Method for controlling manufacturing precision of ultra-large steel pile of cutter suction dredger

The method addresses precision control issues in super-large steel piles by employing staggered welds and double-sided nodes, achieving precise assembly and improved operating efficiency for cutter suction dredgers.

CN119057290APending Publication Date: 2024-12-03GUANGZHOU WENCHONG SHIPYARD CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411185120.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-27
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing manufacturing processes for super-large steel piles of cutter suction dredgers fail to meet the precision control requirements necessary for assembly, particularly in ensuring a 10mm single-side gap with the clamp of the dredger's trolley and hull, due to the increased size and complexity of these piles.

Method used

A method involving precise welding and assembly techniques, including staggered longitudinal welds, simultaneous half-circle welding, and double-sided groove nodes, along with precision inspections, to ensure accurate splicing and positioning of the steel piles.

Benefits of technology

The method enhances manufacturing precision by balancing welding forces and maintaining controllable accuracy, ensuring the steel piles meet the required forming precision and operating efficiency of cutter suction dredgers.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057290A_ABST
    Figure CN119057290A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of cutter suction dredgers, and discloses a cutter suction dredger ultra-large steel pile manufacturing precision control method which comprises the following steps that S1, a cylinder is manufactured, and the weld reinforcement and ovality are controlled; s2, a plurality of barrels are assembled in a segmented mode, the barrels are integrally spliced on a jig frame to form a steel pile, longitudinal weld joints of the adjacent barrels are staggered by a preset arc length value C, for annular butt joints welded in the axial direction, if the annular butt joints have the turning-over condition on the jig frame, the step S3 is executed, and if not, the step S4 is executed; the step S3 comprises the substeps that S310, the inner lower half ring and the outer upper half ring are welded at the same time; s320, leaving the jig frame, turning over by 180 degrees, and fixing on the jig frame; s330, the turned-over inner lower half ring and the turned-over outer upper half ring are welded at the same time; the step S4 comprises the substeps that S410, a left half ring in the annular butt joint and a right half ring in the annular butt joint are welded at the same time; s420, a left half ring outside the annular butt joint and a right half ring outside the annular butt joint are welded at the same time; and S5, precision inspection is carried out, and coating work is carried out after qualification.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of cutter suction dredgers, and in particular to a method for controlling the manufacturing accuracy of super-large steel piles for cutter suction dredgers. Background Art

[0002] The steel pile size of the currently developed cutter suction dredger reaches more than 50 meters in length and more than 2 meters in diameter. During assembly, the single-side gap between the steel pile and the upper clamp of the steel pile trolley and the wear-resistant plate of the lower clamp of the hull is required to be only 10mm. The original manufacturing process scheme for small-sized steel piles cannot meet the precision control requirements. Therefore, a new method for precision control of super-large steel piles for cutter suction dredgers is provided to control the forming precision of super-large steel piles. Summary of the invention

[0003] The purpose of the present invention is to provide a method for controlling the manufacturing accuracy of super-large steel piles for a cutter suction dredger, so as to ensure the forming accuracy of the super-large steel piles and achieve high operating efficiency.

[0004] To achieve this object, the present invention adopts the following technical solutions:

[0005] The method for controlling the manufacturing precision of super-large steel piles of a cutter suction dredger comprises the following steps:

[0006] S1. Making the cylinder: Roll the plate into a round cylinder and weld the longitudinal butt joint. The weld excess height |△P|≤ the first excess height value, and the ovality is within the target ovality range;

[0007] S2, assembling multiple cylinders in sections, and splicing them as a whole on a tire frame to form a steel pile, the longitudinal welds of adjacent cylinders are staggered by a preset arc length value △C, and for the annular butt joints of axial butt welding, if the conditions for turning over on the tire frame are met, step S3 is executed, if not, step S4 is executed;

[0008] Step S3 includes: S310, welding the inner lower half circle and the outer upper half circle at the same time; S320, leaving the tire frame, turning over 180 degrees, and fixing on the tire frame; S330, welding the inner lower half circle after turning over and the outer upper half circle after turning over at the same time;

[0009] Step S4 includes: S410, welding the inner left half circle and the inner right half circle of the annular butt joint simultaneously; S420, welding the outer left half circle and the outer right half circle of the annular butt joint simultaneously;

[0010] S5. Precision inspection, after passing the inspection, proceed with painting.

