Water resource balanced configuration method and system suitable for multiple targets
Through neural network and Maslow's hierarchy of demand theory, a multi-objective water resource allocation model was constructed, and combined with NSGA-III and TOPSIS methods, the problem of uneven water resource allocation in the existing technology was solved, and the multi-water resource allocation was achieved Optimize and efficient utilization of goals.
Patent Information
- Application Number
- CN202411138424.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-11-29
AI Technical Summary
The existing water resource allocation methods mainly focus on economic and social benefits, ignore the balance between space and water users, and cannot coordinate regional economic and social development. The allocation of a single goal and a single water user entity cannot meet multiple needs.
Using neural network combined with Maslow's hierarchy of demand theory, predict water consumption and build a multi-target water resource allocation model, considering economic benefits, social benefits, ecological benefits, spatial equilibrium and water use subject equilibrium, Pareto non-inferiority was solved through the NSGA-III algorithm. To solve the solution, the TOPSIS method is used to optimize the optimal configuration scheme.
The multi-target optimized allocation of water resources has been achieved, the utilization rate of water resources has been improved, the economic, social, ecological and spatial benefits have been balanced, and the balanced allocation among water users has been ensured.
Smart Images

Figure CN119047766A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the field of water resources planning and management, and in particular relates to a water resources balanced configuration method and system applicable to multiple objectives. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] Water shortage will seriously restrict the sustainable development of social economy and the health of ecological environment. In order to make limited water resources play a greater social, economic and ecological value, optimizing water resource allocation is one of the most effective ways.
[0004] With the rapid development of society, the economic and social attributes of water resources have become increasingly prominent, and the traditional water use pattern and economic conditions have undergone tremendous changes. In the past, water resource allocation mainly focused on economic and social benefits, often ignoring the balance between space and water users. Water resource allocation with a single goal and a single water user can no longer coordinate regional economic and social development. Summary of the invention
[0005] In order to overcome the deficiencies of the above-mentioned prior art, the present invention provides a water resource balanced allocation method and system suitable for multiple objectives, which comprehensively considers the efficient utilization of water resources and the balance among all objectives, obtains the best water resource allocation plan, and improves the utilization rate of water resources.
[0006] To achieve the above objectives, one or more embodiments of the present invention provide the following technical solutions:
[0007] A first aspect of the present invention provides a water resources balanced allocation method applicable to multiple objectives.
[0008] A water resources balanced allocation method applicable to multiple objectives, comprising:
[0009] Acquire historical data of the area to be configured, the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user;
[0010] Based on the water demand influencing factors, water quotas, and water consumption in historical data, neural networks are used in combination with Maslow's hierarchy of needs theory to predict the water demand of each water user.
[0011] Based on the water demand and water supply of each water user, a multi-objective water resource allocation model is constructed to predict the water supply allocated by the water supply source to each water user.
[0012] Solving the multi-objective water resources allocation model, obtaining a non-inferior solution set under multi-objective optimization, and selecting the best allocation scheme from the non-inferior solution set;
[0013] The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
[0014] Furthermore, the water demand of each water user is predicted as follows:
[0015] Based on neural network, a GA-BP water demand prediction model is established, and the model is trained using historical data to predict the water demand of each water user.
[0016] Based on Maslow's hierarchy of needs theory, the principle of water demand division is determined, and the water demand of each water user is predicted through the trained GA-BP model, including rigid water demand and elastic water demand.
[0017] Furthermore, the objective function is constructed with economic benefits, social benefits, ecological benefits, spatial balance and water-using subject balance as multiple objectives, specifically:
[0018] The goal of economic benefits is to maximize the overall comprehensive economic benefits of the area to be allocated;
[0019] The social benefit goal is to minimize the total water shortage in the area to be allocated;
[0020] The goal of ecological benefit is to minimize the overall ecological water shortage in the area to be allocated;
[0021] The goal of spatial balance is to minimize the Gini coefficient of water supply in each water receiving area;
[0022] The goal of balancing water users is to minimize the sum of the water supply Gini coefficients of each water receiving area.
[0023] Furthermore, the constraints include water supply constraints, water demand constraints and non-negative constraints.
