Construction safety monitoring method and device, storage medium and electronic equipment

By obtaining image information of construction personnel and identifying illegal operations, combined with the analysis of the construction area, a reminder signal is issued to warn of violations, which solves the problem of difficulty in real-time monitoring and early warning in construction safety monitoring, and significantly improves the safety of the construction site.

CN119048974AActive Publication Date: 2024-11-29GUANGDONG FUGUANG NEW ENERGY TECH CO LTD

Patent Information

Application Number
CN202411006623.X
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-25
Publication Date
2024-11-29
Estimated Expiration
2044-07-25

AI Technical Summary

Technical Problem

The existing construction safety monitoring technology is difficult to monitor the illegal operations of construction personnel on the construction site in real time, resulting in greater safety hazards. Especially when construction personnel enter the construction site or go to work, they cannot provide timely early warnings.

Method used

By obtaining image information of construction personnel, identifying illegal operations and sending reminders, determining construction areas that are prone to illegal operations, and issuing early warning signals within a specific distance between personnel and areas to remind construction personnel to avoid illegal operations.

Benefits of technology

It effectively reduces the safety hazards at the construction site. By promptly reminding construction personnel to adjust illegal operations, the occurrence of safety accidents is reduced and the safety of the construction site is improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119048974A_ABST
    Figure CN119048974A_ABST
Patent Text Reader

Abstract

The invention relates to a construction safety monitoring method and device, a storage medium and electronic equipment, and relates to the technical field of construction monitoring, and the method comprises the steps: obtaining the target image information of a target constructor entering a construction site; based on the target image information, determining violation operation of the target constructor, and sending out a first reminding signal of the violation operation; according to the violation operation, a corresponding target construction area is determined from the construction site, and the target construction area is a construction area where constructors are prone to violation operation on the way to work; and judging whether the target constructor goes to the target construction area to work or not, and if so, sending a second reminding signal of the violation operation when a first distance between the target constructor and the target construction area is smaller than a first early warning distance. The method has the effect of reducing potential safety hazards in the construction site.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of construction monitoring, and in particular to a construction safety monitoring method, device, storage medium and electronic equipment. Background Art

[0002] Construction safety is a very important part of the construction process of engineering projects. It is related to the life safety of construction workers, the normal operation of equipment and the smooth completion of the project. Therefore, we must attach great importance to construction safety and take effective measures to ensure safety during the construction process. Construction safety monitoring refers to the real-time monitoring and management of production safety work at the construction site to prevent or correct safety risks during the construction process and ensure the safety of on-site construction workers and equipment.

[0003] At present, the construction safety monitoring method commonly used in construction sites is: the facial features of construction workers entering the construction site are identified through a face recognition system to verify the identity of the entrants, ensuring that only authorized personnel can enter the construction site, which improves the safety of the construction site to a certain extent. However, once the construction workers enter the construction site or perform behaviors or operations that do not comply with construction safety regulations during work, such as not wearing a safety helmet, they cannot be monitored in real time, resulting in greater safety hazards in the construction site. Summary of the invention

[0004] In order to reduce potential safety hazards in construction sites, the present application provides a construction safety monitoring method, device, storage medium and electronic equipment.

[0005] In a first aspect of the present application, a construction safety monitoring method is provided, which specifically includes: Acquire target image information of target construction personnel entering the construction site; Based on the target image information, determining the illegal operation of the target construction personnel, and issuing a first reminder signal of the illegal operation, wherein the first reminder signal is used to remind the target construction personnel to adjust the illegal operation, wherein the illegal operation is an operation that does not comply with construction safety; According to the illegal operation, a corresponding target construction area is determined from the construction site, wherein the target construction area is a construction area where construction workers are prone to perform the illegal operation during work; Determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, issue a second reminder signal of the illegal operation, and the second reminder signal is used to remind the target construction personnel to avoid the illegal operation.

[0006] By adopting the above technical solution, if the target construction personnel perform illegal operations when entering the construction site, the safety hazards of the construction site are reduced, and a first reminder signal is issued to remind the target construction personnel to make adjustments. Then, based on the illegal operations, the target construction area in the construction site where the construction personnel are prone to perform such illegal operations while on the way to work is determined. Further, if the first distance between the target construction personnel and the target construction area is less than the first warning distance, it means that the target construction personnel are close to the target construction area and need to be warned of illegal operations in time, then a second reminder signal corresponding to the illegal operations is issued to remind the target construction personnel not to perform illegal operations again, thereby timely reminding the target construction personnel of illegal operations after entering the construction site and on the way to work, reducing the safety hazards in the construction site.

[0007] Optionally, the method further includes: If the target construction personnel have not gone to the target construction area to work, then obtain the construction image information of the special type of workers in the target construction area; Based on the construction image information, determining whether the corresponding special worker is wearing a matching work permit; If not, a third reminder signal is sent to the target construction area, and the corresponding construction process is determined as a potential risk process, and the third reminder signal is used to remind the corresponding special workers to wear work permits, otherwise the work is suspended; According to each of the potential risk processes, determine the potential safety accidents and the corresponding impact warning distances and protective operations; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, and the fourth reminder signal is used to remind the target construction personnel to stay away from the target construction area and perform the protective operation.

[0008] By adopting the above technical solution, if the target construction personnel are not going to the target construction area to work, it means that the target construction personnel are not the construction personnel working in the target construction area, but may pass by the target construction area. Then it is judged whether the special workers in the target construction area are wearing the corresponding work permit. If not, it means that the special workers may be in an unsafe situation of working without a permit. Then a third reminder signal is issued to remind the special workers to wear the corresponding work permit or suspend work, thereby eliminating the safety hazard of working without a permit. Furthermore, if the second distance is less than the impact warning distance, it means that the target construction personnel passed by the target construction area during the movement and the distance is relatively close. Once a potential safety accident occurs, it will be affected. Then a fourth reminder signal is issued to remind the target construction personnel to stay away from the target construction area and implement corresponding protective measures to reduce the safety hazards in the construction site.

[0009] Optionally, determining a potential safety accident and a corresponding warning distance and protective operation according to each of the potential risk processes specifically includes: Obtaining current environmental impact factors and determining the impact level of the environmental impact factors on each of the potential risk processes; Selecting the maximum impact level from the impact levels, and determining the potential risk process corresponding to the maximum impact level as the key risk process; Determine the potential safety accidents corresponding to the key risk processes, determine the impact warning distance and protective operations of the potential safety accidents, and determine the reminder duration according to the maximum impact level; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, which specifically includes: If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued and lasts for the reminder duration.

[0010] By adopting the above technical solution, the greater the impact level, the greater the impact on the normal progress of the corresponding potential risk process, the higher the safety hazard, and the longer the corresponding reminder time. Then, the key risk process with the greatest safety hazard under the influence of environmental impact factors is determined, and the corresponding reminder time is determined according to its corresponding maximum impact level. Finally, when the second distance is less than the impact warning distance, the fourth reminder signal is issued and the reminder time is continued, so as to provide a longer reminder and warning to the target construction personnel passing through the target construction area to avoid the target construction personnel being affected once a potential safety accident occurs.

