Railway emergency scheme automatic generation method, equipment and emergency system

By calculating the correlation between task difficulty and workload scores, the railway emergency execution team plan is automatically generated, which solves the problem of low efficiency in manual emergency plans in the existing technology, and achieves more efficient and reasonable emergency task allocation and execution.

CN119058783APending Publication Date: 2024-12-03INST OF COMPUTING TECH CHINA ACAD OF RAILWAY SCI +2
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202310612842.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-26
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the prior art, the formulation of railway emergency plans and task allocation rely on manual processing, resulting in low efficiency, long time and unreasonable task allocation may occur.

Method used

By obtaining emergency task information and execution personnel information, calculating task difficulty scores and workload scores, automatically correlating tasks and personnel, generating emergency execution team plans, and realizing automated task allocation and plan generation.

Benefits of technology

It improves the success rate and rationality of emergency tasks, shortens the formulation time, reduces manual intervention, and ensures the rationality and efficiency of task allocation.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119058783A_ABST
    Figure CN119058783A_ABST
Patent Text Reader

Abstract

The invention provides a railway emergency scheme automatic generation method and device and an emergency system, and belongs to the technical field of railway emergency processing, and the method comprises the steps: obtaining emergency task information and executor information; calculating a task difficulty score corresponding to each emergency task according to the emergency task information; calculating a workload score corresponding to each executor according to the executor information; and according to the task difficulty score and the workload score, associating the emergency task information with the executor information, and generating emergency execution group scheme information. According to the mode of distributing the emergency task to the executor according to the task difficulty score and the workload score, the effect of automatically generating the emergency scheme is achieved, manual processing and making are not needed, efficiency is improved, consumed time is shortened, the difficulty of the emergency task and the workload of the executor are comprehensively considered, and the efficiency is improved. The success rate of emergency task execution is improved, and the generated emergency execution group scheme information is more reasonable.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of railway emergency processing, and in particular to a railway emergency plan automatic generation method, equipment and emergency system. Background Art

[0002] Railways are an important part of the transportation system, with characteristics such as large passenger flow and planned operation. Safe operation is an important issue for railways. To ensure safety, the Railway Bureau will formulate various emergency plans to enable rapid and effective responses when emergencies and sudden incidents occur on the railway, improve work efficiency and ensure railway safety to the greatest extent.

[0003] In the prior art, although emergency plans have been formulated, they only provide the framework, direction and emergency tasks of emergency work. Detailed and specific emergency plans still need to be manually formulated by the Ministry of Railways, the government or the emergency working group. For example, the allocation of various emergency tasks and who is responsible for executing which emergency task need to be determined manually. In a situation where every second counts, manually processing various information to formulate specific emergency plans will be time-consuming and inefficient. In addition, the manual allocation of emergency tasks to executors may be affected by subjective factors and may lead to unreasonable allocation of emergency tasks. Summary of the invention

[0004] The present invention provides a method for automatically generating a railway emergency plan, which is used to solve the defects of low efficiency, long time consumption and possible unreasonable allocation of emergency tasks when manually formulating emergency plans in the prior art, and achieves the effect of automatically and reasonably allocating emergency tasks to generate emergency plans.

[0005] In a first aspect, the present invention provides a method for automatically generating a railway emergency plan, comprising:

[0006] Obtain emergency task information and executor information;

[0007] Calculate the task difficulty score corresponding to each emergency task according to the emergency task information;

[0008] Calculate the workload score corresponding to each executor according to the executor information;

[0009] According to the task difficulty score and the workload score, the emergency task information is associated with the executor information to generate emergency execution team plan information.

[0010] According to a method for automatically generating a railway emergency plan provided by the present invention, before acquiring the emergency task information and the executor information, the method further includes:

[0011] Obtain emergency plan information;

[0012] Extracting emergency execution team information based on the emergency plan information;

[0013] The emergency task information is extracted according to the emergency execution team information.

[0014] According to a method for automatically generating a railway emergency plan provided by the present invention, after acquiring the emergency plan information, the method further includes:

[0015] Extracting emergency leadership team information based on the emergency plan information;

[0016] Generate emergency leadership team plan information based on the emergency leadership team information.

