Compact conglomerate reservoir numerical simulation method based on time-varying miscible pressure

By dynamically adjusting the mixed phase pressure in dense conglomerate reservoirs, the inaccurate simulation results caused by changes in formation parameters are solved, the recovery rate and collection efficiency are improved, and high-precision reservoir development is achieved.

CN119067002APending Publication Date: 2024-12-03PETROCHINA CO LTD
View PDF 1 Cites 0 Cited by

Patent Information

Application Number
CN202310653606.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2023-06-02
Publication Date
2024-12-03

Smart Images

  • Figure CN119067002A_ABST
    Figure CN119067002A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of conglomerate oil reservoir development, in particular to a compact conglomerate reservoir numerical simulation method based on time-varying miscible pressure. Comprising the following steps that S1, interfacial tension between gas and in-situ crude oil is measured, and the minimum miscible pressure under the initial condition of an oil reservoir is determined; s2, performing a fitting experiment to obtain fluid parameters which are the same as the in-situ crude oil in property; s3, performing gas displacement, and exporting a fluid physical property parameter file at a certain moment; s4, loading the exported fluid physical property parameter file into the numerical simulation model of the target oil reservoir, calculating the minimum miscible pressure, and fitting the production condition; s5, when the oil well production characteristic changes suddenly increase or suddenly decrease, the relevant parameters of the node are measured again; s6, replacing the corresponding parameters in S2 and S3 with the relevant parameters measured in S5, and repeating the steps S2-S6 to obtain a final fitting production condition; according to the invention, a high-precision production fitting result can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of conglomerate oil reservoir development, and in particular to a numerical simulation method for tight conglomerate reservoirs based on time-varying miscible pressure. Background Art

[0002] The recovery rate of developed low-permeability reservoirs is low after one development, and conventional water injection is not applicable to low-permeability reservoirs. It is necessary to change the development method to improve the recovery rate. At present, vertical wells are all developed by depletion. In view of the problems that conventional water drive is not applicable, local degassing is serious, resulting in rapid decline of reservoirs and low final recovery rate, it is urgent to find suitable technologies to improve the recovery rate of low-permeability reservoirs. Gas drive / huff and puff and repeated fracturing are the main technical directions for improving the recovery rate of low-permeability and tight reservoirs.

[0003] Gas drive development of oil reservoirs involves minimum miscibility pressure and phase changes of fluids during the development process, and the crude oil components will partially change at different production stages. Therefore, calibrating different miscibility pressures and phase change parameters according to different production stages can provide a reference for the on-site implementation of gas injection technology and effectively guide the implementation of gas injection to enhance oil recovery.

[0004] Prior art CN106021778B discloses a method for determining the dynamic miscibility pressure of simulated CO2 displacement, comprising the following steps: (1) determination of the interfacial tension between CO2 and formation crude oil; (2) inputting the physical property parameters of the formation crude oil into the PVTi module of the Eclipse numerical simulation software, fitting the parameters of the fluid so that the fluid in the PVTi module has the same properties as the formation crude oil; simulating CO2 displacement in the PVTi module, and monitoring the oil-gas interfacial tension in the PVTi module when the pressure is the minimum miscibility pressure of the reservoir under the above-mentioned initial condition; when the oil-gas interfacial tension is zero, the fluid property data is derived; (3) the derived fluid property data is placed in the numerical simulation model of the target oil field for virtual development; by analyzing the change in the interfacial tension of each grid in the numerical simulation model, the miscibility pressure at this time is determined. However, the above method does not take into account that after a certain stage of development, the relevant parameters in the formation will change. At this time, if the relevant parameters in the initial formation are still used for simulation development, the production simulation results will be inaccurate.

[0005] Therefore, there is an urgent need to provide a numerical simulation method for tight conglomerate reservoirs based on time-varying miscible pressure to obtain high-precision production fitting results compared to the existing technology. Summary of the invention

[0006] In order to solve the above problems, the present invention provides a numerical simulation method for tight conglomerate reservoirs based on time-varying miscible pressure.