[0011] Optionally, after determining whether the corresponding special worker wears a matching work permit, the process further includes: If yes, then obtain the current environmental impact factor, and determine the interference coefficient of the environmental impact factor on different special types of work in the target construction area. The higher the interference coefficient, the more likely it is that a safety accident will occur to the special type of worker of the corresponding special type of work; Determine the safety accidents that are likely to occur for special workers of different special types of work in the target construction area under the environmental impact factors, and determine the risk factor corresponding to each of the safety accidents that are likely to occur; The interference coefficient and the risk factor for safety accidents corresponding to the same special type of work are multiplied to obtain the corresponding environmental risk coefficient, and the environmental risk coefficient corresponding to each special type of work and the total number of special workers in the target construction area are substituted into the preset work safety risk coefficient formula to obtain the corresponding safety risk coefficient of the special type of work. The work safety risk coefficient formula is: S = E * log (n + 1); In the formula, S represents the safety risk factor, E represents the environmental risk factor, and n represents the total number of special workers corresponding to a single special job type; Based on the safety risk coefficients corresponding to the special types of work in the target construction area, the overall safety risk coefficient of the target construction area is determined, and when the overall safety risk coefficient exceeds a preset coefficient threshold, a danger warning signal is issued.

[0012] By adopting the above technical scheme, the interference coefficient corresponding to the same special type of work and the risk coefficient prone to safety accidents are multiplied to obtain the corresponding environmental risk coefficient. The larger the environmental risk coefficient, the more likely the special type of work personnel of the corresponding special type of work under this environmental impact factor will cause more dangerous safety accidents, and the greater the impact on construction safety. Substitute the environmental risk coefficient and the total number of special type of work personnel corresponding to each special type of work in the target construction area into the formula of the type of work safety risk coefficient, and finally obtain the corresponding safety risk coefficient of the special type of work personnel, that is, the impact on the construction safety of the target construction area. When calculating the safety risk coefficient, the total number of special type of work personnel is added by 1 and the natural logarithm is taken, which can effectively alleviate the linear influence of the total number of special type of work personnel on the safety risk coefficient, avoid excessive safety risk coefficient when the total number of special type of work personnel is too large, and thus make the determined safety risk coefficient more objective and accurate. Finally, if the overall safety risk coefficient exceeds the coefficient threshold, it means that the risk of the target construction area causing safety problems to the construction site is higher, then a danger reminder signal is issued to remind the target construction personnel passing through the target construction area to pay attention to safety and ensure the safety of the construction site.

[0013] Optionally, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, issuing the second reminder signal of the illegal operation specifically includes: Determine the hazard level corresponding to the illegal operation in the target construction area; According to the danger level, determining a first warning distance corresponding to the target construction personnel, and determining a first distance between the target construction personnel and the target construction area, wherein the higher the danger level, the greater the corresponding first warning distance; If the first distance is smaller than the first warning distance, a second reminder signal corresponding to the illegal operation is issued until the first distance is smaller than the second warning distance and the second warning distance is smaller than the first warning distance.

[0014] By adopting the above technical solution, the higher the danger level, the higher the degree of danger to the target construction personnel when they make such illegal operations while working in the target construction area, the earlier the warning needs to be issued when the target construction personnel are on the way to work, and the larger the corresponding first warning distance. If the first distance is less than the first warning distance, a warning of illegal operation is required, and a second reminder signal of the illegal operation is issued until the first distance is less than the second warning distance, and then the reminder is stopped, thereby preventing the target construction personnel from making illegal operations again on the way to work and reducing safety hazards in the construction site.

[0015] Optionally, the method further includes: When the type of work of the target construction personnel is a target special type of work, determining the construction importance level of each construction area of ​​the target special type of work in the construction site; Determine the third warning distance of the corresponding construction area according to the construction importance level, the higher the construction importance level, the larger the corresponding third warning distance; Determine a third distance between the target construction personnel and each of the construction areas, and if the third distance is less than the corresponding third warning distance and the target construction personnel does not wear the corresponding work permit, issue a fifth reminder signal, wherein the fifth reminder signal is used to remind the target construction personnel to wear the work permit corresponding to the target special type of work; When the number of times the fifth reminder signal is issued exceeds the number threshold, if the target construction worker does not wear the corresponding work permit, a check reminder for the target construction worker is sent to the terminal of the safety supervisor.

[0016] By adopting the above technical solution, the higher the construction importance level, the more important the target construction personnel are to the construction process of the corresponding construction area, and the earlier they need to be reminded to wear the work permit, the larger the corresponding third warning distance. If the third distance is less than the third warning distance and the target construction personnel do not wear the corresponding work permit, it indicates that if there is no reminder, there is a high possibility of safety hazards of unlicensed operation, so a fifth reminder signal is issued to remind the target construction personnel to wear the work permit corresponding to the target special type of work. Further, when the number of times issued exceeds the preset number threshold, it means that the third distance between the target construction personnel and more construction areas is small and triggers reminders, which further indicates that the target construction personnel may be unfamiliar with the construction area where they are working. Further, if the target construction personnel still do not wear the work permit, it means that the target construction personnel are most likely to be temporary workers who are working without a permit, so a check reminder for the target construction personnel is sent to the terminal of the safety supervisor, thereby quickly eliminating the construction safety hazards.

[0017] Optionally, determining a corresponding target construction area from the construction site according to the illegal operation specifically includes: Counting the number of times the construction workers in each construction area of ​​the construction site entered the construction site and performed the illegal operations within a preset historical period, and selecting a preset number of construction areas from each construction area in descending order of the number of times as areas prone to illegal operations; Calculating a first weight of each of the prone violation areas, where the first weight is a ratio of the number of times each of the prone violation areas corresponds to the sum of the number of times of all the prone violation areas; Counting the number of people who have violated the regulations while working in each of the prone-to-violation areas within the preset historical time, and calculating a second weight of the violations during working in each of the prone-to-violation areas, wherein the second weight is the ratio of the number of people who have violated the regulations while working in each of the prone-to-violation areas to the corresponding total number of people on the job; Calculate the product of the combined weight consisting of the first weight of each of the violation-prone areas and the corresponding second weight; A maximum product is selected from the products, and the violation-prone area corresponding to the maximum product is determined as the target construction area.

[0018] By adopting the above technical solution, the more times, the more likely the construction personnel in the corresponding construction area are to make this illegal operation, and then the easy-to-violate area is determined according to the number of times, and the first weight of each easy-to-violate area is calculated, thereby characterizing the possibility of construction personnel in the easy-to-violate area making this illegal operation on the way to work; in addition, the higher the number of people, the more likely the construction personnel in the corresponding easy-to-violate area are to make this illegal operation on the way to work. Further, the second weight of the occurrence of this illegal operation on the way to work corresponding to each easy-to-violate area is calculated, thereby characterizing the possibility of construction personnel in the easy-to-violate area making this illegal operation on the way to work, and finally the product of the combined weight composed of the first weight of each easy-to-violate area and the corresponding second weight is calculated. The larger the product, the greater the possibility of construction personnel in the corresponding easy-to-violate area making this illegal operation on the way to work, and finally the easy-to-violate area corresponding to the maximum product in the product is determined as the target construction area, thereby accurately determining the target construction area.

