Fly ash sampling device for pneumatic ash conveying pipeline of thermal power plant and operation method
By designing ash-conveying connection pipe, feed pipe, fly ash separation bin, ash storage bin and exhaust pipe, using the Venturi principle to generate negative pressure and isolation plate control, the problem of inaccurate fly ash sampling in the existing technology is solved. Fast and accurate fly ash sampling is achieved to ensure sample authenticity.
Patent Information
- Application Number
- CN202411133363.2
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-19
- Publication Date
- 2024-12-03
AI Technical Summary
In the prior art, fly ash sampling is limited to the local location of the ash input pipeline. Without introducing external power, it is difficult to quickly and accurately complete the fly ash sampling work from the ash input pipeline, and the samples cannot truly reflect the fly ash characteristics.
设计了一种火力电厂气力输灰管道的飞灰取样装置,包括输灰连接管、进料管、飞灰分离仓、储灰仓和排气管,利用文丘里管段和采样头的设计在飞灰流动过程中产生负压,实现飞灰的有效吸入和分离,并通过隔离板的控制确保样品的准确性。
It realizes the rapid and accurate fly ash sampling from the ash supply pipeline without external power, ensuring that the sample truly reflects the fly ash characteristics, avoids interference with the internal fly ash flow field, and improves sampling efficiency and accuracy.
Smart Images

Figure CN119064091A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of fly ash sampling, in particular to a fly ash sampling device and an operating method for a pneumatic ash conveying pipeline in a thermal power plant. Background Art
[0002] When pulverized coal is burned in the boiler to release energy, it also produces fly ash, which is transported to the ash storage bin through the pneumatic ash conveying system.
[0003] Fly ash particle size and fly ash moisture content are important parameters that affect the performance of pneumatic ash conveying systems. By analyzing these two parameters of different coal types, the pneumatic ash conveying system, low-temperature economizer, ash hopper heater and other related systems can be adjusted. Due to the complex situation of the coal market, it is difficult for power plants to guarantee the use of designed coal types, and the fly ash particle size is closely related to the type of coal. The larger the fly ash particle size, the worse the carrying capacity of compressed air, and the fly ash is easy to settle and cause pipe blockage. Therefore, it is necessary to increase the air intake of the ash conveying system and appropriately increase the air intake pressure to improve the ash conveying capacity.
[0004] Usually, a low-temperature economizer is installed before the dust collector. When the outlet flue gas temperature of the low-temperature economizer is lower than the dew point, moisture is easily precipitated from the flue gas. The precipitated moisture will be absorbed by the fly ash, resulting in an increase in the moisture content of the fly ash and an increase in the viscosity of the fly ash. In severe cases, the fly ash may become hardened in the dust collector, affecting the safety of the unit operation.
[0005] In summary, in the prior art, fly ash sampling is limited to a local position of the ash conveying pipeline. Without the introduction of external power, it is difficult to quickly and accurately complete the fly ash sampling work from the ash conveying pipeline, and the samples cannot truly reflect the characteristics of the fly ash. Summary of the invention
[0006] The technical problem to be solved by the present invention is that in the prior art, fly ash sampling is limited to a local position of the ash conveying pipeline. Without the introduction of external power, it is difficult to quickly and accurately complete the fly ash sampling work from the ash conveying pipeline, and the sample cannot truly reflect the characteristics of the fly ash.