[0007] To achieve the above object, the technical solution of the present invention is as follows:

[0008] A method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure comprises the following steps:

[0009] S1. Determine the interfacial tension between gas and formation crude oil and determine the minimum miscible pressure under initial reservoir conditions;

[0010] S2. By fitting the physical property parameters of the formation crude oil, the fluid bubble point pressure, relative volume coefficient, viscosity, density, gas expansion experiment and minimum miscible pressure experiment are obtained to obtain the fluid parameters with the same properties as the formation crude oil;

[0011] S3, perform gas displacement, and when the pressure reaches the minimum miscible pressure determined in step S1 and the interfacial tension between the gas and the formation crude oil is zero, export the fluid physical property parameter file;

[0012] S4, loading the fluid physical property parameter file derived in S3 into the numerical simulation model of the target reservoir, calculating the minimum miscible pressure, and fitting the production situation;

[0013] S5. When the production characteristics of the oil well suddenly increase or decrease, re-measure the minimum miscible pressure, bubble point pressure, density and viscosity of the formation oil at that node;

[0014] S6. Replace the corresponding parameters in S2 with the bubble point pressure, density, and viscosity measured in S5, replace the minimum miscible pressure in S3 with the minimum miscible pressure value remeasured in S5, and repeat steps S2-S6 to obtain the final fitting production situation.

[0015] Furthermore, the physical property parameters described in S2 include the interfacial tension between the gas and the formation crude oil measured in S1, the C 7+ Molar mass, C in formation oil 1 +N 2 Molar mass, C in formation oil 2 -C 6 Molar mass.

[0016] Furthermore, the minimum miscibility pressure in step S4 is calculated by the following formula:

[0017]

[0018] In the above formula, MMP 气体 Indicates the minimum miscible pressure when injecting gas; T R Indicates the formation temperature; Indicates the C 7+ Molar mass; Indicates the C 1 +N 2 Molar mass; Indicates the C2 -C 6 Molar mass.

[0019] Furthermore, the bubble point pressure in step S5 is determined by the following method:

[0020] (1) First, roughly measure the bubble point pressure: start from the formation pressure and reduce the pressure by withdrawing the pump, and pay attention to the changes in the pressure gauge pointer. When the pressure gauge pointer decreases slowly or does not decrease or even rises, stop withdrawing the pump. The pressure value after the pressure gauge pointer stabilizes is the roughly measured bubble point pressure value;

[0021] (2) Measure the bubble point pressure in detail: increase the pressure to the formation pressure, and then reduce the pressure from the formation pressure, and then reduce the pressure at intervals. When the pressure drops to the roughly measured bubble point pressure value, reduce the pressure for the last time by a certain amount, and the pressure value after stabilization is the last measured bubble point pressure.

[0022] Furthermore, in S5 , the density of the node is remeasured by a densitometer, and the viscosity of the node is remeasured by a falling ball viscometer.

[0023] Furthermore, the specific method of step S1 is: keeping the formation temperature condition unchanged, measuring the interfacial tension between the gas and the formation crude oil under different pressure conditions, and obtaining a relationship curve between the interfacial tension between the gas and the formation crude oil and the pressure. According to the curve, the pressure corresponding to when the interfacial tension between the gas and the formation crude oil is zero is the minimum miscibility pressure under the initial conditions of the reservoir.

[0024] Furthermore, the interfacial tension between the gas and the formation crude oil was measured using the pendant drop method.

[0025] Compared with the prior art, the present invention has the following beneficial effects:

[0026] (1) During the oil reservoir exploitation process, the present invention finds nodes with large changes in production characteristics by observing changes in oil reservoir production characteristics, so that the parameters at this node can be corrected, so that the cumulative production of a single well when the time-varying miscible pressure is considered is about 3% higher than that when the time-varying miscible pressure is not considered, thereby obtaining a high-precision historical fitting result and effectively improving the gas drive miscible effect in actual exploitation. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is the PVT phase fitting diagram of the present invention.

[0028] Figure 2 It is a schematic diagram of the calculation results of the miscible pressure in different production stages of the present invention.

[0029] Figure 3 This is a flow chart of the mixed phase pressure test of the present invention.

[0030] Figure 4This is a comparison chart of the cumulative production of a single well when the present invention takes into account and does not take into account the time-varying miscible pressure.

[0031] Description of reference numerals:

[0032] 1. High-pressure displacement pump; 2. Formation crude oil storage container; 3. Injection gas storage container; 4. Capillary model; 5. High-pressure observation window;

[0033] 6. Back pressure regulator; 7. Valve; 8. Separation bottle; 9. Gas meter. DETAILED DESCRIPTION

[0034] The technical solution of the present invention will be clearly described below in conjunction with the accompanying drawings. Obviously, the described embodiments are not all embodiments of the present invention, and all other embodiments obtained by ordinary technicians in the field without making creative work are within the protection scope of the present invention.

