Fracturing fluid conveying hose for shale oil and gas exploitation and manufacturing method of fracturing fluid conveying hose
By adopting a double-layer structure and staggered fiber design in the fracturing fluid delivery hose, the problem of insufficient pressure bearing strength and softness in the prior art is solved, and higher strength and convenient storage and use are achieved.
Patent Information
- Application Number
- CN202411285850.0
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-13
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
While increasing the pressure bearing strength, the existing fracturing fluid conveying hoses have insufficient softness, which affects their use and storage in the shale oil and gas mining process.
Using the inner tube layer, reinforcement layer and outer tube layer structure arranged in sequence from the inside to the outside, the reinforcement layer consists of interlaced first and second reinforcement layers, using different fiber materials, and is connected through the adhesive layer to increase the Connecting holes and connecting columns to enhance overall strength.
It achieves the maintenance of good softness while improving the pressure bearing strength, which is easy to wind and store, and the overall strength and anti-static properties of the hose are further improved by the staggered fiber and wire arrangement.
Smart Images

Figure CN119062833A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of hose production, and more particularly to a hose for conveying fracturing fluid used in shale oil and gas development and a manufacturing method thereof. Background Art
[0002] Hydraulic fracturing or hydraulic fracturing is the process of fracturing rock using pressurized fluids. It has become the preferred method for extracting and producing shale oil and gas, tight gas, tight oil and coalbed methane. High-pressure fluids fill the wellbore and fracture the rock formation. Proppants in the high-pressure fluids allow the fractures to remain open and also act as fast-permeating pathways for oil and gas directional drilling. Pipelines are required to transport the fracturing fluids during shale oil and gas production.
[0003] The invention patent with publication number CN103612377A discloses a fracturing fluid delivery hose, which includes from outside to inside: an outer rubber layer, a reinforcement layer, and an inner rubber layer; the reinforcement layer is woven into a tubular shape by warp and weft. The invention patent with publication number CN103612376A discloses a fracturing fluid delivery hose for shale oil and gas development, which includes from outside to inside: a covering layer, a reinforcement layer, and an inner lining layer, and the covering layer and the reinforcement layer, and the reinforcement layer and the inner lining layer are bonded by adhesive layers respectively. The reinforcement layer of the fracturing fluid delivery hose in the above patents is a single-layer structure. In actual use, the pressure-bearing strength of the fracturing fluid delivery hose can only be improved by increasing the fineness and density of the warp and weft strings, which will greatly reduce the softness of the fracturing fluid delivery hose.
[0004] Therefore, how to provide a fracturing fluid delivery hose for shale oil and gas development with good pressure-bearing strength and softness and a manufacturing method thereof is one of the technical problems that urgently need to be solved in the art. Summary of the invention
[0005] In view of this, the present invention provides a fracturing fluid delivery hose for shale oil and gas development and a manufacturing method thereof, the purpose of which is to solve the problems in the prior art.
[0006] In order to solve the above technical problems, the present invention adopts the following technical solutions:
[0007] A fracturing fluid delivery hose for shale oil and gas development comprises: an inner tube layer, a reinforcement layer and an outer tube layer arranged in sequence from the inside to the outside; an adhesive layer is provided between the inner tube layer and the reinforcement layer, and between the outer tube layer and the reinforcement layer respectively; the reinforcement layer comprises a first reinforcement layer and a second reinforcement layer arranged in sequence from the outside to the inside; the first reinforcement layer is woven from a first warp and a first weft; the second reinforcement layer is woven from a second warp and a second weft; the first warp and the second warp are arranged in an alternating manner; the first weft and the second weft are arranged in an alternating manner; the first warp and the second warp are connected together by connecting wefts; the first weft and the second weft are connected together by connecting warps.
[0008] Preferably, the reinforcing layer is provided with a plurality of communicating holes; and connecting posts for connecting the adhesive layer at the inner and outer sides of the reinforcing layer are provided in the communicating holes.
