Front boron washing pump circulation system
By adding water paths at the intake of the diaphragm pump and accelerating the water flow with a transition shrinkage tube, combined with nitrogen purge and filtration structure, the pump blockage and pump speed problems caused by B2O3 crystallization are solved, extending the equipment life and reducing the cleaning frequency.
Patent Information
- Application Number
- CN202411186312.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
In the prior art, when the diaphragm pump suctions the exhaust gas in the furnace tube, the problems of pipeline blockage and excessive pump speed due to B2O3 crystallization, affecting the equipment life and cleaning frequency.
A front boron water washing pump circulation system is designed. By adding water paths to the intake of the pump, the water flow rate is increased by using the transition shrinkage tube, combining nitrogen purge and filter structure to separate H3BO3 and particle impurities, reducing the frequency of blockage and cleaning times .
It effectively reduces crystallization in the pump, extends the service life of the diaphragm pump, reduces the frequency of cleaning and pump replacement, improves the erosion effect in the pump body, and avoids the return of particle impurities.
Smart Images

Figure CN119056786A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of water washing pumps, in particular to a front boron water washing pump circulation system. Background Art
[0002] The chemical reaction and high temperature in the combustion process in the furnace tube easily lead to the generation of waste gas. In order to prevent the pressure in the furnace tube from being too high or the airflow from being blocked, the waste gas generated inside the furnace tube generally needs to be extracted. At present, the waste gas generated by the furnace tube is mainly extracted through the tail exhaust by a diaphragm pump. However, the waste gas contains a large amount of B2O3. Due to the characteristics of B2O3, it will form crystals at 200°~450°, which will cause the pump pipeline to be blocked, making the cleaning frequency higher. At the same time, the acid discharge crystallization will cause the pump speed to be too high, resulting in a high square resistance of the silicon wafer. Summary of the invention
[0003] In view of the deficiencies in the prior art, the purpose of the present invention is to provide a pre-boron water washing pump circulation system to solve the problem of crystallization in the diaphragm pump for extracting exhaust gas in the furnace tube proposed in the above background technology, resulting in pump pipeline blockage and excessive pump speed.
[0004] To achieve the above-mentioned object, the present invention provides the following technical solutions: a front boron water washing pump circulation system, comprising a furnace tube, a diaphragm pump is arranged at the rear side of the furnace tube, a ventilation pipeline is connected between the input end of the diaphragm pump and the furnace tube, a discharge component is connected to the gas outlet end of the diaphragm pump, a water supply component for extracting clean water to flush the diaphragm pump body when the diaphragm pump is started is connected to the ventilation pipeline, and a nitrogen supply component for purging after flushing in the diaphragm pump is completed is connected to the front end of the furnace tube;
[0005] The water supply assembly comprises a water supply pipeline fixedly connected to the ventilation pipeline, and a one-way valve is installed on the water supply pipeline.
[0006] Preferably, the nitrogen supply assembly comprises a delivery pipeline connected to the front end of the furnace tube, and a nitrogen valve is installed on the delivery pipeline.
[0007] Preferably, the ventilation pipeline includes a straight pipe connected to the tail end of the furnace tube, a transition shrinkage tube is fixedly connected to the tail end of the straight pipe, and an introduction pipe with an inner diameter smaller than that of the straight pipe is connected between the transition shrinkage tube and the input end of the diaphragm pump;
[0008] The vertical section of the transition shrinkage tube is in the shape of a right-angled trapezoid, and the lowest points of the bottoms of the straight-through tube, the transition shrinkage tube and the introduction tube are all on the same straight line.
[0009] Preferably, the tail end of the water supply pipe is connected to the middle of the top surface of the straight pipe, and the water supply pipe is inclined, and its inclination angle is not greater than 30°.
[0010] Preferably, the discharge assembly comprises a discharge pipe for discharging waste water used for flushing the diaphragm pump, and a water tank for storing waste water is connected to the tail end of the discharge pipe.
