Intelligent concrete slump monitoring method and system
Through the concrete slump intelligent monitoring system, the monitoring images are identified with the problem of manual judgment dependence on construction sites, and efficient and accurate slump detection is achieved, reducing costs and improving the standardization of detection. .
Patent Information
- Application Number
- CN202410929104.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-11
- Publication Date
- 2024-11-29
AI Technical Summary
In the prior art, concrete slump detection relies on manual judgment, resulting in high cost, low accuracy and difficulty in ensuring the standardization and real-timeness of the detection, especially when the construction site lacks laboratory conditions.
The concrete slump intelligent monitoring system is adopted to identify the effectiveness and integrity of the monitoring images through the sampling monitoring end, ensuring the quality of the image uploaded to the central analysis management end, reducing the dependence on manual experience, and realizing automated detection and real-time supervision.
It improves the objectivity and accuracy of the detection results, reduces labor costs, reduces the calculation pressure on the central analysis management end, improves the detection efficiency and response speed, and ensures the compliance and accuracy of the detection process.
Smart Images

Figure CN119048969A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of concrete quality detection, and in particular to an intelligent monitoring system for concrete slump and a computer-readable storage medium. Background Art
[0002] Concrete is a common building material, widely used in building construction, roads and bridges, municipal engineering, hydraulic engineering, marine engineering and other construction projects. In order to ensure the smooth progress of the project, the quality of concrete must meet the requirements of the specifications, especially the slump of concrete, a technical control indicator, which is the most critical. Slump is closely related to the design strength, workability and constructability of concrete. Specifically, it is measured through a quantitative indicator to determine whether the construction can proceed normally.
[0003] Slump test refers to a common method for measuring the workability of concrete mixtures. It reflects whether the concrete is easy to construct and has uniform and dense properties, including the water retention, fluidity and cohesion of the concrete. It is an important indicator for measuring the consistency of concrete mixtures.
[0004] During the production, transportation and on-site pouring construction of ready-mixed concrete, real-time detection of slump is required.
[0005] At present, the detection of concrete slump is mainly based on the method specified in GB / T 50080-2016 "Standard for Performance Test Methods of Ordinary Concrete Mixtures". Concrete companies obtain test data by setting up laboratories to conduct relevant experiments. However, since the construction site often does not have experimental site conditions, it can only be judged manually by experienced material inspectors at the construction site. This not only increases labor costs, but also makes it difficult to ensure the accuracy and standardization of the test, and it is difficult to effectively supervise the test process. Summary of the invention
[0006] In order to solve the above technical problems, the embodiments of the present application provide a method, system and computer storage medium for intelligent monitoring of concrete slump.
[0007] The intelligent monitoring method for concrete slump provided in an embodiment of the present application is applied to an intelligent monitoring system for concrete slump, wherein the system includes a sampling monitoring terminal and a central analysis and management terminal, and the method includes the following steps: the sampling monitoring terminal responds to a monitoring image upload instruction, identifies the validity of the monitoring image and marks the monitoring image based on the identification result; wherein the validity identification includes identifying the state of a reference object in a first calibration area in the monitoring image, and marking the monitoring image as valid when it is determined that the state of the reference object is a standard state, otherwise marking it as invalid; when the number of valid monitoring images meets a preset requirement, each of the valid monitoring images is sent to the central analysis and management terminal for the central analysis and management terminal to perform slump analysis.
[0008] In the above technical solution, the concrete slump detection process is monitored by means of the concrete slump intelligent monitoring system, and the central analysis management terminal directly performs slump analysis based on the monitoring images, which reduces the reliance on manual experience judgment in the detection process, makes the detection results more objective, and reduces labor costs. Furthermore, by performing validity identification on the collected images before uploading the monitoring images to the central analysis management terminal, it is possible to make real-time judgments on whether the detection process is compliant, and to a certain extent, ensure the compliance of the uploaded monitoring images, reduce the computing pressure of the central analysis management terminal, and improve the response speed of the central analysis management terminal.