[0011] Optionally, step S310 and / or step S330 includes the steps of:

[0012] S311, the inner lower half circle is divided into N lower arc segments, and the outer upper half circle is divided into N upper arc segments, N ≥ 2;

[0013] S312. Simultaneously weld a lower arc segment and an upper arc segment that are symmetrical with respect to the axis of the cylinder until the welding of all lower arc segments and all upper arc segments is completed.

[0014] Optionally,

[0015] In step 311, N=4, the inner lower half circle includes a first inner arc segment, a third inner arc segment, a second inner arc segment and a fourth inner arc segment connected in sequence, the outer upper half circle includes a first outer arc segment, a third outer arc segment, a second outer arc segment and a fourth outer arc segment connected in sequence, the first inner arc segment is symmetrical with the first outer arc segment about the cylinder axis, the second inner arc segment is symmetrical with the second outer arc segment about the cylinder axis, the third inner arc segment is symmetrical with the third outer arc segment about the cylinder axis, and the fourth inner arc segment is symmetrical with the fourth outer arc segment about the cylinder axis;

[0016] In step S312, the first inner arc segment and the first outer arc segment are welded first, then the second inner arc segment and the second outer arc segment are welded, then the third inner arc segment and the third outer arc segment are welded, and finally the fourth inner arc segment and the fourth outer arc segment are welded.

[0017] Optionally, step S410 and / or S420 includes the steps of:

[0018] S411, the left half circle is divided into M left arc segments, and the right half circle is divided into M right arc segments, M ≥ 2;

[0019] S412. Simultaneously weld a left arc segment and a right arc segment that are symmetrical with respect to the axis of the cylinder until the welding of the left arc segment and all the right arc segments is completed.

[0020] Optionally,

[0021] In step 411, M=4, the left half circle includes the third left arc segment, the first left arc segment, the fourth left arc segment and the second left arc segment which are connected in sequence, the right half circle includes the third right arc segment, the first right arc segment, the fourth right arc segment and the second right arc segment which are connected in sequence, the first left arc segment and the first right arc segment are symmetrical about the cylinder axis, the second left arc segment and the second right arc segment are symmetrical about the cylinder axis, the third left arc segment and the third right arc segment are symmetrical about the cylinder axis, and the fourth left arc segment and the fourth right arc segment are symmetrical about the cylinder axis;

[0022] In step S412, the first left arc segment and the first right arc segment are welded first, then the second left arc segment and the second right arc segment are welded, then the third left arc segment and the third right arc segment are welded, and finally the fourth left arc segment and the fourth right arc segment are welded.

[0023] Optionally, in step S2, a plurality of cylinders are assembled in sections and integrally spliced ​​on a tire frame to form a steel pile, including:

[0024] S201, splicing cylinders into cylinder sections: multiple cylinders are connected by butt welding along the axial direction;

[0025] S202, splicing cylinder segments into cylinder sections: multiple cylinder segments are connected by butt welding along the axial direction;

[0026] S203, arranging a tire frame at the assembly site, drawing a position verification line based on the position of the tire frame, and drawing a joint line on the outer surface of the barrel segment;

[0027] S204, placing the barrel section on the tire frame, and adjusting the barrel position according to the position verification line and the alignment line;

[0028] S205, welding the annular butt joints between the barrel sections according to step S3 or S4.

[0029] Optionally, step S2 also includes: installing an internal structure in the cylinder, using a deep fusion welding groove node between the cylinder and the internal structure, with a groove angle of 45 degrees and leaving a thickness of one third of the cylinder wall thickness.

[0030] Optionally, the cylinder wall thickness is greater than 18 mm, and double-sided groove deep fusion welding is used between the cylinder and the internal structural parts, and / or, the cylinder wall thickness is not greater than 18 mm, and single-sided groove deep fusion welding is used between the cylinder and the internal structural parts.

[0031] Optionally, in step S1, welding the longitudinal butt seam comprises:

[0032] S601, turn the longitudinal butt joint to the flat welding position;

[0033] S602, welding inner seams, using submerged arc automatic welding for multi-layer and multi-pass welding;

[0034] S603, welding outer seams, using submerged arc automatic welding for multi-layer and multi-pass welding.

