Direct reduction iron feeding system for furnace cover of electric arc furnace

By designing rotary vibration feeder and ring pipe cutting assembly on the arc furnace cover, uniform feeding of direct reduction of iron is achieved, solving the problems of uneven feeding and cold zone of the molten pool, and improving metal yield and production efficiency .

CN119061234APending Publication Date: 2024-12-03BERIS ENG & RES CORP
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411217609.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

The existing arc furnace feeding methods have problems such as uneven feeding, insufficient feeding capacity, cold zone of the melt pool and the risk of spontaneous combustion and explosion of reduced pellet powder, resulting in low metal yield and reduced production efficiency.

Method used

A direct reduction iron feeding system for electric arc furnace cover is designed, including a rotary vibration feeder, a cutting funnel assembly and annular pipe cutting assembly. Through the design of multiple blanking points and cooling water circulation cooling, the direct reduction of iron is achieved. Evenly distributed and efficient feeding.

Benefits of technology

The uniform distribution of direct reduction iron in the furnace melting pool is achieved, which improves the uniformity of the melting pool temperature, avoids the cold zone of the melting pool, shortens the smelting cycle, and improves metal yield and production efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061234A_ABST
    Figure CN119061234A_ABST
Patent Text Reader

Abstract

The invention belongs to the technical field of electric arc furnace steelmaking, and discloses a direct reduction iron feeding system for a furnace cover of an electric arc furnace. The electric arc furnace cover direct reduction iron feeding system at least comprises a discharging hopper assembly used for receiving direct reduction iron from a rotary vibration feeder and an annular pipe discharging assembly communicated with the discharging hopper assembly, and the discharging hopper assembly comprises a discharging hopper and a discharging chute communicated with the discharging hopper. The annular pipe discharging assembly comprises an annular pipe communicated with the discharging chute and a first cooling pipeline at least located on the periphery of a discharging port of the annular pipe, the discharging port of the annular pipe is opposite to a discharging point on the furnace cover, the annular pipe is in a disc shape formed by winding on the same plane, and the plane inclines towards the furnace cover; and the direct reduction iron can enter a blanking point through the blanking funnel, the blanking chute and the discharge hole of the annular pipe in sequence by virtue of the gravity of the direct reduction iron. According to the direct reduction iron feeding system for the furnace cover of the electric arc furnace, the metal yield of the electric arc furnace can be increased.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of electric arc furnace steelmaking, and in particular to an electric arc furnace cover direct reduced iron charging system. Background Art

[0002] At present, there are three main ways to add direct reduced iron (DRI) to an electric arc furnace: (1) adding direct reduced iron (DRI) by means of a charging basket, i.e., the furnace cover is unscrewed and the direct reduced iron (DRI) is added into the furnace by means of a charging basket; (2) adding direct reduced iron into the furnace by means of a charging system of the electric furnace (usually, charging is performed through a charging funnel or chute through the furnace cover); and (3) adding direct reduced iron into the furnace by means of a horizontal charging system, i.e., a scrap steel horizontal continuous charging and scrap steel preheating system.

[0003] The above three methods all have certain defects and problems. For method (1), when adding materials, the electric furnace airtight cover (dog house) needs to be opened and the electric furnace cover needs to be unscrewed. The above operations will directly affect the production rhythm of the electric furnace, increase the heat dissipation loss of the electric furnace, and reduce production efficiency. For method (2), the amount of material added is limited by the capacity of the feeding system. It is difficult to add a large amount of direct reduced iron to the electric arc furnace in a short period of time. In addition, the traditional electric furnace cover has only one receiving point. After the direct reduced iron enters the electric furnace, it is distributed in the same position. When a large amount of material is added, it is easy to cause a cold zone in the molten pool, and even form an "iceberg" effect, which greatly reduces the efficiency of the furnace. The metal recovery rate is low. For method (3), from the perspective of the feeding method, direct reduced iron (DRI) is not suitable for being directly added to the electric furnace from the horizontal feeding section. There are two main reasons: First, the horizontal feeding vibration feeding method will increase the crushing rate of the reduced pellets, thereby increasing the powder rate of the reduced pellets. After entering the horizontal feeding preheating section, the powder will be sucked into the sedimentation chamber, waste heat recovery and dust removal system by the hot flue gas of the electric furnace (primary flue gas dust removal system), thereby causing the metal recovery rate to decrease. Second, the powder of the reduced pellets is unstable and prone to spontaneous combustion. After combining with the high-temperature flue gas in the preheating section, there is a risk of combustion or even explosion. Summary of the invention

[0004] In order to improve the metal recovery rate of an electric arc furnace, the present invention provides an electric arc furnace cover direct reduced iron charging system.