[0009] In one implementation, the image upload instruction is generated based on an image storage event of the monitoring image.
[0010] Based on the above technical solution, the acquisition monitoring end can timely check the image every time the inspector completes shooting, so that feedback can be quickly provided when problems occur, avoiding unnecessary and invalid operations and improving inspection efficiency.
[0011] In one implementation, the first calibrated area is an area defined by a marking frame displayed in a capture screen during image capture, and the marking frame is displayed in the monitoring image. Accordingly, the state recognition of the reference object in the first calibrated area in the monitoring image includes: cutting out a first image corresponding to the first calibrated area based on the marking frame, and recognizing the state of the reference object based on the first image.
[0012] Based on the above technical solution, the first calibration area can be quickly determined through the marking box, thereby improving the processing rate of the first image and achieving rapid response, so as not to affect the detection sampling efficiency and miss the sampling time.
[0013] In one implementation, the reference object is used to indicate whether the position of the concrete test plate is horizontal, and identifying the state of the reference object includes identifying whether the position information indicated by the reference object is horizontal.
[0014] During the concrete slump test, the sample is required to be placed horizontally. However, due to the complex construction site environment, it is difficult to ensure that the sample position is horizontal during the traditional test process. Based on the above technical solution, whether the position of the test board is horizontal during the test is determined by checking whether the reference object in each monitoring image is indicated as horizontal, so as to confirm the compliance of the test process and ensure that the uploaded monitoring images are collected when the test board is in a horizontal state.
[0015] In one implementation, before the image storage event is generated, the method further includes: checking the integrity of the reference image in the first calibration area, and if the check passes, storing the monitoring image, otherwise refusing to store the monitoring image.
[0016] Based on the above scheme, the integrity of the captured image is checked before the image storage event is generated to ensure that only monitoring images that meet the integrity requirements are stored, thereby ensuring that each captured image has a reference object and meets the requirements, thereby ensuring that the shooting angle of the stored monitoring image meets the preset requirements, reducing the difficulty of the image analysis process, and improving image processing efficiency and accuracy.
[0017] In one implementation, the integrity check includes checking the overall outline of the reference object and the area ratio of the reference object in the first calibration area.
[0018] Based on the above technical solution, the integrity of the reference object can be guaranteed by identifying the overall outline of the reference object, and the correctness of the shooting distance and angle can be guaranteed by combining the area ratio of the reference object in the first calibration area.
[0019] In one implementation, the method further includes: after the sampling monitoring end sends each of the valid monitoring images to the central analysis and management end, the sampling monitoring end monitors the communication port with the central analysis and management end in real time, and upon receiving a re-sampling instruction fed back by the central analysis and management end, notifies the detection personnel to perform re-sampling detection.
[0020] In one implementation, after sending each of the valid monitoring images to the central analysis management end, the sampling monitoring end turns off the monitoring image storage function.
[0021] Based on the above technical solution, after the monitoring image is sent, by forcibly closing the monitoring image storage function, it is possible to avoid the situation where the terminal device resources are occupied by image acquisition, resulting in failure to respond to the re-sampling instruction in time.
[0022] Based on the same inventive concept, an embodiment of the present application also provides a concrete slump intelligent monitoring system, which is used to execute the above-mentioned concrete slump intelligent monitoring method.
[0023] In addition, an embodiment of the present application further provides a computer-readable storage medium storing a computer program, which implements the above-mentioned intelligent monitoring method for concrete slump when executed by a processor.
[0024] In summary, the embodiments of the present application at least include the following beneficial technical effects: 1. Detecting concrete slump with the help of the concrete slump intelligent monitoring system reduces the experience requirements for detection personnel, thereby reducing costs and making the detection results more objective, reliable and traceable.
