Power construction management and control method and system
By obtaining and analyzing the sensing data in the construction area, establishing a multi-level sensing network and power supply topology, and formulating optimization strategies, it solves the problem that traditional power management methods are difficult to adapt to dynamic changes in the construction site, and achieves efficient and safe power supply manage.
Patent Information
- Application Number
- CN202411554122.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-04
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
Traditional power management methods are difficult to adapt to dynamic changes in the construction site, resulting in waste or shortage of power resources, affecting construction progress and costs, and lack real-time response capabilities, posing safety hazards.
By obtaining sensing data in the construction area, regional sensing hierarchy division and data fusion, establishing a multi-level construction area sensing network, analyzing the power supply topology, identifying the power demand pattern, and formulating optimization strategies to achieve real-time power supply management.
It improves the efficiency of power resource utilization, reduces construction delays and costs, improves construction safety and response capabilities to dynamic changes, and achieves more scientific and accurate power management.
Smart Images

Figure CN119048034A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power supply management, and in particular to a power construction management and control method and system. Background Art
[0002] In modern construction projects, the reliability and stability of power supply are crucial to the construction progress and project quality. This demand has become more and more obvious with the continuous expansion of the scale of construction projects and the increase in construction complexity. Power supply not only involves basic lighting and power needs, but also involves complex construction equipment and systems, such as electric welders, cranes, concrete mixers, etc., which have extremely high requirements for the stable supply of electricity. Once there is a problem with the power supply, it may cause construction interruption, equipment damage, and even pose a threat to the safety of construction workers, thereby affecting the progress and quality of the project and increasing project costs. Traditional power management methods usually rely on empirical judgment and manual scheduling. The limitation of this method is that it mainly relies on static power demand forecasts and fails to fully consider the actual situation of dynamic changes at the construction site. As the construction progresses and construction conditions change, the power demand will also change significantly. For example, in some construction stages, specific equipment may be running at the same time, requiring a large amount of electricity, while in other stages, the power demand may drop significantly. If the power supply fails to adapt to these changes, it may lead to waste or shortage of power resources, thus affecting the construction progress and cost. In addition, traditional power management methods often lack the ability to respond to real-time environmental changes. At the construction site, there may be power load fluctuations, equipment failures, cable aging and other problems, all of which require timely adjustments and interventions. However, manual scheduling and static predictions are difficult to achieve a quick response to these problems, which can easily lead to waste of resources or safety hazards. Summary of the invention
[0003] Based on this, it is necessary for the present invention to provide a power construction management and control method and system to solve at least one of the above-mentioned technical problems.
[0004] To achieve the above purpose, a method for controlling power construction includes the following steps: Step S1: Acquire construction area sensor data, and divide the regional sensor layers according to the construction area sensor data, so as to obtain regional sensor layer data; perform construction area sensor data fusion on the construction area sensor data based on the regional sensor layer data, so as to obtain a multi-level construction area sensor network; Step S2: Acquire regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, thereby obtaining a regional power supply topology structure model; perform power construction node link structure division on the regional power supply topology structure model, thereby obtaining a construction area power node link structure model; Step S3: Analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; Step S4: Performing construction area environment integration based on a multi-level construction area sensor network to obtain construction area environment data; performing construction area power demand matching based on the construction area power demand behavior pattern data and the construction area environment data to obtain construction area power demand forecast data; Step S5: Analyze the power supply strategy of the construction area based on the power demand forecast data and the power demand behavior pattern data of the construction area, so as to obtain the power supply strategy of the construction area; optimize the power supply strategy of the power node link structure model of the construction area according to the power supply strategy of the construction area, so as to obtain the power supply optimization strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
[0005] The present invention can accurately grasp the power demand and environmental changes on site by acquiring the sensor data of the construction area in real time. In this way, potential problems can be discovered and adjusted in time. Hierarchical division of the construction area helps to manage and analyze the sensor data of large-scale construction sites. Hierarchical processing can improve data processing efficiency and accuracy. By integrating data from different sensors into a multi-level sensor network through data fusion, it is helpful to fully understand the actual situation of the construction area and improve the intelligent level of power management. By analyzing the regional power supply data and establishing a topological structure model, the structure and characteristics of the power supply network can be intuitively understood, which helps to optimize power scheduling and resource allocation. Dividing the power node link structure can help identify key nodes and connections, optimize power flow, and reduce bottlenecks and redundancy in power supply. Analyzing the power demand in the construction area helps to understand the power consumption in different construction stages, predict future demand fluctuations, and better plan power resources. Integrating power demand behavior pattern data can reveal the regularity and trend of power demand, and provide a basis for formulating more accurate power supply strategies. By integrating the environmental data of the construction area, the actual environmental conditions of the construction site, such as equipment operation status, load changes, etc., can be fully understood, so as to more accurately predict power demand. Matching the power demand behavior pattern data with the environmental data helps to accurately predict power demand. This helps to reduce the waste and insufficient supply of power resources and improve construction efficiency and safety. By analyzing the power demand forecast data and behavior pattern data, a reasonable power supply strategy can be formulated to ensure that power demand is met at different construction stages and optimize resource allocation. Optimizing the power node link structure model can improve the reliability and efficiency of power supply, reduce energy waste, and reduce construction costs. Uploading the optimization strategy to the regional power supply management platform to ensure the execution and monitoring of the strategy makes power supply management more intelligent and automated, reducing human intervention and errors. These steps modernize construction site power management by introducing real-time data, intelligent analysis, and optimization strategies. Specific benefits include improving the utilization efficiency of power resources, reducing construction delays and costs, improving safety, and enhancing the ability to respond to dynamic changes. This systematic power management approach can significantly improve the limitations of traditional empirical methods and bring more scientific and accurate power management solutions.
[0006] Optionally, step S1 specifically includes: Step S11: acquiring sensor data of the construction area, and performing camera image extraction on the sensor data of the construction area, thereby obtaining a camera image of the construction area; Step S12: constructing a three-dimensional coordinate system of the construction area according to the camera image of the construction area, thereby obtaining the three-dimensional coordinate system of the construction area; Step S13: performing hierarchical division of the construction area based on the camera image of the construction area, thereby obtaining hierarchical division data of the construction area; Step S14: performing construction area sensor association on the construction area hierarchical division data and the construction area sensor data, thereby obtaining regional sensor hierarchical data; Step S15: performing construction area sensor data fusion on the construction area three-dimensional coordinate system and the construction area sensor data according to the regional sensor level data, thereby obtaining a multi-level construction area sensor network.
[0007] The present invention can obtain information about the environment, equipment status, personnel activities and other aspects by acquiring sensor data of the construction area. The extraction of camera images provides visual evidence for these data, ensuring the comprehensiveness and accuracy of the data. The use of camera images can monitor the dynamic changes of the construction site in real time, timely discover potential problems or safety hazards, and improve the management efficiency of the construction site. Through high-resolution camera images, the actual situation of the construction site can be accurately recorded, providing a reliable basis for subsequent analysis and decision-making. The construction of a three-dimensional coordinate system can accurately determine the spatial coordinates of each position in the construction area, which is conducive to accurate construction planning and implementation. The three-dimensional coordinate system provides a stereoscopic view of the construction area, which helps to better understand the spatial layout of the construction site and improve the design and construction plan. With the three-dimensional coordinate system, more complex spatial analysis can be performed, such as checking the geometry of the construction area, measuring distances and areas, and further optimizing the construction plan. Hierarchical division can divide the construction area into different levels or areas, which helps to clearly identify and manage the various parts of the construction area and improve the construction organization and coordination capabilities. Through hierarchical division, tasks and resources can be divided according to different construction areas to optimize the construction progress and efficiency. Hierarchical division data enables problems to be accurately located in specific areas, facilitating targeted inspection and processing. Correlating hierarchical data with sensor data can integrate data from different sources to form a more comprehensive data view of the construction area. Regional sensor hierarchical data allows for more in-depth data analysis, such as analyzing sensor data within a certain hierarchical area to discover region-specific problems. By correlating data, construction conditions at all levels can be better monitored to achieve precise construction management and control. Fusion of three-dimensional coordinate systems and sensor data can create a comprehensive, multi-level construction area sensor network, which is essential for real-time monitoring and analysis of construction sites. Multi-level sensor networks provide all-round monitoring capabilities from the overall to the details, helping to identify and respond to various construction situations in a timely manner. The fused data supports more complex decision-making analysis, helping to optimize construction plans and improve construction quality and efficiency.
[0008] Optionally, step S13 is specifically: Step S131: performing edge detection based on the camera image of the construction area, thereby obtaining edge point data of the construction area image; Step S132: Calculating the slopes of adjacent edge points based on the edge point data of the construction area image, thereby obtaining the slope data of adjacent edge points; Step S133: classifying the slope edge points according to the slope data of the adjacent edge points, thereby obtaining high slope edge point data and low slope edge point data; Step S134: dividing the camera image of the construction area into areas with dense distribution of high-slope edge points according to the high-slope edge point data, thereby obtaining the main construction area data; dividing the camera image of the construction area into areas with dense distribution of low-slope edge points according to the low-slope edge point data, thereby obtaining the construction sub-area data; Step S135: regional spatial merging of the construction main area data and the construction sub-area data to obtain construction area hierarchical division data.