[0019] In a second aspect of the present application, a construction safety monitoring device is provided, specifically comprising: An image acquisition module is used to acquire target image information of target construction personnel entering the construction site; A first reminder module, used for determining the illegal operation of the target construction personnel based on the target image information, and issuing a first reminder signal of the illegal operation, wherein the first reminder signal is used for reminding the target construction personnel to adjust the illegal operation, wherein the illegal operation is an operation that does not comply with construction safety; An area determination module, used to determine a corresponding target construction area from the construction site according to the illegal operation, wherein the target construction area is a construction area where construction workers are prone to perform the illegal operation during work; The second reminder module is used to determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, a second reminder signal of the illegal operation is issued, and the second reminder signal is used to remind the target construction personnel to avoid the illegal operation.

[0020] By adopting the above technical solution, the image acquisition module acquires the target image information of the target construction personnel, the first reminder module determines the illegal operation of the target construction personnel and sends out a first reminder signal of the illegal operation, then the area determination module determines the corresponding target construction area from the construction site according to the illegal operation, and finally the second reminder module sends out a second reminder signal when the target construction personnel goes to the target construction area to work if the first distance is less than the first warning distance.

[0021] In a third aspect of the present application, a computer-readable storage medium is provided, in which a computer program is stored. When the computer program is loaded and executed by a processor, the method steps described in any one of the first aspects are performed.

[0022] In a fourth aspect of the present application, an electronic device is provided, specifically comprising: A processor, a memory, and a computer program stored in the memory and capable of running on the processor, wherein the processor is used to load and execute the computer program stored in the memory so that the electronic device performs the method as described in any one of the first aspects.

[0023] In summary, the present application includes at least one of the following beneficial technical effects: if the target construction personnel perform illegal operations when entering the construction site, the safety hazards of the construction site are reduced, and a first reminder signal is issued to remind the target construction personnel to make adjustments. Then, based on this illegal operation, the target construction area in the construction site where the construction personnel are prone to perform this illegal operation while on the way to work is determined. Further, if the first distance between the target construction personnel and the target construction area is less than the first warning distance, it means that the target construction personnel are close to the target construction area and need to be warned of illegal operations in time, then a second reminder signal corresponding to the illegal operation is issued to remind the target construction personnel not to perform illegal operations again, thereby timely reminding the target construction personnel of illegal operations after entering the construction site and on the way to work, reducing the safety hazards in the construction site. BRIEF DESCRIPTION OF THE DRAWINGS

[0024] Figure 1It is a flow chart of a construction safety monitoring method provided in an embodiment of the present application; Figure 2 It is a flowchart of another construction safety monitoring method provided by an embodiment of the present application; Figure 3 It is a structural schematic diagram of a construction safety monitoring device provided in an embodiment of the present application; Figure 4 It is a structural schematic diagram of another construction safety monitoring device provided in an embodiment of the present application.

[0025] Explanation of the accompanying drawings: 11. Image acquisition module; 12. First reminder module; 13. Area determination module; 14. Second reminder module; 15. Impact warning module; 16. Risk warning module; 17. Investigation reminder module. DETAILED DESCRIPTION

[0026] In order to enable those skilled in the art to better understand the technical solutions in this specification, the technical solutions in the embodiments of this specification will be clearly and completely described below in conjunction with the drawings in the embodiments of this specification. Obviously, the described embodiments are only part of the embodiments of this application, not all of the embodiments.

[0027] In the description of the embodiments of the present application, words such as "illustrative", "for example" or "for example" are used to indicate examples, illustrations or descriptions. Any embodiment or design described as "illustrative", "for example" or "for example" in the embodiments of the present application should not be interpreted as being more preferred or more advantageous than other embodiments or designs. Specifically, the use of words such as "illustrative", "for example" or "for example" is intended to present related concepts in a concrete way.

[0028] In the description of the embodiments of the present application, the term "and / or" is only a kind of association relationship describing the associated objects, indicating that there may be three kinds of relationships, for example, A and / or B, which can represent: A exists alone, B exists alone, and A and B exist at the same time. In addition, unless otherwise specified, the meaning of the term "multiple" refers to two or more. For example, multiple systems refer to two or more systems, and multiple screen terminals refer to two or more screen terminals. In addition, the terms "first" and "second" are only used for descriptive purposes, and cannot be understood as indicating or implying relative importance or implicitly indicating the indicated technical features. Thus, the features defined as "first" and "second" can explicitly or implicitly include one or more of the features. The terms "include", "comprise", "have" and their variations all mean "including but not limited to", unless otherwise specifically emphasized.

[0029] See also Figure 1The present application embodiment discloses a flow chart of a construction safety monitoring method, which can be implemented by a computer program or run on a construction safety monitoring device based on the von Neumann system. The computer program can be integrated into an application or run as an independent tool application, specifically including: S101: Acquire target image information of target construction workers entering the construction site.

[0030] Specifically, the construction site refers to a place where the construction process is carried out for an engineering construction project. In the embodiment of the present application, the engineering construction project is mainly a photovoltaic power station construction project. In other embodiments, the engineering construction project may also be a housing construction project. The target construction personnel are construction personnel who are currently preparing to enter the construction site from the entrance of the construction site. In other embodiments, they may also be construction personnel in the construction site. Construction personnel are divided into ordinary construction personnel and special type of workers. Ordinary construction personnel are workers engaged in general, non-technical or manual labor. Special type of workers are workers engaged in types of work with specific skills or professional knowledge requirements. According to the requirements, they need to wear a work permit matching the special type of work, such as high-altitude workers, electric welding workers, etc. in the construction site. In addition, the target image information can be the whole body image information of the target construction personnel. In other embodiments, it can also be the head image information of the target construction personnel. It should be noted that a camera is pre-set at the entrance of the construction site, and the image information of the personnel entering the construction site can be collected in real time. Among them, the executor of a construction safety monitoring method disclosed in an embodiment of the present application is a server, and the server is wirelessly connected to a camera. The server can be an independent physical server, or a server cluster or distributed system composed of multiple physical servers.

[0031] A feasible way to obtain the target image information of the target construction personnel is: when the target construction personnel are about to enter the construction site, the camera collects the corresponding target image information in real time, and then sends the target image information to the server, and finally the server obtains the target image information.

[0032] S102: Based on the target image information, determine the illegal operation of the target construction personnel, and issue a first reminder signal of the illegal operation, where the first reminder signal is used to remind the target construction personnel to adjust the illegal operation.

[0033] Specifically, after the target image information is determined, the human behavior of the target construction worker is extracted from the target image information. A feasible extraction method is: input this target image information into the trained behavior extraction model, and finally identify and extract the human behavior of the target construction worker when entering. The behavior extraction model can use a convolutional neural network model. The training process is specifically: collect a number of images containing human behavior of construction workers and summarize them into a sample set, and label each image in the sample set with the behavior category, for example, label "not wearing a helmet action", label "smoking action", etc., and further, the labeled image data is cropped, scaled and normalized, and the behavior extraction model is trained with the processed image data to obtain a trained behavior extraction model. This is a prior art and will not be repeated here.

