Pile sinking equipment for concrete precast pile construction and construction method thereof
The pile sinking device with an auxiliary mechanism and hydraulic systems stabilizes the delivery and sinking of precast concrete piles, addressing inefficiencies in existing equipment by ensuring precise positioning and stable operation, enhancing construction efficiency.
Patent Information
- Application Number
- CN202410755517.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-06-12
- Publication Date
- 2024-12-03
AI Technical Summary
Existing pile driving equipment for precast concrete piles is inefficient due to the inability to quickly and stably deliver precast concrete piles to the equipment, especially in windy conditions, leading to reduced construction efficiency and equipment use.
A pile sinking device with an auxiliary mechanism and pile sinking mechanism, featuring a rectangular plate, trapezoidal blocks, electric push rods, and hydraulic systems, allows for precise positioning and stable delivery of precast concrete piles using a mobile vehicle and hydraulic rods to clamp and fix the piles during sinking.
The device enables quick and stable delivery of precast concrete piles, improving construction efficiency and equipment use by ensuring the piles are not affected by wind, and can be sunk into the foundation with minimal disturbance.
Smart Images

Figure CN119061891A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a concrete precast pile construction pile sinking device and a construction method thereof. Background Art
[0002] Precast concrete piles are prefabricated concrete piles in factories or construction sites. Common precast concrete piles include round piles, square piles and pipe piles. They are usually cast into piles of specific shapes and sizes through molds and then installed on site. Precast concrete piles can provide a solid foundation for buildings, reduce foundation settlement, and improve foundation bearing capacity. The installation of precast concrete piles requires the use of pile sinking equipment.
[0003] In actual use, the existing pile driving equipment for precast concrete pile construction can sink the precast concrete pile vertically into the foundation, but it does not have the function of assisting the precast concrete pile to be quickly delivered to the interior of the pile driving equipment. When the precast concrete pile is fed to the interior of the pile driving equipment by a crane and encounters strong winds, the hoisted precast concrete pile may shake, that is, the shaking precast concrete pile cannot be quickly delivered to the interior of the pile driving equipment, thereby reducing the efficiency of the construction, reducing both the use effect of the pile driving equipment and the use efficiency of the pile driving equipment.
[0004] Therefore, it is necessary to propose a new concrete precast pile construction pile sinking equipment and a construction method thereof, so as to solve the above-mentioned problems. Summary of the invention
[0005] The object of the present invention is to provide a pile driving device for precast concrete pile construction and a construction method thereof, so as to solve the problem that the existing pile driving device for precast concrete pile construction proposed in the above-mentioned background technology does not have the function of assisting the precast concrete piles to be quickly delivered to the interior of the pile driving device. When the precast concrete piles are fed to the interior of the pile driving device by a crane and encounter strong winds, the precast concrete piles lifted at this time will shake, that is, the shaking precast concrete piles will not be able to be quickly delivered to the interior of the pile driving device, thereby reducing the efficiency of the construction, which not only reduces the use effect of the pile driving device, but also reduces the use efficiency of the pile driving device.
[0006] To achieve the above object, the present invention provides the following technical solutions: A pile sinking device for precast concrete pile construction, comprising a pile sinking mechanism, wherein an auxiliary mechanism is provided on the pile sinking mechanism;
[0007] The auxiliary mechanism includes a rectangular plate, two symmetrical trapezoidal blocks are fixed on the top of the rectangular plate, two electric push rods are installed on opposite sides of the two trapezoidal blocks, the four electric push rods are divided into two groups, a U-shaped block is installed between the telescopic ends of the electric push rods in each group, and a semicircular block is fixed on opposite sides of the two U-shaped blocks. Two symmetrical sliding grooves are provided on the top of the rectangular plate, and two sliding blocks are slidably connected inside each of the sliding grooves. Three groups of first hollow blocks are fixed on the inner walls of the two semicircular blocks, and the number of first hollow blocks in each group is two. Auxiliary wheels are rotatably connected between the insides of each group of the first hollow blocks through first bearings, and six second hollow blocks are fixed on the inner wall of each semicircular block, wherein the insides of the six second hollow blocks are rotatably connected to mother blocks through second bearings, and the insides of the other six second hollow blocks are rotatably connected to sub-blocks through third bearings. A cylindrical hole is provided on the top of the rectangular plate.
[0008] Preferably, opposite sides of the two semicircular blocks are in contact with each other, the four sliders are divided into two groups, opposite sides of the two groups of sliders are in contact with each other, and the top of each group of sliders is fixed to the bottom of each semicircular block.
