Combined deviation rectifying method for inclination of open caisson of rotational flow well
By analyzing the ground survey report and combining construction measures, including the addition of new precipitation wells, pipe pile heads, counterweights and hydraulic jacks, the problem of large inclination during the cyclone well caisson was solved, and the stability and construction of the well body were achieved. Improvement of quality.
Patent Information
- Application Number
- CN202411383169.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-30
- Publication Date
- 2024-12-03
AI Technical Summary
During the cyclone well caisson, due to complex geological conditions and untimely construction monitoring, different degrees of inclination are caused, and traditional methods are difficult to meet the correction of large caisson inclination.
Through analyzing the geological survey report, a new steel precipitation well was added, pipe pile heads and counterweights were added, high-pressure rotary spray drilling, hydraulic jacks and soil removal were gradually adjusted, and the well body posture was reduced to reduce the soil water content. and friction to achieve correcting of the well body.
It effectively avoids soil damage and soil erosion, ensures construction quality, solves the problem of large inclination of cyclone wells, and ensures the stability of the well body and the safety of surrounding buildings.
Smart Images

Figure CN119061925A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the field of deep foundations as lower structures, and in particular to a combined deviation correction method for a swirl well caisson inclination. Background Art
[0002] The swirl well is a necessary building for steel rolling and steelmaking production lines in metallurgical construction, and the swirl well caisson construction method is the preferred construction scheme in the construction planning process, which is convenient for construction and saves costs. However, during the swirl well caisson process, due to the complexity of geological conditions and untimely monitoring of the construction process, different degrees of tilt will occur.
[0003] The height of the swirl well structure is 31.5m. The construction process is divided into 5 sections: -31.5m to -25m, -25m to -18.5m, -18.5m to -11.7m, and -6.7m to -1.7m. The total weight of the swirl well structure is more than 4,000 tons. During the caisson process from -25.5m to -31.5m, silt appeared at the bottom of the blade and poured into the well, causing the maximum height difference in the northeast and southwest directions to reach 960mm. The traditional construction method of using external force and partial soil removal cannot meet the above-mentioned large-scale caisson tilt correction. Summary of the invention
[0004] In order to overcome the defects of the prior art and provide a foundation construction method with good construction quality, the invention discloses a combined deviation correction method for the inclination of a swirl well caisson.
[0005] The present invention achieves the purpose of the invention through the following technical solutions: A combined deviation correction method for a swirl well caisson tilt is characterized by being implemented in sequence according to the following steps: S1: According to the geological survey report, the soil moisture content of the -25.5m to -31.5m layer is 18.8% to 27.4%, and the liquid limit range is 25.2% to 27.8%. Part of the soil in this layer is close to the flowing state. New steel precipitation wells are added outside the caisson to lower the water level, and new steel precipitation wells are added inside the caisson to reduce the soil moisture content; S2: Add measures to the pile head and reinforce the bottom of the blade foot to prevent sinking; S3: Adding weight to the vortex well; S4: Two rows of boreholes are constructed around the northeastern part of the high vortex well. The construction method uses high-pressure jet drilling to reduce the friction between the well body and the soil at this part. S5: Hydraulic jacks are arranged symmetrically on both sides of the lower southwest part of the vortex well along the inclined direction, and steel plates are set behind the jacks as backrests. The backrest steel plates are supported by placing fixed counterweight concrete blocks; S6: Partial soil removal from the bottom of the caisson is an inevitable choice for correction. The lower side in the southwest direction is kept unchanged, and the higher side in the northeast direction is partially soil removed to gradually lower the blade foot elevation. Finally, the blade feet on both sides of the caisson reach the same height and the correction is successful; S7: S5 and S6 are implemented repeatedly.
[0006] The combined deviation correction method for the tilt of a swirl well caisson is characterized by: In step S1, 18 new steel wells with a depth of 45m were added outside the caisson to lower the water level, and 5 new steel wells with a depth of 16m were added inside the caisson to reduce the moisture content of the soil.
[0007] The combined deviation correction method for the tilt of a swirl well caisson is characterized by: In step S2, a pipe pile head is added to the bottom of the blade foot in the southwest direction of the vortex well to reinforce the bottom of the blade foot in the southwest direction to prevent the well body from sinking further due to its own weight.
[0008] The combined deviation correction method for the tilt of a swirl well caisson is characterized by: In step S3, the corbel is welded at the higher northeast position of the vortex well, and steel bars are piled on top.
[0009] The combined deviation correction method for the tilt of a swirl well caisson is characterized by: In step S4, the hole diameter is φ150 mm and the hole depth is set to 30 m.
[0010] The combined deviation correction method for the tilt of a swirl well caisson described in claim 4 is characterized by: In step S5, a 100mm thick steel plate is set behind the jack as a backrest.
[0011] The present invention provides a deviation correction construction method according to the existing special geological conditions, and adopts a variety of combined construction methods to solve the problem of large-scale tilting of the swirl well caisson. Specifically, the present invention has the following beneficial effects: 1. The present invention adopts a newly added steel precipitation well to avoid the phenomenon that the soil squeezes the precipitation well and causes damage during the well sinking process, and can ensure that the precipitation well is not damaged by the excavator during the excavation process in the well.
