Pretreatment method for epitaxial pre-cleaning chamber
By homogenizing the epitaxial pre-cleaning chamber, the reaction of NH3 and F active particles is used to form a composite to adsorb on the inner wall of the chamber, solving the first substrate effect and batch drift problems caused by equipment instability, realizing Consistent and efficient production of substrate cleaning process.
Patent Information
- Application Number
- CN202411557566.4
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2024-12-03
AI Technical Summary
The first-piece substrate effect and batch drift problems caused by the instability of existing epitaxial pre-cleaning chamber equipment lead to a decrease in substrate processing yield and inconsistent product quality.
The homogenization process is carried out in the epitaxial pre-cleaning chamber, and the first pre-treatment gas (including NH3) and the second pre-treatment gas (including F active particles) are respectively passed to react to form a composite adsorbed on the inner wall of the chamber, providing A stable chemical environment and a pre-adsorption step is provided if necessary to improve the chemical stability of the chamber.
After homogenization, the chamber maintains dynamic chemical balance, achieving consistency in the substrate cleaning process, avoiding the first substrate effect and batch drift, shortening process time, and improving output efficiency and product quality Rate.
Smart Images

Figure CN119061471A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of semiconductors and relates to a pretreatment method for an epitaxial pre-cleaning chamber. Background Art
[0002] In various processes of semiconductor device manufacturing, substrates need to be transferred between different processing equipment. During the transfer process, they need to enter the atmospheric environment, which will cause a large amount of naturally oxidized materials (SiO2) to exist on the surface of the substrate. These silicon oxides cover the surface of the single crystal silicon substrate, which will make it impossible to deposit a uniform single crystal silicon crystal material layer on the substrate. Therefore, before epitaxial growth of silicon or other semiconductor materials, a dedicated pre-cleaning chamber is required to remove this natural oxide or other contaminants.
[0003] For example, epitaxy (EPI) growth is a technique for growing single-crystal thin films, which deposits a single-crystal thin film of the same or different material as the substrate on a substrate. The substrate needs to undergo a strict pre-clean etching process in an epitaxy pre-cleaning chamber before epitaxial growth to remove particle contamination or oxide layers, such as silicon oxide, on the substrate surface.
[0004] The existing pre-cleaning process requires two steps: 1) Low-temperature salt formation step (40℃-60℃), first, a clean reaction gas group activated by remote plasma is introduced into the epitaxial pre-cleaning chamber. The reaction gas group includes free radicals of fluorine, nitrogen, hydrogen and other components, which react with silicon oxide on the surface of the substrate to produce solid salt (NH4)2SiF6. The reaction equation is as follows: F * +NH3→NH4F Formula 1 SiO2+6NH4F→(NH4)2SiF6+H2O+4NH3 Formula 2 2) Then, a high-temperature sublimation step is performed to increase the substrate temperature to a temperature (greater than 120°C) at which the solid salt is sublimated and vaporized. The sublimated gas is pumped away by the exhaust system, completing a salt sublimation cycle and etching away the silicon oxide on the surface.
[0005] However, there is always a problem of reduced substrate processing yield due to the First Wafer Effect (FWE) or Run-to-Run Drift phenomenon in the cleaned substrate. The First Wafer Effect refers to the fact that when a new processing batch starts in the semiconductor manufacturing process, the first or first few substrates (wafers) may show different characteristics and performance from the subsequent processed substrates. This phenomenon is usually caused by the unstable state of the processing equipment or environment in the initial stage. Run-to-Run Drift refers to the gradual change in process parameters or product performance between different batches (runs) in the semiconductor manufacturing process. This drift may be caused by a variety of factors, but similar to the reasons for the First Wafer Effect, both may be caused by inconsistent results after cleaning, and both situations may lead to inconsistency and reliability problems in the quality of subsequent epitaxial products.