[0017] According to a method for automatically generating a railway emergency plan provided by the present invention, the step of calculating the task difficulty score corresponding to each emergency task according to the emergency task information includes:

[0018] Obtain emergency resource information and train passenger information;

[0019] Calculate the passenger service workload corresponding to each emergency task according to the emergency task information and the train passenger information;

[0020] Calculate the resource acquisition difficulty value corresponding to each emergency task according to the emergency task information and the emergency resource information;

[0021] The task difficulty score corresponding to each emergency task is calculated according to the emergency task information, the passenger service workload and the resource acquisition difficulty value.

[0022] According to a method for automatically generating a railway emergency plan provided by the present invention, the passenger service workload corresponding to each emergency task is calculated according to the emergency task information and the train passenger information, including:

[0023] According to the train passenger information, extract the train arrival and departure timetable, the number of passengers on the train, the number of passengers who have arrived, and the number of tickets sold;

[0024] Calculate the number of passengers who have not arrived based on the number of tickets sold and the number of passengers who have arrived;

[0025] Calculate the number of passengers according to the current time, the train arrival and departure schedule, the number of passengers on the train, the number of passengers who have arrived, and the number of passengers who have not arrived;

[0026] Extracting the task area information and the planned completion time corresponding to each emergency task according to the emergency task information;

[0027] The passenger service workload corresponding to each emergency task is calculated based on the task area information, the planned completion time and the passenger number information.

[0028] According to a method for automatically generating a railway emergency plan provided by the present invention, the step of calculating the workload score corresponding to each executor according to the executor information includes:

[0029] Classify the executive personnel information into off-duty personnel information and on-duty personnel information;

[0030] According to the information of the absent personnel, the home address, completed work tasks and working hours corresponding to the absent personnel are obtained, and the workload score corresponding to each absent personnel is calculated according to the home address, the completed work tasks and the working hours;

[0031] Based on the on-the-job personnel information, the current work position, work frequency, working hours, physical exertion value and mental exertion value of the on-the-job personnel are obtained, and the work saturation value is obtained by weighted calculation based on the work frequency, the working hours, the physical exertion value and the mental exertion value; the workload score corresponding to each on-the-job personnel is calculated based on the current work position and the work saturation value.

[0032] According to a railway emergency plan automatic generation method provided by the present invention, the emergency task information is associated with the executor information according to the task difficulty score and the workload score to generate the emergency execution team plan information, including:

[0033] Sorting the emergency task information according to the task difficulty score;

[0034] Sorting the executor information according to the workload score;

[0035] The executor information corresponding to the high workload score is associated with the emergency task information corresponding to the low task difficulty score to generate emergency execution team plan information.

[0036] In a second aspect, the present invention further provides a device, comprising a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein the processor implements the above-mentioned method for automatically generating a railway emergency plan when executing the computer program.

[0037] In a third aspect, the present invention provides an emergency system, comprising: an interface unit, an emergency task processing unit, an executor processing unit and an emergency plan generating unit; the interface unit is used to obtain emergency task information and executor information; the emergency task processing unit is used to calculate the task difficulty score corresponding to each emergency task based on the emergency task information; the executor processing unit is used to calculate the workload score corresponding to each executor based on the executor information; the emergency plan generating unit is used to associate the emergency task information with the executor information based on the task difficulty score and the workload score, and generate emergency execution team plan information; the interface unit, the emergency task processing unit, the executor processing unit and the emergency plan generating unit cooperate with each other to realize the above-mentioned method for automatically generating railway emergency plans.

[0038] In a fourth aspect, the present invention provides a non-transitory computer-readable storage medium having a computer program stored thereon, wherein the computer program, when executed by a processor, implements the above-mentioned method for automatically generating a railway emergency plan.

[0039] According to a railway emergency plan automatic generation method provided by the present invention, at least the following technical effects can be achieved: the core of the emergency execution group plan is the allocation of emergency tasks, and it is necessary to determine suitable executors to perform emergency tasks. By calculating the task difficulty score reflecting the difficulty of executing the emergency task, and calculating the workload score reflecting the current workload of the executor, the task difficulty score and the workload score are weighed, so that the workload of the executor can be adapted to the emergency task to be executed subsequently, which is conducive to improving the success rate of emergency task execution, and balancing the workload of the executor, and improving the rationality of the emergency plan. In this way, by allocating emergency tasks to executors according to the task difficulty score and the workload score, the effect of automatic generation of emergency plans is achieved, without relying on manual processing and formulation, which is conducive to improving efficiency and shortening time consumption, and the difficulty of the emergency task and the workload of the executor are comprehensively considered, which is conducive to improving the success rate of emergency task execution, making the generated emergency execution group plan information more reasonable. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] In order to more clearly illustrate the technical solutions in the present invention or the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0041] Figure 1 This is one of the flow charts of the method for automatically generating a railway emergency plan provided by the present invention;

