Construction project safety risk intelligent assessment system

Through the intelligent assessment system for safety risk of construction projects, the construction environment and the physical status of personnel are analyzed, and personalized construction deployment optimization is provided, which solves the problem of insufficient effectiveness of personalized assessment and risk assessment in the existing technology, and improves construction safety and The scientific nature of resource allocation.

CN119047841AInactive Publication Date: 2024-11-29WUXI HENGXIN SECURITY TECHNOLOGY SERVICES CO LTD

Patent Information

Application Number
CN202411248503.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-06
Publication Date
2024-11-29
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The safety risk assessment of existing construction projects mainly focuses on the project level, lack of personalized assessment, and the unique risk factors of construction personnel and specific job positions are not fully considered, resulting in insufficient effectiveness of risk assessment and the inability to effectively reduce the impact of construction occupational diseases.

Method used

An intelligent assessment system for safety risk of construction projects was designed, including project construction information import module, construction record data import module, construction safety risk analysis module, database, construction deployment risk assessment module and construction deployment setting optimization module, through analysis of construction environment interference Trend and physical condition interference provide personalized construction deployment optimization information to ensure the safety of construction personnel.

Benefits of technology

Achieve a comprehensive assessment and identification of potential risks in the construction area, improve the reliability of risk assessment, enhance the accuracy of subsequent operation deployment and rationality of planning, reduce the impact of construction occupational diseases, and ensure the scientific allocation of construction resources. and normative.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047841A_ABST
    Figure CN119047841A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of project safety risk assessment, and particularly discloses a construction project safety risk intelligent assessment system. The system comprises a project construction information import module, a construction record data import module, a construction safety risk analysis module, a database, a construction deployment risk assessment module, a construction deployment setting optimization module and a construction deployment optimization feedback terminal. The construction risk analysis is performed according to the basic information of the to-be-constructed project and the construction record data of the reference construction project, the construction safety deployment index is confirmed, and the construction deployment risk assessment is performed, so that the defect of lack of personalized assessment at present is effectively overcome; according to the method, the construction body potential safety hazards and unique risk factors of the personnel in each construction area are fully considered, then the potential risks of different construction areas are fully evaluated and identified, and meanwhile, by confirming the deployment optimization information of the current to-be-constructed project, the construction operation safety deployment is more normative.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of project safety risk assessment, and in particular, relates to an intelligent assessment system for construction project safety risks. Background Art

[0002] With the rapid development of the economy, the scale of construction projects continues to expand, the technical difficulty continues to increase, and the fields involved are becoming more and more extensive, such as energy, transportation, water conservancy, chemical industry, etc. Construction project safety risk assessment is an important link to ensure the safety of personnel and the smooth progress of the project during the construction period, which highlights the importance and necessity of its safety risk assessment.

[0003] Prior art, such as a Chinese invention patent application with application publication number CN113627735A, discloses an early warning method and system for safety risks of engineering construction projects. The early warning method collects and processes sample data of engineering construction projects, thereby avoiding the interference of erroneous data on the risk prediction process, and making the sample data accurate and reliable. On this basis, the present invention constructs a time series model for single-factor short-term prediction, and constructs a support vector machine model optimized by a particle swarm optimization algorithm for multi-factor system prediction, forming a hierarchical early warning model for safety risks of engineering construction projects, thereby comprehensively and effectively predicting and warning safety risks of engineering construction projects, thereby providing effective response plans while providing efficient early warning of risks to meet the needs of practical applications.

[0004] Regarding the above technical solutions, it is obvious that the current safety risk assessment of construction projects mainly focuses on the project itself or the related risks during the implementation of the project, such as the safety risk of the construction progress, and there is still a certain lack of attention to the safety risks of construction personnel, which is specifically reflected in the following aspects: 1. Lack of personalized assessment: Existing safety warnings may rely more on project-level data and fail to fully consider the unique risk factors of each worker or specific job position. This means that some risks specific to individuals or specific work areas may not be fully identified and assessed.

[0005] 2. There are certain deficiencies in the effectiveness of risk assessment. Currently, it has not been combined with the impact on the human body to conduct targeted environmental risk monitoring, which makes the subsequent work deployment less accurate and targeted. It will also lead to the rationality and reliability of the layout and planning requirements of subsequent projects, and it is also impossible to minimize the impact of construction occupational diseases. Summary of the invention

[0006] In view of this, in order to solve the problems raised in the above background technology, a construction project safety risk intelligent assessment system is proposed.

