Double-layer confined water sand soil stratum rotary excavating cast-in-place pile counter bore method

By conducting geological and hydrological exploration in the construction of rotary excavation cast-injected piles, arranging pressure-reducing wells and dry drain wells, adjusting the specific gravity of mud and cofferdam filling, combining layered compaction and low-speed drilling technology, the construction of the pressure-bearing water layer is solved. The impact of the hole formation success rate and construction efficiency are improved, and are suitable for multi-layer pressure-bearing water and soft soil foundations.

CN119041468APending Publication Date: 2024-11-29CHINA MCC5 GROUP CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411345746.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-26
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

In the construction of rotary excavation and pouring piles, the existence of the pressure-bearing water layer causes water pressure relief, affects the quality of the wall protection mud, and increases the construction difficulty. The single use of existing response methods cannot effectively solve the problems caused by pressure-bearing water, especially in many cases. The layer is under pressure water.

Method used

The method of rotary digging of cast-injected piles by double-layer pressurized water sand soil formations includes geological, hydrological exploration, determining the depth and pressure of the pressure-bearing water layer, laying down pressure wells and dry drain wells, adjusting the specific gravity of the wall-protecting mud and cofferdam filling Height, combined with layered compaction and low speed and high torque drilling technology, ensure that the mud presses the pressure-bearing head and reduces construction difficulty and cost.

Benefits of technology

Effectively improve the qualification rate of hole formation, reduce construction costs and difficulty, ensure the stability of the hole formation process, reduce the waste pile rate and rework, improve construction efficiency and economic benefits, and is suitable for multi-layer pressure-bearing water and soft soil foundation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041468A_ABST
    Figure CN119041468A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of constructional engineering, and particularly discloses a double-layer confined water sand soil stratum rotary excavating cast-in-place pile counter bore method which specifically comprises the following steps: S1, geological and hydrological exploration; s2, determining the depth, thickness and pressure of the confined water layer; s3, according to the dewatering and drainage scheme, decompression wells and drainage wells are arranged; s4, according to the soil layer data obtained in the step S1, the specific gravity range of the wall protection slurry is determined, and the height h of the wall protection slurry is obtained; according to the height h of the wall protection slurry, whether the pressure of the wall protection slurry can press the confined water head or not is judged; s5, if the cofferdam cannot be pressed, the filling height of the cofferdam is calculated according to the pressure of the confined water head and the specific gravity of the retaining wall slurry; s6, a cofferdam is designed and constructed, and a soil layer is tamped; and S7, pile foundation drilling construction is conducted. According to the method, when the pressure of a confined water layer is too large or multiple layers of confined water are encountered, the pile forming quality under the double-layer confined water sandy soil stratum is improved, the construction difficulty is reduced, and the construction cost is saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of construction engineering, and more specifically to a method for sinking a rotary bored pile in a double-layer pressure-bearing water-sand soil stratum. Background Art

[0002] Rotary bored cast-in-place piles are widely used in various fields of civil engineering due to their strong adaptability to the construction environment, high construction efficiency and quality, superior mechanical properties, and convenient construction.

[0003] During the rotary drilling process, pressurized water layers are often encountered, and even more than one layer of pressurized water layers may occur on the drilling path when the pile foundation is too deep. The pressurized water releases pressure after encountering the drilling hole, and a large amount of water gushes out, affecting the quality of the wall slurry and increasing the difficulty of construction; at the same time, the pressure release of the pressurized water disturbs the soil layer, which may cause problems such as non-verticality after the hole is formed and the steel cage cannot be smoothly inserted into the hole. In severe cases, it may even cause serious collapse of the hole wall.

