High-temperature environment explosive material performance in-situ test system and method
By using constant temperature waterways and water purification systems in the in-situ test system of blasting equipment performance, the safety and accuracy of blasting equipment performance tests in high-temperature environments are solved, and reliable tests are achieved under stable high-temperature conditions on site. In various blasting conditions.
Patent Information
- Application Number
- CN202411263717.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In high temperature environments, it is difficult for the prior art to conduct safe, reliable and accurate performance tests of blasting equipment, especially in on-site conditions, temperature fluctuations and environmental simulation are difficult, and the safety and accuracy of the test equipment are insufficient.
A high-temperature environmental blasting equipment performance in situ test system is designed, including electronic supply system, heating subsystem and testing subsystem. The stable high-temperature environment is maintained in the blast hole through constant temperature water circuit and water purification system, and shielded lines and safe power supply are used. , ensure the safety and accuracy of the test.
It realizes a stable test environment under high temperature conditions, ensures the representativeness and reliability of test results, and is suitable for open-air and underground blasting conditions. The process is simple, the operation is simple and the cost is controllable.
Smart Images

Figure CN119043095A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of engineering blasting, and in particular to an in-situ test system and method for blasting equipment performance in a high-temperature environment. Background Art
[0002] Blasting is widely used in rock excavation for water conservancy, hydropower, transportation, mining, municipal engineering and other construction projects. The performance of explosives, detonators, detonating cords and other blasting equipment plays a decisive role in the effect of rock blasting. Generally, blasting equipment performance tests are required before formal blasting in general projects to provide important references for determining reasonable blasting parameters. At present, according to the requirements of the management regulations of explosives, only a few qualified units can carry out indoor tests on the performance of blasting equipment, and the test time is limited by the management department and the supply time of blasting equipment, which cannot be well connected with the promotion time of blasting projects. In addition, at the construction site of the blasting project, conventional blasting equipment performance tests can be carried out, such as detonation velocity tests of explosives and detonating cords, but the on-site testing conditions are simple and it is difficult to carry out complex and sophisticated blasting equipment performance tests.
[0003] At present, the performance test of blasting equipment under normal temperature conditions is relatively easy to carry out. However, some blasting projects are in high temperature environments, such as high geothermal tunnel blasting, coal mine blasting in fire areas, etc., and the performance test of blasting equipment under high temperature conditions is difficult to carry out accurately. On the one hand, the high temperature environment on site is difficult to accurately simulate in indoor laboratories. The blasting equipment heated by indoor heating equipment needs to be moved to a safe site for performance testing. During the conversion process, the ambient temperature of the blasting equipment has changed significantly, and there are certain safety risks in indoor heated blasting equipment. On the other hand, there are temperature fluctuations in the high temperature environment on site, and it is currently difficult to accurately control the ambient temperature on site. In summary, it is urgent to carry out research on safe, reliable and accurate performance test methods for blasting equipment in high temperature environments. Summary of the invention
[0004] The purpose of the present invention is to provide a safe, reliable and accurate in-situ test system and method for blasting material performance in a high temperature environment in view of the shortcomings of existing blasting material performance test methods.
[0005] A high-temperature environment blasting material performance in-situ test system comprises a power supply subsystem, a heating subsystem and a testing subsystem; the characteristics are that the power supply subsystem, the heating subsystem and the testing subsystem are respectively arranged in a safe zone behind a test blast hole; the water delivery pump of the heating subsystem is located between the test blast hole and a constant temperature water tank; the testing instrument of the testing subsystem is arranged in a safe zone behind the test blast hole.
[0006] According to the above scheme, the power supply subsystem is arranged in a safe area behind the test blasthole; the power supply of the power supply subsystem can be served by an on-site power supply box or by a battery of equivalent capacity and power, and the power supply must meet the power requirements of the heating subsystem and the testing subsystem; the power supply line of the power supply subsystem is an insulated line, and the specifications of the power supply line must meet the safe power requirements of the heating subsystem and the testing subsystem.