[0042] Figure 2 This is the second flow chart of the method for automatically generating a railway emergency plan provided by the present invention;

[0043] Figure 3 It is a flow chart of step S2 in the method for automatically generating a railway emergency plan provided by the present invention;

[0044] Figure 4 It is a flow chart of step S22 in the method for automatically generating a railway emergency plan provided by the present invention;

[0045] Figure 5 It is a flow chart of step S3 in the method for automatically generating a railway emergency plan provided by the present invention;

[0046] Figure 6 It is a flow chart of step S4 in the method for automatically generating a railway emergency plan provided by the present invention;

[0047] Figure 7 It is a flow chart of step S42 in the method for automatically generating a railway emergency plan provided by the present invention. DETAILED DESCRIPTION

[0048] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0049] It should be noted that in the description of the embodiments of the present invention, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "include one..." do not exclude the existence of other identical elements in the process, method, article or device including the elements. The orientation or position relationship indicated by the terms "upper", "lower" and the like is based on the orientation or position relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. Unless otherwise clearly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be directly connected, or indirectly connected through an intermediate medium, or it can be a connection between two elements. For those skilled in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0050] The terms "first", "second", etc. in this application are used to distinguish similar objects, and are not used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present application can be implemented in an order other than those illustrated or described here, and the objects distinguished by "first", "second", etc. are generally of one type, and the number of objects is not limited. For example, the first object can be one or more. In addition, "and / or" represents at least one of the connected objects, and the character " / " generally indicates that the objects associated with each other are in an "or" relationship.

[0051] Combine the following Figure 1-Figure 7 A method for automatically generating a railway emergency plan provided by an embodiment of the present invention is described.

[0052] Figure 1 It is a flow chart of a method for automatically generating a railway emergency plan provided by the present invention, such as Figure 1 As shown, including but not limited to the following steps:

[0053] S1: Obtain emergency task information and executor information;

[0054] S2: Calculate the task difficulty score corresponding to each emergency task according to the emergency task information;

[0055] S3: Calculate the workload score corresponding to each executor according to the executor information;

[0056] S4: According to the task difficulty score and the workload score, the emergency task information is associated with the executor information to generate emergency execution team plan information.

[0057] The core of the emergency execution team plan is the allocation of emergency tasks, and it is necessary to determine the appropriate executors to perform emergency tasks. By calculating the task difficulty score that reflects the difficulty of executing the emergency task, and calculating the workload score that reflects the current workload of the executor, the task difficulty score and the workload score are weighed, so that the workload of the executor can adapt to the subsequent emergency tasks, which is conducive to improving the success rate of emergency task execution, balancing the workload of the executors, and improving the rationality of the emergency plan. In this way, by allocating emergency tasks to executors according to the task difficulty score and the workload score, the effect of automatic generation of emergency plans is achieved, without relying on manual processing and formulation, which is conducive to improving efficiency and shortening time. In addition, the difficulty of the emergency task and the workload of the executors are comprehensively considered, which is conducive to improving the success rate of emergency task execution and making the generated emergency execution team plan information more reasonable.

[0058] Emergency task information mainly includes the corresponding positions, task content, work area, planned completion time and adverse consequence score of each emergency task. The adverse consequence score is used to measure the severity of the consequences caused by the failure to complete the emergency task within the planned completion time, which can reflect the importance of the emergency task.

[0059] Executor information mainly includes: name, position, contact information, current execution task, location information, work frequency, work hours, physical exertion value and mental exertion value, etc.

[0060] The task difficulty score is used to measure the difficulty of executing emergency tasks.

[0061] The workload score is used to measure the current workload of the executive, which can be understood as the degree of fatigue and work pressure.

[0062] The emergency execution team plan information mainly includes: the name of the executor, contact information, task content, work area, planned completion time and adverse consequence score. For example, an emergency execution team plan information: executor name: Li XX; contact information: 15XXXXXXXXX; task content: evacuate passengers in area A; work area: area A; planned completion time: X hours; adverse consequence score: 6 / 10 (6 points out of 10 points).