[0025] 2. By identifying the validity and integrity of the monitoring images at the acquisition monitoring end, the quality of the monitoring images uploaded to the central analysis and management end can be guaranteed, the difficulty of image processing at the central analysis and management end can be reduced, and the computing pressure at the central analysis and management end can be alleviated.
[0026] 3. The introduction of the test bench and reference objects can provide corresponding reference data for the intelligent monitoring system and effectively guide the detection process to improve detection efficiency and accuracy. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] The drawings constituting a part of the present application are used to provide a further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application.
[0028] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0029] Figure 1 A structural schematic diagram of a concrete slump intelligent monitoring system provided in an embodiment of the present application is shown.
[0030] Figure 2A A schematic diagram of the structure of a detection auxiliary tool provided in an embodiment of the present application is shown.
[0031] Figure 2B A schematic diagram of the structure of a detection board provided in an embodiment of the present application is shown.
[0032] Figure 3 A flow chart of the intelligent monitoring method for concrete slump provided in an embodiment of the present application is shown.
[0033] Figure 4A A schematic diagram of a photo taking interface provided in an embodiment of the present application is shown.
[0034] Figure 4B A schematic diagram of another photo-taking interface provided in an embodiment of the present application is shown.
[0035] Figure 4C A schematic diagram of another photo-taking interface provided in an embodiment of the present application is shown. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present application to clearly and completely describe the technical solutions in the embodiments of the present application. Obviously, the described embodiments are only part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.
[0037] In the description of the embodiments of the present application, unless otherwise specified, "multiple" means two or more, and "first", "second" and various digital numbers are only distinguished for the convenience of description and are not used to limit the scope of the embodiments of the present application.
[0038] The features, structures or characteristics in this application may be combined in one or more embodiments in any suitable manner. In various embodiments of this application, the size of the sequence number of each process does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of this application.
[0039] Some optional features in the embodiments of the present application may be implemented independently in some scenarios without relying on other features to solve corresponding technical problems and achieve corresponding effects. They may also be combined with other features in some scenarios as needed.
[0040] In this application, unless otherwise specified, the same or similar parts between the various embodiments can refer to each other. In the various embodiments of this application, if there is no special description and logical conflict, the terms and / or descriptions between different embodiments are consistent and can be referenced to each other, and the technical features in different embodiments can be combined to form new embodiments according to their inherent logical relationships. The implementation methods of this application do not constitute a limitation on the scope of protection of this application.
[0041] The embodiments of the present application are described in detail below with reference to the accompanying drawings.
[0042] The intelligent monitoring method provided in the embodiment of the present application is realized by a concrete slump intelligent monitoring system in combination with a detection auxiliary tool. Figure 1 The intelligent monitoring system 100 for concrete slump includes at least one sampling monitoring terminal 110 and a central analysis management terminal 120 , and each sampling monitoring terminal 110 is respectively connected to the central analysis management terminal 120 for communication.
[0043] Specifically, the sampling monitoring terminal 110 is an executable program that can be accessed through a smart terminal device, such as an application program (APP), a website or a small program, etc., and a smart terminal device such as a mobile phone, a tablet computer, a laptop computer and other smart electronic products with a built-in camera. The sampling monitoring terminal 110 includes an image acquisition unit 111, a storage unit 112, a recognition unit 113 and a communication unit 114, wherein the storage unit 112 is respectively connected to the image acquisition unit 111, the recognition unit 113 and the communication unit 114 in communication, and the image acquisition unit 111 is also connected to the communication unit 114 in communication.
[0044] Please refer to Figure 2A The detection auxiliary tool 200 includes a detection plate 210 and a reference object 220, which is low-cost and easy to carry. The detection plate 210 is a hard flat plate structure, which can be made of steel or hard resin, and is used to carry the concrete sample during the detection process.
