Prefabricated inverted filter retaining wall and construction method thereof

Through the combination of prefabricated split filter layer and anti-seepage geotextile, layered drainage is achieved using drainage holes, which solves the problems of traditional slow construction speed and concentrated water flow, and improves the construction efficiency and structural stability of retaining walls.

CN119061933AActive Publication Date: 2024-12-03CHINA FIRST METALLURGICAL GROUP
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
CN202411338120.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-25
Publication Date
2024-12-03
Estimated Expiration
2044-09-25

AI Technical Summary

Technical Problem

The construction speed of the traditional retaining wall reverse filter layer is slow, and seepage water is prone to flow vertically, concentrated at the bottom of the wall, affecting the stability of the structure.

Method used

A prefabricated split filter layer is adopted, including a plastic filter unit with a mesh permeable structure and an anti-seepage geotextile. The drainage holes are used to achieve layered drainage to prevent water from collecting downwards.

Benefits of technology

The construction speed has been greatly improved, the unorganized water flow has been converted into organized and layered drainage, which has improved the drainage rate and prevented local settlement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119061933A_ABST
    Figure CN119061933A_ABST
Patent Text Reader

Abstract

The invention discloses a prefabricated inverted filter retaining wall and a construction method thereof.The prefabricated and split type inverted filter is installed on the inner side wall of a wall body of the retaining wall and comprises a plurality of inverted filter units which are vertically distributed, and the inverted filter units correspond to all sets of drainage holes one to one; the inside of each inverted filter unit is made of a plastic material with a mesh permeable structure, the outside of each inverted filter unit is wrapped with inverted filter geotechnical cloth, each inverted filter unit comprises a plate-shaped main body and protrusions distributed at the lower end of one face of the plate-shaped main body, the plate-shaped main bodies are attached to the inner side wall of the wall body, and the protrusions are inserted into the drainage holes of the corresponding sets; the backfill soil is arranged in a layered mode, anti-seepage geotechnical cloth is laid on the interfaces of the adjacent layers of backfill soil, the interfaces of all the layers of backfill soil correspond to all the sets of drainage holes in a one-to-one mode, and the bottom face of the lowermost layer of plate-shaped body is supported on the lowermost layer of backfill soil in an attached mode through the anti-seepage geotechnical cloth. And the bottom surfaces of the rest layers of plate-shaped main bodies are attached and supported on the top surface of the next layer of plate-shaped main body through the impermeable geotechnical cloth. The construction speed is increased, and water is prevented from being gathered at the bottom of the wall.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a retaining wall, in particular to a prefabricated reverse filter layer retaining wall and a construction method thereof. Background Art

[0002] Retaining walls can support roadbed fill or hillside soil, prevent fill or soil from deforming and becoming unstable, and have the functions of shore connection, water retaining, soil retaining, and anti-seepage, and are widely used in water conservancy and municipal engineering. The backfill behind the retaining wall is usually earthwork, and its lateral pressure is generally large, especially after rain, when there is serious water accumulation in the earthwork. If it is not discharged in time, water bags will form behind the retaining wall or wall cracks will leak, which will eventually affect the stability of the retaining wall structure. Therefore, drainage pipes are generally set at intervals between the retaining wall body, and a filter layer is set behind the wall body.

[0003] The traditional construction of retaining wall filter layer is to use geotextile to separate the filter layer and earth, and backfill the earth while filling the filter layer. Therefore, the construction speed is slow, and the seepage water tends to flow vertically in the filter layer, and a large amount of it is concentrated at the bottom of the retaining wall. The upper drainage pipe loses its drainage function, and the seepage water gathers at the bottom. The water flow is large, which can easily carry away fine sand and affect the stability of the retaining wall structure. Summary of the invention

[0004] The purpose of the present invention is to provide a prefabricated filter layer retaining wall and a construction method thereof, which does not require backfilling and compacting of the filter layer, and does not require alternating construction with earth backfilling, thereby greatly improving the construction speed and converting the unorganized flow of water in the soil into an organized layered drainage method, thereby preventing water from continuously flowing downward and gathering at the bottom of the wall.

