A welding tool for assembled building mold

By designing a welding tool including positioning columns, push rods, connecting caps and push frames, the problem of ear positioning errors during welding of prefabricated building molds is solved, and the accurate butt of ear connections and welding accuracy is improved.

CN119057296BActive Publication Date: 2025-05-02YANTAI KUNJIAN NEW MATERIALS CO LTD
View PDF 2 Cites 0 Cited by

Patent Information

Application Number
CN202411457891.3
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2024-10-18
Publication Date
2025-05-02
Estimated Expiration
2044-10-18

AI Technical Summary

Technical Problem

During the welding process of prefabricated building molds, due to the large manual positioning error, the connection ears cannot be accurately connected, which seriously affects the welding accuracy.

Method used

A welding tool for prefabricated building molds is designed. Through the combination of positioning columns, push rods, connecting caps and push frames, the precise positioning and welding of the butt ears are achieved to ensure the accurate docking of the joint ears.

Benefits of technology

Through this welding tool, it is possible to effectively ensure that the ears of the side mold and the bottom mold after welding can be accurately connected, and the welding accuracy can be improved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119057296B_ABST
    Figure CN119057296B_ABST
Patent Text Reader

Abstract

The present invention relates to the field of welding facilities, and in particular to a welding tool for an assembled building mold, comprising a base, a moving part is installed inside the base, a concave frame is installed at the end of the moving part, rod rings are fixedly installed at both ends of the concave frame, push rods are slidably installed inside the two rod rings, positioning columns are fixedly installed at the opposite ends of the two push rods, and two limiting ears are symmetrically extended on the outer surface of the positioning column, a connecting cap is elastically installed at the middle of the upper end of the concave frame, and push frames are rotatably installed on both sides of the connecting cap, and the ends of the two push frames are respectively rotatably connected to the two push rods, and a welding part is installed on the concave frame. The present invention ensures that the side mold and the bottom mold can be accurately docked after welding, improves the welding accuracy, and meets the welding requirements at the same time.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of welding facilities, and in particular to a welding tool for an assembled building mould. Background Art

[0002] Prefabricated buildings are a representative of modern industrialized production methods. They achieve the goal of efficient, environmentally friendly and energy-saving construction by transferring a large number of on-site operations in traditional construction methods to factories. During the manufacturing process of prefabricated building molds, the bottom mold and the side mold are usually connected together using a door-axis connection method, so that when demolding, the side mold can be turned down for easy demolding.

[0003] When the bottom mold and the side mold are connected, multiple ears are evenly arranged on the bottom mold and the side mold, and fixed by welding, and then the pin is passed through the ears of the two to connect the two together. When welding the ears, workers usually position each ear by manual measurement, and then weld. This operation method has a large manual positioning error, resulting in that after the ears on the bottom mold and the ears on the side mold are welded, when they are assembled together, the ears of the two cannot be accurately docked, which seriously affects the welding accuracy. Summary of the invention

[0004] The purpose of the present invention is to solve the shortcomings of the background technology and to propose a welding tool for an assembled building mold.

[0005] To achieve the above purpose, the technical solution adopted by the present invention is: a welding tool for an assembled building mold, including a base, a moving part is installed inside the base, a concave frame is installed on the end of the moving part, rod rings are fixedly installed at both ends of the concave frame, push rods are slidably installed inside the two rod rings, positioning columns are fixedly installed on the opposite ends of the two push rods, and two limiting ears are symmetrically extended on the outer surface of the positioning column, a connecting cap is elastically installed in the middle of the upper end of the concave frame, and pushing frames are rotatably installed on both sides of the connecting cap, and the ends of the two pushing frames are rotatably connected to the two push rods respectively, and a welding part is installed on the concave frame.

[0006] Preferably, the opposite ends of the two push rods are coaxially inlaid with limiting caps, the rear end of the connecting cap is coaxially extended with a pulling rod, the outer surface of the pulling rod is fitted with a rod sleeve, the lower end of the rod sleeve is fixed to the concave frame, and the end of the pulling rod is inlaid with a holding frame.