[0034] Furthermore, the extracted human behavior actions are compared with the violation behavior actions in the preset violation behavior action library. If there is an action in the violation behavior action library that is consistent with the extracted human behavior action, then it is determined that the target construction personnel have violated the rules. The violation operation is an operation that does not comply with construction safety. The violation operation is the operation corresponding to the human behavior action. For example, the human behavior action is not wearing a safety helmet, and the corresponding violation operation is not wearing a safety helmet in the construction site. Among them, the violation behavior action library includes multiple violation actions that do not comply with the construction safety of this construction site, all of which are set by personnel based on experience.

[0035] Finally, a first reminder signal corresponding to the illegal operation is issued, so as to timely remind the target construction personnel to adjust the illegal operation. Specifically, the first reminder signal can be played through the broadcasting equipment set up in the construction site, for example, in the form of voice broadcast, so as to achieve the purpose of reminding the target construction personnel to adjust the illegal operation. For example, if the illegal operation is not wearing a safety helmet in the construction site, then the first reminder signal is used to remind the target construction personnel to wear a safety helmet.

[0036] S103: According to the illegal operations, a corresponding target construction area is determined from the construction site, where the target construction area is a construction area where construction workers are prone to illegal operations during work.

[0037] Specifically, after the illegal operation of the target construction personnel is determined, the target construction area is determined from each construction area in the construction site, that is, the construction personnel in this target construction area are prone to this illegal operation on the way to work. Among them, on the way to work refers to the construction personnel entering the construction site and going to the construction site to work. A feasible way to determine the target construction area is: retrieve the record of the illegal operation of the construction personnel in the history of the construction site within the preset time from the database, and count the number of times the construction personnel in each construction area have this illegal operation based on the illegal operation record. The more times, the more likely the construction personnel in the corresponding construction area are to have this illegal operation. Then, according to the order of the number of times from large to small, a preset number of construction areas are selected from each construction area and are all determined as easy-to-violate areas, that is, construction areas where construction personnel are prone to this illegal operation. Further, the first weight of each easy-to-violate area is calculated, that is, the ratio of the number of times corresponding to each easy-to-violate area to the sum of the number of times of all easy-to-violate areas, so as to characterize the possibility of illegal operations by construction personnel in easy-to-violate areas. The larger the first weight, the greater the possibility.

[0038] Furthermore, the number of people who have made this illegal operation on the way to work in each easy-to-violate area within the historical preset time is counted. The specific process is: based on the number of times that construction personnel in each easy-to-violate area have made this illegal operation, the construction personnel on the way to work are screened out, and the number of illegal operations corresponding to them is determined as the number of people who have made illegal operations on the way to work in the corresponding easy-to-violate area. The higher the number of people, the more likely the construction personnel in the corresponding easy-to-violate area are to make this illegal operation on the way to work. Further, the second weight of this illegal operation on the way to work corresponding to each easy-to-violate area is calculated, that is, the ratio of the number of people who have made illegal operations on the way to work in each easy-to-violate area to the corresponding total number of people on the way to work, so as to characterize the possibility of construction personnel in the easy-to-violate area making this illegal operation on the way to work. Among them, the total number of people on the way is the total number of construction personnel who went to the corresponding easy-to-violate area to work within the historical preset time.

[0039] Furthermore, the product of the combined weight of the first weight of each easy-to-violate area and the corresponding second weight is calculated. The larger the product, the greater the possibility that the construction personnel in the corresponding easy-to-violate area will perform this illegal operation on the way to work. Finally, the easy-to-violate area corresponding to the maximum product in the product is determined as the target construction area.

[0040] S104: Determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, issue a second reminder signal for illegal operation. The second reminder signal is used to remind the target construction personnel to avoid illegal operation.

[0041] Specifically, after the target construction area is determined, the construction area where the target construction worker is going to work is sent by the terminal of the security guard at the entrance of the construction site. If the construction area where the target construction worker is going to work is consistent with the target construction area, then it is determined that the target construction worker is preparing to go to the target construction area to work, which means that the target construction worker is a construction worker in the target construction area, and there is a high safety hazard of performing illegal operations on the way to work. Then, the location information of the target construction worker is obtained in real time through the ultra-wide band (UWB) tag worn by the target construction worker, and the first distance between the target construction worker and the target construction area is determined, wherein the UWB tag is an electronic device used for positioning and tracking.

[0042] Furthermore, when the first distance is less than the first warning distance, a second reminder signal for the illegal operation is issued. A feasible implementation method is: determine the danger level corresponding to the illegal operation in the target construction area. The danger level is used to characterize the degree of danger caused to the construction personnel when the illegal operation occurs when the construction personnel are working in the target construction area. The greater the danger level, the higher the degree. The danger level takes a value of 0 to 1. The injury assessment level of the historical construction personnel injured in the accident corresponding to the illegal operation is obtained from the historical construction accident records. The injury assessment level is divided into level one to level ten. The injury assessment level is level one, and the injury is the most serious. The number of occurrences of each injury assessment level is counted, and the danger level of the illegal operation is determined according to the injury assessment level with the largest number of occurrences. The injury assessment level with the largest number of occurrences is level one, and the danger level is determined to be 1; the injury assessment level is level two, and the danger level is determined to be 0.9... The injury assessment level is level ten, and the danger level is determined to be 0.1. Furthermore, the first warning distance corresponding to this danger level is matched from the preset warning distance matching table, that is, the first warning distance corresponding to this target construction personnel. The first warning distance is the critical distance for reminding and warning the target construction personnel for performing illegal operations during work. The warning distance matching table includes different danger levels and corresponding first warning distances, all of which are set based on human experience. The higher the danger level, the earlier the warning is needed when the target construction personnel are at work, and the larger the corresponding first warning distance.

[0043] Furthermore, if the first distance is less than the first warning distance, an illegal operation warning is required, and a second reminder signal for the illegal operation is issued until the first distance is less than the second warning distance, and the reminder is stopped. The second warning distance is the minimum warning distance for reminding illegal operations, and it is less than the first warning distance. If the target construction personnel adjust the illegal operation after being reminded by the first reminder signal, the second reminder signal can prevent the target construction personnel from making illegal operations again during work; if the illegal operation is not adjusted after being reminded by the first reminder signal, the second reminder signal can play a better role as a secondary reminder, reducing safety hazards in the construction site.

[0044] In other embodiments, if the construction area where the work is carried out is inconsistent with the target construction area, it means that the target construction personnel are not going to the target construction area to work, and the target construction personnel are not the construction personnel working in the target construction area. Then, through the camera pre-set in the target construction area, the construction image information of the special workers working in the target construction area is obtained, and based on the construction image information, it is determined whether the corresponding special workers are wearing matching work permits. The behavioral action extraction model that has been trained is used to extract the behavioral actions of the special workers. If the special workers do not have the behavioral action of "wearing the corresponding work permit", it is determined that the special workers are not wearing work permits. In order to avoid the unsafe situation of working without a permit, a third reminder signal is sent to the target construction area through the broadcasting equipment to remind the special workers who are not wearing work permits to wear their work permits, otherwise the work will be suspended. At the same time, the construction process corresponding to the special workers who do not wear work permits, that is, the construction process in the operation, is determined as a potential risk process, that is, a construction process with construction safety risks. Then, the potential safety accidents corresponding to each potential risk process, as well as the impact warning distance and protective operations of the potential safety accidents are matched through the preset safety accident matching table. The potential safety accidents are the construction safety accidents that can be induced by the corresponding potential risk processes, and the impact warning distance is the maximum critical distance of the warning to avoid the corresponding potential safety accidents from affecting personnel. Among them, the safety accident matching table includes different potential risk processes and the corresponding potential safety accidents, the impact warning distance and protective operations of potential safety accidents, all of which are set based on manual experience.