[0011] Preferably, the discharge pipeline includes a derivation pipe connected to the output end of the diaphragm pump, an inclined conduit is fixedly connected to the tail end of the derivation pipe, and a filtering structure is installed on the inner wall of the middle part of the inclined conduit.
[0012] Preferably, a rectangular groove is provided on the bottom surface of the middle part of the inclined conduit, and the edge of the rectangular groove fits with the bottom of the filtering structure. A control valve is installed at the bottom of the rectangular groove, and the bottom of the control valve is detachably connected to a collecting cylinder.
[0013] Preferably, a solenoid valve 1 is installed between the rectangular groove on the inclined conduit and the outlet pipe, and an exhaust gas exhaust pipe is also installed at the tail end of the outlet pipe. The exhaust gas exhaust pipe is arranged in a Y shape with the outlet pipe and the inclined conduit, and a solenoid valve 2 is installed on the exhaust gas exhaust pipe.
[0014] Preferably, the process steps of the water wash pump circulation system are as follows:
[0015] S1, the host computer issues instructions;
[0016] S2, nitrogen valve closed, check valve opened, open for 1 minute, deliver 0.5-1L cold water;
[0017] S3, the diaphragm pump is running, the pump speed is 3%, the one-way valve is still open, and the water supply is 1.5-2L per minute. The cold water sent in through the water supply pipe is pumped out through the diaphragm pump to start flushing the diaphragm pump. The flushing waste water is discharged into the water tank through the discharge pipe;
[0018] S4. After flushing, close the one-way valve, open the nitrogen valve, and run the diaphragm pump to purge the furnace tube and the diaphragm pump body at a pump speed of 15% for 15s, 30% for 15s, 50% for 15s, and 80% for 1min;
[0019] S5. After the purge is completed, close the nitrogen valve at a pump speed of 20%, run the diaphragm pump for 1 minute at a pump speed of 20%, and start the purge nitrogen for >3 minutes.
[0020] By means of the above technical solution, the present invention provides a front boron water washing pump circulation system, which has at least the following beneficial effects:
[0021] 1. The present invention adds a water channel at the air inlet of the pump, and reduces crystallization in the pump through water washing, reduces the frequency of pump blockage, and reduces the excessive pump speed caused by acid discharge crystallization. On the premise of meeting the process indicators, the life of the diaphragm pump is increased and the number of cleaning times and pump replacement frequency are reduced.
[0022] 2. After flushing the pump body of the diaphragm pump, the present invention cooperates with blowing nitrogen into the furnace tube, and when the diaphragm pump is pumping nitrogen, the nitrogen can be used to dry the residual cold water in the pump body.
[0023] 3. The present invention utilizes a transition contraction tube to increase the water flow velocity entering the diaphragm pump body, thereby causing the water flow fluid to generate a higher impact force when entering the diaphragm pump body, and to a certain extent, improving the flushing effect of crystals and sediments in the diaphragm pump body.
[0024] 4. The present invention can achieve the purpose of separating H3BO3 and particulate impurities by cooperating with the filtering structure in the discharge component, and due to the inclined characteristics of the inclined conduit, the backflow of particulate impurities intercepted by the filtering structure can be effectively avoided. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] The drawings described herein are used to provide a further understanding of the present application and constitute a part of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute an improper limitation on the present application. In the drawings:
[0026] Figure 1 It is a schematic diagram of the overall structure of the present invention;
[0027] Figure 2 It is a schematic diagram of the installation structure of the ventilation pipeline and the water supply component of the present invention;
[0028] Figure 3 It is a schematic diagram of the cross-section structure of the ventilation pipeline of the present invention;
[0029] Figure 4 It is a schematic diagram of the structure of the discharge assembly of the present invention;
[0030] Figure 5 It is a schematic diagram of the structure of the discharge pipeline of the present invention.