[0007] Preferably, a tensioning spring is wound around the outer side of the pulling rod, one end of the tensioning spring is fixed to the rod sleeve, and the other end of the tensioning spring is fixed to the holding frame, both ends of the base are vertically fixed with fixing frames, and two mold support ears are symmetrically fixed at the opposite ends of the two fixing frames, and positioning ears are fixed at the front ends of the two fixing frames, and the two positioning ears are symmetrically arranged.

[0008] Preferably, the welding part includes two guide sleeves symmetrically and slidably mounted on the concave frame, a connecting frame is fixedly mounted between the upper ends of the two guide sleeves, two gun racks are symmetrically extended from the front end of the connecting frame, welding guns are fixedly mounted at the ends of the two gun racks, and the two welding guns are symmetrically arranged.

[0009] Preferably, the movable part includes a frame seat that is slidably installed inside the base, an extension frame is slidably installed inside the frame seat, the end of the extension frame is fixed to the concave frame, guide ears are extended from the upper and lower ends of the frame seat, the guide ears pass through the upper and lower ends of the base, a special-shaped frame is fixedly installed on the upper end of the frame seat, the special-shaped frame is located behind the guide ears, a stud is passed through the end of the special-shaped frame and screwed, a pressure frame is rotatably installed on the lower end of the stud, and the pressure frame is pressed on the base.

[0010] Preferably, the upper and lower end surfaces of the base are provided with sliding grooves, the guide ears are fitted into the inside of the sliding grooves, a handwheel is coaxially fixedly installed on the upper end of the stud, a groove seat is fixedly installed on the front end of the special-shaped frame, a limiting block is fitted into the inside of the groove seat, and the end of the limiting block is fixed to the upper end of the pressure frame.

[0011] Preferably, a bearing sleeve is fixedly installed at the rear end of the special-shaped frame, and a locking pin is coaxially arranged inside the bearing sleeve. The two ends of the locking pin respectively pass through the upper and lower ends of the bearing sleeve, and the locking pin is slidably matched with the bearing sleeve. The lower end of the locking pin passes through the upper end of the frame seat and the upper end of the extension frame in turn, and the locking pin is slidably matched with the frame seat and the extension frame.

[0012] Preferably, a pin cap is coaxially inlaid on the outer surface of the locking pin, and the pin cap fits onto the inner surface of the bearing sleeve. A pin fixing spring is wound around the outer side of the locking pin, and the upper end of the pin fixing spring is fixed to the inner top surface of the bearing sleeve. The lower end of the pin fixing spring is fixed to the upper end of the pin cap, and a pull ring is fixedly installed on the upper end of the locking pin.

[0013] Compared with the prior art, the present invention has the following beneficial effects:

[0014] 1. Insert the two No. 1 connecting ears on the two positioning columns respectively, and position the No. 1 connecting ears through the positioning columns so that the axial hole on the No. 1 connecting ear can be aligned with the axial hole on the No. 2 connecting ear. Then, the spring is tightened to push the connecting cap. At this time, the pulling rod slides in the rod sleeve to guide the connecting cap, and the moving connecting cap drives the pushing frame to move, thereby driving the two push rods to move synchronously toward each other, so that the two No. 1 connecting ears are respectively tightened on both sides of the No. 2 connecting ear, and then the connecting frame can be pushed to drive the two welding guns to move, so as to weld the two No. 1 connecting ears and the side mold together at the same time, so as to position and weld the two No. 1 connecting ears with the No. 2 connecting ear as a reference, which effectively ensures that the side mold and the bottom mold can be accurately docked after welding, thereby improving the welding accuracy.