[0045] Further, the second distance between the target construction personnel and the target construction area is determined. The determination method can be referred to step S104 and will not be described in detail here. If the second distance is less than the impact warning distance, it means that the target construction personnel passed by the target construction area during the movement and the distance is relatively close. Once a potential safety accident occurs, it will be affected. Then a fourth reminder signal is issued to remind the target construction personnel to stay away from the target construction area and implement corresponding protective measures.

[0046] In one embodiment, according to the potential risk process, the potential safety accident and the corresponding impact warning distance and protective operation are determined. An achievable implementation method is: obtain the current environmental impact factor, which is an environmental factor that affects the normal progress of the construction process. In the embodiment of the present application, the environmental impact factor is rainfall, and it can be determined by a preset raindrop sensor whether it is currently raining. In other embodiments, the environmental impact factor can also be rainfall and / or wind. Furthermore, the impact level of this environmental impact factor on each potential risk process is matched through a preset impact level matching table. The impact level matching table includes different environmental impact factors and the impact level on each construction process, all of which are set based on human experience. The greater the impact level, the higher the degree of impact on the normal progress of the corresponding potential risk process, and the higher the safety hazard.

[0047] Furthermore, the potential risk process corresponding to the maximum impact level is selected from each potential risk process as the key risk process, that is, the construction process with the highest safety hazard under this environmental impact factor. Then, the potential safety accident corresponding to this key risk process and its impact warning distance and protective operation are matched through the safety accident matching table. At the same time, the reminder duration corresponding to this maximum impact level is matched from the duration matching table. The duration matching table includes different impact levels and corresponding reminder durations, which are all set based on human experience. The greater the impact level, the higher the degree of influence of the environmental impact factor on the construction process, the easier it is to induce a safety accident, and the longer the corresponding reminder duration. Furthermore, when the second distance is less than the impact warning distance, a fourth reminder signal is issued and the reminder duration is continued, and the target construction personnel passing through the target construction area are reminded and warned for a long time to avoid the target construction personnel being affected once a potential safety accident occurs.

[0048] In other embodiments, if there is no special worker in the target construction area who does not wear a work permit, then determine the interference coefficient of the current environmental impact factor on different special types of work in the target construction area, that is, the interference coefficient of the operation of special workers of different special types of work. The higher the interference coefficient, the more likely it is that a safety accident will occur when the special worker of the corresponding special type of work is working. Among them, the interference coefficient of this environmental impact factor on the special type of work is matched by a preset interference coefficient matching table, and the interference coefficient matching table includes different environmental impact factors and interference coefficients for special types of work. The specific setting process is: the interference coefficient takes a value of 0 to 1, and based on the historical construction accident records, the number of construction accidents that occur to construction workers of each special type of work when a single environmental impact factor occurs is counted. The more times, the greater the interference coefficient of this single environmental impact factor on the corresponding special type of work. For example, if the number is the largest, the interference coefficient of the corresponding special type of work is set to 1, and the number is the second largest, the interference coefficient of the corresponding special type of work is set to 0.9, and so on, and finally determine the interference coefficient of different environmental impact factors on the special type of work. Furthermore, under this environmental impact factor, the safety accidents that are prone to occur corresponding to special workers of different special work types in the target construction area are determined. Prone safety accidents refer to safety accidents that are prone to occur when special workers of a single special work type are working. One feasible determination method is to screen out the safety accidents that have occurred under this environmental impact factor from the historical safety accidents of the construction site, and then count the safety accidents that have occurred with the highest number of times caused by special workers of a single special work type from the safety accidents that have occurred, and determine them as prone safety accidents.

[0049] Further, the hazard coefficient corresponding to the safety accident prone to occur is matched from the preset hazard coefficient matching table. The hazard coefficient matching table includes different safety accidents prone to occur and the corresponding hazard coefficients. The specific setting process is: the hazard coefficient takes a value of 0 to 1, and the number of injured people caused by each safety accident prone to occur is obtained from the historical construction accident records. The more injured people are, the wider the range of injuries of the corresponding safety accident prone to occur is, the higher the degree of danger is, and the higher the corresponding hazard coefficient is. For example, if the number of injured people is 10 or more, the hazard coefficient is set to 1, the number of injured people is 9, and the hazard coefficient is set to 0.9, and so on. The higher the hazard coefficient, the higher the degree of danger of the corresponding safety accident prone to occur. Further, the interference coefficient corresponding to the same special type of work in the target construction area and the hazard coefficient prone to safety accidents are multiplied to obtain the corresponding environmental risk coefficient. The larger the environmental risk coefficient is, the more likely the special type of work personnel of the corresponding special type of work under this environmental impact factor will cause more dangerous safety accidents.

[0050] Furthermore, the environmental risk coefficient corresponding to each special type of work in the target construction area and the total number of special workers are substituted into the work safety risk coefficient formula, and finally the safety risk coefficient of the corresponding special workers is obtained, that is, the degree of impact on the construction safety of the target construction area. Among them, the work safety risk coefficient formula is: S=E*log(n+1); In the formula, S represents the safety risk coefficient, E represents the environmental risk coefficient, and n represents the total number of special workers corresponding to a single special job type. It should be noted that when calculating the safety risk coefficient, adding 1 to the total number of corresponding special workers and taking the natural logarithm can effectively alleviate the linear impact of the total number of special workers on the safety risk coefficient, avoid excessively high safety risk coefficients when the total number of special workers is too large, and thus make the determined safety risk coefficient more objective and accurate.

[0051] Furthermore, based on the safety risk coefficients corresponding to each special type of work in the target construction area, the overall safety risk coefficient of the target construction area is determined, that is, the degree of influence of the entire target construction area on construction safety. A feasible determination method is to perform weighted summation of each safety risk coefficient to obtain an overall safety risk coefficient. The earlier the construction process corresponding to the special type of work in the target construction area is, the more important it is for construction safety, and the greater the corresponding weight. Furthermore, if the overall safety risk coefficient exceeds the coefficient threshold, it means that the target construction area has a higher risk of causing safety problems to the construction site, and then a danger warning signal is issued to remind the target construction personnel passing through the target construction area to pay attention to safety.

[0052] In another embodiment, if this environmental impact factor occurs on other working days after the current time, then when the construction workers enter the construction site, a voice reminder is played through the broadcasting equipment preset at the entrance of the construction site to remind the construction workers to pay attention to safety when passing through the target construction area, and according to the overall safety risk factor corresponding to the target construction area, the corresponding voice reminder duration is determined. The longer the overall safety risk coefficient, the longer the voice reminder duration.