[0031] In the figure:
[0032] 1. Furnace tube; 2. Diaphragm pump;
[0033] 3. Ventilation pipeline; 301. Straight-through pipe; 302. Transition shrink pipe; 303. Introduction pipe;
[0034] 4. Discharge assembly; 401. Discharge pipe; 4011. Export pipe; 4012. Inclined conduit; 4013. Filter structure; 4014. Rectangular trough; 4015. Control valve; 4016. Collecting cylinder; 4017. Solenoid valve 1; 4018. Exhaust pipe; 4019. Solenoid valve 2; 402. Water tank;
[0035] 5. Water supply assembly; 501. Water supply pipeline; 502. One-way valve;
[0036] 6. Nitrogen supply assembly; 601. Delivery pipeline; 602. Nitrogen valve. DETAILED DESCRIPTION
[0037] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only a part of the embodiments of the present invention, rather than all of the embodiments. In the description of the present invention, it should be understood that the orientations or positional relationships indicated by the terms "upper", "lower", "front", "back", "left", "right", "top", "bottom", "inside", "outside", etc. are based on the orientations or positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.
[0038] Embodiment 1
[0039] The service life of the pump used to extract the exhaust gas in the furnace tube is 30-50 days. After the pump is taken offline for maintenance, the service life of the pump is 5-25 days, and the average life is 15 days. Frequent cleaning and pump replacement are required, which will take up a lot of human resources. In addition, locking the pipe during the pump replacement process also has a great impact on production capacity. In order to effectively increase the service life of the pump body and reduce the number of cleaning times and pump replacement frequency, please refer to Figure 1-Figure 5 The present embodiment proposes a front boron water washing pump circulation system, including a furnace tube 1, a diaphragm pump 2 is arranged on the rear side of the furnace tube 1, a ventilation pipeline 3 is connected between the input end of the diaphragm pump 2 and the furnace tube 1, a discharge component 4 is connected to the air outlet end of the diaphragm pump 2, and the ventilation pipeline 3 is connected to a water supply component 5 for extracting clean water to flush the diaphragm pump 2 when the diaphragm pump 2 is started. The water supply component 5 includes a water supply pipe 501 fixedly connected to the ventilation pipe 3, and a one-way valve 502 is installed on the water supply pipe 501.
[0040] When the diaphragm pump 2 is in operation, it can be used to extract the waste gas generated in the furnace tube 1. However, since the waste gas contains a large amount of B2O3, B2O3 will form crystals at a high temperature of 200°-450°, which will cause the pump pipeline to be blocked, resulting in a high pump speed and a high silicon wafer resistance. However, B2O3 is easily soluble in water and reacts with water at room temperature to form H3BO3. In this embodiment, by opening the one-way valve 502, the water supply pipeline 501 and the ventilation pipeline 3 are in a cleared state, so that the cold water in the cold water supply device connected to the water supply pipeline 501 can directly enter the pump body of the diaphragm pump 2 along the water supply pipeline 501 and the ventilation pipeline 3. On this basis, the diaphragm pump 2 itself is operated in conjunction to generate suction, and the cold water entering the ventilation pipeline 3 is extracted to start water flushing, which effectively reduces the crystals formed by B2O3 at high temperature in the pump body, thereby effectively avoiding the blockage of the pump pipeline, while increasing its life, reducing the number of cleaning times and pump replacement frequency. The waste water used to flush the pump body of the diaphragm pump 2 is discharged from the discharge component 4 .
[0041] Embodiment 2
[0042] After flushing the pump body of diaphragm pump 2, in order to effectively avoid cold water residue in the pump body, such as Figure 1 As shown, a nitrogen supply assembly 6 for purging after flushing in the diaphragm pump 2 is connected to the front end of the furnace tube 1, and the nitrogen supply assembly 6 includes a delivery pipe 601 connected to the front end of the furnace tube 1, and a nitrogen valve 602 is installed on the delivery pipe 601. After flushing is completed, the nitrogen valve 602 is opened to force the nitrogen in the nitrogen supply device to enter the interior of the furnace tube 1 along the delivery pipe 601 for purging, effectively preventing the material or workpiece in the furnace tube 1 from being oxidized, and cooperating with the diaphragm pump 2 to continuously suck the furnace tube 1, sucking the nitrogen together, and using the nitrogen to dry the residual cold water in the pump body.