[0063] refer to Figure 2In some embodiments of the present invention, before S1, the method further includes:

[0064] S01: Obtain emergency plan information;

[0065] S02: extracting emergency execution team information according to the emergency plan information;

[0066] S03: Extracting the emergency task information according to the emergency execution team information.

[0067] The emergency plan information is prepared in advance, indicating the direction, responsibilities, and general framework of the emergency work. It mainly includes the emergency leadership group and the emergency execution group. The emergency leadership group is responsible for overall command, and the emergency execution group is responsible for executing emergency tasks. The emergency execution group information will list the emergency tasks that need to be completed, that is, the emergency task information. In this way, the emergency task information can be extracted based on the emergency plan information, and the emergency tasks that need to be executed can be fully obtained, avoiding the omission of emergency task allocation, making the final generated emergency execution group plan information more reliable.

[0068] The emergency execution team information mainly includes: execution department, execution department personnel and emergency responsibilities. The execution department responsibilities include the emergency task list, that is, emergency task information. For example, a specific set of emergency execution team information includes: execution department: equipment maintenance department; execution department personnel: Li XX, Chen XX...; emergency responsibilities: maintain the normal operation of equipment A, maintain the normal operation of equipment B...

[0069] refer to Figure 2 In some embodiments of the present invention, after S01, the method further includes:

[0070] S011: Extracting emergency leadership team information based on the emergency plan information;

[0071] S012: Generate emergency leadership team plan information based on the emergency leadership team information.

[0072] The emergency leadership team part of the emergency plan information will provide candidate leadership information and job responsibilities, as well as emergency project information. The core of generating specific emergency leadership team plan information is to confirm the emergency project that the specific leadership personnel are responsible for. This part can associate and confirm the leadership information with the emergency project information based on the leadership position and the content of the emergency project, and then generate the emergency leadership team plan information. In this way, generating the emergency leadership team plan information based on the emergency plan information is conducive to making the generated emergency leadership team plan information more reasonable and reliable.

[0073] The emergency leadership team information mainly includes: the leader's name, contact information and job responsibilities, such as a specific information: leader's name: Li XX; contact information: 15XXXXXXXXX; job responsibilities: head of equipment maintenance department. The emergency leadership team information also includes emergency project information, such as: equipment maintenance, passenger evacuation, etc. Among them, the emergency project information is related to the emergency task information. For example, if an emergency project is: evacuate passengers, its related emergency tasks may include: evacuate passengers in area A, evacuate passengers in area B..., that is, an emergency project may include multiple emergency tasks.

[0074] The emergency leadership team plan information mainly includes: leader name, contact information, job responsibilities, emergency project name, emergency project planned duration, emergency project status, and related personnel names and contact information. The related personnel can be the executors of the emergency tasks under the emergency project. For example, a set of specific emergency leadership team plan information: leader name: Li XX; contact information: 15XXXXXXXXX; job responsibilities: head of equipment maintenance department; emergency project: equipment maintenance; planned duration: X hours; emergency project status: in progress; related personnel: Chen XX-15XXXXXXXXX, Lin XX-13XXXXXXXXX, ...

[0075] The emergency leadership team plan information can provide intuitive information about each emergency project, the corresponding responsible leaders, and the personnel related to the emergency project. If any unexpected problems are encountered during the specific implementation of the emergency plan, the corresponding leaders and related personnel can be contacted in time to feedback the problems.

[0076] The emergency plan information mainly includes the emergency leadership group part and the emergency execution group part. For easier understanding, it can be considered as two tables. The table header, title and some cells in the table have been filled in. Later, you need to fill in the specific information that needs to be determined in the table, such as the executive personnel information and leadership personnel information corresponding to the emergency task. Finally, the form is completed. The complete table corresponding to the emergency execution group part is the emergency execution group plan information, and the complete table corresponding to the emergency leadership group part is the emergency leadership group plan information. The combination of the emergency execution group plan information and the emergency leadership group plan information can form specific emergency plan information. The above content is only for the convenience of understanding, and it is not limited to implementation in table form.