[0009] Preferably, each of the sub-card blocks is respectively matched with each of the mother card blocks, the bottoms of the two U-shaped blocks are in contact with the top of the rectangular plate, and the bottoms of the two semicircular blocks are in contact with the top of the rectangular plate.
[0010] Preferably, the pile driving mechanism includes a moving vehicle, and two rectangular grooves are provided on the front surface and the rear surface of the moving vehicle, and a first hydraulic rod is installed inside each of the rectangular grooves. The four first hydraulic rods are divided into two groups, and a support plate is installed between the telescopic ends of each group of the first hydraulic rods.
[0011] Preferably, two symmetrical placement racks are fixed on the upper side of the mobile vehicle, a concave block is fixed on the upper side of the mobile vehicle near the edge, two U-shaped racks are installed inside the concave block, a baffle is installed on one side of the concave block, three oil tanks are placed inside the concave block, and the surfaces of the three oil tanks are in contact with the surface of the baffle.
[0012] Preferably, the three oil tanks and the two U-shaped frames are arranged in an alternating manner, three oil pumps are installed on the top of the concave block, the output end of each oil pump is installed with an oil outlet pipe, the input end of each oil pump is installed with an oil inlet pipe, the input end of each oil inlet pipe is respectively connected to the output end of each oil tank, and the input end of each oil tank is installed with an oil return pipe.
[0013] Preferably, a first reversing valve is installed on the top of the concave block, a first port of the first reversing valve is connected to the output end of one of the oil outlet pipes, and a first port of the first reversing valve is connected to the input end of one of the oil return pipes, and two symmetrical support frames are fixed on the top of the mobile vehicle, the bottom of the rectangular plate and the tops of the two support frames are installed by screws, and an arc hole is opened on the inner wall of each of the support frames.
[0014] Preferably, a second hydraulic rod is installed on the top of the inner wall of each support frame, a stabilizing frame is fixedly sleeved on the outer surface of each second hydraulic rod, each stabilizing frame is installed inside each support frame by bolts, a third hydraulic rod is installed on one end of the telescopic end of each second hydraulic rod, and a clamp is installed on one end of the telescopic ends of the two third hydraulic rods.
[0015] Preferably, the inner wall of each clamp is bonded with an anti-slip pad, and two second reversing valves are installed on the top of the concave block, and the first ports of the two second reversing valves are respectively connected to the output ends of the other two oil outlet pipes, and the second ports of the two second reversing valves are respectively connected to the input ends of the other two oil return pipes.
[0016] A construction method for a concrete precast pile construction pile sinking device comprises the following steps:
[0017] S1. When the precast concrete pile needs to be sunk into the foundation, the bottom of the mobile vehicle is lifted off the ground by using the cooperation of the controller inside the mobile vehicle, one of the oil pumps, the corresponding oil inlet pipe, the corresponding oil outlet pipe, the prepared oil pipe, the corresponding oil tank and the first reversing valve. Then, the precast concrete pile is moved to the top of the cylindrical hole by using a crane. Then, the precast concrete pile is moved down until the other end of the precast concrete pile moves between the insides of the two semicircular blocks. Then, the precast concrete pile is positioned by using the cooperation of the controller inside the mobile vehicle, the electric push rod, the trapezoidal block, the U-shaped block, the semicircular block, the first hollow block, the second hollow block, the auxiliary wheel, the sub-block and the mother block.
[0018] S2, then use the cooperation of the auxiliary mechanism to directly move the precast concrete pile downward stably and vertically. When the middle section of the precast concrete pile reaches between the insides of the two anti-slip pads, stop moving the precast concrete pile downward, and then directly use the cooperation of the controller inside the mobile vehicle, the corresponding oil pump, the corresponding oil inlet pipe, the corresponding oil outlet pipe, the prepared oil pipe, the corresponding oil tank, the third hydraulic rod and the corresponding second reversing valve to clamp and fix the precast concrete pile, and then remove the crane and the lifting rope at one end of the precast concrete pile;
[0019] S3, then use the controller inside the mobile vehicle, the corresponding oil pump, the corresponding oil inlet pipe, the corresponding oil outlet pipe, the prepared oil pipe, the corresponding oil tank, the second hydraulic rod and the corresponding second reversing valve to sink the fixed precast concrete pile into the foundation.