[0045] The reference object 220 is used to provide a reference in the image recognition process to determine the scaling of the image, and can be stably placed on the detection board 210, for example, a wooden or resin block. In a preferred embodiment, the reference object 220 can be selected as a square cylindrical level, which can not only provide a size reference, but also indicate whether the detection board 210 is placed horizontally, which helps to accurately adjust the placement of the detection board 210 to meet the detection requirements, and can also help to analyze the effectiveness of the sampled image during the image recognition process, and the cost is low. Furthermore, the square cylindrical level can display horizontal indication information at multiple angles to ensure that the horizontal indication information can be presented in the collected monitoring image. For example, part of the outer shell of the square cylindrical level can be selected from a transparent material, so that the horizontal indication information can be obtained from various angles.
[0046] In order to keep the reference object 220 stably placed during the detection process, an auxiliary layer can be added to the contact surface between the reference object 220 and the detection board 210 or the contact surface between the detection board 210 and the reference object 220 to achieve the connection between the reference object 220 and the detection board 210. In one embodiment, the auxiliary layer can be a glue layer or a magnetic layer, which can be selected according to the material of the detection board 210 and the reference object 220.
[0047] Please refer to Figure 2B, different graphic marks can be set on the detection board 210 to guide and distinguish the placement areas of the reference object 220 and the concrete sample, wherein the placement area Z1 of the reference object 220 and the placement area Z2 of the concrete sample are set according to the preset imaging requirements, for example, there is no overlap under the preset shooting angle, so that the interference between the reference object 220 and the sample in the sampling image can be reduced, the difficulty of image recognition can be reduced, and the recognition efficiency can be improved. Figure 2B As shown, in order to ensure the expansion space of the concrete sample, the placement area Z2 of the reference object 220 is set close to the left edge of the detection plate 210, and is staggered with the placement area Z2 of the concrete sample at multiple imaging angles. Based on this, it is convenient to obtain the front, back and side views of the concrete sample, so that the central analysis management end 120 can directly determine the height of the concrete based on these images. Among them, the preset imaging requirements are determined according to the image recognition technology used by the system. Accordingly, the placement position of the reference object 220 can be guided by setting the size of the reference object placement area to meet the shooting requirements.
[0048] The following is an example of a concrete detection process to illustrate the intelligent monitoring method for concrete slump provided by the embodiment of the present application. Figure 3 The concrete slump detection method provided in the embodiment of the present application specifically comprises the following steps: 310, prepare the testing environment.
[0049] Specifically, the test board 210 is placed on a stable horizontal plane, and a reference object 220 is installed. At the same time, it should be ensured that there is no debris on the surface of the test board 210 and it meets the test requirements.
[0050] Preferably, in order to facilitate subsequent photography, the horizontal plane should be at a certain height from the ground, such as a desktop or table top.
[0051] When the reference object 220 is a level meter, the inspector can use the reference object 220 to adjust the position of the inspection plate 210 to be horizontal.
[0052] 320 , prepare a concrete sample to be tested in the sample placement area of the testing board 210 .
[0053] The method for preparing the concrete sample to be tested specifically includes placing the slump cone in the concrete sample placement area, loading and tamping the cone, scraping and smoothing the cone mouth, and finally lifting the cone.
[0054] 330 , photograph the test sample on the detection board 210 based on the sampling monitoring terminal, obtain and store the monitoring image.
[0055] For example, the inspector can open the sampling monitoring terminal application installed on the mobile phone, enter the photo taking interface provided by the image acquisition unit 111, and perform monitoring image acquisition according to the instructions in the photo taking interface.
[0056] The image acquisition unit 111 assists the inspector in selecting the correct shooting angle by displaying a mark frame and text guidance on the shooting interface. The mark frame is used to indicate the imaging position of the reference object 220 in the monitoring image, and the text guidance is used to remind the inspector to ensure that the reference object in the shooting image is located within the mark frame before clicking the shooting button. Figure 4A As shown, a marking box 410a and a photo button 420 are displayed in the photo taking interface, wherein the position of the marking box 410a in the photo taking interface is fixed, that is, it is always located on the left side of the interface, corresponding to the position of the placement area where the reference object 220 is located on the detection board 210, thereby facilitating the detection personnel to quickly find the required shooting angle.
