Charging pile metering performance online monitoring method and device, electronic equipment and medium

By monitoring the metrology performance of charging piles online, and identifying abnormalities using data preprocessing and clustering technology, the problems of time-consuming and low accuracy of existing charging pile metering solutions are solved, and efficient and accurate measurement of various types of charging piles are achieved. Error modeling and maintenance guidance.

CN119044877AActive Publication Date: 2024-11-29STATE GRID HUBEI ELECTRIC POWER INFORMATION & TELECOMMUNICATION COMPANY +1

Patent Information

Application Number
CN202411155718.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-22
Publication Date
2024-11-29
Estimated Expiration
2044-08-22

AI Technical Summary

Technical Problem

The existing charging pile metering scheme has the problem of long-term installation of monitoring metering modules, low detection accuracy and low metrology efficiency.

Method used

By obtaining charging data information and charging pile type operation information, data preprocessing, clustering processing, error identification and confidence interval determination are carried out, online monitoring and abnormal detection of charging pile metering performance is realized, and the replacement and maintenance of the metering module is guided.

Benefits of technology

It realizes the modeling of various types of metrology errors for DC, AC, and AC and DC hybrid charging piles, improves the accuracy of the metrology error model, supports timely maintenance, and improves metrology efficiency and accuracy.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119044877A_ABST
    Figure CN119044877A_ABST
Patent Text Reader

Abstract

The embodiment of the invention discloses a charging pile metering performance online monitoring method and device, electronic equipment and a medium. A specific embodiment of the method comprises the following processing steps for a preprocessed charging data information group: determining a charging pile type corresponding to the preprocessed charging data information group; according to a charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information, error identification is carried out on the preprocessed charging data information group; determining a charging pile confidence interval corresponding to each piece of preprocessed charging data information in the preprocessed charging data information group; and according to each charging pile confidence interval and the charging pile error information, determining an abnormal performance charging pile and an abnormal electric energy meter. According to the embodiment, the comprehensive metering error models are respectively created for the direct current charging pile, the alternating current charging pile and the alternating current and direct current hybrid charging pile, the metering performance of the charging piles is monitored on line, and the charging piles with metering out-of-tolerance or failure risks are timely and accurately positioned.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The embodiments of the present disclosure relate to the field of charging pile monitoring, and specifically to a method, device, electronic device and medium for online monitoring of charging pile metering performance. Background Art

[0002] With the rapid development of the new energy vehicle industry, the construction of charging infrastructure has developed rapidly. There are many manufacturers of AC and DC charging stations, and the construction spans a long period of time. The efficiency loss of charging piles and the loss in charging stations are complicated. The detection process is energy-consuming and time-consuming, and the degree of automation is low. Many places have implemented mandatory inspection requirements for electric vehicle charging piles. However, mandatory inspections every year or even longer cannot guarantee that the charging piles are in good operating condition during the inspection period. Efficient and accurate inspection methods are needed to meet daily monitoring needs.

[0003] At present, the commonly used charging pile metering solution is: install a monitoring metering module on the basis of the original internal structure of the existing charging piles and new charging piles, and upload the data to the platform in real time through the data module interface, and compare the billing electricity meter data with the electricity data of the monitoring metering module in real time, so as to screen out charging piles that may have abnormalities.

[0004] However, current charging pile metering solutions usually have the following technical problems: installing a monitoring metering module is time-consuming, has low detection accuracy and low metering efficiency.

[0005] The above information disclosed in this Background section is only for enhancement of understanding of the background of the inventive concept and therefore it may contain information that does not form the prior art that is already known in this country to a person of ordinary skill in the art. Summary of the invention

[0006] The content of this disclosure is used to introduce concepts in a brief form, which will be described in detail in the detailed implementation section below. The content of this disclosure is not intended to identify the key features or essential features of the technical solution claimed for protection, nor is it intended to limit the scope of the technical solution claimed for protection.

[0007] Some embodiments of the present disclosure propose a method, device, electronic device and computer-readable medium for online monitoring of charging pile metering performance to solve one or more of the technical problems mentioned in the above background technology section.

[0008] In a first aspect, some embodiments of the present disclosure provide a method for online monitoring of charging pile metering performance, the method comprising: obtaining a charging data information set and a charging pile type operation information group of a target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; performing data preprocessing on each charging data information in the above charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set; performing clustering processing on each preprocessed charging data information in the above preprocessed charging data information set to obtain a preprocessed charging data information group set, wherein one preprocessed charging data information group corresponds to one charging pile type; for the above preprocessed For each pre-processed charging data information group in the charging data information group set, the following processing steps are executed: determining the charging pile type corresponding to the above pre-processed charging data information group; performing error identification on the above pre-processed charging data information group according to the charging pile metering error model corresponding to the above charging pile type and the corresponding charging pile type operation information, to obtain the charging pile error information corresponding to the above charging pile type; determining the charging pile confidence interval corresponding to each pre-processed charging data information in the above pre-processed charging data information group; determining the abnormal performance charging pile and the abnormal electric energy meter according to each charging pile confidence interval and the above charging pile error information; and replacing each abnormal performance charging pile and abnormal electric energy meter determined.