[0020] Compared with the prior art, the present invention has the following beneficial effects:
[0021] 1. By setting up the auxiliary mechanism, the precast concrete piles can be quickly and stably delivered to the interior of the pile driving equipment, which not only improves the efficiency of construction, but also improves the use efficiency of the pile driving equipment. When the precast concrete piles need to be quickly delivered to the interior of the pile driving equipment, the controller, electric push rod, trapezoidal block, slide groove, U-shaped block and slider inside the mobile vehicle are first used to move all the first hollow blocks and all the second hollow blocks at the same time. At the same time, the cooperation of all the first hollow blocks and all the second hollow blocks can be used to quickly position the lower end of the precast concrete pile moved between the two semicircular blocks. Then, the cooperation of the auxiliary wheels, the sub-block and the mother block can be used to realize the stable downward movement of the precast concrete piles, which will not be affected by the strong wind in the environment.
[0022] 2. By setting up a pile sinking mechanism, the precast concrete pile can be sunk to a stable state in the foundation. At this time, the bottom of the mobile vehicle can be lifted off the ground by using the cooperation of the controller, oil pump, first reversing valve, oil inlet pipe, oil outlet pipe, first hydraulic rod, oil tank and support plate inside the mobile vehicle. When the precast concrete pile moves the middle section of the concrete between the insides of the two anti-skid pads through the cooperation of the auxiliary mechanism and the crane, the precast concrete pile that needs to be sunk can be clamped and fixed by using the cooperation of the controller, oil pump, second reversing valve, oil inlet pipe, oil outlet pipe, prepared oil pipe, anti-skid pad, oil tank and third hydraulic rod inside the mobile vehicle.
[0023] 3. By reusing the controller, oil pump, second reversing valve, oil inlet pipe, oil outlet pipe, prepared oil pipe, oil tank and second hydraulic rod inside the mobile vehicle, the clamped precast concrete piles can be sunk into the foundation. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 A three-dimensional diagram of a pile sinking device for concrete precast pile construction according to the present invention;
[0025] Figure 2 A three-dimensional diagram of an auxiliary mechanism of a pile sinking device for concrete precast pile construction according to the present invention;
[0026] Figure 3 A three-dimensional diagram of a mother clamping block of a pile driving device for precast concrete pile construction according to the present invention;
[0027] Figure 4 A three-dimensional diagram of a sub-block of a pile sinking device for precast concrete pile construction according to the present invention;
[0028] Figure 5 It is a three-dimensional structural schematic diagram of a concave block and a U-shaped frame of a pile sinking device for concrete precast pile construction according to the present invention;
[0029] Figure 6 A three-dimensional diagram of a mobile vehicle for pile sinking equipment for concrete precast pile construction according to the present invention;
[0030] Figure 7 A three-dimensional diagram of a pile sinking mechanism of a pile sinking device for concrete precast pile construction according to the present invention;
[0031] Figure 8 It is a three-dimensional structural schematic diagram of a first hydraulic rod and a support plate of a pile driving device for precast concrete pile construction according to the present invention;
[0032] Fig. 9 It is a partially cutaway stereoscopic view of a pile driving device for concrete precast pile construction according to the present invention;
[0033] Fig.10 The present invention is a cross-sectional perspective view of an oil tank of a pile driving device for concrete precast pile construction.
[0034] In the figure:
[0035] 1. Pile sinking mechanism; 101. Mobile vehicle; 102. Rectangular groove; 103. First hydraulic rod; 104. Support plate; 105. Placement rack; 106. Concave block; 107. U-shaped rack; 108. Baffle; 109. Oil tank; 110. Oil pump; 111. Oil outlet pipe; 112. Oil inlet pipe; 113. Oil return pipe; 114. First reversing valve; 115. Support rack; 116. Arc hole; 117. Second hydraulic rod; 118. Stabilizer Fixed frame; 119, third hydraulic rod; 120, clamp; 121, anti-skid pad; 122, second reversing valve; 2, auxiliary mechanism; 201, rectangular plate; 202, trapezoidal block; 203, electric push rod; 204, U-shaped block; 205, semicircular block; 206, slide groove; 207, slider; 208, first hollow block; 209, auxiliary wheel; 210, mother block; 211, daughter block; 212, cylindrical hole; 213, second hollow block. DETAILED DESCRIPTION
[0036] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the implementation regulations described are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0037] Reference Figure 1-Figure 10 As shown: a concrete precast pile construction pile driving device, comprising a pile driving mechanism 1, on which an auxiliary mechanism 2 is arranged;
[0038] The auxiliary mechanism 2 includes a rectangular plate 201, two symmetrical trapezoidal blocks 202 are fixed on the top of the rectangular plate 201, two electric push rods 203 are installed on the opposite sides of the two trapezoidal blocks 202, and the four electric push rods 203 are divided into two groups. A U-shaped block 204 is installed between the telescopic ends of each group of electric push rods 203, and a semicircular block 205 is fixed on the opposite sides of the two U-shaped blocks 204. Two symmetrical slide grooves 206 are opened on the top of the rectangular plate 201, and two sliders 207 are slidably connected to the inside of each slide groove 206. The two semicircular blocks Three groups of first hollow blocks 208 are fixed to the inner wall of 205, and the number of first hollow blocks 208 in each group is two, and the inside of each group of first hollow blocks 208 is rotatably connected with auxiliary wheels 209 through the first bearing, and six second hollow blocks 213 are fixed to the inner wall of each semicircular block 205, among which the inside of the six second hollow blocks 213 is rotatably connected with mother blocks 210 through the second bearing, and the inside of the other six second hollow blocks 213 is rotatably connected with sub-blocks 211 through the third bearing, and a cylindrical hole 212 is opened on the top of the rectangular plate 201.