[0004] At present, if the drilling path of the rotary pile encounters a confined water layer, the response methods include mud balance method, filling cofferdam method, full casing method, arranging drainage wells, and pressure relief wells. The mud balance method is limited by the specific gravity of the wall mud, the filling cofferdam method is affected by the construction site, and the full casing method has too high construction cost and construction complexity when the pile body is too long. When the pressure of the confined water is too large or there are multiple layers of confined water, arranging drainage wells and pressure relief wells may not solve the problems caused by the confined water. Summary of the invention

[0005] The technical problem to be solved by the present invention is to provide a method for sinking a rotary bored pile in a double-layer pressure-bearing water-sand soil stratum;

[0006] The solution adopted by the present invention to solve the technical problem is:

[0007] A method for sinking a double-layered water-bearing sandy soil stratum rotary bored pile comprises the following steps:

[0008] Step S1: geological and hydrological exploration;

[0009] Step S2: Determine the depth, thickness and pressure of the confined water layer;

[0010] Step S3: Arrange pressure relief wells and drainage wells according to the drainage plan;

[0011] Step S4: Obtain soil layer data according to step S1, determine the range of wall protection mud density, use the maximum value of the mud density to calculate the wall protection mud height h; determine whether the pressure of the wall protection mud can suppress the pressure head;

[0012] Step S5: If the cofferdam cannot be pressed down, the cofferdam filling height is calculated according to the pressure of the pressure head and the specific gravity of the wall protection mud;

[0013] Step S6: cofferdam design, construction, and soil compaction;

[0014] Step S7: Pile foundation drilling construction.

[0015] In some possible implementations, the pressure relief wells and dewatering wells are arranged in a plum blossom shape.

[0016] In some possible implementations, step S5 specifically includes the following steps:

[0017] Step S51: Calculation of mud height:

[0018] According to the formula H 泥浆 ×ρ 浆 ≥H 水 ×ρ 水 , the mud height H is calculated 泥浆 ;

[0019] Step S52: Cofferdam filling height H 填 :

[0020] H 填 =H 泥浆 -h.

[0021] In some possible implementations, the soil layer in step S6 is compacted by layering.

[0022] In some possible implementations, when the soil layer is compacted, if soft soil exists, the soft soil will be replaced.

[0023] In some possible implementations, during pile foundation drilling construction, drilling is performed in a low speed and high torque manner.

[0024] In some possible implementations, during the pile foundation drilling construction, a sand dredging bucket with a double bottom door is selected.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] The present invention can effectively solve the problem that when the pressure of the confined water layer is too large or when there are multiple layers of confined water, the confined water head cannot be well suppressed by simply adjusting the mud density or building a cofferdam to increase the mud pressure, thereby improving the pile quality under the double-layer confined water sandy soil layer, reducing the construction difficulty and saving the construction cost;

[0027] The invention improves the qualified rate of hole formation by arranging drainage wells, pressure reducing wells, increasing mud density and taking cofferdam filling measures, prevents pressurized water from entering the hole and affecting the hole formation, causing the hole to collapse and then become a waste pile, and uses a double-layer pressurized water sandy soil stratum rotary drilling and grouting hole formation construction method. The core of the invention is to reduce the pressure of pressurized water and ensure that the pressurized water will not affect the drilling during the hole formation process, resulting in hole formation failure. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] Figure 1 It is the work flow chart of the present invention. DETAILED DESCRIPTION

[0029] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral body; it can be directly connected, or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. The "first", "second" and similar words mentioned in this application do not indicate any order, quantity or importance, but are only used to distinguish different components. Similarly, "one" or "one" and other similar words do not indicate a quantity restriction, but indicate the existence of at least one. In the implementation of this application, "and / or" describes the association relationship of the associated objects, indicating that there can be three relationships, for example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In the description of the embodiments of the present application, unless otherwise specified, the meaning of "multiple" refers to two or more. For example, multiple positioning columns refer to two or more positioning columns. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0030] The present invention is described in detail below.

[0031] like Figure 1 As shown: A method for rotary drilling and grouting holes in a double-layer pressure-bearing water-sand soil stratum, comprising the following steps:

[0032] Step S1: geological and hydrological exploration;

[0033] Step S2: Determine the depth, thickness and pressure of the confined water layer;

[0034] Step S3: reasonably arrange pressure relief wells and drainage wells according to the drainage plan;

[0035] Step S4: Determine the specific gravity range of the wall protection mud according to the soil layer conditions, adjust it to the maximum value, and use the maximum value to calculate the height h of the wall protection mud; determine whether the pressure of the wall protection mud can suppress the pressure head;

[0036] Step S5: If the pressure cannot be suppressed, the cofferdam filling height is calculated according to the pressure head and the specific gravity of the wall protection mud and a certain margin is left;

[0037] Step S6: cofferdam design, construction, and soil compaction;

[0038] Step S7: pile foundation drilling construction.

