Intelligent while-drilling geological forecast integrated platform system and method thereof
Through the coordinated detection and data fusion of the integrated intelligent drilling geological forecasting platform system, the problems of low geological forecasting efficiency and high risks in tunnel construction are solved, and more accurate and efficient geological forecasting is achieved, ensuring construction safety.
Patent Information
- Application Number
- CN202410944877.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-15
- Publication Date
- 2024-12-03
AI Technical Summary
In tunnel construction, the existing technology has the limitations of a single forecast method for advance drilling, resulting in low geological forecasting efficiency and high risk, especially in complex geological conditions, which is difficult to conduct comprehensive geological forecasting and data collection.
Adopt intelligent drilling geological forecasting integrated platform system, combining advanced drilling, geological radar detection, transient electromagnetic detection, seismic wave detection and geological sketching modules, through coordinated detection and data fusion, the geological conditions in front of the palm are achieved. Analysis and forecast.
It improves the accuracy and timeliness of geological forecasts, reduces forecast time, enhances the level of mechanization, and ensures construction safety.
Smart Images

Figure CN119065003A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of tunnel engineering, and in particular to an intelligent while-drilling geological prediction integrated platform system and a method thereof. Background Art
[0002] The statements in this section merely provide background information related to the present invention and do not necessarily constitute prior art.
[0003] The geological conditions in nature are extremely complex. During the tunnel construction process, adverse geological conditions such as faults, broken zones, and karst are often encountered. Engineering disasters such as water inrush, mud inrush, and collapse occur frequently, posing a considerable threat to the safety of tunnel construction and seriously affecting the construction efficiency of the tunnel. Therefore, it is very important to use advanced geological prediction technology to fully identify and predict the geological conditions in front of the tunnel, which can effectively avoid the occurrence of various geological disasters during the construction process, ensure the safety of construction personnel, and ensure the construction efficiency of the tunnel. At present, the advanced geological prediction in the tunnel still has the following problems:
[0004] 1. Advanced drilling is widely used due to its wide applicability and strong intuitiveness, but it has not been effectively combined with geophysical exploration, geological sketching and other methods, and is limited to a single forecasting method, which has the disadvantage of "one-sided view".
[0005] 2. At present, the comprehensive geological forecast in each tunnel generally still conducts advance drilling, geophysical exploration, and geological sketching separately, and analyzes the results separately, which has low forecast efficiency and excessively occupies the working time of the face. The coordinated detection of multiple forecasting methods and the comprehensive interpretation of forecasting results have not yet been realized.
[0006] 3. In the construction of water-rich tunnels, inclined shafts and other projects, conducting geological sketches of the face and collecting geophysical data often become very difficult due to the presence of a large amount of water in the area in front of the face, which greatly increases the risk of forecasting. Summary of the invention
[0007] In order to solve the above problems, the present invention proposes an intelligent while-drilling geological prediction integrated platform system and method, which improves the accuracy and timeliness of geological prediction by combining advance drilling with other multiple prediction methods for collaborative detection and comprehensive analysis of the prediction results.
[0008] To achieve the above object, the present invention adopts the following technical solution:
[0009] Firstly, an intelligent integrated platform system for geological prediction while drilling is proposed, including a carrying platform and a geological analysis system; the carrying platform is equipped with an advanced drilling module, a geophysical prediction module and a geological sketching module;
[0010] Advanced drilling module, used to obtain drilling data and in-hole images;
[0011] Geophysical exploration prediction module, used to obtain geophysical exploration data such as geological radar data, transient electromagnetic data and seismic wave data;
[0012] Geological sketch module, used to obtain tunnel face images;
[0013] The geological analysis system is used to determine the surrounding rock grade based on drilling data; determine the rock type and degree of fracture development in the hole based on the in-hole image; obtain detection images based on geological radar data, transient electromagnetic data and seismic wave data; and determine the rock type and fractures in the face based on the face image.