[0024] Furthermore, the NSGA-III algorithm is used to solve the multi-objective water resources allocation model and obtain a Pareto non-inferior solution set under multi-objective optimization;
[0025] The TOPSIS method is used to select the best configuration plan from the Pareto non-inferior solution set.
[0026] Furthermore, the NSGA-III algorithm is used to solve the multi-objective water resources allocation model, and the specific steps are as follows:
[0027] (1) Initialize the population;
[0028] (2) generating offspring;
[0029] (3) Merging populations;
[0030] (4) non-dominated sorting;
[0031] (5) Select an operation;
[0032] (6) Reference point selection;
[0033] (7) Repeat steps (2) to (6) until the algorithm reaches the maximum number of iterations and obtains the Pareto non-inferior solution set.
[0034] Furthermore, the TOPSIS method is used to select the best configuration solution in the Pareto non-inferior solution set, specifically:
[0035] Indicators are aligned;
[0036] Matrix normalization;
[0037] Normalization processing;
[0038] Calculate comprehensive evaluation parameters;
[0039] Based on the comprehensive evaluation parameters, the best configuration scheme is selected.
[0040] A second aspect of the present invention provides a water resource balance configuration system applicable to multiple objectives.
[0041] A water resource balance configuration system suitable for multiple objectives, including acquisition module, prediction module, construction module and solution module:
[0042] The acquisition module is configured to: acquire historical data of the area to be configured, the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user;
[0043] The prediction module is configured to: predict the water demand of each water user based on the water demand influencing factors, water quotas, and water consumption in historical data by using a neural network combined with Maslow's hierarchy of needs theory;
[0044] The construction module is configured to: construct a multi-objective water resource allocation model based on the water demand and water supply of each water user, so as to predict the water supply configured by the water supply source for each water user;
[0045] A solution module is configured to: solve the multi-objective water resource allocation model, obtain a non-inferior solution set under multi-objective optimization, and select the best configuration scheme from the non-inferior solution set;
[0046] The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
[0047] The third aspect of the present invention provides a computer-readable storage medium having a program stored thereon, which, when executed by a processor, implements the steps in a water resources balanced configuration method applicable to multiple objectives as described in the first aspect of the present invention.
[0048] The fourth aspect of the present invention provides an electronic device, including a memory, a processor, and a program stored in the memory and executable on the processor. When the processor executes the program, the steps in a water resource balance configuration method applicable to multiple objectives as described in the first aspect of the present invention are implemented.
[0049] One or more of the above technical solutions have the following beneficial effects:
[0050] Based on the three conventional goals of economic benefit, social benefit and ecological benefit, the present invention introduces the goals of spatial balance and water user balance, comprehensively considers the efficient use of water resources and the balance among all goals, obtains the best water resource allocation plan, and improves the utilization rate of water resources.
[0051] The present invention predicts the rigid and elastic water demands of water users based on the GA-BP algorithm and Maslow's hierarchy of needs theory; establishes a high-dimensional multi-objective water resource efficient and balanced configuration model with economic, social, ecological and water resource spatial balance and subject balanced distribution on the principle of efficient utilization of water resources; utilizes the outstanding performance of the NSGA-Ⅲ algorithm in high-dimensional and multi-objective optimization problems to solve the Pareto non-inferior solution set of the model, and finally optimizes the water resource efficient and balanced configuration scheme through the TOPSIS decision-making method.
[0052] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0053] The accompanying drawings in the specification, which constitute a part of the present invention, are used to provide a further understanding of the present invention. The exemplary embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute improper limitations on the present invention.
[0054] Figure 1 This is a flow chart of the method of the first embodiment.
[0055] Figure 2 This is a flow chart of the GA-BP algorithm of the first embodiment.
[0056] Figure 3 This is the NSGA-III algorithm flow chart of the first embodiment.
