Precast column positioning structure and construction method thereof

By using the combination of precast columns of anchors and guide holes in construction, the problems of inaccurate positioning of precast columns and insufficient structural stability are solved, precise positioning and high stability are achieved, and construction quality and structure are improved. Security.

CN119062129APending Publication Date: 2024-12-03赖政兴
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
CN202310621871.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-05-30
Publication Date
2024-12-03

AI Technical Summary

Technical Problem

In the existing construction methods, the positioning of the precast columns is not accurate, resulting in poor accuracy in subsequent steel structure installation, and the precast columns are easily deviated by weather and construction conditions, affecting structural stability.

Method used

The anchor is used to cooperate with the precast column with guide holes. The anchor is inserted into the concrete paving layer. The guide hole passes through the center of gravity of the precast column to ensure the precise joint between the precast column and the anchor, and enhances structural stability. sex.

Benefits of technology

The precise positioning and structural stability of the precast column is achieved, construction errors are reduced, overall construction quality is improved, and higher stability is provided when facing external forces or wind forces.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119062129A_ABST
    Figure CN119062129A_ABST
Patent Text Reader

Abstract

The invention provides a precast column positioning structure. The precast column positioning structure comprises an anchoring piece and a precast column, the anchoring piece is vertically inserted into a concrete bedding layer, the anchoring piece is provided with a combination section and a positioning section, the combination section extends into and is fixedly arranged on the concrete bedding layer, and the positioning section is exposed out of the concrete bedding layer; the precast column is provided with a bottom face, a guide hole is formed in the bottom face, and the precast column is connected to the positioning section of the anchoring piece through the guide hole, so that the bottom face is arranged on the concrete bedding layer in a bearing mode. Therefore, the precast column can be accurately and smoothly positioned on the concrete bedding layer, and meanwhile, the stability of the structure is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to a building structure and a construction method thereof, in particular to a precast column positioning structure and a construction method thereof. Background Art

[0002] In the current construction method, precast columns are used in conjunction with steel beams as the supporting structure of the building. When constructing precast columns, PC (pure concrete, concrete paving layer) is first laid on the construction site as a working surface, and then straight rods or gantry plates are used as measurement and layout control lines. The control lines are then used as standards to hoist the precast columns to their correct positions.

[0003] However, due to the mobility of the crane's boom, the construction process requires groping back and forth to find the positioning point, which makes the construction time-consuming. Even after positioning, installation errors still occur. Therefore, the precast columns cannot be accurately positioned at the preset positions. Therefore, during the subsequent steel structure installation, the accuracy will be poor, affecting the overall construction quality.

[0004] Moreover, the only way to prevent the precast columns and PC (concrete paving layer) from tipping over on the construction site is to use steel bars or long rods to support the precast columns on the sides in a diagonal manner. This is easily affected by the quality of construction or weather conditions, such as earthquakes or strong winds, which can cause the precast columns to shift and affect the accuracy of positioning. Summary of the invention

[0005] In order to solve the above-mentioned problems, the present invention provides a precast column positioning structure and a construction method thereof, wherein an anchor is inserted on a concrete cushion layer, and a precast column with a guide hole is aligned with the anchor. When the precast column is installed, the precast column is smoothly engaged with the anchor, thereby improving the stability of the structure.

[0006] To achieve the above purpose, a precast column positioning structure is provided in an embodiment of the present invention, which includes an anchor and a precast column. The anchor is inserted into a concrete cushion layer, and the anchor has a coupling section and a positioning section. The coupling section extends into and is fixed to the concrete cushion layer, and the positioning section is exposed from the concrete cushion layer. The precast column has a bottom surface, and a guide hole is provided on the bottom surface along the length direction. The precast column is connected to the positioning section of the anchor by the guide hole, so that the bottom surface is supported and set on the concrete cushion layer.

[0007] In another embodiment of the present invention, the anchor is inserted into the concrete cushion layer vertically on the ground, and the center of the guide hole extends through the center of gravity of the precast column.

[0008] In another embodiment of the present invention, the guide hole has a trumpet-shaped guide portion recessed from the bottom surface and an inner hole portion away from the bottom surface and connected to the guide portion.