[0014] Furthermore, the geophysical prospecting prediction module includes a geological radar detection module, a transient electromagnetic detection module and a seismic wave detection module;
[0015] Geological radar detection module, used to obtain geological radar data of the tunnel face;
[0016] Transient electromagnetic detection module, used to obtain transient electromagnetic of the tunnel face;
[0017] Seismic wave detection module, used to obtain seismic wave data of the tunnel face;
[0018] The geological radar detection module and transient electromagnetic detection module are both arranged on the front side of the carrying platform; the seismic wave detection module is arranged on both sides of the carrying platform.
[0019] Furthermore, the advance drilling module is arranged on the front side of the carrying platform, and the advance drilling module includes a drill bit, a drill rod, an in-hole imaging device, a propulsion device and a drilling information acquisition module; the drill bit is connected to the drill rod, the in-hole imaging device and the drilling information acquisition module are both connected to the drill bit, the propulsion device is connected to the drill rod, the in-hole imaging device is used to obtain the in-hole image of the borehole; the drilling information acquisition module is used to obtain drilling data.
[0020] Furthermore, the drilling data includes drilling speed, rotation speed, thrust pressure and torque.
[0021] Furthermore, the advance drilling module and the geophysical prediction module are respectively connected to corresponding folding structures, and the folding structure can drive the advance drilling module or the geophysical prediction module to move toward and away from the tunnel face.
[0022] Furthermore, the geological analysis system is used to extract reflection coefficients from geological radar data, transient electromagnetic data and seismic wave data respectively; perform forward imaging on the three extracted reflection coefficients respectively, decompose each forward imaging into images of different scales, extract image features of each scale image, fuse the image features of all images of different scales, and obtain a detection image.
[0023] Furthermore, the carrying platform adopts a crawler-type mobile carrying platform.
[0024] Further, the geological sketch module includes an image acquisition device and an auxiliary lighting device;
[0025] An image acquisition device, used for acquiring a tunnel face image;
[0026] The auxiliary lighting device is used to provide lighting for the image acquisition device when acquiring images.
[0027] In the second aspect, a detection method of an intelligent while-drilling geological prediction integrated platform system proposed in the first aspect is proposed, including:
[0028] The advanced drilling module, geophysical prediction module and geological sketching module are driven by the carrying platform to move to the set position in the tunnel;
[0029] Acquire drilling data and in-hole images through the advanced drilling module;
[0030] Obtain geological radar data, transient electromagnetic data and seismic wave data through the geophysical prediction module;
[0031] Obtain tunnel face images through the geological sketch module;
[0032] The surrounding rock grade is determined based on the drilling data; the rock type and the degree of fracture development in the hole are determined based on the in-hole image; the detection image is obtained based on the geological radar data, transient electromagnetic data and seismic wave data; the rock type and fractures in the face are determined based on the face image.
[0033] Furthermore, reflection coefficients are extracted from geological radar data, transient electromagnetic data and seismic wave data respectively; forward imaging is performed on the three extracted reflection coefficients respectively, each forward imaging is decomposed into images of different scales, image features of each scale image are extracted, and image features of all images of different scales are fused to obtain the detection image.
[0034] Compared with the prior art, the present invention has the following beneficial effects:
[0035] 1. The present invention coordinates advance drilling, geological radar detection, transient electromagnetic detection, seismic wave detection, geological sketching and other methods to conduct comprehensive geological forecasting in front of the tunnel face, thereby reducing the time of occupying the tunnel face and improving the efficiency and timeliness of geological forecasting.
[0036] 2. The present invention fuses and images geophysical exploration data such as geological radar detection data, transient electromagnetic detection data, and seismic wave detection data, thereby improving the accuracy of geophysical exploration.
[0037] 3. The present invention solves the problem of difficulty in conducting face geological sketching and geophysical data collection in tunnel construction under complex geological conditions, realizes the integrated operation of geological forecasting, improves the level of mechanization, and ensures the life safety of technical personnel.
[0038] 4. The present invention connects the advance drilling module and the geophysical prediction module with a foldable structure. After reaching the tunnel face, the foldable structure is extended for detection, and is kept retracted before reaching the tunnel face, so as to reduce the volume of the integrated carrying platform system, avoid excessive space occupation, and ensure the space efficiency of operations in the tunnel.