[0009] The edge detection of the present invention can identify the outline and boundary of the construction area, providing a clear basis for subsequent analysis. Clear edge data helps to accurately describe the actual shape of the construction area and reduce data noise and errors. Edge detection simplifies image data, compresses it from complex full image data to edge point data, and improves processing efficiency. Slope calculation can help identify the characteristics of different edges, such as whether there are relatively straight edges or curves, and further understand the shape and structure of the construction area. Through slope data, different parts of the construction area, such as straight lines and curved parts, can be more accurately distinguished to provide support for subsequent classification. Classification can identify different types of edges, such as straight lines (high slopes) and curves (low slopes), which helps to understand the specific characteristics of the construction area. Classifying edge points with different slopes helps to simplify data processing and convert complex edge data into more meaningful category data. Dividing the construction area according to the slope of the edge point can better identify the main construction area and sub-area, thereby optimizing construction management. Dividing the construction area into different areas can enhance the visual understanding of the construction site and help make more effective decisions and planning. Area merging provides a hierarchical view of the construction area, which helps to fully understand the structure and layout of the construction area. Through hierarchical data, we can better allocate construction resources, track progress and manage areas, thereby improving construction efficiency.
[0010] Optionally, step S2 specifically includes: Step S21: Acquire regional power supply data, and perform node resource allocation feature extraction and node link feature extraction on the regional power supply data, thereby obtaining power supply node resource allocation data and power supply node link data; Step S22: classifying node loads according to the power supply node resource allocation data, thereby obtaining high-load node data and low-load node data; Step S23: Counting the node connection amount according to the node link data, thereby obtaining the node data of high-value connection amount and the node data of low-value connection amount; Step S24: performing node intersection operation on high-load node data and high-value connection node data, thereby obtaining supply structure primary node data; performing node intersection operation on low-load node data and low-value connection node data, thereby obtaining supply structure secondary node data; Step S25: performing a regional power main node topology structure analysis based on the supply structure main node data and the power supply node link data, thereby obtaining a regional power main supply topology structure model; performing a regional power secondary node topology structure analysis based on the supply structure secondary node data and the power supply node link data, thereby obtaining a regional power secondary supply topology structure model; Step S26: Perform regional power supply topology structure integration on the regional power main supply topology structure model and the regional power secondary supply topology structure model to obtain the regional power supply topology structure model, and perform power construction node link structure division on the regional power supply topology structure model to obtain the construction area power node link structure model.
[0011] The present invention helps to gain an in-depth understanding of the resource distribution and connection characteristics of the power supply system by extracting node resource allocation and node link characteristics, laying the foundation for subsequent analysis. Node load classification can identify high-load and low-load nodes, which helps to make accurate decisions when designing power supply and adjusting loads, and optimize power distribution. Node connection statistics can help identify nodes with high and low connections, and provide data support for network topology optimization and node importance assessment. Obtaining primary and secondary nodes through intersection operations helps to determine key nodes, so that these nodes can be given priority in resource management and network security. Topological structure analysis of primary and secondary nodes can obtain two types of power supply models respectively, provide power system views at different levels, and help optimize power supply strategies. Integrating primary and secondary supply topological structure models helps to fully understand the regional power supply structure, and then divide the power node link structure in the construction area, and optimize construction and maintenance plans.
[0012] Optionally, step S26 is specifically: Step S261: integrating the regional power supply topology structure model of the main regional power supply topology structure model and the regional power supply secondary regional power supply topology structure model, thereby obtaining a power supply topology structure model; Step S262: mapping the power supply node resource allocation to the power supply topology model according to the power supply node resource allocation data, thereby obtaining a regional power supply topology model; Step S263: spatially correlating power supply nodes in the construction area according to the multi-level construction area sensor network and the regional power supply topology model, thereby obtaining power supply correlation node data in the construction area; Step S264: dividing the regional power supply topology model into associated node link structures according to the construction area power supply associated node data, thereby obtaining the construction area power node link structure model.
[0013] The present invention can obtain a more comprehensive power supply topology model by integrating the main and secondary power supply topology models. This integration can cover more power supply sources and transmission paths, ensuring that the continuity and stability of power supply can be maintained under any circumstances. After integration, power resources, including backup power supplies and emergency power supplies, can be more effectively identified and utilized, avoiding resource waste and improving the efficiency of the power supply system. Comprehensive consideration of the main and secondary supply nodes helps to improve the reliability and resilience of the power system. If the main power supply fails, the secondary supply can be quickly replaced to reduce the interruption time of the system. By mapping the power supply node resource allocation data, the resource status and demand of each node can be accurately understood, thereby optimizing the allocation of power resources and reducing the risk of overload and power shortage. This mapping helps to monitor the status of power nodes in real time, and make timely adjustments and optimizations to cope with load changes or emergencies. It can provide accurate data support for the planning and design of the power system, helping decision makers to formulate more reasonable power supply plans and strategies. By combining a multi-level construction area sensor network with a power supply topology model, the power supply nodes in the construction area can be accurately determined. This helps to ensure the accuracy and reliability of power supply during construction. Understanding the spatial association of power nodes in the construction area helps to develop safe construction plans, avoid the impact of construction activities on the power system, and reduce the interference of the power system on construction activities. Providing data on associated nodes of power supply in the construction area can provide decision support for construction management personnel, optimize construction plans and resource allocation, and improve construction efficiency. By dividing the associated node link structure, the connection relationship of power nodes in the construction area can be more clearly understood, which is conducive to structured management and optimization. Clarifying the link structure of power nodes helps construction teams better coordinate and plan construction activities, reduce the downtime of the power system and the impact of construction on the power system. When a power system fails, a clear node link structure can help quickly locate the problem area, conduct efficient troubleshooting and maintenance, and improve the recovery speed and reliability of the system.
[0014] Optionally, step S3 specifically includes: Step S31: extracting the historical power load characteristics of the link nodes and the capacity characteristics of the power supply nodes from the power node link structure model in the construction area, thereby obtaining the historical power load data of the link nodes and the capacity data of the power supply nodes; Step S32: Perform regional power historical load demand statistics based on the linked node power historical load data, thereby obtaining construction area power demand data; Step S33: Calculate the power supply node load factor based on the link node power historical load data and the power supply node capacity data, thereby obtaining the power supply node load factor; Step S34: Performing statistics on the temporal and spatial distribution of power load on the power demand data of the construction area, thereby obtaining the temporal and spatial distribution data of power load in the construction area; Step S35: Integrate the construction area power demand behavior pattern according to the power supply node load factor and the construction area power load spatiotemporal distribution data, so as to obtain the construction area power demand behavior pattern data.
[0015] The present invention can obtain detailed and accurate power load data and supply capacity by extracting the historical power load characteristics and supply node capacity characteristics, providing a reliable basis for subsequent analysis and decision-making. After obtaining these data, the historical performance and actual capacity of the power network can be better understood, which is helpful for more accurate demand forecasting and resource allocation. By analyzing the historical load data and the supply node capacity, potential nodes with overloaded or insufficient load can be identified, and measures can be taken in advance to prevent system bottlenecks or failures. Statistics on historical power load demand help to understand the fluctuations in power demand in the construction area in different time periods, providing a historical basis for demand forecasting. Based on historical load data, future power demand trends can be inferred, thereby providing data support for system expansion, load scheduling, etc. Understanding regional power demand conditions helps to optimize the allocation and scheduling of power resources and improve the operating efficiency of the power system. By calculating the load factor, the capacity utilization of the power supply node can be evaluated and its performance under different load conditions can be understood. The calculation of the load factor helps to identify whether there is excessive or insufficient load conditions, thereby optimizing load distribution and adjusting the configuration of the power system. Provide real load condition data on the power supply node, support system design and improvement, and improve the overall stability and reliability of the power system. Through spatiotemporal distribution statistics, the variation patterns of power load in different time and space can be identified, which helps to understand the spatiotemporal characteristics of demand. The peak and trough periods of power load can be predicted to help formulate more reasonable power dispatching and demand management strategies. Provide data support for the dispatch of the power system to ensure that demand can be effectively responded to during peak load periods and avoid system overload. Combining the load factors of power supply nodes with the spatiotemporal distribution data of power load can form a comprehensive analysis of power demand in the construction area and understand the actual demand pattern. By integrating demand behavior pattern data, more accurate demand forecasts can be made to help plan future power supply and infrastructure construction. Provide decision support for the operation and expansion of the power system, optimize the match between power supply and demand, reduce resource waste, and improve the overall efficiency of the power system.
[0016] Optionally, step S35 is specifically: Step S351: evaluating the power supply stability of the power supply node according to the load factor of the power supply node, thereby obtaining the power supply node stability data; Step S352: extracting the time distribution characteristics of the power load in the construction area and the node distribution characteristics of the power load in the construction area from the time-space distribution data of the power load in the construction area, thereby obtaining the time distribution data of the power load in the construction area and the node distribution data of the power load in the construction area; Step S353: integrating the time behavior pattern of power demand according to the time distribution data of power load in the construction area and the stability data of power supply nodes, thereby obtaining the time behavior pattern data of power demand; Step S354: integrating the load behavior pattern of the power demand node according to the power load node distribution data of the construction area and the power supply node stability data, thereby obtaining the load behavior pattern data of the power demand node; Step S355: Perform descriptive statistical identification of the power demand behavior pattern on the power demand time behavior pattern data and the power demand node load behavior pattern data, so as to obtain the construction area power demand behavior pattern data.