[0077] refer to Figure 3 In some embodiments of the present invention, S2 includes:

[0078] S21: Obtain emergency resource information and train passenger information;

[0079] S22: Calculating the passenger service workload corresponding to each emergency task according to the emergency task information and the train passenger information;

[0080] S23: Calculating a resource acquisition difficulty value corresponding to each emergency task according to the emergency task information and the emergency resource information;

[0081] S24: Calculate the task difficulty score corresponding to each emergency task according to the emergency task information, the passenger service workload and the resource acquisition difficulty value.

[0082] For some emergency tasks, such as guiding passengers and answering passengers' questions, the difficulty of such emergency tasks needs to consider the workload of serving passengers, which can be measured by the number of passengers. Therefore, according to the emergency task information, the emergency tasks and work area related to serving passengers are obtained, and combined with the number of passengers in the train passenger information, the workload of serving passengers corresponding to the emergency tasks can be calculated.

[0083] Some emergency tasks, such as repair and rescue, require the use of emergency resources, such as small machinery and equipment, inventory materials, etc. The difficulty of such emergency tasks needs to consider the difficulty of obtaining emergency resources. Therefore, according to the emergency task information, the emergency tasks that require the use of emergency resources and the scope of the work area are obtained. Combined with the emergency resource information, according to the distance between the emergency resources and the scope of the work area and other parameters, the resource acquisition difficulty value can be calculated.

[0084] Based on emergency task information, such as the scope of the work area and the planned completion time, combined with the workload of serving passengers and the difficulty value of resource acquisition, calculations are performed to ultimately obtain the task difficulty score that the emergency task should correspond to. This can achieve the effect of quantifying the difficulty of the emergency task, which is conducive to a more scientific and reasonable allocation of emergency tasks in the future.

[0085] It should be noted that not every emergency task involves serving passengers and emergency resources. If it is not related to serving passengers, the passenger serving workload can be set to zero when calculating the task difficulty score. If it is not related to emergency resources, the resource acquisition difficulty value can be set to zero when calculating the task difficulty score.

[0086] refer to Figure 4 In some embodiments of the present invention, the S22 includes:

[0087] S221: extracting the train arrival and departure timetable, the number of passengers on the train, the number of passengers who have arrived, and the number of tickets sold according to the train passenger information;

[0088] S222: Calculate the number of passengers who have not arrived based on the number of tickets sold and the number of passengers who have arrived;

[0089] S223: Calculate passenger number information according to the current time, the train arrival and departure schedule, the number of passengers on the train, the number of passengers who have arrived, and the number of passengers who have not arrived;

[0090] S224: extracting task area information and planned completion time corresponding to each emergency task according to the emergency task information;

[0091] S225: Calculate the passenger service workload corresponding to each emergency task according to the task area information, the planned completion time and the passenger number information.

[0092] Railway transportation has a relatively obvious planning. The fluctuation of the number of passengers at each railway station is strongly related to the arrival and departure of railway trains. When calculating the number of passengers, it is necessary to consider not only the number of passengers arriving at the current station, but also the number of passengers who have not arrived, so as to more accurately estimate the number of passengers when the emergency task is executed. The number of passengers who have not arrived can be calculated based on the number of tickets sold and the number of passengers who have arrived at the station. According to the current time, train arrival and departure schedule, the number of trains, the number of passengers who have arrived, and the number of passengers who have not arrived, the number of passengers in the current time period and the approximate number of passengers in the future time period, that is, the number of passengers information, can be obtained. According to the working area of ​​the emergency task and the planned completion time combined with the passenger number information, the service passenger workload corresponding to the emergency task is calculated. In this way, considering the fluctuation of the number of passengers in the current time period and the future time period can more accurately reflect the service passenger workload during the execution of the emergency task, making the task difficulty score corresponding to the final emergency task more reasonable.

[0093] The train arrival and departure schedule includes information such as the arrival and departure sequence, time, and inspection stop time of each station of the train. The number of passengers on the train includes information such as the number of actual passengers carried on the train, the number of people expected to get on the train at each station, and the number of people expected to get off the train at each station. The number of passengers who have arrived includes the number of people who have entered the station. The number of tickets sold includes the number of train tickets sold at each station. The number of passengers who have not arrived refers to the number of passengers who have not arrived at each station and are expected to arrive later, which can be calculated by subtracting the number of passengers who have arrived from the number of tickets sold. In some embodiments of the present invention, the number of passengers who have arrived can be the number of people identified by video captured by a camera, or the number of people counted at the station entry checkpoint.