[0039] 5. The advance drilling module of the present invention is arranged on the front side of the carrying platform, which is convenient for carrying out advance drilling work on the tunnel face; the geological radar detection module and the transient electromagnetic detection module are both arranged on the front side of the carrying platform, which is convenient for the geological radar and transient electromagnetic transmitting coil and receiving probe to be quickly deployed and close to the front tunnel face, moving at a certain speed, and comprehensively collecting the geological radar and transient electromagnetic data in front of the tunnel face; the seismic wave detection module is arranged on both sides of the carrying platform, which is convenient for drilling excitation holes and receiving holes on both sides of the tunnel, and obtaining seismic wave data at a certain excitation interval and frequency.
[0040] Advantages of additional aspects of the present invention will be given in part in the following description, and in part will become obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS
[0041] The drawings in the specification, which constitute a part of the present application, are used to provide further understanding of the present application. The illustrative embodiments of the present application and their descriptions are used to explain the present application and do not constitute improper limitations on the present application.
[0042] Figure 1 A framework diagram of the integrated platform system disclosed in the embodiment;
[0043] Figure 2 It is a framework diagram of the integrated forecasting system disclosed in the embodiment. DETAILED DESCRIPTION
[0044] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0045] It should be noted that the following detailed descriptions are illustrative and are intended to provide further explanation of the present application. Unless otherwise specified, all technical and scientific terms used herein have the same meanings as those commonly understood by those skilled in the art to which the present application belongs.
[0046] It should be noted that the terms used herein are only for describing specific embodiments and are not intended to limit the exemplary embodiments according to the present application. As used herein, unless the context clearly indicates otherwise, the singular form is also intended to include the plural form. In addition, it should be understood that when the terms "comprise" and / or "include" are used in this specification, it indicates the presence of features, steps, operations, devices, components and / or combinations thereof.
[0047] In the absence of conflict, the embodiments of the present invention and the features of the embodiments may be combined with each other.
[0048] Example 1
[0049] In this embodiment, an intelligent geological prediction while drilling integrated platform system is disclosed, including a carrying platform and a geological analysis system; an advance drilling module, a geophysical prediction module and a geological sketching module are arranged on the carrying platform;
[0050] Advanced drilling module, used to obtain drilling data and in-hole images;
[0051] Geophysical prospecting prediction module, used to obtain geological radar data, transient electromagnetic data and seismic wave data;
[0052] Geological sketch module, used to obtain tunnel face images;
[0053] The geological analysis system is used to determine the surrounding rock grade based on drilling data; determine the rock type and degree of fracture development in the hole based on the in-hole image; obtain detection images based on geological radar data, transient electromagnetic data and seismic wave data; and determine the rock type and fractures in the face based on the face image.
[0054] Combination Figure 1 , Figure 2 An intelligent while-drilling geological prediction integrated platform system disclosed in this embodiment is described in detail.
[0055] The embodiment discloses an intelligent integrated platform system for geological prediction while drilling, including a carrying platform, a prediction system, a control system, a geological information transmission system and a geological analysis system. The carrying platform is a crawler-type mobile carrying platform, which can drive the movement of various systems.
[0056] Specifically, the carrying platform includes a chassis platform, a crawler chassis, a power module and a hydraulic module. The chassis platform is connected to the crawler chassis, and the power module and the hydraulic module are fixed on the chassis platform. The chassis platform can also be equipped with a variety of systems and modules. The entire platform adopts a crawler chassis, which enables it to travel in the tunnel so as to reach the face to carry out work. Among them, the power module provides power supply for the carrying platform and various systems and modules to ensure the smooth progress of the work. The hydraulic module provides hydraulic power for the propulsion device in the advance drilling module to ensure efficient advance drilling.
[0057] The prediction system includes advance drilling module, geophysical prediction module and geological sketching module.
[0058] The advance drilling module is arranged at the front side of the carrying platform, and includes a drill bit, a drill rod, an in-hole imaging device, a propulsion device, and an information acquisition module while drilling; the drill bit is connected to the drill rod, the in-hole imaging device and the information acquisition module while drilling are both connected to the drill bit, the propulsion device is connected to the drill rod, the propulsion device is connected to the hydraulic module, and the hydraulic module provides hydraulic power to the propulsion device, the propulsion device can push the drill rod forward, and the advancement of the drill rod drives the drill bit forward, and the propulsion device provides drilling propulsion force for the drill bit and the drill rod, and the in-hole imaging device is used to obtain the in-hole image of the borehole; the information acquisition module while drilling is used to obtain drilling data. The advance drilling module also includes an information transmission module while drilling, and the information transmission module while drilling is communicatively connected with the information acquisition module while drilling and the in-hole imaging device.