[0053] See also Figure 2 The present application embodiment discloses a flowchart of another construction safety monitoring method, which can be implemented by a computer program or run on a construction safety monitoring device based on the von Neumann system. The computer program can be integrated into an application or run as an independent tool application, specifically including: S201: Acquire target image information of target construction workers entering the construction site.

[0054] S202: Based on the target image information, determine the illegal operation of the target construction personnel, and issue a first reminder signal of the illegal operation, where the first reminder signal is used to remind the target construction personnel to adjust the illegal operation.

[0055] S203: According to the illegal operations, a corresponding target construction area is determined from the construction site, where the target construction area is a construction area where construction workers are prone to illegal operations during work.

[0056] S204: Determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, issue a second reminder signal for illegal operation. The second reminder signal is used to remind the target construction personnel to avoid illegal operation.

[0057] For details, please refer to steps S101-S104, which will not be described in detail here.

[0058] S205: When the target construction worker's job type is a target special job type, determine the construction importance level of the target special job type in each construction area in the construction site.

[0059] S206: Determine the third warning distance of the corresponding construction site according to the construction importance level. The higher the construction importance level, the greater the corresponding third warning distance.

[0060] S207: Count the third distance between the target construction personnel and each construction area. If the third distance is less than the corresponding third warning distance and the target construction personnel does not wear the corresponding work permit, a fifth reminder signal is issued. The fifth reminder signal is used to remind the target construction personnel to wear the work permit corresponding to the target special type of work.

[0061] S208: When the number of times the fifth reminder signal is sent exceeds the number threshold, if the target construction worker does not wear the corresponding work permit, a check reminder for the target construction worker is sent to the terminal of the safety supervisor.

[0062] Specifically, when the target construction worker enters the construction site, his identity is identified by the face recognition system and the job type information of the target construction worker is screened from the preset personnel registration information. If the job type of the target construction worker is a target special job type, the target special job type is one of many special jobs. Then the construction importance level of the target special job type in each construction area of ​​the construction site is matched from the preset importance level matching table. The higher the construction importance level, the higher the importance of the personnel work of the target special job type in the entire construction work of the corresponding construction area. The importance level matching table includes different special jobs and their construction importance levels in each construction area. The specific setting logic is: the construction importance level takes a value of 1 to 10, and the proportion of construction workers of a single special job type in all construction workers in the construction area is counted. The larger the proportion, the higher the importance of this special job type to the construction area. For example, if the proportion is in the range of 0-0.1, the construction importance level of the corresponding special job type is 1; if the proportion is in the range of 0.1-0.2, the construction importance level is 2... If the proportion is in the range of 0.9-1, the construction importance level is 10.

[0063] Furthermore, according to the construction importance level, the third warning distance of the corresponding construction area is matched from the preset mapping table, and the third warning distance is the maximum critical distance for warning the wearing of the work permit for special types of work. The mapping table includes different construction importance levels and corresponding warning distances. The higher the construction importance level, the more important the target construction personnel are to the construction process of the corresponding construction area, and the sooner they need to be reminded to wear the work permit, the larger the corresponding third warning distance. Furthermore, the third distance between the target construction personnel and each construction area is determined. If the third distance is less than the third warning distance and the target construction personnel does not wear the corresponding work permit, then a fifth reminder signal is issued to remind the target construction personnel to wear the work permit corresponding to the target special type of work.

[0064] Further, the number of times the fifth reminder signal is issued is counted. When the number of times exceeds the preset threshold, it indicates that the third distance between the target construction worker and more construction areas is small and triggers a reminder, which further indicates that the target construction worker may be unfamiliar with the construction area where he is working. Further, if the target construction worker still does not wear a work permit, it indicates that the target construction worker is most likely a temporary worker who is working without a permit. Then, a check reminder for the target construction worker is sent to the terminal of the safety supervisor, and the location information of the target construction worker is sent together, so that the safety supervisor can go to check him as soon as possible to determine whether he is a temporary worker, thereby quickly eliminating the hidden dangers of construction safety. It should be noted that if the target construction worker is not a temporary worker, then on the way to work, each time the third distance with other construction areas is less than the corresponding third warning distance, the fifth reminder signal issued can repeatedly remind him to wear a work permit, reduce the probability of not wearing a work permit when working, and help reduce construction safety risks.

[0065] The implementation principle of a construction safety monitoring method in an embodiment of the present application is as follows: if a target construction worker performs an illegal operation when entering a construction site, a first reminder signal is issued to remind the target construction worker to make adjustments to reduce the potential safety hazards of the construction site. Then, based on the illegal operation, a target construction area in the construction site where the construction worker is prone to perform the illegal operation while on the way to work is determined. Further, if the first distance between the target construction worker and the target construction area is less than the first warning distance, it means that the target construction worker is close to the target construction area and needs to be warned of illegal operations in time, then a second reminder signal corresponding to the illegal operation is issued to remind the target construction worker not to perform illegal operations again, thereby timely reminding the target construction worker of illegal operations after entering the construction site and on the way to work, thereby reducing the potential safety hazards in the construction site.

[0066] The following is an embodiment of the device of the present application, which can be used to execute the embodiment of the method of the present application. For details not disclosed in the embodiment of the device of the present application, please refer to the embodiment of the method of the present application.

[0067] See also Figure 3 , is a schematic diagram of the structure of the construction safety monitoring device provided in the embodiment of the present application. The construction safety monitoring device can be implemented as all or part of the device through software, hardware or a combination of both. The device includes an image acquisition module 11, a first reminder module 12, an area determination module 13 and a second reminder module 14.

[0068] An image acquisition module 11 is used to acquire target image information of target construction personnel entering the construction site; A first reminder module 12 is used to determine the illegal operation of the target construction personnel based on the target image information, and send a first reminder signal of the illegal operation, the first reminder signal is used to remind the target construction personnel to adjust the illegal operation, and the illegal operation is an operation that does not meet the construction safety requirements; The area determination module 13 is used to determine the corresponding target construction area from the construction site according to the illegal operation, and the target construction area is the construction area where the construction workers are prone to illegal operations during work; The second reminder module 14 is used to determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, a second reminder signal of illegal operation is issued. The second reminder signal is used to remind the target construction personnel to avoid illegal operation.

[0069] Optional, such as Figure 4 As shown, the device also includes an impact warning module 15, which is specifically used to: If the target construction personnel do not go to the target construction area to work, then obtain the construction image information of the special type of workers in the target construction area; Based on the construction image information, determine whether the corresponding special workers are wearing matching work permits; If not, a third reminder signal is sent to the target construction area, and the corresponding construction process is determined as a potential risk process. The third reminder signal is used to remind the corresponding special workers to wear work permits, otherwise the work will be suspended; According to each potential risk process, determine the potential safety accidents and the corresponding warning distance and protective operations; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, and the fourth reminder signal is used to remind the target construction personnel to stay away from the target construction area and perform protective operations.

[0070] Optionally, the early warning module 15 is specifically used for: Obtain the current environmental impact factors and determine the impact level of environmental impact factors on each potential risk process; Select the maximum impact level from each impact level, and identify the potential risk process corresponding to the maximum impact level as the key risk process; Identify potential safety accidents corresponding to key risk processes, determine the impact warning distance and protective operations of potential safety accidents, and determine the reminder duration based on the maximum impact level; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, specifically including: If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued and the reminder duration is continued.