[0007] According to the above scheme, the heating subsystem is arranged in a safe area behind the test blasthole; the constant temperature water tank of the heating subsystem is composed of a water tank, a heating unit, a temperature control unit, and a feeding unit; the capacity of the water tank should meet the requirements of filling the test blasthole with water, the heating unit and the temperature control unit keep the water temperature in the water tank at the required temperature of the test, and the feeding unit is to meet the requirements of adding inorganic salts and other solutes for water temperatures above 100°C. The water temperature requirement of 100°C can be met by heating with conventional water only, and the water temperature exceeding 100°C needs to add appropriate inorganic salts and other solutes to the conventional water to raise the boiling point of the solution to above 100°C.
[0008] According to the above scheme, the water supply pump of the heating subsystem is located between the blasthole and the constant temperature water tank, and pumps constant temperature hot water into the test blasthole to provide a constant temperature environment for the blasthole; the return water pump of the heating subsystem is located between the front and rear water purifiers, and pumps the water in the blasthole back to the constant temperature tank at a stable flow rate to ensure that the water temperature in the blasthole remains constant, and the test water is recycled to achieve the purpose of water saving. The pre-water purifier of the heating subsystem is located between the test blasthole and the return water pump, and is intended to purify the water flowing into the return water pump to avoid clogging of the return water pump; the post-water purifier of the heating subsystem is located between the return water pump and the constant temperature water tank, and is intended to purify the water flowing into the constant temperature water tank to avoid affecting the subsequent heating and pumping processes. The heating subsystem can also be omitted under the condition that the on-site conditions are limited. At this time, the water in the blasthole overflows freely and cannot be recycled.
[0009] According to the above scheme, the test instruments of the test subsystem are arranged in a safe area behind the test blasthole; the test circuit of the test subsystem is composed of shielded wires to avoid the influence of power supply lines and stray currents of on-site construction on the transmission of test signals; the diameter and depth of the test blasthole of the test subsystem are determined according to the actual situation of the blasting project; the blasting equipment of the test subsystem is generally explosives, detonators and detonating cords that are actually applicable to blasting projects.
[0010] The present invention also provides an in-situ test method for the performance of blasting equipment in a high temperature environment, comprising the following steps: Step 1: According to the actual drilling and blasting conditions of the blasting project, drill a test blasthole of corresponding diameter and depth according to the blasthole diameter and depth of the blasting operation; Step 2: Arrange the power supply subsystem, heating subsystem, and test subsystem separately according to the requirements of safety and cleanliness. The distance between each subsystem and the test blasthole shall not be less than the warning distance of the blasting operation. The pipelines of each subsystem shall be covered and protected by on-site drilling cuttings or sandbags. Step 3: Connect the heating subsystem and the test subsystem to the power supply subsystem respectively according to safety and reliability requirements, connect the heating subsystem to the test subsystem, and perform waterproof and dustproof treatment on the interfaces of each subsystem; Step 4: According to the test temperature requirements, adjust the water temperature of the constant temperature water tank to the specified temperature, and keep the water temperature of the constant temperature water tank unchanged through the temperature control module; Step 5: Place the blasting equipment into the test blasthole, connect the corresponding test instrument, turn on the water pump, and make the water flow smoothly in the entire heating subsystem; Step 6: Conduct performance tests on blasting equipment, analyze measured performance data, and confirm that the tests are successfully completed; Step 7: Arrange the in-situ test system and complete the performance test of the blasting equipment. Beneficial Effects
[0011] (1) The constant temperature water circuit ensures that the water temperature in the blasthole is constant, which can provide stable high temperature conditions and the temperature can be higher than 100°C; (2) In-situ testing ensures that the test conditions and working conditions are consistent with the actual blasting project conditions and environment to the greatest extent possible, and the test results of blasting equipment performance are more representative and have more reference value; (3) The system and method of the present invention can be applied to both high-temperature blasting conditions in open air and underground conditions, and has wide applicability and high promotion value; (4) The test process is concise and clear, the operation is simple and the cost is controllable. BRIEF DESCRIPTION OF THE DRAWINGS
[0012] Figure 1 This is a schematic diagram of the composition of an in-situ test system for blasting equipment performance in a high-temperature environment.
[0013] Figure 2 The present invention is a schematic diagram of the steps of an in-situ test method for the performance of explosive materials in a high temperature environment.