[0005] The technical solution adopted by the present invention is: A prefabricated filter layer retaining wall comprises a wall body with a plurality of groups of drainage holes opened in layers; a prefabricated and split filter layer is installed on the inner wall of the wall, the filter layer comprises a plurality of vertically distributed filter units, each filter unit corresponds to each group of drainage holes one by one, the interior of the filter unit adopts a plastic material with a mesh water-permeable structure, and the exterior is wrapped with a filter geotextile, the filter unit comprises a plate-like body and protrusions distributed at the lower end of one side of the plate-like body, the plate-like body is attached to the inner wall of the wall, and each protrusion is inserted into each drainage hole of the corresponding group; the backfill soil on the inner side of the wall is arranged in layers, and an anti-seepage geotextile is laid on the interface of adjacent layers of backfill soil, the interface of each layer of backfill soil corresponds to each group of drainage holes one by one, the bottom surface of the lowest layer of the plate-like body is supported on the lowest layer of the backfill soil by the anti-seepage geotextile, and the bottom surfaces of the plate-like bodies of the remaining layers are supported on the top surface of the plate-like body of the next layer by the anti-seepage geotextile.

[0006] Preferably, the drainage hole is arranged obliquely and the end outside the wall is the lower end, the top and bottom surfaces of the filter unit have the same inclination as the drainage hole, and the height of the filter unit is the same as the spacing between drainage holes in adjacent layers.

[0007] Preferably, the backfill soil interface has the same inclination as the drainage hole and is connected to the bottom surface of the corresponding filter unit.

[0008] Preferably, the inclination of the drainage hole is 2%.

[0009] Preferably, when the wall is short, a single anti-filtration unit is used in each layer; when the wall is long, more than two anti-filtration units are used in parallel in each layer.

[0010] Preferably, the drainage hole and the protrusion are rectangular in shape.

[0011] Preferably, the plastic material inside the reverse filtration unit is polyethylene.

[0012] The construction method of the prefabricated filter layer retaining wall comprises the following steps: S1, constructing the retaining wall and reserving drainage holes on the wall; S2, after the wall reaches a strength that allows backfilling, starting to backfill the lowest layer of backfill soil and compacting it until the lowest layer of backfill soil reaches the lower elevation of the lowest layer of drainage holes, then laying an anti-seepage geotextile on the lowest layer of backfill soil, and then installing the lowest layer of anti-filter units, so that the plate-shaped main body is attached to the inner wall of the wall, the protrusions are inserted into the drainage holes of the lowest layer, and the bottom surface of the plate-shaped main body is supported on the lowest layer of backfill soil through the anti-seepage geotextile; S3: Option 1: Use a cyclic construction method of backfilling the current layer of backfill soil and compacting it, laying the next layer of anti-seepage geotextile, and installing the next layer of anti-filtration units, and construct upward layer by layer until the top layer of anti-filtration units is installed, and then backfill the top layer of backfill soil; Option 2: Install the remaining filter units upwards in sequence, and set up anti-seepage geotextiles between adjacent filter units until the top filter unit is installed, then backfill the remaining backfill soil layer by layer, and separate the adjacent layers of backfill soil using the reserved anti-seepage geotextiles and the newly added anti-seepage geotextiles; Option 3: Install the remaining filter units upwards in sequence, and set up anti-seepage geotextiles between adjacent filter units. At the same time, backfill the remaining backfill soil layer by layer, and use the reserved anti-seepage geotextiles and the newly added anti-seepage geotextiles to separate adjacent layers of backfill soil.

[0013] The beneficial effects of the present invention are: The filter layer is prefabricated and split. There is no need to backfill the filter layer and tamp it, and there is no need to alternate construction with earth backfilling. It can be installed directly layer by layer, and can be installed separately, which greatly improves the construction speed. The filter layer can use the mesh permeable structure to penetrate water. At the same time, the filter geotextile can prevent soil loss during drainage, which not only maintains the stability of the soil, but also avoids affecting the permeability of the filter unit. The anti-seepage geotextile can block the water that has penetrated into the filter layer from flowing downward and the water flow between layers in the backfill soil. Therefore, the unorganized flow of water in the soil can be transformed into an organized layered drainage method. The water in each layer enters the filter unit of each layer and is discharged through the drainage holes of each layer, which not only improves the drainage rate, but also, the key is to avoid the continuous downward flow of water and gather at the bottom of the wall to prevent local settlement. BRIEF DESCRIPTION OF THE DRAWINGS

[0014] Figure 1 It is a cross-sectional schematic diagram of a prefabricated filter layer retaining wall in an embodiment of the present invention.

[0015] Figure 2 : is an internal schematic diagram of the filter unit in an embodiment of the present invention (excluding the external filter geotextile), and the unit of the dimensions in the figure is cm.

[0016] In the figure: 1-wall; 2-filter unit; 201-plate-shaped body; 202-protrusion; 3-backfill soil; 4-anti-seepage geotextile. DETAILED DESCRIPTION

[0017] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.