[0057] In some embodiments, the central analysis management terminal 120 needs to identify and analyze multiple monitoring images at different angles to obtain accurate slump data. Figure 4B , 4C In the example, the detector is based on Figure 4A After the interface is shot, the image acquisition unit 111 displays Figure 4B The photo taking interface shown is used to instruct the inspector to complete the photo taking of the corresponding image, and after completing the corresponding photo taking, the Figure 4C The photo taking interface shown in FIG. 1 is used to indicate the acquisition of the corresponding image. Figure 4A , 4B The positions and sizes of the marking boxes 410a, 410b and 410c in FIGS. 4C and 4C may be determined based on the display position and size of the reference object 220 in the image at a preset acquisition angle.
[0058] To ensure that the collected monitoring image is qualified, after the inspector clicks the photo button 420, the image acquisition unit 111 first performs a completeness check on the currently collected monitoring image, that is, checks the completeness of the reference image in the first calibration area circled by the marking box. If the check passes, the image storage event is triggered to send the monitoring image to the storage unit 112 for storage. Otherwise, the monitoring image is refused to be stored, and the corresponding shooting interface is returned to instruct the inspector to take photos again. Based on this, it can be guaranteed to be usable to a certain extent, and the problem image can be re-shot in time, which improves the work efficiency and facilitates the inspector to quickly complete the collection of effective images, and try to avoid missing the effective detection time due to delayed feedback.
[0059] The integrity check includes checking the overall outline of the reference object displayed in the first calibration area and the area ratio of the reference object in the first calibration area. In one implementation, the integrity of the overall outline of the reference object can be determined by the continuity of the background image in the first calibration area, and the area ratio can be determined by calculating the area of the background image, wherein the background image is obtained by intercepting the image corresponding to the first calibration area in the monitoring image based on the marking frame, calibrating the reference image, and removing it to obtain the background image. Compared with directly identifying the reference object, the recognition error caused by the change of the background can be reduced.
[0060] When receiving the storage request for the monitoring image, the storage unit 112 generates an image storage event and stores the monitoring image.
[0061] 340 , the sampling monitoring end, in response to the monitoring image upload instruction, identifies the validity of the monitoring image and marks the monitoring image based on the identification result.
[0062] Among them, the image upload instruction is generated based on the image storage event of the monitoring image. Specifically, the identification unit 113 monitors the storage space of the storage unit 112 in real time. When a new image is detected to be stored, the image upload instruction is automatically generated, and the validity of the newly stored monitoring image is identified.
[0063] In one implementation, validity identification includes status identification of a reference object in a first calibration area in a monitoring image, and when it is determined that the status of the reference object is a standard status, the monitoring image is marked as valid, otherwise it is marked as invalid. The marking box display can be in the monitoring image, and the status identification of the reference object in the first calibration area in the monitoring image includes: cutting out the first image corresponding to the first calibration area based on the marking box, identifying whether the position information indicated by the reference object is horizontal based on the first image, if it is indicated to be horizontal, then determining that the monitoring image is valid, otherwise, determining that the monitoring image is invalid, and forcibly exiting the sampling operation at the same time, and feedback that this detection is invalid through the graphical interface, and sending a re-detection instruction to the detection personnel. Since the detection board 210 needs to be kept horizontal during the concrete slump detection process, otherwise the detection process is not compliant, therefore, when it is identified that the reference object indication information is a non-horizontal position, it can be directly determined that this detection is invalid, and the detection personnel can be notified in time to re-detect.
[0064] In other implementations, validity identification includes identification of brightness, pixels, or background interference factors of the monitoring image, which can be specifically set according to the requirements of the central analysis management terminal 120 for the monitoring image to ensure that the uploaded image meets the identification requirements of the central analysis management terminal 120.