[0009] Preferably, the material of the inner tube layer is polyvinyl chloride or thermoplastic polyurethane; the material of the outer tube layer is polyvinyl chloride or thermoplastic polyurethane.
[0010] Preferably, the first warp thread is made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the first weft thread is made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the second warp thread is made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the second weft thread is made of polyester fiber, nylon fiber, polyester fiber or PEN fiber.
[0011] Preferably, metal wires are woven on the first reinforcement layer and / or the second reinforcement layer; and the metal wires are arranged along the central axis direction of the reinforcement layer.
[0012] A method for manufacturing a fracturing fluid delivery hose for shale oil and gas development, which is used to manufacture the fracturing fluid delivery hose for shale oil and gas development, comprises the following steps:
[0013] S1: braided reinforcement layer;
[0014] S2: Co-extruding the raw material of the outer tube layer and the raw material of the adhesive layer to sequentially form the adhesive layer and the outer tube layer from the inside to the outside of the reinforcement layer, and co-extruding the raw material of the inner tube layer and the raw material of the adhesive layer to sequentially form the adhesive layer and the inner tube layer from the outside to the inside of the reinforcement layer, thereby obtaining a hose;
[0015] S3: Cooling the hose obtained in S2.
[0016] Preferably, in S1, the weaving reinforcement layer specifically includes the following steps: S11: weaving a first reinforcement layer and a second reinforcement layer, and setting connecting holes on the first reinforcement layer and the second reinforcement layer; S12: connecting the first reinforcement layer and the second reinforcement layer with connecting weft threads and connecting warp threads to form a reinforcement layer; S13: drying the reinforcement layer obtained in S12.
[0017] Preferably, in S2, the adhesive layer raw material enters the connecting holes on the reinforcing layer and forms connecting columns, connecting the adhesive layers on both sides of the reinforcing layer to form an integral structure.
[0018] Compared with the prior art, the present invention has achieved the following technical effects: by setting a double-layer added layer structure, the present invention can improve the pressure bearing strength of the fracturing fluid delivery hose while ensuring that the fracturing fluid delivery hose has good softness, facilitating the winding and storage of the fracturing fluid delivery hose, and at the same time, by staggering the first warp and the second warp and the first weft and the second weft respectively, the strength of the fracturing fluid delivery hose can be further improved. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] Figure 1 This is a front schematic diagram of a fracturing fluid delivery hose for shale oil and gas development according to the present invention;
[0020] Figure 2 A side schematic diagram of a fracturing fluid delivery hose for shale oil and gas development according to the present invention;
[0021] Figure 3 A schematic diagram of the connection between the first meridian, the second meridian and the connecting latitude;
[0022] Figure 4 is a connection diagram of a first latitude line, a second latitude line and a connecting longitude line;
[0023] In the figure: 1. inner tube layer; 2. reinforcement layer; 21. first reinforcement layer; 211. first warp; 212. first weft; 22. second reinforcement layer; 221. second warp; 222. second weft; 3. outer tube layer; 4. adhesive layer; 5. connecting weft; 6. connecting warp; 7. connecting column. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] Reference Figure 1-4As shown, the present invention provides a fracturing fluid delivery hose for shale oil and gas development, comprising: an inner tube layer 1, a reinforcement layer 2 and an outer tube layer 3 arranged in sequence from the inside to the outside; an adhesive layer 4 is respectively arranged between the inner tube layer 1 and the reinforcement layer 2, and between the outer tube layer 3 and the reinforcement layer 2; the reinforcement layer 2 comprises a first reinforcement layer 21 and a second reinforcement layer 22 arranged in sequence from the outside to the inside; the first reinforcement layer 21 is woven from a first warp 211 and a first weft 212; the second reinforcement layer 22 is woven from a second warp 221 and a second weft 222; the first warp 211 and the second warp 221 are staggered; the first weft 212 and the second weft 222 are staggered; the first warp 211 and the second warp 221 are connected together by a connecting weft 5; the first weft 212 and the second weft 222 are connected together by a connecting warp 6.