[0039] In some optional technical solutions, in step S1, geological and hydrological explorations must be detailed and accurate; wherein, geological explorations prepare for the selection range of mud density in step S4, and hydrological surveys provide a basis for determining detailed confined water data in step S2.

[0040] In some optional technical solutions, in step S2, according to the hydrological survey data provided in step S1, the maximum confined water depth, thickness and pressure are calculated;

[0041] In step S3, the arrangement of the pressure relief well and the drainage well is determined to provide support for the subsequent determination of the construction method of rotary drilling and grouting holes;

[0042] In some optional technical solutions, step S4 specifically includes selecting a reasonable range of wall protection mud density according to the soil layer data obtained by geological exploration in step S1;

[0043] Adjust the mud specific gravity to the maximum value, and use the maximum value to calculate whether the pressure of the mud in the hole can suppress the pressure head by the mud balance method;

[0044] If it can be pressed down, the mud height h calculated by the mud balance method is directly used to carry out pile foundation drilling construction;

[0045] In some optional technical solutions, in step S5, if the mud height h calculated by the mud balance method in step S4 cannot suppress the pressure head, the pile hole mouth elevation is increased by using the cofferdam filling method, thereby increasing the mud pressure in the hole;

[0046] The mud balance method and the cofferdam filling method are used together. After ensuring through calculation that the pressure head can be contained, a certain margin of mud pressure in the hole is ensured and the cofferdam construction workload is reduced as much as possible, the final cofferdam filling height is determined.

[0047] In some optional technical solutions, in step S6, the cofferdam is built on the basis of the original pile top elevation. Since the cofferdam needs to be removed after the pile foundation is poured, the cofferdam construction is to stack and compact any soil layer in the foundation pit excavation process at the pile foundation position in layers;

[0048] The rotary drilling process requires large machinery to reach the pile top elevation, so the cofferdam needs to be sloped, and the size of the cofferdam top and the slope need to be designed and calculated to ensure the safety and stability of the machinery.

[0049] In some optional technical solutions, step S7 is specifically that when the drill bit depth reaches the influence range of the pressurized water, a double-layer bottom door sand dredging drill bucket should be used to reduce the speed of rotary drilling to avoid a large amount of pressurized water gushing out to dilute the mud, resulting in the mud being unable to suppress the pressurized water head, or even disturbing the bottom layer to cause hole collapse.

[0050] Embodiment 1:

[0051] A method for drilling holes in double-layer water-confined sandy soil layers by rotary drilling and grouting, including reasonable arrangement of drainage wells, pressure relief wells, increasing mud density, and cofferdam filling measures:

[0052] Reasonable arrangement of drainage wells and pressure relief wells includes determining the depth of pressurized water based on geological and hydrological exploration. The water level is higher and the pressure is greater. A 20.0*20.0m plum blossom-shaped drainage well / pressure relief mixed well is set in the north plot, entering 5.0m below the basement; a 30.0*30.0m plum blossom-shaped drainage well / pressure relief mixed well is set in the south plot, and the drainage well enters 6.0 meters below the basement; the drainage well lowers the water level, and the pressure relief well reduces the pressure of the pressurized water, which is used to reduce the pressure of the pressurized water so that the mud can suppress the water head.

[0053] Increase the mud density, specifically adjust the mud density to the maximum value:

[0054] According to the soil layer data of hydrogeological exploration, the maximum value of mud height h that can suppress the water head is calculated. High-quality mud is used, and the specific gravity and viscosity of mud are increased. The production personnel master the key parameters, production methods, and index measurement methods of mud production. The sediment separator required by the configuration review is added. Every 6 mud pools are equipped with a set of processing capacity of 10m 3 / h sediment separator, and at the same time increase mud mixing equipment to meet the requirements for preparing qualified mud.

[0055] The cofferdam filling height is calculated based on the pressure head and the wall protection mud density, and a certain margin is left: after increasing the mud density, the minimum height of the cofferdam filling needs to be calculated based on the water pressure and head height to ensure the success rate of drilling.