[0065] It is understandable that the recognition unit 113 may have different validity judgment criteria for monitoring images at different angles, which are specifically determined according to preset image requirements. For example, all monitoring images are identified for brightness, and those with brightness that do not meet the required range are determined to be invalid and need to be re-captured. For some monitoring images, the reference object status can be further identified.
[0066] The recognition unit 113 may mark the monitoring image based on the recognition result.
[0067] 350, when the number of valid monitoring images meets the preset requirements, each valid monitoring image is sent to the central analysis management end for the central analysis management end to perform slump analysis.
[0068] Specifically, the communication unit 114 monitors the number of valid monitoring images in the storage space of the storage unit 112 in real time, and determines the required number of monitoring images according to the needs of the central analysis management end, and uploads the valid monitoring images when they meet the preset requirements.
[0069] The central analysis management terminal 120 calculates the height of the concrete sample based on the received monitoring image, and finally obtains the detection result based on the height difference between the concrete sample and the slump cone.
[0070] In a specific implementation, the central analysis management terminal 120 can directly perform identification and calculation based on the concrete sample image in each monitoring image, such as identification based on a pre-built big data model, or correct the image according to a reference object, and finally determine the height of the concrete sample based on the actual size of the reference object and the proportional relationship with the concrete sample. 3D modeling can also be performed based on multi-angle pictures and reference objects to obtain the height data of the concrete sample. The specific calculation method can be selected according to actual needs, and the present application is not limited to this.
[0071] In one implementation, the image acquisition unit 111 may mark the area where the concrete sample is located in the image as the second calibration area during the photographing process, and mark the second calibration area in the monitoring image, such as setting a marking frame or recording area information, so that the central analysis management terminal 120 can directly determine the corresponding second image of the concrete sample based on the second calibration area. This simplifies the data processing process of the central analysis management terminal 120 and improves the image analysis efficiency.
[0072] After completing the slump calculation, the central analysis management terminal 120 analyzes the test results, generates a test report, and generates corresponding operation instructions based on the test report and sends them to the sampling monitoring terminal 110, wherein the operation instructions include: re-sampling and test completion.
[0073] In one implementation, when the communication unit 114 determines to start uploading the monitoring image, it sends a stop acquisition instruction to the image acquisition unit 111 to instruct the image acquisition unit 111 to exit the photo taking interface, and notifies the storage unit to turn off the monitoring image storage function, thereby avoiding invalid operations by the detection personnel. At the same time, it can reduce the system resources occupied by the sampling monitoring terminal 110 and avoid the execution of other functions affecting the detection results and instructions fed back by the central analysis management terminal 120.
[0074] 360, the sampling monitoring end monitors the communication port with the central analysis and management end in real time, and upon receiving the re-sampling instruction fed back by the central analysis and management end, it notifies the testing personnel to conduct re-sampling testing.
[0075] The communication unit 114 can establish a stable and reliable communication connection with the central analysis management terminal 120 based on the Transmission Control Protocol (TCP). After the monitoring image is uploaded through the communication connection, the validity of the communication connection is maintained based on the Keep alive mechanism, and the connection port is monitored in real time to ensure that the operation instructions from the central analysis management terminal 120 are received in a timely and complete manner. When a re-sampling instruction is received, a notification is sent to the detection personnel and an opening instruction is sent to the image acquisition unit 111 to instruct the image acquisition unit 111 to open the photo taking interface, so that the detection personnel's smart terminal directly enters the photo taking interface.
[0076] Based on the above method, the slump detection of concrete is realized by using detection auxiliary tools and intelligent monitoring systems, which can provide guidance and correction in the detection process, with simple operation, and realize automatic calculation of slump data based on image recognition technology, without relying on manual experience, to ensure the objectivity and accuracy of the detection results. Furthermore, by pre-identifying the collected monitoring images at the acquisition and monitoring end, the availability of the monitoring images and the compliance of the detection process can be ensured, which not only reduces the calculation pressure of the central analysis and management end, but also can feedback problems in time, so that on-site personnel can make corrections in time. In addition, the detection auxiliary tool has a simple structure and is easy to carry, with low site requirements, and can be applied to various construction sites. At the same time, the detection personnel can complete the detection process through intelligent terminal devices, with low equipment cost and easy to use, which reduces personnel requirements and saves labor costs.