[0026] The above technical scheme, by setting up a double-layer added layer structure, can improve the pressure-bearing strength of the fracturing fluid delivery hose while ensuring that the fracturing fluid delivery hose has good softness, facilitating the winding and storage of the fracturing fluid delivery hose. At the same time, by staggering the first warp and the second warp and the first weft and the second weft respectively, the strength of the fracturing fluid delivery hose can be further improved.
[0027] In this embodiment, a plurality of connecting holes are provided on the reinforcing layer 2; connecting columns 7 for connecting the adhesive layers 4 on the inner and outer sides of the reinforcing layer 2 are provided in the connecting holes; by connecting the adhesive layers on the inner and outer sides of the reinforcing layer through the connecting columns, the integrity of the fracturing fluid delivery hose can be improved, thereby improving the overall strength of the fracturing fluid delivery hose.
[0028] In this embodiment, the material of the inner tube layer 1 is polyvinyl chloride or thermoplastic polyurethane; the material of the outer tube layer 3 is polyvinyl chloride or thermoplastic polyurethane.
[0029] In this embodiment, the first warp threads 211 are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the first weft threads 212 are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the second warp threads 221 are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the second weft threads 222 are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber.
[0030] In this embodiment, metal wires are woven on the first reinforcement layer 21 and / or the second reinforcement layer 22; the metal wires are arranged along the central axis direction of the reinforcement layer 2; and the metal wires are arranged to conduct static electricity generated during the transportation process, thereby playing an anti-static role.
[0031] In this embodiment, the metal wire is copper wire.
[0032] In some other embodiments, the material of the metal wire can be selected according to actual needs.
[0033] The present invention also provides a method for manufacturing a fracturing fluid delivery hose for shale oil and gas development, which is used to manufacture the above-mentioned fracturing fluid delivery hose for shale oil and gas development, comprising the following steps:
[0034] S1: braided reinforcement layer 2;
[0035] S2: Co-extrude the raw material of the outer tube layer 3 and the raw material of the adhesive layer 4 to sequentially form the adhesive layer 4 and the outer tube layer 3 on the outer side of the reinforcement layer 2 from the inside to the outside, and co-extrude the raw material of the inner tube layer 1 and the raw material of the adhesive layer 4 to sequentially form the adhesive layer 4 and the inner tube layer 1 on the inner side of the reinforcement layer 2 from the outside to the inside, and thus obtain the hose;
[0036] S3: Cooling the hose obtained in S2.
[0037] In this embodiment, in S1, the weaving reinforcement layer 2 specifically includes the following steps: S11: weaving a first reinforcement layer 21 and a second reinforcement layer 22, and setting connecting holes on the first reinforcement layer 21 and the second reinforcement layer 22; S12: using connecting weft threads 5 and connecting warp threads 6 to connect the first reinforcement layer 21 and the second reinforcement layer 22 to form a reinforcement layer 2; S13: drying the reinforcement layer 2 obtained in S12.
[0038] In this embodiment, in S2, the raw material of the adhesive layer 4 enters the connecting hole on the reinforcing layer 2 and forms the connecting column 7, connecting the adhesive layer 4 on both sides of the inner and outer sides of the reinforcing layer 2 to form an integral structure.
[0039] The above description is only a preferred embodiment of the present invention and does not limit the technical scope of the present invention. Therefore, any slight modifications, equivalent changes and modifications made to the above embodiments based on the technical essence of the present invention are still within the scope of the technical solution of the present invention.