[0035] Optionally, step S5 includes:

[0036] The roundness of the cross section was tested, and the average diameter deviation was ±2.5mm;

[0037] To check the straightness, divide the steel pile into 8 equal parts along the length of the steel pile on the outer circumference of the steel pile, and make 9 measuring points in total. The straightness of two adjacent measuring points shall be ≤4mm, and the straightness of all measuring points shall be ≤16mm.

[0038] Beneficial effects of the present invention:

[0039] The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger provided by the present invention ensures the manufacturing precision of the steel piles by processing and controlling the ovality and weld excess height. Through step S310, the steel piles are connected by welding in a whole circle, and the outer upper half circle and the inner lower half circle are constructed by two welders at the same time. The connecting forces formed during the welding process are balanced with each other, ensuring that the positioning of the steel piles is not affected by welding, which is beneficial to improving the welding precision. Through step S410, the steel piles are connected by welding in a whole circle, and the inner left half circle and the inner right half circle are constructed by two welders at the same time. The connecting forces formed during the welding process are balanced with each other, ensuring that the positioning of the steel piles is not affected by welding, which is beneficial to improving the welding precision. Step S420 further maintains controllable precision and completes the welding of the steel piles. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] Figure 1 is a schematic diagram of arranging a cross-shaped channel steel in a cylinder in an embodiment of the present invention;

[0041] Figure 2 is a schematic cross-sectional view of the arrangement of steel piles on a tire frame in an embodiment of the present invention;

[0042] Figure 3 is a schematic diagram of the welding sequence and direction in step S312 provided in an embodiment of the present invention;

[0043] Figure 4 It is a schematic diagram of the welding sequence and direction of the inside of the steel pile in step S412 of the present invention;

[0044] Figure 5 It is a schematic diagram of the sequence and direction of welding the steel pile exterior in step S412 of the present invention;

[0045] Figure 6 It is a schematic diagram of a double-sided welding groove node provided by an embodiment of the present invention;

[0046] Figure 7 Schematic diagram of deep penetration welding groove node when the wall thickness is greater than 18 mm in an embodiment of the present invention;

[0047] Figure 8 It is a schematic diagram of the deep penetration welding groove node when the wall thickness is not more than 18 mm in an embodiment of the present invention.

[0048] In the figure:

[0049] 1. First inner arc segment; 2. Second inner arc segment; 3. Third inner arc segment; 4. Fourth inner arc segment;

[0050] 1', first outer arc segment; 2', second outer arc segment; 3', third outer arc segment; 4', fourth outer arc segment;

[0051] A, the first left arc segment; B, the second left arc segment; C, the third left arc segment; D, the fourth left arc segment;

[0052] A', the first right arc segment; B', the second right arc segment; C', the third right arc segment; D', the fourth right arc segment;

[0053] 100. Steel piles; 101. Cross-shaped channel steel; 102. Tire frame. DETAILED DESCRIPTION

[0054] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0055] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0056] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0057] In the description of this embodiment, the terms "upper", "lower", "right", etc., directions or positional relationships are based on the directions or positional relationships shown in the drawings, and are only for the convenience of description and simplification of operation, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0058] This embodiment provides a method for controlling the manufacturing accuracy of super-large steel piles for a cutter suction dredger, which comprises the following steps:

[0059] S1. Making the cylinder: Roll the plate into a round cylinder and weld the longitudinal butt joint. The weld excess height |△P|≤ the first excess height value, and the ovality is within the target ovality range. Specifically, the weld excess height is controlled by grinding. Figure 1 As shown, the cross-shaped channel steel 101 is installed at the port of the cylinder to strengthen it and ensure the ovality. Moreover, after the longitudinal weld of the cylinder is welded, it is re-rolled to ensure the ovality. Optionally, the first excess height value is within 0 to 0.5 mm. Optionally, the target ovality range refers to the ovality error within ±3 mm. The excess height of all welds on the outside of the straight part of the cylinder of the steel pile 100 must be strictly controlled, and the weld surfaces must be ground flat, including the stainless steel identification ring weld on the outside of the middle part of the steel pile 100. The manufacturing accuracy of the steel pile 100 is guaranteed by processing and controlling the ovality and weld excess height.