[0006] With the rapid development of semiconductor technology, product quality is particularly sensitive to differences between different substrate batches. Therefore, it is necessary to improve the stability of clean chamber equipment. In order to avoid rising production costs, the process time to improve the stability of clean chamber equipment also needs to be strictly controlled. Summary of the invention
[0007] The purpose of the present invention is to quickly improve the stability of the chamber by pre-treating the chamber used for epitaxial pre-cleaning, so as to avoid the first-wafer substrate effect and batch-to-batch drift caused by the instability of the chamber equipment.
[0008] In order to achieve the above object, the present invention provides a pretreatment method for an epitaxial pre-cleaning chamber, comprising: Providing an epitaxial pre-cleaning chamber; Homogenization treatment: introducing a first pretreatment gas and a second pretreatment gas into the chamber respectively, so that a complex formed by the reaction of the first pretreatment gas and the second pretreatment gas is adsorbed on the surface of the inner wall of the chamber to provide a stable chemical environment; The first pretreatment gas contains NH3, and the second pretreatment gas contains: F-containing active particles; the F-containing active particles are dissociated in a plasma source before entering the chamber.
[0009] Optionally, the homogenization treatment time is 25s-250s, the flow rate of the first pretreatment gas is 10sccm-20sccm, and the flow rate of the second pretreatment gas is 5sccm-10sccm.
[0010] Optionally, before the homogenization step, a pre-adsorption step is further included: introducing a precursor gas for a first time so that the precursor gas is adsorbed on the surface of the inner wall of the chamber, and the precursor gas contains NH3 and / or F-containing active particles.
[0011] Optionally, the first time is 30s to 120s, and the homogenization treatment time is 50s to 80s.
[0012] Optionally, the pre-adsorption step comprises: introducing NH3 for a second time so that the NH3 is adsorbed on the surface of the inner wall of the chamber, and then introducing F-containing active particles for a third time, wherein the second time is ≥ the third time.
[0013] Optionally, the second time is ≥40s, and the homogenization treatment time is 50s~80s.
[0014] Optionally, the second time is 60s~120s.
[0015] Optionally, the third time is the same as the etching process time.
[0016] Optionally, the third time is 20s~50s.
[0017] Optionally, the pre-adsorption step comprises: introducing F-containing active particles for a fourth time so that the F-containing active particles are adsorbed on the surface of the inner wall of the chamber, and then introducing NH3 for a fifth time, wherein the fourth time ≤ the fifth time.
[0018] Optionally, the fourth time is ≥30s, and the homogenization treatment time is 50s~80s.
[0019] Optionally, the fifth time is 60s~120s.
[0020] Optionally, H2 is also introduced during the homogenization step.
[0021] Optionally, the flow rate range of H2 is 2000sccm-6000sccm.
[0022] Optionally, the temperature in the chamber is 20° C. to 60° C., and the pressure in the chamber is 2 torr to 10 torr.
[0023] Compared with the prior art, the technical solution of the present invention has at least the following beneficial effects: The present invention performs a homogenization treatment on the epitaxial pre-cleaning chamber before performing substrate etching cleaning, and introduces a first pre-treatment gas and a second pre-treatment gas into the chamber respectively, so that the complex formed by the reaction of the first pre-treatment gas and the second pre-treatment gas is adsorbed on the inner wall surface of the chamber to provide a stable chemical environment. The chamber after the homogenization treatment can maintain a dynamic chemical balance in the subsequent continuous substrate cleaning process, obtain substrates with good consistency, and there is no need to increase the batch pre-treatment steps, which can not only shorten the process time, but also prevent the damage to the chemical environment during the batch pre-treatment process.
[0024] Furthermore, the present invention also provides a pre-adsorption step before the homogenization treatment: introducing the precursor gas for a first time. This not only allows the chamber to reach a chemically stable state more quickly, but also allows the adsorption amount of the inner wall of the chamber to be larger, so that the chamber can be in a chemically balanced state with a longer etching and cleaning process time, and more batches of substrates can be cleaned and processed. BRIEF DESCRIPTION OF THE DRAWINGS
[0025] Figure 1 The present invention is a process flow chart of a pretreatment method for an epitaxial pre-cleaning chamber.