[0007] The purpose of the present invention can be achieved through the following technical solutions: The present invention provides an intelligent assessment system for safety risks of construction projects, including: a project construction information import module, used to import the basic information of the current project to be constructed, including project type, personnel construction plan and expected construction period.

[0008] The construction record data import module is used to record the constructed projects that are consistent with the current project type as reference construction projects and import the construction record data of the reference construction projects.

[0009] The construction safety risk analysis module is used to conduct construction risk analysis and confirm construction safety deployment indicators based on the analysis results.

[0010] The database is used to store the interference environment parameters and safety values ​​of the interference environment parameters corresponding to each construction area, store the interfering body parts of each interference environment parameter, and store the appropriate index value range of each physical examination index corresponding to each physical examination part.

[0011] The construction deployment risk assessment module is used to assess whether there is a construction risk. If there is a construction risk, the construction deployment setting optimization module is started; otherwise, the construction deployment risk assessment result is output.

[0012] The construction deployment setting optimization module is used to confirm the deployment optimization information of the current project to be constructed based on the construction safety deployment indicators.

[0013] The construction deployment optimization feedback terminal is used to feed back the deployment optimization information of the current project to be constructed that does not have construction risks or the current project to be constructed to the construction management personnel of the current project to be constructed.

[0014] Compared with the prior art, the beneficial effects of the present invention are as follows: (1) The present invention effectively solves the current lack of personalized assessment by conducting construction risk analysis based on the basic information of the project to be constructed and the construction record data of the reference construction project, confirming the construction safety deployment indicators and conducting construction deployment risk assessment, and fully considers the physical safety hazards and unique risk factors of personnel in each construction area, and then fully assesses and identifies the potential risks in different construction areas, making the risk assessment more reliable.

[0015] (2) The present invention conducts construction risk analysis by analyzing the trend of construction environment interference, which effectively solves the problem of the lack of effectiveness of current risk assessment, fully considers the impact on the health of construction workers, and realizes targeted environmental risk monitoring, thereby providing effective assistance for the accuracy and targeting of subsequent work deployment, thereby improving the rationality and reliability of the layout and planning requirements of subsequent projects, and also reduces the impact of construction occupational diseases as much as possible.

[0016] (3) The present invention can ensure that the exposure time of construction personnel in harmful working environments is set more reasonably and accurately by confirming the deployment optimization information of the current project to be constructed when there is a construction risk, thereby making the safe deployment of construction operations more scientific and standardized, and also providing a clear direction for the optimization of construction resource allocation. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the accompanying drawings required for describing the embodiments will be briefly introduced below. Obviously, the accompanying drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other accompanying drawings can be obtained based on these accompanying drawings without paying creative work.

[0018] Figure 1 This is a schematic diagram of the connection of the system modules of the present invention.

[0019] Figure 2 It is a schematic diagram of the overall process of the present invention. DETAILED DESCRIPTION

[0020] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0021] See also Figure 1 and Figure 2 As shown, the present invention provides an intelligent assessment system for safety risks of construction projects, which includes: a project construction information import module, a construction record data import module, a construction safety risk analysis module, a database, a construction deployment risk assessment module, a construction deployment setting optimization module and a construction deployment optimization feedback terminal.

[0022] In the above, the construction record data import module is respectively connected to the project construction information import module and the construction safety risk analysis module, the construction safety risk analysis module is respectively connected to the database and the construction deployment risk assessment module, the construction deployment risk assessment module is also respectively connected to the project construction information import module, the database and the construction deployment optimization feedback terminal, and the construction deployment setting optimization module is also connected to the construction deployment optimization feedback terminal.

[0023] The project construction information import module is used to import the basic information of the current project to be constructed, including the project type, personnel construction plan and estimated construction period.

[0024] Specifically, the personnel construction plan includes, but is not limited to, the planned number of construction personnel to be placed in each construction area and the corresponding single continuous operation duration set for each construction area.

[0025] The construction record data importing module is used to record a constructed project that is consistent with the current project type as a reference construction project and import the construction record data of the reference construction project.

[0026] Specifically, the construction record data includes but is not limited to the construction data of each construction worker, wherein the construction data includes the construction area, the construction log of each construction day and the physical examination data of each physical examination day.

[0027] Among them, the construction log records information such as the duration of a single continuous operation and the monitoring values ​​of various interference environment parameters at each construction time point, and the physical examination data includes the index values ​​of each body part corresponding to each physical examination index.

[0028] The construction safety risk analysis module is used to perform construction risk analysis and confirm construction safety deployment indicators based on the analysis results.