[0018] Embodiment 1 This embodiment discloses a prefabricated filter layer retaining wall, such as Figure 1 As shown, it includes a wall 1, a filter layer and backfill soil 3; wherein: a plurality of drainage holes are provided in layers on the wall 1, as shown in FIG. Figure 1 The filter layer is installed on the inner wall of the wall 1, and adopts a prefabricated and split structure, including a plurality of vertically distributed filter units 2, each filter unit 2 corresponds to each group of drainage holes, the interior of the filter unit 2 is made of a plastic material with a mesh permeable structure, and the outside is wrapped with a filter geotextile, and the filter unit 2 includes a plate-like body 201 and a protrusion 202 distributed at the lower end of one side of the plate-like body 201, the plate-like body 201 is attached to the inner wall of the wall 1, and each protrusion 202 is inserted into each drainage hole of the corresponding group, see Figure 1 and Figure 2The backfill soil 3 is arranged in layers on the inner side of the wall 1, and an anti-seepage geotextile 4 is laid on the interface of the adjacent layers of backfill soil 3. The interface of each layer of backfill soil 3 corresponds to each group of drainage holes. The bottom surface of the lowest layer of plate-like main body 201 is supported on the lowest layer of backfill soil 3 by the anti-seepage geotextile 4, and the bottom surfaces of the plate-like main bodies 201 of the remaining layers are supported on the top surface of the next layer of plate-like main body 201 by the anti-seepage geotextile 4. Figure 1 .

[0019] From the above scheme, we can know that: First, the filter layer is prefabricated and split, so there is no need to backfill the filter layer and compact it, and there is no need to alternate the construction with the earth backfill. It can be installed directly layer by layer and can be installed separately, which greatly improves the construction speed. Second, the filter layer can use the mesh permeable structure to penetrate water. At the same time, the filter geotextile can prevent soil loss during drainage, which not only maintains the stability of the soil, but also avoids affecting the permeability of the filter unit 2. The anti-seepage geotextile 4 can block the water that penetrates into the filter layer from flowing downward and the water flow between layers in the backfill soil 3. Therefore, the unorganized flow of water in the soil can be transformed into an organized layered drainage method. The water in each layer enters the filter unit 2 of each layer and is discharged through the drainage holes of each layer, which not only improves the drainage rate, but also, the key is that it can prevent water from continuing to flow downward and gather at the bottom of the wall to prevent local settlement.

[0020] like Figure 1 and Figure 2 As shown, in this embodiment, preferably: the drainage hole is arranged obliquely and the end thereof on the outer side of the wall 1 is the lower end, the top and bottom surfaces of the filter unit 2 have the same inclination as the drainage hole, and the height of the filter unit 2 is the same as the spacing between the drainage holes of the adjacent layers; the interface of the backfill soil 3 has the same inclination as the drainage hole and is connected to the bottom surface of the corresponding filter unit 2 to improve the drainage efficiency; the inclination of the drainage hole is 2%.

[0021] like Figure 2 As shown, in this embodiment, preferably: the drainage hole and the protrusion 202 are rectangular, and the wall 1 and the filter unit 2 are easy to manufacture.

[0022] In this embodiment, preferably: when the wall 1 is short, a single filter unit 2 is used in each layer; when the wall 1 is long, more than two filter units 2 are used in parallel in each layer.

[0023] In this embodiment, preferably, the plastic material inside the reverse filtration unit 2 is polyethylene, which is corrosion-resistant, pressure-resistant and wear-resistant.

[0024] Taking into account the setting of settlement joints of the retaining wall and the convenience of transportation, taking a 110-meter-long wall as an example, the size of the drainage hole is 11 cm×11 cm, and two anti-filtration units 2 are set on each layer. The anti-filtration unit 2 is 20 cm wide, 200 cm high, and 500 cm long. The top and bottom surfaces have a 2% inclination and are provided with three protrusions 202. The protrusion 202 is 10 cm wide, 10 cm high, and ≥25 cm long. The protrusions 202 are spaced 200 cm apart, and the protrusions 202 extend into the drainage hole by at least 25 cm. Therefore, even without the support of the plate-like body 201, they will not fall off the inner wall of the wall 1.