[0026] Figure 2 It is a schematic diagram of the partial structure of an epitaxial pre-cleaning chamber of the present invention.
[0027] Figure 3 Schematic diagram of the energy states of the reaction between F and NH3.
[0028] Figure 4 FIG. 4 is a process flow chart of another pretreatment method for an epitaxial pre-cleaning chamber according to the present invention.
[0029] Figure ID: Vacuum reaction chamber 21 Base 22 Gas sprinkler 23 Substrate w. DETAILED DESCRIPTION
[0030] The technical solution of the present invention will be described clearly and completely below in conjunction with the accompanying drawings. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0031] In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc., indicating the orientation or positional relationship, are based on the orientation or positional relationship shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0032] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0033] The “F-containing active particles” described herein contain at least one of F radicals, F ions, and F atoms in an excited state.
[0034] The "stable chemical environment" described in this article means that in this environment, the adsorption of process gas by the inner wall of the chamber reaches saturation or near saturation and is in a dynamic equilibrium state. The particles adsorbed on the inner wall of the chamber will not affect the concentration and distribution of the process gas in the chamber.
[0035] As described in the background technology above, the substrates processed by the existing substrate cleaning process have at least the following two problems: the first-wafer substrate effect or the drift problem between batches, which leads to defects in the consistency of the substrates. With the development of semiconductor technology, semiconductor process products are more and more sensitive to the consistency of the substrates to be processed. Therefore, it is urgent to improve the cleaning process to overcome the first-wafer substrate effect or the drift problem between batches of the substrates.
[0036] The inventors have found that the main reasons for the first-wafer effect include: the inner wall of the chamber, especially the inner wall of the chamber that has not been pre-treated to achieve a stable chemical environment, may absorb the process gases required for cleaning, such as F * , NH3 and NH4F, etc., which reduces the amount of etching reactants of the first substrate under the same cleaning process time, thereby making the etching amount of the first substrate lower. The main reasons for batch drift include: During the substrate cleaning process, the purge gas H2 introduced will produce additional HF, the equation is as follows: F * + H2→HF Formula 3 Therefore, the following wet etching reaction (Formula 4) occurs during the cleaning process of the 2nd to nth substrates while dry etching (Formula 2) is being performed, thereby increasing the etching amount (drifting occurs): SiO2+ 4HF + 2NH4F → (NH4) 2SiF6+ 2H2O Formula 4.
[0037] To solve the above problems, the present invention attempts to perform a batch pre-treatment (pre-lot step) on the epitaxial pre-cleaning chamber before the substrate enters the epitaxial pre-cleaning chamber for cleaning, that is, a process gas is introduced into the chamber for a certain time before the next substrate enters the chamber. However, the experiment found that after a substrate is etched and cleaned, the etching amount of the next substrate will still drift, and the substrate cannot be cleaned continuously. We found that the possible reasons are as follows: During the batch pre-treatment process, once the process gas, such as NH3 and F radicals, come into contact, it is easy to react to form NH4F, and NH4F is mainly physically adsorbed on the inner wall of the chamber in the form of deposition. Because the physical adsorption is not stable enough and the adsorption amount is insufficient, after a substrate is etched and cleaned, the chemical environment of the chamber is prone to change, so it is necessary to re-batch pre-treatment. However, before each substrate enters the chamber for cleaning, a batch pre-treatment time is added, which significantly increases the product process time, not only resulting in waste of process gas, but also reducing the utilization efficiency of the chamber, resulting in increased production costs.