Claims
1. A fracturing fluid delivery hose for shale oil and gas development, characterized in that: include: An inner tube layer (1), a reinforcement layer (2) and an outer tube layer (3) are sequentially arranged from the inside to the outside; an adhesive layer (4) is respectively arranged between the inner tube layer (1) and the reinforcement layer (2), and between the outer tube layer (3) and the reinforcement layer (2); the reinforcement layer (2) comprises a first reinforcement layer (21) and a second reinforcement layer (22) which are sequentially arranged from the outside to the inside; the first reinforcement layer (21) is woven from first warp threads (211) and first weft threads (212); the second reinforcement layer (22) is woven from second warp threads (221) and second weft threads (222); the first warp threads (211) and the second warp threads (221) are arranged in an alternating manner; the first weft threads (212) and the second weft threads (222) are arranged in an alternating manner; the first warp threads (211) and the second warp threads (221) are connected together by connecting weft threads (5); the first weft threads (212) and the second weft threads (222) are connected together by connecting warp threads (6).
2. A fracturing fluid delivery hose for shale oil and gas development according to claim 1, characterized in that: The reinforcing layer (2) is provided with a plurality of communicating holes; and connecting posts (7) for connecting the adhesive layer (4) on the inner and outer sides of the reinforcing layer (2) are provided in the communicating holes.
3. The fracturing fluid delivery hose for shale oil and gas development according to claim 1, characterized in that: The material of the inner tube layer (1) is polyvinyl chloride or thermoplastic polyurethane; the material of the outer tube layer (3) is polyvinyl chloride or thermoplastic polyurethane.
4. A fracturing fluid delivery hose for shale oil and gas development according to claim 1, characterized in that: The first warp threads (211) are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the first weft threads (212) are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; the second warp threads (221) are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber; and the second weft threads (222) are made of polyester fiber, nylon fiber, polyester fiber or PEN fiber.
5. The fracturing fluid delivery hose for shale oil and gas development according to claim 1, characterized in that: Metal wires are woven on the first reinforcement layer (21) and / or the second reinforcement layer (22); the metal wires are arranged along the central axis direction of the reinforcement layer (2).
6. A method for manufacturing a fracturing fluid delivery hose for shale oil and gas development, used for manufacturing a fracturing fluid delivery hose for shale oil and gas development as claimed in any one of claims 1 to 5, characterized in that: The following steps are involved: S1: braided reinforcement layer (2); S2: Co-extruding the raw material of the outer tube layer (3) and the raw material of the adhesive layer (4) to sequentially form the adhesive layer (4) and the outer tube layer (3) on the outer side of the reinforcement layer (2) from the inside to the outside, and co-extruding the raw material of the inner tube layer (1) and the raw material of the adhesive layer (4) to sequentially form the adhesive layer (4) and the inner tube layer (1) on the inner side of the reinforcement layer (2) from the outside to the inside, thereby obtaining a hose; S3: Cooling the hose obtained in S2.
7. The method for manufacturing a fracturing fluid delivery hose for shale oil and gas development according to claim 6, characterized in that: In S1, the braided reinforcement layer (2) is specifically The method comprises the following steps: S11: weaving a first reinforcement layer (21) and a second reinforcement layer (22), and providing connecting holes on the first reinforcement layer (21) and the second reinforcement layer (22); S12: connecting the first reinforcement layer (21) and the second reinforcement layer (22) by using a connecting weft thread (5) and a connecting warp thread (6) to form a reinforcement layer (2); S13: drying the reinforcement layer (2) obtained in S12.
8. The method for manufacturing a fracturing fluid delivery hose for shale oil and gas development according to claim 6, characterized in that: In S2, the raw material of the adhesive layer (4) enters the connecting holes on the reinforcing layer (2) and forms a connecting column (7), connecting the adhesive layer (4) on both sides of the reinforcing layer (2) to form an integral structure.
Citation Information
Patent Citations
Fracturing liquid conveying flexible pipe for exploiting shale oil gas, manufacturing method thereof and co-extrusion mold
CN103612376A
Fracturing fluid conveying hose and manufacturing method thereof as well as co-extrusion mould
CN103612377A