[0017] The present invention can judge the stability of power supply nodes under different load conditions by evaluating the load factor of power supply nodes. This helps to identify which nodes may have stability problems under high load or fluctuating load conditions. By discovering potential power supply risk points, measures can be taken in advance, such as increasing equipment power supply or adjusting load distribution, to reduce the possibility of power outages. According to the stability assessment results, the configuration of the power system can be optimized, the overall power supply reliability can be improved, and the problem of insufficient power supply can be avoided during high demand. By extracting the time and space distribution characteristics of the power load in the construction area, the law of power demand changes and the load concentration area in the construction area can be clearly understood. Using these data, the power demand in the future construction area can be predicted to ensure that the power supply during construction can meet the actual demand. According to the analysis of power load characteristics, construction planners can better arrange construction progress and power resources to avoid construction delays caused by insufficient power. By integrating power load time distribution data and power supply node stability data, the time behavior pattern of power demand can be identified. For example, the peak and trough periods of power consumption are identified. It is helpful to formulate more reasonable power demand management strategies, such as demand response measures, load regulation, etc., to balance power supply and demand. It can optimize the dispatching and control strategies of the power system and improve the responsiveness and operating efficiency of the system. Integrating the distribution data of power load nodes in the construction area and the stability data of power supply nodes is helpful to analyze the load behavior patterns of each power demand node and understand the load demand of different nodes. The power configuration can be adjusted according to the load behavior pattern to ensure that each node can obtain sufficient power supply during the peak demand period. By understanding the load characteristics and demand behavior of each node, the stability of the power system can be improved and the unstable power supply caused by excessive local load can be avoided. Descriptive statistical analysis of power demand time behavior pattern data and node load behavior pattern data can help identify the overall behavior pattern of power demand, such as peak and valley periods of power consumption and their changing trends. Providing detailed power demand behavior pattern data can help decision makers formulate scientific and reasonable power management and dispatching strategies. Through descriptive statistics of power demand behavior patterns, possible power consumption anomalies or demand surges can be identified in advance, and corresponding risk management and emergency plan preparation can be carried out.
[0018] Optionally, step S4 is specifically: Step S41: integrating the construction area environment based on the multi-level construction area sensor network to obtain construction area environment data; Step S42: extracting construction progress features according to the construction area environment data, thereby obtaining construction progress data; Step S43: Acquire construction equipment energy consumption data, and perform construction equipment power consumption prediction based on the construction equipment energy consumption data and construction progress data, thereby obtaining construction equipment power consumption prediction data; Step S44: extracting the time characteristics of power demand from the power demand behavior pattern data of the construction area, thereby obtaining the time characteristic data of power demand; Step S45: fusing the construction equipment power consumption forecast data and the power demand time characteristic data to obtain a comprehensive power demand characteristic set; Step S46: constructing a power demand prediction model based on the power demand comprehensive feature set, the power demand data of the construction area, and the environmental data of the construction area; Step S47: forecasting the power demand in the construction area based on the power demand behavior pattern data and the construction area environmental data through the power demand forecasting model, thereby obtaining the power demand forecasting data in the construction area.
[0019] The multi-level sensor network of the present invention can collect environmental data of the construction area in real time, such as temperature, humidity, wind speed, etc., which helps to understand the environmental conditions of the construction area in detail. Providing comprehensive monitoring of the construction area environment helps to discover and solve the potential impact of environmental changes on the construction progress. By integrating sensor data at different levels, more comprehensive and accurate environmental data can be obtained to provide support for subsequent data analysis and decision-making. It can track the construction progress and analyze the key characteristics of the construction progress (such as construction speed, task completion, etc.) to provide data support for construction management. By extracting progress feature data, bottlenecks and problems in construction can be identified, and then construction plans and resource allocation can be optimized. Provide basic data for the construction progress prediction model, so that the prediction of construction progress is more accurate. By analyzing the energy consumption data of the equipment, the energy efficiency and operating status of the construction equipment can be evaluated, so as to find energy-saving opportunities. Combined with the construction progress data, the power consumption trend of the construction equipment can be predicted to help estimate the power demand. Accurately predicting the power consumption of equipment helps to better control the energy cost during construction. Extracting the time characteristic data of power demand helps to understand the changing patterns of power demand in different time periods. More accurate time characteristic data can improve the accuracy of power demand forecasting, help make better power supply plans, optimize the scheduling of power resources, and reduce energy waste and supply shortages. Fusion of power consumption forecast data and time characteristic data can form a more comprehensive power demand feature set. Providing multi-dimensional input data enhances the performance of the power demand forecasting model. The comprehensive feature set can better capture the changing patterns of power demand and improve the accuracy of the forecast results. By integrating multiple feature data, a more complex and accurate power demand forecasting model can be constructed. Modeling is carried out using actual data in the construction area to ensure that the model can truly reflect the power demand situation in the construction area. The model can be dynamically adjusted according to real-time data to improve the responsiveness to changes in power demand. Using the forecasting model to forecast power demand provides reliable data support, provides a scientific basis for power supply and management, and can plan the supply of power resources in advance to prevent power shortages or waste.
[0020] Optionally, step S5 specifically includes: Step S51: extracting power supply node resource allocation features based on the power node link structure model in the construction area, thereby obtaining power supply node resource allocation data in the construction area; Step S52: performing spatial and temporal division of regional power demand according to the power demand forecast data of the construction area and the power demand behavior pattern data of the construction area, thereby obtaining spatial and temporal data of regional power demand; Step S53: matching power supply and demand according to the power supply node resource allocation data of the construction area and the regional power demand spatiotemporal data, thereby obtaining power supply and demand matching data of the construction area; Step S54: performing power supply strategy analysis based on the power supply and demand matching data of the construction area, thereby obtaining a power supply strategy for the construction area; Step S55: extracting the power supply strategy from the power node link structure model of the construction area, thereby obtaining the rated power supply strategy of the construction area; Step S56: Optimize the rated power supply strategy of the construction area according to the power supply strategy of the construction area, so as to obtain the optimized power supply strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
[0021] The present invention can clarify the power resource status of each node in the construction area by extracting the resource allocation characteristics of the power node, which provides basic data for subsequent supply and demand matching. Understanding the resource allocation of each node helps to optimize the configuration of power resources, reduce resource waste and unnecessary scheduling, thereby improving the overall supply efficiency. The power supply node resource allocation data generated in this step is the key input for subsequent analysis and decision-making, ensuring that the system accurately grasps the actual situation. By dividing the power demand in time and space, the power demand in different time and space ranges can be more accurately predicted, thereby improving the accuracy of the prediction. Time and space division can help identify high-demand areas and time periods, so as to make adjustments when allocating power resources, avoid resource shortages or surpluses, provide detailed demand data support for decision-making, and help formulate more reasonable power supply strategies and plans. By matching the power supply node resource allocation data with the power demand time and space data, the problem of supply and demand imbalance can be identified and solved, ensuring the effective connection between power supply and demand. Good supply and demand matching can reduce the load fluctuation of the power system and improve the stability and reliability of the system. By optimizing the supply and demand matching, the additional costs caused by insufficient or excessive supply can be reduced, and the overall economic benefits can be improved. Power supply strategy analysis based on supply and demand matching data helps to formulate more scientific and effective power supply strategies, thereby improving supply efficiency and quality. Through analysis, potential supply problems and bottlenecks can be identified, and measures can be taken in advance to reduce the incidence of system failures. Strategy analysis provides decision support to help power managers formulate and adjust strategies, thereby improving the overall management level. Extracting power supply strategies from supply and demand matching data can clarify the future power supply direction and key areas, and guide actual operations and resource allocation. The extracted strategies are more targeted, can effectively solve practical problems, and meet the specific needs of the construction area. It helps to formulate long-term power supply plans and strategies to ensure that the power demand in the construction area is guaranteed in the long term. By optimizing the power supply strategy, the efficiency and reliability of power supply can be further improved to meet the actual needs of the construction area. The optimization strategy helps to better utilize existing resources, reduce unnecessary waste, and reduce operating costs. Uploading the optimization strategy to the regional power supply management platform helps to achieve real-time monitoring and dynamic adjustment, and improve overall management capabilities and response speed.
[0022] Optionally, the present invention further provides an electric power construction management and control system, which is used to execute the electric power construction management and control method as described above, and the electric power construction management and control system includes: The sensor data fusion module is used to obtain the sensor data of the construction area, and divide the regional sensor level according to the sensor data of the construction area, so as to obtain the regional sensor level data; based on the regional sensor level data, the construction area sensor data is fused to obtain a multi-level construction area sensor network; The topology structure analysis module is used to obtain regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, so as to obtain a regional power supply topology structure model; the regional power supply topology structure model is divided into power construction node link structure, so as to obtain a construction area power node link structure model; The power demand behavior analysis module is used to analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; The construction area power demand prediction module is used to integrate the construction area environment based on the multi-level construction area sensor network to obtain the construction area environment data; match the construction area power demand according to the construction area power demand behavior pattern data and the construction area environment data to obtain the construction area power demand prediction data; The power supply strategy analysis module is used to analyze the power supply strategy in the construction area based on the power demand forecast data and the power demand behavior pattern data in the construction area, so as to obtain the power supply strategy in the construction area; optimize the power supply strategy of the power node link structure model in the construction area according to the power supply strategy in the construction area, so as to obtain the power supply optimization strategy in the construction area, and upload it to the regional power supply management platform to perform power supply control tasks.