[0029] Specifically, the construction risk analysis includes: S1, locating the construction data of each construction worker from the construction record data, including the construction area, the construction log of each construction day and the physical examination data of each physical examination day.

[0030] S2. Extracting various interference environment parameters of the construction area corresponding to each construction worker from the database, and confirming the interference location that each construction worker tends to be.

[0031] S3. Extract the monitoring values ​​of each interference environment parameter at each construction time point from the construction log of each construction day, and analyze the construction environment interference trend of each construction worker on each construction day, recorded as β it , i represents the construction worker number, i=1,2,......n, t represents the construction day number, t=1,2,......m.

[0032] S4, grouping each physical examination day into a physical examination cycle, extracting the index value of each physical examination index corresponding to the interference position from the physical examination data, and analyzing the interference degree of the physical state of each construction worker in each physical examination cycle, recorded as δ ij , j represents the physical examination cycle number, j = 1, 2, ... q, β it and δ ij As the analysis result of construction risk analysis.

[0033] Furthermore, the step S2 of confirming the interfering body parts of each construction worker includes: extracting the interfering body parts of each construction worker corresponding to each interfering environmental parameter in the construction area from the database.

[0034] The interference environment parameters of the same interfering body part are integrated, the number of interference environment parameters of each interfering body part is counted, and the interfering body part with the largest number of interference environment parameters is taken as the tendency interference part of each construction worker.

[0035] Furthermore, in step S3, the construction environment interference tendency of each construction worker on each construction day is analyzed, including: S31, extracting the safety value of each interference environment parameter from the database.

[0036] S32. Filter out the maximum monitoring value from the monitoring values ​​of each interference environment parameter at each construction time point on each construction day as the target monitoring value of each interference environment parameter.

[0037] S33, calculating the difference between the target monitoring value and the safety value of the same interference environment parameter, and recording the interference environment parameter with a difference greater than 0 as the confirmed interference environment parameter.

[0038] S34. Count the number of environmental interference parameters confirmed by each construction worker on each construction day, and compare them with the number of environmental interference parameters, and record the ratio as k. it .

[0039] The difference between each construction worker and each confirmed interference environment parameter on each construction day is recorded as △Z itr , r represents the confirmed interference environment parameter number, r=1,2,......u.

[0040] S35. Calculate the construction environment interference tendency β of each construction worker on each construction day it , k′ is the ratio of the number of interference environment parameters set as reference, △Z r ′ is the reference deviation value of the rth confirmed interference environment parameter, u represents the number of confirmed interference environment parameters, d0 and d1 represent the weights of the interference environment parameter number ratio and the interference environment parameter difference respectively, and d0+d1=1.

[0041] It should be added that the interference environment parameter number ratio refers to the ratio of the number of interference environment parameters in an abnormal state to the total number of all monitored interference environment parameters on a certain construction day. If there are more interference environment parameters in an abnormal state on a construction day, it means that the construction environment on that day is relatively bad and has a greater impact on the construction personnel. The difference of interference environment parameters refers to the difference between the actual measured value of a certain interference environment parameter and the safe value of the parameter. The larger the parameter difference, the higher the degree of deviation of the parameter from the safe range, and the greater the potential threat to the construction personnel. Therefore, the construction environment interference trend degree analysis is carried out from two aspects: the interference environment parameter number ratio and the difference of interference environment parameters.

[0042] In a specific embodiment, the number ratio reflects how many types of interference environment parameters exceed the safety threshold. It means the overall severity of the environment. The difference reflects the degree to which a certain parameter deviates from the safety standard. Even if only one parameter exceeds the standard by a large amount, it may pose a major threat to the health or safety issues involved in the parameter, that is, it reflects the severity. Therefore, the value of d1 is set to be greater than the value of d0. For example, d1 can be 0.6 and d0 can be 0.4.

[0043] It should also be added that the specific value of the reference interference environment parameter number ratio can be 0.3, and for example, assuming that the confirmed interference environment parameter is temperature, the reference deviation value of the confirmed interference environment parameter can be 5°C, assuming that the confirmed interference environment parameter is noise decibels, the reference deviation value of the confirmed interference environment parameter can be 5dB.

[0044] In a specific embodiment, assuming that the interference site of a construction worker is the respiratory system, the physical examination indicators involved are blood oxygen saturation, lung function test and inflammatory markers in the blood, the inflammatory markers in the blood are specifically represented by C-reactive protein, and the lung function test is specifically represented by FEV1 / FVC, wherein the appropriate index value range of blood oxygen saturation is 95%-100%, the appropriate index value range of FEV1 / FVC is >70%, and the appropriate index value range of C-reactive protein is <3mg / L. The physical examination data within a certain physical examination cycle are shown in Table 1.