[0005] The direct reduced iron feeding system for the electric arc furnace cover according to the present invention at least comprises: a feeding hopper assembly for receiving the direct reduced iron from the rotary vibrating feeder and a ring pipe feeding hopper assembly connected to the feeding hopper assembly, the feeding hopper assembly comprises a feeding hopper and a feeding chute connected to the feeding hopper, the ring pipe feeding hopper assembly comprises a ring pipe connected to the feeding chute and a first cooling pipe at least located on the periphery of the discharge port of the ring pipe, the discharge port of the ring pipe is opposite to the feeding point on the furnace cover, the ring pipe is in the shape of a disk wound on the same plane, and the plane is inclined toward the furnace cover, so that the direct reduced iron can enter the feeding point through the feeding hopper, the feeding chute and the discharge port of the ring pipe in sequence by its own gravity.

[0006] Furthermore, the first cooling pipeline includes a water inlet channel formed on the outer peripheral wall of the discharge port of the annular tube and a water return channel located on the outer peripheral wall of the water inlet channel.

[0007] Furthermore, an inner tube is disposed outside the discharge port of the annular tube, and a water inlet channel is formed between the inner tube and the annular tube; an outer tube is disposed outside the inner tube, and a water return channel is formed between the outer tube and the inner tube; the end of the discharge port of the annular tube is closed and connected to the end of the outer tube.

[0008] Furthermore, the discharge port of the annular tube includes a straight pipe section coaxially connected to the annular tube and a discharge section connected to the straight pipe section and arranged toward the drop point. The discharge section is eccentrically and inclined relative to the straight pipe section. The inner diameter of the straight pipe section is equal to the inner diameter of the annular tube and larger than the inner diameter of the discharge section.

[0009] Furthermore, the distance between the end section of the inner tube facing the material dropping point and the inner wall of the material discharging section gradually decreases in the direction toward the material dropping point.

[0010] Furthermore, the flow rate of cooling water entering the water inlet channel is set to be lower than the water outlet flow rate of the return water channel; the water inlet temperature of the water inlet channel is ≤35°C, the water outlet temperature of the return water channel is <50°C, and the temperature of the cooling water at the end of the inner tube facing the drop point is less than 15°C.

[0011] Furthermore, the flow rate of the cooling water at the end of the inner tube toward the material drop point is greater than the water outlet flow rate of the return water channel; the cooling water flow rate at the end of the inner tube toward the material drop point is calculated by the following formula:

[0012]

[0013] F=πdL Formula (2)

[0014] Where: Q is cooling water flow, t / h;

[0015] F is the heating area of ​​the outlet of the ring tube, m 2 ;

[0016] d is the outer diameter of the discharge port of the ring tube, m;

[0017] L is the axial length of the heated surface of the discharge port of the annular tube, m;

[0018] C is the specific heat of water;

[0019] Δt is the temperature difference between inlet and outlet cooling water, °C;

[0020] Q is the average maximum heat load on the heated surface of the annular tube outlet, kJ / h·m 2 .

[0021] Furthermore, there are multiple drop points evenly distributed on the furnace cover; the annular tube has multiple discharge ports corresponding one-to-one to each drop point, or the discharge chute is opposite to one of the drop points, and the number of the annular tube's discharge ports is the same as the number of the remaining drop points and corresponds one-to-one.

[0022] Furthermore, the discharge funnel assembly also includes a second cooling pipe located on the outer peripheral wall of the discharge funnel and a third cooling pipe located on the outer peripheral wall of the discharge chute and connected to the second cooling pipe.