[0009] In another embodiment of the present invention, the length of the connecting section is greater than that of the positioning section, and the length of the connecting section is between 20 cm and 30 cm; the positioning section protrudes 8 cm to 10 cm from the concrete paving layer; and the anchor is a bamboo steel bar, a straight steel bar or a steel nail.

[0010] To achieve the above-mentioned purpose, an embodiment of the present invention provides a construction method for a precast column positioning structure, which includes the following steps: laying a concrete cushion layer on the ground; inserting an anchor into the concrete cushion layer, the anchor having a coupling section and a positioning section, the coupling section extending into the concrete cushion layer, and the positioning section exposed from the concrete cushion layer; and providing a precast column, the precast column having a bottom surface, the bottom surface being provided with a guide hole, aligning the guide hole of the precast column with the anchor, so that the precast column is connected to the positioning section of the anchor with the guide hole, so as to position the precast column in the concrete cushion layer.

[0011] In another embodiment of the present invention, the concrete paving layer is provided with holes for inserting the anchors, so that the anchors can be inserted and positioned vertically on the ground.

[0012] In another embodiment of the present invention, the anchor is inserted before the concrete paving layer solidifies.

[0013] In another embodiment of the present invention, the anchoring member is nailed into the concrete cushion layer after the concrete cushion layer solidifies.

[0014] In another embodiment of the present invention, the anchor is nailed into the concrete cushion layer in cooperation with a positioning tube after the concrete cushion layer solidifies. The positioning tube includes a base and a tube portion vertically connected to the base. The positioning tube also includes a through hole that passes through the base and the tube portion, and the through hole allows the anchor to be nailed straight into the concrete cushion layer.

[0015] The beneficial effects of the present invention are:

[0016] By using the guide holes of the precast columns of the present invention to match the anchors on the concrete cushion layer, the two can be smoothly joined and accurately positioned. After the precast columns are installed, the structural stability during external force collisions, strong winds, and earthquakes can be increased.

[0017] The above and other objects, technical features and advantages of the present invention will be best understood from the following detailed description and corresponding drawings and embodiments. BRIEF DESCRIPTION OF THE DRAWINGS

[0018] Figure 1 It is a schematic diagram of the construction method of the precast column positioning structure according to one embodiment of the present invention;

[0019] Figure 2 A schematic diagram of a construction method of a precast column positioning structure according to an embodiment of the present invention, wherein an anchor is inserted vertically into a concrete cushion layer on the ground;

[0020] Figure 3A construction method of a precast column positioning structure according to an embodiment of the present invention, wherein the guide hole of the precast column is aligned with the anchor member;

[0021] Figure 4 A schematic diagram of a construction method of a precast column positioning structure according to an embodiment of the present invention, wherein the precast column is installed and positioned on a concrete cushion layer;

[0022] Figure 5 A schematic diagram of a construction method of a precast column positioning structure according to another embodiment of the present invention, wherein the positioning cylinder is placed on a solidified concrete cushion layer;

[0023] Figure 6 A schematic diagram of a construction method of a precast column positioning structure according to another embodiment of the present invention, wherein an anchor is nailed into a concrete cushion layer through a positioning tube;

[0024] Figure 7 A schematic diagram of a construction method of a precast column positioning structure according to another embodiment of the present invention, wherein an anchor is vertically nailed to a concrete cushion layer;

[0025] Figure 8 This is a schematic diagram of a construction method for a precast column positioning structure according to another embodiment of the present invention, in which a precast column is installed and positioned on a concrete cushion layer through an anchor.

[0026] Description of reference numerals:

[0027] 100, 100a: Precast column positioning structure

[0028] 10: Concrete paving layer

[0029] 11: Surface

[0030] 12: Holes

[0031] 20, 20a: Anchor

[0032] 21: Combined segment

[0033] 22: Positioning segment

[0034] 23: Cutting Edge

[0035] 30: Precast columns

[0036] 31: Bottom

[0037] 32: Guide hole

[0038] 321: Guidance Department

[0039] 322:Inner hole part

[0040] 40: Positioning tube

[0041] 41: Base

[0042] 42: barrel

[0043] 43:Piercing

[0044] G: Center of gravity

[0045] S1: Steps

[0046] S2: Steps

[0047] S3: step. DETAILED DESCRIPTION

[0048] Exemplary embodiments of the present invention are described in detail below with reference to the accompanying drawings, and it is not intended to limit the technical principles of the present invention to the specific disclosed embodiments. Instead, the scope of the present invention is limited only by the scope of the claims and covers substitutions, modifications and equivalents.