[0045] Table 1 Physical examination data table

[0046]

[0047] From the data in Table 1, it can be seen that all indicators of the construction worker were within the appropriate range on the initial physical examination day, indicating that the physical condition was good. However, on the final physical examination day, the C-reactive protein in the blood was slightly increased, indicating that there may be a certain degree of health problems. Therefore, according to the physical condition interference degree analysis method of the present invention, it can be analyzed that the physical condition of the construction worker during the physical examination period is disturbed.

[0048] When performing construction risk analysis, the embodiment of the present invention performs construction environment interference trend analysis, effectively solving the problem of the lack of effectiveness of current risk assessment, fully considering the impact on the health of construction personnel, and realizing targeted environmental risk monitoring, thereby providing effective assistance for the accuracy and targeting of subsequent work deployment, thereby improving the rationality and reliability of the layout and planning requirements of subsequent projects, and also reducing the impact of construction occupational diseases as much as possible.

[0049] Furthermore, step S4 analyzes the interference degree of the physical condition of each construction worker in each physical examination cycle, including: S41, extracting the appropriate index value interval corresponding to each physical examination index of the tendency interference position from the database, and marking the physical examination index whose index value is within the appropriate index value interval as a matching index.

[0050] S42. Sort the physical examination days within the physical examination cycle by time, record them as the start date and the end date respectively, and count the number of matching indicators between the start date and the end date.

[0051] S43. For each physical examination index, if the index is a matching index, its index value difference is recorded as 0; otherwise, the difference between the physical examination index value and its appropriate index value interval is calculated, and the absolute value of the difference is taken as the index value difference.

[0052] It should be added that if the index value of a physical examination index exceeds the upper limit of the corresponding appropriate index value interval, the difference between the index value of the physical examination index and the upper limit of its appropriate index value interval is calculated; if the index value of a physical examination index is lower than the lower limit of the corresponding appropriate index value interval, the difference between the index value of the physical examination index and the lower limit of its appropriate index value interval is calculated.

[0053] S44, record the number of matching indicators of each construction worker on the starting day and the ending day of each physical examination cycle as B ij and B′ ij .

[0054] S45. The difference between the index values ​​of each physical examination index of each construction worker on the starting physical examination day and the ending physical examination day in each physical examination cycle is recorded as △E ijy and △E′ ijy , y represents the physical examination index number, y=1,2,......g.

[0055] S46. Count the physical condition interference degree δ of each construction worker in each physical examination cycle ij , △B is the difference in the number of matching indicators set as the reference, △E′ y ′ is the reference index value difference of the set yth physical examination index, It represents the rounding down symbol, e is a natural constant, and g is the number of physical examination indicators.

[0056] It should be added that the statistical formula of body state interference is based on the exponential regression function. The purpose is to reduce the value range of numerical calculations to facilitate subsequent comparisons and mean calculations. That is, min(·,1) in the formula limits the output value of the exponential regression function to no more than 1. It also helps to ensure the stability of the calculation results and avoid numerical overflow problems caused by the rapid growth of the exponential function.

[0057] In a specific embodiment, for the convenience of analysis, ΔB can be taken as 1, ΔE′ y 'It is usually derived based on a large amount of data from healthy people. For example, assuming that the physical examination indicator is blood oxygen saturation, the reference indicator value difference of blood oxygen saturation can be 2%. Assuming that the physical examination indicator is FEV1 / FVC, the reference indicator value difference of FEV1 / FVC can be 1.5%.

[0058] In another specific embodiment, the construction safety deployment index is confirmed according to the analysis result, including: F1. If a construction day is within a physical examination cycle, the construction day is used as an associated construction day of the physical examination cycle.

[0059] F2. Count the number of days with a construction environment interference tendency greater than 0 among all related construction days, record them as the number of interference construction days, and calculate the ratio of the number of interference construction days to the number of related construction days as the construction environment interference factor.

[0060] F3. If the physical condition interference value of a construction worker in a physical examination period is greater than 0 and the construction interference factor is greater than the set reference value, the construction worker is recorded as an analysis worker and the physical examination period is recorded as an analysis period.

[0061] It should be added that the reference value of the construction interference factor can be set to 0.3.

[0062] F4. Compare the construction areas of each analyst, integrate the analysts in the same construction area, and set the construction safety deployment correction factor for each construction area.

[0063] F5. Extract the duration of a single continuous operation from the construction log.

