Caisson ceiling mounting method
Through the prefabricated and precise measuring instrument calibration method, the problem of difficult to ensure the construction quality of caisson ceilings on large buildings is solved, and the precise construction of caisson ceilings on large buildings is achieved.
Patent Information
- Application Number
- CN202411116041.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-14
- Publication Date
- 2024-12-03
- Estimated Expiration
- 2044-08-14
AI Technical Summary
The existing caisson ceiling construction method is difficult to ensure the construction quality on large buildings, with large error accumulation and lack of precise control.
The horizontal keel, longitudinal keel, beam-covered slab and caisson bottom plate required for prefabricated caisson ceiling are used for prefabricating and pre-inspection. The caisson unit installation control line is set up in combination with measuring instruments and laser vertical instruments to calibrate the splicing of horizontal keel and longitudinal keel in real time to ensure that Construction accuracy.
The precise keel foundation is provided through the caisson unit installation control line, which significantly improves the construction quality and accuracy of the caisson ceiling on large buildings.
Smart Images

Figure CN119062050A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of building construction, in particular to a method for installing a caisson ceiling. Background Art
[0002] The ceiling decoration forms of modern large public buildings can generally be divided into five types: flat ceiling, partial ceiling, grid ceiling, caisson ceiling and special-shaped ceiling. As one of the five types, caisson ceiling is very popular. Caisson ceiling is a partial ceiling around the room, which can be designed as one or two layers. This decoration can increase the sense of space height and change the lighting effect in the room.
[0003] However, since most of the current caisson ceilings are local ceilings and are generally installed in smaller indoor spaces, the project volume is relatively small. They are generally carried out manually by small construction teams using tape measures for calibration. The construction method is relatively rough and the construction control is not standardized. When it is used for continuous construction of caisson ceilings in buildings with larger indoor spaces, it will lead to excessive error accumulation and it is difficult to guarantee the construction quality. Summary of the invention
[0004] In order to solve the problem that the existing caisson ceiling construction method in the background technology is difficult to be applied to the continuous construction project of caisson ceiling in the building with a large indoor space, the present invention proposes a caisson ceiling installation method.
[0005] The technical solution of the present invention is: a method for installing a caisson ceiling, comprising the following steps: S1~ prefabricating the transverse keel, longitudinal keel, beam cladding plate and caisson bottom plate required for the construction of the caisson ceiling in a factory; S2~ The construction worker marks the benchmark line and leveling point at the construction site according to the construction drawings and construction technology; S3~ Surveyors use surveying instruments to lay out external control lines on the bottom floor of the building, and use laser vertical meters to lead the control points to the roof of the building for positioning; S4~Based on the external control line and the horizontal elevation point, the surveying and laying-out workers lay the horizontal steel wires on the bottom of the building roof in the left-right direction, and fix the upper ends of the vertical steel wires on the horizontal steel wires. The mouth-shaped structure formed by the combination of the vertical steel wires and the horizontal steel wires is the installation control line of the caisson unit; S5~ The surveying and setting-out workers use measuring instruments to measure and record the elevation dimensions of the top and bottom of each caisson unit relative to the axis; S6~Transport the horizontal keel, longitudinal keel, beam cladding and caisson bottom plate to the construction site; S7~ According to the horizontal steel wire, the horizontal keel is spliced section by section along the left and right directions and fixed on the building roof; S8~ According to the vertical steel wire, the longitudinal keel is spliced section by section along the front-back direction and fixed on the transverse keel; S9~Install the beam-wrapping plates at the bottom and left and right sides of the longitudinal keel, and install the caisson bottom plate between adjacent beam-wrapping plates to complete the construction.
[0006] Preferably, in step S1, after the transverse keels, longitudinal keels, beam plates and caisson bottom plates are prefabricated, it is necessary to pre-inspect the quantity, specifications, and appearance quality of the prefabricated transverse keels, longitudinal keels, beam plates and caisson bottom plates one by one, and replace the plates and rods that do not meet the quality standards.
[0007] Preferably, before pre-inspection of the caisson floor plate and the beam-wrapping plate, the caisson floor plate and the beam-wrapping plate are numbered and pre-arranged according to the construction drawings, and then pre-inspection is performed.