[0057] Figure 4 This is a comprehensive scoring chart of various efficient and balanced configuration schemes in the Pareto solution set of the Shandong water receiving area in the Yellow River Basin of the first embodiment. DETAILED DESCRIPTION
[0058] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used in the present invention have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0059] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0060] It is extremely important to allocate water resources reasonably. In the future, we should continue to optimize the allocation of water resources, further balance economic development with social and ecological benefits on the premise of efficient use of water resources, balance the allocation relationship between space and subjects, and carry out research on water resource optimization allocation with multiple objectives, multiple water receiving areas and multiple water users. To this end, the present invention proposes a method for efficient and balanced allocation of water resources suitable for multiple objectives, which takes into account the economic, social and ecological benefits of water resources and the balanced allocation of space and subjects. By introducing the NSGA-Ⅲ algorithm, the efficient equilibrium model of high-dimensional multi-objective is solved, and the TOPSIS method is used to obtain the optimal configuration scheme.
[0061] Embodiment 1
[0062] In one embodiment of the present disclosure, a water resource balance configuration method applicable to multiple objectives is provided, such as Figure 1 As shown, the following steps are included:
[0063] Step S1: Acquire historical data of the area to be configured, wherein the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user;
[0064] The historical data here is a time series, including the water demand influencing factors, water quotas, water consumption and water supply of each water user over a period of time.
[0065] In this embodiment, the prefecture-level city is taken as the water receiving area, and the water users are divided into multiple water users such as life, industry, agriculture, and ecology.
[0066] Step S2: Based on the water demand influencing factors, water quotas, and water consumption in the historical data, a neural network is used in combination with Maslow's hierarchy of needs theory to predict the water demand of each water user, specifically:
[0067] (1) Based on the neural network, a GA-BP water demand prediction model is established. The water demand influencing factors and water quota data in the historical data are used as inputs, and the water consumption in the historical data is used as labels. The model is trained to predict the water consumption of each water user and use it as the water demand, such as Figure 2 As shown, specifically:
[0068] Step 1: Determine the structure of the BP neural network, including the number of nodes and the encoding length of the input layer, hidden layer and output layer. The input data includes the water demand influencing factors of each entity and the water quota data.
[0069] Step 2: Initialize the population and determine the population size, number of iterations, crossover probability, and mutation probability.
[0070] Step 3: Determine the fitness function and use the sum of the absolute errors between the predicted output and the actual value as the individual fitness value.
[0071] Step 4: Iterate the population, generate new individuals and calculate their fitness values until the set number of iterations is reached.
[0072] Step 5: Decode the best individual in the population to obtain the weights and thresholds of the BP neural network.
[0073] Step 6: Set the neural network parameters, train and verify the model based on the historical water consumption series data, and output the predicted total water demand of each entity.
[0074] (2) Based on Maslow's hierarchy of needs theory, the water demand division principles are determined as shown in Table 1.
[0075] Based on Maslow's hierarchy of needs theory, and taking into account the characteristics of water resources in the research area and the characteristics of water use by different water users, the water demand of water users is divided into rigid demand and elastic demand; rigid demand is the most basic human need, corresponding to the physiological and safety needs in the hierarchy of needs theory; elastic demand corresponds to the belonging and respect needs in the hierarchy of needs theory, and can even reach the level of self-realization; at the rigid demand level, if the minimum or basic needs provided to water users are not met, human survival, social and economic development and the ecological environment will be threatened or destroyed. If the elastic water demand of water users is met, water resources can promote the rapid development of social economy and good protection of ecological environment, otherwise its development will be restricted; water use corresponding to rigid demand is rigid water demand, that is, the amount of water required to meet the basic life, production and ecology of water users. Water use corresponding to elastic demand is elastic water demand, that is, the amount of water required to improve the quality of life, meet food consumption needs, promote industrial development and shape a suitable urban and rural ecological environment.
[0076] Table 1 Principles for water demand division
[0077]
[0078] (3) According to the principle of water demand division, the rigid water quota values or other parameters for living, production and ecology are determined; in the prediction of rigid water demand for living, the water quota is the minimum daily water consumption of urban and rural residents (liters / (person / day)); in the prediction of rigid water demand for agriculture, the water quota is the minimum irrigation water consumption of 180 kg per capita for annual food security; the rigid water demand for ecology is calculated based on the water quota for watering green spaces and the water quota for watering roads; in industry, the general industrial water demand outside the six major water-intensive industries of electricity, steel, textiles, papermaking, petroleum and petrochemicals, and food is taken as the rigid water demand for industry; by adjusting the water quota and water demand influencing factors in the GA-BP model, the rigid water demand of each water user is predicted; the difference between the total water demand predicted by (1) and the rigid water demand predicted by (2) is taken as the elastic water demand.