[0060] S2, assemble multiple cylinders in sections, such as Figure 2 As shown, the steel pile 100 is formed by integral splicing on the tire frame 102, and the longitudinal welds of adjacent cylinders are staggered by a preset arc length value △C. For the annular butt joints of the axial butt welding, if the conditions for turning over on the tire frame 102 are met, step S3 is executed, if not, step S4 is executed; optionally, the preset arc length value △C is ≥ 300mm.

[0061] like Figure 3 As shown, step S3 includes the following steps: S310, welding the inner lower half circle and the outer upper half circle simultaneously; S320, leaving the tire frame 102, turning over 180 degrees, and fixing on the tire frame 102; S330, welding the inner lower half circle after turning over and the outer upper half circle after turning over simultaneously; through step S310, the steel pile 100 is connected by welding in a whole circle, and the outer upper half circle and the inner lower half circle are constructed by two welders at the same time, and the connection forces formed during the welding process are balanced with each other, ensuring that the positioning of the steel pile 100 is not affected by welding, which is conducive to improving the welding accuracy. After the steel pile 100 is turned over, the process of step S330 is similar to step S310, so it has the same effect.

[0062] like Figure 4 and Figure 5 As shown, step S4 includes the steps of: S410, welding the left half circle inside the annular butt joint and the right half circle inside the annular butt joint at the same time; S420, welding the left half circle outside the annular butt joint and the right half circle outside the annular butt joint at the same time. Through step S410, the steel pile 100 is connected by welding on a whole circle, and the inner left half circle and the inner right half circle are constructed by two welders at the same time. The connection forces formed during the welding process are balanced with each other, ensuring that the positioning of the steel pile 100 is not affected by welding, which is conducive to improving the welding accuracy. Step S420 further maintains controllable accuracy and completes the welding of the steel pile 100.

[0063] S5. Precision inspection, after passing the inspection, proceed with painting.

[0064] like Figure 6 As shown, in this embodiment, both the longitudinal butt joint and the annular butt joint of the steel pile 100 adopt double-sided weld groove nodes to reduce welding deformation and stress.

[0065] Optionally, in step S2, multiple cylinders are assembled in sections and integrally spliced ​​on a tire frame 102 to form a steel pile 100, including the following steps: S201, splicing cylinders into cylinder sections: multiple cylinders are connected by axial butt welding; S202, splicing cylinder sections into cylinder segments: multiple cylinder segments are connected by axial butt welding; S203, arranging the tire frame 102 at the general assembly site, drawing a position verification line based on the position of the tire frame 102, and drawing a matching line on the outer surface of the cylinder segment; S204, placing the cylinder segment on the tire frame 102, and adjusting the position of the cylinder according to the position verification line and the matching line; S205, welding the annular butt seams between the cylinder segments according to step S3 or S4.

[0066] like Figure 3 As shown, optionally, step S310 includes the steps of: S311, dividing the inner lower half circle into N lower arc segments, and dividing the outer upper half circle into N upper arc segments, N ≥ 2; S312, welding a lower arc segment and an upper arc segment symmetrical with the axis of the cylinder at the same time, until the welding of all lower arc segments and all upper arc segments is completed. Simultaneously welding the upper arc segment and the lower arc segment that are symmetrical with the center is conducive to ensuring the force balance of the steel pile 100 during the welding process and improving the splicing accuracy. Dividing into N segments, by controlling the accuracy of each pair of upper arc segments and lower arc segments one by one, the overall accuracy can be controlled, which has high feasibility and good accuracy control effect.

[0067] like Figure 3 As shown, optionally, step S330 includes: S311, the inner lower half circle is divided into N lower arc segments, and the outer upper half circle is divided into N upper arc segments, N≥2; S312, simultaneously welding a lower arc segment and an upper arc segment symmetrical with the axis of the cylinder until the welding of all lower arc segments and all upper arc segments is completed.