[0007] In order to solve the above technical problems, the present invention provides a technical solution for a fly ash sampling device for a pneumatic ash conveying pipeline in a thermal power plant:
[0008] The fly ash sampling device of the pneumatic ash conveying pipeline of a thermal power plant comprises an ash conveying connecting pipe, a feeding pipe, a fly ash separation bin, an ash storage bin and an exhaust pipe, wherein the end of the ash conveying connecting pipe is provided with a first connecting portion and a second connecting portion for connecting with the ash conveying pipeline;
[0009] The ash conveying connecting pipe is also provided with a venturi tube section, the inner diameter of the venturi tube section is smaller than the inner diameter of the ash conveying connecting pipe, and the first connecting part, the venturi tube section and the second connecting part are arranged in sequence along the fly ash flow direction of the ash conveying pipeline;
[0010] A first interface is provided on the side wall of the ash conveying connection pipe near the first connection portion, the feed pipe is inserted at the first interface, the end of the feed pipe extends to the interior of the ash conveying connection pipe, and at least two sampling heads are provided at the end of the feed pipe;
[0011] A second interface is provided on the side wall of the venturi tube section, the exhaust pipe is connected to the second interface, and the fly ash separation bin is connected between the feed pipe and the exhaust pipe, so that the feed pipe, the fly ash separation bin and the exhaust pipe are connected in sequence to form a fly ash sampling channel;
[0012] The ash storage bin is arranged at the lower part of the fly ash separation bin, and an isolation plate is movably installed between the fly ash separation bin and the ash storage bin; the isolation plate is closed during sampling to separate the fly ash separation bin and the ash storage bin; after the sampling is completed, the isolation plate is opened to connect the fly ash separation bin and the ash storage bin.
[0013] Furthermore, at least two of the sampling heads are staggeredly distributed on the cross section of the ash conveying connecting pipe.
[0014] Furthermore, the side wall of the ash conveying connecting pipe is provided with three first interfaces distributed along the flow direction of fly ash, and three feed pipes are provided. The three feed pipes are respectively inserted into the corresponding first interfaces, and the ends of the three feed pipes have different extension lengths inside the ash conveying connecting pipe.
[0015] Furthermore, the extension lengths of the ends of the three feed pipes inside the ash conveying connecting pipe are arranged in increasing order along the flow direction of the fly ash.
[0016] Furthermore, the sampling head is a conical expansion, and the expansion end of the sampling head is arranged toward the first connecting portion.
[0017] Furthermore, the inner diameter of the Venturi tube section is greater than or equal to two-thirds of the inner diameter of the ash conveying connecting pipe, and the Venturi tube section is smoothly connected to the ash conveying connecting pipe.
[0018] Furthermore, a material guide pipe is connected to the ash inlet side of the fly ash separation bin, three material feed pipes are connected in parallel to the material guide pipe, and the material guide pipe is arranged to be tilted downward along the flow direction of the fly ash.
[0019] Furthermore, a plurality of baffles are arranged inside the fly ash separation bin, and the plurality of baffles are staggered and distributed to form an S-shaped path, and the isolation plate is horizontally plugged and installed on the lower side of the plurality of baffles.
[0020] Furthermore, the feed pipe is located outside the ash conveying connecting pipe and is equipped with a feed valve, the exhaust pipe is located outside the ash conveying connecting pipe and is equipped with an exhaust valve, and a discharge valve is also installed at the bottom of the ash storage bin.
[0021] In order to solve the above technical problems, the present invention provides a technical solution for an operation method of a fly ash sampling device for a pneumatic ash conveying pipeline in a thermal power plant:
[0022] The operating method of the fly ash sampling device based on the above-mentioned pneumatic ash conveying pipeline of the thermal power plant includes the following steps:
[0023] S1. Install the fly ash sampling device on the horizontal straight pipe section of the ash conveying pipeline. The front and rear distance between the fly ash sampling device and the elbow is greater than 10m, and the distance between the fly ash sampling device and the ash conveying transmitter is greater than 100m;
[0024] S2. Open the feed valve and exhaust valve of the fly ash sampling device and make sure that the isolation plate and discharge valve are in the closed state;
[0025] S3, open the feeding valve and the balancing valve of the ash conveyor, and the fly ash begins to enter the ash conveyor. When the fly ash reaches the set material level, close the feeding valve and the balancing valve;
[0026] S4, opening the air inlet valve group of the ash conveying pipeline and the feed valve of the ash conveying transmitter to start pneumatic ash conveying;
[0027] S5. When the ash-gas mixture in the ash conveying pipeline is transported to the fly ash sampling device, sampling begins. Sampling can be completed after 2 to 5 ash conveying cycles or 5 to 10 minutes of sampling time.