[0094] refer to Figure 5 In some embodiments of the present invention, the S3 includes:

[0095] S31: Classify the executive personnel information into off-duty personnel information and on-duty personnel information;

[0096] S32: according to the information of the absent person, obtaining the home address, completed work tasks and working hours corresponding to the absent person, and calculating the workload score corresponding to the absent person according to the home address, the completed work tasks and the working hours;

[0097] S33: According to the on-the-job personnel information, the current work position, work frequency, working hours, physical exertion value and mental exertion value of the on-the-job personnel are obtained, and the work saturation value is obtained by weighted calculation according to the work frequency, the working hours, the physical exertion value and the mental exertion value, and the workload score corresponding to the on-the-job personnel is calculated according to the current work position and the work saturation value.

[0098] The information of executive personnel is classified into the information of personnel who are not on duty and the information of personnel on duty. The workload score can be calculated according to different standards for the two situations, so that the workload score corresponding to each executive personnel is more reasonable. For personnel who are not on duty, the workload of returning to work needs to be specially considered. According to the home address, the distance and time taken to reach the location of the railway emergency can be known. Combined with the completed work tasks and working hours, the workload score of the personnel who are not on duty is calculated. For personnel on duty, the work saturation value is obtained by weighted calculation according to the work frequency, working hours, physical consumption value and mental consumption value. By assigning different weights to the work frequency, working hours, physical consumption value and mental consumption value for calculation, the work saturation can be more reasonably reflected. The workload score of the personnel on duty is calculated according to the current work position combined with the work saturation value. In this way, the workload scores are calculated according to different standards for the characteristics of personnel who are not on duty and personnel on duty, which can more reasonably reflect the workload of each executive personnel.

[0099] In the process of calculating the work saturation of on-the-job personnel, in addition to using common parameters such as working hours and working frequency to measure the work saturation, the impact of physical and mental consumption values ​​on work saturation is also considered. Since different work contents consume different amounts of executors under the same working hours, the introduction of physical and mental consumption values ​​can measure the quality of work, that is, the degree of labor load per unit time. Physical and mental consumption values ​​are measured according to positions and work content. For example, if the position is equipment transportation, the corresponding physical consumption value can be calculated by the weight and number of times the equipment is moved; for example, if the position is message processing, the corresponding mental consumption value can be calculated by the number of processed messages and the number of items. In this way, introducing physical and mental consumption values ​​when calculating the work saturation of executors can more reasonably reflect the work saturation of executors.

[0100] refer to Figure 6In some embodiments of the present invention, the step S4 includes:

[0101] S41: sorting the emergency task information according to the task difficulty score;

[0102] S42: sorting the executor information according to the workload score;

[0103] S43: Associating the executor information corresponding to the high workload score with the emergency task information corresponding to the low task difficulty score to generate emergency execution team plan information.

[0104] The emergency task information is sorted according to the task difficulty score, the executor information is sorted according to the workload score, and then the executor information is associated with the emergency task information according to the principle of pairing high workload scores with low task difficulty scores, so as to achieve the effect of determining specific executors in emergency task allocation, and then generate emergency execution team plan information. In this way, executors with high workloads handle emergency tasks with low task difficulty, and executors with low workloads handle emergency tasks with high task difficulty, which can balance the workload of executors and improve the success rate of emergency task execution, making the final generated emergency execution team plan more reasonable.

[0105] refer to Figure 7 In some embodiments of the present invention, the S42 includes:

[0106] S421: extracting the position information corresponding to each emergency task according to the emergency task information;

[0107] S422: Filtering the information of the executive personnel according to the position information;

[0108] S423: Sort the filtered executor information according to the workload score.

[0109] When the position of the executor matches or is similar to the position requirements of the emergency task, the efficiency of the executor in handling the emergency task will be higher. Therefore, the executor information is screened according to the position information in the emergency task information to obtain the executor information with matching or similar positions, and the screened executor information is sorted according to the workload score. Then, based on the principle that executors with high workloads handle emergency tasks with low task difficulty, the screened executor information is associated with the emergency task information. In this way, the executors who perform emergency tasks can be more adapted to the task content of the emergency tasks, which is conducive to improving the success rate and completion efficiency of emergency task execution.