[0009] In a second aspect, some embodiments of the present disclosure provide an online monitoring device for metering performance of a charging pile, the device comprising: an acquisition unit, configured to acquire a charging data information set and a charging pile type operation information group of a target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; a preprocessing unit, configured to perform data preprocessing on each charging data information in the above charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set; a clustering unit, configured to perform clustering processing on each preprocessed charging data information in the above preprocessed charging data information set to obtain a preprocessed charging data information group set, wherein one preprocessed charging data information group corresponds to one charging pile type; determine The unit is configured to perform the following processing steps for each pre-processed charging data information group in the above-mentioned pre-processed charging data information group set: determine the charging pile type corresponding to the above-mentioned pre-processed charging data information group; perform error identification on the above-mentioned pre-processed charging data information group according to the charging pile metering error model corresponding to the above-mentioned charging pile type and the corresponding charging pile type operation information, and obtain the charging pile error information corresponding to the above-mentioned charging pile type; determine the charging pile confidence interval corresponding to each pre-processed charging data information in the above-mentioned pre-processed charging data information group; determine the abnormal performance charging pile and the abnormal electric energy meter according to each charging pile confidence interval and the above-mentioned charging pile error information; the replacement unit is configured to replace each abnormal performance charging pile and abnormal electric energy meter determined.

[0010] In a third aspect, some embodiments of the present disclosure provide an electronic device comprising: one or more processors; a storage device on which one or more programs are stored, and when the one or more programs are executed by the one or more processors, the one or more processors implement the method described in any implementation manner of the above-mentioned first aspect.

[0011] In a fourth aspect, some embodiments of the present disclosure provide a computer-readable medium having a computer program stored thereon, wherein when the program is executed by a processor, the method described in any implementation manner of the above-mentioned first aspect is implemented.

[0012] The above-mentioned embodiments of the present disclosure have the following beneficial effects: through the online monitoring method of the metering performance of charging piles of some embodiments of the present disclosure, by creating comprehensive metering error models for DC charging piles, AC charging piles, and AC / DC hybrid charging piles, the metering performance of charging piles is monitored online, and the charging piles with metering out-of-tolerance or failure risks are located timely and accurately, and the replacement, detection, and operation and maintenance of the charging pile metering module are guided in a targeted manner. The metering error modeling and metering evaluation of various types of charging piles, such as DC charging piles, AC charging piles, and AC / DC hybrid charging piles, are supported. The metering error model has high accuracy and wider applicability. Through multi-process processing before, during, and after calculation, the accuracy of the metering error model is improved. Combined with simulation evaluation, it can be applied to stations of different scales, different line loss rates, and different power consumption characteristics, and the adaptation parameters of the model for various charging stations are continuously iterated and optimized. Accurately locate the abnormal points that cause energy efficiency loss, and realize timely maintenance and disposal of abnormal charging piles. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] The above and other features, advantages and aspects of the embodiments of the present disclosure will become more apparent with reference to the following detailed description in conjunction with the accompanying drawings. Throughout the accompanying drawings, the same or similar reference numerals represent the same or similar elements. It should be understood that the drawings are schematic and that components and elements are not necessarily drawn to scale.

[0014] Figure 1 is a flow chart of some embodiments of the method for online monitoring of charging pile metering performance according to the present disclosure;

[0015] Figure 2 It is a schematic diagram of the structure of some embodiments of the online monitoring device for charging pile metering performance according to the present disclosure;

[0016] Figure 3 It is a schematic diagram of the structure of an electronic device suitable for implementing some embodiments of the present disclosure. DETAILED DESCRIPTION

[0017] Embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. Although certain embodiments of the present disclosure are shown in the accompanying drawings, it should be understood that the present disclosure can be implemented in various forms and should not be construed as being limited to the embodiments set forth herein. On the contrary, these embodiments are provided to provide a more thorough and complete understanding of the present disclosure. It should be understood that the drawings and embodiments of the present disclosure are only for exemplary purposes and are not intended to limit the scope of protection of the present disclosure.

[0018] It should also be noted that, for ease of description, only the parts related to the invention are shown in the drawings. In the absence of conflict, the embodiments and features in the embodiments of the present disclosure can be combined with each other.

[0019] It should be noted that the concepts such as "first" and "second" mentioned in the present disclosure are only used to distinguish different devices, modules or units, and are not used to limit the order or interdependence of the functions performed by these devices, modules or units.

[0020] It should be noted that the modifications of "one" and "plurality" mentioned in the present disclosure are illustrative rather than restrictive, and those skilled in the art should understand that unless otherwise clearly indicated in the context, it should be understood as "one or more".

[0021] The names of the messages or information exchanged between multiple devices in the embodiments of the present disclosure are only used for illustrative purposes and are not used to limit the scope of these messages or information.

[0022] The present disclosure will be described in detail below with reference to the accompanying drawings and in conjunction with embodiments.