[0071] Optionally, the device further includes a risk warning module 16, which is specifically used to: If yes, then obtain the current environmental impact factor and determine the interference coefficient of the environmental impact factor on different special types of work in the target construction area. The higher the interference coefficient, the more likely it is that special workers of the corresponding special type of work will have safety accidents. Determine the safety accidents that are prone to occur for special workers of different special types of work in the target construction area under environmental impact factors, and determine the risk factor corresponding to each safety accident that is prone to occur; The interference coefficient and the risk factor for safety accidents corresponding to the same special type of work are multiplied to obtain the corresponding environmental risk coefficient. The environmental risk coefficient corresponding to each special type of work and the total number of special workers in the target construction area are substituted into the preset work safety risk coefficient formula to obtain the corresponding safety risk coefficient of the special type of work. The work safety risk coefficient formula is: S=E*log(n+1); In the formula, S represents the safety risk factor, E represents the environmental risk factor, and n represents the total number of special workers corresponding to a single special job type; Based on the safety risk factors corresponding to each special type of work in the target construction area, the overall safety risk factor of the target construction area is determined, and when the overall safety risk factor exceeds a preset coefficient threshold, a danger warning signal is issued.

[0072] Optionally, the second reminder module 14 is specifically used for: Determine the hazard level corresponding to illegal operations in the target construction area; According to the danger level, the first warning distance corresponding to the target construction personnel is determined, and the first distance between the target construction personnel and the target construction area is determined. The higher the danger level, the larger the corresponding first warning distance; If the first distance is smaller than the first warning distance, a second reminder signal corresponding to the illegal operation is issued until the first distance is smaller than the second warning distance and the second warning distance is smaller than the first warning distance.

[0073] Optionally, the device further includes a troubleshooting and reminding module 17, which is specifically used to: When the target construction personnel's job type is a target special job type, determine the construction importance level of each construction area of ​​the target special job type in the construction site; According to the construction importance level, the third warning distance of the corresponding construction area is determined. The higher the construction importance level, the larger the corresponding third warning distance; Determine a third distance between the target construction personnel and each construction area. If the third distance is less than the corresponding third warning distance and the target construction personnel does not wear the corresponding work permit, issue a fifth reminder signal, which is used to remind the target construction personnel to wear the work permit corresponding to the target special type of work; When the number of times the fifth reminder signal is sent exceeds the number threshold, if the target construction worker does not wear the corresponding work permit, a check reminder for the target construction worker is sent to the terminal of the safety supervisor.

[0074] Optionally, the region determination module 13 is specifically configured to: Count the number of times that construction workers in each construction area of ​​the construction site enter the construction site and make illegal operations within a preset historical period, and select a preset number of construction areas from each construction area in descending order of the number of times as easy-to-violate areas; Calculate the first weight of each prone violation area, where the first weight is the ratio of the number of times corresponding to each prone violation area to the sum of the numbers of all prone violation areas; The number of people who have violated the rules during work in each violation-prone area within the preset historical period is counted, and the second weight of the violations during work corresponding to each violation-prone area is calculated. The second weight is the ratio of the number of people who have violated the rules during work in each violation-prone area to the total number of people on the job. Calculate the product of the combined weight consisting of the first weight of each prone-to-violation area and the corresponding second weight; The maximum product is selected from each product, and the violation-prone area corresponding to the maximum product is determined as the target construction area.

[0075] It should be noted that the construction safety monitoring device provided in the above embodiment only uses the division of the above functional modules as an example when executing the construction safety monitoring method. In actual applications, the above functions can be assigned to different functional modules as needed, that is, the internal structure of the device is divided into different functional modules to complete all or part of the functions described above. In addition, the construction safety monitoring device provided in the above embodiment and the construction safety monitoring method embodiment belong to the same concept, and the implementation process thereof is detailed in the method embodiment, which will not be repeated here.

[0076] An embodiment of the present application further discloses a computer-readable storage medium, and the computer-readable storage medium stores a computer program, wherein when the computer program is executed by a processor, a construction safety monitoring method of the above embodiment is adopted.

[0077] Among them, the computer program can be stored in a computer-readable medium, the computer program includes computer program code, the computer program code can be in the form of source code, object code, executable file or certain middleware, etc. The computer-readable medium includes any entity or device that can carry the computer program code, recording medium, USB flash drive, mobile hard disk, magnetic disk, optical disk, computer memory, read-only memory (ROM), random access memory (RAM), electrical carrier signal, telecommunication signal and software distribution medium, etc. It should be noted that the computer-readable medium includes but is not limited to the above-mentioned components.

[0078] Among them, through this computer-readable storage medium, a construction safety monitoring method of the above embodiment is stored in a computer-readable storage medium, and is loaded and executed on a processor to facilitate the storage and application of the above method.

[0079] An embodiment of the present application also discloses an electronic device, in which a computer program is stored in a computer-readable storage medium. When the computer program is loaded and executed by a processor, the above-mentioned construction safety monitoring method is adopted.

[0080] The electronic device may be a desktop computer, a laptop computer, a cloud server or other electronic device, and the electronic device includes but is not limited to a processor and a memory. For example, the electronic device may also include input and output devices, a network access device, and a bus.

[0081] Among them, the processor can adopt a central processing unit (CPU). Of course, according to actual usage, other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gate or transistor logic devices, discrete hardware components, etc. can also be adopted. The general-purpose processor can adopt a microprocessor or any conventional processor, etc., and this application does not impose any restrictions on this.

[0082] Among them, the memory can be an internal storage unit of the electronic device, such as a hard disk or memory of the electronic device, or it can be an external storage device of the electronic device, such as a plug-in hard disk, a smart memory card (SMC), a secure digital card (SD) or a flash memory card (FC) equipped on the electronic device. Moreover, the memory can also be a combination of an internal storage unit and an external storage device of the electronic device. The memory is used to store computer programs and other programs and data required by the electronic device. The memory can also be used to temporarily store data that has been output or is to be output, and this application does not impose any restrictions on this.

[0083] Among them, through this electronic device, a construction safety monitoring method of the above embodiment is stored in the memory of the electronic device, and is loaded and executed on the processor of the electronic device for easy use.

[0084] The above is only an exemplary embodiment of the present disclosure, and the scope of the present disclosure cannot be limited thereto. That is, any equivalent changes and modifications made according to the teachings of the present disclosure are still within the scope of the present disclosure. After considering the specification and practicing the disclosure here, those skilled in the art will easily think of other embodiments of the present disclosure. This application is intended to cover any modification, use or adaptation of the present disclosure, which follows the general principles of the present disclosure and includes common knowledge or customary technical means in the technical field not recorded in the present disclosure. The description and examples are only regarded as exemplary, and the scope and spirit of the present disclosure are defined by the claims.

Claims

1. A construction safety monitoring method, characterized in that: The method comprises: Acquire target image information of target construction personnel entering the construction site; Based on the target image information, determining the illegal operation of the target construction personnel, and issuing a first reminder signal of the illegal operation, wherein the first reminder signal is used to remind the target construction personnel to adjust the illegal operation, wherein the illegal operation is an operation that does not comply with construction safety; According to the illegal operation, a corresponding target construction area is determined from the construction site, wherein the target construction area is a construction area where construction workers are prone to perform the illegal operation during work; Determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, issue a second reminder signal of the illegal operation. The second reminder signal is used to remind the target construction personnel to avoid the illegal operation.