[0056] Furthermore, the cofferdam is designed, constructed, and the soil layer is compacted. The soil layer on the entire plain is compacted, and backfill is carried out according to the designed filling height and the foundation elevation of the drilling position. The slope is set when filling the soil; the water head of the pressurized water is raised, the water pressure is reduced, and the mud can suppress the water head of the pressurized water, so as to further carry out the drilling work.

[0057] Furthermore, when carrying out pile foundation drilling construction, when selecting drilling machinery, use a sand dredging drill bucket with a double bottom door to reduce the speed of rotary drilling and avoid a large amount of pressurized water gushing out, which causes the mud to be unable to suppress the pressurized water head and cause the hole to collapse, so as to improve the overall stability and success rate of pile foundation drilling.

[0058] Embodiment 2:

[0059] A method for rotary drilling and pouring holes in a double-layer confined water-sand soil stratum, specifically comprising the following steps:

[0060] Step S1: Geological and hydrological exploration:

[0061] According to the geotechnical engineering investigation report, the geological composition of the soil layer is composed of multiple layers of accumulation sand geology; based on the investigation data and existing hydrogeological data, it is concluded that the groundwater on the site is composed of double layers of pressurized water and several layers of clay soil impermeable layers.

[0062] Step S2: Determine the depth, thickness and pressure of the confined water layer:

[0063] Through geological exploration, including drilling and geophysical methods,

[0064] The water level of confined water No. 1 is determined to be buried at a depth of 12.60 to 16.30 m, with a water level elevation of -10.82 to -5.38 m; the water level of confined water No. 2 is determined to be buried at a depth of 14.00 to 16.20 m, with a water level elevation of -11.62 to -6.64 m;

[0065] Through constant flow or constant drawdown pumping tests, the hydrogeological parameters of the confined aquifer are determined, and then the pressure state of the confined water is calculated.

[0066] Step S3: Arrange drainage wells and pressure relief wells reasonably according to the drainage plan:

[0067] According to step S2, the water level of the confined water is high and the pressure is high. A 20.0*20.0m plum blossom-shaped drainage well / decompression mixed well is set in the north side plot, which goes 5.0m below the basement; a 30.0*30.0m plum blossom-shaped drainage well / decompression mixed well is set in the south side plot, and the drainage well goes 6.0 meters below the basement. The drainage well lowers the water level, and the decompression well reduces the pressure of the confined water.

[0068] Step S4: Determine the specific gravity range of the wall protection slurry according to the soil layer conditions, adjust it to the maximum value, and determine the height h of the wall protection slurry:

[0069] According to the soil layer data explored in step S1, using high-quality mud, increasing the specific gravity and viscosity of the mud, and making the mud's own weight suppress the pressure of the confined water play a key role in judging whether the pressure of the wall-protecting mud can suppress the confined water head at the height h of the wall-protecting mud.

[0070] Step S5: Calculate the cofferdam filling height and leave a margin based on the pressure head and the wall protection mud specific gravity:

[0071] If the calculation result of step S4 using the mud balance method is still insufficient to suppress the confined water head, the pile hole elevation is increased by using the cofferdam method to increase the mud pressure in the hole, increase the water head, and reduce the confined water pressure. According to the formula H 泥浆 ×ρ 浆 ≥H 水 ×ρ 水 Calculate the mud height H 泥浆 , and then by the calculated H 泥浆 -h, calculate the cofferdam filling height H填 ;

[0072] Step S6: cofferdam design, construction, and soil compaction: Before construction, the site needs to be cleaned, debris removed, soft soil replaced, and soil leveled and compacted;

[0073] The earth filling in the cofferdam construction needs to be carried out in layers, and the thickness of each layer of the slope treatment should be controlled within the specified range to ensure uniform filling;

[0074] Use compaction machinery to compact the soil layer to ensure that the density of each layer of soil meets the design requirements. Repeat the operation until the required compaction degree is achieved; after the cofferdam is used, it needs to be gradually dismantled to ensure the stability and safety of the structure during the process;

[0075] Step S7: Pile foundation drilling construction: Use a sand dredging drill bucket with a double bottom door to drill into the sand layer, move the rotary drilling rig to the designated position (the working site with a deviation of more than 2° front, back, left, and right should be re-padded; the working site of the weak and easily trapped machine should be filled with other materials or pave with a thickness of more than 20mm and an area of ​​not less than 1.5 times the horizontal projection area of ​​the drilling rig to improve the ground pressure and prevent the machine from sinking and the drilling rig from shifting), use the mud prepared in step S4 to drill the wall, adopt low speed and high torque drilling, reduce the footage of each round, and appropriately increase the relative density and viscosity of the stabilizing liquid to improve the success rate of hole formation.