[0023] Furthermore, the direct reduced iron feeding system of the electric arc furnace cover also includes a vibrating feeder, a feeding chute, a belt conveyor, a batching belt scale and a high-level storage bin which are arranged in sequence from bottom to top starting from the top of the feeding hopper assembly. The high-level storage bin is filled with nitrogen and a slight positive pressure is maintained in the high-level storage bin. A temperature monitoring component and a pressure monitoring component are also provided in the high-level storage bin.

[0024] Compared with the prior art, the electric arc furnace cover direct reduced iron feeding system of the present invention can effectively solve the problems of uneven entry of hydrogen-based vertical furnace direct reduced iron into the furnace through the furnace cover and insufficient feeding capacity, so that a large amount of direct reduced iron is evenly distributed in the electric furnace molten pool, while improving the uniformity of the molten pool temperature and avoiding the existence of cold zones in the molten pool ("iceberg" phenomenon), thereby shortening the electric furnace smelting cycle and improving the metal recovery rate. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 Schematic diagram of the structure of the direct reduced iron charging system for an electric arc furnace roof according to an embodiment of the present invention;

[0026] Figure 2 for Figure 1 The structural schematic diagram of the unloading chute assembly shown;

[0027] Figure 3 for Figure 1 A schematic structural diagram of a discharge port of a ring tube of a ring tube feeding assembly shown;

[0028] Figure 4 This is a schematic diagram of the structure of the drop point on the furnace cover. DETAILED DESCRIPTION

[0029] In order to better understand the purpose, structure and function of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings.

[0030] Figure 1 FIG. 2 shows the structure of a direct reduced iron charging system 100 for an electric arc furnace roof according to an embodiment of the present invention. Figure 1 As shown, the direct reduced iron charging system 100 for the electric arc furnace roof may at least include: a feeding hopper assembly 1 for receiving the direct reduced iron from the rotary vibrating feeder 3 and a ring tube feeding assembly 2 connected to the feeding hopper assembly 1, as shown in FIG. Figure 2 As shown, the feeding hopper assembly 1 may include a feeding hopper 11 and a feeding chute 12 connected to the feeding hopper 11. Figure 3 As shown, the annular tube unloading assembly 2 may include an annular tube (not shown in the figure) connected to the unloading chute 12 and a first cooling pipe 20 at least located on the outer periphery of the discharge port 201 of the annular tube, the discharge port 201 of the annular tube is opposite to the unloading point on the furnace cover 10, the annular tube is in a disc shape wound on the same plane, and the plane is inclined toward the furnace cover 10, so that the direct reduced iron can enter the unloading point 101 (as shown in the figure) in sequence through the unloading funnel 11, the unloading chute 12 and the discharge port 201 of the annular tube by its own gravity. Figure 4 shown).

[0031] In the electric arc furnace cover direct reduced iron charging system 100 of the embodiment of the present invention, by setting the ring tube feeding assembly 2, the ring tube is a disc-shaped ring tube formed by winding on the same plane, which increases the travel of the direct reduced iron in the ring tube feeding assembly 2, which enables the direct reduced iron (DRI) to enter the electric arc furnace more smoothly through the feeding point 101, so that the direct reduced iron can react more fully in the furnace, and thus can effectively solve the problem of a large amount of direct reduced iron being added to the electric arc furnace instantaneously to cause a cold zone in the molten pool, thereby shortening the electric furnace smelting cycle and improving the metal yield of the direct reduced iron. At the same time, by setting the first cooling pipe 20 on the outer periphery of the discharge port 201 of the ring tube, the temperature of the discharge port 201 of the ring tube near the feeding point 101 is reduced, which can prevent the high-temperature molten pool where the furnace cover 10 is located from baking the discharge port 201 of the ring tube, thereby helping to protect the discharge port 201 of the ring tube.

[0032] Preferably, the angle at which the annular tube is inclined toward the furnace cover 10 in the same plane can be set according to the specific material conditions, the inner diameter of the annular tube, etc., as long as it can ensure that the material can be discharged smoothly.