[0110] If there is no executive information that meets the job requirements after screening the emergency task information, based on the principle that executives with high workloads handle emergency tasks with low task difficulty, appropriate executive information is selected from all candidate executive information and associated with the emergency task information.

[0111] In some embodiments of the present invention, in addition to sorting the emergency tasks according to their difficulty scores and associating the executor information with the emergency task information based on the principle that executors with high workloads handle emergency tasks with low task difficulties, the emergency task information can also be sorted according to the adverse consequence scores in the emergency task information and associated with the emergency task information based on the principle that executors with low workloads handle emergency tasks with high adverse consequence scores. In this way, it can be ensured that emergency tasks with high adverse consequence scores, that is, high importance, are performed by executors with low workloads, thereby improving the success rate of important emergency tasks.

[0112] An embodiment of the present invention provides a device, including a memory, a processor, and a computer program stored in the memory and executable on the processor, wherein when the processor executes the computer program, a method for automatically generating a railway emergency plan in any of the above embodiments is implemented.

[0113] The device can be a computer, a mobile phone, etc., in which the processor executes the computer program in the memory, and realizes the effect of automatic generation of emergency plans by allocating emergency tasks to executors according to the task difficulty score and the workload score. There is no need to rely on manual processing and formulation, which is conducive to improving efficiency and shortening time. In addition, the comprehensive consideration of the difficulty of the emergency task and the workload of the executors is conducive to improving the success rate of the execution of the emergency task, making the generated emergency execution team plan information more reasonable.

[0114] An embodiment of the present invention provides an emergency system, characterized in that it includes: an interface unit, an emergency task processing unit, an executor processing unit and an emergency plan generating unit; the interface unit is used to obtain emergency task information and executor information; the emergency task processing unit is used to calculate the task difficulty score corresponding to each emergency task based on the emergency task information; the executor processing unit is used to calculate the workload score corresponding to each executor based on the executor information; the emergency plan generating unit is used to associate the emergency task information with the executor information based on the task difficulty score and the workload score, and generate emergency execution team plan information.

[0115] The interface unit, the emergency task processing unit, the executor processing unit and the emergency plan generation unit work in cooperation with each other and can achieve the effect of automatic generation of emergency plans by allocating emergency tasks to executors according to task difficulty scores and workload scores. There is no need to rely on manual processing and formulation, which is conducive to improving efficiency and shortening time. The comprehensive consideration of the difficulty of emergency tasks and the workload of executors is conducive to improving the success rate of emergency task execution and making the generated emergency execution team plan information more reasonable.

[0116] It should be noted that an emergency system provided by an embodiment of the present invention can execute a railway emergency plan automatic generation method described in any of the above embodiments during specific operation, which will not be described in detail in this embodiment.

[0117] An embodiment of the present invention provides a non-transitory computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, a method for automatically generating a railway emergency plan in the above embodiment is implemented.

[0118] When the calculation on the storage medium, that is, the program is executed, it can achieve the effect of automatic generation of emergency plans by allocating emergency tasks to executors according to task difficulty scores and workload scores. There is no need to rely on manual processing and formulation, which is conducive to improving efficiency and shortening time. The comprehensive consideration of the difficulty of emergency tasks and the workload of executors is conducive to improving the success rate of emergency task execution and making the generated emergency execution team plan information more reasonable.

[0119] The device embodiments described above are merely illustrative, wherein the units described as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place, or they may be distributed on multiple network units. Some or all of the modules may be selected according to actual needs to achieve the purpose of the scheme of this embodiment. Ordinary technicians in this field can understand and implement it without paying creative labor.

[0120] Through the description of the above implementation methods, those skilled in the art can clearly understand that each implementation method can be implemented by means of software plus a necessary general hardware platform, and of course, it can also be implemented by hardware. Based on this understanding, the above technical solution is essentially or the part that contributes to the prior art can be embodied in the form of a software product, and the computer software product can be stored in a computer-readable storage medium, such as ROM / RAM, a disk, an optical disk, etc., including a number of instructions for a computer device (which can be a personal computer, a server, or a network device, etc.) to execute the methods described in each embodiment or some parts of the embodiments.

[0121] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or make equivalent replacements for some of the technical features therein. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.

Claims

1. A method for automatically generating railway emergency plans, It is characterized in that include: Obtain emergency task information and executor information; Calculate the task difficulty score corresponding to each emergency task according to the emergency task information; Calculate the workload score corresponding to each executor according to the executor information; According to the task difficulty score and the workload score, the emergency task information is associated with the executor information to generate emergency execution team plan information.