[0079] Step S3: Based on the water demand and water supply of each water user, a multi-objective water resource allocation model is constructed to predict the water supply allocated by the water supply source to each water user;
[0080] The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
[0081] In order to achieve balanced allocation of water resources, the principles of fairness, efficiency and balance should be upheld during the allocation process:
[0082] (1) Principle of Fairness
[0083] Water resources are a basic resource. The state owns the water resources and the people jointly own the right to use them. When allocating water resources, the rigid water needs of each user in the water receiving area must be guaranteed, and water resources must be allocated to each user in the water receiving area in a completely fair manner in accordance with the rigid water needs.
[0084] (2) Efficient configuration principle
[0085] The "efficient" allocation of water resources is reflected in the simultaneous improvement of water use efficiency and water use benefits. High water use efficiency means that water resources are preferentially allocated to users with high unilateral water value, which reflects high-level water use and achieves high water use benefits in the entire water receiving area. It is at the elastic demand level. In order to achieve efficient use of water resources, the economic benefits brought by water supply are taken into consideration during allocation, and the economic benefits of the receiving area are maximized through water resource allocation.
[0086] (3) Balanced configuration principle
[0087] In areas with multiple water receiving areas and multiple water users, in order to ensure efficient and balanced development, it is necessary to consider the issue of spatial balance; achieving spatial balance of water resources can promote the sustainable use of water resources, support the balanced development of the regional economy and society, and protect the ecological environment at the same time.
[0088] Based on the above principles, a multi-objective water resources allocation model including objective functions and constraints is constructed. The objective function takes economic benefits, social benefits, ecological benefits, spatial balance and water use subject balance as multiple objectives, specifically:
[0089] (1) Goal 1: Maximize economic benefits
[0090] The goal of economic benefit is to maximize the overall comprehensive economic benefit of the area to be allocated, which can be expressed as follows:
[0091]
[0092] In the formula, Q ij The water supply (distributed water volume) from the water supply source to the water user j in the water receiving area i, in units of 10,000 m 3 ; b ij is the water supply efficiency coefficient of the jth user in the water receiving area i; c ij is the water supply cost coefficient of the jth user in the water receiving area i; i=1,2,3…n are the water receiving areas respectively, and j=1,2,3,4 are the water users respectively.
[0093] (2) Goal 2: Maximize social benefits
[0094] The social benefit goal is to minimize the total water shortage in the area to be allocated, which can be expressed as:
[0095]
[0096] Where W ij The water demand of the jth water user in the water receiving area i, i=1,2,3...n are the water receiving areas respectively, and j=1,2,3,4 are the water users respectively.
[0097] (3) Goal 3: Maximize ecological benefits
[0098] The goal of ecological benefit is to minimize the overall ecological water shortage in the area to be allocated:
[0099]
[0100] Where W i4 The water demand of ecological water users in receiving area i, Q i4 The amount of water supplied by the main ecological users in the receiving area i.
[0101] (4) Goals 4 and 5: Balanced configuration goals
[0102] In the balanced allocation of water resources, when it is at the elastic demand level, its balance is reflected in two aspects:
[0103] First, balanced spatial allocation of water resources
[0104] The balanced spatial allocation of water resources does not require that water resources be distributed evenly. The allocation of water resources depends on the demand for water. The core meaning of the balanced spatial allocation of water resources lies in the balance of the supply and demand ratio between water receiving areas and between different water users in the water receiving areas.