[0015] 2. By pulling the pull ring, the locking pin pushed out by the fixing pin spring can be separated from between the extension frame and the frame seat. Then, the extension frame can be directly pulled to slide in the frame seat, so that the positioning column can be separated from the two sides of the No. 2 ear. Then, the stud can be loosened to move the pressure frame upward and away from the ground seat. Then, the frame seat can be moved to drive the positioning column to move sideways, so that the positioning column can be moved to the next No. 2 ear to position and weld the No. 1 ear at that location. This can be done by analogy to complete the welding operations of all No. 1 ears to meet the welding requirements. BRIEF DESCRIPTION OF THE DRAWINGS

[0016] Figure 1 It is a structural schematic diagram of a welding tooling of an assembled building mold of the present invention;

[0017] Figure 2 It is a schematic diagram of a concave frame of a welding tooling of an assembled building mold of the present invention;

[0018] Figure 3 It is a schematic diagram of a stand of a welding tool for an assembled building mold of the present invention;

[0019] Figure 4 This is an internal view of a bearing sleeve of a welding tooling of an assembled building mold of the present invention;

[0020] Figure 5 This is a view of the use of a welding tool for an assembled building mold of the present invention;

[0021] Figure 6 A welding tool for an assembled building mold of the present invention Figure 5 A magnified view of middle;

[0022] Figure 7 The present invention is a view of the connection between a bottom mold and a side mold of a welding tool for an assembled building mold.

[0023] In the figure: 1, base; 2, fixing frame; 3, mold support ear; 4, positioning ear; 5, extension frame; 6, push rod; 7, concave frame; 8, frame seat; 9, guide ear; 10, bearing sleeve; 11, pulling rod; 12, holding frame; 13, rod sleeve; 14, slide groove; 15, pushing frame; 16, hand wheel; 17, guide sleeve; 18, connecting frame; 19, connecting cap; 20, tightening spring; 21, gun frame; 22, welding gun; 23, positioning column; 24, limiting ear; 25, rod ring; 26, limiting cap; 27, locking pin; 28, fixing pin spring; 29, pin cap; 30, special-shaped frame; 31, pull ring; 32, stud; 33, slot seat; 34, limiting block; 35, pressing frame; 36, bottom mold; 37, side mold; 38, No. 1 connecting ear; 39, No. 2 connecting ear. DETAILED DESCRIPTION

[0024] The following description is used to disclose the present invention so that those skilled in the art can implement the present invention. The preferred embodiments described below are only examples, and those skilled in the art may think of other obvious variations.

[0025] like Figure 1-Figure 7 The welding tool of an assembled building mold shown in the figure includes a base 1, a moving part is installed inside the base 1, a concave frame 7 is installed at the end of the moving part, rod rings 25 are fixedly installed at both ends of the concave frame 7, and the concave frame 7 plays a role in bearing the rod ring 25. Push rods 6 are slidably installed inside the two rod rings 25, and the rod rings 25 play a role in guiding the push rods 6. Positioning columns 23 are fixedly installed at the opposite ends of the two push rods 6, and the push rods 6 play a role in driving the positioning columns 23 to move. The positioning columns 23 can position the No. 1 ear 38 so that the No. 1 ear can be positioned. The axial hole on the ear 38 can be aligned with the axial hole on the No. 2 ear 39. The outer surface of the positioning column 23 is symmetrically extended with two limiting ears 24. The limiting ears 24 can limit the No. 1 ear 38 so that the No. 1 ear 38 remains upright. A connecting cap 19 is elastically installed in the middle of the upper end of the concave frame 7. Push frames 15 are rotatably installed on both sides of the connecting cap 19. The connecting cap 19 can drive the pushing frame 15 to move so as to drive the two push rods 6 to move toward each other synchronously. The ends of the two pushing frames 15 are rotatably connected to the two push rods 6 respectively, and welding parts are installed on the concave frame 7.

[0026] The opposite ends of the two push rods 6 are coaxially inlaid with limit caps 26, which prevent the push rods 6 and the rod ring 25 from separating. A pull rod 11 is coaxially extended from the rear end of the connecting cap 19, and a rod sleeve 13 is fitted on the outer surface of the pull rod 11. The pull rod 11 and the rod sleeve 13 guide the connecting cap 19. The lower end of the rod sleeve 13 is fixed to the concave frame 7. The end of the pull rod 11 is inlaid with a holding frame 12, which facilitates the holding and pushing of the pull rod 11.