[0043] Embodiment 3
[0044] In order to effectively increase the flow rate of cold water entering the pump body without changing the pumping speed of diaphragm pump 2, such as Figure 2 and Figure 3As shown, the ventilation pipeline 3 includes a straight pipe 301 connected to the tail end of the furnace tube 1, a transition shrink pipe 302 is fixedly connected to the tail end of the straight pipe 301, an introduction pipe 303 with an inner diameter smaller than that of the straight pipe 301 is connected between the transition shrink pipe 302 and the input end of the diaphragm pump 2, the vertical section of the transition shrink pipe 302 is in the shape of a right-angle trapezoid, the tail end of the water supply pipe 501 is connected to the middle of the top surface of the straight pipe 301, and the water supply pipe 501 is inclined, and its inclination angle is not greater than 30°. Cold water flows along the relatively gently inclined water supply pipe 501 to the straight pipe 301 near the transition shrink pipe 302, and then flows along the transition shrink pipe 302 to the introduction pipe 303. During the process, the inner diameter of the transition shrink tube 302 gradually shrinks, so that the relatively thick water flow in the straight tube 301 is transformed into a relatively thin water flow in the introduction tube 303, and the water flow speed is increased, so that the water flow fluid generates a higher impact force when entering the pump body of the diaphragm pump 2, and to a certain extent, the flushing effect of crystals and sediments in the pump body of the diaphragm pump 2 is improved. In addition, the lowest points of the bottoms of the straight tube 301, the transition shrink tube 302 and the introduction tube 303 are all on the same straight line, which can effectively reduce the resistance from the straight tube 301 to the introduction tube 303 when the cold water flows.
[0045] Embodiment 4
[0046] When the diaphragm pump 2 sucks the exhaust gas in the furnace tube 1, it not only contains a large amount of B2O3, but also generally contains particulate impurities. Therefore, when the diaphragm pump 2 pump body is flushed with cold water, not only B2O3 reacts with water to form H3BO3, but also particulate impurities are taken out. It is usually not recommended to discharge particulate impurities directly with the wastewater. Figure 1 , Figure 4 and Figure 5As shown, in order to effectively separate the wastewater discharged from the diaphragm pump 2 and the particulate impurities brought out of the pump body of the diaphragm pump 2, the discharge component 4 includes a discharge pipe 401 for discharging the wastewater used for flushing the diaphragm pump 2, and a water tank 402 for storing wastewater is connected to the tail end of the discharge pipe 401. The discharge pipe 401 includes an outlet pipe 4011 connected to the output end of the diaphragm pump 2, and an inclined conduit 4012 is fixedly connected to the tail end of the outlet pipe 4011. A filtering structure 4013 is installed on the inner wall of the middle part of the inclined conduit 4012, and a rectangular groove 4014 is opened on the bottom surface of the middle part of the inclined conduit 4012, and the edge of the rectangular groove 4014 is in contact with the bottom of the filtering structure 4013, and a control valve 4015 is installed at the bottom of the rectangular groove 4014, and a collecting cylinder 4016 is detachably connected to the bottom of the control valve 4015. In actual application, after the cold water impacts the diaphragm pump 2, it is discharged along the outlet pipe 4011 with the particulate impurities and B2O3, and then enters the inclined conduit 4012 and contacts with the filter structure 4013, wherein the liquid H3BO3 passes through the filter structure 4013 and continues to flow into the water tank 402 along the inclined conduit 4012, while the particulate impurities are intercepted by the filter structure 4013, and slide down along the inclined filter structure 4013 and the rectangular groove 4014, and fall into the collecting tube 4016 along the open control valve 4015, thereby achieving the purpose of separating H3BO3 and particulate impurities. Among them, the setting of the inclined conduit 4012 can effectively avoid the backflow phenomenon of the particulate impurities intercepted by the filter structure 4013. In addition, the collecting tube 4016 is preferably set to be transparent, so as to facilitate the observation of whether the inside is fully loaded, and when fully loaded, the collecting tube 4016 can be removed from the bottom of the control valve 4015 by closing the control valve 4015 to clean it.