[0059] In order to ensure that high-quality in-hole images can be obtained, the present embodiment provides a spraying device for the in-hole imaging device, which is used to spray water onto the in-hole imaging device. The in-hole imaging device performs real-time imaging of the in-hole scene during the advancement of the drill rod and the drill bit for subsequent intelligent image recognition. When the in-hole imaging device is affected by a lot of rock cuttings, the spraying device sprays water on it to ensure the cleanliness of the in-hole imaging device, thereby obtaining high-quality in-hole images.
[0060] Preferably, the in-hole imaging device adopts an in-hole camera.
[0061] The information acquisition module while drilling includes a variety of sensors that can acquire drilling data in real time, wherein the acquired drilling data includes drilling speed, rotation speed, propulsion pressure and torque, etc.
[0062] The geophysical exploration prediction module includes a geological radar detection module, a transient electromagnetic detection module and a seismic wave detection module; the geological radar detection module is used to obtain geological radar data of the tunnel face; the transient electromagnetic detection module is used to obtain transient electromagnetic of the tunnel face; the seismic wave detection module is used to obtain seismic wave data of the tunnel face; the geological radar detection module and the transient electromagnetic detection module are arranged on the front side of the carrying platform; the seismic wave detection module is arranged on both sides of the carrying platform. Under the control of the geophysical exploration control module, the above three detection modules cooperate to obtain geological radar data, transient electromagnetic data, and seismic wave data in real time, and transmit them to the geological analysis system for subsequent multi-source data fusion imaging.
[0063] The geological radar detection module, transient electromagnetic detection module and seismic wave detection module of the geophysical prediction module are all reasonably arranged according to the characteristics of each detection method. The advance drilling module is arranged at the front side of the carrying platform to facilitate the advance drilling of the tunnel face; the geological radar detection module and the transient electromagnetic detection module are both arranged at the front side of the carrying platform to facilitate the rapid deployment of the geological radar and transient electromagnetic transmitting coil and receiving probe close to the front tunnel face, moving at a certain rate, and comprehensively collecting the geological radar and transient electromagnetic data in front of the tunnel face; the seismic wave detection module is arranged on both sides of the carrying platform to facilitate the drilling of excitation holes and receiving holes on both sides of the tunnel, and to obtain seismic wave data at a certain excitation interval and frequency.
[0064] Since the space occupied by the advance drilling module and the geophysical prediction module is relatively large, the advance drilling module and the geophysical prediction module are respectively connected to the corresponding folding structure, and the folding structure can drive the advance drilling module or the geophysical prediction module to move toward and away from the tunnel face. After arriving at the tunnel face, the folding structure is extended to drive the advance drilling module and the geophysical prediction module to move toward the tunnel face. When they are in place, detection is carried out. When the detection is completed, the folding structure is retracted to drive the advance drilling module and the geophysical prediction module to move away from the tunnel face. In addition, the folding mechanism remains retracted before arriving at the tunnel face to reduce the volume of the integrated carrying platform system, avoid excessive space occupation, and ensure the space efficiency of operations in the tunnel.
[0065] The folding structure consists of a high-strength articulated frame and an automatic locking device. When the carrying platform moves to the working position, the hydraulic module controls the unfolding of the folding structure, and the automatic locking device locks each hinge point to ensure the stability of the overall structure. After completing the detection task, the folding structure is automatically retracted.
[0066] Preferably, the folding structure may adopt a mechanical arm, and the advance drilling module or the geophysical prospecting prediction module may be driven to move by extending and retracting the mechanical arm.
[0067] The geological sketch module includes an image acquisition device and an auxiliary lighting device; the image acquisition device is used to acquire the tunnel face image; the auxiliary lighting device is used to provide lighting for the image acquisition device when acquiring the image, so as to ensure that the image acquisition device can capture a clear tunnel face image.
