Whole-process engineering consultation project risk management system
By designing a mobile risk monitoring device, the problem of existing equipment being unable to move for risk monitoring is solved, comprehensive monitoring and management of engineering risks is achieved, losses are reduced, and detection comprehensiveness and equipment endurance are improved.
Patent Information
- Application Number
- CN202411357299.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-27
- Publication Date
- 2024-12-03
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing engineering equipment cannot be moved for risk monitoring, which makes it difficult to detect and manage risks in a timely manner and the damage is widened.
A full-process engineering consulting project risk management system was designed, including a mobile risk monitoring device, which adopts mobile base device, adjustment device and energy replenishment device to realize the mobility and all-round risk monitoring of the equipment, and improve the battery life through power supply through photovoltaic panels. ability.
It realizes comprehensive monitoring and management of engineering risks, reduces project losses, improves the comprehensiveness of inspection and the endurance of equipment.
Smart Images

Figure CN119062882A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of engineering projects, and in particular to a full-process engineering consulting project risk management system. Background Art
[0002] With the development of social economy, various large-scale engineering construction projects are increasing day by day. These projects involve high technology, large investment, long cycle and high risk, which puts forward higher requirements for project risk management.
[0003] The existing engineering project equipment has the following defects:
[0004] Existing engineering project equipment cannot be moved for risk monitoring and management, so after a risk occurs, it is difficult to detect the risk, leading to the problem of damage expansion. For this reason, a solution is needed. Summary of the invention
[0005] The purpose of the present invention is to provide a full-process engineering consulting project risk management system to solve the problems raised in the above background technology.
[0006] To achieve the above object, the present invention provides the following technical solutions:
[0007] A full-process engineering consulting project risk management system includes a mobile risk monitoring device and a risk management system. The mobile risk monitoring device includes a mobile base device, a mounting platform, an adjustment device, a control box and an energy charging device. The mounting platform is a square structure, the mounting platform is installed on the top of the mobile base device, the adjustment device is installed on the top of the mounting platform, the control box is a square structure, the mounting platform is installed on the top driving end of the adjustment device, and the energy charging device is installed on the top of the control box.
[0008] As a preferred embodiment of the present invention, the mobile base device includes a main base, a first base and a second base. The main base, the first base and the second base are all smoothly transitioned and integrally processed structures. The main base is higher than the first base and the second base. The first base is located at the left end of the main base, and the second base is located at the right end of the main base.
[0009] As a preferred embodiment of the present invention, two groups of symmetrically distributed drive motors are installed on the top of the first base and the second base, and drive wheels are installed on the bottom drive ends of the drive motors, and the drive wheels are located at the bottom of the first base and the second base.
[0010] As a preferred embodiment of the present invention, a protective shell is installed on the top of the first base and the second base, and a maintenance sealing door is installed on the top of the protective shell.
[0011] As a preferred embodiment of the present invention, two groups of shock-absorbing support seats distributed in a symmetrical manner are provided between the main base and the installation platform.
[0012] As a preferred embodiment of the present invention, the adjusting device includes a bottom rotating bearing, a rotating shaft and a rotating motor. The rotating shaft is installed on the top of the bottom rotating bearing. A gear plate is provided on the outside of the rotating shaft. A pinion is provided on the top driving end of the rotating motor, and the pinion is meshed with the gear plate.
[0013] As a preferred embodiment of the present invention, detection cameras are installed on four sides of the control box.
[0014] As a preferred embodiment of the present invention, the energy charging device includes a mounting support frame, side support legs and photovoltaic panels. The mounting support frame is a T-shaped structure. The side support legs are provided with a group, and a group of side support legs are respectively installed at the left and right ends of the bottom of the mounting support frame. A plurality of fixing holes are opened on the surface of the side support legs. The photovoltaic panels are provided with a group, and a group of photovoltaic panels are symmetrically installed on the top of the mounting support frame.
[0015] As a preferred embodiment of the present invention, the risk management system includes a detection module, a processing module, a positioning module, a data sending module and a host, the detection module is connected to the processing module and the positioning module respectively, the positioning module is connected to the data sending module, and the data module is connected to the host.
[0016] Compared with the prior art, the present invention has the following beneficial effects:
[0017] In a full-process engineering consulting project risk management system of the present invention, a mobile base device is provided, so that the purpose of mobile risk monitoring can be effectively achieved, the comprehensiveness of engineering risk monitoring is further improved, and the purpose of reducing engineering losses can be achieved. This device is provided with an adjustment device, which can rotate and adjust the detection direction, thereby further improving the comprehensiveness of the detection. This device is also provided with an energy replenishment device, which can generate electricity through photovoltaic panels to supply power and replenish electricity to the components in the control box, thereby improving the overall endurance. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 It is a schematic diagram of the overall internal structure of the present invention;
[0019] Figure 2 It is a structural schematic diagram of the mobile base device of the present invention;
[0020] Figure 3 It is a schematic diagram of the control box structure of the present invention;
[0021] Figure 4 It is a schematic diagram of the structure of the energy replenishment device of the present invention;
[0022] Figure 5 It is a schematic diagram of the risk management system of the present invention;.