[0039] according to Figure 1 and Figure 2 As shown, the opposite sides of the two semicircular blocks 205 are in contact with each other, and the four sliders 207 are divided into two groups. The opposite sides of the two groups of sliders 207 are in contact with each other, and the top of each group of sliders 207 is fixed to the bottom of each semicircular block 205, so that all the auxiliary wheels 209, all the sub-blocks 211 and all the mother blocks 210 can be driven to move simultaneously with the cooperation of the semicircular blocks 205, the first hollow block 208 and the second hollow block 213.
[0040] according to Figure 1-Figure 4 As shown, each sub-block 211 is respectively matched with each mother block 210, the bottoms of the two U-shaped blocks 204 are in contact with the top of the rectangular plate 201, and the bottoms of the two semicircular blocks 205 are in contact with the top of the rectangular plate 201. With the cooperation of the rectangular plate 201 and screws, the auxiliary mechanism 2 can be installed on the pile driving mechanism 1.
[0041] according to Figure 1 , Figure 6 and Figure 8As shown, the pile driving mechanism 1 includes a mobile vehicle 101. Two rectangular grooves 102 are provided on the front surface and the rear surface of the mobile vehicle 101. A first hydraulic rod 103 is installed inside each rectangular groove 102. The four first hydraulic rods 103 are divided into two groups. A support plate 104 is installed between one end of the telescopic end of each group of first hydraulic rods 103, so that the bottom of the mobile vehicle 101 can be lifted off the ground with the cooperation of the support plate 104 and the first hydraulic rods 103.
[0042] according to Figure 1 , Figure 5-Figure 7 and Fig.10 As shown, two symmetrical placement racks 105 are fixed on the upper side of the mobile vehicle 101, a concave block 106 is fixed on the upper side of the mobile vehicle 101 near the edge, two U-shaped racks 107 are installed inside the concave block 106, a baffle 108 is installed on one side of the concave block 106, three oil tanks 109 are placed inside the concave block 106, and the surfaces of the three oil tanks 109 are in contact with the surface of the baffle 108. Under the action of the baffle 108, the oil tanks 109 can be prevented from moving out of the concave block 106.
[0043] according to Figure 1 , Figure 5 , Figure 7 and Fig.10 As shown, three oil tanks 109 and two U-shaped frames 107 are arranged in a staggered manner, and three oil pumps 110 are installed on the top of the concave block 106. The output end of each oil pump 110 is installed with an oil outlet pipe 111, and the input end of each oil pump 110 is installed with an oil inlet pipe 112. The input end of each oil inlet pipe 112 is respectively connected to the output end of each oil tank 109, and the input end of each oil tank 109 is installed with an oil return pipe 113. Under the action of the oil return pipe 113, the hydraulic oil output from the inside of the oil tank 109 can be transported back to the inside of the oil tank 109.
[0044] according to Figure 1 , Figure 5-Figure 7 and Fig. 9 As shown, a first reversing valve 114 is installed on the top of the concave block 106, and a first port of the first reversing valve 114 is connected to the output end of one of the oil outlet pipes 111, and a first port of the first reversing valve 114 is connected to the input end of one of the oil return pipes 113. Two symmetrical support frames 115 are fixed on the top of the mobile vehicle 101, and the bottom of the rectangular plate 201 and the tops of the two support frames 115 are installed by screws. An arc hole 116 is opened on the inner wall of each support frame 115, so that under the action of the arc hole 116, the oil port on the second hydraulic rod 117 and the oil port on the third hydraulic rod 119 can be conveniently connected to the corresponding port of the second reversing valve 122 through the corresponding prepared oil pipes.