[0023] Figure 1 1 is a flowchart of some embodiments of the method for online monitoring of charging pile metering performance according to the present disclosure. 100 of some embodiments of the method for online monitoring of charging pile metering performance according to the present disclosure is shown. The method for online monitoring of charging pile metering performance includes the following steps:

[0024] Step 101, obtaining a charging data information set and a charging pile type operation information group of a target charging station within a preset time period.

[0025] In some embodiments, the execution subject (for example, a computing device) of the online monitoring method for the metering performance of a charging pile may obtain a charging data information set and a charging pile type operation information group of a target charging station within a preset time period. Among them, each charging data information corresponds to a charging pile in the target charging station. The target charging station may be a charging station including various types of charging piles. The charging pile type operation information may be the operation information of a certain type of charging station within a preset time period, and may include: fixed loss and line loss. Fixed loss may refer to the fixed loss of a certain type of charging pile. Line loss may refer to the loss of each line involved in a certain type of charging pile. The charging data information may refer to the charging data of a certain charging pile within a preset time period, and may include: the metering value of the charging pile electric energy meter. For example, the metering value of the charging pile electric energy meter may refer to the practical amount of electricity measured by the electric energy meter of the charging pile.

[0026] Step 102 : performing data preprocessing on each charging data information in the charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set.

[0027] In some embodiments, the execution subject may perform data preprocessing on each charging data information in the charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set. Data preprocessing may include a series of data cleaning and preprocessing such as missing data detection, abnormal data detection, available data detection, and consistency detection.

[0028] Step 103 : performing clustering processing on each pre-processed charging data information in the pre-processed charging data information set to obtain a pre-processed charging data information group set.

[0029] In some embodiments, the execution subject may cluster the preprocessed charging data information in the preprocessed charging data information set to obtain a preprocessed charging data information group set. One preprocessed charging data information group corresponds to one charging pile type. For example, the charging pile type may include but is not limited to: AC charging pile, DC charging pile, AC / DC hybrid pile, etc. That is, the preprocessed charging data information of the same charging pile type may be clustered into one category.

[0030] Step 104, for each pre-processed charging data information group in the pre-processed charging data information group set, perform the following processing steps:

[0031] Step 1041, determining the charging pile type corresponding to the above-mentioned pre-processed charging data information group.

[0032] In some embodiments, the execution entity may determine the type of charging pile corresponding to the pre-processed charging data information group.

[0033] Step 1042: According to the charging pile metering error model corresponding to the above charging pile type and the corresponding charging pile type operation information, error identification is performed on the above pre-processed charging data information group to obtain the charging pile error information corresponding to the above charging pile type.

[0034] In some embodiments, the above-mentioned execution entity can perform error identification on the above-mentioned pre-processed charging data information group according to the charging pile metering error model corresponding to the above-mentioned charging pile type and the corresponding charging pile type operation information to obtain the charging pile error information corresponding to the above-mentioned charging pile type.

[0035] In practice, the execution subject may perform error identification on the pre-processed charging data information group through the following steps:

[0036] In the first step, in response to determining that the charging pile type represents an AC station charging pile, determining that the corresponding charging pile metering error model is an AC station charging pile metering error model.

[0037] In the second step, the above-mentioned pre-processed charging data information group and the above-mentioned charging pile type operation information are input into the above-mentioned AC station charging pile metering error model to obtain the AC station charging pile metering error information. The above-mentioned charging pile type operation information includes: the AC total electric energy meter measurement value, the AC total electric energy meter measurement error, the AC station charging pile line loss, and the AC station charging pile fixed loss; the pre-processed charging data information includes: the AC station charging pile sub-electricity meter measurement value. The AC total electric energy meter measurement value may refer to the measurement value (total electricity usage) of the total electric energy meter of each charging pile corresponding to the same charging pile type. The AC total electric energy meter measurement error may refer to the error ratio of the total electric energy meter. For example, the AC total electric energy meter measurement error may be 0.03. The AC station charging pile sub-electricity meter measurement value may be the electricity measured by the sub-electricity meter of each AC charging pile.

[0038] For example, the total electric energy meter measurement value, the AC total electric energy meter measurement error, the AC station charging pile line loss, the AC station charging pile fixed loss, and the measurement value of each AC station charging pile sub-electric energy meter included in the pre-processed charging data information group are input into the following AC station charging pile measurement error model to obtain the AC station charging pile measurement error information:

[0039]

[0040] Among them, ε y represents the measurement error of the total AC electric energy meter, y represents the measurement value of the total AC electric energy meter, ε i represents the measurement error of the charging pile electric energy meter of the i-th AC station, φ i represents the measured value of the electric energy meter of the charging pile of the i-th AC station, N represents the number of pre-processed charging data information included in the above pre-processed charging data information group, E LLrepresents the line loss of the AC station charging pile, ε0 represents the fixed loss of the AC station charging pile, and the above-mentioned AC station charging pile metering error information includes the metering error of each AC station charging pile sub-electricity meter.

[0041] For example, when calculating the metering error of the sub-energy meter of each AC station charging pile, the historical average metering error of the sub-energy meters of other AC station charging piles can be determined first; then, the above-mentioned total energy meter measurement value, the AC total energy meter measurement error, the AC station charging pile line loss, the AC station charging pile fixed loss, the metering value of each AC station charging pile sub-energy meter included in the above-mentioned pre-processed charging data information group, and the historical average metering error of the sub-energy meters of other AC station charging piles can be substituted into the AC station charging pile metering error model to obtain the metering error of the sub-energy meter of the AC station charging pile.