[0027] A tensioning spring 20 is wound around the outside of the pulling rod 11, and one end of the tensioning spring 20 is fixed to the rod sleeve 13. The tensioning spring 20 can push the connecting cap 19, so that the moving connecting cap 19 drives the pushing frame 15 to move, and then drives the two push rods 6 to move synchronously toward each other. The other end of the tensioning spring 20 is fixed to the holding frame 12. Both ends of the base 1 are vertically fixed with fixing frames 2, and the fixing frames 2 serve to carry the supporting ears 3 and the positioning ears 4. The opposite ends of the two fixing frames 2 are symmetrically fixed with two supporting ears 3, and the supporting ears 3 serve to support and limit the side mold 37. The front ends of the two fixing frames 2 are fixedly installed with positioning ears 4, and the two positioning ears 4 are symmetrically arranged, and the positioning ears 4 serve to limit the bottom mold 36.

[0028] The welding part includes two guide sleeves 17 symmetrically and slidably mounted on the concave frame 7, the guide sleeves 17 play a role in guiding the welding gun 22, a connecting frame 18 is fixedly mounted between the upper ends of the two guide sleeves 17, and two gun racks 21 are symmetrically extended from the front end of the connecting frame 18, the gun rack 21 plays a role in supporting the welding gun 22, and welding guns 22 are fixedly mounted at the ends of the two gun racks 21. The two welding guns 22 are symmetrically arranged and can weld the joints of the two No. 1 ears 38 and the side mold 37 at the same time. The welding gun 22 is connected to an external welding machine for use. Since welding by means of the welding gun 22 is a prior art and has been widely used, it is not elaborated in detail here.

[0029] The moving part includes a frame seat 8 that is slidably installed inside the base 1, and an extended frame 5 is slidably installed inside the frame seat 8. The frame seat 8 plays a role in supporting the extended frame 5. The end of the extended frame 5 is fixed to the concave frame 7, and the extended frame 5 plays a role in supporting the concave frame 7. Guide ears 9 are extended from the upper and lower ends of the frame seat 8. The guide ears 9 pass through the upper and lower ends of the base 1, and the guide ears 9 prevent the frame seat 8 from separating from the base 1. A special-shaped frame 30 is fixedly installed on the upper end of the frame seat 8. The special-shaped frame 30 is located behind the guide ears 9. A stud 32 is screwed through the end of the special-shaped frame 30, and the special-shaped frame 30 plays a role in supporting the stud 32. A pressing frame 35 is rotatably installed at the lower end of the stud 32. The stud 32 can drive the pressing frame 35 to move up and down to loosen and tighten the frame seat 8, and the pressing frame 35 is pressed tightly on the base 1.

[0030] The upper and lower end surfaces of the base 1 are both provided with a slide groove 14, and the guide ear 9 is fitted inside the slide groove 14. The slide groove 14 cooperates with the guide ear 9. The upper end of the stud 32 is coaxially fixed with a handwheel 16, and the handwheel 16 facilitates the rotation of the stud 32. The front end of the special-shaped frame 30 is fixedly installed with a groove seat 33, and the interior of the groove seat 33 is fitted with a limiting block 34. The end of the limiting block 34 is fixed to the upper end of the pressing frame 35, and the cooperation between the groove seat 33 and the limiting block 34 prevents the pressing frame 35 from rotating.

[0031] A bearing sleeve 10 is fixedly installed at the rear end of the special-shaped frame 30, and a locking pin 27 is coaxially arranged inside the bearing sleeve 10. The bearing sleeve 10 serves to support the locking pin 27. The two ends of the locking pin 27 respectively pass through the upper and lower ends of the bearing sleeve 10, and the locking pin 27 slides with the bearing sleeve 10. The lower end of the locking pin 27 passes through the upper end of the frame seat 8 and the upper end of the extension frame 5 in turn, and the locking pin 27 slides with the frame seat 8 and the extension frame 5. The locking pin 27 fixes the frame seat 8 and the extension frame 5 together.