[0025] Embodiment 2 This embodiment discloses a first construction method of the prefabricated filter layer retaining wall in the first embodiment, comprising the steps of: S1, constructing a retaining wall 1 and reserving drainage holes on the wall 1; S2, after the wall 1 reaches the strength for backfilling, start backfilling the bottom layer of backfill soil 3 and compacting it until the bottom layer of backfill soil 3 reaches the lower elevation of the bottom drainage hole, then lay the anti-seepage geotextile 4 on the bottom layer of backfill soil 3, and then install the bottom layer of anti-filtration unit 2, so that its plate-like body 201 is attached to the inner wall of the wall 1, each protrusion 202 is inserted into each drainage hole of the bottom layer, and the bottom surface of the plate-like body 201 is attached and supported on the bottom layer of backfill soil 3 through the anti-seepage geotextile 4; S3, adopt the cyclic construction method of backfilling the current layer of backfill soil 3 and compacting it, laying the previous layer of anti-seepage geotextile 4, and installing the previous layer of filter unit 2, constructing upward layer by layer until the top layer of filter unit 2 is installed, and then backfilling the top layer of backfill soil 3.

[0026] Embodiment 3 This embodiment discloses a second construction method of the prefabricated filter layer retaining wall in the first embodiment, comprising the steps of: S1, constructing a retaining wall 1 and reserving drainage holes on the wall 1; S2, after the wall 1 reaches the strength for backfilling, start backfilling the bottom layer of backfill soil 3 and compacting it until the bottom layer of backfill soil 3 reaches the lower elevation of the bottom drainage hole, then lay the anti-seepage geotextile 4 on the bottom layer of backfill soil 3, and then install the bottom layer of anti-filtration unit 2, so that its plate-like body 201 is attached to the inner wall of the wall 1, each protrusion 202 is inserted into each drainage hole of the bottom layer, and the bottom surface of the plate-like body 201 is attached and supported on the bottom layer of backfill soil 3 through the anti-seepage geotextile 4; S3. Install the remaining filter units 2 upward in sequence, and set an impermeable geotextile 4 between adjacent filter units 2, until the top filter unit 2 is installed, then backfill the remaining backfill soil 3 upward layer by layer, and separate adjacent layers of backfill soil 3 using the reserved impermeable geotextile 4 and the newly added impermeable geotextile 4.

[0027] Embodiment 4 This embodiment discloses a third construction method of the prefabricated filter layer retaining wall in the first embodiment, comprising the following steps: S1, constructing a retaining wall 1 and reserving drainage holes on the wall 1; S2, after the wall 1 reaches the strength for backfilling, start backfilling the bottom layer of backfill soil 3 and compacting it until the bottom layer of backfill soil 3 reaches the lower elevation of the bottom drainage hole, then lay the anti-seepage geotextile 4 on the bottom layer of backfill soil 3, and then install the bottom layer of anti-filtration unit 2, so that its plate-like body 201 is attached to the inner wall of the wall 1, each protrusion 202 is inserted into each drainage hole of the bottom layer, and the bottom surface of the plate-like body 201 is attached and supported on the bottom layer of backfill soil 3 through the anti-seepage geotextile 4; S3, sequentially install the remaining filter units 2 upwards, and set an impermeable geotextile 4 between adjacent filter units 2, and at the same time, backfill the remaining backfill soil 3 upwards layer by layer, and separate adjacent layers of backfill soil 3 using the reserved impermeable geotextile 4 and the newly added impermeable geotextile 4.

[0028] The embodiments described above are part of the embodiments of the present application, rather than all of the embodiments. The detailed description of the embodiments of the present application is not intended to limit the scope of the present application for protection, but merely represents the selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.

Claims

1. A prefabricated filter layer retaining wall, comprising a wall body with a plurality of groups of drainage holes provided in layers; characterized in that: A prefabricated and split filter layer is installed on the inner wall of the wall, and the filter layer includes a number of vertically distributed filter units, each of which corresponds to each group of drainage holes. The interior of the filter unit is made of plastic material with a mesh water-permeable structure, and the exterior is wrapped with a filter geotextile. The filter unit includes a plate-like body and protrusions distributed at the lower end of one side of the plate-like body. The plate-like body is attached to the inner wall of the wall, and each protrusion is inserted into each drainage hole of the corresponding group; the backfill soil on the inner side of the wall is arranged in layers and an anti-seepage geotextile is laid on the interface between adjacent layers of backfill soil. The interface of each layer of backfill soil corresponds to each group of drainage holes. The bottom surface of the lowest layer of the plate-like body is supported on the lowest layer of the backfill soil through the anti-seepage geotextile, and the bottom surfaces of the plate-like bodies of the remaining layers are supported on the top surface of the next layer of the plate-like body through the anti-seepage geotextile.