[0038] To this end, the present invention further proposes a pretreatment method, which pre-treats the epitaxial pre-cleaning chamber before processing the first substrate, so that the chamber quickly reaches a chemically stable state, and the particles (including ions, molecules, free radicals, etc.) adsorbed on the inner wall of the chamber are not easy to desorb, and will not affect the process environment of the chamber. Then, the substrate cleaning treatment is performed, and the properties of a large number of substrates after treatment are stable and consistent, which can meet the growing process requirements and improve the product yield. There is no need to perform batch pre-treatment on the chamber after each substrate is processed, which improves the output efficiency of the epitaxial pre-cleaning chamber.
[0039] The following is a detailed description with reference to the accompanying drawings and embodiments.
[0040] like Figure 1 As shown, the present invention provides a pretreatment method for an epitaxial pre-cleaning chamber, comprising: Step S1, providing an epitaxial pre-cleaning chamber.
[0041] like Figure 2As shown, an example of an epitaxial pre-cleaning chamber includes a vacuum reaction chamber 21, a base 22 is arranged at the bottom of the chamber for carrying a substrate w, and a gas shower head 23 is arranged at the top of the chamber opposite to the base 22. The reaction gas is transported downward by the gas shower head 23 to the substrate w to be processed, so as to clean the substrate w.
[0042] The material of the inner wall of the epitaxial pre-cleaning chamber exposed to the reaction space is often different from that of the substrate, and the amount of gas adsorbed is different. In this example, the inner wall of the vacuum reaction chamber of the epitaxial pre-cleaning chamber is made of stainless steel material and corrosion-resistant coating. The substrate is a silicon-containing substrate. In order to prevent the inner wall of the chamber from adsorbing too much process gas during the substrate pre-cleaning process, causing the substrate etching amount to change, the present invention performs the following pretreatment on the epitaxial pre-cleaning chamber.
[0043] Step S2, homogenization treatment: respectively introduce a first pretreatment gas and a second pretreatment gas into the chamber, so that a complex formed by the reaction of the first pretreatment gas and the second pretreatment gas is adsorbed on the inner wall surface of the chamber to provide a stable chemical environment; wherein the first pretreatment gas contains NH3, and the second pretreatment gas contains: F-containing active particles.
[0044] During the homogenization process, reaction conditions suitable for the adsorption of the composite can be set. More preferably, the set temperature and chamber pressure are similar to the conditions for subsequent substrate pre-cleaning, so that the composite adsorbed on the inner wall surface formed during the homogenization process can also be stably present without falling off under the subsequent pre-cleaning conditions. For example, in some embodiments, the temperature in the chamber is 20°C to 60°C, and the pressure in the chamber is 2 torr to 10 torr.
[0045] At the same time, for the reaction efficiency and stability of the composite, in some embodiments, it can be achieved by adjusting the flow rate of the processing gas, for example, the flow rate of the first pretreatment gas is 10sccm-20sccm, and the flow rate of the second pretreatment gas is 5sccm-10sccm. The first pretreatment gas and the second pretreatment gas can be introduced into the chamber one after another, or they can be introduced at the same time. The purpose is to adsorb as much as possible and as tightly as possible to the inner wall of the chamber, so as to avoid affecting the chemical environment in the chamber in the subsequent cleaning process. The processing environment of each batch of substrates is completely consistent, thereby overcoming the first-wafer substrate effect and the drift problem between batches, so that there is no need to perform batch pretreatment before cleaning each batch of substrates, and continuous cleaning can be achieved. The "continuous cleaning" described in this article means that after a substrate is etched and cleaned, it is removed from the chamber without sweeping or cleaning treatment, and the next substrate is directly transported to the chamber for etching and cleaning.
[0046] At the same flow rate, the longer the homogenization time is, the higher the saturation of the adsorbed complex on the inner wall of the chamber is. However, too long a homogenization time will extend the overall process time of the chamber and affect the cleaning efficiency of the chamber. By controlling the homogenization time within a suitable range, the adequacy of the subsequent pre-cleaning process can be ensured and the cleaning efficiency of the chamber can be improved. As an example, the homogenization time is 25s~250s.