[0042] In a third step, in response to determining that the charging pile type represents a DC station charging pile, determining that the corresponding charging pile metering error model is a DC station charging pile metering error model.

[0043] In the fourth step, the above-mentioned pre-processed charging data information group and the above-mentioned charging pile type operation information are input into the above-mentioned DC station charging pile metering error model to obtain the DC station charging pile metering error information. The above-mentioned charging pile type operation information includes: DC total energy meter measurement value, DC total energy meter measurement error, DC station charging pile line loss, DC station charging pile fixed loss; the pre-processed charging data information includes: DC station charging pile sub-energy meter measurement value, AC-DC conversion efficiency. The DC total energy meter measurement value may refer to the measurement value (total power usage) of the total energy meter of each charging pile corresponding to the same charging pile type (DC charging pile type). The DC total energy meter measurement error may refer to the error ratio of the total energy meter. For example, the DC total energy meter measurement error may be 0.03. The DC station charging pile sub-energy meter measurement value may be the power measured by the sub-energy meter of each DC charging pile. The DC station charging pile fixed loss may refer to the fixed loss (power loss) of the DC station charging pile. The DC station charging pile line loss may refer to the loss of each line involved in the DC charging pile type. The AC-DC conversion efficiency may refer to the AC-DC (AC input to DC output) conversion efficiency.

[0044] For example, the above-mentioned DC total energy meter measurement value, DC total energy meter measurement error, DC station charging pile line loss, DC station charging pile fixed loss, the above-mentioned pre-processed charging data information group included in each DC station charging pile energy meter measurement value and AC-DC conversion efficiency are input into the following DC station charging pile measurement error model to obtain the DC station charging pile measurement error information:

[0045]

[0046] Among them, A xrepresents the measurement error of the DC total electric energy meter, x represents the measurement value of the DC total electric energy meter, θ t A represents the measurement error of the t-th DC station charging pile electric energy meter, t represents the measured value of the energy meter of the tth DC station charging pile, β t represents the tth AC-DC conversion efficiency, T represents the amount of pre-processed charging data information included in the above-mentioned pre-processed charging data information group, ε represents the DC station charging pile line loss, μ represents the DC station charging pile fixed loss, and the above-mentioned DC station charging pile metering error information includes the metering error of each DC station charging pile sub-electric energy meter.

[0047] For example, when calculating the metering error of each DC station charging pile, the historical average metering error of the metering meters of other DC station charging piles can be determined first; then, the metering value of the total DC meter, the metering error of the total DC meter, the line loss of the DC station charging pile, the fixed loss of the DC station charging pile, the metering value of each DC station charging pile meter and the AC-DC conversion efficiency included in the pre-processed charging data information group, and the historical average metering error of the metering meters of other DC station charging piles can be substituted into the DC station charging pile metering error model to obtain the metering error of the metering meter of the DC station charging pile. Thus, the metering error of the metering meter of each DC station charging pile is obtained as the metering error information of the DC station charging pile.

[0048] In a fifth step, in response to determining that the charging pile type represents an AC / DC hybrid station charging pile, determining that the corresponding charging pile metering error model is an AC / DC hybrid station charging pile metering error model.

[0049] The sixth step is to input the above-mentioned pre-processed charging data information group and the above-mentioned charging pile type operation information into the above-mentioned AC / DC hybrid station charging pile metering error model to obtain the AC / DC hybrid station charging pile metering error information. The pre-processed charging data information group corresponding to the AC / DC hybrid station charging pile includes: the pre-processed charging data information of the DC station charging pile and the pre-processed charging data information of the AC station charging pile. That is, the pre-processed charging data information of the DC station charging pile includes: the DC station charging pile sub-electricity meter measurement value, AC / DC conversion efficiency. The pre-processed charging data information of the AC station charging pile includes: the AC station charging pile sub-electricity meter measurement value.

[0050] For example, the above-mentioned pre-processed charging data information group and the above-mentioned charging pile type operation information are input into the following AC / DC hybrid station charging pile metering error model to obtain the AC / DC hybrid station charging pile metering error information:

[0051]

[0052] Among them, A crepresents the DC total electric energy meter measurement error included in the above charging pile type operation information, c represents the DC total electric energy meter measurement value included in the above charging pile type operation information, θ j A represents the measurement error of the jth DC station charging pile electric energy meter, j represents the measured value of the energy meter of the tth DC station charging pile, β j represents the jth AC-DC conversion efficiency, ε l represents the measurement error of the charging pile electric energy meter of the lth AC station, represents the metering value of the lth AC station charging pile electric energy meter, L represents the number of pre-processed charging data information representing the AC station charging piles included in the above-mentioned pre-processed charging data information group, J represents the number of pre-processed charging data information representing the DC station charging piles included in the above-mentioned pre-processed charging data information group, R represents the line loss of the AC / DC hybrid station charging pile, K represents the fixed loss of the AC / DC hybrid station charging pile, and the above-mentioned DC station charging pile metering error information includes the metering errors of the electric energy meters of each DC station charging pile.