[0064] F6. Calculate the average single continuous operation duration of each analyst in each construction area during the analysis period, and correct the average single continuous operation duration based on the construction safety deployment correction factor to obtain the corresponding safe single continuous operation duration for each construction area.

[0065] It should be added that the corrected single continuous operation duration = average single continuous operation duration × construction safety deployment correction factor.

[0066] It should also be added that calculating the average single continuous working time of each analyst in each construction area during the analysis period refers to calculating the average of the single continuous working time of each analyst in each construction area corresponding to each related construction day in each analysis period, thereby obtaining the average single continuous working time in each construction area.

[0067] Furthermore, in step F4, a construction safety deployment correction factor is set for each construction area, including: F41, with the analysis period as the horizontal coordinate and the physical state interference degree as the vertical coordinate, a physical state interference degree curve of each analyst is drawn, and the slope is extracted therefrom and recorded as the interference change rate.

[0068] F42. Calculate the mean of the single continuous working time of each analyst on each related construction day to obtain the reference continuous working time of each analysis period. Use the analysis period as the horizontal axis and the reference continuous working time as the vertical axis to draw the working time change curve of each analyst. For each curve, extract its slope as the working time change rate.

[0069] F43. For the same analyst in the same construction area, calculate the difference between his interference change rate and operation duration change rate, and record the analyst whose difference is less than the set reference change rate difference as a matching analyst.

[0070] It should be added that the reference change rate difference is set based on the correlation between the corresponding development trends of the interference change rate and the operation time change rate. The reference change rate difference is a reasonable threshold that can reflect the relationship between the interference degree of the employee's physical condition and the change trend of the operation time. Several factors need to be considered at the same time, including but not limited to the standards of the construction industry, employee health and safety regulations, etc. The specific value of the reference change rate difference needs to be determined according to the actual situation. Usually, 0.05 to 0.2 is a common choice. Assuming that there are more health problems or older employees in the employee group, the reference change rate difference is set to a specific value of 0.1. Assuming that there are fewer health problems in the employee group and the age tends to be young, the reference change rate difference is set to a specific value of 0.15.

[0071] It should also be added that the specific value of the reference change rate difference should be set by professional safety managers or engineers based on the specific circumstances of the project, and can be adjusted accordingly based on the actual situation of the specific project. The data given in the present invention are only example data and can be flexibly adjusted according to specific needs.

[0072] F44. Count the number of matching personnel in each construction area and compare it with the number of analysis personnel. The ratio is recorded as k′ f ″, f represents the construction area number, f=1,2,......x, calculate the construction safety deployment correction factor η of each construction area f ,

[0073] It should be added that the interference change rate and the operation time change rate both refer to the slope of the regression line to which the corresponding curve belongs, and the slope reflects the development trend. The closer the slope is, the more consistent the development trend is, that is, the higher the correlation between the operation time and the degree of physical condition interference, the greater the demand for reducing the operation time, that is, the smaller the construction safety deployment correction factor, so the slope parameter is selected for construction safety deployment correction factor analysis.

[0074] For example, suppose we have two construction areas A and B. The number of matching personnel in area A is 10, and the number of analysts is 10, that is, the ratio of the number of matching personnel to the number of analysts is 1.

[0075] The number of matching personnel in area B is 4, and the number of analysts is 8, that is, the ratio of the number of matching personnel to the number of analysts is 0.5.

[0076] For area A, the construction safety deployment correction factor For area B, the construction safety deployment correction factor

[0077] The construction deployment risk assessment module is used to assess whether there is a construction risk. If there is a construction risk, the construction deployment setting optimization module is started; otherwise, the construction deployment risk assessment result is output.

[0078] Specifically, evaluating whether there is a construction risk includes: R1, extracting the number of construction days and the number of construction personnel placed in each construction area from the construction record data.

[0079] R2. Extract the number of planned construction personnel for each construction area from the personnel construction plan of the current project to be constructed. At the same time, based on the preset construction period, count the preset construction days, and calculate the construction similarity between the current project to be constructed and the reference construction project through the similarity measurement algorithm.

[0080] It should be added that similarity measurement algorithms include Jaccard similarity coefficient and Pearson correlation coefficient, etc. For example, in order to facilitate analysis, the Jaccard similarity coefficient can be used for calculation, that is, the construction days and the number of resettled construction personnel corresponding to each construction area can form a reference data set, and the preset construction days and the planned number of resettled construction personnel corresponding to each construction area can form a planned data set. The Jaccard similarity coefficient is used to calculate the construction similarity between the current project to be constructed and the reference construction projects. Among them, the Jaccard similarity coefficient is a relatively mature algorithm currently available, and its specific calculation formula will not be supplemented and displayed.