[0045] according to Figure 1 and Fig. 9 As shown, a second hydraulic rod 117 is installed on the top of the inner wall of each support frame 115, and a stabilizing frame 118 is fixedly sleeved on the outer surface of each second hydraulic rod 117. Each stabilizing frame 118 is respectively installed inside each support frame 115 by bolts, and a third hydraulic rod 119 is installed on one end of the telescopic end of each second hydraulic rod 117, and a clamp 120 is installed on one end of the telescopic end of the two third hydraulic rods 119. With the cooperation of the clamp 120, the third hydraulic rod 119 and the anti-slip pad 121, the concrete precast pile that needs to be sunk can be clamped and fixed.
[0046] according to Figure 1 , Figure 5 , Figure 7 and Fig. 9 As shown, the inner wall of each clamp 120 is bonded with an anti-slip pad 121, and two second reversing valves 122 are installed on the top of the concave block 106. The first ports of the two second reversing valves 122 are respectively connected to the output ends of the other two oil outlet pipes 111, and the second ports of the two second reversing valves 122 are respectively connected to the input ends of the other two return oil pipes 113, so that the hydraulic oil delivered from the first reversing valve 114 and the second reversing valve 122 can be transported back to the corresponding oil tank 109 under the action of the return oil pipe 113.
[0047] In the present invention, when it is necessary to sink the precast concrete pile into the foundation, the first reversing valve 114 is first connected to the oil ports of the corresponding four first hydraulic rods 103 through the prepared oil pipe, and then one of the second reversing valves 122 is also connected to the oil ports of the corresponding two second hydraulic rods 117 through the prepared oil pipe, and then the other second reversing valve 122 is also connected to the oil ports of the corresponding two third hydraulic rods 119 through the prepared oil pipe. When everything is ready, the mobile vehicle 101 is directly used to move the entire pile sinking equipment to the position where the pile is required to be sunk, and then the controller inside the mobile vehicle 101 is used to control one of the oil pumps 110 to start and open the first reversing valve 114, and then the oil circuit direction of the first reversing valve 114 is set ( The telescopic end of the first hydraulic rod 103 can be extended), and the oil pump 110 started at this time will start the four first hydraulic rods 103 at the same time with the cooperation of the oil inlet pipe 112, the oil outlet pipe 111, the prepared oil pipe, the corresponding oil tank 109 and the first reversing valve 114 connected thereto. At this time, each group of first hydraulic rods 103 started will drive the support plate 104 connected thereto to move vertically downward. When the two downwardly moving support plates 104 lift the bottom of the mobile vehicle 101 off the ground together, the internal controller of the mobile vehicle 101 is directly used to pause the oil pump 110 and close the first reversing valve 114, and then use the crane to put appropriate counterweights into the two placement racks 105 respectively, and then use the crane to lift one end of the concrete precast pile that needs to be sunk The precast concrete pile is lifted and moved to the top of the entire pile driving equipment, and then the position of the lifted precast concrete pile is fine-tuned by the crane until the other end of the precast concrete pile is above the cylindrical hole 212, and then the precast concrete pile is controlled to move downward by the crane. When the other end of the precast concrete pile moves down to between the insides of the two semicircular blocks 205, the movement of the precast concrete pile is paused, and then the controller inside the mobile vehicle 101 is used to simultaneously start the four electric push rods 203. At this time, each set of the started electric push rods 203 will drive the U-shaped block 204 connected thereto to move horizontally with the cooperation of the trapezoidal block 202 connected thereto, and the two U-shaped blocks 204 that move horizontally will directly drive the corresponding slide groove 206 and slider 207 to cooperate with each other. The semicircular block 205 connected thereto is moved horizontally, and the two moving semicircular blocks 205 will drive the corresponding auxiliary wheels 209 and the sub-blocks 211 or the mother blocks 210 to move through the cooperation of the first hollow block 208 and the second hollow block 213 connected thereto. When the surfaces of all the auxiliary wheels 209, all the sub-blocks 211 and all the mother blocks 210 are in contact with the surfaces of the precast concrete piles and cannot move, the bottom center of the other end of the precast concrete pile is just on the same vertical line with the center of the cylindrical hole 212. At this time, the controller inside the mobile vehicle 101 is used to pause all the electric push rods 203 at the same time, and the crane is used to drive the precast concrete piles to move downward. At this time, under the action of the auxiliary mechanism 2,This can ensure that the concrete precast pile can be moved down stably. At