[0023] The electric power construction control system of the present invention can implement any one of the electric power construction control methods of the present invention, and is used to combine the operation and signal transmission medium between various modules to complete the electric power construction control method. The internal modules of the system cooperate with each other, thereby improving the accuracy and efficiency of power management. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Other features, objects and advantages of the present invention will become more apparent from the detailed description of non-limiting embodiments thereof made with reference to the following drawings: Figure 1 It is a schematic diagram of the steps of the electric power construction control method of the present invention; Figure 2 Detailed step flow diagram of step S1 in the present invention; Figure 3 Detailed step flow diagram of step S13 in the present invention; The realization of the purpose, functional features and advantages of the present invention will be further explained in conjunction with embodiments and with reference to the accompanying drawings. DETAILED DESCRIPTION
[0025] The technical method of the present invention is described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by technicians in this field without creative work are within the scope of protection of the present invention.
[0026] In addition, the accompanying drawings are only schematic illustrations of the present invention and are not necessarily drawn to scale. The same reference numerals in the figures represent the same or similar parts, and their repeated description will be omitted. Some of the block diagrams shown in the accompanying drawings are functional entities and do not necessarily correspond to physically or logically independent entities. The functional entities can be implemented in software form, or implemented in one or more hardware modules or integrated circuits, or implemented in different networks and / or processor methods and / or microcontroller methods.
[0027] It should be understood that, although the terms "first", "second", etc. may be used herein to describe various units, these units should not be limited by these terms. These terms are used only to distinguish one unit from another unit. For example, without departing from the scope of the exemplary embodiments, the first unit may be referred to as the second unit, and similarly the second unit may be referred to as the first unit. The term "and / or" used herein includes any and all combinations of one or more of the listed associated items.
[0028] To achieve this, please refer to Figures 1 to 3 The present invention provides a method for controlling power construction, the method comprising the following steps: Step S1: Acquire construction area sensor data, and divide the regional sensor layers according to the construction area sensor data, so as to obtain regional sensor layer data; perform construction area sensor data fusion on the construction area sensor data based on the regional sensor layer data, so as to obtain a multi-level construction area sensor network; In this embodiment, based on the data obtained by the sensors in the construction area, the regional sensing level division is first performed. It is assumed that the construction area includes multiple sub-areas, each of which is equipped with a temperature and humidity sensor and an air quality sensor. Based on the data of these sensors, the area is divided, for example, the area is divided into a "dry area" and a "wet area" according to the temperature range and humidity level. Subsequently, the sensor data at different levels are fused to create a multi-level sensor network, which involves using a data fusion algorithm (such as a weighted average method) to integrate the data from different sensors.
[0029] Step S2: Acquire regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, thereby obtaining a regional power supply topology structure model; perform power construction node link structure division on the regional power supply topology structure model, thereby obtaining a construction area power node link structure model; In this embodiment, after obtaining regional power supply data through cooperation with the power supply company in the urban area, the power node topology structure analysis is performed. For example, the connectivity of each power node (such as substation, distribution box) in the construction area is analyzed through the power grid model to establish a power supply topology structure model. The connection relationship between power nodes is further analyzed, such as dividing the power supply line into different link structures according to the connection mode between nodes, and generating a detailed power node link structure model for subsequent power demand and supply analysis.
[0030] Step S3: Analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; In this embodiment, the power demand analysis is performed on the power node link structure model in the construction area, the real-time power consumption data of each node is collected, and the power demand data is generated. For example, the power demand in a certain time period in the future is calculated through the power consumption history data and the prediction model (such as time series analysis). These demand data are combined with the environmental data of the construction area (such as workload, equipment operation status) to integrate into power demand behavior pattern data to predict the changes in power demand under different conditions.
[0031] Step S4: Performing construction area environment integration based on a multi-level construction area sensor network to obtain construction area environment data; performing construction area power demand matching based on the construction area power demand behavior pattern data and the construction area environment data to obtain construction area power demand forecast data; In this embodiment, data from a multi-level construction area sensor network is used to integrate construction area environmental data, such as air quality, temperature and humidity. Power demand matching is performed in combination with the power demand behavior pattern data in the construction area. Prediction algorithms (such as regression analysis) are used to predict future power demand based on historical data and environmental changes, and generate construction area power demand forecast data. These data can help optimize power supply plans.
[0032] Step S5: Analyze the power supply strategy of the construction area based on the power demand forecast data and the power demand behavior pattern data of the construction area, so as to obtain the power supply strategy of the construction area; optimize the power supply strategy of the power node link structure model of the construction area according to the power supply strategy of the construction area, so as to obtain the power supply optimization strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
[0033] In this embodiment, the power supply strategy of the construction area is analyzed based on the power demand forecast data and the demand behavior pattern data. For example, an optimization algorithm (such as linear programming) is used to determine the optimal power distribution strategy, taking into account factors such as power supply cost and demand peak. After formulating the power supply strategy, the power node link structure model is optimized and adjusted, such as adjusting the configuration of the power supply line and the node. Finally, the optimized power supply strategy is uploaded to the regional power supply management platform to achieve real-time power supply control and ensure that the power demand in the construction area is met.
[0034] Optionally, step S1 specifically includes: Step S11: acquiring sensor data of the construction area, and performing camera image extraction on the sensor data of the construction area, thereby obtaining a camera image of the construction area; In this embodiment, multiple sensors, such as temperature sensors, humidity sensors, acceleration sensors, etc., can be arranged in the construction area, and these sensors continuously collect data. Taking the temperature and humidity sensors as an example, the data of these sensors are transmitted to the central control system via a wireless network. Then, a high-definition camera installed in the construction area is used to capture real-time images of the construction area. These camera images are extracted from the output stream of the camera, processed and saved in a digital format. Image processing algorithms, such as edge detection algorithms, are used in the image extraction process to extract important construction area feature information for subsequent processing.
[0035] Step S12: constructing a three-dimensional coordinate system of the construction area according to the camera image of the construction area, thereby obtaining the three-dimensional coordinate system of the construction area; In this embodiment, computer vision technology and 3D reconstruction algorithms (such as structured light or stereo vision) are used to extract key feature points from the obtained camera images. Through these feature points, a 3D model of the construction area is generated using a 3D reconstruction tool (such as Photogrammetry software). These feature points and the 3D model are converted into a local coordinate system to establish a 3D coordinate system for the construction area. This 3D coordinate system can accurately represent the spatial position and geometric shape within the construction area, providing a basis for subsequent data analysis and processing.
[0036] Step S13: performing hierarchical division of the construction area based on the camera image of the construction area, thereby obtaining hierarchical division data of the construction area; In this embodiment, after the three-dimensional model is established, the image segmentation technology (such as K-means clustering or deep learning segmentation model) is applied to perform hierarchical processing on the camera images of the construction area. Taking different building structures or areas in the construction area as an example, the segmentation algorithm divides the area into several levels, such as the base layer, the main layer and the top layer. Each level represents a part with similar characteristics or functions in the construction area. These hierarchical division data are stored as a hierarchical data structure (such as a tree structure), providing detailed hierarchical information of the area.
[0037] Step S14: performing construction area sensor association on the construction area hierarchical division data and the construction area sensor data, thereby obtaining regional sensor hierarchical data; In this embodiment, the obtained hierarchical data is combined with the sensor data. First, a corresponding construction area level is assigned to each sensor. For example, the readings of the temperature and humidity sensor are associated with a specific construction level (such as the main construction level) through the spatial position of the sensor. Next, the sensor data is matched with the hierarchical data using data association technology (such as a data fusion algorithm or an association rule algorithm) to form "regional sensor hierarchical data". These data indicate the status and environmental conditions of each construction level, which helps to analyze the construction situation of each level in detail.
[0038] Step S15: performing construction area sensor data fusion on the construction area three-dimensional coordinate system and the construction area sensor data according to the regional sensor level data, thereby obtaining a multi-level construction area sensor network.
[0039] In this embodiment, the obtained regional sensor level data is applied to the three-dimensional coordinate system for data fusion. The sensor data of each level is integrated into the three-dimensional coordinate system using a data fusion algorithm (such as Kalman filtering or Bayesian network) to generate a multi-level sensor network for the construction area. For example, the temperature and humidity sensor data of different levels are fused into a comprehensive construction environment monitoring network. Finally, a multi-level sensor network with detailed spatial information is obtained, which can monitor and analyze various environmental factors and states of the construction area in real time, and provide support for construction management and decision-making.
[0040] Optionally, step S13 is specifically: Step S131: performing edge detection based on the camera image of the construction area, thereby obtaining edge point data of the construction area image; In this embodiment, a high-definition camera is installed in the construction area to obtain an image of the construction area. The image is processed using an image processing algorithm such as the Canny edge detection algorithm to identify edge point data in the construction area image. The Canny edge detection algorithm includes Gaussian filter denoising, gradient calculation, non-maximum suppression, and dual threshold detection. The obtained edge point data includes the coordinate position of each edge point and its edge strength, ensuring that the edge point can accurately reflect the structural characteristics of the construction area.
[0041] Step S132: Calculating the slopes of adjacent edge points based on the edge point data of the construction area image, thereby obtaining the slope data of adjacent edge points; In this embodiment, the edge point data obtained in step S131 is processed using a computational geometry algorithm. By calculating the slope between adjacent edge points, each pair of adjacent edge points (x_1, y_1) and (x_2, y_2) is first selected to calculate the slope m = \frac{y_2 - y_1}{x_2 - x_1}. The slope calculation needs to take into account the arrangement order and spatial distribution of the edge points to ensure that the calculated slope data can accurately reflect the degree of inclination between the edge points.