[0023] In the figure: 1. Mobile risk monitoring device; 2. Mobile base device; 3. Installation platform; 4. Adjustment device; 5. Control box; 6. Energy charging device; 7. Main base; 8. First base; 9. Second base; 10. Drive motor; 11. Drive wheel; 12. Protective shell; 13. Maintenance sealing door; 14. Shock-absorbing support seat; 15. Bottom rotating bearing; 16. Rotating shaft; 17. Rotating motor; 18. Pinion; 19. Gear plate; 20. Detection camera; 21. Installation support frame; 22. Side support foot; 23. Fixing hole; 24. Photovoltaic panel. DETAILED DESCRIPTION
[0024] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0025] See also Figure 1-5 , the present invention provides a technical solution:
[0026] A full-process engineering consulting project risk management system includes a mobile risk monitoring device 1 and a risk management system. The mobile risk monitoring device 1 includes a mobile base device 2, a mounting platform 3, an adjustment device 4, a control box 5 and an energy charging device 6. The mounting platform 3 is a square structure, the mounting platform 3 is mounted on the top of the mobile base device 2, the adjustment device 4 is mounted on the top of the mounting platform 3, the control box 5 is a square structure, the mounting platform 3 is mounted on the top driving end of the adjustment device 4, and the energy charging device 6 is mounted on the top of the control box 5.
[0027] As a preferred embodiment of the present invention, the mobile base device 2 includes a main base 7, a first base 8 and a second base 9. The main base 7, the first base 8 and the second base 9 are all smoothly transitioned and integrally processed structures. The main base 7 is higher than the first base 8 and the second base 9. The first base 8 is located at the left end of the main base 7, and the second base 9 is located at the right end of the main base 7.
[0028] As a preferred embodiment of the present invention, two groups of drive motors 10 distributed in a symmetrical manner are installed on the top of the first base 8 and the second base 9, and drive wheels 11 are installed on the bottom drive ends of the drive motors 10. The drive wheels 11 are located at the bottom of the first base 8 and the second base 9. When the mobile risk monitoring device 1 is mobile monitored, the staff starts the two groups of drive motors 10 on the first base 8 and the second base 9, and the drive motors 10 drive the drive wheels 11 at the bottom to rotate. Then, the drive wheels 11 can be used to move on the installation track, and the drive motors 10 can be driven forward and reverse, thereby driving the mobile risk monitoring device 1 to move forward or backward.
[0029] As a preferred embodiment of the present invention, a protective shell 12 is installed on the top of the first base 8 and the second base 9, and a maintenance sealing door 13 is installed on the top of the protective shell 12. The staff can open the maintenance sealing door 13 on the protective shell 12, and then they can maintain the components on the first base 8 and the second base 9.
[0030] As a preferred embodiment of the present invention, two groups of shock-absorbing support seats 14 distributed in a symmetrical manner are provided between the main base 7 and the mounting platform 3. When moving, the shock-absorbing support seats 14 between the base 7 and the mounting platform 3 can achieve the purpose of shock absorption and improve the overall stability.
[0031] As a preferred embodiment of the present invention, the adjusting device 4 includes a bottom rotating bearing 15, a rotating shaft 16 and a rotating motor 17. The rotating shaft 16 is installed on the top of the bottom rotating bearing 15. A gear plate 19 is provided on the outside of the rotating shaft 16. A pinion 18 is provided on the top driving end of the rotating motor 17. The pinion 18 is meshed with the gear plate 19. When a group of detection cameras 20 are monitoring blind spots for detection, the staff can start the rotating motor 17. The rotating motor 17 drives the gear plate 19 through the pinion 18, and the rotating shaft 16 can rotate on the bottom rotating bearing 15, and the control box 5 on the top of the rotating shaft 16 can rotate, thereby facilitating the detection camera 20 to monitor.
[0032] As a preferred embodiment of the present invention, detection cameras 20 are installed on four sides of the control box 5. The detection cameras 20 on the four sides of the control box 5 can monitor four directions of the construction site, thereby improving the comprehensiveness of the monitoring.
[0033] As a preferred embodiment of the present invention, the energy replenishment device 6 includes a mounting support frame 21, a side support leg 22 and a photovoltaic panel 24. The mounting support frame 21 is a T-shaped structure. The side support leg 22 is provided with a group, and a group of the side support legs 22 are respectively installed at the left end and the right end of the bottom of the mounting support frame 21. The surface of the side support leg 22 is provided with a plurality of fixing holes 23. The photovoltaic panel 24 is provided with a group, and a group of the photovoltaic panels 24 are symmetrically installed on the top of the mounting support frame 21. When in use, a group of photovoltaic panels 24 on the mounting support frame 21 converts sunlight into electrical energy, and then transmits it to the control box 5 for power replenishment, and a group of photovoltaic panels 24 can achieve the purpose of sun protection and rain protection.