[0047] like Figure 5 As shown, a solenoid valve 1 4017 is installed between the rectangular groove 4014 on the inclined conduit 4012 and the outlet pipe 4011, and an exhaust gas exhaust pipe 4018 is also installed at the tail end of the outlet pipe 4011, and the exhaust gas exhaust pipe 4018, the outlet pipe 4011 and the inclined conduit 4012 are arranged in a Y shape, and a solenoid valve 2 4019 is installed on the exhaust gas exhaust pipe 4018. When the diaphragm pump 2 sucks the exhaust gas in the furnace tube 1, the solenoid valve 1 4017 on the inclined conduit 4012 is in a closed state, and the solenoid valve 2 4019 on the exhaust gas exhaust pipe 4018 is in an open state, so that the exhaust gas and wastewater are discharged separately.
[0048] The process steps of the water washing pump circulation system are as follows:
[0049] S1, the host computer issues instructions;
[0050] S2, nitrogen valve 602 is closed, check valve 502 is opened, opened for 1 minute, and 0.5-1L of cold water is delivered;
[0051] S3, the diaphragm pump 2 is running, the pump speed is 3%, the check valve 502 is kept open, and the water supply is 1.5-2L per minute. The cold water sent in through the water supply pipe 501 is drawn by the diaphragm pump 2 to start flushing the diaphragm pump 2, and the flushing waste water is discharged into the water tank 402 through the discharge pipe 401;
[0052] S4, after flushing, close the one-way valve 502, open the nitrogen valve 602, cooperate with the diaphragm pump 2 to run, and purge the furnace tube 1 and the pump body of the diaphragm pump 2 at a pump speed of 15%, 15s, 30%, 15s, 50%, 15s, and 80%, 1min;
[0053] S5. After the purge is completed, the nitrogen valve 602 is closed at a pump speed of 20%, and the diaphragm pump is operated for 1 minute at a pump speed of 20%, and the purge nitrogen is turned on for >3 minutes.
[0054] The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent replacements or changes according to the technical scheme and inventive concept of the present invention within the technical scope disclosed by the present invention, which should be covered by the protection scope of the present invention.
Claims
1. A pre-boron water washing pump circulation system, comprising a furnace tube (1), characterized in that: A diaphragm pump (2) is arranged at the rear side of the furnace tube (1); a ventilation pipeline (3) is connected between the input end of the diaphragm pump (2) and the furnace tube (1); a discharge assembly (4) is connected to the gas outlet end of the diaphragm pump (2); a water supply assembly (5) is connected to the ventilation pipeline (3) for extracting clean water to flush the diaphragm pump (2) when the diaphragm pump (2) is started; and a nitrogen supply assembly (6) is connected to the front end of the furnace tube (1) for purging after flushing in the diaphragm pump (2); The water supply assembly (5) comprises a water supply pipe (501) fixedly connected to the ventilation pipeline (3), and a one-way valve (502) is installed on the water supply pipe (501).
2. A front boron water washing pump circulation system according to claim 1, characterized in that: The nitrogen supply component (6) comprises a delivery pipeline (601) connected to the front end of the furnace tube (1), and a nitrogen valve (602) is installed on the delivery pipeline (601).