[0042] Step S133: classifying the slope edge points according to the slope data of the adjacent edge points, thereby obtaining high slope edge point data and low slope edge point data; In this embodiment, the edge points are classified according to the calculated slope data. A threshold value \theta θ (e.g., 0.5) is set, and edge points with a slope greater than \theta θ are classified as high-slope edge points, and edge points with a slope less than or equal to \thetaθ are classified as low-slope edge points. Statistical methods or machine learning classification algorithms (such as K-means clustering) are used to optimize the threshold and classification accuracy to ensure that the classification results can accurately distinguish the main structural features in the construction area.
[0043] Step S134: dividing the camera image of the construction area into areas with dense distribution of high-slope edge points according to the high-slope edge point data, thereby obtaining the main construction area data; dividing the camera image of the construction area into areas with dense distribution of low-slope edge points according to the low-slope edge point data, thereby obtaining the construction sub-area data; In this embodiment, the construction area image is divided into areas with dense distribution of high-slope edge points. First, the density of high-slope edge points is mapped to the grid of the image, and a density clustering algorithm (such as DBSCAN) is used to determine the high-density area, thereby obtaining the main construction area data. Similarly, the low-slope edge points are density mapped and clustered to obtain the construction sub-area data. The main body and sub-areas of the construction area are divided through the distribution information of these areas to ensure that the hierarchical distribution of the construction area can accurately reflect the actual situation of the construction process.
[0044] Step S135: regional spatial merging of the construction main area data and the construction sub-area data to obtain construction area hierarchical division data.
[0045] In this embodiment, after obtaining the data of the main construction area and the construction sub-area, spatial merging is performed. A spatial analysis tool (such as a geographic information system GIS) is used to merge the two types of construction hierarchical areas, the main area and the sub-area, and the processing methods of overlapping areas are considered, such as intersection or union operations. During the merging process, a spatial data merging algorithm (such as spatial connection) is used to ensure that the merged data can completely cover all parts of the construction area. The resulting hierarchical division data of the construction area provides a layered and structured view to help manage and optimize the construction process.
[0046] Optionally, step S2 specifically includes: Step S21: Acquire regional power supply data, and perform node resource allocation feature extraction and node link feature extraction on the regional power supply data, thereby obtaining power supply node resource allocation data and power supply node link data; In this embodiment, in a city's power supply network, regional power supply data is obtained through a data acquisition system (such as a SCADA system or a smart meter). These data include the load, power generation capacity, energy storage capacity, etc. of each power node. Using data mining techniques such as principal component analysis (PCA) or feature selection algorithms, node resource allocation characteristics are extracted, including the load capacity and energy supply of power nodes. At the same time, by calculating the current flow and power transmission between nodes, node link characteristics are extracted to obtain node connection strength and network topology data. These feature data will be used for subsequent load classification and connection quantity statistics.
[0047] Step S22: classifying node loads according to the power supply node resource allocation data, thereby obtaining high-load node data and low-load node data; In this embodiment, a cluster analysis algorithm (such as K-means clustering or DBSCAN) is used to classify the load data of the power nodes. A load threshold is set, for example, nodes with load values exceeding a certain percentile are marked as high-load nodes, and nodes below this threshold are marked as low-load nodes. This process can be performed by writing Python scripts combined with the Pandas library for data processing and classification. For example, the load value of a high-load node may be set to be greater than the 90th percentile, and the load value of a low-load node may be set to be less than the 10th percentile.
[0048] Step S23: Counting the node connection amount according to the node link data, thereby obtaining the node data of high-value connection amount and the node data of low-value connection amount; In this embodiment, the node link data is counted to calculate the number of connections of each node (i.e., how many other nodes each node is directly connected to). The node connection data is obtained by using the node degree statistics method in graph theory. A connection threshold is set, and nodes with a connection number greater than the threshold are marked as high-value connection nodes, and nodes with a connection number lower than the threshold are marked as low-value connection nodes. For example, the NetworkX library is used to construct a graph and calculate the node degree. Nodes with a connection number exceeding the 80% quantile are considered to be high-value connection nodes.
[0049] Step S24: performing node intersection operation on high-load node data and high-value connection node data, thereby obtaining supply structure primary node data; performing node intersection operation on low-load node data and low-value connection node data, thereby obtaining supply structure secondary node data; In this embodiment, a set operation is used to calculate the intersection of high-load nodes and high-value connection nodes to obtain a primary node set. This can be implemented in Python by writing a script, such as using a set data structure to perform an intersection operation. Similarly, an intersection operation is performed on low-load nodes and low-value connection nodes to obtain a secondary node set. For example, if the high-load node set is {A, B, C} and the high-value connection node set is {B, C, D}, then the primary node data is {B, C}. Similar operations are performed on low-load and low-value connection nodes to obtain secondary node data.
[0050] Step S25: performing a regional power main node topology structure analysis based on the supply structure main node data and the power supply node link data, thereby obtaining a regional power main supply topology structure model; performing a regional power secondary node topology structure analysis based on the supply structure secondary node data and the power supply node link data, thereby obtaining a regional power secondary supply topology structure model; In this embodiment, a graph analysis tool (such as Gephi or Cytoscape) is used to perform topological structure analysis based on the main node data and node link data. A subgraph of the main node is established, and its network structure characteristics, such as connectivity, clustering coefficient, etc., are analyzed to generate a main supply topological structure model. A similar analysis is performed on the secondary node data to obtain a secondary supply topological structure model. For example, Gephi is used to build a graph model, and the main and secondary node networks are visualized and structurally analyzed respectively to generate a corresponding topological structure graph.
[0051] Step S26: Perform regional power supply topology structure integration on the regional power main supply topology structure model and the regional power secondary supply topology structure model to obtain the regional power supply topology structure model, and perform power construction node link structure division on the regional power supply topology structure model to obtain the construction area power node link structure model.
[0052] In this embodiment, the main supply topology model and the secondary supply topology model are integrated to construct a comprehensive regional power supply topology model. The integration process includes merging the two topology models, solving the overlapping problems of nodes and connections, and forming a complete regional power supply network. Then, using the topology analysis results, the power node link structure is divided according to the power construction requirements (such as nodes and links in the construction area). Use construction planning tools (such as AutoCAD or construction management software) to convert the topology model into a construction node link structure model, and identify the main and secondary nodes in the construction area and their connection relationships.
[0053] Optionally, step S26 is specifically: Step S261: integrating the regional power supply topology structure model of the main regional power supply topology structure model and the regional power supply secondary regional power supply topology structure model, thereby obtaining a power supply topology structure model; In this embodiment, the obtained regional power main supply topology structure model including all main power sources and the connection relationship between them and the obtained regional power secondary supply topology structure model covering the secondary power sources and their connections are integrated, and the nodes and connections in the secondary topology are inserted into the main topology model, and the weights and connection methods are adjusted to form a comprehensive power supply topology structure model. This integration process ensures that the main and secondary power supply systems can jointly describe the overall layout and network structure of the regional power.
[0054] Step S262: mapping the power supply node resource allocation to the power supply topology model according to the power supply node resource allocation data, thereby obtaining a regional power supply topology model; In this embodiment, the power supply node resource allocation data including the capacity, load and resource configuration information of each power node is mapped to the integrated power supply topology model, and the regional power supply topology model is generated by marking and optimizing the resource allocation of the nodes. The mapping process includes adjusting the load capacity of the node to make it consistent with the actual resource allocation, and recalculating the load flow and connection between the nodes in the network to ensure that the resource allocation matches the actual supply capacity.
[0055] Step S263: spatially correlating power supply nodes in the construction area according to the multi-level construction area sensor network and the regional power supply topology model, thereby obtaining power supply correlation node data in the construction area; In this embodiment, the spatial position and sensor data of each power supply node in the construction area are obtained by combining the multi-level sensor network data of the construction area. These data are used to associate the position of the power supply node in the regional power supply topology model, and determine the spatial relationship between the power node and the sensor in each construction area. By analyzing the sensor data and the position of the power node, the spatial association data of the power supply node in the construction area is constructed to reflect the actual position and functional distribution of the node in the construction area.
[0056] Step S264: dividing the regional power supply topology model into associated node link structures according to the construction area power supply associated node data, thereby obtaining the construction area power node link structure model.
[0057] In this embodiment, the link structure between power nodes is identified and divided according to the node data associated with the power supply in the construction area. First, the physical and logical connection relationships between nodes are determined, and then these relationships are classified and sorted. The connection information between nodes is extracted from the node data associated with the power supply in the construction area, and the power node link structure in the topology model is divided according to the associated node data to create a power node link structure model in the construction area. This model shows the connection mode of power nodes in the construction area and their location in the power supply network, helping to optimize the power supply layout in construction and maintenance work.
[0058] Optionally, step S3 specifically includes: Step S31: extracting the historical power load characteristics of the link nodes and the capacity characteristics of the power supply nodes from the power node link structure model in the construction area, thereby obtaining the historical power load data of the link nodes and the capacity data of the power supply nodes; In this embodiment, in the construction area, a link structure model of power nodes is first constructed, including all key power nodes. By extracting the historical power load data of these nodes, the power load changes of each node in the past certain period of time (such as the past 12 months) are obtained. The data may include load peaks, valleys, and daily change patterns. In addition, the capacity characteristic data of the power supply nodes are extracted to determine the maximum power supply capacity of each node. The capacity data usually includes rated power and current load usage. These data can be obtained through a historical record database or a real-time monitoring system for subsequent analysis.