[0068] Preferably, the image acquisition device adopts a high-definition camera.
[0069] The control system includes a platform movement control module, an advance drilling control module, a geophysical exploration control module and a geological sketch control module. The platform movement control module is connected to the carrying platform to control the movement of the carrying platform. The advance drilling control module is connected to the advance drilling module to control the advance drilling module to perform drilling and obtain drilling data and in-hole images during the drilling process; the geophysical exploration control module is connected to the geophysical exploration prediction module to control the geophysical exploration prediction module to perform geological radar detection, transient electromagnetic detection and seismic wave detection on the tunnel, thereby obtaining geological radar data, transient electromagnetic data and seismic wave data; the geological sketch control module is connected to the geological sketch module to control the geological sketch module to obtain the tunnel face image. The platform can be driven to a suitable position in front of the tunnel face by manually operating the platform movement control module, and the relevant data and images can be collaboratively acquired in combination with the advance drilling control module, the geophysical exploration control module and the geological sketch control module, so as to provide the geological analysis system with in-depth analysis of geological conditions.
[0070] Specifically, the advance drilling control module can adjust the corresponding drilling parameters based on the surrounding rock grade determined in real time by the geological analysis system, and control the advance drilling module to perform drilling according to the adjusted drilling parameters to prevent the drill from getting stuck due to changes in the rock properties of the strata.
[0071] The geophysical exploration control module is responsible for operating the geophysical exploration prediction module installed on the carrying platform, including manipulating the geological radar in the geological radar detection module to be close to the tunnel face and move on the tunnel face at a certain rate to transmit and receive electromagnetic waves, thereby collecting geological radar data; at the same time, controlling the transient electromagnetic transmitting coil and receiving probe in the transient electromagnetic detection module to be in close contact with the tunnel face and move on the tunnel face at a certain rate to obtain transient electromagnetic data; in addition, it also controls the excitation interval, frequency, energy and other parameters of the seismic wave source in the seismic wave detection module to obtain seismic wave data.
[0072] The geological sketch control module can control the opening and closing of the auxiliary lighting device to ensure that the tunnel face is fully illuminated, and ensure that the image acquisition device can capture clear tunnel face images to provide image data for subsequent geological sketching work.
[0073] The geological information transmission system includes a geological information integration module and a geological information transmission module. The geological information integration module is used to integrate data and images containing geological information such as drilling data, in-hole images, geological radar data, transient electromagnetic data, seismic wave data and face images. The geological information transmission module is used to send the data integrated by the geological information integration module to the geological analysis system.
[0074] The geological analysis system of this embodiment is used to determine the surrounding rock grade based on drilling data; determine the rock type and the degree of fracture development in the hole based on the in-hole image; obtain the detection image based on the geological radar data, transient electromagnetic data and seismic wave data; and determine the rock type and fracture in the face based on the face image.
[0075] Among them, the geological analysis system is used to extract reflection coefficients from geological radar data, transient electromagnetic data and seismic wave data respectively; perform forward imaging on the three extracted reflection coefficients respectively, decompose each forward imaging into images of different scales, extract the image features of each scale image, and fuse the image features of all images of different scales to obtain the detection image.
[0076] In specific implementation, the geological analysis system includes a geological information receiving module, a drilling information analysis module, a geophysical data analysis module and a geological sketch analysis module. The geological information receiving module is used to receive the integrated information of drilling data, in-hole images, geological radar data, transient electromagnetic data, seismic wave data and tunnel face images transmitted by the geological information transmission module, and send the drilling data and in-hole images to the drilling information analysis module, send the geological radar data, transient electromagnetic data and seismic wave data to the geophysical data analysis module, and send the tunnel face image to the geological sketch analysis module.
[0077] The drilling information analysis module is used to use a pre-trained surrounding rock condition prediction model to analyze the real-time collected drilling information such as drilling speed, rotation speed, thrust pressure, torque, etc. to determine the surrounding rock grade; it uses a trained borehole image recognition model to analyze the real-time acquired in-hole images to determine the rock type and the degree of fracture development.