[0032] A pin cap 29 is coaxially inlaid on the outer surface of the locking pin 27, and the pin cap 29 is fitted to the inner surface of the bearing sleeve 10. The pin cap 29 is pushed by the pin fixing spring 28. The outer side of the locking pin 27 is wrapped with a pin fixing spring 28. The upper end of the pin fixing spring 28 is fixed to the inner top surface of the bearing sleeve 10, and the pin fixing spring 28 plays the role of pushing the locking pin 27 out. The lower end of the pin fixing spring 28 is fixed to the upper end of the pin cap 29. A pull ring 31 is fixedly installed on the upper end of the locking pin 27, and the pull ring 31 plays the role of facilitating the pulling of the locking pin 27.

[0033] During welding, the bottom mold 36 with the second ear 39 welded thereto is placed between the two positioning ears 4. At this time, the notches on the two positioning ears 4 fit the corners of the bottom mold 36 to limit the bottom mold 36 so that the two positioning columns 23 can be located on both sides of the second ear 39 and aligned with the axial hole of the second ear 39. Then, the side mold 37 is placed on the supporting ear 3. At this time, the supporting ear 3 is pressed against the inner corner of the side mold 37 to support and limit the side mold 37 so that the side mold 37 can be aligned with the bottom mold 36. Then, the pull rod 11 is pulled. The two positioning posts 23 are pushed to move in opposite directions. At this time, the tensioning spring 20 contracts and deforms. Then, the two No. 1 connecting ears 38 are respectively inserted on the two positioning posts 23 to position the No. 1 connecting ear 38 through the positioning posts 23 so that the shaft hole on the No. 1 connecting ear 38 can be aligned with the shaft hole on the No. 2 connecting ear 39. Then, the pulling rod 11 is released to allow the tensioning spring 20 to recover its deformation to push the connecting cap 19. At this time, the pulling rod 11 slides in the rod sleeve 13 to guide the connecting cap 19, so that the moving connecting cap 19 drives the pushing frame 15 to move, thereby bringing The two push rods 6 are moved toward each other synchronously to press the two No. 1 ears 38 against the two sides of the No. 2 ears 39 respectively, and then the connecting frame 18 is pushed to drive the two welding guns 22 to move. At this time, the guide sleeve 17 slides on the concave frame 7 to guide the welding gun 22, so that the moving welding gun 22 is used to weld the joint of the No. 1 ear 38 and the side mold 37, so as to weld the two No. 1 ears 38 and the side mold 37 together at the same time. After the welding is completed, the pulling rod 11 can be pushed first to make the two positioning columns 23 move oppositely to disengage from the No. 1 ear 38. Then, the pull ring 31 is pulled to disengage the locking pin 27 pushed out by the fixing pin spring 28 from between the extending frame 5 and the frame seat 8, and then the extending frame 5 is directly pulled to slide in the frame seat 8, so that the positioning column 23 is disengaged from both sides of the No. 2 ear 39, and then the stud 32 is loosened to allow the pressing frame 35 to move up and disengage from the base 1, and then the frame seat 8 is moved to drive the positioning column 23 to move sideways, so that the positioning column 23 moves to the next No. 2 ear 39, so as to position and weld the No. 1 ear 38 there, and so on to complete the welding operation of all the No. 1 ears 38.

[0034] The above shows and describes the basic principles, main features and advantages of the present invention. Those skilled in the art should understand that the present invention is not limited to the above embodiments. The above embodiments and descriptions only describe the principles of the present invention. The present invention may be subject to various changes and improvements without departing from the spirit and scope of the present invention. These changes and improvements fall within the scope of the present invention. The scope of protection claimed by the present invention is defined by the attached claims and their equivalents.