[0059] Step S32: Perform regional power historical load demand statistics based on the linked node power historical load data, thereby obtaining construction area power demand data; In this embodiment, the power demand of the entire construction area is summarized by using the extracted historical power load data of the link nodes. Statistical analysis tools can be used to summarize the load data of each node by time to calculate the total amount and fluctuation of power demand in the area. For example, the total power demand per month can be calculated using the time series analysis method, and the peak and valley periods of load can be analyzed. These data can be used to draw the power demand curve and provide a basis for subsequent demand forecasting.
[0060] Step S33: Calculate the power supply node load factor based on the link node power historical load data and the power supply node capacity data, thereby obtaining the power supply node load factor; In this embodiment, the load factor of each power supply node is calculated based on the power historical load data and the capacity data of the power supply node. The load factor can be calculated by the formula \text{load factor} = \frac{\text{actual load}}{\text{maximum capacity}}, where the actual load is the average load value obtained from the historical data and the maximum capacity is the rated supply capacity of the node. The calculation of the load factor can help evaluate the load utilization of the node and further optimize the power distribution.
[0061] Step S34: Performing statistics on the temporal and spatial distribution of power load on the power demand data of the construction area, thereby obtaining the temporal and spatial distribution data of power load in the construction area; In this embodiment, the power demand data of the construction area is analyzed for temporal and spatial distribution to determine the distribution pattern of power load at different times and spaces. Spatial data analysis tools, such as geographic information system (GIS), are used in combination with time series data to draw a spatial distribution map of power load and analyze its time-varying characteristics. Load heat maps can be created to show the power demand intensity of different regions at different time periods, identify load peaks and valleys, and help to rationally allocate power resources.
[0062] Step S35: Integrate the construction area power demand behavior pattern according to the power supply node load factor and the construction area power load spatiotemporal distribution data, so as to obtain the construction area power demand behavior pattern data.
[0063] In this embodiment, the calculated load factor and the obtained load spatiotemporal distribution data are combined to integrate the power demand behavior pattern. The power demand behavior pattern of the construction area is integrated through data mining techniques, such as cluster analysis or pattern recognition. This can help identify common patterns of demand, such as peak demand concentrated in a specific area or time period. Ultimately, the obtained behavior pattern data can be used to predict future changes in power demand and optimize power supply and scheduling strategies.
[0064] Optionally, step S35 is specifically: Step S351: evaluating the power supply stability of the power supply node according to the load factor of the power supply node, thereby obtaining the power supply node stability data; In this embodiment, in the stability assessment of the power supply node, it is first necessary to collect the load factor data of the power supply node. Assume that we have a power supply node A, and the load factor data is obtained through a real-time monitoring system, including the load fluctuation of node A in the past month. Next, the load factor data is used to calculate the stability indicators of the node, such as the standard deviation of the load factor and the ratio of the load peak to the valley value. These indicators are used to evaluate the stability of node A under different load conditions, and the stability data of node A is obtained. These data include the stability performance of node A under normal load, peak load and abnormal load conditions. For example, if node A shows high volatility when the load factor exceeds 80%, its stability is poor.
[0065] Step S352: extracting the time distribution characteristics of the power load in the construction area and the node distribution characteristics of the power load in the construction area from the time-space distribution data of the power load in the construction area, thereby obtaining the time distribution data of the power load in the construction area and the node distribution data of the power load in the construction area; In this embodiment, for the extraction of spatiotemporal distribution data of the power load in the construction area, first, a power load monitoring system can be established in the construction area, which can record the power consumption data in each time period. Assume that the construction area includes area 1 and area 2, and each area has several power load measurement points. By processing the data of these measurement points, the time distribution characteristics and node distribution characteristics of the power load in the construction area can be extracted. The time distribution characteristics include the changing trend of the power load within 24 hours a day, such as higher loads in the morning and evening, and lower loads at noon. The node distribution characteristics include the load distribution of each measurement point, for example, the load of the measurement points in area 1 is concentrated at specific nodes during the peak construction period. The temporal and spatial distribution data of the power load in the construction area obtained by integrating the previous steps can also be used to extract the power load distribution in time and the power load distribution in space.
[0066] Step S353: integrating the time behavior pattern of power demand according to the time distribution data of power load in the construction area and the stability data of power supply nodes, thereby obtaining the time behavior pattern data of power demand; In this embodiment, the time behavior pattern of power demand is integrated based on the time distribution data of power load in the construction area and the stability data of power supply nodes. It is assumed that the power load in the construction area increases significantly during peak hours (e.g., 10 a.m. to 4 p.m.), and the power supply nodes show decreased stability during these time periods. By integrating these data, a time behavior pattern model of power demand can be established to predict the power demand in a specific time period. The model can show that during peak hours, the power demand in the construction area increases significantly, so the power supply strategy needs to be optimized to meet the demand. These pattern data can help formulate a power demand plan that adapts to the construction schedule.
[0067] Step S354: integrating the load behavior pattern of the power demand node according to the power load node distribution data of the construction area and the power supply node stability data, thereby obtaining the load behavior pattern data of the power demand node; In this embodiment, the load behavior pattern of the power demand node is integrated based on the power load node distribution data of the construction area and the stability data of the power supply node. It is assumed that the power load nodes in the construction area behave differently under different load conditions. For example, the demand of node B increases significantly during peak load. By analyzing the data of these nodes, the load patterns of each node in different time periods can be identified and integrated into a load behavior pattern model of the power demand node. The model can show the load change trend of node B during the peak construction period, thereby guiding the load scheduling and stability assurance at these nodes to optimize the overall power supply.
[0068] Step S355: Perform descriptive statistical identification of the power demand behavior pattern on the power demand time behavior pattern data and the power demand node load behavior pattern data, so as to obtain the construction area power demand behavior pattern data.
[0069] In this embodiment, descriptive statistical identification is performed on the power demand time behavior pattern data and the power demand node load behavior pattern data. It is assumed that the power demand time behavior pattern data contains the load data of the construction area in different time periods, and the power demand node load behavior pattern data contains the load changes of each node. By performing descriptive statistical analysis on these data, such as calculating the mean, standard deviation, load fluctuation range, etc., the power demand behavior pattern data of the construction area can be obtained. For example, statistics show that the load of the construction area during the morning peak and evening peak is 1500kW and 2000kW respectively, and the fluctuation range of the node load during the peak period is 500kW. These statistical results can help understand the power demand pattern of the construction area and provide data support for the formulation of power supply strategies.
[0070] Optionally, step S4 is specifically: Step S41: integrating the construction area environment based on the multi-level construction area sensor network to obtain construction area environment data; In this embodiment, a multi-level sensor network is deployed at the construction site, including temperature sensors, humidity sensors, wind speed sensors, air pressure sensors and light sensors. These sensors are installed at different locations and heights in the construction area to capture comprehensive information about the environment. The data of the sensor network is aggregated to the central data processing unit through a wireless communication system. After data cleaning and integration, detailed construction area environmental data is obtained, including parameters such as temperature, humidity, wind speed, air pressure and light intensity. These data are used for subsequent analysis to evaluate the impact of the environment on the construction progress and equipment energy consumption. Environmental sensor data fusion can also be performed through the established multi-level construction area sensor network to obtain construction area environmental data.
[0071] Step S42: extracting construction progress features according to the construction area environment data, thereby obtaining construction progress data; In this embodiment, the environmental data obtained is used to extract the construction progress characteristics in combination with the construction plan and progress tracking obtained through the construction site. Specifically, the temperature and humidity changes, wind speed and other environmental factors at the construction site are analyzed through environmental data to analyze the impact of the construction progress, and data mining technology is used to identify the main characteristics of the construction progress, such as construction speed, delays and work efficiency. The construction progress data includes the amount of work completed, the process time and the actual construction progress, which are compared with the scheduled progress to generate construction progress feature data to help understand the actual performance of the construction progress and its relationship with environmental factors. The construction area environment image in the construction area environment data can also be used for the extraction of construction progress. Through image analysis and computer vision technology, the actual progress of the construction site, such as the structural changes of the building or the location of the construction equipment, can be identified, thereby inferring the construction progress. This method can provide valuable data for the extraction of construction progress features and enhance the accurate understanding of the construction progress.
[0072] Step S43: Acquire construction equipment energy consumption data, and perform construction equipment power consumption prediction based on the construction equipment energy consumption data and construction progress data, thereby obtaining construction equipment power consumption prediction data; In this embodiment, real-time energy consumption data of construction equipment is collected, including power consumption, operating time and load conditions. This data can be obtained through smart meters or embedded sensors. These energy consumption data are combined with construction progress data, and regression analysis or machine learning algorithms (such as linear regression, support vector machine, etc.) are used to predict the power consumption of equipment at different construction stages. The obtained construction equipment power consumption prediction data includes the power demand prediction of each equipment at a specific construction stage, which helps optimize energy management and budget control.