[0014] Among them: 1-1 is the power supply of the power supply subsystem, 1-2 is the power supply circuit of the power supply subsystem; 2-1 is the pre-water purifier of the heating subsystem, 2-2 is the post-water purifier of the heating subsystem, 3-1 is the water supply pump of the heating subsystem, 3-2 is the return water pump of the heating subsystem, 4-1 is the constant temperature water tank of the heating subsystem, 4-2 is the water supply pipeline of the heating subsystem; 5-1 is the test instrument of the test subsystem, 5-2 is the test circuit of the test subsystem, 6-1 is the test blast hole of the test subsystem, and 6-2 is the blasting equipment to be tested in the test subsystem. DETAILED DESCRIPTION
[0015] In order to better understand the present invention, the present invention is further described below in conjunction with the accompanying drawings and specific embodiments. This embodiment is intended to test the explosive performance of a 90 mm diameter emulsion explosive at 90°C in a blasting project with a step height of 12 m and a blasthole diameter of 120 mm. Example 1
[0016] like Figure 1 The schematic diagram of the composition of an in-situ test system for the performance of explosive materials in a high temperature environment is shown, which includes a power supply subsystem, a heating subsystem, and a test subsystem. The power supply subsystem is composed of a power supply 1-1 and a power supply line 1-2. The heating subsystem is composed of a constant temperature water tank 4-1, a water delivery pump 3-1, a return water pump 3-2, a pre-water purifier 2-1, and a post-water purifier 2-2. The test subsystem is composed of a test instrument 5-1, a test line 5-2, a test blast hole 6-1, and a blasting material to be tested 6-2. The power supply subsystem is arranged in a safe area behind the test blast hole, more than 50 m away from the blast hole; the power supply of the power supply subsystem is provided by an on-site power supply box; the power supply line of the power supply subsystem is an insulated line, and the maximum allowable current reaches 32 A. The heating subsystem is arranged in a safe area behind the test blasthole, more than 50 m away from the blasthole; the constant temperature water tank of the heating subsystem consists of a water tank, a heating unit, a temperature control unit, and a feeding unit; the water tank capacity is 100L, and the heating unit and the temperature control unit keep the water temperature in the water tank at 90°C, the temperature required for the test. The water delivery pump of the heating subsystem is located between the blasthole and the constant temperature water tank, pumping constant temperature hot water into the test blasthole to provide a constant temperature environment for the blasthole; the return water pump of the heating subsystem is located between the front and rear water purifiers, pumping the water in the blasthole back to the constant temperature tank at a stable flow rate, ensuring that the water temperature in the blasthole remains constant, and recycling the test water to achieve the purpose of water saving. The front water purifier of the heating subsystem is located between the test blasthole and the return water pump, aiming to clean the water flowing into the return water pump to avoid clogging of the return water pump; the rear water purifier of the heating subsystem is located between the return water pump and the constant temperature water tank, aiming to clean the water flowing into the constant temperature water tank to avoid affecting the subsequent heating and pumping processes. The test instruments of the test subsystem are arranged in a safe area behind the test blasthole, more than 50 m away from the blasthole; the test line of the test subsystem is composed of shielded wires to avoid the influence of power supply lines and stray currents of on-site construction on the transmission of test signals; the diameter and depth of the test blasthole of the test subsystem are 120 mm and 12 m respectively; the blasting equipment of the test subsystem is emulsion explosive with a diameter of 90 mm. Example 2
[0017] The present invention also provides an in-situ test method for the performance of blasting equipment in a high temperature environment, comprising the following steps: Step 1: According to the actual situation of the blasting project, drill a test blasthole with a diameter of 120 mm and a depth of 12 m respectively; Step 2: Arrange the power supply subsystem, heating subsystem, and test subsystem respectively according to safety and cleanliness requirements; Step 3: Connect the heating subsystem and the test subsystem to the power supply subsystem respectively according to safety and reliability requirements, and connect the heating subsystem to the test subsystem; Step 4: According to the test temperature requirements, adjust the water temperature of the constant temperature water tank to 90°C, and keep the water temperature of the constant temperature water tank unchanged through the temperature control module; Step 5: Place 90 mm diameter emulsion explosive into the test blasthole, connect the corresponding test instrument, turn on the water pump, and make the water flow smoothly in the entire heating subsystem; Step 6: Conduct explosion performance test of 90 mm diameter emulsion explosive, analyze measured performance data, and confirm that the test is successfully completed; Step 7: Arrange the in-situ test system and complete the performance test of the blasting equipment.