[0076] Compared with the traditional hole-making method, the present invention greatly improves the first-time hole-making qualified rate, greatly reduces the secondary hole cleaning and rework work, ensures the construction quality of the bored pile, improves the construction efficiency of the rotary bored pile, saves machinery and labor costs, and can also save construction time, thus achieving better economic benefits.

[0077] The present invention uses a double-layer water-contained sandy soil layer rotary excavation and grouting hole construction method, so the quality of the rotary excavation and grouting pile is guaranteed, and the success rate of one-time hole formation is effectively improved; through detailed countermeasures and strict operating procedures, the harm of pressurized water is effectively prevented; at the same time, the double-layer water-contained sandy soil layer rotary excavation and grouting hole construction method has strong adaptability and can be applied to soft soil, sandy soil and other foundations, and can ensure that the success rate and efficiency of hole formation will not drop significantly due to changes in the address; by improving the mud qualification rate to maintain the pressure balance in the hole, the hole wall collapse is avoided. Especially when crossing the water-contained layer, the mud density and viscosity are reasonably adjusted to effectively prevent the hole collapse accident.

[0078] The waste slurry and slag generated during construction are treated by solid-liquid separation and other methods, thereby reducing pollution to the environment and complying with the concept of green construction. Compared with traditional impact drills, rotary drilling rigs have less noise, thus reducing the impact on the surrounding environment and residents' lives.

[0079] The present invention is suitable for bored piles under various soft soil foundations and can also be used in multi-layer pressurized water environments. It will have high adaptability and promotion value in actual engineering projects in the future.

[0080] The present invention is not limited to the above-mentioned specific embodiments, but extends to any new features or any new combination disclosed in this specification, as well as any new method or process steps or any new combination disclosed.

Claims

1. A method for sinking double-layer pressurized water-sand soil strata by rotary excavation and bored piles. It is characterized in that The specific steps include: Step S1: geological and hydrological exploration; Step S2: Determine the depth, thickness and pressure of the confined water layer; Step S3: Arrange pressure relief wells and drainage wells according to the drainage plan; Step S4: Obtain soil layer data according to step S1, determine the range of wall protection mud density, use the maximum value of the mud density to calculate the wall protection mud height h; determine whether the pressure of the wall protection mud can suppress the pressure head; Step S5: If the cofferdam cannot be pressed down, the cofferdam filling height is calculated according to the pressure of the pressure head and the specific gravity of the wall protection mud; Step S6: cofferdam design, construction, and soil compaction; Step S7: Pile foundation drilling construction.

2. A method for sinking double-layer pressurized water-sand soil strata rotary bored piles according to claim 1, It is characterized in that The pressure relief well and the drainage well are arranged in a plum blossom shape.

3. A method for sinking double-layered water-contained sandy soil strata rotary bored piles according to claim 1, It is characterized in that The step S5 specifically comprises the following steps: Step S51: Calculation of mud height: According to the formula H 泥浆 ×ρ 浆 ≥H 水 ×ρ 水 , the mud height H is calculated 泥浆 ; Step S52: Cofferdam filling height H 填 : H 填 =H 泥浆 -h。 4. A method for sinking double-layer pressurized water-sand soil strata rotary bored piles according to claim 1, It is characterized in that In step S6, the soil layer is compacted by layer.

5. A method for sinking double-layered water-contained sandy soil strata rotary bored piles according to claim 4, It is characterized in that When compacting the soil, if there is soft soil, it will be replaced.

6. A method for sinking double-layered water-contained sandy soil strata rotary bored piles according to claim 1, It is characterized in that During pile foundation drilling construction, low speed and high torque are used for drilling.

7. A method for sinking double-layered water-contained sandy soil strata rotary bored piles according to claim 6, It is characterized in that When drilling holes for pile foundations, use a sand dredging bucket with a double bottom door.