[0047] Figure 3 The energy diagram of F-containing active particles and NH3 under different reaction states, where the ordinate represents the energy without ZPVE correction, the abscissa represents the various reaction states of F-containing active particles with F and NH3, F+NH3 represents the state where the two do not react, F···NH3 represents that F and NH3 are attracted to each other and approach each other, TS represents the intermediate product, FH···NH2 represents the complex formed by F in the process of competing for one H of NH3, and FH+NH2 represents the state where F completely seizes one H of NH3 and combines with it to form HF, while NH3 loses one H to form NH2. In the figure, the lower the energy, the more stable the state.
[0048] The present invention unexpectedly found that Figure 3 As shown, in the reaction between F and NH3, the step of forming the complex (FH···NH2) releases the most energy, proving that the complex (FH...NH2) is the most difficult to desorb and the most stable. During the process, the excess HF generated by the purge gas H2 easily complexes with the complex FH...NH2 adsorbed on the inner wall of the chamber, thereby avoiding participation in the wet etching reaction of the above formula 4 and overcoming the drift between batches. Therefore, in other embodiments, H2 can also be introduced during the homogenization process to enhance the adsorption stability of the complex.
[0049] The following is explained in conjunction with the embodiments. In the embodiments, the F-containing active particles are F radicals, which can come from a remote plasma source. The chamber used for substrate cleaning is an epitaxial pre-cleaning chamber, the chamber temperature is 20°C, and the pressure is 3torr. The process gas for etching and cleaning the substrate is NH3, F radicals and H2, wherein the flow rate of NH3 is 16sccm, the flow rate of F radicals is 8sccm, the flow rate of H2 is 3000sccm, and the introduction time is 50s. Example 1
[0050] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0051] Homogenization treatment step: NH3 and F free radicals are introduced into the epitaxial pre-cleaning chamber respectively, wherein the flow rate of NH3 is 16 sccm, the flow rate of F free radicals is 8 sccm, and the introduction time is 25 s.
[0052] In the above-mentioned treated chamber, the substrate was cleaned in a continuous cleaning manner, and the substrate cleaning results are as follows: the etching amount of the first substrate is 34.7Å (angstroms), and the etching amount trend of the 1st to 20th substrates is slowly increasing in the range of 34.7Å~35.4Å. It can be seen that the etching uniformity of the 1st to 20th substrates is 1.2%~1.5%, which meets the requirements of substrate pre-cleaning stability, significantly curbs the drift of substrate pre-cleaning results, and overcomes the first substrate effect and batch drift problems.
[0053] like Figure 4 As shown, before the homogenization step, the method further comprises: Step S10, pre-adsorption step: introducing a precursor gas for a first time so that the precursor gas is adsorbed on the surface of the inner wall of the chamber, wherein the precursor gas contains NH3 and / or F-containing active particles.
[0054] The first time is 30s to 120s. The homogenization time is 50s to 80s.
[0055] The purpose of the pre-adsorption step is to first introduce a precursor gas into the chamber so that the inner wall of the chamber fully adsorbs the precursor gas, forming a reaction site on the inner wall of the chamber, and then performing a homogenization treatment. When the first pretreatment gas and the second pretreatment gas are introduced, an ammonium fluoride product can be directly formed on the inner wall of the chamber. The ammonium fluoride product formed in this way is adsorbed more tightly, and the chamber can adsorb more ammonium fluoride products, so that the gas adsorption saturation on the surface of the chamber is higher and the stability of the chamber is better. When the substrate etching and cleaning process is subsequently performed, the process gas is not easily adsorbed to the inner wall of the chamber, thereby ensuring that under the same process formula, the processing environment of different batches of substrates is the same, the consistency of the processed substrates is good, and there is no first-chip substrate effect and drift between batches. Example 2
[0056] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0057] Pre-adsorption step: firstly, F radicals are introduced into the epitaxial pre-cleaning chamber at a flow rate of 8 sccm for a time of 30 s.