[0077] Another embodiment of the present application relates to a computer-readable storage medium storing a computer program. When the computer program is executed by a processor, the embodiment of the above-mentioned intelligent monitoring method for concrete slump is implemented.
[0078] Those skilled in the art can understand that all or part of the steps in the above-mentioned implementation method can be completed by instructing the relevant hardware through a program, and the program is stored in a storage medium, including a number of instructions to enable a device (which can be a single-chip microcomputer, chip, etc.) or a processor (processor) to execute all or part of the steps of each implementation method of the present invention. The aforementioned storage medium includes: U disk, mobile hard disk, read-only memory (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), disk or optical disk and other media that can store program codes.
[0079] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims
1. An intelligent monitoring method for concrete slump, characterized in that: Applied to the intelligent monitoring system of concrete slump, the system includes a sampling monitoring end and a central analysis management end, and the method includes the steps of: The sampling monitoring end, in response to the monitoring image upload instruction, identifies the validity of the monitoring image and marks the monitoring image based on the identification result; wherein the validity identification includes identifying the state of the reference object in the first calibration area of the monitoring image, and marking the monitoring image as valid if it is determined that the state of the reference object is a standard state, otherwise marking it as invalid; When the number of valid monitoring images meets the preset requirement, each of the valid monitoring images is sent to the central analysis management end so that the central analysis management end can perform slump analysis.
2. The method according to claim 1, characterized in that The image upload instruction is generated based on an image storage event of the monitoring image.
3. The method according to claim 1, characterized in that The first calibrated area is an area defined by a marking frame displayed in a capture screen during image capture, and the marking frame is displayed in the monitoring image. Accordingly, the state recognition of the reference object in the first calibrated area in the monitoring image includes: cutting out a first image corresponding to the first calibrated area based on the marking frame, and recognizing the state of the reference object based on the first image.
4. The method according to claim 1 or 3, characterized in that The reference object is used to indicate whether the position of the concrete detection plate is horizontal, and identifying the state of the reference object includes identifying whether the position information indicated by the reference object is horizontal.
5. The method according to claim 2, characterized in that Before the image storage event is generated, the method further includes: checking the integrity of the reference image in the first calibration area, and if the check passes, storing the monitoring image, otherwise refusing to store the monitoring image.
6. The method according to claim 5, characterized in that The integrity check includes checking the overall outline of the reference object and the area ratio of the reference object in the first calibration area.
7. The method according to claim 1, characterized in that The method further comprises: After sending each of the valid monitoring images to the central analysis and management end, the sampling monitoring end monitors the communication port with the central analysis and management end in real time, and upon receiving a re-sampling instruction fed back by the central analysis and management end, notifies the detection personnel to perform re-sampling detection.
8. The method according to claim 7, characterized in that After sending each of the valid monitoring images to the central analysis management end, the sampling monitoring end turns off the monitoring image storage function.
9. Concrete slump intelligent monitoring system, characterized in that: The system is used to execute the intelligent monitoring method for concrete slump according to any one of claims 1 to 8.
10. A computer-readable storage medium storing a computer program, characterized in that: When the computer program is executed by a processor, the intelligent monitoring method for concrete slump according to any one of claims 1 to 8 is implemented.
Citation Information
Patent Citations
Slump measuring method, device and equipment and storage medium
CN113902725A
Concrete member quality control method and system based on visual monitoring
CN117808356A
Concrete slump detection equipment
CN212622606U
Concrete slump detection device
CN220913133U
Automatic level detection device
TWM586793U