[0028] S6. After sampling, open the isolation plate to allow the fly ash sample in the fly ash separation bin to fall into the ash storage bin, and then close the isolation plate;
[0029] S7, in the process of air blowing and cleaning the pipeline in the last ash conveying cycle of the sampling process, the feed pipe, the guide pipe and the exhaust pipe of the fly ash sampling device are simultaneously air blown and cleaned;
[0030] S8. At the end of the last ash delivery cycle in the sampling process, close the delivery valve of the ash delivery transmitter, and at the same time close the exhaust valve and feed valve of the fly ash sampling device;
[0031] S9. Open and close the isolation plate once more to clean the remaining dust;
[0032] S10, connecting a sample container to the outlet of the discharge valve, and then opening the discharge valve to discharge the fly ash sample in the ash storage bin into the sample container.
[0033] Compared with the prior art, the fly ash sampling device and operation method of the pneumatic ash conveying pipeline of a thermal power plant of the present invention has the following beneficial effects: the fly ash sampling device of the pneumatic ash conveying pipeline of a thermal power plant adopts the design form of an ash conveying connecting pipe, a feeding pipe, a fly ash separation bin, an ash storage bin and an exhaust pipe, and the end of the ash conveying connecting pipe is provided with a first connecting part and a second connecting part, and the ash conveying connecting pipe is connected to the ash conveying pipeline through the first and second connecting parts. The ash conveying connecting pipe is also provided with a venturi tube section whose inner diameter is smaller than the inner diameter of the ash conveying connecting pipe, and the first connecting part, the venturi tube section and the second connecting part are arranged in sequence along the fly ash flow direction of the ash conveying pipeline, and in the process of fly ash flow, the channel becomes thinner from thick, so that the fly ash flow velocity in the venturi tube section is greater than the fly ash flow velocity in the ash conveying pipeline.
[0034] Among them, the side wall of the ash conveying connecting pipe is provided with a first interface near the first connecting part, the feed pipe is inserted at the first interface, the side wall of the venturi tube section is provided with a second interface, the exhaust pipe is connected to the second interface, and the fly ash separation bin is connected between the feed pipe and the exhaust pipe. According to the Venturi principle, if the fly ash flow rate in the venturi tube section is large, the pressure at the second interface of the venturi tube section is less than the pressure at the first interface of the ash conveying connecting pipe, that is, a negative pressure is generated between the second interface and the first interface. Under the action of negative pressure, part of the fly ash in the ash conveying connecting pipe can be effectively sucked into the sampling head, and then flow back to the venturi tube section through the fly ash sampling channels of the feed pipe, the fly ash separation bin and the exhaust pipe in turn.
[0035] The ash storage bin is arranged at the lower part of the fly ash separation bin, and an isolation plate is movably installed between the fly ash separation bin and the ash storage bin. When sampling, the isolation plate is closed to separate the fly ash separation bin and the ash storage bin, and the ash-gas mixture flows to the inside of the fly ash separation bin. The fly ash sample and the gas can be separated by its internal structure, and the fly ash sample falls onto the isolation plate, while the gas continues to flow into the exhaust pipe. When the sampling is completed, the isolation plate can be opened to allow the fly ash sample on the isolation plate to fall into the ash storage bin by itself. In addition, the feed pipe is designed with at least two sampling heads, so that the sampling position of the fly ash is not limited to the local position of the ash conveying pipeline. With the help of the Venturi principle, the interference with the internal fly ash flow field can be avoided. In the absence of external power, the fly ash sampling work can be completed quickly and accurately from the ash conveying pipeline to ensure that the sample truly reflects the characteristics of the fly ash. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 2 is a schematic diagram of the structure of a fly ash sampling device for a pneumatic ash conveying pipeline of a thermal power plant according to an embodiment of the present invention;
[0037] Figure 2 Schematic diagram of the structure of the fly ash sampling device in the embodiment of the present invention applied to the pneumatic ash conveying pipeline of a thermal power plant;
[0038] In the figure: 1-ash conveying connecting pipe, 10-Venturi tube section, 11-first connecting part, 12-second connecting part, 13-first interface, 14-second interface, 2-feeding pipe, 20-sampling head, 21-feeding valve, 22-material guide pipe, 3-fly ash separation bin, 30-baffle, 31-isolation plate, 4-ash storage bin, 41-discharging valve, 5-exhaust pipe, 51-exhaust valve, 6-ash conveying pipeline, 60-intake valve group, 7-ash conveying transmitter, 71-loading valve, 72-balancing valve, 73-feeding valve, 74-level meter. DETAILED DESCRIPTION
[0039] The specific implementation of the present invention is further described in detail below in conjunction with the accompanying drawings and examples. The following examples are used to illustrate the present invention, but are not intended to limit the scope of the present invention.