[0105] Among them, the balance of supply and demand ratios between water receiving areas takes the minimum water supply Gini coefficient of each water receiving area as the goal of spatial balance, and the balance of supply and demand ratios between different water users in the water receiving area takes the minimum sum of the water supply Gini coefficients of the water users in each water receiving area as the goal of water user balance, which can be expressed as follows:
[0106]
[0107]
[0108]
[0109]
[0110] In the formula, F4(X) is the water supply Gini coefficient of each water receiving area. The smaller its value, the more balanced the water resources allocation in each water receiving area. The water supply Gini coefficient of each water user in each water receiving area is calculated separately. F5(X) is the sum of the water supply Gini coefficients of each water user in each water receiving area. The smaller its value, the more balanced the water resources allocation among different water users in each water receiving area. M i′It is the sum of the ratio of water supply to water demand in all water receiving areas; M ij′ It is the sum of the ratios of water supply and water demand of different water users in the receiving area i; Q i is the total water supply of receiving area i; W i is the total water demand of the receiving area; Q i′ and W i′ is the total water supply and total water demand of water receiving area i′ which is different from water receiving area i; Q ij′ and W ij′ It is the water supply and demand of water user j′ which is different from water user j.
[0111] Second, the balanced configuration among the five objectives
[0112] In order to achieve a certain spatial balance goal, a relatively stable equilibrium state is maintained in space when allocating water resources. Aiming at the multi-objective balanced development needs of economic benefits, social benefits, ecological benefits, balance between water receiving areas, and balance between different water users in water receiving areas, the equilibrium point between the five goals is found and expressed as follows:
[0113] F=W1*F1(X)+W2*F2(X)+W3*F3(X)+W4*F4(X)+W5*F5(X)
[0114] Among them, W1, W2, W3, W4, and W5 are the balance coefficients of the five targets respectively.
[0115] Furthermore, the constraints include:
[0116] (1) Water supply constraints:
[0117] Water supply constraints in various cities:
[0118] W ij ≤W ijmax
[0119] Total water supply constraints:
[0120]
[0121] W ij is the water supply of water user j in prefecture-level city i, W ijmax is the maximum water supply of water user j in city i, and its value is similar to Q ijmax equal; is the total water supply, W h The amount of water that needs to be distributed.
[0122] (2) Water demand constraints:
[0123] Q ijmin ≤Q ij ≤Q ijmax
[0124] Q ij is the water demand of water user j in prefecture-level city i, Q ijmax is the elastic water demand of water user j in city i, serving as the upper limit of water supply; Q ijmin is the rigid water demand of water user j in city i, which serves as the lower limit of water supply.
[0125] (3) Non-negative constraints:
[0126] The amount of water allocated to all water users in all cities, i.e. the decision variables, are non-negative values.
[0127] Q ij ≥0
[0128] Step S4: solving the multi-objective water resources allocation model to obtain a non-inferior solution set under multi-objective optimization, and selecting the best allocation scheme from the non-inferior solution set;
[0129] Furthermore, the NSGA-III algorithm is used to solve the multi-objective water resources allocation model and obtain a Pareto non-inferior solution set under multi-objective optimization;
[0130] The TOPSIS method is used to select the best configuration plan from the Pareto non-inferior solution set.
[0131] Furthermore, the NSGA-III algorithm is used to solve the multi-objective water resources allocation model, such as Figure 3 As shown, the specific steps are:
[0132] S41. Initialize the population. Randomly generate a parent generation P with a population size of N. t .
[0133] S42, generate offspring. Generate offspring Q of size N through selection, crossover and mutation operations. t .
[0134] S43, merge the population. t and offspring Q t Merge into a population R of size 2N t .
[0135] S44, non-dominated sorting. For population R t Perform non-dominated sorting to obtain a non-dominated hierarchy (F1, F1…). Put the solutions in the non-dominated hierarchy into the set S in sequence. t middle.
[0136] S45, select an operation. If S t If the size is N, then directly change S t As the parent of the next generation, P t+1, then repeat steps 2 and 3. If S t The size of S is greater than N, then t Select a part of the solution as the parent of the next generation P t+1 , the remaining part selects solutions from the last non-dominated layer for processing.
[0137] S46, reference point selection. Determine the number and position of reference points on the (M-1)-dimensional hyperplane, and select the reference points from the set S. t Perform adaptive normalization. Then associate the normalized individuals with the reference point, and select the individual with the smallest association with the reference point to join the new parent generation P t+1 , until the parent P t+1 The number of individuals reaches N. Repeat steps 2 to 6 until the algorithm reaches the maximum number of iterations.
