (1) and is located below the pressing mechanism (602); a nameplate clip (7) is fixed on the fixing frame (6011); one end of the telescopic rod (6012) is arranged on the fixing frame (6011) and the other end is connected to the suction cup (6013), so that the suction cup (6013) can move between below the nameplate clip (7) and below the upper shell of the single-phase electric energy meter.

7. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 5 is characterized in that: The nameplate clip (7) comprises a nameplate limiting track (701), a nameplate pressing mechanism (702) and a base (703); the base (703) is fixed on the workbench (1); the nameplate limiting track (701) is arranged on the base (703); the nameplate is placed in the nameplate limiting track (701); the nameplate pressing mechanism (702) is arranged in the nameplate limiting track (701) and is located above the nameplate; the nameplate pressing mechanism (702) can move up and down along the nameplate limiting track (701) and cooperate with the feeding mechanism (601) to move a single nameplate to a position to be processed.

8. The automatic assembly device for the upper shell nameplate of a single-phase electric energy meter according to claim 1 is characterized in that: The upper shell installation manipulator (5) comprises a mechanical arm (501), an upper shell clamping jaw (502) and a pressure sensor (503); the upper shell clamping jaw (502) is fixed to the top of the mechanical arm (501) and is used for positioning and grasping the upper shell of the single-phase electric energy meter; the pressure sensor (503) is arranged between the mechanical arm (501) and the upper shell clamping jaw (502) and is used for detecting the pressure value during the assembly process; when the pressure value is greater than a preset value, an alarm is issued and the assembly action is stopped.

9. An assembly method for an automatic assembly device for a nameplate on a single-phase electric energy meter shell according to any one of claims 1 to 8, characterized in that: include: S1: The upper shell loading manipulator (3) clamps the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable (2); S2: The upper shell buffer turntable (2) rotates to move the upper shell of the single-phase electric energy meter to be processed to the bottom of the nameplate installation unit, and the nameplate installation unit completes the nameplate installation; S3: the upper shell cache turntable (2) rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator (5) grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot (5) installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray (4).

10. The method for automatically assembling the nameplate on the upper shell of a single-phase electric energy meter according to claim 9, characterized in that: The nameplate installation unit comprises a nameplate installation mechanism (6) and a nameplate clip (7); the nameplate installation mechanism (6) comprises a feeding mechanism (601) and a pressing mechanism (602); the method comprises: S1: The upper shell loading manipulator (3) clamps the upper shell of the single-phase electric energy meter to be processed from the turnover box and fixes it on the upper shell buffer turntable (2); S2: the upper shell buffer turntable (2) rotates to move the upper shell of the single-phase electric energy meter to be processed to below the pressing mechanism (602); the feeding mechanism (601) extracts a single nameplate from the nameplate clip (7) and moves it to the processing position of the upper shell of the single-phase electric energy meter to be processed; the pressing mechanism (602) cooperates with the feeding mechanism (601) to perform the nameplate pressing action to complete the assembly of the nameplate; S3: the upper shell cache turntable (2) rotates to move the upper shell of the single-phase electric energy meter with the nameplate installed from below the nameplate installation unit, and the upper shell installation manipulator (5) grabs the upper shell of the single-phase electric energy meter with the nameplate installed; S4: The upper shell installation robot (5) installs the upper shell of the single-phase electric energy meter with the nameplate installed on the semi-finished single-phase electric energy meter transferred to the fixed position by the conveying tray (4).

Citation Information

Patent Citations

  • Automatic nameplate marking device and use method thereof

    CN104608505A

  • Automatic nameplate laser code spraying device and using method thereof

    CN105172382A

  • Preassembling machine for door cover plate

    CN106891153A

  • Full-automatic electric energy meter nameplate mounting device and method

    CN111112972A

  • Semiconductor double-optical-filter switcher assembling equipment based on AA manufacturing procedure

    CN112318085A

Cited By

  • Closing assembly line and closing method for ultrasonic gas meter steel shell assembly

    CN120533426A

  • An electric meter shell production and assembly device

    CN123000434A