Claims

1. A welding tool for an assembled building mold, comprising a base (1), characterized in that: A moving part is installed inside the base (1), and a concave frame (7) is installed at the end of the moving part. Rod rings (25) are fixedly installed at both ends of the concave frame (7), and push rods (6) are slidably installed inside the two rod rings (25). Positioning columns (23) are fixedly installed at the opposite ends of the two push rods (6). Two limiting ears (24) are symmetrically extended on the outer surface of the positioning column (23). A connecting cap (19) is elastically installed at the middle part of the upper end of the concave frame (7), and a pushing frame (15) is rotatably installed on both sides of the connecting cap (19). The ends of the two pushing frames (15) are respectively rotatably connected to the two push rods (6), and a welding part is installed on the concave frame (7); The opposite ends of the two push rods (6) are coaxially inlaid with limit caps (26); a pull rod (11) is coaxially extended from the rear end of the connecting cap (19); a rod sleeve (13) is fitted on the outer surface of the pull rod (11); the lower end of the rod sleeve (13) is fixed to the concave frame (7); and a holding frame (12) is inlaid at the end of the pull rod (11); A tensioning spring (20) is wound around the outside of the pulling rod (11), one end of the tensioning spring (20) is fixed to the rod sleeve (13), and the other end of the tensioning spring (20) is fixed to the holding frame (12). Both ends of the base (1) are vertically fixed with a fixing frame (2), and two mold ears (3) are symmetrically fixedly installed at the opposite ends of the two fixing frames (2). Positioning ears (4) are fixedly installed at the front ends of the two fixing frames (2), and the two positioning ears (4) are symmetrically arranged. The welding part comprises two guide sleeves (17) symmetrically slidably mounted on the concave frame (7), a connecting frame (18) being fixedly mounted between the upper ends of the two guide sleeves (17), two gun racks (21) symmetrically extending from the front end of the connecting frame (18), welding guns (22) being fixedly mounted at the ends of the two gun racks (21), and the two welding guns (22) being symmetrically arranged.

2. The welding tool for an assembled building mold according to claim 1, characterized in that: The movable member comprises a frame seat (8) which is slidably installed inside the base (1), a protruding frame (5) is slidably installed inside the frame seat (8), the end of the protruding frame (5) is fixed to the concave frame (7), the upper and lower ends of the frame seat (8) are both extended with guide ears (9), the guide ears (9) extend from the upper and lower ends of the base (1), the upper end of the frame seat (8) is fixedly installed with a special-shaped frame (30), the special-shaped frame (30) is located behind the guide ears (9), the end of the special-shaped frame (30) is screwed with a stud (32), the lower end of the stud (32) is rotatably installed with a pressing frame (35), and the pressing frame (35) is pressed on the base (1).

3. The welding tool for an assembled building mold according to claim 2, characterized in that: The upper and lower end surfaces of the base (1) are both provided with a slide groove (14), the guide ear (9) is fitted inside the slide groove (14), the upper end of the stud (32) is coaxially fixedly mounted with a hand wheel (16), the front end of the special-shaped frame (30) is fixedly mounted with a groove seat (33), the interior of the groove seat (33) is fitted with a limiting block (34), and the end of the limiting block (34) is fixed to the upper end of the pressing frame (35).

4. The welding tool for an assembled building mold according to claim 2, characterized in that: A bearing sleeve (10) is fixedly mounted on the rear end of the special-shaped frame (30), and a locking pin (27) is coaxially arranged inside the bearing sleeve (10). The two ends of the locking pin (27) respectively extend through the upper and lower ends of the bearing sleeve (10), and the locking pin (27) and the bearing sleeve (10) are slidably engaged. The lower end of the locking pin (27) extends through the upper end of the frame seat (8) and the upper end of the extension frame (5) in sequence, and the locking pin (27) and the frame seat (8) and the extension frame (5) are slidably engaged.

5. The welding tool for an assembled building mold according to claim 4, characterized in that: The outer surface of the locking pin (27) is coaxially inlaid with a pin cap (29), and the pin cap (29) is fitted to the inner surface of the bearing sleeve (10). A pin fixing spring (28) is wound around the outer side of the locking pin (27), and the upper end of the pin fixing spring (28) is fixed to the inner top surface of the bearing sleeve (10), and the lower end of the pin fixing spring (28) is fixed to the upper end of the pin cap (29). A pull ring (31) is fixedly installed on the upper end of the locking pin (27).

Citation Information

Patent Citations

  • Prefabricated platform for factory assembly of pipeline system

    CN118492836A

  • Semi-automatic welding gun

    GB1407340A