[0033] In such Figure 4In the preferred embodiment shown, a plurality of drop points 101 may be evenly distributed on the furnace cover 10; the discharge ports 201 of the ring tube may be multiple and correspond to each drop point one by one, or the discharge chute 12 is opposite to one of the drop points, and the number of the discharge ports 201 of the ring tube is the same as the number of the remaining drop points and corresponds to each other one by one. The arrangement of this embodiment enables direct reduced iron to be dropped at multiple drop points at the same time, which not only improves the feeding capacity, but also further improves the uniformity of the temperature distribution of the molten pool, thereby further shortening the electric furnace smelting cycle and improving the metal recovery rate of direct reduced iron.

[0034] According to the present invention, in Figure 3 In the preferred embodiment shown, the first cooling pipe 20 may include a water inlet channel 23 formed on the outer peripheral wall of the discharge port 201 of the annular tube and a water return channel 24 located on the outer peripheral wall of the water inlet channel 23. The cooling water enters the water return channel 24 after cooling the temperature in the annular tube through the water inlet channel 23, and the water in the water return channel 24 may flow back to the water inlet channel 23 after passing through a cooling or waste heat recovery device.

[0035] Preferably, if Figure 3 As shown, the discharge port 201 of the annular tube is provided with an inner tube 21, and a water inlet channel 23 is formed between the inner tube 21 and the annular tube; the inner tube 21 is provided with an outer tube 22, and a water return channel 24 is formed between the outer tube 22 and the inner tube 21; the end of the discharge port 201 of the annular tube is sealed and connected with the end of the outer tube 22. This arrangement enables the discharge port 201 of the annular tube to be cooled by a water-cooled jacket type, and the discharge port 201 of the annular tube, the inner tube 21 and the outer tube 22 are composed of three-layer jackets made of seamless steel pipes, which has a simple structure and a good cooling effect.

[0036] Furthermore, the wall thickness and diameter of the annular tube outlet 201 can be selected according to the feeding amount and feeding time of direct reduced iron (i.e., feeding capacity) and the standard seamless steel pipe product specifications; the diameters of the inner tube 21 and the outer tube 22 can be determined according to the flow rate and flow of cooling water.

[0037] In a preferred embodiment, the inner tube 21 may preferably be a corrugated tube for increasing the travel of cooling water in the water inlet channel 23 to enhance the cooling effect of the water inlet channel 23 on the material channel 25 formed in the outlet 201 of the annular tube.

[0038] In such Figure 3In the preferred embodiment shown, the discharge port 201 of the ring pipe may include a straight pipe section 27 coaxially connected to the ring pipe and a discharge section 26 connected to the straight pipe section 27 and arranged toward the discharge point 101, the discharge section 26 is eccentric and inclined relative to the straight pipe section 27, and the inner diameter of the straight pipe section 27 is equal to the inner diameter of the ring pipe and larger than the inner diameter of the discharge section 26. The arrangement of the discharge section 26 is used to achieve a more accurate correspondence between the discharge port 201 of the ring pipe and the discharge point 101, and also helps to reduce the amount of direct reduced iron entering the electric arc furnace per unit time, so that the direct reduced iron entering the electric arc furnace can react quickly and fully.

[0039] Preferably, the distance 28 between the end of the inner tube 21 facing the drop point 101 and the inner wall of the discharge section gradually decreases in the direction toward the drop point 101. Since the end of the discharge port 201 of the ring tube bears the largest heat flow, in order to ensure that the discharge port 201 of the ring tube has a longer service life, the flow rate of the cooling water at the end of the discharge port 201 of the ring tube is increased through this setting.

[0040] According to the present invention, in a preferred embodiment, the flow rate of the cooling water entering the water inlet channel 23 can be set to be less than the water outlet flow rate of the water return channel 24; the water inlet temperature of the water inlet channel 23 is ≤35°C, the water outlet temperature of the water return channel 24 is <50°C, and the temperature of the cooling water at the end of the inner tube 21 facing the material drop point is less than 15°C. In this embodiment, since the outlet water temperature increases and the volume increases, the water outlet speed is set to be slightly higher than the water inlet speed. Preferably, the flow rate of the cooling water entering the water inlet channel 23 can be selected according to 5-6m / s, and the water outlet flow rate of the water return channel 24 can be selected according to 6-7m / s.

[0041] Furthermore, the flow rate of the cooling water at the end of the inner tube toward the material drop point is greater than the water outlet flow rate of the return channel. Preferably, the flow rate of the cooling water at the end of the inner tube toward the material drop point can be 7-8 m / s.