[0035] The present invention provides a method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure, comprising the following steps:

[0036] S1. Keeping the formation temperature unchanged, the interfacial tension between the gas and the formation crude oil is measured by the hanging drop method under different pressure conditions to obtain the relationship curve between the interfacial tension between the gas and the formation crude oil and the pressure. According to the curve, the pressure corresponding to zero interfacial tension is the minimum miscible pressure under the initial conditions of the reservoir.

[0037] The hanging drop method can be carried out using the hanging drop method commonly used in the prior art.

[0038] S2. Input the physical property parameters of the formation crude oil into the PVTSIM software, fit the fluid bubble point pressure, relative volume coefficient, viscosity, density, gas expansion experiment and minimum miscible pressure experiment, and form a PVT phase state fitting diagram (such as Figure 1 As shown in the figure, the fitted fluid parameters are the same as the properties of the formation crude oil.

[0039] The physical property parameters include the interfacial tension between the gas and the formation crude oil measured in S1, the C 7+ (Saturated alkanes and unsaturated alkanes with carbon number 7) molar mass (g / mol); C 1 +N 2 (methane + nitrogen) molar mass (g / mol); C 2 -C 6 (Composition of ethane, propane, butane, pentane and toluene) Molar mass (g / mol).

[0040] S3. In the PVTSIM software, the PVTI module simulates gas displacement. When the pressure reaches the minimum miscible pressure determined in step S1, the oil-gas interfacial tension in the PVTI module is observed. When the interfacial tension is zero, the fluid physical property parameter file at this time is exported.

[0041] S4. Load the fluid property parameter file derived in S3 into the numerical simulation model of the target reservoir to fit the production situation. Specifically, the miscible pressure is calculated in the numerical simulation model using the following formula. The miscible pressure calculation results at different production stages are as follows: Figure 2 As shown:

[0042]

[0043] In the above formula, MMP 气体 Indicates the minimum miscible pressure when injecting gas; T R Indicates the formation temperature; Indicates the C 7+ Molar mass (g / mol), C 7+ It represents saturated alkanes and unsaturated alkanes with carbon number 7 in formation oil; Indicates the C 1 +N 2 Molar mass (g / mol); Indicates the C 2 -C 6 Molar mass (g / mol).

[0044] S5. When the oil well production reaches a certain stage, the gas-oil ratio, saturation, and crude oil components will change. At the nodes where the production characteristics change greatly, such as the nodes where the production increases or decreases suddenly, physical simulation is used again to determine the minimum miscible pressure, bubble point pressure, density, viscosity and other parameters of the reservoir at that production moment;

[0045] (a) If Figure 3 As shown in Figure 1, the minimum miscible pressure determination process includes the following steps:

[0046] (1) Inject saturated oil into the capillary model 4

[0047] a) After the capillary model 4 is cleaned, nitrogen or aviation oil is injected to keep the temperature and pressure inside the capillary model 4 constant to the experimental temperature and pressure.

[0048] b) The formation crude oil sample is placed in the formation crude oil storage container 2 at a constant temperature at the experimental temperature for more than 4 hours, and the crude oil sample is pressurized to a pressure higher than the experimental pressure by the high-pressure displacement pump 1, and is fully stirred to form a single phase.

[0049] c) Under the experimental pressure and experimental temperature, slowly open the outlet valve 7 of the formation crude oil storage container 2 and the inlet valve 7 of the capillary model 4, and use the formation crude oil sample to displace the nitrogen or aviation kerosene in the capillary model 4 at a displacement speed of 60 cm 3 / h-90cm 3 / h.

[0050] d) After displacing 2 times of the pore volume, the volume of oil and gas produced is measured at the outlet of the capillary model 4 through the separation bottle 8 and the gas meter 9 every 0.1 to 0.2 times of the pore volume (performed in accordance with the requirements of GB / T26981), and oil and gas samples are taken for analysis of their composition. If the component composition and gas-oil ratio of the produced sample are consistent with those of the formation crude oil sample, the displacement is stopped, and the capillary model 4 is now filled with oil and gas.

[0051] (2) After the crude oil is injected into the capillary model 4, gas displacement is performed within 2 hours to prevent oil-gas separation of the crude oil in the capillary model 4.

[0052] a) The temperature of the injection gas sample in the injection gas storage container 3 is kept constant at the experimental temperature. The injection gas is preferably carbon dioxide.

[0053] b) Fill and flush the pipeline to the inlet valve 7 of the capillary model 4 with injection gas, adjust the injection gas pressure to 0.05MPa to 0.1MPa higher than the experimental pressure, and record the initial reading of the high-pressure displacement pump 1 at this pressure.