[0068] like Figure 3As shown, optionally, in step S311, N=4, the inner lower half circle includes the first inner arc segment 1, the third inner arc segment 3, the second inner arc segment 2 and the fourth inner arc segment 4 which are connected in sequence, and the outer upper half circle includes the first outer arc segment 1', the third outer arc segment 3', the second outer arc segment 2' and the fourth outer arc segment 4' which are connected in sequence, the first inner arc segment 1 and the first outer arc segment 1' are symmetrical with respect to the cylinder axis, the second inner arc segment 2 and the second outer arc segment 2' are symmetrical with respect to the cylinder axis, the third inner arc segment 3 and the third outer arc segment 3' are symmetrical with respect to the cylinder axis, and the fourth inner arc segment 4 and the fourth outer arc segment 4' are symmetrical with respect to the cylinder axis; in step S312, the first inner arc segment 1 and the first outer arc segment 1' are welded first, then the second inner arc segment 2 and the second outer arc segment 2' are welded, then the third inner arc segment 3 and the third outer arc segment 3' are welded, and finally the fourth inner arc segment 4 and the fourth outer arc segment 4' are welded. Following the welding sequence in step S312 is beneficial to further improve the force balance of the steel pile 100 during the welding process and improve the splicing accuracy. Figure 3 Weld each section in the direction of the arrow.

[0069] Specifically, when the welding of the lower inner half circle and the upper outer half circle of the steel pile 100 is completed, the relevant technical personnel need to measure the accuracy of the steel pile 100. If qualified, it can be turned over (180°) to achieve the exchange of the upper and lower half circles and the tire is fixed. Then the relevant technical personnel will measure its accuracy again. If qualified, the inner (the lower inner half circle after turning over) and the outer (the upper outer half circle after turning over) will be thoroughly carbon planed and polished to white, and then pressed Figure 3 The area after the root cleaning is symmetrically welded in the above welding sequence and direction, and finally the other remaining welds of the steel pile 100 are symmetrically welded. The accuracy of the steel pile 100 must be strictly controlled during welding and turning, and special attention must be paid to controlling the welding quality at the intersection of the inner and outer welds of the steel pile 100. The accuracy change of the steel pile 100 must be measured in time during the welding process, and the welding sequence and direction can be adjusted according to the changes on site (based on the on-site markings of the technicians) to ensure that the accuracy of the steel pile 100 after welding meets the relevant requirements.

[0070] like Figure 4 As shown, optionally, step S410 includes: S411, the left half circle is divided into M left arc segments, and the right half circle is divided into M right arc segments, M≥2; S412, a left arc segment and a right arc segment that are symmetrical about the axis of the cylinder are welded simultaneously until the welding of the left arc segment and all the right arc segments is completed. Simultaneously welding the right arc segment and the left arc segment that are symmetrical about the center is conducive to ensuring the force balance of the steel pile 100 during the welding process and improving the splicing accuracy. Dividing into M segments, by controlling the accuracy of each pair of right arc segments and left arc segments one by one, the overall accuracy can be controlled, which has high feasibility and good accuracy control effect.

[0071] Similarly, step S420 includes: S411, dividing the left half circle into M left arc segments, and the right half circle into M right arc segments, M≥2; S412, simultaneously welding a left arc segment and a right arc segment symmetrical about the axis of the cylinder until the welding of the left arc segment and all the right arc segments is completed.

[0072] like Figure 4 and Figure 5 As shown, optionally, in step S411, M=4, the left half circle includes the third left arc segment C, the first left arc segment A, the fourth left arc segment D and the second left arc segment B connected in sequence, the right half circle includes the third right arc segment C', the first right arc segment A', the fourth right arc segment D' and the second right arc segment B' connected in sequence, the first left arc segment A and the first right arc segment A' are symmetrical about the cylinder axis, the second left arc segment B and the second right arc segment B' are symmetrical about the cylinder axis, the third left arc segment C and the third right arc segment C' are symmetrical about the cylinder axis, and the fourth left arc segment D and the fourth right arc segment D' are symmetrical about the cylinder axis; in step S412, the first left arc segment A and the first right arc segment A' are welded first, then the second left arc segment B and the second right arc segment B' are welded, then the third left arc segment C and the third right arc segment C' are welded, and finally the fourth left arc segment D and the fourth right arc segment D' are welded. Following the welding sequence in step S412 is beneficial to further improve the force balance of the steel pile 100 during the welding process and improve the splicing accuracy. Figure 4 and Figure 5 Weld each section in the direction of the arrow.