[0042] According to the present invention, the amount of cooling water in the discharge port 201 of the ring tube can be calculated based on the actual heating area of ​​the discharge port 201 of the ring tube, the outlet water temperature, etc., and the cooling water flow rate, cooling water flow, cooling water resistance and water pressure can be verified. Since the discharge port 201 of the ring tube is directly above the arc furnace molten pool, during the arc furnace smelting process, it is affected by different high temperature environments in the furnace, and its heating state is changing and complex with the smelting stage. The cooling water flow rate of the cooling water at the end of the inner tube toward the drop point is calculated by the following formula:

[0043]

[0044] F=πdL Formula (2)

[0045] Where: Q is cooling water flow, t / h;

[0046] F is the heating area of ​​the outlet of the ring tube, m 2 ;

[0047] d is the outer diameter of the discharge port of the ring tube, m;

[0048] L is the axial length of the heated surface of the discharge port of the annular tube, m;

[0049] C is the specific heat of water;

[0050] Δt is the temperature difference between inlet and outlet cooling water, °C;

[0051] Q is the average maximum heat load on the heated surface of the annular tube outlet, kJ / h·m 2 .

[0052] Among them, the average maximum heat load value of the heating surface of the outlet of the ring tube is about (0.96~1.71)×10 6 kJ / h·m 2 About, as the diameter of the molten pool increases, the heat load value can be slightly higher.

[0053] According to the present invention, in Figure 1 In the preferred embodiment shown, the feeding hopper assembly 1 may further include a second cooling pipe 13 located on the outer peripheral wall of the feeding hopper 11 and a third cooling pipe 14 located on the outer peripheral wall of the feeding chute 12 and connected to the second cooling pipe 13. By adopting cooling measures for both the feeding hopper 11 and the feeding chute 12, the high-temperature molten pool where the furnace cover 10 is located can be prevented from baking the feeding hopper assembly 1, thereby helping to protect the feeding hopper assembly 1.

[0054] Preferably, the second cooling pipe 13 can be a pipe body wound and fixed on the outer peripheral wall of the discharge funnel 11; the third cooling pipe 14 can be a pipe body sleeved on the outer peripheral wall of the discharge chute 12.

[0055] According to the present invention, in Figure 1 In the preferred embodiment shown, the direct reduced iron feeding system 100 for the electric arc furnace cover may also include a vibrating feeder 3, a material discharge chute 4, a belt conveyor 5, a batching belt scale 6 and a high-level storage bin 7 arranged in sequence from bottom to top starting from the top of the discharge hopper assembly 1. Nitrogen can be filled in the high-level storage bin 7 to maintain a slight positive pressure in the high-level storage bin 7. A temperature monitoring component and a pressure monitoring component are also provided in the high-level storage bin 7. In this embodiment, nitrogen can be filled in the high-level storage bin 7 to maintain a slight positive pressure in the high-level storage bin 7 to ensure an inert environment in the bin, so as to ensure the safe use of the bin. The high-level storage bin 7 shall not discharge materials when feeding, and the monitoring component and the pressure monitoring component can further ensure the safe use of the bin.

[0056] Preferably, the nitrogen consumption of the high-level storage bin 7 for nitrogen filling is related to the design parameters of the bin, mainly including the maximum DRI feeding rate of the bin, the maximum DRI discharging rate of the bin, the leakage area of ​​the bin, the pressure value for maintaining a slight positive pressure of nitrogen inside the bin, and the bin cycle time (i.e., a working cycle of feeding and discharging).

[0057] Also preferably, the feeding speed and discharging speed of the high-level storage bin 7 are not higher than 2.5 t / min, and the bin cycle time, i.e., the number of ventilation times, is ≥12 times / hour.

[0058] The specific embodiment of the direct reduced iron charging system 100 for the electric arc furnace roof is given below:

[0059] Direct reduced iron is transported from the high-level silo 7 to the discharge hopper assembly 1 through the vibrating feeder 8, the batching belt scale 6, the discharge chute 4, and the rotary vibrating feeder 3, enters the annular pipe through the feeding funnel 11 and the feeding chute 12, and enters the arc furnace molten pool through the three discharge ports 201 of the annular pipe.