3. A front boron water washing pump circulation system according to claim 2, characterized in that: The ventilation pipeline (3) comprises a straight pipe (301) connected to the tail end of the furnace tube (1), a transition shrinkage tube (302) is fixedly connected to the tail end of the straight pipe (301), and an introduction pipe (303) having an inner diameter smaller than that of the straight pipe (301) is connected between the transition shrinkage tube (302) and the input end of the diaphragm pump (2); The vertical section of the transition contraction tube (302) is in the shape of a right-angled trapezoid, and the lowest points of the bottoms of the straight-through tube (301), the transition contraction tube (302) and the introduction tube (303) are all on the same straight line.
4. A pre-boron water washing pump circulation system according to claim 3, characterized in that: The tail end of the water supply pipe (501) is connected to the middle of the top surface of the straight pipe (301), and the water supply pipe (501) is inclined, with an inclination angle of no more than 30°.
5. A front boron water washing pump circulation system according to claim 1, characterized in that: The discharge assembly (4) comprises a discharge pipe (401) for discharging waste water used for flushing the diaphragm pump (2), and a water tank (402) for storing waste water is connected to the tail end of the discharge pipe (401).
6. A pre-boron water washing pump circulation system according to claim 5, characterized in that: The discharge pipeline (401) comprises an outlet pipe (4011) connected to the output end of the diaphragm pump (2), an inclined conduit (4012) is fixedly connected to the tail end of the outlet pipe (4011), and a filtering structure (4013) is installed on the inner wall of the middle part of the inclined conduit (4012).
7. A pre-boron water washing pump circulation system according to claim 6, characterized in that: A rectangular groove (4014) is provided on the bottom surface of the middle part of the inclined conduit (4012), and the edge of the rectangular groove (4014) is in contact with the bottom of the filtering structure (4013). A control valve (4015) is installed at the bottom of the rectangular groove (4014), and a collecting cylinder (4016) is detachably connected to the bottom of the control valve (4015).
8. A pre-boron water washing pump circulation system according to claim 7, characterized in that: A solenoid valve 1 (4017) is installed between the rectangular groove (4014) on the inclined conduit (4012) and the outlet pipe (4011), and an exhaust gas exhaust pipe (4018) is also installed at the tail end of the outlet pipe (4011). The exhaust gas exhaust pipe (4018) and the outlet pipe (4011) and the inclined conduit (4012) are arranged in a Y shape, and a solenoid valve 2 (4019) is installed on the exhaust gas exhaust pipe (4018).
9. A pre-boron water washing pump circulation system according to any one of claims 1 to 8, characterized in that: The process steps of the water washing pump circulation system are as follows: S1, the host computer issues instructions; S2, nitrogen valve (602) is closed, check valve (502) is opened, opened for 1 minute, and 0.5-1L of cold water is delivered; S3, the diaphragm pump (2) is running, the pump speed is 3%, the one-way valve (502) is kept open, and 1.5-2L of water is supplied per minute. The cold water supplied through the water supply pipe (501) is drawn by the diaphragm pump (2) to start flushing the diaphragm pump (2). The flushing waste water is discharged into the water tank (402) through the discharge pipe (401); S4, after flushing is completed, the one-way valve (502) is closed, the nitrogen valve (602) is opened, and the diaphragm pump (2) is operated in conjunction with the operation of the diaphragm pump (2) at a pump speed of 15% for 15 seconds, a pump speed of 30% for 15 seconds, a pump speed of 50% for 15 seconds, and a pump speed of 80% for 1 minute to purge the furnace tube (1) and the pump body of the diaphragm pump (2); S5. After the purge is completed, the nitrogen valve (602) is closed at a pump speed of 20%, and the diaphragm pump is operated for 1 min at a pump speed of 20%, and the purge nitrogen is turned on for >3 min.
Citation Information
Patent Citations
Purging nozzle for electrolytic aluminum anode scrap and using method of purging nozzle
CN111318517A
Boron diffusion reaction system and process method thereof
CN115094521A
Tubular furnace
CN116086188A
Airtight storage tank cleaning device of culture medium
CN206351156U
Closestool and closestool nozzle structure
CN209129104U