[0053] For example, the metering errors of the DC station charging pile sub-meters and the AC station charging pile sub-meters in the pre-processed charging data information group can be calculated respectively. For example, when calculating the metering error of the sub-meter of each DC station charging pile, the historical average metering error of the sub-meters of other DC station charging piles and the historical average metering error of the sub-meters of other AC station charging piles can be determined first; then, the above-mentioned DC total energy meter metering value, DC total energy meter metering error, AC / DC hybrid station charging pile line loss, AC / DC hybrid station charging pile fixed loss, the metering values ​​of each DC station charging pile sub-meter included in the above-mentioned pre-processed charging data information group, AC / DC conversion efficiency, AC station charging pile sub-meter metering value, other DC station charging pile sub-meters, and other AC station charging pile sub-meters can be substituted into the DC station charging pile metering error model to obtain the metering error of the DC station charging pile sub-meter.

[0054] Therefore, the charging pile metering performance online monitoring system provides functions such as charging pile abnormality analysis, charging pile conversion efficiency analysis, and energy efficiency analysis. It analyzes and diagnoses the energy loss in the charging station based on the line loss in the charging station, AC / DC conversion efficiency, and abnormal power consumption analysis in the station, determines the main causes of energy loss in the station, and makes quantitative estimates.

[0055] Step 1043 , determining the charging pile confidence interval corresponding to each pre-processed charging data information in the pre-processed charging data information group.

[0056] In some embodiments, the execution subject may determine the confidence interval of the charging pile corresponding to each pre-processed charging data information in the pre-processed charging data information group. That is, determine the confidence interval of the metering error of the electric energy meter corresponding to each pre-processed charging data information. The confidence interval may be a confidence interval calculated in advance based on the historical metering data (historical metering error value) of the electric energy meter of each charging pile.

[0057] Therefore, a confidence interval evaluation is set for the charging pile metering error, and the confidence interval is used to screen abnormal charging piles to improve the accuracy of the model calculation results.

[0058] Step 1044, determining the abnormal performance charging pile and the abnormal electric energy meter according to the confidence interval of each charging pile and the above charging pile error information.

[0059] In some embodiments, the above-mentioned execution entity can determine the abnormal performance charging pile and the abnormal electric energy meter based on the confidence interval of each charging pile and the above-mentioned charging pile error information.

[0060] In practice, the above-mentioned execution entity can determine the abnormal performance charging pile and abnormal energy meter through the following steps:

[0061] The first step is to determine whether there is a charging pile confidence interval that meets the abnormal condition among the above charging pile confidence intervals. The abnormal condition may be: the interval length of the charging pile confidence interval is greater than or equal to the preset length. For example, the charging pile confidence interval may be 0.95-0.98, and the interval length is 0.03; the preset length may be 0.02.

[0062] In the second step, in response to determining that there is a charging pile confidence interval that meets the abnormal condition among the above-mentioned charging pile confidence intervals, the charging pile corresponding to the charging pile confidence interval that meets the abnormal condition is determined as an abnormal performance charging pile.

[0063] The third step is to remove the pre-processed charging data information corresponding to the confidence interval of the charging pile that meets the abnormal condition in the pre-processed charging data information group, so as to update the pre-processed charging data information group and obtain an updated pre-processed charging data information group.

[0064] In the fourth step, according to the charging pile metering error model and the corresponding charging pile type operation information, the updated pre-processed charging data information group is subjected to error identification to obtain updated charging pile error information corresponding to the above charging pile type. For example, the error identification method here can refer to the implementation method of step 1042, which will not be repeated here.

[0065] Step 5: Proportionally adjust the electric energy meter operation data corresponding to the target update pre-processed charging data information to obtain simulated electric energy meter operation data. For example, the electric energy meter operation data can be reduced by a certain proportion. The electric energy meter operation data can include: sub-electric energy meter measurement values.

[0066] The sixth step is to replace the updated pre-processed charging data information corresponding to the target updated pre-processed charging data information in the updated pre-processed charging data information group with the simulated electric energy meter operation data to obtain a simulated pre-processed charging data information group.

[0067] In the seventh step, according to the charging pile metering error model and the corresponding charging pile type operation information, the above-mentioned simulation pre-processing charging data information group is subjected to error identification to obtain the simulation charging pile error information corresponding to the above-mentioned charging pile type. For example, the error identification method here can refer to the implementation method of step 1042, which will not be repeated here.

[0068] In the eighth step, in response to determining that the error information between the above-mentioned simulated charging pile error information and the above-mentioned updated charging pile error information is greater than or equal to the preset error information, the electric energy meter corresponding to the above-mentioned target updated pre-processed charging data information is determined as an abnormal electric energy meter. For example, first, the metering error corresponding to the target updated pre-processed charging data information in the simulated charging pile error information can be determined, and the metering error corresponding to the target updated pre-processed charging data information in the updated charging pile error information can be determined; then, it is determined whether the error value between the two metering errors is greater than or equal to the preset error information. Among them, the preset error information can represent a preset error value.