2. A method for automatically generating a railway emergency plan according to claim 1, It is characterized in that Before obtaining the emergency task information and the executor information, the following steps are also included: Obtain emergency plan information; Extracting emergency execution team information based on the emergency plan information; The emergency task information is extracted according to the emergency execution team information.

3. A method for automatically generating a railway emergency plan according to claim 2, It is characterized in that After obtaining the emergency plan information, the method further includes: Extracting emergency leadership team information based on the emergency plan information; Generate emergency leadership team plan information based on the emergency leadership team information.

4. A method for automatically generating a railway emergency plan according to claim 1, It is characterized in that The calculating the task difficulty score corresponding to each emergency task according to the emergency task information includes: Obtain emergency resource information and train passenger information; Calculate the passenger service workload corresponding to each emergency task according to the emergency task information and the train passenger information; Calculate the resource acquisition difficulty value corresponding to each emergency task according to the emergency task information and the emergency resource information; The task difficulty score corresponding to each emergency task is calculated according to the emergency task information, the passenger service workload and the resource acquisition difficulty value.

5. A method for automatically generating a railway emergency plan according to claim 4, It is characterized in that The calculating, according to the emergency task information and the train passenger information, the passenger service workload corresponding to each emergency task includes: According to the train passenger information, extract the train arrival and departure timetable, the number of passengers on the train, the number of passengers who have arrived, and the number of tickets sold; Calculate the number of passengers who have not arrived based on the number of tickets sold and the number of passengers who have arrived; Calculate the number of passengers according to the current time, the train arrival and departure schedule, the number of passengers on the train, the number of passengers who have arrived, and the number of passengers who have not arrived; Extracting the task area information and the planned completion time corresponding to each emergency task according to the emergency task information; The passenger service workload corresponding to each emergency task is calculated based on the task area information, the planned completion time and the passenger number information.

6. A method for automatically generating a railway emergency plan according to claim 1, It is characterized in that The calculating the workload score corresponding to each executor according to the executor information includes: Classify the executive personnel information into off-duty personnel information and on-duty personnel information; According to the information of the absent personnel, the home address, completed work tasks and working hours corresponding to the absent personnel are obtained, and the workload score corresponding to each absent personnel is calculated according to the home address, the completed work tasks and the working hours; Based on the on-the-job personnel information, the current work position, work frequency, working hours, physical exertion value and mental exertion value of the on-the-job personnel are obtained, and the work saturation value is obtained by weighted calculation based on the work frequency, the working hours, the physical exertion value and the mental exertion value; the workload score corresponding to each on-the-job personnel is calculated based on the current work position and the work saturation value.

7. A method for automatically generating a railway emergency plan according to claim 1, It is characterized in that The step of associating the emergency task information with the executor information according to the task difficulty score and the workload score to generate emergency execution team plan information includes: Sorting the emergency task information according to the task difficulty score; Sorting the executor information according to the workload score; The executor information corresponding to the high workload score is associated with the emergency task information corresponding to the low task difficulty score to generate emergency execution team plan information.

8. A device comprising a memory, a processor and a computer program stored in the memory and executable on the processor, It is characterized in that When the processor executes the computer program, the method for automatically generating a railway emergency plan according to any one of claims 1 to 7 is implemented.

9. An emergency system, It is characterized in that include: Interface unit, emergency task processing unit, executive personnel processing unit and emergency plan generation unit; The interface unit is used to obtain emergency task information and executor information; The emergency task processing unit is used to calculate the task difficulty score corresponding to each emergency task according to the emergency task information; The executor processing unit is used to calculate the workload score corresponding to each executor according to the executor information; The emergency plan generating unit is used to associate the emergency task information with the executor information according to the task difficulty score and the workload score, and generate emergency execution team plan information; The interface unit, the emergency task processing unit, the executive personnel processing unit and the emergency plan generation unit cooperate with each other to realize a railway emergency plan automatic generation method as described in any one of claims 1 to 7.

10. A non-transitory computer-readable storage medium having a computer program stored thereon, It is characterized in that When the computer program is executed by a processor, the method for automatically generating a railway emergency plan according to any one of claims 1 to 7 is implemented.