[0049] See also Figures 1 to 4 As shown, a construction method of a precast column positioning structure 100 of the present invention comprises the following steps:

[0050] Step S1, laying a concrete cushion layer 10 (ie, PC layer) on the ground. The concrete cushion layer 10 is laid after excavation and land preparation at the construction site.

[0051] Step S2, an anchor 20 is vertically inserted into the concrete cushion layer 10. The anchor 20 is a bamboo steel bar, a straight steel bar or a steel nail, and the anchor 20 has a connecting section 21 and a positioning section 22, the connecting section 21 extends into the concrete cushion layer 10, and the positioning section 22 is exposed from the concrete cushion layer 10. Among them, the construction step of inserting the anchor 20 into the concrete cushion layer 10 is to insert it before the concrete cushion layer 10 is solidified, or to insert it after the concrete cushion layer 10 is solidified. In this embodiment, the anchor 20 is inserted into the concrete cushion layer 10 before the concrete cushion layer 10 is solidified, and accordingly, a surface 11 is formed after the concrete cushion layer 10 is solidified, so that the anchor 20 is vertically inserted into the concrete cushion layer 10, and the positioning section 22 of the anchor 20 is exposed from the surface 11. The length of the connecting section 21 is greater than the length of the positioning section 22. In the embodiment of the present invention, the length of the connecting section 21 is between 20 cm and 30 cm. However, in actual construction, the concrete cushion layer 10 can be provided with a hole 12 for inserting the anchor 20. The depth of the hole 12 is between 20 cm and 30 cm, so that the anchor 20 can be inserted and positioned accurately. After the concrete cushion layer 10 solidifies, the anchor 20 is provided with strength to resist the collision of external forces or displacement and overturning during strong winds and earthquakes.

[0052] Step S3, providing a precast column 30, the precast column 30 is reinforced concrete, and has a bottom surface 31, the bottom surface 31 is provided with a guide hole 32 arranged along the length direction, the depth of the guide hole 32 is at least 10 cm, and the center of the guide hole 32 extends through the center of gravity G of the precast column 30. The guide hole 32 has a guide portion 321 that is recessed from the bottom surface 31 and is flared, and an inner hole portion 322 that is away from the bottom surface 31 and connected to the guide portion 321, the depth of the guide portion 321 is less than the depth of the inner hole portion 322, and the inner diameter of the inner hole portion 322 is 3 cm or more. During construction, the precast column 30 is lifted by a crane or a hanging device and moved to the top of the anchor 20, so that the guide hole 32 of the precast column 30 is aligned with the anchor 20, and the precast column 30 is connected to the positioning section 22 of the anchor 20 with the guide hole 32, so that the precast column 30 is positioned on the concrete cushion layer 10, that is, the bottom surface 31 of the precast column 30 is supported by the surface 11 set on the concrete cushion layer 10, so that the precast column 30 can be smoothly connected with the anchor 20 as a guide. After the connection, the weight of the precast column 30 itself can provide a certain stability to prevent tipping or displacement; and when the wind force or earthquake force is too large, the anchor 20 can also help prevent the movement of the precast column 30 to improve the stability of the structure.

[0053] It is worth mentioning that, when the precast column 30 is engaged with the anchor 20, the trumpet-shaped guide portion 321 of the guide hole 32 of the precast column 30 provides a guiding effect, so that the precast column 30 and the anchor 20 can be matched to achieve fast and accurate positioning, reduce the matching error value between the two, effectively improve the reliability and smoothness of construction, avoid being affected by uncontrollable factors (such as weather effects, crane flexibility, crane operation proficiency, and uncertain factors in manual construction of the precast column 30, etc.), and greatly improve the overall construction quality.