this time, the other end of the concrete precast pile that is moved down will pass through the inside of the two anti-slip pads 121 and the top through hole of the mobile vehicle 101 in sequence. When the middle section of the concrete precast pile reaches the inside of the two anti-slip pads 121, the crane is stopped to move the concrete precast pile down. At this time, the bottom of the other end of the concrete precast pile is just about to touch the ground where the pile driving equipment is located. Then, the controller inside the mobile vehicle 101 is used to start another oil pump 110 and open the corresponding second reversing valve 122. Then, the oil circuit direction of the second reversing valve 122 is set (to allow the telescopic end of the third hydraulic rod 119 to extend). At this time, the started oil pump 110 will be connected to the oil inlet pipe 112, the oil outlet pipe 111, the prepared oil pipe, the corresponding oil tank 109 and the second reversing valve 122, the two third hydraulic rods 119 are started at the same time. At this time, the two started third hydraulic rods 119 will directly drive the connected clamps 120 to move, and the two moving clamps 120 will also drive the connected anti-skid pads 121 to move. When the two clamps 120 move to a point where they cannot move, the controller inside the mobile vehicle 101 will directly close the other oil pump 110 and the corresponding second reversing valve 122. At this time, the hoisting rope at one end of the crane and the precast concrete pile is directly removed, thus completing the rapid loading operation of the precast concrete pile on the pile sinking equipment. Even if a strong wind is encountered during the loading process, the pile will not shake, thus improving the efficiency of the construction. When the precast concrete pile needs to be sunk into the foundation, the controller inside the mobile vehicle 101 is directly used to control the middle oil pump 110 (such as, Figure 1As shown in the figure, the corresponding second reversing valve 122 is started and opened. At this time, the started oil pump 110 will start the two second hydraulic rods 117 at the same time with the cooperation of the connected oil inlet pipe 112, the oil outlet pipe 111, the prepared oil pipe, the corresponding oil tank 109 and the second reversing valve 122. When the two second hydraulic rods 117 are started at the same time, the two started second hydraulic rods 117 will directly drive the fixed precast concrete piles to move downward stably with the cooperation of the auxiliary mechanism 2. When the fixed precast concrete piles move to a point where they cannot move, the controller inside the mobile vehicle 101 will again control the oil pump 110 of the third hydraulic rod 119 and the second reversing valve 122 (at this time, the oil circuit direction of the second reversing valve 122 needs to be adjusted to allow the telescopic end of the third hydraulic rod 119 to contract) to make the two clamps 12 0 are all reset to the initial position, and then the controller inside the mobile vehicle 101 will again control the oil pump 110 and the second reversing valve 122 of the second hydraulic rod 117 (at this time, the oil circuit direction of the second reversing valve 122 needs to be adjusted to allow the telescopic end of the second hydraulic rod 117 to contract) to allow the two third hydraulic rods 119 to reset to the initial position. When the two clamps 120 and the two third hydraulic rods 119 are all reset to the initial position, the third hydraulic rod 119, the clamp 120 and the anti-slip pad 121 are used again to fix the precast concrete piles, and then the second hydraulic rod 117 and the auxiliary mechanism 2 are used to sink the fixed concrete again, and this process is repeated until the precast concrete piles sink to a suitable position. When the precast concrete piles sink to a suitable position, the components on the pile driving equipment are directly reset to the initial position.
[0048] Among them, the first bearing, the second bearing and the third bearing are the most commonly used parts in reality;
[0049] The two semicircular blocks 205 can form a hollow column, and the center of the hollow column and the center of the cylindrical hole 212 are on the same vertical line;
[0050] Each sub-block 211 can be matched with the corresponding mother block 210 to form a wheel with the same effect as the auxiliary wheel 209 when used;
[0051] like Figure 1 As shown, from left to right, the output end of each oil tank 109 is the right port, and the oil inlet of each right port is connected to an L-shaped tube, and the oil inlet position of each L-shaped tube is close to the bottom position of the inner wall of each oil tank 109, and the input end of each oil tank 109 is the left port;
[0052] The first port of the first reversing valve 114 is close to the direction of the corresponding oil pump 110, and the second port of the first reversing valve 114 is also close to the direction of the corresponding oil pump 110. The eight ports of the first reversing valve 114 away from the direction of the corresponding oil pump 110 are divided into two groups, and each group of ports is connected to the two oil ports of each first hydraulic rod 103 through an oil pipe.