[0081] R3. If the construction similarity is less than the set value, the absence of construction risk is taken as the evaluation result. Otherwise, the evaluation conditions are defined.

[0082] The evaluation conditions are defined, including: extracting the corresponding single continuous operation duration of each construction area from the personnel construction plan, and extracting the corresponding safe single continuous operation duration of each construction area from the construction safety deployment indicators.

[0083] The evaluation condition is that the corresponding single continuous operation duration of the construction area is set to be longer than its safe single continuous operation duration, and the difference between the single continuous operation duration and the safe single continuous operation duration is outside the set range.

[0084] R4. If the assessment conditions are met, the existence of construction risk will be taken as the assessment result, otherwise the non-existence of construction risk will be taken as the assessment result.

[0085] The embodiment of the present invention effectively solves the current lack of personalized assessment by performing construction risk analysis based on the basic information of the project to be constructed and the construction record data of the reference construction project, confirming the construction safety deployment indicators and conducting construction deployment risk assessment, and fully considers the physical safety hazards and unique risk factors of personnel in each construction area, and then fully assesses and identifies the potential risks in different construction areas, making the risk assessment more reliable.

[0086] The construction deployment setting optimization module is used to confirm the deployment optimization information of the current project to be constructed based on the construction safety deployment index.

[0087] Specifically, confirming the deployment optimization information of the current project to be constructed includes: recording the construction area that meets the evaluation conditions as the deployment optimization area.

[0088] The corresponding single continuous operation duration and safe single continuous operation duration of each deployment optimization area are recorded as T p and T p ′, and the average construction similarity is recorded as τ, p represents the number of the deployment optimization area, p = 1, 2, ... h.

[0089] Calculate the corrected setting single continuous operation duration T for each deployment optimization area p =T p -(T p -T p ′)*τ.

[0090] Each deployment optimization area and the single continuous operation duration of the correction setting of each deployment optimization area are used as the deployment optimization information of the current project to be constructed.

[0091] It should be added that when the similarity with the reference construction project is not high, there will be certain errors in the analysis using the safe single continuous operation time of the reference construction project, so it is corrected according to the average construction similarity.

[0092] The embodiment of the present invention can ensure that the exposure time of construction personnel in harmful working environments is set more reasonably and accurately by confirming the deployment optimization information of the current project to be constructed when there is a construction risk, thereby making the safe deployment of construction operations more scientific and standardized, and also providing a clear direction for the optimization of construction resource allocation.

[0093] The database is used to store the interference environment parameters and safety values ​​of the interference environment parameters corresponding to each construction area, store the interfering body parts of each interference environment parameter, and store the appropriate indicator value range of each physical examination indicator corresponding to each physical examination part.

[0094] Exemplarily, the construction area includes but is not limited to a concrete mixing area, an earth excavation area, and a welding operation area. The interference environmental parameters of the concrete mixing area include dust concentration, temperature, and humidity; the interference environmental parameters of the earth excavation area include noise decibels and dust concentration; and the interference environmental parameters of the welding operation area include welding smoke concentration and noise decibels.

[0095] As another example, the body part disturbed by temperature is the skin, the body part disturbed by dust concentration is the respiratory system, the body part disturbed by noise decibels is the auditory system, and the body part disturbed by welding smoke concentration is the eyes and respiratory system.

[0096] The construction deployment optimization feedback terminal is used to feed back the deployment optimization information of the current project to be constructed that does not have construction risks or the current project to be constructed to the construction management personnel of the current project to be constructed.

[0097] The above contents are merely examples and explanations of the concept of the present invention. Those skilled in the art may make various modifications or additions to the specific embodiments described or replace them in a similar manner. As long as they do not deviate from the concept of the invention or exceed the scope defined by the present invention, they shall all fall within the protection scope of the present invention.

Claims

1. A construction project safety risk intelligent assessment system, characterized in that: include: The project construction information import module is used to import the basic information of the current project to be constructed, including project type, personnel construction plan and estimated construction period; A construction record data import module is used to record a constructed project that is consistent with the current project type as a reference construction project and import the construction record data of the reference construction project; The construction safety risk analysis module is used to conduct construction risk analysis and confirm construction safety deployment indicators based on the analysis results; A database for storing the interference environment parameters and safety values ​​of the interference environment parameters corresponding to the construction areas, storing the interference body parts of the interference environment parameters, and storing the appropriate index value intervals of the physical examination indicators corresponding to the physical examination parts; The construction deployment risk assessment module is used to assess whether there is a construction risk. If there is a construction risk, the construction deployment setting optimization module is started; otherwise, the construction deployment risk assessment result is output; The construction deployment setting optimization module is used to confirm the deployment optimization information of the current project to be constructed based on the construction safety deployment indicators; The construction deployment optimization feedback terminal is used to feed back the deployment optimization information of the current project to be constructed that does not have construction risks or the current project to be constructed to the construction management personnel of the current project to be constructed.