[0078] Among them, the surrounding rock condition prediction model takes drilling data as input and surrounding rock grade as output, and is constructed by using a random forest model. The constructed surrounding rock condition prediction model is trained to obtain the trained surrounding rock condition prediction model. The specific process is: obtaining historical drilling data, marking the surrounding rock grade and fracture development degree corresponding to the historical drilling data, and using the marked historical drilling data to train the surrounding rock condition prediction model. After the training is completed, the trained surrounding rock condition prediction model is obtained.
[0079] In order to improve the performance of the surrounding rock condition prediction model and reduce the risk of overfitting, this embodiment preprocesses the acquired historical drilling data to obtain preprocessed historical drilling data. The preprocessing includes data cleaning and standardization, processing missing values or outliers, performing feature engineering operations such as feature selection, feature transformation, feature construction, and data dimension reduction, and annotating the surrounding rock grades corresponding to the preprocessed historical drilling data to obtain annotated historical drilling data.
[0080] The borehole image recognition model takes the borehole image as input and the rock type and fracture development degree as output, and is constructed using a convolutional neural network (CNN). The process of training the borehole image recognition model to obtain a trained borehole image recognition model includes: collecting historical borehole images containing different rock types and fracture development degrees, and performing preprocessing such as image enhancement, cropping, and normalization on the collected historical borehole images to obtain preprocessed borehole images, annotating the rock type and fracture development degree corresponding to the preprocessed borehole images, adjusting appropriate batch size, learning rate and other training parameters, and using the annotated historical borehole images to train, evaluate and cross-validate the borehole image recognition model to obtain a trained borehole image recognition model with high accuracy.
[0081] The geophysical data analysis module is used to extract reflection coefficients from geological radar data, transient electromagnetic data and seismic wave data respectively; resample and reconstruct the extracted reflection coefficients to maintain the consistency of multi-source data and improve data quality; forward image the resampled and reconstructed reflection coefficients respectively; use multi-scale decomposition technology to decompose the three forward images into images of different scales and extract the image features of each scale image; use adaptive fusion rules to retain the key information in each layer, fuse the image features of all images of different scales, and reconstruct the detection image through the inverse transformation process
[0082] The geological sketch analysis module is used to identify the tunnel face image using the trained tunnel face image recognition model to determine the rock type and cracks in the tunnel face.
[0083] Among them, the tunnel face image recognition model takes the tunnel face image as input and the rock type and cracks in the tunnel face as output. It is constructed using a convolutional neural network (CNN). The process of obtaining a trained tunnel face image recognition model includes: first, obtaining historical tunnel face images containing different rock types and different crack distributions, performing preprocessing work such as image enhancement, cropping and normalization on the historical tunnel face images, obtaining the preprocessed historical tunnel face images, annotating the rock type and crack position of the preprocessed historical tunnel face images, adjusting appropriate training parameters such as batch size and learning rate, and using the annotated historical tunnel face images to train, evaluate and cross-validate the tunnel face image recognition model to obtain a trained tunnel face image recognition model with high accuracy.
[0084] The application process of an intelligent while-drilling geological prediction integrated platform system disclosed in this embodiment includes:
[0085] A. Comprehensively collect historical drilling data, geological radar data, transient electromagnetic data, seismic wave data, in-hole images, face images, corresponding surrounding rock grades, fracture development levels, rock types and fractures, etc., and pre-process and annotate the collected data to obtain various training data.
[0086] B. Use the corresponding training data to train the surrounding rock condition prediction model, the borehole image recognition model and the tunnel face image recognition model to obtain the trained surrounding rock condition prediction model, the borehole image recognition model and the tunnel face image recognition model.
[0087] C. When an integrated geological prediction task is required, the control system is used to control the carrying platform to reach the area in front of the face to be predicted, and the position of the integrated carrying platform is adjusted so that the advance drilling module, geophysical prediction module and geological sketching module can operate normally.
[0088] D. After the carrying platform is adjusted to the set position, the advance drilling control module, geophysical exploration control module and geological sketching control module are used to control the corresponding advance drilling module, geophysical exploration prediction module and geological sketching module to enter the prediction working state.