[0058] Homogenization treatment step: NH3 and F free radicals are introduced into the epitaxial pre-cleaning chamber respectively at the same time, wherein the flow rate of NH3 is 16 sccm, the flow rate of F free radicals is 8 sccm, and the introduction time is 50 s.
[0059] In the above-mentioned treated chamber, the substrate was cleaned in a continuous cleaning manner, and the substrate cleaning results are as follows: the etching amount of the first substrate was 34.8Å (angstroms), and the etching amount trend of the 1st to 20th substrates slowly increased within the range of 34.8Å~35.3Å, and the etching uniformity of the 1st to 20th substrates was 1.2%~1.4%, which met the stability requirements of substrate pre-cleaning, significantly curbed the drift of substrate pre-cleaning results, and overcame the first substrate effect and batch drift problems. Example 3
[0060] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0061] Pre-adsorption step: first, NH3 is introduced into the epitaxial pre-cleaning chamber at a flow rate of 16 sccm for a time of 120 s.
[0062] Homogenization treatment step: NH3 and F free radicals are introduced into the epitaxial pre-cleaning chamber respectively at the same time, wherein the flow rate of NH3 is 16 sccm, the flow rate of F free radicals is 8 sccm, and the introduction time is 50 s.
[0063] In the above-mentioned treated chamber, the substrate was cleaned in a continuous cleaning manner, and the substrate cleaning results are as follows: the etching amount of the first substrate was 34.8Å (angstroms), and the etching amount trend of the 1st to 20th substrates slowly increased within the range of 34.8Å~35.3Å, and the etching uniformity of the 1st to 20th substrates was 1.2%~1.4%, which met the stability requirements of substrate pre-cleaning, significantly curbed the drift of substrate pre-cleaning results, and overcame the first substrate effect and batch drift problems.
[0064] In some embodiments, the pre-adsorption step includes: introducing NH3 for a second time so that the NH3 is adsorbed on the surface of the inner wall of the chamber, and then introducing F-containing active particles for a third time, and the second time is ≥ the third time. The present invention first introduces NH3 for a sufficiently long time, and then inputs F-containing active particles. The duration of injecting F-containing active particles is the same as the etching process, so that the chamber wall can adsorb a sufficient amount of the complex. Optionally, the second time is ≥ 40s, and the homogenization treatment time is 50s~80s. Optionally, the second time is 60s~120s. Optionally, the third time is the same as the etching process time. Optionally, the third time is 20s~50s. Example 4
[0065] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0066] Pre-adsorption step: firstly, NH3 is introduced into the epitaxial pre-cleaning chamber at a flow rate of 16 sccm for a time of 120 s; then, F free radicals are introduced into the epitaxial pre-cleaning chamber for a time of 30 s.
[0067] Homogenization treatment step: NH3 and F free radicals are introduced into the epitaxial pre-cleaning chamber respectively at the same time, wherein the flow rate of NH3 is 16 sccm, the flow rate of F free radicals is 8 sccm, and the introduction time is 50 s.
[0068] In the above-mentioned treated chamber, the substrate was cleaned in a continuous cleaning manner, and the substrate cleaning results were as follows: the etching amount of the first substrate was 35Å (angstroms), and the etching amount trend of the 1st to 20th substrates slowly increased in the range of 35Å~35.3Å, and the etching uniformity of the 1st to 20th substrates was 1.1%~1.2%, which met the stability requirements of substrate pre-cleaning, significantly curbed the drift of substrate pre-cleaning results, and overcame the first substrate effect and batch drift problems.