2. The intelligent safety risk assessment system for construction projects according to claim 1, characterized in that: The construction risk analysis includes: Locating the construction data of each construction worker from the construction record data, including the construction area, the construction log of each construction day, and the physical examination data of each physical examination day; Extract the interference environment parameters of the construction area corresponding to each construction worker from the database to confirm the interference location of each construction worker; The monitoring values ​​of each interference environment parameter at each construction time point are extracted from the construction log of each construction day, and the interference tendency of the construction environment of each construction worker on each construction day is analyzed, which is recorded as β it , i represents the construction worker number, i=1,2,......n, t represents the construction day number, t=1,2,......m; In pairs, each physical examination day is grouped into a physical examination cycle. The index value of each physical examination index corresponding to the interference position is extracted from the physical examination data. The interference degree of the physical state of each construction worker in each physical examination cycle is analyzed, which is recorded as δ ij , j represents the physical examination cycle number, j = 1, 2, ... q, β it and δ ij As the analysis result of construction risk analysis.

3. A construction project safety risk intelligent assessment system as claimed in claim 2, characterized in that: The identification of the interference location of each construction worker includes: Extracting the interfering body parts of each construction worker corresponding to each interfering environmental parameter in the construction area from the database; The interference environment parameters of the same interfering body part are integrated, the number of interference environment parameters of each interfering body part is counted, and the interfering body part with the largest number of interference environment parameters is taken as the tendency interference part of each construction worker.

4. A construction project safety risk intelligent assessment system as claimed in claim 2, characterized in that: The analysis of the construction environment interference tendency of each construction worker on each construction day includes: Extracting safety values ​​of various interference environment parameters from the database; The maximum monitoring value is selected from the monitoring values ​​of each interference environment parameter at each construction time point on each construction day as the target monitoring value of each interference environment parameter; The target monitoring value and the safety value of the same interference environment parameter are calculated for difference, and the interference environment parameter with a difference greater than 0 is recorded as the confirmed interference environment parameter; Count the number of environmental interference parameters confirmed by each construction worker on each construction day, and compare them with the number of environmental interference parameters, and record the ratio as k it ; The difference between each construction worker and each confirmed interference environment parameter on each construction day is recorded as △Z itr , r represents the confirmed interference environment parameter number, r=1,2,......u; Calculate the construction environment interference tendency β of each construction worker on each construction day it , k′ is the ratio of the number of interference environment parameters set as reference, △Z r ′ is the reference deviation value of the rth confirmed interference environment parameter, u represents the number of confirmed interference environment parameters, d0 and d1 represent the weights of the interference environment parameter number ratio and the interference environment parameter difference respectively, and d0+d1=1.

5. The intelligent assessment system for safety risks of construction projects as claimed in claim 2, characterized in that: The analysis of the interference degree of the physical condition of each construction worker in each physical examination cycle includes: Extracting appropriate index value intervals corresponding to various physical examination indexes of the tendency interference part from the database, and marking the physical examination indexes whose index values ​​are within the appropriate index value intervals as matching indexes; The physical examination days within the physical examination cycle are sorted by time, recorded as the start date and the end date respectively, and the number of matching indicators between the start date and the end date is counted; For each physical examination index, if the index is a matching index, its index value difference is recorded as 0; otherwise, the difference between the physical examination index value and its appropriate index value interval is calculated, and the absolute value of the difference is taken as the index value difference; The number of matching indicators of each construction worker on the starting day and the ending day of each physical examination cycle is recorded as B ij and B i ' j ; The difference between the starting and ending physical examination dates of each construction worker in each physical examination cycle is recorded as △E ijy and ∆E i ' jy , y represents the physical examination index number, y=1,2,......g; Statistical analysis of the physical condition interference degree δ of each construction worker during each physical examination period ij , △B is the difference in the number of matching indicators set as the reference, △E′ y ′ is the reference index value difference of the set yth physical examination index, It represents the rounding down symbol, e is a natural constant, and g is the number of physical examination indicators.