[0069] Therefore, by proportionally adjusting the operating data of a certain electric energy meter, substituting the simulation data into the error calculation model, the metering error of the electric energy meter with respect to the simulation data is obtained, and the detection sensitivity of the model to the change of the operating error of the electric energy meter is obtained. Through simulation evaluation of stations of different scales, different line loss rates, and different power consumption characteristics, the adaptation parameters of the model for various charging stations are continuously iterated and optimized.

[0070] Step 105: Replace each abnormal performance charging pile and abnormal electric energy meter that has been determined.

[0071] In some embodiments, the execution subject may replace each abnormal performance charging pile and abnormal energy meter determined. For example, each abnormal performance charging pile and abnormal energy meter may be replaced with a new charging pile and energy meter.

[0072] Further references Figure 2 As an implementation of the methods shown in the above figures, the present disclosure provides some embodiments of a charging pile metering performance online monitoring device. These charging pile metering performance online monitoring device embodiments are similar to Figure 1Corresponding to the method embodiments shown, the charging pile metering performance online monitoring device can be specifically applied to various electronic devices.

[0073] like Figure 2 As shown, some embodiments of the charging pile metering performance online monitoring device 200 include: an acquisition unit 201, a preprocessing unit 202, a clustering unit 203, a determination unit 204 and a replacement unit 205. The acquisition unit 201 is configured to acquire a charging data information set and a charging pile type operation information group of a target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; the preprocessing unit 202 is configured to perform data preprocessing on each charging data information in the above charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set; the clustering unit 203 is configured to perform clustering processing on each preprocessed charging data information in the above preprocessed charging data information set to obtain a preprocessed charging data information group set, wherein one preprocessed charging data information group corresponds to one charging pile type; the determination unit 204 ... For each pre-processed charging data information group in the charging data information group set, the following processing steps are performed: determining the type of charging pile corresponding to the above pre-processed charging data information group; performing error identification on the above pre-processed charging data information group according to the charging pile metering error model corresponding to the above charging pile type and the corresponding charging pile type operation information, to obtain the charging pile error information corresponding to the above charging pile type; determining the charging pile confidence interval corresponding to each pre-processed charging data information in the above pre-processed charging data information group; determining the abnormal performance charging pile and the abnormal electric energy meter according to the confidence interval of each charging pile and the above charging pile error information; the replacement unit 205 is configured to perform a replacement operation on each determined abnormal performance charging pile and abnormal electric energy meter.

[0074] It can be understood that the units recorded in the charging pile metering performance online monitoring device 200 are similar to the reference Figure 1 Therefore, the operations, features and beneficial effects described above for the method are also applicable to the charging pile metering performance online monitoring device 200 and the units contained therein, and will not be described in detail here.

[0075] Reference below Figure 3 , which shows a schematic diagram of the structure of an electronic device 300 (e.g., a computing device) suitable for implementing some embodiments of the present disclosure. The electronic devices in some embodiments of the present disclosure may include, but are not limited to, mobile terminals such as mobile phones, notebook computers, digital broadcast receivers, PDAs (personal digital assistants), PADs (tablet computers), PMPs (portable multimedia players), etc., and fixed terminals such as digital TVs, desktop computers, etc. Figure 3The electronic device shown is only an example and should not bring any limitation to the functions and scope of use of the embodiments of the present disclosure.

[0076] like Figure 3 As shown, the electronic device 300 may include a processing device (e.g., a central processing unit, a graphics processing unit, etc.) 301, which can perform various appropriate actions and processes according to a program stored in a read-only memory (ROM) 302 or a program loaded from a storage device 308 into a random access memory (RAM) 303. In the RAM 303, various programs and data required for the operation of the electronic device 300 are also stored. The processing device 301, the ROM 302, and the RAM 303 are connected to each other via a bus 304. An input / output (I / O) interface 305 is also connected to the bus 304.

[0077] Typically, the following devices may be connected to the I / O interface 305: input devices 306 including, for example, a touch screen, a touch pad, a keyboard, a mouse, a camera, a microphone, an accelerometer, a gyroscope, etc.; output devices 307 including, for example, a liquid crystal display (LCD), a speaker, a vibrator, etc.; storage devices 308 including, for example, a magnetic tape, a hard disk, etc.; and communication devices 309. The communication devices 309 may allow the electronic device 300 to communicate with other devices wirelessly or by wire to exchange data. Although Figure 3 The electronic device 300 is shown with various devices, but it should be understood that it is not required to implement or possess all the devices shown. More or fewer devices may be implemented or possessed instead. Figure 3 Each block shown in the figure may represent one device, or may represent multiple devices as required.

[0078] In particular, according to some embodiments of the present disclosure, the process described above with reference to the flowchart can be implemented as a computer software program. For example, some embodiments of the present disclosure include a computer program product, which includes a computer program carried on a computer-readable medium, and the computer program includes a program code for executing the method shown in the flowchart. In some such embodiments, the computer program can be downloaded and installed from the network through the communication device 309, or installed from the storage device 308, or installed from the ROM 302. When the computer program is executed by the processing device 301, the above-mentioned functions defined in the method of some embodiments of the present disclosure are executed.