[0138] S47. The calculation is completed and the Pareto non-inferior solution set is obtained.
[0139] Furthermore, the TOPSIS method is used to select the best configuration solution in the Pareto non-inferior solution set, specifically:
[0140] S51. Indicators are in the same direction.
[0141] S52, Matrix Standardization:
[0142]
[0143] In the solution set processing, the entire solution set constitutes the original data matrix X, and each point in the solution set is represented by x ij Represents, where i represents each point on the solution set and j represents the dimension of the target space.
[0144] S53, normalization processing:
[0145]
[0146] Where: w j is the weight of the jth attribute, that is, the weight of each target.
[0147] S54. Calculate comprehensive evaluation parameters:
[0148]
[0149] 0 <Y i <1, Y i The closer it is to 1, the better the evaluated solution is.
[0150] The following is an example of 13 cities in the Shandong water receiving area of the Yellow River Basin. The water resources efficient and balanced allocation method suitable for high-dimensional and multi-objective water resources is used to allocate 7 billion m3 of water in the Yellow River in Shandong Province in the “87” water allocation plan for the Yellow River Basin. 3 Efficient and balanced configuration is performed, among which the rigid and elastic water demand prediction results are shown in Table 2:
[0151] Table 2 Prediction results of rigid and elastic water demand (unit: 10,000 m 3 )
[0152]
[0153] Based on the above prediction results, the optimal state of five different goals, namely, maximizing economic benefits, minimizing water shortage in social systems, minimizing water shortage in ecosystems, balancing between cities, and balancing between different water users in cities, and the best compromise solution with the highest comprehensive score, were focused on, and the results of the configuration schemes were analyzed. The TOPSIS scoring results are shown in Figure 4 and Table 3, and the configuration schemes are shown in Tables 4 to 9.
[0154] Table 3 Target values of the Yellow River Shandong high-efficiency balance scheme
[0155]
[0156] Table 4 Scheme 1: Efficient and balanced allocation scheme focusing on economic benefits
[0157]
[0158] Table 5 Scheme 2: Efficient and balanced allocation scheme focusing on social benefits
[0159]
[0160] Table 6 Scheme 3: Efficient and balanced allocation scheme focusing on ecological benefits
[0161]
[0162]
[0163] Table 7 Scheme 4: Focus on balanced and efficient allocation among 13 cities
[0164]
[0165] Table 8 Scheme 5: Focus on balanced and efficient allocation among different water users in 13 cities
[0166]
[0167] Table 9 Solution 6: Best compromise solution for efficient and balanced configuration
[0168]
[0169]
[0170] The specific analysis process of the high-dimensional and multi-objective water resources efficient and balanced allocation results in the Yellow River receiving area of Shandong Province is as follows:
[0171] The TOPSIS decision-making comprehensive score of Scheme 1 is 0.5023. The water shortage rates of life, industry, agriculture, and ecology are 0.50%, 2.30%, 2.77%, and 1.66%, respectively. The ecological water shortage rate is the highest among the six schemes, and the industrial water shortage rate is the lowest among the six schemes. This scheme has the greatest economic benefits from the Yellow River water resources. The allocation of water resources among different water users in 13 cities is the most unbalanced, and the allocation of water resources among 13 cities is the most unbalanced. The scheme focuses on economic benefits.
[0172] The TOPSIS decision-making comprehensive score of Scheme 2 is 0.6110. The water shortage rates of life, industry, agriculture, and ecology are 0.48%, 2.37%, 2.80%, and 1.50%, respectively. The water shortage rate of life is the lowest among the six schemes. The economic benefits of the Yellow River water resources in this scheme are second only to those in Scheme 1, and this scheme focuses on social benefits.
[0173] The TOPSIS decision-making comprehensive score of Scheme 3 is 0.5446, the lowest score among the six schemes. The water shortage rates of life, industry, agriculture, and ecology are 0.50%, 2.53%, 2.83%, and 1.16% respectively. The ecological water shortage rate is the lowest among the six schemes, and the agricultural water shortage rate is the lowest among the six schemes. The overall water shortage of life, industry, and agriculture is the largest, and this scheme focuses on ecological benefits.