[0008] Preferably, in S6, after the transverse keels, longitudinal keels, beam plates and caisson bottom plates are transported to the construction site, it is necessary to perform a secondary inspection of the standardization and uniformity of the transverse keels, longitudinal keels, beam plates and caisson bottom plates based on the caisson unit record data in S5, and correct the plates or rods with large deviations.
[0009] Preferably, before the construction of S7, the straightness of the horizontal steel wire is first detected and corrected, and then the installation of the transverse keel is started.
[0010] Preferably, after S7 is completed, the straightness of the spliced transverse keels is checked according to the construction drawings and the measurement data in S5, and the transverse keels exceeding the error are corrected.
[0011] Preferably, after S8 is completed, the straightness of the spliced longitudinal keels is checked according to the construction drawings and the measurement data in S5, and the longitudinal keels that exceed the error are corrected.
[0012] Preferably, in S9, the aluminum alloy hanger is first installed on the longitudinal keel, and then the beam cladding plate and the caisson bottom plate are fixed on the aluminum alloy hanger.
[0013] Preferably, the aluminum alloy hanger is a square-shaped rod frame extending in the front-rear direction, and the aluminum alloy hanger is sleeved on the longitudinal keel; The left and right sides of the aluminum alloy pendant are detachably fixed with angle irons extending in the front-back direction; The tops of the left and right side plates of the beam-wrapping plate are fixed with hook plates extending toward the longitudinal keel, and the hook plates are hooked on the angle irons; One end of the caisson bottom plate facing the longitudinal keel is overlapped on the hook plate, and one end of the caisson bottom plate facing the longitudinal keel is fixedly provided with a connecting vertical plate extending upward, and the connecting vertical plate is detachably fixedly connected with the angle iron.
[0014] Advantages of the present invention: The present invention is suitable for the continuous construction of caisson ceilings on the roofs of buildings with large indoor spaces. By installing the caisson unit control line constructed during construction, a real-time calibration basis is provided for the continuous construction of the horizontal keels and vertical keels of the caisson ceiling, providing a more accurate keel foundation for the construction of the caisson ceiling, thereby ensuring the project quality after the continuous construction of the caisson ceiling. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
[0016] Figure 1 is a schematic structural diagram of one of the caisson units in Example 1; Figure 2 for Figure 1 A schematic diagram of the local structure of the connection between the caisson bottom plate, the beam plate and the aluminum alloy hanger; In the figure, 1, roof, 2, horizontal keel, 3, longitudinal keel, 4, upper longitudinal rod, 5, connecting vertical rod, 6, lower longitudinal rod, 7, connecting horizontal rod, 8, beam board, 801, hook board, 9, caisson bottom plate, 901, connecting vertical board, 10, angle iron. DETAILED DESCRIPTION
[0017] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0018] Embodiment 1: A method for installing a caisson ceiling comprises the following steps: S1~ Prefabricate the transverse keel 2, the longitudinal keel 3, the beam cladding plate 8 and the caisson bottom plate 9 required for the construction of the caisson ceiling in a factory; Then, the quantity, specification, and appearance quality of the prefabricated transverse keels 2, longitudinal keels 3, beam cladding plates 8, and caisson bottom plates 9 are pre-checked one by one, and the plates and rods that do not meet the quality standards are replaced; Before the pre-inspection of the caisson bottom plate 9 and the beam-wrapping plate 8, the caisson bottom plate 9 and the beam-wrapping plate 8 are numbered and pre-arranged according to the construction drawings, and then the pre-inspection is carried out.
[0019] S2~Construction workers mark benchmark lines and leveling points at the construction site based on construction drawings and construction technology.
[0020] S3~The surveyor uses a surveying instrument to lay out the external control line on the bottom floor of the building, and uses a laser plumb line to lead the control point to the roof 1 of the building for positioning.
[0021] S4~The surveying and laying-out workers lay out the horizontal steel wires at the bottom of the building roof 1 in the left-right direction according to the external control line and the horizontal elevation point, and fix the upper ends of the vertical steel wires on the horizontal steel wires. The mouth-shaped structure formed by the combination of the vertical steel wires and the horizontal steel wires is the caisson unit installation control line; S5~ The surveying and setting-out workers use measuring instruments to measure and record the elevation dimensions of the top and bottom of each caisson unit relative to the axis; S6~Transport the transverse keel 2, longitudinal keel 3, beam plate 8 and caisson bottom plate 9 to the construction site; and according to the caisson unit record data in S5, conduct secondary inspection of the standard degree and uniformity of the transverse keel 2, longitudinal keel 3, beam plate 8 and caisson bottom plate 9, and correct the plates or rods with large deviations.