[0069] In some embodiments, the pre-adsorption step comprises: introducing F-containing active particles for a fourth time so that the F-containing active particles are adsorbed on the surface of the inner wall of the chamber, and then introducing NH3 for a fifth time, wherein the fourth time is ≤ the fifth time. Since the adsorption rate of F atoms is relatively high, introducing F-containing active particles first can promote a sufficient number of compounds to be adsorbed on the surface more quickly; or, within a certain period of time, it can cause the compounds to be more saturatedly attached to the surface. Optionally, the fourth time is ≥30s, and the homogenization treatment time is 50s~80s. Optionally, the fifth time is 60s~120s. Example 5
[0070] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0071] Pre-adsorption step: firstly, introduce F radicals into the epitaxial pre-cleaning chamber for 30 seconds; then introduce NH3 into the epitaxial pre-cleaning chamber at a flow rate of 16 sccm for 120 seconds.
[0072] Homogenization treatment step: NH3 and F free radicals are introduced into the epitaxial pre-cleaning chamber respectively at the same time, wherein the flow rate of NH3 is 16 sccm, the flow rate of F free radicals is 8 sccm, and the introduction time is 50 s.
[0073] In the above-mentioned treated chamber, the substrate was cleaned in a continuous cleaning manner, and the substrate cleaning results were as follows: the etching amount of the first substrate was 35Å (angstroms), and the etching amount trend of the 1st to 20th substrates slowly increased in the range of 35Å~35.3Å, and the etching uniformity of the 1st to 20th substrates was 1.1%~1.3%, which met the stability requirements of substrate pre-cleaning, significantly curbed the drift of substrate pre-cleaning results, and overcame the first substrate effect and batch drift problems.
[0074] In some embodiments, H2 is also introduced during the homogenization step. Optionally, the flow rate of H2 is in the range of 2000sccm-6000sccm.
[0075] Embodiment 6-10 Different from Examples 1-5, in the homogenization step, H2 is also introduced into the epitaxial pre-cleaning chamber at a flow rate of 3000 sccm.
[0076] The substrate cleaning results show that when the epitaxial pre-cleaning chamber processed in Examples 6-10 is used to continuously clean substrates, it can perform substrate cleaning equivalent to or with slightly better consistency than the corresponding Examples 1-5. Embodiment 11
[0077] An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0078] The substrate was cleaned in a discontinuous manner: before each substrate cleaning process, a pre-lot step was added, that is, a process gas was introduced into the chamber for a certain period of time before a new substrate entered the chamber. The process gas had a flow rate of 16 sccm for NH3 and a flow rate of 8 sccm for F radicals, and the introduction time was 30 s.
[0079] The substrate cleaning results are as follows: the etching amount of the first substrate is 35Å (angstroms), the etching amount trend of the 1st to 20th substrates is slowly increasing in the range of 35Å~35.3Å, and the etching uniformity of the 1st to 20th substrates is 1.2%~1.3%, which meets the stability requirements of substrate pre-cleaning, significantly curbs the drift of substrate pre-cleaning results, and overcomes the first substrate effect and batch drift problems.
[0080] Comparative Example 1 An epitaxial pre-cleaning chamber is provided for substrate cleaning.
[0081] Directly clean the substrate: Use a continuous cleaning method to clean the substrate.
[0082] In the above-mentioned treated chamber, the substrate was cleaned by continuous cleaning, and the substrate cleaning results were as follows: the etching amount of the first substrate was 34.7Å (angstroms), and the etching amount trend of the 1st to 20th substrates fluctuated greatly in the range of 34.7Å~37.6Å, with obvious first-substrate effect and batch drift problems. The etching uniformity of the 1st to 20th substrates was 1.1%~1.5%, which did not meet the stability requirements of substrate pre-cleaning.
[0083] In summary, the pretreatment method for the epitaxial pre-cleaning chamber provided by the present invention performs a homogenization treatment on the chamber before substrate cleaning, so that the adsorption of the process gas by the chamber is in a dynamic equilibrium state. In the etching and cleaning process, the chamber can maintain chemical stability for a long time, will not affect the concentration or distribution of the process gas, and can achieve continuous cleaning of multiple batches of substrates with good consistency. Furthermore, the present invention also sets a pre-adsorption step before the homogenization treatment, which can achieve the chemical stability of the chamber more quickly, or, under the same processing time, the adsorption amount of the chamber is larger, which can achieve longer substrate etching and cleaning, process more substrates, and have good substrate consistency.