[0054] c) At the experimental temperature and pressure, the injection rate is constant, and the formation crude oil sample in the capillary model 4 is displaced by the injected gas. The displacement rate is generally set to 6 cm 3 / h-15cm 3 / h.

[0055] d) During the gas displacement process, the displacement pressure difference between the injection pressure of the capillary model 4 and the experimental pressure set by the back pressure regulator 6 should be less than 0.5 MPa. If the displacement pressure difference is too high, the injection speed should be reduced.

[0056] e) During the gas displacement process, measure the volume of produced oil (measure oil by weighing method) and gas every time 0.1 to 0.15 times of the pore volume is injected, record the reading of the high-pressure displacement pump 1, the injection pressure and the back pressure, and determine the component composition and properties of the produced oil and gas, and observe the phase state and color changes of the fluid in the high-pressure observation window 5. After the gas breakthrough, try to increase the data collection density.

[0057] f) When the injection of the slim tube model 4 exceeds 1.20 times of the pore volume or no longer produces oil, the displacement is stopped.

[0058] (3) Determine the minimum miscibility pressure

[0059] a) First, the experiment is carried out under the original formation pressure. According to the miscibility and degree of miscibility, the displacement test pressure is determined by the method of successive approximation to the minimum miscibility pressure.

[0060] b) At least three test pressure points should be set in the miscible section and the immiscible section respectively.

[0061] c) The relationship between the oil displacement efficiency and displacement pressure when 1.20 times the pore volume is injected into the miscible section and the immiscible section of the capillary model 4 is plotted respectively. The pressure corresponding to the intersection of the immiscible section and the miscible section curves is the minimum miscible pressure.

[0062] (II) Determination of bubble point pressure:

[0063] (1) First, roughly measure the bubble point pressure: start from the formation pressure and reduce the pressure by withdrawing the pump (at a constant speed) and pay attention to the changes in the pressure gauge pointer. When the pressure gauge pointer decreases slowly or does not decrease or even rises again, stop withdrawing the pump. The pressure value after the pressure gauge pointer stabilizes is the roughly measured bubble point pressure value.

[0064] (2) Measure the bubble point pressure again:

[0065] a) Increase the pressure to the formation pressure, allow the precipitated gas to completely dissolve in the oil, and then reduce the pressure from the formation pressure. Record the volume after the pressure stabilizes every time the pressure is reduced by a certain amount (e.g. 1.0 MP);

[0066] b) When the pressure drops below the roughly measured bubble point pressure, record the pressure value after the first stabilization every time a certain volume is reduced (such as 3 ml). This pressure value is the last measured bubble point pressure.

[0067] (III) Density measurement:

[0068] (1) Keep the density cylinder and thermometer used for measurement at approximately the same temperature as the sample being tested.

[0069] (2) Carefully pour the uniform sample into a clean density measuring cylinder along the wall of the density measuring cylinder, preventing splashing and avoiding the formation of bubbles.

[0070] (3) Place the density measuring cylinder containing the sample vertically in a place without large air flow, and ensure that the temperature of the sample does not change significantly during the time required to complete the measurement to avoid excessive temperature changes.

[0071] (4) Insert the thermometer into the sample and stir the sample carefully, making sure the mercury wire of the thermometer remains fully immersed. Then gently place the petroleum density meter into the sample.

[0072] (5) After the densitometer is still, press the densitometer into the sample about two scale marks and then release it.

[0073] (6) When the densitometer is stationary and floating freely away from the density measuring cylinder, read the densitometer reading as the final required density value.

[0074] (IV) Viscosity measurement:

[0075] (1) Pour the formation oil sample into the standard tube of the falling ball viscometer and keep the temperature at the formation temperature using a constant temperature water bath method;

[0076] (2) Turn the falling ball viscometer upward so that the steel ball is attracted to the upper magnet;

[0077] (3) Turn the falling ball viscometer so that the upper part faces upward and an inclination angle is fixed. Turn on the switch, and the steel ball starts to fall. At the same time, the timing starts. When the steel ball falls to the bottom, the timing stops automatically. Record the falling time t of the steel ball. Repeat the test for more than 3 times until the measured time is basically the same. The viscosity value displayed by the falling ball viscometer corresponding to the falling time is the viscosity value to be measured.

[0078] S6. Re-input the physical properties of the formation oil at the node time when the production characteristics change significantly into the PVTSIM software, update the bubble point pressure, density and viscosity in S2 according to the ones measured in step S5, update the minimum miscible pressure in S3 according to the miscible pressure measured in S5, repeat steps S2-S5 to obtain high-precision historical fitting results.