[0073] Step S44: extracting the time characteristics of power demand from the power demand behavior pattern data of the construction area, thereby obtaining the time characteristic data of power demand; In this embodiment, the behavior pattern of power demand in the construction area is analyzed to extract time characteristic data. Power demand data is collected, including peak power consumption time, off-peak power consumption time, daily and weekly power consumption patterns, etc. Time series analysis techniques (such as autoregressive moving average model ARMA, or long short-term memory network LSTM) are used to extract the time characteristics of power demand, such as intra-day change rules, intra-week change patterns, etc. These time characteristic data will help establish a prediction model for power demand and understand the characteristics of power demand in different time periods.
[0074] Step S45: fusing the construction equipment power consumption forecast data and the power demand time characteristic data to obtain a comprehensive power demand characteristic set; In this embodiment, the obtained construction equipment power consumption forecast data is combined with the extracted power demand time characteristic data to perform feature fusion. Data fusion technology (such as principal component analysis PCA or feature selection algorithm) is used to integrate these data into a comprehensive feature set. This power demand comprehensive feature set includes the construction equipment power consumption forecast and the time characteristics of power demand, which can fully reflect the power demand characteristics of the construction area and provide a more accurate basis for power demand analysis.
[0075] Step S46: constructing a power demand prediction model based on the power demand comprehensive feature set, the power demand data of the construction area, and the environmental data of the construction area; In this embodiment, the power demand forecasting model is constructed using the obtained comprehensive power demand feature set, the power demand data of the construction area, and the environmental data of the construction area. A machine learning model (such as random forest, gradient boosting tree GBDT) or a deep learning model (such as a neural network) can be selected, and the above data can be used as input features to predict future power demand through training models. During the model construction process, data preprocessing, feature selection, model training and verification are required to ensure the accuracy and reliability of the prediction model.
[0076] Step S47: forecasting the power demand in the construction area based on the power demand behavior pattern data and the construction area environmental data through the power demand forecasting model, thereby obtaining the power demand forecasting data in the construction area.
[0077] In this embodiment, the constructed power demand prediction model is applied to the power demand behavior pattern data and the construction area environmental data of the construction area to predict the future power demand. The input includes the real-time environmental data of the construction area, the construction progress, the equipment power consumption data, etc., and the future power demand data of the construction area is obtained through model prediction. The prediction results will include the power demand in different time periods, helping construction management personnel to make reasonable power arrangements, optimize energy use, reduce costs, and improve construction efficiency.
[0078] Optionally, step S5 specifically includes: Step S51: extracting power supply node resource allocation features based on the power node link structure model in the construction area, thereby obtaining power supply node resource allocation data in the construction area; In this embodiment, based on the power node link structure model in the construction area, GIS tools are used to extract the power capacity and connection information of each power node. By analyzing the power network diagram in the construction area, the maximum power supply capacity, load capacity and connection relationship of each node with other nodes are identified. Combined with actual construction data and historical load records, the resource allocation characteristics of each node are calculated, such as node load balance, backup power capacity, etc. Through these data, detailed resource allocation data of power nodes in the construction area are obtained.
[0079] Step S52: performing spatial and temporal division of regional power demand according to the power demand forecast data of the construction area and the power demand behavior pattern data of the construction area, thereby obtaining spatial and temporal data of regional power demand; In this embodiment, the regional power demand is divided into time and space based on the power demand forecast data of the construction area (such as the power demand in the future construction stage) and the power demand behavior pattern (such as the peak and valley of power use during the working time period). The power demand is predicted using the time series analysis method, and the spatiotemporal model of power demand is established in combination with the actual progress and process requirements of the construction activities. This will generate detailed spatiotemporal data on the power demand in the construction area, such as the demand intensity and pattern for each time period and location.
[0080] Step S53: matching power supply and demand according to the power supply node resource allocation data of the construction area and the regional power demand spatiotemporal data, thereby obtaining power supply and demand matching data of the construction area; In this embodiment, the obtained power supply node resource allocation data is matched with the generated power demand spatiotemporal data. An optimization algorithm (such as linear programming or mixed integer programming) is used to determine how power resources are allocated to meet the power demand in various time periods and locations. This process will generate power supply and demand matching data, showing the effectiveness and deficiencies of power supply in different time periods and regions.
[0081] Step S54: performing power supply strategy analysis based on the power supply and demand matching data of the construction area, thereby obtaining a power supply strategy for the construction area; In this embodiment, the power supply strategy analysis is performed based on the power supply and demand matching data. This may include evaluating the efficiency, reliability and cost-effectiveness of the current power supply mode. A decision support system (DSS) is used to simulate and analyze different power supply strategies, such as adjusting the load distribution of supply nodes, optimizing the configuration of backup power sources, etc. Ultimately, a power supply strategy for the construction area will be formulated to improve the efficiency and stability of the overall power supply.
[0082] Step S55: extracting the power supply strategy from the power node link structure model of the construction area, thereby obtaining the rated power supply strategy of the construction area; In this embodiment, the rated power supply strategy is extracted based on the power node resource allocation contained in the power node link structure model of the construction area. By analyzing the resource configuration of the power nodes, the power demand, supply capacity and connection relationship of each node are understood. Based on the resource allocation data, the supply strategy of the overall power demand in the history of the construction area is analyzed, that is, the overall power supply strategy of the area before construction. This includes determining the original power supply priority, load distribution, and backup power use strategy of each node.
[0083] Step S56: Optimize the rated power supply strategy of the construction area according to the power supply strategy of the construction area, so as to obtain the optimized power supply strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
[0084] In this embodiment, when optimizing the power supply strategy in the construction area, the load conditions of each power node are first analyzed in detail to ensure that changes in power demand during construction will not cause node overload. Taking into account historical data and expected demand fluctuations during construction, the load distribution of nodes is adjusted through the load forecasting model, the power supply path is optimized, and the backup power supply configuration of key nodes is determined. For example, considering that the demand of a certain node surges during the construction process, its power supply priority is adjusted, and stable power supply is maintained by enabling backup power or adjusting the load of other nodes. Finally, the optimized power supply strategy is uploaded to the regional power supply management platform, and the platform will monitor and adjust power distribution in real time according to the new strategy to ensure stable and safe power supply during construction.
[0085] Optionally, the present invention further provides an electric power construction management and control system, which is used to execute the electric power construction management and control method as described above, and the electric power construction management and control system includes: The sensor data fusion module is used to obtain the sensor data of the construction area, and divide the regional sensor level according to the sensor data of the construction area, so as to obtain the regional sensor level data; based on the regional sensor level data, the construction area sensor data is fused to obtain a multi-level construction area sensor network; The topology structure analysis module is used to obtain regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, so as to obtain a regional power supply topology structure model; the regional power supply topology structure model is divided into power construction node link structure, so as to obtain a construction area power node link structure model; The power demand behavior analysis module is used to analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; The construction area power demand prediction module is used to integrate the construction area environment based on the multi-level construction area sensor network to obtain the construction area environment data; match the construction area power demand according to the construction area power demand behavior pattern data and the construction area environment data to obtain the construction area power demand prediction data; The power supply strategy analysis module is used to analyze the power supply strategy in the construction area based on the power demand forecast data and the power demand behavior pattern data in the construction area, so as to obtain the power supply strategy in the construction area; optimize the power supply strategy of the power node link structure model in the construction area according to the power supply strategy in the construction area, so as to obtain the power supply optimization strategy in the construction area, and upload it to the regional power supply management platform to perform power supply control tasks.
[0086] The electric power construction control system of the present invention can implement any one of the electric power construction control methods of the present invention, and is used to combine the operation and signal transmission medium between various modules to complete the electric power construction control method. The internal modules of the system cooperate with each other, thereby improving the accuracy and efficiency of power management.
[0087] Therefore, the embodiments should be regarded as illustrative and non-restrictive from all points, and the scope of the present invention is limited by the appended claims rather than the above description, and it is therefore intended that all changes falling within the meaning and range of equivalent elements of the application documents are included in the present invention.
[0088] The above description is only a specific embodiment of the present invention, so that those skilled in the art can understand or implement the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present invention. Therefore, the present invention will not be limited to the embodiments shown herein, but should conform to the widest scope consistent with the principles and novel features invented herein.
Claims
1. A method for controlling power construction, characterized in that: The following steps are involved: Step S1: Acquire construction area sensor data, and divide the regional sensor layers according to the construction area sensor data, so as to obtain regional sensor layer data; perform construction area sensor data fusion on the construction area sensor data based on the regional sensor layer data, so as to obtain a multi-level construction area sensor network; Step S2: Acquire regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, thereby obtaining a regional power supply topology structure model; perform power construction node link structure division on the regional power supply topology structure model, thereby obtaining a construction area power node link structure model; Step S3: Analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; Step S4: Performing construction area environment integration based on a multi-level construction area sensor network to obtain construction area environment data; performing construction area power demand matching based on the construction area power demand behavior pattern data and the construction area environment data to obtain construction area power demand forecast data; Step S5: Analyze the power supply strategy of the construction area based on the power demand forecast data and the power demand behavior pattern data of the construction area, so as to obtain the power supply strategy of the construction area; optimize the power supply strategy of the power node link structure model of the construction area according to the power supply strategy of the construction area, so as to obtain the power supply optimization strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
2. The electric power construction management and control method according to claim 1, characterized in that: Step S1 is specifically as follows: Step S11: acquiring sensor data of the construction area, and performing camera image extraction on the sensor data of the construction area, thereby obtaining a camera image of the construction area; Step S12: constructing a three-dimensional coordinate system of the construction area according to the camera image of the construction area, thereby obtaining the three-dimensional coordinate system of the construction area; Step S13: performing hierarchical division of the construction area based on the camera image of the construction area, thereby obtaining hierarchical division data of the construction area; Step S14: performing construction area sensor association on the construction area hierarchical division data and the construction area sensor data, thereby obtaining regional sensor hierarchical data; Step S15: performing construction area sensor data fusion on the construction area three-dimensional coordinate system and the construction area sensor data according to the regional sensor hierarchy data, thereby obtaining a multi-level construction area sensor network.