[0053] The mobile vehicle 101 is a crawler type mobile vehicle 101, which is mainly used to move the pile driving equipment;
[0054] The first port of the second reversing valve 122 is close to the direction of the corresponding oil pump 110, and the second port of the first reversing valve 114 is also close to the direction of the corresponding oil pump 110. The four ports of one of the second reversing valves 122 away from the direction of the corresponding oil pump 110 are divided into two groups, and the port fluid of each group is connected to the two oil ports of each second hydraulic rod 117 through an oil pipe. The four ports of the other second reversing valve 122 away from the direction of the corresponding oil pump 110 are also divided into two groups, and the port fluid of each group is connected to the two oil ports of each third hydraulic rod 119 through an oil pipe.
[0055] The three oil pumps 110, the first reversing valve 114, the two second reversing valves 122 and the four electric push rods 203 are all electrically connected to the controller inside the control room of the mobile vehicle 101 through wires. The first reversing valve 114 and the two second reversing valves 122 are all electric.
[0056] Among them, the oil pump 110, the oil tank 109, the first reversing valve 114, the first hydraulic rod 103, the second hydraulic rod 117, the third hydraulic rod 119, the second reversing valve 122 and the electric push rod 203 are all existing technologies, and their working principles are all public technologies. Their models can be selected according to actual conditions and no excessive explanation will be given here.
[0057] Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for those skilled in the art to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. A pile sinking device for concrete precast pile construction, comprising a pile sinking mechanism (1), characterized in that: The pile sinking mechanism (1) is provided with an auxiliary mechanism (2); The auxiliary mechanism (2) comprises a rectangular plate (201), two symmetrical trapezoidal blocks (202) are fixed on the top of the rectangular plate (201), two electric push rods (203) are installed on opposite sides of the two trapezoidal blocks (202), the four electric push rods (203) are divided into two groups, a U-shaped block (204) is installed between the telescopic ends of each group of electric push rods (203), and a semicircular block (205) is fixed on opposite sides of the two U-shaped blocks (204). Two symmetrical sliding grooves (206) are opened on the top of the rectangular plate (201), and two sliders (207) are slidably connected inside each of the sliding grooves (206). Three groups of first hollow blocks (208) are fixed on the inner wall of each semicircular block (205), and the number of first hollow blocks (208) in each group is two. The interiors of each group of first hollow blocks (208) are rotatably connected to auxiliary wheels (209) via first bearings. Six second hollow blocks (213) are fixed on the inner wall of each semicircular block (205), wherein the interiors of six second hollow blocks (213) are rotatably connected to mother clamping blocks (210) via second bearings, and the interiors of another six second hollow blocks (213) are rotatably connected to sub-clamping blocks (211) via third bearings. A cylindrical hole (212) is provided on the top of the rectangular plate (201).
2. The pile sinking equipment for precast concrete pile construction according to claim 1 is characterized by: The opposite sides of the two semicircular blocks (205) are in contact with each other, and the four sliders (207) are divided into two groups. The opposite sides of the two groups of sliders (207) are in contact with each other, and the top of each group of sliders (207) is fixed to the bottom of each semicircular block (205).
3. The pile sinking equipment for precast concrete pile construction according to claim 2 is characterized in that: Each of the sub-card blocks (211) is respectively matched with each of the mother card blocks (210), the bottoms of the two U-shaped blocks (204) are in contact with the top of the rectangular plate (201), and the bottoms of the two semicircular blocks (205) are in contact with the top of the rectangular plate (201).
4. The pile sinking equipment for precast concrete pile construction according to claim 3 is characterized by: The pile driving mechanism (1) comprises a moving vehicle (101), the front surface of the moving vehicle (101) and the rear surface of the moving vehicle (101) are both provided with two rectangular grooves (102), a first hydraulic rod (103) is installed inside each of the rectangular grooves (102), four of the first hydraulic rods (103) are divided into two groups, and a support plate (104) is installed between one end of the telescopic end of each group of the first hydraulic rods (103).