[0079] according to Figure 4 It can be seen that the cumulative production of a single well when the time-varying miscible pressure is considered is about 3% higher than that when the time-varying miscible pressure is not considered. Therefore, in the process of reservoir exploitation, by observing the changes in reservoir production characteristics, we can find the nodes with large changes in production characteristics, so that we can correct the parameters at this node to obtain high-precision history fitting results, effectively improving the miscible effect of gas drive in actual exploitation.

[0080] The above specific implementation methods are only used to illustrate the technical solution of the present invention rather than to limit it. Although the present invention has been described in detail with reference to examples, a person skilled in the art should understand that the technical solution of the present invention can be modified or replaced by equivalents without departing from the scope of the technical solution of the present invention, which should be included in the scope of the claims of the present invention.

Claims

1. A numerical simulation method for tight conglomerate reservoirs based on time-varying miscible pressure, characterized in that: The following steps are involved: S1. Determine the interfacial tension between gas and formation crude oil and determine the minimum miscible pressure under initial reservoir conditions; S2. By fitting the physical property parameters of the formation crude oil, the fluid bubble point pressure, relative volume coefficient, viscosity, density, gas expansion experiment and minimum miscible pressure experiment are obtained to obtain the fluid parameters with the same properties as the formation crude oil; S3, performing gas displacement, when the pressure reaches the minimum miscible pressure determined in step S1, and at the same time, the interfacial tension between the gas and the formation crude oil is zero, exporting the fluid physical property parameter file; S4, loading the fluid physical property parameter file derived in S3 into the numerical simulation model of the target reservoir, calculating the minimum miscible pressure, and fitting the production situation; S5. When the production characteristics of the oil well suddenly increase or decrease, re-measure the minimum miscible pressure, bubble point pressure, density and viscosity of the formation oil at that node; S6. Replace the corresponding parameters in S2 with the bubble point pressure, density, and viscosity measured in S5, replace the minimum miscible pressure in S3 with the minimum miscible pressure value remeasured in S5, and repeat steps S2-S6 to obtain the final fitting production situation.

2. The method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 1, characterized in that: The physical property parameters described in S2 include the interfacial tension between the gas and the formation crude oil measured in S1, the C 7+ Molar mass, C1+N2 molar mass in formation oil, C2-C6 molar mass in formation oil.

3. The method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 2, characterized in that: The minimum miscibility pressure in step S4 is calculated by the following formula: In the above formula, MMP 气体 Indicates the minimum miscible pressure when injecting gas; T R Indicates the formation temperature; Indicates the C 7+ Molar mass; It represents the molar mass of C1+N2 in the formation oil; Indicates the molar mass of C2-C6 in formation oil.

4. The method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 1, characterized in that: The bubble point pressure in step S5 is determined by the following method: (1) First, roughly measure the bubble point pressure: start from the formation pressure and reduce the pressure by withdrawing the pump, and pay attention to the changes in the pressure gauge pointer. When the pressure gauge pointer decreases slowly or does not decrease or even rises, stop withdrawing the pump. The pressure value after the pressure gauge pointer stabilizes is the roughly measured bubble point pressure value; (2) Measure the bubble point pressure in detail: increase the pressure to the formation pressure, and then reduce the pressure from the formation pressure, and then reduce the pressure at intervals. When the pressure drops to the roughly measured bubble point pressure value, reduce the pressure for the last time by a certain amount, and the pressure value after stabilization is the last measured bubble point pressure.

5. The method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 1, characterized in that: In S5, the density of the node is re-measured by a densitometer, and the viscosity of the node is re-measured by a falling ball viscometer.

6. The method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 1, characterized in that: The specific method of step S1 is: keeping the formation temperature condition unchanged, under different pressure conditions, measuring the interfacial tension between the gas and the formation crude oil, and obtaining a relationship curve between the interfacial tension between the gas and the formation crude oil and the pressure. According to the curve, when the interfacial tension between the gas and the formation crude oil is zero, the corresponding pressure is the minimum miscible pressure under the initial conditions of the reservoir.

7. A method for numerical simulation of tight conglomerate reservoirs based on time-varying miscible pressure according to claim 6, characterized in that: The interfacial tension between gas and formation crude oil was measured using the pendant drop method.

Citation Information

Patent Citations

  • A method for determining dynamic miscibility pressure in simulated CO2 displacement

    CN106021778B