[0089] E. The advance drilling module, geological radar detection module, transient electromagnetic detection module, seismic wave detection module and geological sketching module work together. The advance drilling module drills the tunnel face and obtains drilling data and in-hole images; the geological radar in the geological radar detection module is close to the tunnel face and moves on the tunnel face at a certain rate to transmit and receive electromagnetic waves and collect geological radar data; the transient electromagnetic transmitting coil and receiving probe in the transient electromagnetic detection module are in close contact with the tunnel face and move on the tunnel face at a certain rate to obtain transient electromagnetic data; the source in the seismic wave detection module will be excited according to a certain excitation interval, frequency and energy to obtain seismic wave data; the geological sketching module obtains high-definition images of the tunnel face and obtains tunnel face images.
[0090] F. The geological information transmission system integrates the drilling data, in-hole images, geological radar data, transient electromagnetic data, seismic wave data and tunnel face images containing geological information collected in step E, and transmits them to the geological analysis system.
[0091] G. The geological analysis system preprocesses the received drilling data, in-hole images, geological radar data, transient electromagnetic data, seismic wave data and tunnel face images, and uses the trained surrounding rock condition prediction model, in-hole image recognition model and tunnel face image recognition model to identify the drilling data, in-hole images and tunnel face images to determine the surrounding rock grade, rock type and degree of fracture development; extracts reflection coefficients from the geological radar data, transient electromagnetic data and seismic wave data respectively; performs forward modeling on the three extracted reflection coefficients respectively, decomposes each forward modeling image into images of different scales, extracts the image features of each scale image, and fuses the image features of all images of different scales to obtain the detection image.
[0092] H. Judge the surrounding rock grade, rock type, fracture development degree and detection image obtained by G to guide the subsequent tunnel construction. If a new geological prediction task is required, just repeat steps C to H.
[0093] The integrated platform system disclosed in this embodiment coordinates the advance drilling, geological radar detection, transient electromagnetic detection, seismic wave detection, geological sketching and other methods to conduct comprehensive geological forecast in front of the tunnel face, thereby reducing the time of occupying the tunnel face and improving the efficiency and timeliness of geological forecast; fusing and imaging geophysical exploration data such as geological radar detection data, transient electromagnetic detection data, seismic wave detection data, etc., thereby improving the accuracy of geophysical exploration; solving the problem of difficulty in conducting geological sketching and geophysical data collection of the tunnel face in tunnel construction under complex geological conditions, realizing the integrated operation of geological forecasting, improving the level of mechanization, and ensuring the life safety of technical personnel.
[0094] Example 2
[0095] In this embodiment, a detection method of an intelligent while-drilling geological prediction integrated platform system disclosed in Embodiment 1 is disclosed, including:
[0096] The advanced drilling module, geophysical prediction module and geological sketching module are driven by the carrying platform to move to the set position in the tunnel;
[0097] Acquire drilling data and in-hole images through the advanced drilling module;
[0098] Obtain geological radar data, transient electromagnetic data and seismic wave data through the geophysical prediction module;
[0099] Obtain tunnel face images through the geological sketch module;
[0100] The surrounding rock grade is determined based on the drilling data; the rock type and the degree of fracture development in the hole are determined based on the in-hole image; the detection image is obtained based on the geological radar data, transient electromagnetic data and seismic wave data; the rock type and fractures in the face are determined based on the face image.
[0101] Among them, reflection coefficients are extracted from geological radar data, transient electromagnetic data and seismic wave data respectively; forward imaging is performed on the three extracted reflection coefficients respectively, each forward imaging is decomposed into images of different scales, the image features of each scale image are extracted, and the image features of all images of different scales are fused to obtain the detection image.
[0102] Although the above describes the specific implementation mode of the present invention in conjunction with the accompanying drawings, it is not intended to limit the scope of protection of the present invention. Those skilled in the art should understand that various modifications or variations that can be made by those skilled in the art on the basis of the technical solution of the present invention without creative work are still within the scope of protection of the present invention.