[0060] The raw material structure of the electric arc furnace is 35% DRI (direct reduced iron) + 65% scrap steel, or 50% DRI (direct reduced iron) + 50% scrap steel, or 80% DRI (direct reduced iron) + 20% scrap steel.

[0061] The chemical composition of DRI (direct reduced iron) is as follows:

[0062] The particle size range of direct reduced iron (DRI) is 8 to 20 mm, with an average particle size of 12.5 mm.

[0063] The direct reduced iron charging system 100 of the electric arc furnace roof is equipped with two high-level silos 7, each of which is equipped with a batching scale to achieve accurate weighing and continuous material feeding. The required amount of DRI can be given by a computer according to the steelmaking raw material conditions or manually set, and the weighing results and signals are uploaded to the electric furnace computer system.

[0064] The charging system is automatically controlled by PLC. When the electric furnace needs to be charged, it is accurately and continuously weighed by the batching scale, passed through the horizontal (R106) and the cross-belt conveyor (R107), and then added to the charging funnel and charging chute of the electric furnace cover through the electric furnace rotary vibrating feeder, and then enters the electric furnace molten pool through the ring pipe and the ring pipe's discharge port.

[0065] Table 1

[0066]

[0067] System technical parameters:

[0068] (1) The volume of the high-level silo 7 is 200m 3, 2 sets in total; high-level silo 7 is equipped with nitrogen protection, which is automatically opened or closed according to demand; a temperature detector is provided on the top of the storage silo, and the detection range is 0-1500℃; a gas pressure detector is provided on the top of the storage silo, and the detection range is 0-0.2MPa; when the material level of the storage silo rises to a high level, a high material level alarm signal is issued and the feeding is stopped. When the material level is at a low level, a low material level alarm signal is issued, requiring the silo to be fed.

[0069] (2) Two electro-hydraulic gate valves are arranged under the high-level silo 7, with model DYTF4000-600, power 3kW, and power type AC380. The electro-hydraulic gate valves are in the open state when adding materials, and are closed only during maintenance.

[0070] (3) Batching belt scales, 2 in total, each with a rated flow of 150t / h, power of 1.5kW, variable frequency speed regulation, power supply type AC380; batching scales are used for continuous and precise weighing of materials (control of feeding speed),

[0071] The two high-level silos 7 can be fed at the same time or separately. The batching scales weigh the materials separately. When the set value is reached, the feeding stops and waits for the next feeding. The weighing results and signals are uploaded to the melting furnace computer system. The batching scales feed materials continuously through the chute to the horizontal belt conveyor (R106) and the cross-belt conveyor (R107), and then through the chute to the rotary vibrating feeder.

[0072] (4) Rotary vibrating feeder, 1 unit, rated flow rate 400-450t / h, inlet and outlet center distance 5600mm, outlet pipe diameter DN500mm.

[0073] (5) The outer diameter of the electric furnace cover is 7550mm, the tubular water-cooled support structure, and the water-cooled wall tube specification is 88.9×11.53mm.

[0074] (6) Feeding funnel and feeding chute. The volume of the feeding funnel is 1.5m 3 , the inner diameter of the feeding chute is DN500.

[0075] (7) Ring pipe and its discharge port: the diameter of the ring pipe is DN400 and the diameter of the discharge port is DN300.

[0076] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein by equivalents; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the scope of the technical solutions of the embodiments of the present invention, and they should all be included in the scope of the claims and specification of the present invention. In particular, as long as there is no structural conflict, the various technical features mentioned in each embodiment can be combined in any way. The present invention is not limited to the specific embodiments disclosed herein, but includes all technical solutions that fall within the scope of the claims.

Claims

1. An electric arc furnace cover direct reduced iron feeding system, characterized in that: At least: A feeding funnel assembly for receiving direct reduced iron from a rotary vibrating feeder and a ring tube feeding assembly connected to the feeding funnel assembly, the feeding funnel assembly includes a feeding funnel and a feeding chute connected to the feeding funnel, the ring tube feeding assembly includes a ring tube connected to the feeding chute and a first cooling pipe at least located on the outer periphery of the discharge port of the ring tube, the discharge port of the ring tube is opposite to the feeding point on the furnace cover, the ring tube is disc-shaped wound on the same plane, and the plane is inclined toward the furnace cover, so that the direct reduced iron can enter the feeding point through the feeding funnel, the feeding chute and the discharge port of the ring tube in sequence by its own gravity.