[0084] Although the content of the present invention has been described in detail through the above preferred embodiments, it should be appreciated that the above description should not be considered as a limitation of the present invention. After reading the above content, it will be apparent to those skilled in the art that various modifications and substitutions of the present invention will occur. Therefore, the protection scope of the present invention should be limited by the appended claims.
Claims
1. A pretreatment method for an epitaxial pre-cleaning chamber, characterized in that: Include: Providing an epitaxial pre-cleaning chamber; Homogenization treatment: introducing a first pretreatment gas and a second pretreatment gas into the chamber respectively, so that a complex formed by the reaction of the first pretreatment gas and the second pretreatment gas is adsorbed on the surface of the inner wall of the chamber to provide a stable chemical environment; The first pretreatment gas contains NH3, and the second pretreatment gas contains: F-containing active particles; the F-containing active particles are dissociated in a plasma source before entering the chamber.
2. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 1, characterized in that: The homogenization treatment time is 25s-250s, the flow rate of the first pretreatment gas is 10sccm-20sccm, and the flow rate of the second pretreatment gas is 5sccm-10sccm.
3. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 1, characterized in that: Before the homogenization step, a pre-adsorption step is also included: a precursor gas is introduced for a first time so that the precursor gas is adsorbed on the surface of the inner wall of the chamber, and the precursor gas contains NH3 and / or F-containing active particles.
4. The pretreatment method for epitaxial pre-cleaning chamber according to claim 3, characterized in that: The first time is 30s~120s, and the homogenization treatment time is 50s~80s.
5. The pretreatment method for epitaxial pre-cleaning chamber according to claim 3, characterized in that: The pre-adsorption step comprises: introducing NH3 for a second time so that the NH3 is adsorbed on the inner wall surface of the chamber, and then introducing F-containing active particles for a third time, wherein the second time is ≥ the third time.
6. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 5, characterized in that: The second time is ≥40s, and the homogenization treatment time is 50s~80s.
7. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 6, characterized in that: The second time is 60s~120s.
8. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 5, characterized in that: The third time is the same as the etching process time.
9. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 8, characterized in that: The third time is 20s~50s.
10. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 3, characterized in that: The pre-adsorption step comprises: introducing F-containing active particles for a fourth time so that the F-containing active particles are adsorbed on the inner wall surface of the chamber, and then introducing NH3 for a fifth time, wherein the fourth time is ≤ the fifth time.
11. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 10, characterized in that: The fourth time is ≥30s, and the homogenization treatment time is 50s~80s.
12. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 11, characterized in that: The fifth time is 60s~120s.
13. The pretreatment method for an epitaxial pre-cleaning chamber according to any one of claims 1 to 12, characterized in that: During the homogenization step, H2 is also introduced.
14. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 13, characterized in that: The flow rate of H2 is in the range of 2000sccm-6000sccm.
15. The pretreatment method for an epitaxial pre-cleaning chamber according to claim 13, characterized in that: The temperature in the chamber is 20° C. to 60° C., and the pressure in the chamber is 2 torr to 10 torr.
Citation Information
Patent Citations
Method for pre-conditioning and stabilizing an etching chamber and method for cleaning an etching chamber
CN101685771A
Semiconductor device recovery method
CN111261555A
Method and apparatus for low temperature selective epitaxy within deep trenches
CN117558649A
Etching method of substrate and semiconductor device thereof
CN117810077A
Method of selective etching of dielectric materials
US20240035196A1
Cited By
Chemical vapor etching method
CN122662598A
Chemical vapor etching method
CN122662598B