Claims
1. An intelligent while-drilling geological prediction integrated platform system, characterized in that: It includes a carrying platform and a geological analysis system; the carrying platform is equipped with an advance drilling module, a geophysical prospecting prediction module and a geological sketching module; Advanced drilling module, used to obtain drilling data and in-hole images; Geophysical exploration prediction module, used to obtain geophysical exploration data such as geological radar data, transient electromagnetic data and seismic wave data; Geological sketch module, used to obtain tunnel face images; The geological analysis system is used to determine the surrounding rock grade based on drilling data; determine the rock type and degree of fracture development in the hole based on the in-hole image; obtain detection images based on geological radar data, transient electromagnetic data and seismic wave data; and determine the rock type and fractures in the face based on the face image.
2. The intelligent while-drilling geological prediction integrated platform system according to claim 1, characterized in that: The geophysical prospecting prediction module includes the geological radar detection module, the transient electromagnetic detection module and the seismic wave detection module; The geological radar detection module and transient electromagnetic detection module are both arranged on the front side of the carrying platform; the seismic wave detection module is arranged on both sides of the carrying platform.
3. The intelligent while-drilling geological prediction integrated platform system according to claim 2, characterized in that: The advance drilling module is arranged on the front side of the carrying platform, and the advance drilling module includes a drill bit, a drill rod, an in-hole imaging device, a propulsion device and an information acquisition module while drilling; the drill bit is connected to the drill rod, the in-hole imaging device and the information acquisition module while drilling are both connected to the drill bit, the propulsion device is connected to the drill rod, the in-hole imaging device is used to obtain the in-hole image of the borehole; the information acquisition module while drilling is used to obtain drilling data.
4. The intelligent geological prediction while drilling integrated platform system according to claim 1, characterized in that: The advance drilling module and the geophysical prediction module are respectively connected to corresponding folding structures, and the folding structure can drive the advance drilling module or the geophysical prediction module to move toward and away from the tunnel face.
5. The intelligent while-drilling geological prediction integrated platform system according to claim 1, characterized in that: Drilling data include penetration rate, rotation speed, thrust pressure and torque.
6. The intelligent geological prediction while drilling integrated platform system according to claim 1, characterized in that: The geological analysis system is used to extract reflection coefficients from geological radar data, transient electromagnetic data and seismic wave data respectively; perform forward imaging on the three extracted reflection coefficients respectively, decompose each forward imaging into images of different scales, extract image features of each scale image, fuse the image features of all images of different scales, and obtain the detection image.
7. The intelligent while-drilling geological prediction integrated platform system according to claim 1, characterized in that: The carrying platform adopts a crawler-type mobile carrying platform.
8. The intelligent while-drilling geological prediction integrated platform system according to claim 1, characterized in that: The geological sketch module includes an image acquisition device and an auxiliary lighting device; An image acquisition device, used for acquiring a tunnel face image; The auxiliary lighting device is used to provide lighting for the image acquisition device when acquiring images.
9. The detection method of the intelligent while-drilling geological prediction integrated platform system according to any one of claims 1 to 8, characterized in that: include: The advanced drilling module, geophysical prediction module and geological sketching module are driven by the carrying platform to move to the set position in the tunnel; Acquire drilling data and in-hole images through the advanced drilling module; Obtain geological radar data, transient electromagnetic data and seismic wave data through the geophysical prediction module; Obtain tunnel face images through the geological sketch module; The surrounding rock grade is determined based on the drilling data; the rock type and the degree of fracture development in the hole are determined based on the in-hole image; the detection image is obtained based on the geological radar data, transient electromagnetic data and seismic wave data; the rock type and fractures in the face are determined based on the face image.
10. The detection method of the intelligent while-drilling geological prediction integrated platform system according to claim 9, characterized in that: Reflection coefficients are extracted from geological radar data, transient electromagnetic data and seismic wave data respectively; forward imaging is performed on the three extracted reflection coefficients respectively, each forward imaging is decomposed into images of different scales, image features of each scale image are extracted, and image features of all images of different scales are fused to obtain the detection image.
Citation Information
Cited By
Tunnel advanced geology forecasting method based on analytic hierarchy process
CN119291803A
Intelligent geological detection while drilling system
CN119572206A
Geological forecasting method and device and detection equipment
CN120507804A
TSP and TEM fusion tunnel water judgment method based on random forest
CN120577892A
Advanced early warning system for TBM (tunnel boring machine) to cope with fault breakage and dense joints and stuck machine de-trapping tunneling method
CN121088469A