[0022] S7~Detect and correct the straightness of the horizontal steel line, and splice the horizontal keel 2 section by section along the left and right direction according to the horizontal steel line and fix it on the building roof 1; According to the construction drawings and the measurement data in S5, the straightness of the spliced transverse keels 2 is checked, and the transverse keels 2 that exceed the error are corrected.
[0023] S8~ The longitudinal keel 3 is spliced section by section along the front-back direction according to the vertical steel wire and fixed on the transverse keel 2; According to the construction drawings and the measurement data in S5, the straightness of the spliced longitudinal keels 3 is checked, and the longitudinal keels 3 that exceed the error are corrected.
[0024] S9~According to the position of the vertical steel wire, weld the vertically arranged hanger at the bottom of the horizontal keel 2, and weld the lower end of the hanger to the top of the longitudinal keel 3. Then, install the aluminum alloy hanger on the longitudinal keel 3, and then install the beam plate 8 at the bottom and left and right sides of the aluminum alloy hanger, install the caisson bottom plate 9 between adjacent beam plates 8, and fix the beam plate 8, the caisson bottom plate 9 and the aluminum alloy hanger to complete the construction.
[0025] The structure of a single caisson unit after construction is completed, such as Figure 1 shown.
[0026] In the step S9 , the aluminum alloy hanger is a square-shaped rod frame extending in the front-rear direction, and the aluminum alloy hanger is sleeved on the longitudinal keel 3 .
[0027] Specifically, Figure 1 and Figure 2As shown, the aluminum alloy hanger includes an upper longitudinal rod 4 arranged on the left and right sides of the suspension rod, a connecting vertical rod 5 is welded to the lower end of the upper longitudinal rod 4, and the lower end of the connecting vertical rod 5 is welded to the top of the lower longitudinal rod 6. The lower longitudinal rod 6 is parallel to the upper longitudinal rod 4. A connecting cross bar 7 is welded between the left and right upper longitudinal rods 4 and the left and right lower longitudinal rods 6, wherein the upper connecting cross bar 7 overlaps the top of the longitudinal keel 3 and is fixed to the longitudinal keel 3 by screws. The lower connecting cross bar 7 is located below the longitudinal keel 3.
[0028] Angle irons 10 extending in the front-rear direction are provided on the outer sides of the connecting vertical rods 5 away from the longitudinal keels 3 .
[0029] The tops of the left and right side plates of the beam-wrapping plate 8 are fixed with hook plates 801 extending toward the longitudinal keel 3, and the hook plates 801 are hooked on the angle iron 10. One end of the caisson bottom plate 9 facing the longitudinal keel 3 is overlapped on the hook plate 801, and one end of the caisson bottom plate 9 facing the longitudinal keel 3 is fixed with a connecting vertical plate 901 extending upward, and the connecting vertical plate 901 and the angle iron 10 are fixed to the connecting vertical rod 5 by screws.
[0030] It will be apparent to those skilled in the art that the invention is not limited to the details of the exemplary embodiments described above and that the invention can be implemented in other specific forms without departing from the spirit or essential features of the invention. Therefore, the embodiments should be considered exemplary and non-limiting in all respects, and the scope of the invention is defined by the appended claims rather than the foregoing description, and it is intended that all variations falling within the meaning and scope of the equivalent elements of the claims be included in the invention. Any reference numeral in a claim should not be considered as limiting the claim to which it relates.