[0054] In addition, according to the foregoing, in the embodiment of the present invention, the anchor 20 can use a bamboo steel bar numbered #8 with a diameter of 2.5 cm, and the positioning section 22 of the anchor 20 protrudes 8 cm to 10 cm from the concrete paving layer 10, and can withstand the impact of a 60 cm square, 2 m long precast column 30 with a lateral force of 0.2 g (approximately 55.3 kgf-m) without bending the anchor 20.

[0055] Based on the above items and the following parameter conditions, the support strength described in the following table can be calculated:

[0056]

[0057] See also Figure 4As shown, according to the above construction method, the present invention provides a precast column positioning structure 100, which includes an anchor 20 and a precast column 30. The anchor 20 is vertically inserted into the concrete cushion layer 10, the coupling section 21 of the anchor 20 extends into and is fixed to the concrete cushion layer 10, and the positioning section 22 is exposed from the concrete cushion layer 10. The precast column 30 is connected to the positioning section 22 of the anchor 20 with a guide hole 32, so that the bottom surface 31 of the precast column 30 is supported and set on the concrete cushion layer 10.

[0058] Thus, the present invention uses the aforementioned precast column positioning structure 100 and its construction method to enable the precast column 30 to cooperate with the anchor 20 on the concrete cushion layer 10 through the guide hole 32, so that the two can be smoothly joined and accurately positioned. After the precast column 30 is installed, the structural stability during external force collision, strong wind, or earthquake can be increased.

[0059] See also Figures 5 to 8 As shown, another construction method of the precast column positioning structure 100a of the present invention is different from the above-mentioned embodiment in that no hole needs to be dug in advance on the construction site, but after the concrete cushion layer 10 is laid and solidified for a period of time, it is measured, laid out, and leveled, and then a positioning tube 40 is placed on the surface 11 of the concrete cushion layer 10. The thickness of the concrete cushion layer 10 is about 10 cm, and the positioning tube 40 includes a base 41 and a cylinder 42 vertically connected to the base 41, and the positioning tube 40 also includes a through hole 43 that passes through the base 41 and the cylinder 42.

[0060] like Figure 6 and Figure 7 As shown, the anchor 20a can be nailed straight into the concrete paving layer 10 through the through hole 43 of the positioning tube 40. In this embodiment, the anchor 20a is a steel nail and has a tip 23, which can facilitate the anchor 20a to be nailed into the concrete paving layer 10, and the verticality of the anchor 20a nailed into the concrete paving layer 10 is ensured by the guidance of the positioning tube 40.

[0061] like Figure 8 As shown, according to the aforementioned construction method, the anchor 20a is vertically nailed into the concrete cushion layer 10, the connecting section 21 of the anchor 20a extends into the concrete cushion layer 10, and the positioning section 22 is exposed from the concrete cushion layer 10. The precast column 30 is connected to the positioning section 22 of the anchor 20a with a guide hole 32, so that the precast column 30 is smoothly connected to the anchor 20a, so that the bottom surface 31 of the precast column 30 is supported and set on the concrete cushion layer 10. After the precast column 30 is installed, the structural stability during external force collision or strong wind or earthquake can be increased. Among them, the guide portion 321 of the guide hole 32 has a depth of 5 cm, the inner hole portion 322 is 2.5 cm, and the hole diameter of the inner hole portion 322 is about 2 cm.

[0062] Further, in the embodiment of the present invention, the anchor 20a can use a steel nail with a diameter of 1.75 cm, and the positioning section 22 of the anchor 20a protrudes 7 cm from the concrete cushion layer 10; it can withstand a lateral force of 0.2 g (impact force of about 233 kgf-m, impact bending moment of about 1633 kgf-cm) of a precast column 30 with a square side length of 45 cm and a length of 240 cm, without displacing or deforming the anchor 20a, wherein the aforementioned parameter conditions and strength calculation results are as follows:

[0063]

[0064] In addition, in another construction method of the embodiment of the present invention, the worker can level the corresponding part of the concrete paving layer 10 according to the column position of each precast column 30 to facilitate the placement of the positioning tube 40 or the placement of the precast column 30 to facilitate subsequent operations.

[0065] In another construction method of the embodiment of the present invention, the anchor 20a can be directly nailed into the concrete cushion layer 10 after solidification, without the need for a positioning tube 40 for construction. The corresponding technical effect can be obtained by simply nailing the anchor 20a vertically into the concrete cushion layer 10.