[0040] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like used in the present invention to indicate the orientation or position relationship are based on the orientation or position relationship shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as limiting the present invention.
[0041] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Therefore, the features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0042] In the present invention, unless otherwise clearly specified and limited, the terms "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be directly connected or indirectly connected through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0043] like Figure 1As shown, a fly ash sampling device for a pneumatic ash conveying pipeline in a thermal power plant according to an embodiment of the present invention comprises an ash conveying connecting pipe 1, a feed pipe 2, a fly ash separation bin 3, an ash storage bin 4 and an exhaust pipe 5, and the end of the ash conveying connecting pipe 1 is provided with a first connecting portion 11 and a second connecting portion 12 for connecting with the ash conveying pipeline 6; a venturi tube section 10 is also provided on the ash conveying connecting pipe 1, and the inner diameter of the venturi tube section 10 is smaller than the inner diameter of the ash conveying connecting pipe 1, and the first connecting portion 11, the venturi tube section 10 and the second connecting portion 12 are arranged in sequence along the fly ash flow direction of the ash conveying pipeline 6.
[0044] A first interface 13 is provided on the side wall of the ash conveying connecting pipe 1 near the first connecting portion 11, and the feed pipe 2 is inserted at the first interface 13. The end of the feed pipe 2 extends to the interior of the ash conveying connecting pipe 1, and at least two sampling heads 20 are provided at the end of the feed pipe 2; a second interface 14 is provided on the side wall of the venturi tube section 10, and the exhaust pipe 5 is connected to the second interface 14, and the fly ash separation bin 3 is connected between the feed pipe 2 and the exhaust pipe 5, so that the feed pipe 2, the fly ash separation bin 3 and the exhaust pipe 5 are connected in sequence to form a fly ash sampling channel.
[0045] The ash storage bin 4 is arranged at the lower part of the fly ash separation bin 3, and an isolation plate 31 is movably installed between the fly ash separation bin 3 and the ash storage bin 4; when sampling, the isolation plate 31 is closed to separate the fly ash separation bin 3 and the ash storage bin 4; after the sampling is completed, the isolation plate 31 is opened to connect the fly ash separation bin 3 and the ash storage bin 4.
[0046] The fly ash sampling device of the pneumatic ash conveying pipeline of the thermal power plant adopts the design form of an ash conveying connecting pipe 1, a feed pipe 2, a fly ash separation bin 3, an ash storage bin 4 and an exhaust pipe 5. The end of the ash conveying connecting pipe 1 is provided with a first connection portion 11 and a second connection portion 12, and the ash conveying connecting pipe 1 is connected to the ash conveying pipeline 6 through the first and second connection portions 11 / 12. The ash conveying connecting pipe 1 is also provided with a venturi tube section 10 whose inner diameter is smaller than the inner diameter of the ash conveying connecting pipe 1, and the first connection portion 11, the venturi tube section 10 and the second connection portion 12 are arranged in sequence along the fly ash flow direction of the ash conveying pipeline 6. In the process of fly ash flow, the fly ash flow velocity in the venturi tube section 10 is greater than the fly ash flow velocity in the ash conveying pipeline 6 because the channel becomes thinner from thicker.
[0047] Among them, the side wall of the ash conveying connecting pipe 1 is provided with a first interface 13 near the first connecting portion 11, the feed pipe 2 is inserted at the first interface 13, the side wall of the venturi tube section 10 is provided with a second interface 14, the exhaust pipe 5 is connected to the second interface 14, and the fly ash separation bin 3 is connected between the feed pipe 2 and the exhaust pipe 5. According to the Venturi principle, if the fly ash flow rate in the venturi tube section 10 is large, the pressure at the second interface 14 of the venturi tube section 10 is less than the pressure at the first interface 13 of the ash conveying connecting pipe 1, that is, a negative pressure is generated between the second interface 14 and the first interface 13. Under the action of negative pressure, part of the fly ash in the ash conveying connecting pipe 1 can be effectively sucked into the sampling head 20, and then flow back to the venturi tube section 10 through the fly ash sampling channels of the feed pipe 2, the fly ash separation bin 3 and the exhaust pipe 5 in sequence.