[0012] 2. The present invention timely monitors the water level by adding precipitation wells, solves the problem of soil moisture content, and avoids the impact of soil erosion on the settlement of surrounding buildings; adopts a combination of measures such as adding counterweights, guiding holes, partial soil removal, and hydraulic jacks, adds counterweights to higher positions, guides holes at higher positions to reduce the friction between the caisson and the soil, uses hydraulic jacks for external force pushing at lower positions, and uses partial soil removal inside the well to solve the problem of large tilting of heavy caissons. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 is a schematic diagram of the cyclone well segmentation in the present invention, Figure 2 It is a schematic diagram of the arrangement of the newly added precipitation wells in the present invention, Figure 3 It is a schematic diagram of increasing the pile head to prevent the sinking in the southwest of the present invention. Figure 4 It is a schematic diagram of the northeast direction hole in the present invention, Figure 5 It is a schematic diagram of adding a hydraulic jack in the southwest direction of the present invention. DETAILED DESCRIPTION
[0014] The present invention is further described below by means of specific examples. Example
[0015] A combined correction method for tilting of a swirl well caisson, such as Figure 1 to Figure 5 As shown, follow the steps below: Step 1: According to the geological survey report, the soil moisture content of the -25.5m to -31.5m layer is 18.8% to 27.4%, and the liquid limit range is 25.2% to 27.8%. Part of the soil in this layer is close to the flowing state. 18 new steel dewatering wells with a depth of 45m are added outside the caisson to lower the water level, and 5 new steel dewatering wells with a depth of 16m are added inside the caisson to reduce the soil moisture content; Step 2: Add a pile head at the bottom of the blade foot in the southwest of the vortex well to reinforce the bottom of the blade foot in the southwest to prevent the well body from sinking due to its own weight; Step 3: Weld the bracket at the higher northeast position of the vortex well, pile up steel bars on top and increase the counterweight; Step 4: construct two rows of boreholes around the northeastern part of the vortex well. The construction method is high-pressure jet drilling, the hole diameter is φ150mm, and the hole depth is set to 30m; Step 5: Arrange hydraulic jacks symmetrically on both sides of the lower southwest part of the vortex well along the inclined direction, and set a 100mm thick steel plate behind the jack as a backrest. The backrest steel plate is supported by placing fixed counterweight concrete blocks (materials can be obtained locally); Step 6: Removing soil from the bottom of the caisson is an inevitable choice for correction. The lower side in the southwest direction is kept unchanged, and the higher side in the northeast direction is partially removed to gradually lower the blade foot elevation. Finally, the blade feet on both sides of the caisson reach the same height and the correction is successful; Step 7: Repeat steps 5 and 6.
Claims
1. A combined deviation correction method for a swirl well caisson, characterized by: Follow the steps below to implement: S1: According to the geological survey report, the soil moisture content of the -25.5m to -31.5m layer is 18.8% to 27.4%, and the liquid limit range is 25.2% to 27.8%. Part of the soil in this layer is close to the flowing state. New steel precipitation wells are added outside the caisson to lower the water level, and new steel precipitation wells are added inside the caisson to reduce the soil moisture content; S2: Add measures to the pile head and reinforce the bottom of the blade foot to prevent sinking; S3: Adding counterweight to the vortex well; S4: Two rows of boreholes are constructed around the northeastern part of the high vortex well. The construction method uses high-pressure jet drilling to reduce the friction between the well body and the soil at this part. S5: Hydraulic jacks are arranged symmetrically on both sides of the lower southwest part of the vortex well along the inclined direction, and steel plates are set behind the jacks as backrests. The backrest steel plates are supported by placing fixed counterweight concrete blocks; S6: Partial soil removal from the bottom of the caisson is an inevitable choice for correction. The lower side in the southwest direction is kept unchanged, and the higher side in the northeast direction is partially soil removed to gradually lower the blade foot elevation. Finally, the blade feet on both sides of the caisson reach the same height and the correction is successful; S7: S5 and S6 are implemented repeatedly.
2. The combined deviation correction method for the swirl well caisson tilt according to claim 1 is characterized by: In step S1, 18 new steel wells with a depth of 45m were added outside the caisson to lower the water level, and 5 new steel wells with a depth of 16m were added inside the caisson to reduce the moisture content of the soil.
3. The combined deviation correction method for the swirl well caisson tilt according to claim 2 is characterized by: In step S2, a pipe pile head is added to the bottom of the blade foot in the southwest direction of the vortex well to reinforce the bottom of the blade foot in the southwest direction to prevent the well body from continuing to sink due to its own weight and to prevent the sinking.
4. The combined deviation correction method for the swirl well caisson tilt according to claim 3 is characterized by: In step S3, the corbel is welded at the higher northeast position of the vortex well, and steel bars are piled on top.
5. The combined deviation correction method for the swirl well caisson tilt according to claim 4 is characterized by: In step S4, the hole diameter is φ150mm and the hole depth is set to 30m.
6. The combined deviation correction method for the swirl well caisson tilt according to claim 4 is characterized by: In step S5, a 100mm thick steel plate is set behind the jack as a backrest.