2. The prefabricated filter retaining wall according to claim 1, characterized in that: The drainage hole is inclined and the end outside the wall is the lower end. The top and bottom surfaces of the filter unit have the same inclination as the drainage hole. The height of the filter unit is the same as the spacing between the drainage holes of adjacent layers.

3. The prefabricated filter retaining wall according to claim 2, characterized in that: The backfill soil interface has the same inclination as the drainage hole and is connected to the bottom surface of the corresponding filter unit.

4. The prefabricated filter retaining wall according to claim 2 or 3, characterized in that: The slope of the drainage holes is 2%.

5. The prefabricated filter retaining wall according to claim 1, characterized in that: When the wall is short, a single anti-filtration unit is used in each layer; when the wall is long, more than two anti-filtration units are used in parallel in each layer.

6. The prefabricated filter retaining wall according to claim 1, characterized in that: The drainage holes and the protrusions are rectangular in shape.

7. The prefabricated filter retaining wall according to claim 1, characterized in that: The plastic material inside the filter unit is polyethylene.

8. A construction method for a prefabricated filter retaining wall according to any one of claims 1 to 7, characterized in that: Includes steps: S1. Construct the retaining wall and reserve drainage holes on the wall; S2. After the wall reaches the strength that can be backfilled with earth, start backfilling the lowest layer of backfill soil and compacting it until the lowest layer of backfill soil reaches the lower elevation of the lowest drainage hole, then lay an anti-seepage geotextile on the lowest layer of backfill soil, and then install the lowest layer of anti-filtration unit, so that its plate-like body is attached to the inner wall of the wall, each protrusion is inserted into each drainage hole of the lowest layer, and the bottom surface of the plate-like body is supported on the lowest layer of backfill soil through the anti-seepage geotextile; S3: Adopt the cyclic construction method of backfilling the current layer of backfill soil and compacting it, laying the previous layer of anti-seepage geotextile, and installing the previous layer of filter unit, and construct upward layer by layer until the top layer of filter unit is installed, and then backfill the top layer of backfill soil.

9. A construction method for a prefabricated filter retaining wall according to any one of claims 1 to 7, characterized in that: Includes steps: S1. Construct the retaining wall and reserve drainage holes on the wall; S2. After the wall reaches the strength that can be backfilled with earth, start backfilling the lowest layer of backfill soil and compacting it until the lowest layer of backfill soil reaches the lower elevation of the lowest drainage hole, then lay an anti-seepage geotextile on the lowest layer of backfill soil, and then install the lowest layer of anti-filtration unit, so that its plate-like body is attached to the inner wall of the wall, each protrusion is inserted into each drainage hole of the lowest layer, and the bottom surface of the plate-like body is supported on the lowest layer of backfill soil through the anti-seepage geotextile; S3. Install the remaining filter units upwards in sequence, and set anti-seepage geotextiles between adjacent filter units until the top filter unit is installed, then backfill the remaining backfill soil layer by layer, and separate adjacent layers of backfill soil using the reserved anti-seepage geotextiles and the newly added anti-seepage geotextiles.

10. A construction method for a prefabricated filter retaining wall according to any one of claims 1 to 7, characterized in that: Includes steps: S1. Construct the retaining wall and reserve drainage holes on the wall; S2. After the wall reaches the strength that can be backfilled with earth, start backfilling the lowest layer of backfill soil and compacting it until the lowest layer of backfill soil reaches the lower elevation of the lowest drainage hole, then lay an anti-seepage geotextile on the lowest layer of backfill soil, and then install the lowest layer of anti-filtration unit, so that its plate-like body is attached to the inner wall of the wall, each protrusion is inserted into each drainage hole of the lowest layer, and the bottom surface of the plate-like body is supported on the lowest layer of backfill soil through the anti-seepage geotextile; S3. Install the remaining filter units upwards in sequence, and set anti-seepage geotextiles between adjacent filter units. At the same time, backfill the remaining backfill soil upwards layer by layer, and separate adjacent layers of backfill soil using the reserved anti-seepage geotextiles and the newly added anti-seepage geotextiles.

Citation Information

Patent Citations

  • Retaining wall device used for water conservancy engineering and provided with inverse filtering mechanisms and construction method of retaining wall device

    CN106049352A

  • Drainage system of retaining wall and construction method thereof

    CN109056785A

  • Structure for effectively lowering underground water level behind retaining wall of bank protection

    CN215441729U

  • Novel cutting retaining wall single-side formwork construction device

    CN215669580U

  • An establishment preventing a soil outflow for aconcreted wall

    KR1020020089688A