[0048] The ash storage bin 4 is arranged at the lower part of the fly ash separation bin 3, and an isolation plate 31 is movably installed between the fly ash separation bin 3 and the ash storage bin 4. When sampling, the isolation plate 31 is closed to separate the fly ash separation bin 3 and the ash storage bin 4, and the ash-gas mixture flows into the interior of the fly ash separation bin 3. The fly ash sample and the gas can be separated by its internal structure, and the fly ash sample falls onto the isolation plate 31, while the gas continues to flow into the exhaust pipe 5. When the sampling is completed, the isolation plate 31 can be opened to allow the fly ash sample on the isolation plate 31 to fall into the ash storage bin 4 by itself. In addition, the feed pipe 2 is designed with at least two sampling heads 20, so that the sampling position of the fly ash is not limited to the local position of the ash conveying pipeline 6. With the help of the Venturi principle, the interference with the internal fly ash flow field can be avoided. In the absence of external power, the fly ash sampling work can be completed quickly and accurately from the ash conveying pipeline 6 to ensure that the sample truly reflects the characteristics of the fly ash.
[0049] In this embodiment, at least two sampling heads 20 are staggered on the cross section of the ash conveying connection pipe 1. Specifically, the side wall of the ash conveying connection pipe 1 is provided with three first interfaces 13 distributed along the flow direction of fly ash, and three feed pipes 2 are provided. The three feed pipes 2 are respectively inserted into the corresponding first interfaces 13, and the ends of the three feed pipes 2 have different extension lengths inside the ash conveying connection pipe 1. As a further preferred embodiment, the extension lengths of the ends of the three feed pipes 2 inside the ash conveying connection pipe 1 are arranged in increasing order along the flow direction of fly ash. The three sampling heads 20 can be used to sample different positions of the cross section of the ash conveying connection pipe 1, thereby ensuring the comprehensiveness and accuracy of fly ash sampling.
[0050] It should be noted that the sampling head 20 is a conical expansion, and the expansion end of the sampling head 20 is arranged toward the first connection portion 11. The sampling head 20 is designed to be conical expansion, which is conducive to the inhalation of fly ash and improves the working efficiency of fly ash sampling. In addition, the inner diameter of the venturi tube section 10 is greater than or equal to two-thirds of the inner diameter of the ash conveying connecting pipe 1, and the venturi tube section 10 is smoothly connected to the ash conveying connecting pipe 1, which ensures the flow performance of the fly ash through the venturi tube section 10, and avoids affecting the smoothness of the fly ash flow due to the inner diameter of the venturi tube section 10 being too small or the transition being not smooth.
[0051] In this embodiment, the fly ash separation bin 3 is connected to a guide pipe 22 corresponding to the ash inlet side, three feed pipes 2 are connected in parallel to the guide pipe 22, and the guide pipe 22 is arranged to be tilted downward along the flow direction of the fly ash, so that the fly ash in the feed pipe 2 can fully flow to the fly ash separation bin 3. In addition, a plurality of baffles 30 are arranged inside the fly ash separation bin 3, and the plurality of baffles 30 are staggered to form an S-shaped path, and the isolation plate 31 is horizontally plugged and installed on the lower side of the plurality of baffles 30. Through the shielding effect of the plurality of baffles 30, the flow rate of the fly ash can be reduced, so that the fly ash sample is separated from the gas and then falls onto the isolation plate 31.
[0052] In addition, the feed pipe 2 is located on the outside of the ash conveying connecting pipe 1 and is equipped with a feed valve 21, the exhaust pipe 5 is located on the outside of the ash conveying connecting pipe 1 and is equipped with an exhaust valve 51, and a discharge valve 41 is also installed at the lower part of the ash storage bin 4. The fly ash sampling and sampling work can be accurately controlled by the feed valve 21, the exhaust valve 51 and the discharge valve 41.