6. A construction project safety risk intelligent assessment system as claimed in claim 2, characterized in that: The construction safety deployment indicators confirmed according to the analysis results include: If a construction day falls within a physical examination cycle, the construction day will be regarded as the associated construction day of the physical examination cycle; The number of days with construction environment interference tendency greater than 0 among all related construction days is counted and recorded as the number of interference construction days. The ratio of the number of interference construction days to the number of related construction days is calculated as the construction environment interference factor. If the value of the physical state interference degree of a construction worker in a physical examination period is greater than 0 and the construction interference factor is greater than the set reference value, the construction worker is recorded as an analysis worker and the physical examination period is recorded as an analysis period; Compare the construction areas of each analyst, integrate the analysts in the same construction area, and set the construction safety deployment correction factor for each construction area; Extracting the duration of a single operation from the construction log; The average single continuous operation duration of each analyst in each construction area during the analysis period is calculated, and the average single continuous operation duration is corrected based on the construction safety deployment correction factor to obtain the corresponding safe single continuous operation duration of each construction area.

7. A construction project safety risk intelligent assessment system as claimed in claim 6, characterized in that: The setting of the construction safety deployment correction factor for each construction area includes: With the analysis period as the horizontal axis and the physical state interference degree as the vertical axis, the physical state interference degree curve of each analyst is drawn, and the slope is extracted from it and recorded as the interference change rate; Calculate the mean of the single continuous working time of each analyst on each related construction day to obtain the reference continuous working time of each analysis period. Draw the working time change curve of each analyst with the analysis period as the horizontal axis and the reference continuous working time as the vertical axis. For each curve, extract its slope as the working time change rate. For the same analyst in the same construction area, the difference between the interference change rate and the operation duration change rate is calculated, and the analyst whose difference is less than the set reference change rate difference is recorded as a matching analyst; Count the number of matching personnel corresponding to each construction area and compare it with the number of analysis personnel, and record the ratio as k′ f ″, f represents the construction area number, f=1,2,......x, calculate the construction safety deployment correction factor η of each construction area f , 8. The intelligent assessment system for safety risks of construction projects according to claim 1, characterized in that: The assessment of whether there are construction risks includes: Extracting the construction days and the number of resettled construction personnel corresponding to each construction area from the construction record data; Extract the number of planned construction personnel for each construction area from the personnel construction plan of the current project to be constructed, and based on the preset construction period, count the preset construction days, and calculate the construction similarity between the current project to be constructed and the reference construction project through a similarity measurement algorithm; If the construction similarity is less than the set value, the absence of construction risk is taken as the evaluation result, otherwise, the evaluation condition is defined; If the assessment conditions are met, the existence of construction risk will be taken as the assessment result, otherwise the non-existence of construction risk will be taken as the assessment result.

9. A construction project safety risk intelligent assessment system as claimed in claim 8, characterized in that: The defined evaluation conditions include: Extract the corresponding single continuous operation duration of each construction area from the personnel construction plan, and extract the corresponding safe single continuous operation duration of each construction area from the construction safety deployment indicators; The evaluation condition is that the corresponding single continuous operation duration of the construction area is set to be longer than its safe single continuous operation duration, and the difference between the single continuous operation duration and the safe single continuous operation duration is outside the set range.

10. The intelligent assessment system for safety risks of construction projects according to claim 2, characterized in that: The confirmation of the deployment optimization information of the current project to be constructed includes: The construction area that meets the evaluation conditions is recorded as the deployment optimization area; The single continuous operation duration and the safe single continuous operation duration corresponding to each deployment optimization area are recorded as T p and T p ′, and the average construction similarity is recorded as τ, p represents the number of the deployment optimization area, p = 1, 2, ... h; Calculate the corrected setting single continuous operation duration T for each deployment optimization area p =T p -(T p -T p ′)*τ; Each deployment optimization area and the single continuous operation duration of the correction setting of each deployment optimization area are used as the deployment optimization information of the current project to be constructed.

Citation Information

Patent Citations

  • Multi-target and multi-dimension risk management system for large building engineering construction

    CN104318408A

  • Coal mine worker pneumoconiosis risk early warning method based on multi-source data fusion

    CN114757569A

  • Building engineering construction safety supervision system based on data analysis

    CN116843174A

  • Method for evaluating hearing impairment of operating personnel in noise environment

    CN118021296A

  • Multi-Dimensional Risk Matrix and Method for generating thereof

    KR102111566B1

Cited By

  • Subway construction safety risk intelligent assessment system

    CN119294834A

  • An intelligent assessment system for subway construction safety risks

    CN119294834B