2. The direct reduced iron charging system for an electric arc furnace roof according to claim 1, characterized in that: The first cooling pipeline includes a water inlet channel formed on the outer peripheral wall of the discharge port of the ring tube and a water return channel located on the outer peripheral wall of the water inlet channel.

3. The direct reduced iron charging system for an electric arc furnace roof according to claim 2, characterized in that: An inner tube is disposed outside the discharge port of the annular tube, and the water inlet channel is formed between the inner tube and the annular tube; an outer tube is disposed outside the inner tube, and the water return channel is formed between the outer tube and the inner tube; the end of the discharge port of the annular tube is closed and connected with the end of the outer tube.

4. The direct reduced iron charging system for an electric arc furnace roof according to claim 3, characterized in that: The discharge port of the annular tube includes a straight pipe section coaxially connected to the annular tube and a discharge section connected to the straight pipe section and arranged toward the drop point. The discharge section is eccentrically and inclined relative to the straight pipe section. The inner diameter of the straight pipe section is equal to the inner diameter of the annular tube and larger than the inner diameter of the discharge section.

5. The direct reduced iron charging system for an electric arc furnace roof according to claim 4, characterized in that: The distance between the end section of the inner tube facing the drop point and the inner wall of the discharge section gradually decreases in the direction toward the drop point.

6. The direct reduced iron charging system for an electric arc furnace roof according to claim 5, characterized in that: The flow rate of the cooling water entering the water inlet channel is set to be lower than the water outlet flow rate of the water return channel; the water inlet temperature of the water inlet channel is ≤35°C, the water outlet temperature of the water return channel is <50°C, and the temperature of the cooling water at the end of the inner tube facing the drop point is less than 15°C.

7. The direct reduced iron charging system for an electric arc furnace roof according to claim 6, characterized in that: The flow rate of the cooling water at the end of the inner tube toward the material drop point is greater than the water outlet flow rate of the return water channel; the cooling water flow rate at the end of the inner tube toward the material drop point is calculated by the following formula: F=πdL Formula (2) Where: Q is cooling water flow, t / h; F is the heating area of ​​the outlet of the ring tube, m 2 ; d is the outer diameter of the discharge port of the ring tube, m; L is the axial length of the heated surface of the discharge port of the annular tube, m; C is the specific heat of water; Δt is the temperature difference between inlet and outlet cooling water, °C; Q is the average maximum heat load on the heated surface of the annular tube outlet, kJ / h·m 2 .

8. The direct reduced iron charging system for an electric arc furnace roof according to any one of claims 1 to 7, characterized in that: There are multiple drop points evenly distributed on the furnace cover; the annular tube has multiple discharge ports that correspond one-to-one to each of the drop points, or the discharge chute is opposite to one of the drop points, and the number of discharge ports of the annular tube is the same as the number of the remaining drop points and corresponds one-to-one.

9. The direct reduced iron charging system for an electric arc furnace roof according to any one of claims 1 to 7, characterized in that: The material discharge funnel assembly also includes a second cooling pipe located on the outer peripheral wall of the material discharge funnel and a third cooling pipe located on the outer peripheral wall of the material discharge chute and connected to the second cooling pipe.

10. The direct reduced iron charging system for an electric arc furnace roof according to any one of claims 1 to 7, characterized in that: The electric arc furnace cover direct reduced iron feeding system also includes a vibrating feeder, a discharge chute, a belt conveyor, a batching belt scale and a high-level storage bin which are arranged in sequence from bottom to top starting from the top of the discharge funnel assembly. The high-level storage bin is filled with nitrogen and a slight positive pressure is maintained in the high-level storage bin. A temperature monitoring component and a pressure monitoring component are also provided in the high-level storage bin.

Citation Information

Cited By

  • Safe and quality-guaranteeing recycling system and method for HDRI powder

    CN121776487A