Claims
1. The method for installing a caisson ceiling is characterized by: The method comprises the following steps: S1~ prefabricate the transverse keel (2), the longitudinal keel (3), the beam cladding plate (8) and the caisson bottom plate (9) required for the construction of the caisson ceiling in a factory; S2~ The construction worker marks the benchmark line and leveling point at the construction site according to the construction drawings and construction technology; S3~ The surveyor uses a surveying instrument to lay out the external control line on the bottom floor of the building, and uses a laser vertical meter to lead the control point to the roof of the building (1) for positioning; S4~ The surveying and laying-out worker lays the horizontal steel wires on the bottom of the building roof (1) in the left-right direction according to the external control line and the horizontal elevation point, and fixes the upper ends of the vertical steel wires on the horizontal steel wires. The mouth-shaped structure formed by the combination of the vertical steel wires and the horizontal steel wires is the caisson unit installation control line; S5~ The surveying and setting-out workers use measuring instruments to measure and record the elevation dimensions of the top and bottom of each caisson unit relative to the axis; S6~Transport the transverse keel (2), the longitudinal keel (3), the beam cladding plate (8) and the caisson bottom plate (9) to the construction site; S7~ The horizontal keel (2) is spliced section by section along the left-right direction according to the horizontal steel line and fixed on the building roof (1); S8~ The longitudinal keel (3) is spliced section by section along the front-back direction according to the vertical steel wire and fixed on the transverse keel (2); S9~ Install the beam-wrapping plates (8) at the bottom and left and right sides of the longitudinal keel (3), and install the caisson bottom plate (9) between adjacent beam-wrapping plates (8), and the construction is completed.
2. The method for installing a caisson ceiling according to claim 1, characterized in that: In step S1, after the transverse keel (2), the longitudinal keel (3), the beam plate (8) and the caisson bottom plate (9) are prefabricated, it is necessary to pre-inspect the quantity, specification and appearance quality of the prefabricated transverse keel (2), the longitudinal keel (3), the beam plate (8) and the caisson bottom plate (9) one by one, and replace the plates and rods that do not meet the quality standards.
3. The method for installing a caisson ceiling according to claim 2, characterized in that: Before pre-inspecting the caisson bottom plate (9) and the beam-wrapping plate (8), the caisson bottom plate (9) and the beam-wrapping plate (8) are numbered and pre-arranged according to the construction drawings, and then pre-inspected.
4. The method for installing a caisson ceiling according to any one of claims 1 to 3, characterized in that: In S6, after the transverse keel (2), the longitudinal keel (3), the beam plate (8) and the caisson bottom plate (9) are transported to the construction site, it is necessary to perform a secondary inspection of the standard degree and uniformity of the transverse keel (2), the longitudinal keel (3), the beam plate (8) and the caisson bottom plate (9) based on the caisson unit record data in S5, and to correct the plates or rods with large deviations.
5. The method for installing a caisson ceiling according to any one of claims 1 to 3, characterized in that: Before S7 construction, the straightness of the horizontal steel wire is first tested and corrected, and then the installation of the cross keel (2) is started.
6. The method for installing a caisson ceiling according to any one of claims 1 to 3, characterized in that: After S7 is completed, the straightness of the spliced transverse keels (2) is checked according to the construction drawings and the measurement data in S5, and the transverse keels (2) that exceed the error are corrected.
7. The method for installing a caisson ceiling according to any one of claims 1 to 3, characterized in that: After S8 is completed, the straightness of the spliced longitudinal keels (3) is checked according to the construction drawings and the measurement data in S5, and the longitudinal keels (3) that exceed the error are corrected.
8. The method for installing a caisson ceiling according to any one of claims 1 to 3, characterized in that: In S9, the aluminum alloy hanger is first installed on the longitudinal keel (3), and then the beam cladding plate (8) and the caisson bottom plate (9) are fixed on the aluminum alloy hanger.
9. The method for installing a caisson ceiling according to claim 9, characterized in that: The aluminum alloy hanger is a square-shaped rod frame extending in the front-rear direction, and the aluminum alloy hanger is sleeved on the longitudinal keel (3); Angle irons (10) extending in the front-rear direction are detachably fixed on the left and right sides of the aluminum alloy hanger; The tops of the left and right side plates of the beam-wrapping plate (8) are both fixedly provided with hook plates (801) extending toward the longitudinal keel (3), and the hook plates (801) are hooked on the angle iron (10); One end of the caisson bottom plate (9) facing the longitudinal keel (3) is overlapped on the hook plate (801), and one end of the caisson bottom plate (9) facing the longitudinal keel (3) is fixedly provided with a connecting vertical plate (901) extending upward, and the connecting vertical plate (901) is detachably fixedly connected to the angle iron (10).
Citation Information
Patent Citations
Ancient building wood-like suspended ceiling structure
CN209907699U
Aluminum square tube suspended ceiling
CN211114344U
Concave suspended ceiling
CN212104762U
Hidden lamp strip node structure adopting acrylic plate as panel
CN214169612U
Pseudo-classic architecture suspended ceiling structure for steel roof
CN214941543U