[0073] Specifically, when it is impossible to turn over, an even number of welders will first weld symmetrically on the left and right. After the internal weld is completed, the outside of the butt weld will be carbon planed to clean the root and whiten it. After thorough grinding and cleaning, an even number of welders will weld the outside symmetrically, and finally weld the remaining welds of the steel pile 100 symmetrically. During the welding process, the accuracy change of the steel pile 100 needs to be measured in time, and the welding order and direction can be adjusted according to the on-site changes (based on the on-site markings of the technicians) to ensure that the accuracy of the steel pile 100 after welding meets the relevant requirements.

[0074] To ensure the welding accuracy of the longitudinal butt joint of the cylinder, optionally, in step S1, welding the longitudinal butt joint includes: S601, turning the longitudinal butt joint to the flat welding position; S602, welding the inner seam, using submerged arc automatic welding for multi-layer and multi-pass welding; S603, welding the outer seam, using submerged arc automatic welding for multi-layer and multi-pass welding. In other words, when welding the longitudinal seam of the cylinder of the steel pile 100, the longitudinal seam should be turned to the flat welding position, and submerged arc automatic welding can be used for multi-layer and multi-pass welding. After the inner seam is welded, the cylinder is rotated so that the outer seam is in the flat welding position, and the carbon arc air planer is used to clean the root and grind before welding. Submerged arc automatic welding can be used for multi-layer and multi-pass welding.

[0075] like Figure 7 and Figure 8As shown, optionally, step S2 also includes: installing the internal structure in the cylinder, using deep penetration welding groove nodes between the cylinder and the internal structure, the groove angle is 45 degrees, and leaving one-third of the cylinder wall thickness, as shown in the figure, where t represents the wall thickness. Optionally, the cylinder wall thickness is greater than 18mm, and double-sided groove deep penetration welding is used between the cylinder and the internal structure. Optionally, the cylinder wall thickness is not greater than 18mm, and single-sided groove deep penetration welding is used between the cylinder and the internal structure.

[0076] Optionally, step S5 includes: detecting the roundness of the cross section, with an average diameter deviation of ±2.5 mm; detecting the straightness, dividing the steel pile 1008 into 9 measuring points along the length direction of the steel pile 100 on the outer circumferential surface of the steel pile 100, with the straightness of two adjacent measuring points ≤4 mm, and the straightness of all measuring points ≤16 mm.

[0077] Obviously, the above embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. For those skilled in the art, various obvious changes, readjustments and substitutions can be made without departing from the protection scope of the present invention. It is not necessary and impossible to list all the embodiments here. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the claims of the present invention.

Claims

1. A method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger, characterized in that: The following steps are involved: S1. Making the cylinder: Roll the plate into a round cylinder and weld the longitudinal butt joint. The weld excess height |△P|≤ the first excess height value, and the ovality is within the target ovality range; S2, assembling multiple cylinders in sections, and splicing them as a whole on a tire frame to form a steel pile, the longitudinal welds of adjacent cylinders are staggered by a preset arc length value △C, and for the annular butt joints of axial butt welding, if the conditions for turning over on the tire frame are met, step S3 is executed, if not, step S4 is executed; Step S3 includes: S310, welding the inner lower half circle and the outer upper half circle at the same time; S320, leaving the tire frame, turning over 180 degrees, and fixing on the tire frame; S330, welding the inner lower half circle after turning over and the outer upper half circle after turning over at the same time; Step S4 includes: S410, welding the inner left half circle and the inner right half circle of the annular butt joint simultaneously; S420, welding the outer left half circle and the outer right half circle of the annular butt joint simultaneously; S5. Precision inspection, after passing the inspection, proceed with painting.

2. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 1 is characterized in that: Step S310 and / or step S330 include: S311, the inner lower half circle is divided into N lower arc segments, and the outer upper half circle is divided into N upper arc segments, N ≥ 2; S312. Simultaneously weld a lower arc segment and an upper arc segment that are symmetrical with respect to the axis of the cylinder until the welding of all lower arc segments and all upper arc segments is completed.

3. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 2 is characterized in that: In step 311, N=4, the inner lower half circle includes a first inner arc segment, a third inner arc segment, a second inner arc segment and a fourth inner arc segment connected in sequence, the outer upper half circle includes a first outer arc segment, a third outer arc segment, a second outer arc segment and a fourth outer arc segment connected in sequence, the first inner arc segment is symmetrical with the first outer arc segment about the cylinder axis, the second inner arc segment is symmetrical with the second outer arc segment about the cylinder axis, the third inner arc segment is symmetrical with the third outer arc segment about the cylinder axis, and the fourth inner arc segment is symmetrical with the fourth outer arc segment about the cylinder axis; In step S312, the first inner arc segment and the first outer arc segment are welded first, then the second inner arc segment and the second outer arc segment are welded, then the third inner arc segment and the third outer arc segment are welded, and finally the fourth inner arc segment and the fourth outer arc segment are welded.

4. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 1 is characterized in that: Step S410 and / or S420 includes: S411, the left half circle is divided into M left arc segments, and the right half circle is divided into M right arc segments, M ≥ 2; S412. Simultaneously weld a left arc segment and a right arc segment that are symmetrical with respect to the axis of the cylinder until the welding of the left arc segment and all the right arc segments is completed.

5. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 4 is characterized in that: In step 411, M=4, the left half circle includes the third left arc segment, the first left arc segment, the fourth left arc segment and the second left arc segment which are connected in sequence, the right half circle includes the third right arc segment, the first right arc segment, the fourth right arc segment and the second right arc segment which are connected in sequence, the first left arc segment and the first right arc segment are symmetrical about the cylinder axis, the second left arc segment and the second right arc segment are symmetrical about the cylinder axis, the third left arc segment and the third right arc segment are symmetrical about the cylinder axis, and the fourth left arc segment and the fourth right arc segment are symmetrical about the cylinder axis; In step S412, the first left arc segment and the first right arc segment are welded first, then the second left arc segment and the second right arc segment are welded, then the third left arc segment and the third right arc segment are welded, and finally the fourth left arc segment and the fourth right arc segment are welded.

6. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 1 is characterized in that: In step S2, a plurality of cylinders are assembled in sections and integrally spliced ​​on a tire frame to form a steel pile, including: S201, splicing cylinders into cylinder sections: multiple cylinders are connected by butt welding along the axial direction; S202, splicing cylinder segments into cylinder sections: multiple cylinder segments are connected by butt welding along the axial direction; S203, arranging a tire frame at the assembly site, drawing a position verification line based on the position of the tire frame, and drawing a joint line on the outer surface of the barrel segment; S204, placing the barrel section on the tire frame, and adjusting the barrel position according to the position verification line and the alignment line; S205, welding the annular butt joints between the barrel sections according to step S3 or S4.

7. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 1, characterized in that: Step S2 also includes: installing the internal structure in the cylinder, using deep fusion welding groove nodes between the cylinder and the internal structure, with a groove angle of 45 degrees and leaving a thickness of one third of the cylinder wall thickness.

8. The method for controlling the manufacturing precision of super-large steel piles for a cutter suction dredger according to claim 7 is characterized in that: When the wall thickness of the cylinder is greater than 18 mm, double-sided groove deep fusion welding is used between the cylinder and the internal structural parts, and / or, when the wall thickness of the cylinder is not greater than 18 mm, single-sided groove deep fusion welding is used between the cylinder and the internal structural parts.

9. The method for controlling the manufacturing accuracy of super-large steel piles for a cutter suction dredger according to claim 1, characterized in that: In step S1, welding the longitudinal butt joint comprises: S601, turn the longitudinal butt joint to the flat welding position; S602, welding inner seams, using submerged arc automatic welding for multi-layer and multi-pass welding; S603, welding outer seams, using submerged arc automatic welding for multi-layer and multi-pass welding.

10. The method for controlling the manufacturing accuracy of super-large steel piles for a cutter suction dredger according to any one of claims 1 to 9, characterized in that: Step S5 includes: The roundness of the cross section was tested, and the average diameter deviation was ±2.5mm; To check the straightness, divide the steel pile into 8 equal parts along the length of the steel pile on the outer circumference of the steel pile, and make 9 measuring points in total. The straightness of two adjacent measuring points shall be ≤4mm, and the straightness of all measuring points shall be ≤16mm.