[0066] Although the present invention is described above with a preferred embodiment, those skilled in the art can make various changes without departing from the spirit and scope of the present invention. The above embodiments are only used to illustrate the present invention and are not used to limit the scope of the present invention. All modifications or changes that do not violate the spirit of the present invention are within the scope of the patent application of the present invention.

Claims

1. A precast column positioning structure, characterized in that: include: an anchoring member inserted into a concrete cushion layer, the anchoring member having a combining section and a positioning section, the combining section extending into and fixed to the concrete cushion layer, the positioning section being exposed from the concrete cushion layer; and A precast column has a bottom surface, the bottom surface is provided with a guide hole arranged along the length direction, the precast column is connected to the positioning section of the anchor member through the guide hole, so that the bottom surface is supported and arranged on the concrete paving layer.

2. The precast column positioning structure according to claim 1, characterized in that: The anchor is vertically inserted into the concrete cushion layer, and the center of the guide hole extends through the center of gravity of the precast column.

3. The precast column positioning structure according to claim 1, characterized in that: The guide hole has a trumpet-shaped guide portion recessed from the bottom surface and an inner hole portion away from the bottom surface and connected to the guide portion.

4. The precast column positioning structure according to claim 3, characterized in that: The length of the combining section is greater than that of the positioning section, and the length of the combining section is between 20cm and 30cm; the positioning section protrudes from the concrete paving layer by 8cm to 10cm; and the anchor is a bamboo steel bar, a straight steel bar or a steel nail.

5. A construction method for a precast column positioning structure, characterized in that: The following steps are involved: Laying a concrete cushion layer on the ground; Inserting an anchor into the concrete cushion layer, the anchor having a combining section and a positioning section, the combining section extending into the concrete cushion layer, and the positioning section protruding out of the concrete cushion layer; and A precast column is provided. The precast column has a bottom surface. The bottom surface is provided with a guide hole arranged along the length direction. The guide hole of the precast column is aligned with the anchor member, so that the precast column is connected to the positioning section of the anchor member through the guide hole to position the precast column on the concrete paving layer.

6. The construction method of the precast column positioning structure according to claim 5, characterized in that: The center of the guide hole extends through the center of gravity of the precast column.

7. The construction method of the precast column positioning structure according to claim 5, characterized in that: The guide hole has a trumpet-shaped guide portion recessed from the bottom surface and an inner hole portion away from the bottom surface and connected to the guide portion.

8. The construction method of the precast column positioning structure according to claim 7, characterized in that: The length of the combining section is greater than that of the positioning section, and the length of the combining section is between 20cm and 30cm; the depth of the guiding portion is less than the depth of the inner hole portion; the anchor is a bamboo steel bar, a straight steel bar or a steel nail; the positioning section protrudes from the concrete cushion layer by 8cm to 10cm.

9. The construction method of the precast column positioning structure according to claim 8, characterized in that: The concrete paving layer is provided with holes for inserting the anchoring member, so that the anchoring member can be inserted and positioned vertically on the ground.

10. The construction method of the precast column positioning structure according to claim 8, characterized in that: The anchor is inserted before the concrete paving layer solidifies.

11. The construction method of the precast column positioning structure according to claim 8, characterized in that: The anchor is nailed in after the concrete cushion layer solidifies.

12. The construction method of the precast column positioning structure according to claim 11, characterized in that: The anchor is nailed into the concrete cushion layer in cooperation with a positioning tube after the concrete cushion layer solidifies. The positioning tube includes a base and a tube portion vertically connected to the base. The positioning tube also includes a through hole that passes through the base and the tube portion, and the through hole allows the anchor to be nailed straight into the concrete cushion layer.

Citation Information

Patent Citations

  • Positioning device for prefabricated assembly column

    CN208996470U

  • Conjunction structure between precast pole and pole base frame having leakage structure

    CN2679262Y

  • Method for erecting pc column on foundation

    JP1998331255A

  • System for Anchoring Precast Concrete Wall Columns to Foundations

    US20120304564A1

  • Fastener with deformable portion for guiding pins or the like

    US3955462A