5. The pile sinking equipment for precast concrete pile construction according to claim 4 is characterized in that: Two symmetrical placement racks (105) are fixed on the upper side of the mobile vehicle (101); a concave block (106) is fixed on the upper side of the mobile vehicle (101) near the edge; two U-shaped racks (107) are installed inside the concave block (106); a baffle (108) is installed on one side of the concave block (106); three oil tanks (109) are placed inside the concave block (106); and the surfaces of the three oil tanks (109) are in contact with the surface of the baffle (108).
6. The pile sinking equipment for precast concrete pile construction according to claim 5 is characterized by: The three oil tanks (109) and the two U-shaped frames (107) are arranged in a staggered manner. Three oil pumps (110) are installed on the top of the concave block (106). The output end of each oil pump (110) is installed with an oil outlet pipe (111). The input end of each oil pump (110) is installed with an oil inlet pipe (112). The input end of each oil inlet pipe (112) is respectively connected to the output end of each oil tank (109). The input end of each oil tank (109) is installed with an oil return pipe (113).
7. The pile sinking equipment for precast concrete pile construction according to claim 6 is characterized by: A first reversing valve (114) is installed on the top of the concave block (106), and a first port of the first reversing valve (114) is connected to the output end of one of the oil outlet pipes (111), and a first port of the first reversing valve (114) is connected to the input end of one of the oil return pipes (113). Two symmetrical support frames (115) are fixed on the top of the mobile vehicle (101), and the bottom of the rectangular plate (201) and the tops of the two support frames (115) are installed by screws, and an arc hole (116) is opened on the inner wall of each of the support frames (115).
8. The pile sinking equipment for precast concrete pile construction according to claim 7 is characterized by: A second hydraulic rod (117) is installed on the top of the inner wall of each support frame (115); a stabilizing frame (118) is fixedly sleeved on the outer surface of each second hydraulic rod (117); each stabilizing frame (118) is installed inside each support frame (115) by bolts; a third hydraulic rod (119) is installed on one end of the telescopic end of each second hydraulic rod (117); and a clamp (120) is installed on one end of the telescopic end of the two third hydraulic rods (119).
9. The pile sinking equipment for precast concrete pile construction according to claim 8, characterized in that: The inner wall of each clamp (120) is bonded with an anti-slip pad (121), and two second reversing valves (122) are installed on the top of the concave block (106). The first ports of the two second reversing valves (122) are respectively connected to the output ends of the other two oil outlet pipes (111), and the second ports of the two second reversing valves (122) are respectively connected to the input ends of the other two oil return pipes (113).
10. A construction method for pile sinking equipment for concrete precast pile construction, characterized in that: The concrete precast pile construction pile sinking equipment according to claim 9 is used, comprising the following steps: S1. When it is necessary to sink the precast concrete pile into the foundation, the bottom of the mobile vehicle (101) is lifted off the ground by using the cooperation of the controller inside the mobile vehicle (101), one of the oil pumps (110), the corresponding oil inlet pipe (112), the corresponding oil outlet pipe (111), the prepared oil pipe, the corresponding oil tank (109) and the first reversing valve (114). Then, the precast concrete pile is moved to the top of the cylindrical hole (212) by using a crane, and then the precast concrete pile is lowered. The precast concrete pile is moved until the other end of the precast concrete pile moves to between the insides of the two semicircular blocks (205), and then the precast concrete pile is positioned by using the cooperation of the controller, the electric push rod (203), the trapezoidal block (202), the U-shaped block (204), the semicircular block (205), the first hollow block (208), the second hollow block (213), the auxiliary wheel (209), the sub-block (211) and the main block (210) inside the moving vehicle (101); S2, then using the cooperation of the auxiliary mechanism (2) to directly move the precast concrete pile downward in a stable vertical direction, when the middle section of the precast concrete pile reaches between the insides of the two anti-skid pads (121), the precast concrete pile stops moving downward, and then directly using the cooperation of the controller inside the mobile vehicle (101), the corresponding oil pump (110), the corresponding oil inlet pipe (112), the corresponding oil outlet pipe (111), the prepared oil pipe, the corresponding oil tank (109), the third hydraulic rod (119) and the corresponding second reversing valve (122) to clamp and fix the precast concrete pile, and then remove the crane and the hoisting rope at one end of the precast concrete pile; S3, then use the controller inside the mobile vehicle (101), the corresponding oil pump (110), the corresponding oil inlet pipe (112), the corresponding oil outlet pipe (111), the prepared oil pipe, the corresponding oil tank (109), the second hydraulic rod (117) and the corresponding second reversing valve (122) to sink the fixed precast concrete pile into the foundation.