[0079] It should be noted that the computer-readable medium recorded in some embodiments of the present disclosure may be a computer-readable signal medium or a computer-readable storage medium or any combination of the above two. The computer-readable storage medium may be, for example, but not limited to, an electrical, magnetic, optical, electromagnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples of computer-readable storage media may include, but are not limited to: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In some embodiments of the present disclosure, a computer-readable storage medium may be any tangible medium containing or storing a program that can be used by or in combination with an instruction execution system, device or device. In some embodiments of the present disclosure, a computer-readable signal medium may include a data signal propagated in a baseband or as part of a carrier wave, which carries a computer-readable program code. This propagated data signal may take a variety of forms, including but not limited to electromagnetic signals, optical signals, or any suitable combination of the above. The computer readable signal medium may also be any computer readable medium other than a computer readable storage medium, which may send, propagate or transmit a program for use by or in conjunction with an instruction execution system, apparatus or device. The program code contained on the computer readable medium may be transmitted using any suitable medium, including but not limited to: wires, optical cables, RF (radio frequency), etc., or any suitable combination of the above.

[0080] In some embodiments, the client and the server may communicate using any currently known or future developed network protocol such as HTTP (HyperText Transfer Protocol), and may be interconnected with any form or medium of digital data communication (e.g., a communication network). Examples of communication networks include a local area network ("LAN"), a wide area network ("WAN"), an internet (e.g., the Internet), and a peer-to-peer network (e.g., an ad hoc peer-to-peer network), as well as any currently known or future developed network.

[0081] The above-mentioned computer-readable medium may be included in the above-mentioned electronic device; or it may exist independently without being assembled into the electronic device. The above-mentioned computer-readable medium carries one or more programs. When the above-mentioned one or more programs are executed by the electronic device, the electronic device: obtains a charging data information set and a charging pile type operation information group of the target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; performs data preprocessing on each charging data information in the above-mentioned charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set; performs clustering processing on each preprocessed charging data information in the above-mentioned preprocessed charging data information set to obtain a preprocessed charging data information group set, wherein one preprocessed charging data information group corresponds to one charging pile type; For each preprocessed charging data information group in the above-mentioned preprocessed charging data information group set, the following processing steps are performed: determining the charging pile type corresponding to the above-mentioned preprocessed charging data information group; performing error identification on the above-mentioned preprocessed charging data information group according to the charging pile metering error model corresponding to the above-mentioned charging pile type and the corresponding charging pile type operation information, and obtaining the charging pile error information corresponding to the above-mentioned charging pile type; determining the charging pile confidence interval corresponding to each preprocessed charging data information in the above-mentioned preprocessed charging data information group; determining the abnormal performance charging pile and the abnormal electric energy meter according to each charging pile confidence interval and the above-mentioned charging pile error information; and replacing each abnormal performance charging pile and abnormal electric energy meter determined.

[0082] Computer program code for performing the operations of some embodiments of the present disclosure may be written in one or more programming languages ​​or a combination thereof, including object-oriented programming languages ​​such as Java, Smalltalk, C++, and conventional procedural programming languages ​​such as "C" or similar programming languages. The program code may be executed entirely on the user's computer, partially on the user's computer, as a separate software package, partially on the user's computer and partially on a remote computer, or entirely on a remote computer or server. In cases involving a remote computer, the remote computer may be connected to the user's computer via any type of network, including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., via the Internet using an Internet service provider).

[0083] The flow chart and block diagram in the accompanying drawings illustrate the possible architecture, function and operation of the system, method and computer program product according to various embodiments of the present disclosure. In this regard, each square box in the flow chart or block diagram can represent a module, a program segment or a part of a code, and the module, the program segment or a part of the code contains one or more executable instructions for realizing the specified logical function. It should also be noted that in some implementations as replacements, the functions marked in the square box can also occur in a sequence different from that marked in the accompanying drawings. For example, two square boxes represented in succession can actually be executed substantially in parallel, and they can sometimes be executed in the opposite order, depending on the functions involved. It should also be noted that each square box in the block diagram and / or flow chart, and the combination of the square boxes in the block diagram and / or flow chart can be implemented with a dedicated hardware-based system that performs a specified function or operation, or can be implemented with a combination of dedicated hardware and computer instructions.

[0084] The units described in some embodiments of the present disclosure may be implemented by software or hardware. The described units may also be arranged in a processor, for example, may be described as: a processor including: an acquisition unit, a preprocessing unit, a clustering unit, a determination unit, and a replacement unit. The names of these units do not constitute limitations on the units themselves in certain cases, for example, the analysis unit may also be described as "a unit for performing spectral analysis on the above-mentioned music audio to extract music feature information".

[0085] The functions described above herein may be performed at least in part by one or more hardware logic components. For example, without limitation, exemplary types of hardware logic components that may be used include: field programmable gate arrays (FPGAs), application specific integrated circuits (ASICs), application specific standard products (ASSPs), systems on chips (SOCs), complex programmable logic devices (CPLDs), and the like.