3. The electric power construction management and control method according to claim 2, characterized in that: Step S13 is specifically as follows: Step S131: performing edge detection based on the camera image of the construction area, thereby obtaining edge point data of the construction area image; Step S132: Calculating the slopes of adjacent edge points based on the edge point data of the construction area image, thereby obtaining the slope data of adjacent edge points; Step S133: classifying the slope edge points according to the slope data of the adjacent edge points, thereby obtaining high slope edge point data and low slope edge point data; Step S134: dividing the camera image of the construction area into areas with dense distribution of high-slope edge points according to the high-slope edge point data, thereby obtaining the main construction area data; dividing the camera image of the construction area into areas with dense distribution of low-slope edge points according to the low-slope edge point data, thereby obtaining the construction sub-area data; Step S135: regional spatial merging of the construction main area data and the construction sub-area data to obtain construction area hierarchical division data.
4. The electric power construction management and control method according to claim 1, characterized in that: Step S2 is specifically as follows: Step S21: Acquire regional power supply data, and perform node resource allocation feature extraction and node link feature extraction on the regional power supply data, thereby obtaining power supply node resource allocation data and power supply node link data; Step S22: classifying node loads according to the power supply node resource allocation data, thereby obtaining high-load node data and low-load node data; Step S23: Counting the node connection amount according to the node link data, thereby obtaining the node data of high-value connection amount and the node data of low-value connection amount; Step S24: performing node intersection operation on high-load node data and high-value connection node data, thereby obtaining supply structure primary node data; performing node intersection operation on low-load node data and low-value connection node data, thereby obtaining supply structure secondary node data; Step S25: performing a regional power main node topology structure analysis based on the supply structure main node data and the power supply node link data, thereby obtaining a regional power main supply topology structure model; performing a regional power secondary node topology structure analysis based on the supply structure secondary node data and the power supply node link data, thereby obtaining a regional power secondary supply topology structure model; Step S26: Perform regional power supply topology structure integration on the regional power main supply topology structure model and the regional power secondary supply topology structure model to obtain the regional power supply topology structure model, and perform power construction node link structure division on the regional power supply topology structure model to obtain the construction area power node link structure model.
5. The electric power construction management and control method according to claim 4, characterized in that: Step S26 is specifically as follows: Step S261: integrating the regional power supply topology structure model of the main regional power supply topology structure model and the regional power supply secondary regional power supply topology structure model, thereby obtaining a power supply topology structure model; Step S262: mapping the power supply node resource allocation to the power supply topology model according to the power supply node resource allocation data, thereby obtaining a regional power supply topology model; Step S263: spatially correlating power supply nodes in the construction area according to the multi-level construction area sensor network and the regional power supply topology model, thereby obtaining power supply correlation node data in the construction area; Step S264: dividing the regional power supply topology model into associated node link structures according to the construction area power supply associated node data, thereby obtaining the construction area power node link structure model.
6. The electric power construction management and control method according to claim 1, characterized in that: Step S3 is specifically as follows: Step S31: extracting the historical power load characteristics of the link nodes and the capacity characteristics of the power supply nodes from the power node link structure model in the construction area, thereby obtaining the historical power load data of the link nodes and the capacity data of the power supply nodes; Step S32: Perform regional power historical load demand statistics based on the linked node power historical load data, thereby obtaining construction area power demand data; Step S33: Calculate the power supply node load factor based on the link node power historical load data and the power supply node capacity data, thereby obtaining the power supply node load factor; Step S34: Performing statistics on the temporal and spatial distribution of power load on the power demand data of the construction area, thereby obtaining the temporal and spatial distribution data of power load in the construction area; Step S35: Integrate the construction area power demand behavior pattern according to the power supply node load factor and the construction area power load spatiotemporal distribution data, so as to obtain the construction area power demand behavior pattern data.
7. The electric power construction management and control method according to claim 6, characterized in that: Step S35 is specifically as follows: Step S351: evaluating the power supply stability of the power supply node according to the load factor of the power supply node, thereby obtaining the power supply node stability data; Step S352: extracting the time distribution characteristics of the power load in the construction area and the node distribution characteristics of the power load in the construction area from the time-space distribution data of the power load in the construction area, thereby obtaining the time distribution data of the power load in the construction area and the node distribution data of the power load in the construction area; Step S353: integrating the time behavior pattern of power demand according to the time distribution data of power load in the construction area and the stability data of power supply nodes, thereby obtaining the time behavior pattern data of power demand; Step S354: integrating the load behavior pattern of the power demand node according to the power load node distribution data of the construction area and the power supply node stability data, thereby obtaining the load behavior pattern data of the power demand node; Step S355: Perform descriptive statistical identification of the power demand behavior pattern on the power demand time behavior pattern data and the power demand node load behavior pattern data, so as to obtain the construction area power demand behavior pattern data.
8. The electric power construction management and control method according to claim 1, characterized in that: Step S4 is specifically as follows: Step S41: integrating the construction area environment based on the multi-level construction area sensor network to obtain construction area environment data; Step S42: extracting construction progress features according to the construction area environment data, thereby obtaining construction progress data; Step S43: Acquire construction equipment energy consumption data, and perform construction equipment power consumption prediction based on the construction equipment energy consumption data and construction progress data, thereby obtaining construction equipment power consumption prediction data; Step S44: extracting the time characteristics of power demand from the power demand behavior pattern data of the construction area, thereby obtaining the time characteristic data of power demand; Step S45: fusing the construction equipment power consumption forecast data and the power demand time characteristic data to obtain a comprehensive power demand characteristic set; Step S46: constructing a power demand prediction model based on the power demand comprehensive feature set, the power demand data of the construction area, and the environmental data of the construction area; Step S47: forecasting the power demand in the construction area based on the power demand behavior pattern data and the construction area environmental data through the power demand forecasting model, thereby obtaining the power demand forecasting data in the construction area.
9. The electric power construction management and control method according to claim 1, characterized in that: Step S5 is specifically as follows: Step S51: extracting power supply node resource allocation features based on the power node link structure model in the construction area, thereby obtaining power supply node resource allocation data in the construction area; Step S52: performing spatial and temporal division of regional power demand according to the power demand forecast data of the construction area and the power demand behavior pattern data of the construction area, thereby obtaining spatial and temporal data of regional power demand; Step S53: matching power supply and demand according to the power supply node resource allocation data of the construction area and the regional power demand spatiotemporal data, thereby obtaining power supply and demand matching data of the construction area; Step S54: performing power supply strategy analysis based on the power supply and demand matching data of the construction area, thereby obtaining a power supply strategy for the construction area; Step S55: extracting the power supply strategy from the power node link structure model of the construction area, thereby obtaining the rated power supply strategy of the construction area; Step S56: Optimize the rated power supply strategy of the construction area according to the power supply strategy of the construction area, so as to obtain the optimized power supply strategy of the construction area, and upload it to the regional power supply management platform to execute the power supply control task.
10. An electric power construction management and control system, characterized in that: Used to execute the electric power construction management and control method according to claim 1, the electric power construction management and control system comprises: The sensor data fusion module is used to obtain the sensor data of the construction area, and divide the regional sensor level according to the sensor data of the construction area, so as to obtain the regional sensor level data; based on the regional sensor level data, the construction area sensor data is fused to obtain a multi-level construction area sensor network; The topology structure analysis module is used to obtain regional power supply data, and perform regional power node topology structure analysis based on the regional power supply data, so as to obtain a regional power supply topology structure model; the regional power supply topology structure model is divided into power construction node link structure, so as to obtain a construction area power node link structure model; The power demand behavior analysis module is used to analyze the power demand of the construction area on the power node link structure model of the construction area, so as to obtain the power demand data of the construction area, and integrate the power demand behavior pattern of the construction area according to the power demand data of the construction area, so as to obtain the power demand behavior pattern data of the construction area; The construction area power demand prediction module is used to integrate the construction area environment based on the multi-level construction area sensor network to obtain the construction area environment data; match the construction area power demand according to the construction area power demand behavior pattern data and the construction area environment data to obtain the construction area power demand prediction data; The power supply strategy analysis module is used to analyze the power supply strategy in the construction area based on the power demand forecast data and the power demand behavior pattern data in the construction area, so as to obtain the power supply strategy in the construction area; optimize the power supply strategy of the power node link structure model in the construction area according to the power supply strategy in the construction area, so as to obtain the power supply optimization strategy in the construction area, and upload it to the regional power supply management platform to perform power supply control tasks.
Citation Information
Patent Citations
Intelligent power utilization method and system based on power internet of things
CN117036104A
Underground coal mine dangerous area identification method and system
CN118468117A
Intelligent control management platform for power supply and demand matching
CN118627859A
Cited By
Method for measuring project resource consumption of overhead transmission line
CN119741550A
Power dynamic scheduling method and system based on big data
CN121076808A