[0174] The TOPSIS decision-making comprehensive score of Scheme 4 is 0.4737. The water shortage rates of life, industry, agriculture, and ecology are 0.58%, 2.53%, 2.74%, and 1.31%, respectively. The water shortage rate of life is the highest among the six schemes, and the water shortage rate of agriculture is the lowest among the six schemes. At this time, the economic benefit is the smallest, and the value of Target 4 is the smallest, focusing on the balance between the allocation of water resources in 13 cities.
[0175] The TOPSIS decision-making comprehensive score of Scheme 5 is 0.5361. The water shortage rates of life, industry, agriculture, and ecology are 0.50%, 2.53%, 2.78%, and 1.31%, respectively. The industrial water shortage rate is the highest among the six schemes. The value of Target 5 is the smallest, focusing on the balance between the allocation of water resources of different water users within the 13 cities.
[0176] Scheme 6 is the best compromise solution, which focuses on each goal. The TOPSIS decision-making comprehensive score is 0.6795, which is the highest among all the solutions (i.e. Figure 4The water shortage rates of life, industry, agriculture, and ecology are 0.50%, 2.42%, 2.80%, and 1.40%, respectively. The water shortage rate of life is the lowest among the six options. The five target values of this option are all close to the single optimal target value, and the effect of efficient and balanced configuration is obvious. The best compromise option is the best efficient and balanced configuration option among all the options in this scenario.
[0177] Emphasis on one of the five goals (such as improving economic benefits, reducing ecological water shortage, etc.) is at the expense of other goals (such as increasing the balanced Gini coefficient of water distribution among the 13 cities, etc.). The best compromise solution can achieve this effect by comprehensively considering the efficient use of water resources and the balance between all goals.
[0178] Embodiment 2
[0179] In one embodiment of the present disclosure, a water resource balance configuration system suitable for multiple objectives is provided, including an acquisition module, a prediction module, a construction module and a solution module:
[0180] The acquisition module is configured to: acquire historical data of the area to be configured, the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user;
[0181] The prediction module is configured to: predict the water demand of each water user based on the water demand influencing factors, water quotas, and water consumption in historical data by using a neural network combined with Maslow's hierarchy of needs theory;
[0182] The construction module is configured to: construct a multi-objective water resource allocation model based on the water demand and water supply of each water user, so as to predict the water supply configured by the water supply source for each water user;
[0183] A solution module is configured to: solve the multi-objective water resource allocation model, obtain a non-inferior solution set under multi-objective optimization, and select the best configuration scheme from the non-inferior solution set;
[0184] The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
[0185] Embodiment 3
[0186] The purpose of this embodiment is to provide a computer-readable storage medium.
[0187] A computer-readable storage medium stores a computer program, which, when executed by a processor, implements the steps in a water resource balanced configuration method applicable to multiple objectives as described in Embodiment 1 of the present disclosure.
[0188] Embodiment 4
[0189] The purpose of this embodiment is to provide an electronic device.
[0190] An electronic device includes a memory, a processor, and a program stored in the memory and executable on the processor. When the processor executes the program, the steps in a water resource balance configuration method applicable to multiple objectives as described in Embodiment 1 of the present disclosure are implemented.
[0191] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the protection scope of the present invention.
Claims
1. A water resource balance configuration method suitable for multiple objectives, characterized in that: include: Acquire historical data of the area to be configured, the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user; Based on the water demand influencing factors, water quotas, and water consumption in historical data, neural networks are used in combination with Maslow's hierarchy of needs theory to predict the water demand of each water user. Based on the water demand and water supply of each water user, a multi-objective water resource allocation model is constructed to predict the water supply allocated by the water supply source to each water user. Solving the multi-objective water resources allocation model, obtaining a non-inferior solution set under multi-objective optimization, and selecting the best allocation scheme from the non-inferior solution set; The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
2. A water resource balanced allocation method applicable to multiple objectives as claimed in claim 1, characterized in that: The water demand of each water user is predicted as follows: Based on neural network, a GA-BP water demand prediction model is established, and the model is trained using historical data to predict the water demand of each water user. Based on Maslow's hierarchy of needs theory, the principle of water demand division is determined, and the water demand of each water user is predicted through the trained GA-BP model, including rigid water demand and elastic water demand.