[0086] The above descriptions are only some preferred embodiments of the present disclosure and an explanation of the technical principles used. Those skilled in the art should understand that the scope of the invention involved in the embodiments of the present disclosure is not limited to the technical solutions formed by a specific combination of the above-mentioned technical features, but should also cover other technical solutions formed by any combination of the above-mentioned technical features or their equivalent features without departing from the above-mentioned inventive concept. For example, the above-mentioned features are replaced with the technical features with similar functions disclosed in the embodiments of the present disclosure (but not limited to) and the technical solutions formed.

Claims

1. A method for online monitoring of charging pile metering performance, comprising: Obtaining a charging data information set and a charging pile type operation information group of a target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; Performing data preprocessing on each charging data information in the charging data information set to generate preprocessed charging data information, thereby obtaining a preprocessed charging data information set; Performing clustering processing on each pre-processed charging data information in the pre-processed charging data information set to obtain a pre-processed charging data information group set, wherein one pre-processed charging data information group corresponds to one charging pile type; For each pre-processed charging data information group in the pre-processed charging data information group set, the following processing steps are performed: Determine the charging pile type corresponding to the pre-processed charging data information group; According to the charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information, error identification is performed on the pre-processed charging data information group to obtain charging pile error information corresponding to the charging pile type; Determine a charging pile confidence interval corresponding to each pre-processed charging data information in the pre-processed charging data information group; Determine the abnormal performance charging pile and the abnormal electric energy meter according to the confidence interval of each charging pile and the error information of the charging pile; Replace the charging piles and electric energy meters with abnormal performance that have been identified.

2. The method according to claim 1, wherein: The method of performing error identification on the pre-processed charging data information group according to the charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information to obtain the charging pile error information corresponding to the charging pile type includes: In response to determining that the charging pile type represents an AC station charging pile, determining that the corresponding charging pile metering error model is an AC station charging pile metering error model; The pre-processed charging data information group and the charging pile type operation information are input into the AC station charging pile metering error model to obtain the AC station charging pile metering error information.

3. The method according to claim 1, wherein: The method of performing error identification on the pre-processed charging data information group according to the charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information to obtain the charging pile error information corresponding to the charging pile type includes: In response to determining that the charging pile type represents a DC station charging pile, determining that the corresponding charging pile metering error model is a DC station charging pile metering error model; The pre-processed charging data information group and the charging pile type operation information are input into the DC station charging pile metering error model to obtain the DC station charging pile metering error information.

4. The method according to claim 1, wherein: The method of performing error identification on the pre-processed charging data information group according to the charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information to obtain the charging pile error information corresponding to the charging pile type includes: In response to determining that the charging pile type represents an AC / DC hybrid station charging pile, determining that the corresponding charging pile metering error model is an AC / DC hybrid station charging pile metering error model; The pre-processed charging data information group and the charging pile type operation information are input into the AC / DC hybrid station charging pile metering error model to obtain the AC / DC hybrid station charging pile metering error information.

5. An online monitoring device for charging pile metering performance, comprising: An acquisition unit is configured to acquire a charging data information set and a charging pile type operation information group of a target charging station within a preset time period, wherein each charging data information corresponds to a charging pile in the target charging station; a preprocessing unit configured to perform data preprocessing on each charging data information in the charging data information set to generate preprocessed charging data information and obtain a preprocessed charging data information set; A clustering unit is configured to perform clustering processing on each pre-processed charging data information in the pre-processed charging data information set to obtain a pre-processed charging data information group set, wherein one pre-processed charging data information group corresponds to one charging pile type; The determination unit is configured to perform the following processing steps for each pre-processed charging data information group in the pre-processed charging data information group set: determine the type of charging pile corresponding to the pre-processed charging data information group; perform error identification on the pre-processed charging data information group according to the charging pile metering error model corresponding to the charging pile type and the corresponding charging pile type operation information to obtain the charging pile error information corresponding to the charging pile type; determine the charging pile confidence interval corresponding to each pre-processed charging data information in the pre-processed charging data information group; determine the abnormal performance charging pile and the abnormal electric energy meter according to each charging pile confidence interval and the charging pile error information; The replacement unit is configured to replace each abnormal performance charging pile and abnormal electric energy meter that has been determined.

6. An electronic device comprising: one or more processors; a storage device having one or more programs stored thereon; When the one or more programs are executed by the one or more processors, the one or more processors implement the method according to any one of claims 1 to 4.

7. A computer readable medium having a computer program stored thereon, wherein: When the computer program is executed by a processor, the method according to any one of claims 1 to 4 is implemented.

Citation Information

Patent Citations

  • Intelligent electric energy meter operation error monitoring system

    CN115166619A

  • Charging pile charging quantity alignment and metering error calculation method in charging station

    CN115575884A

  • Intelligent charging pile management system and method thereof

    CN116664015A

  • Charging pile metering misalignment detection method and system, terminal and medium

    CN118011308A

Cited By

  • DC charging pile anomaly detection method and system

    CN119828036A

  • A method and system for detecting abnormalities in a DC charging pile

    CN119828036B