[0018] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.
Claims
1. A high temperature environment blasting material performance in-situ test system, comprising a power supply subsystem, a heating subsystem, and a test subsystem; characterized in that: The power supply subsystem, heating subsystem and test subsystem are respectively arranged in a safe area behind the test blasthole; the water delivery pump of the heating subsystem is located between the test blasthole and the constant temperature water tank; the test instrument of the test subsystem is arranged in a safe area behind the test blasthole.
2. The high temperature environment blasting material performance in-situ testing system according to claim 1, characterized in that: The heating subsystem includes a constant temperature water tank, a water supply pump, a return water pump, front and rear water purifiers, and a heating pipeline; the constant temperature water tank includes a water tank, a heating unit, a temperature control unit, and a feeding unit; the water tank capacity meets the requirements of the test blasthole being filled with water, the heating unit and the temperature control unit maintain the water temperature in the water tank at the required temperature for the test, and the feeding unit realizes the inorganic salt solute feeding requirements that meet the test water temperature requirements.
3. The high temperature environment blasting material performance in-situ testing system according to claim 1, characterized in that: The water supply pump of the heating subsystem is located between the blasthole and the constant temperature water tank, and pumps constant temperature hot water into the test blasthole to provide a constant temperature environment for the blasthole; the return water pump of the heating subsystem is located between the front and rear water purifiers, and draws the water in the blasthole back to the constant temperature tank at a stable flow rate to ensure that the water temperature in the blasthole remains constant and the test water is recycled; the front water purifier of the heating subsystem is located between the test blasthole and the return water pump, and is intended to purify the water flowing into the return water pump to avoid clogging of the return water pump; the rear water purifier of the heating subsystem is located between the return water pump and the constant temperature water tank, and is intended to purify the water flowing into the constant temperature water tank to avoid affecting the subsequent heating and pumping processes, or the return water part of the heating subsystem is omitted under the condition that the on-site conditions are limited, and the water in the blasthole overflows freely and cannot be recovered; the heating pipeline of the heating subsystem needs to meet the high temperature resistance requirements, and the pipeline diameter should be smaller than the test blasthole diameter.
4. The high temperature environment blasting material performance in-situ testing system according to claim 1, characterized in that: The test circuit of the test subsystem adopts shielded wire; the diameter and depth of the test blasthole are determined according to the actual situation of the blasting project; the blasting equipment of the test subsystem is explosives, detonators and detonating cords.
5. The high temperature environment blasting material performance in-situ testing system as claimed in claim 2, characterized in that: The thermostatic tank of the heating subsystem is made of a hard solid water tank or a foldable soft water tank.
6. An in-situ test system for the performance of explosive materials in a high temperature environment according to any one of claims 1 to 5, characterized in that: The power supply subsystem, heating subsystem and testing subsystem are integrated into a system or exist independently as separate subsystems.
7. A method for in-situ testing of blasting equipment performance in a high temperature environment, characterized by: The method is based on the test system according to any one of claims 1 to 6, and comprises the following steps: Step 1: Drill a certain number of test holes of corresponding diameter and depth according to the actual situation of the blasting project; Step 2: Arrange the power supply subsystem, heating subsystem, and test subsystem respectively according to safety and cleanliness requirements; Step 3: Connect the heating subsystem and the test subsystem to the power supply subsystem respectively according to safety and reliability requirements, and connect the heating subsystem to the test subsystem; Step 4: According to the test temperature requirements, adjust the water temperature of the constant temperature water tank to the specified test temperature, and keep the water temperature of the constant temperature water tank unchanged through the temperature control module; Step 5: Place the blasting equipment into the test blasthole, connect the corresponding test instrument, turn on the water pump, and make the water flow smoothly in the entire heating subsystem; Step 6: Conduct performance tests on blasting equipment, analyze measured performance data, and confirm that the tests are successfully completed; Step 7: Arrange the in-situ test system and complete the performance test of the blasting equipment.
Citation Information
Patent Citations
Small-caliber ammunition soaking system
CN114858012A
Method for testing cementing property of high-ground-temperature tunnel sprayed concrete and surrounding rock
CN115950760A
Detection device of simulation fire area explosion protection structure
CN204255601U
High-temperature pipeline blasting test apparatus and method
WO2022267073A1