3. A water resource balanced allocation method applicable to multiple objectives as claimed in claim 1, characterized in that: The objective function is constructed with economic benefits, social benefits, ecological benefits, spatial balance and water-use subject balance as multiple objectives, specifically: The goal of economic benefits is to maximize the overall comprehensive economic benefits of the area to be allocated; The social benefit goal is to minimize the total water shortage in the area to be allocated; The goal of ecological benefit is to minimize the overall ecological water shortage in the area to be allocated; The goal of spatial balance is to minimize the Gini coefficient of water supply in each water receiving area; The goal of balancing water users is to minimize the sum of the water supply Gini coefficients of each water receiving area.
4. A water resource balanced allocation method applicable to multiple objectives as claimed in claim 1, characterized in that: The constraints include water supply constraints, water demand constraints and non-negative constraints.
5. The water resource balanced allocation method applicable to multiple objectives as claimed in claim 1, characterized in that: The NSGA-I II algorithm is used to solve the multi-objective water resources allocation model and obtain the Pareto non-inferior solution set under multi-objective optimization; The TOPSIS method is used to select the best configuration plan from the Pareto non-inferior solution set.
6. A water resource balanced allocation method applicable to multiple objectives as claimed in claim 5, characterized in that: The NSGA-III algorithm is used to solve the multi-objective water resources allocation model, and the specific steps are as follows: (1) Initialize the population; (2) generating offspring; (3) Merging populations; (4) non-dominated sorting; (5) Select an operation; (6) Reference point selection; (7) Repeat steps (2) to (6) until the algorithm reaches the maximum number of iterations and obtains the Pareto non-inferior solution set.
7. A water resource balanced allocation method applicable to multiple objectives as claimed in claim 5, characterized in that: The TOPSIS method is used to select the best configuration solution in the Pareto non-inferior solution set, specifically: Indicators are aligned; Matrix normalization; Normalization processing; Calculate comprehensive evaluation parameters; Based on the comprehensive evaluation parameters, the best configuration scheme is selected.
8. A water resource balance configuration system suitable for multiple objectives, characterized in that: Including acquisition module, prediction module, construction module and solution module: The acquisition module is configured to: acquire historical data of the area to be configured, the area to be configured includes multiple water receiving areas, each water receiving area includes multiple water users, and the historical data includes water demand influencing factors, water quotas, water consumption and water supply of each water user; The prediction module is configured to: predict the water demand of each water user based on the water demand influencing factors, water quotas, and water consumption in historical data, using a neural network combined with Maslow's hierarchy of needs theory; The construction module is configured to: construct a multi-objective water resource allocation model based on the water demand and water supply of each water user, so as to predict the water supply configured by the water supply source for each water user; A solution module is configured to: solve the multi-objective water resource allocation model, obtain a non-inferior solution set under multi-objective optimization, and select the best configuration scheme from the non-inferior solution set; The multi-objective water resource allocation model is constructed by taking economic benefits, social benefits, ecological benefits, spatial balance and water user balance as multiple objectives, constructing an objective function and adding constraints.
9. An electronic device, comprising: a memory for non-transitory storage of computer readable instructions; a processor for executing the computer-readable instructions; Wherein, when the computer-readable instructions are executed by the processor, the method according to any one of claims 1 to 7 is executed.
10. A storage medium, characterized in that: The computer-readable instructions are non-transitorily stored, wherein when the computer-readable instructions are executed by a computer, the method of any one of claims 1 to 7 is performed.
Citation Information
Patent Citations
BP neural network interval water demand prediction method
CN107886160A
Multi-target dynamic water resource optimal configuration method based on improved NSGA III algorithm
CN116796951A
Multi-target water resource allocation method, device and equipment and storage medium
CN117034611A
Optimal allocation method of complex water resource system based on "zoning-grading" theory
US20220092238A1
Cited By
Comprehensive analysis scheduling method based on water supply area data of water affair industry
CN119962890A