2. The construction safety monitoring method according to claim 1, characterized in that: The method further comprises: If the target construction personnel have not gone to the target construction area to work, then obtain the construction image information of the special type of workers in the target construction area; Based on the construction image information, determining whether the corresponding special worker is wearing a matching work permit; If not, a third reminder signal is sent to the target construction area, and the corresponding construction process is determined as a potential risk process. The third reminder signal is used to remind the corresponding special workers to wear work permits, otherwise the work will be suspended; According to each of the potential risk processes, determine the potential safety accidents and the corresponding impact warning distances and protective operations; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, and the fourth reminder signal is used to remind the target construction personnel to stay away from the target construction area and perform the protective operation.

3. The construction safety monitoring method according to claim 2, characterized in that: Determining potential safety accidents and corresponding impact warning distances and protective operations according to each of the potential risk processes specifically includes: Obtaining current environmental impact factors and determining the impact level of the environmental impact factors on each of the potential risk processes; Select the maximum impact level from the impact levels of the potential risk processes, and determine the potential risk process corresponding to the maximum impact level as the key risk process; Determine the potential safety accidents corresponding to the key risk processes, determine the impact warning distance and protective operations of the potential safety accidents, and determine the reminder duration according to the maximum impact level; If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued, which specifically includes: If the second distance between the target construction personnel and the target construction area is less than the impact warning distance, a fourth reminder signal is issued and lasts for the reminder duration.

4. The construction safety monitoring method according to claim 2, characterized in that: After determining whether the corresponding special worker is wearing a matching work permit, the method further includes: If yes, then obtain the current environmental impact factor, and determine the interference coefficient of the environmental impact factor on different special types of work in the target construction area. The higher the interference coefficient, the more likely it is that a safety accident will occur to the special type of worker of the corresponding special type of work; Determine the safety accidents that are likely to occur for special workers of different special types of work in the target construction area under the environmental impact factors, and determine the risk factor corresponding to each of the safety accidents that are likely to occur; The interference coefficient and the risk factor for safety accidents corresponding to the same special type of work are multiplied to obtain the corresponding environmental risk coefficient, and the environmental risk coefficient corresponding to each special type of work and the total number of special workers in the target construction area are substituted into the preset work safety risk coefficient formula to obtain the corresponding safety risk coefficient of the special type of work. The work safety risk coefficient formula is: S = E * log (n + 1); In the formula, S represents the safety risk factor, E represents the environmental risk factor, and n represents the total number of special workers corresponding to a single special job type; Based on the safety risk coefficients corresponding to the special types of work in the target construction area, the overall safety risk coefficient of the target construction area is determined, and when the overall safety risk coefficient exceeds a preset coefficient threshold, a danger warning signal is issued.

5. The construction safety monitoring method according to claim 1, characterized in that: When the first distance between the target construction personnel and the target construction area is less than the first warning distance, issuing the second reminder signal of the illegal operation specifically includes: Determine the hazard level corresponding to the illegal operation in the target construction area; According to the danger level, determining a first warning distance corresponding to the target construction personnel, and determining a first distance between the target construction personnel and the target construction area, wherein the higher the danger level, the greater the corresponding first warning distance; If the first distance is smaller than the first warning distance, a second reminder signal corresponding to the illegal operation is issued until the first distance is smaller than the second warning distance and the second warning distance is smaller than the first warning distance.

6. The construction safety monitoring method according to claim 1, characterized in that: The method further comprises: When the type of work of the target construction personnel is a target special type of work, determining the construction importance level of each construction area of ​​the target special type of work in the construction site; Determine the third warning distance of the corresponding construction area according to the construction importance level, the higher the construction importance level, the larger the corresponding third warning distance; Determine a third distance between the target construction personnel and each of the construction areas, and if the third distance is less than the corresponding third warning distance and the target construction personnel does not wear the corresponding work permit, issue a fifth reminder signal, wherein the fifth reminder signal is used to remind the target construction personnel to wear the work permit corresponding to the target special type of work; When the number of times the fifth reminder signal is issued exceeds the number threshold, if the target construction worker does not wear the corresponding work permit, a check reminder for the target construction worker is sent to the terminal of the safety supervisor.

7. The construction safety monitoring method according to claim 1, characterized in that: Determining a corresponding target construction area from the construction site according to the illegal operation specifically includes: Counting the number of times the construction workers in each construction area of ​​the construction site entered the construction site and performed the illegal operations within a preset historical period, and selecting a preset number of construction areas from each construction area in descending order of the number of times as areas prone to illegal operations; Calculating a first weight of each of the prone violation areas, where the first weight is a ratio of the number of times each of the prone violation areas corresponds to the sum of the number of times of all the prone violation areas; Counting the number of people who have violated the regulations while working in each of the prone-to-violation areas within the preset historical time, and calculating a second weight of the violations during working in each of the prone-to-violation areas, wherein the second weight is the ratio of the number of people who have violated the regulations while working in each of the prone-to-violation areas to the corresponding total number of people on the job; Calculate the product of the combined weight consisting of the first weight of each of the violation-prone areas and the corresponding second weight; A maximum product is selected from the products, and the violation-prone area corresponding to the maximum product is determined as the target construction area.

8. A construction safety monitoring device, characterized in that: include: An image acquisition module (11) is used to acquire target image information of target construction personnel entering the construction site; a first reminder module (12), used for determining, based on the target image information, an illegal operation of the target construction personnel, and issuing a first reminder signal of the illegal operation, wherein the first reminder signal is used for reminding the target construction personnel to adjust the illegal operation, wherein the illegal operation is an operation that does not comply with construction safety; An area determination module (13) is used to determine a corresponding target construction area from the construction site according to the illegal operation, wherein the target construction area is a construction area where construction workers are likely to perform the illegal operation during work; The second reminder module (14) is used to determine whether the target construction personnel go to the target construction area to work. If so, when the first distance between the target construction personnel and the target construction area is less than the first warning distance, a second reminder signal of the illegal operation is issued, and the second reminder signal is used to remind the target construction personnel to avoid the illegal operation.

9. A computer-readable storage medium having a computer program stored therein, characterized in that: When the computer program is loaded and executed by a processor, the method according to any one of claims 1 to 7 is adopted.

10. An electronic device comprising a memory, a processor, and a computer program stored in the memory and capable of running on the processor, characterized in that: When the processor loads and executes the computer program, the method according to any one of claims 1 to 7 is adopted.

Citation Information

Patent Citations

  • Infrastructure construction operation intelligent safety monitoring method and system

    CN107180312A

  • Operation area management and control method, device and equipment and medium

    CN116418951A

  • Distribution network constructor violation detection method and system based on action recognition

    CN117173791A

  • Construction area safety warning method based on target detection

    CN117456674A

  • Construction area safety control method based on behavior analysis

    CN117475598A

Cited By

  • Construction safety monitoring method and system

    CN120236367B