[0053] The fly ash sampling device is used in the pneumatic ash conveying pipeline of thermal power plants. Figure 2 As shown, the operation method of the fly ash sampling device based on the above-mentioned pneumatic ash conveying pipeline of the thermal power plant includes the following steps:
[0054] S1. Install the fly ash sampling device on the horizontal straight pipe section of the ash conveying pipeline 6. The front-to-back distance between the fly ash sampling device and the elbow is greater than 10m, and the distance between the fly ash sampling device and the ash conveying transmitter 7 is greater than 100m.
[0055] S2. Open the feed valve 21 and the exhaust valve 51 of the fly ash sampling device, and make sure that the isolation plate 31 and the discharge valve 41 are in a closed state.
[0056] S3. Open the loading valve 71 and the balancing valve 72 of the ash conveying transmitter 7, and the fly ash begins to enter the ash conveying transmitter 7. The level meter 74 is used to detect the amount of fly ash in the ash conveying transmitter 7. When the fly ash reaches the set level, the loading valve 71 and the balancing valve 72 are closed.
[0057] S4, opening the air inlet valve group 60 of the ash conveying pipeline 6 and the material conveying valve 73 of the ash conveying transmitter 7, and starting pneumatic ash conveying.
[0058] S5. When the ash-gas mixture in the ash conveying pipeline 6 is transported to the fly ash sampling device, sampling begins. The sampling can be completed after 2 to 5 ash conveying cycles or 5 to 10 minutes of sampling time.
[0059] S6. After sampling, the isolation plate 31 is opened to allow the fly ash sample in the fly ash separation bin 3 to fall into the ash storage bin 4, and then the isolation plate 31 is closed.
[0060] S7, in the process of air blowing and cleaning the pipeline in the last ash conveying cycle of the sampling process, the feed pipe 2, the guide pipe 22 and the exhaust pipe 5 of the fly ash sampling device are simultaneously air blown and cleaned.
[0061] S8. When the last ash delivery cycle of the sampling process ends, the delivery valve 73 of the ash delivery transmitter 7 is closed, and the exhaust valve 51 and the feed valve 21 of the fly ash sampling device are closed at the same time.
[0062] S9, open and close the isolation plate 31 once more to clean the remaining ash.
[0063] S10, connecting a sample container to the outlet of the discharge valve 41, and then opening the discharge valve 41 to discharge the fly ash sample in the ash storage bin 4 into the sample container.
[0064] The operating method of the fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant in the embodiment of the present invention is the same as the specific embodiment of the operating method of the fly ash sampling device based on the pneumatic ash conveying pipeline of a thermal power plant in the above specific implementation manner, and will not be repeated here.
[0065] The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and substitutions can be made without departing from the technical principles of the present invention. These improvements and substitutions should also be regarded as the scope of protection of the present invention.
Claims
1. A fly ash sampling device for a pneumatic ash conveying pipeline in a thermal power plant, characterized in that: It includes an ash conveying connecting pipe, a feeding pipe, a fly ash separation bin, an ash storage bin and an exhaust pipe, wherein the end of the ash conveying connecting pipe is provided with a first connecting portion and a second connecting portion for connecting with the ash conveying pipeline; The ash conveying connecting pipe is also provided with a venturi tube section, the inner diameter of the venturi tube section is smaller than the inner diameter of the ash conveying connecting pipe, and the first connecting part, the venturi tube section and the second connecting part are arranged in sequence along the fly ash flow direction of the ash conveying pipeline; A first interface is provided on the side wall of the ash conveying connection pipe near the first connection portion, the feed pipe is inserted at the first interface, the end of the feed pipe extends to the interior of the ash conveying connection pipe, and at least two sampling heads are provided at the end of the feed pipe; A second interface is provided on the side wall of the venturi tube section, the exhaust pipe is connected to the second interface, and the fly ash separation bin is connected between the feed pipe and the exhaust pipe, so that the feed pipe, the fly ash separation bin and the exhaust pipe are connected in sequence to form a fly ash sampling channel; The ash storage bin is arranged at the lower part of the fly ash separation bin, and an isolation plate is movably installed between the fly ash separation bin and the ash storage bin; the isolation plate is closed during sampling to separate the fly ash separation bin and the ash storage bin; after the sampling is completed, the isolation plate is opened to connect the fly ash separation bin and the ash storage bin.