[0034] As a preferred embodiment of the present invention, the risk management system includes a detection module, a processing module, a positioning module, a data sending module and a host. The detection module is respectively connected to the processing module and the positioning module, the positioning module is connected to the data sending module, and the data module is connected to the host. The risk is detected by the detection module, and then the detection module sends the risk to the processing module for processing and the positioning module for positioning. Finally, the information processed by the processing module and the positioning information of the positioning module are sent to the host for display through the data sending module.
[0035] Working principle: When the mobile risk monitoring device 1 is being monitored, the staff starts the two sets of drive motors 10 on the first base 8 and the second base 9, and the drive motors 10 drive the drive wheels 11 at the bottom to rotate, and then the drive wheels 11 can be used to move on the installation track, and the drive motors 10 can be driven forward and reversely, thereby driving the mobile risk monitoring device 1 to move forward or backward. When the mobile risk monitoring device 1 is moving, the shock-absorbing support seat 14 between the base 7 and the installation platform 3 can achieve the purpose of shock absorption and improve the overall stability. During operation, the detection cameras 20 on the four sides of the control box 5 can The construction site is monitored in four directions. When a group of detection cameras 20 are monitoring blind spots, the staff can start the rotating motor 17. The rotating motor 17 drives the gear plate 19 through the pinion 18, and the rotating shaft 16 can rotate on the bottom rotating bearing 15, and the control box 5 on the top of the rotating shaft 16 can rotate, so as to facilitate the detection camera 20 to monitor, and the detection module to detect the risk. Then the detection module sends the risk to the processing module for processing and the positioning module for positioning. Finally, the information processed by the processing module and the positioning information of the positioning module are sent to the host for display through the data sending module.
[0036] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims
1. A full-process engineering consulting project risk management system, characterized by: The invention comprises a mobile risk monitoring device (1) and a risk management system. The mobile risk monitoring device (1) comprises a mobile base device (2), a mounting platform (3), an adjusting device (4), a control box (5) and an energy replenishing device (6). The mounting platform (3) is in a square structure. The mounting platform (3) is mounted on the top of the mobile base device (2). The adjusting device (4) is mounted on the top of the mounting platform (3). The control box (5) is in a square structure. The mounting platform (3) is mounted on the top driving end of the adjusting device (4). The energy replenishing device (6) is mounted on the top of the control box (5).
2. A full-process engineering consulting project risk management system according to claim 1, characterized in that: The mobile base device (2) comprises a main base (7), a first base (8) and a second base (9); the main base (7), the first base (8) and the second base (9) are all smoothly transitioned and integrally processed structures; the main base (7) is higher than the first base (8) and the second base (9); the first base (8) is located at the left end of the main base (7) and the second base (9) is located at the right end of the main base (7).
3. A full-process engineering consulting project risk management system according to claim 2, characterized in that: Two groups of symmetrically distributed drive motors (10) are installed on the top of the first base (8) and the second base (9), and drive wheels (11) are installed on the bottom drive ends of the drive motors (10), and the drive wheels (11) are located at the bottom of the first base (8) and the second base (9).
4. The full-process engineering consulting project risk management system according to claim 2 is characterized by: A protective shell (12) is installed on the top of each of the first base (8) and the second base (9), and a maintenance sealing door (13) is installed on the top of the protective shell (12).
5. The full-process engineering consulting project risk management system according to claim 2 is characterized by: Two groups of shock-absorbing support seats (14) distributed in a symmetrical manner are arranged between the main base (7) and the installation platform (3).
6. The full-process engineering consulting project risk management system according to claim 1 is characterized by: The adjusting device (4) comprises a bottom rotating bearing (15), a rotating shaft (16) and a rotating motor (17); the rotating shaft (16) is mounted on the top of the bottom rotating bearing (15); a gear plate (19) is arranged on the outside of the rotating shaft (16); a pinion (18) is arranged on the top driving end of the rotating motor (17); and the pinion (18) is meshed with the gear plate (19).
7. The full-process engineering consulting project risk management system according to claim 1 is characterized by: Detection cameras (20) are installed on four sides of the control box (5).
8. The full-process engineering consulting project risk management system according to claim 1 is characterized by: The energy replenishment device (6) comprises a mounting support frame (21), a side support leg (22) and a photovoltaic panel (24); the mounting support frame (21) is in a T-shaped structure; a group of the side support legs (22) is provided, and a group of the side support legs (22) is respectively installed at the left end and the right end of the bottom of the mounting support frame (21); a plurality of groups of fixing holes (23) are opened on the surface of the side support leg (22); a group of the photovoltaic panel (24) is provided, and a group of the photovoltaic panel (24) is symmetrically installed on the top of the mounting support frame (21).
9. The full-process engineering consulting project risk management system according to claim 1 is characterized by: The risk management system includes a detection module, a processing module, a positioning module, a data sending module and a host. The detection module is connected to the processing module and the positioning module respectively, the positioning module is connected to the data sending module, and the data module is connected to the host.