2. The fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant according to claim 1 is characterized in that: At least two of the sampling heads are staggeredly distributed on the cross section of the ash conveying connecting pipe.
3. The fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant according to claim 2 is characterized in that: The side wall of the ash conveying connecting pipe is provided with three first interfaces distributed along the flow direction of fly ash, and three feed pipes are provided. The three feed pipes are respectively inserted into the corresponding first interfaces, and the ends of the three feed pipes have different extension lengths inside the ash conveying connecting pipe.
4. The fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant according to claim 3 is characterized in that: The extension lengths of the ends of the three feed pipes inside the ash conveying connecting pipe are arranged in increasing order along the flow direction of the fly ash.
5. The fly ash sampling device for pneumatic ash conveying pipeline of thermal power plant according to claim 1 is characterized in that: The sampling head is tapered and expanded, and the expanded end of the sampling head is arranged toward the first connecting portion.
6. The fly ash sampling device for pneumatic ash conveying pipeline of thermal power plant according to claim 1 is characterized in that: The inner diameter of the Venturi tube section is greater than or equal to two-thirds of the inner diameter of the ash conveying connecting pipe, and the Venturi tube section is smoothly connected to the ash conveying connecting pipe.
7. The fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant according to claim 3 is characterized in that: The fly ash separation bin is connected with a material guide pipe corresponding to the ash inlet side, three of the material inlet pipes are connected in parallel to the material guide pipe, and the material guide pipe is arranged to be tilted downward along the fly ash flow direction.
8. The fly ash sampling device for pneumatic ash conveying pipeline of thermal power plant according to claim 1 is characterized in that: A plurality of baffles are arranged inside the fly ash separation bin, and the plurality of baffles are staggered and distributed to form an S-shaped path, and the isolation plate is horizontally plugged and installed on the lower side of the plurality of baffles.
9. The fly ash sampling device for pneumatic ash conveying pipeline of thermal power plant according to claim 1, characterized in that: The feed pipe is located outside the ash conveying connecting pipe and is equipped with a feed valve, the exhaust pipe is located outside the ash conveying connecting pipe and is equipped with an exhaust valve, and a discharge valve is also installed at the lower part of the ash storage bin.
10. The method for operating the fly ash sampling device for the pneumatic ash conveying pipeline of a thermal power plant according to any one of claims 1 to 9, characterized in that: The following steps are involved: S1. Install the fly ash sampling device on the horizontal straight pipe section of the ash conveying pipeline. The front and rear distance between the fly ash sampling device and the elbow is greater than 10m, and the distance between the fly ash sampling device and the ash conveying transmitter is greater than 100m; S2. Open the feed valve and exhaust valve of the fly ash sampling device and make sure that the isolation plate and discharge valve are in the closed state; S3, open the feeding valve and the balancing valve of the ash conveyor, and the fly ash begins to enter the ash conveyor. When the fly ash reaches the set material level, close the feeding valve and the balancing valve; S4, opening the air inlet valve group of the ash conveying pipeline and the feed valve of the ash conveying transmitter to start pneumatic ash conveying; S5. When the ash-gas mixture in the ash conveying pipeline is transported to the fly ash sampling device, sampling begins. Sampling can be completed after 2 to 5 ash conveying cycles or 5 to 10 minutes of sampling time. S6. After sampling, open the isolation plate to allow the fly ash sample in the fly ash separation bin to fall into the ash storage bin, and then close the isolation plate; S7, in the process of air blowing and cleaning the pipeline in the last ash conveying cycle of the sampling process, the feed pipe, the guide pipe and the exhaust pipe of the fly ash sampling device are simultaneously air blown and cleaned; S8. At the end of the last ash delivery cycle in the sampling process, close the delivery valve of the ash delivery transmitter, and at the same time close the exhaust valve and feed valve of the fly ash sampling device; S9. Open and close the isolation plate once more to clean the remaining dust; S10, connecting a sample container to the outlet of the discharge valve, and then opening the discharge valve to discharge the fly ash sample in the ash storage bin into the sample container.